1 minute read

Pop Denison Park playground progress

Stage 2 works are now underway and will include larger and more challenging equipment and features to cater for a wider range of ages and abilities.

The senior kids playground will feature:

  • Double 25-metre-long flying fox

  • 3 tower treehouse structure with raised walkways and slide

  • Pendulum basket swing

  • Inclusive all-access carousel

  • Sphere climber and tunnel climbing feature

  • Additional BBQs, picnic shelters and nature play.

The second stage of the playground construction is expected to be completed by December 2023 (weather and site conditions permitting).

View the Pop Denison Park Master Plan at ballina.nsw.gov.au/popdenison-park

Proudly funded by Ballina Shire Council and NSW Government.

This article is from: