BAN ZOC ARCHITECTURAL PORTFOLIO
clare banzon | banzoc designs
CLARE BANZON MOBILE: 0430 034 419 EMAIL: banzoc18@gmail.com LINKEDIN: https://www.linkedin.com/in/clare-banzon-bbb1a6200/ Clare Banzon is an undergraduate student of the Bachelor of Architecture and Environments degree at The University of Sydney. By this time, the skills curated from her time at university has shown a high level and quality driven output that is recognised by both her peers and tutors. Clare exemplifies a broad way of thinking that is reflected in her creative approach to work, of which she plans to further demonstrate through her employment opportunities. Her exposure to the urban design realm in particular, is also shaped by her interest in creating more accessible and responsive spaces through collaborative effort. This was developed in her engagement with PTW Architects in an interdisciplinary project where she was able to develop her collaboration skills even further by learning how to listen and adapt her way of thinking according to the team members in order to best cater towards a better output.
achievements
Dean’s List of Excellence for Academic Performance (2020 AND 2019)
Awarded to students in the top 15% of their course each year who have also have completed an annual workload of at least 1.0 EFTSL (48 credit points) with a full-time enrolment loading recorded each semester; and who have achieved an AAM of 85 or greater when calculated after the end of year exams.
Make Sense Architectural Catalogue (2020)
Praised to students who demonstrate extensive design skills ranging from urban analysis and masterplan proposals to conceptual or environmentally conscious architectural designs. Those within the catalogue were recognised as a part of the top twenty projects in the graduating cohort.
Nomination for Shape Exhibition (2017)
Awarded to students who, in association with the Powerhouse Museum, demonstrate exemplary 2017 HSC major design project from subjects including Design and Technology, Industrial Technology and Textiles and Design, alongside a final HSC mark of 90 or greater when calculated after the end of year exams.
Design and Technology Academic Achievement Award (2016 - 2012)
Awarded to students who rank first in the designated subject across the entire cohort, and as such has maintained grades within the top 10% of the class and exemplified projects showcasing creative design skills, building knowledge and innovative problem solving.
PG 4
PG 10
1.0 AUDREY WILKINSON WINERY
2.0 LEPPINGTON LANDSCAPE
Designed for the landscape in the Hunter Valley regions, this winery celebrates the materiality of concrete and timber whilst creating a unique scenic experience for the users.
Urban masterplan proposal for a better future of the existing and anticipating residents of Leppington, addressing the lack of consideration towards past and present stories of country and suburb.
PG 15
PG 19
PG 24
PG 28
3.0 ST PETERS TERRACE
4.0 WILKINSON WORKSPACE
5.0 UNIVERSITY FACILITY
6.0 MODEL MAKING
Terrace renovation informed by council regulations and drawing standards, underpinning the significance of housing heritage and the program possibilities within restricted sites.
Motivated by the intention to improve the indoor environmental quality of the office, this workspace design contributes to the productivity of the employees and overall well being.
University facility that accomodates students with a flexible design that enables those who require temporary stay a bedroom alongside a space to relax and help their mental state.
Collage of physical models that were produced to aid the interpretation and understanding of designs, concepts and construction techniques throughout the feedback process.
1.0 AUDREY WILKINSON WINERY This winery was completed as a collaborative project with colleague Carla Alkhouri, located in the Hunter Valley region and replaces the existing Audrey Wilkinson Winery, offering hilltop views of the surrounding vineyards and open landscape. It encourages visitor engagement through the inclusion of courtyards that provide an additional incentive for people to stay and visually enjoy the vineyard landscape. The structural system reflects a celebration of concrete being a load bearing element where the usage extends right from the slab, to the walls and to the roof system.
8
12 1
13
5
10
4
6
11 2
9
3 7
MOSAIC TILE
BROKEN MOSAIC TILE
BUILDING MODULES
FRAMED COURTYARDS
A single rectangular tile that gives the impression of the chosen site being that there is an existing building.
Broken into several pieces that reflect the division of building modules connected through integrated courtyards.
Building modules that would be rearranged and labelled to better suit the wine journey and given site contours.
Spaces between the building modules are to be courtyards or circulation areas that will further engage user experience.
NORTH ELEVATION
9
8
10
7
3 2
5
12
13 C B
H
E
D
4
D
F
G
C
A
1
BUILDING ARRANGEMENT
PROGRAM DISTRIBUTION
Building modules rearranged to better reflect the necessary spaces according to the wine journey.
Program distribution of building modules according to the wine journey and the consideration of circulatory experiences.
EAST ELEVATION
E
D
14
11
6
E
D
GENERAL FLOOR PLAN A. Delivery Office B. Lab C. Grape Drying Hall D. Fermentation Hall E. Maturation Hall F. Bottling Space G. Bottle Aging Storage H. Diner
FRAMED COURTYARDS Three courtyard areas that are framed by the outcome of the building re arrangement, of which are open to user experience
VEHICULAR CIRCULATION
EMPLOYEE CIRCULATION
VISITOR CIRCULATION
Secondary roads specifically are catered for delivery truck access to the necessary building module.
Employees have access to the entire interior spaces of the winery through the highlighted doors, ramps and platform lifts.
Visitor circulation is directly linked from the carpark that extends to the highlighted areas that enables a better appreciation of the wine.
WEST ELEVATION
PROGRAM DISTRIBUTION
MODULE CONNECTIONS
WINE JOURNEY
Program distribution of building modules according to the wine journey and the consideration of user circulatory experiences.
Building modules are connected via small “tunnel” like corridors that provide a seamless flow for the wine journey.
The wine moves from left to right, beginning with the delivery of the grapes to the production and then distribution to the public.
WEST SECTION
Winery Floor Plans Scale 1:250 @ A3
SECTION A
2 A-15
1 A-14
3 A-16
4 A-17
SECTION B
1
2 3 4
1. 32 mm VERTICAL TIMBER BATTEN 2. 35 mm HORIZONTAL TIMBER STUDS 3. VAPOUR BARRIER 4. 20 mm SHEATHING BOARD 5. 80 mm THERMAL INSULATION 6. 20 mm SHEATHING BOARD 1. 32 mm VERTICAL TIMBER BATTEN 7.2.EPDM SEAL TIMBER STUDS 35 mm HORIZONTAL VAPOUR 8.3.20 mmBARRIER BACK VENTILATION 4. 20 mm SHEATHING BOARD 9.5.150 PRECAST CONCRETE 80 mmmm THERMAL INSULATION 6. 20 mm SHEATHING BOARD 10. 300 mm PRECAST 7. EPDM SEAL CONCRETE WITH STEEL 8. 20 mm BACK SLAB VENTILATION 9. 150 mm PRECAST CONCRETE REINFORCEMENT 10. 300 mm PRECAST CONCRETE SLAB WITH 11. 300 mm CONCRETE FOOTING STEEL REINFORCEMENT 11. 300STEEL mm CONCRETE FOOTING WITH STEEL WITH REINFORCEMENT REINFORCEMENT
Detail Drawing One Scale 1:20 @ A3
5 6 7 8
9
10
11
1
1. 32 mm TIMBER CLADDING 2. 70 mm TIMBER STUD 3. VAPOUR BARRIER 4. 20 mm SHEATHING BOARD 5. 200 mm THERMAL INSULATION 6. ROOF MEMBRANE 7. 100 mm - 150 mm PRECAST CONCRETE 8. 150 mm WIDE CONCRETE JOIST SYSTEM 1. 32 mm TIMBER CLADDING 9.70ROOF FLASHING 2. mm TIMBER STUD 3. VAPOUR 10. 32 BARRIER mm VERTICAL TIMBER 4. 20 mm SHEATHING BOARD BATTEN 5. 200 mm THERMAL INSULATION 6. ROOF 11. 35MEMBRANE mm HORIZONTAL TIMBER 7. 100 mm - 150 mm PRECAST CONCRETE STUDS 8. 150 mm WIDE CONCRETE JOIST SYSTEM 12. VAPOUR 9. ROOF FLASHING BARRIER 10. mm VERTICAL TIMBER BATTENBOARD 13.32 20 mm SHEATHING 11. 35 mm HORIZONTAL TIMBER STUDS 14.VAPOUR 80 mm THERMAL INSULATION 12. BARRIER 13. mm SHEATHING BOARD 15.20 20 mm SHEATHING BOARD 14. 80 mm THERMAL INSULATION 16.20 EPDM SEALBOARD 15. mm SHEATHING 16. 17.EPDM 20SEAL mm BACK VENTILATION 17. 20 mm BACK VENTILATION 18.WINDOW 18. WINDOW LINTEL LINTEL FLASHING FLASHING 19. GLAZEDGLAZED WINDOW 19.DOUBLE DOUBLE WINDOW
Detail Drawing Two Scale 1:20 @ A3
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19
banzoc designs | audrey wilkinson winery
15
1. 150 mm WIDE CONCRETE JOIST SYSTEM 2. 100 mm - 150 mm PRECAST CONRETE 3. ROOF MEMBRANE 4. 200 mm THERMAL INSULATION 5. 20 mm SHEATHING BOARD 6. VAPOUR BARRIER 7. 70 mm TIMBER STUD 8. 32 mm TIMBER CLADDING 1. 150 mm WIDE CONCRETE JOIST SYSTEM 9. ROOF 2. 100 mm - FLASHING 150 mm PRECAST CONCRETE 3. ROOF 10. 32 MEMBRANE mm VERTICAL TIMBER 4. 200 mm THERMAL INSULATION BATTEN 5. 20 mm SHEATHING BOARD 6. VAPOUR BARRIER 11. 35 mm HORIZONTAL TIMBER 7. 70 mm TIMBER STUD STUDS 8. 32 mm TIMBER CLADDING 9. ROOF FLASHING BARRIER 12. VAPOUR 10. 32 mm VERTICAL TIMBER BATTEN 13. 20 SHEATHING BOARD 11. 35 mmmm HORIZONTAL TIMBER STUDS 12. VAPOUR BARRIER 14. 80 mm THERMAL INSULATION 13. 20 mm SHEATHING BOARD 15. 20 mm SHEATHING BOARD 14. 80 mm THERMAL INSULATION 16. EPDM SEAL BOARD 15. 20 mm SHEATHING 16. EPDM SEAL 17. 20 mm BACK VENTILATION 17. 20 mm BACK VENTILATION 18. FIXED SKYLIGHT 18. FIXED SKYLIGHT WINDOW WINDOW
Detail Drawing Three Scale 1:20 @ A3
1
2
3
4
5
6
7
8 9 10 11 12 13 14 15 16 17
18
1
1. 32 mm TIMBER CLADDING 2. 70 mm TIMBER STUD 3. VAPOUR BARRIER 4. 20 mm SHEATHING BOARD 5. 200 mm THERMAL INSULATION 6. ROOF MEMBRANE 7. 100 mm - 150 mm PRECAST CONCRETE 8. 150 mm WIDE CONCRETE JOIST 1. 32 mmSYSTEM TIMBER CLADDING 2. 70 mm TIMBER STUD 9. ROOF FLASHING 3. VAPOUR BARRIER 10. mm VERTICAL TIMBER 4. 20 32 mm SHEATHING BOARD 5. 200 mm THERMAL INSULATION BATTEN 6. ROOF MEMBRANE 11. TIMBER 7. 10035 mmmm - 150 HORIZONTAL mm PRECAST CONCRETE 8. 150 mm WIDE CONCRETE JOIST SYSTEM STUDS 9. ROOF FLASHING 12. BARRIER 10. 32VAPOUR mm VERTICAL TIMBER BATTEN 11. 3520 mmmm HORIZONTAL TIMBER STUDS 13. SHEATHING BOARD 12. VAPOUR BARRIER 14. THERMAL 13. 2080 mmmm SHEATHING BOARD INSULATION 14. 8020 mmmm THERMAL INSULATION BOARD 15. SHEATHING 15. 20 mm SHEATHING BOARD 16. EPDM SEAL 16. EPDM SEAL 17. 2020 mmmm BACK BACK VENTILATION 17. VENTILATION
Detail Drawing Four Scale 1:20 @ A3
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17
banzoc designs | audrey wilkinson winery
17
2.0 LEPPINGTON LANDSCAPE ‘Leppington Landscape’ is a masterplan project stemmed from the intention to re-ignite the existing or latent oral history stories that could otherwise be lost as a part of justification behind mass neoliberal infrastructure projects. It aims to achieve this through re-distributing development to encourage active movement in a manner that respects the significant Aboriginal sites along the creeks (including the re-introduction of Aboriginal agriculture and opportunities for ceremony) and that allows the existing agricultural landscapes to be retained for the use and appreciation of all.
SITE MAP
LAND USE MAP Leppington Station
Buildings Bodies of Water Creeks Site Boundary Roads Lot Boundaries
Figure A Evidence of modern residential upgrade with granny flat
F
Train Line
Figure B Leppington Community Progress Hall
Figure C Commercial land use that is more industrial and specific
SITE MAP
LAND USE MAP
The landscape of Leppington can be described as a quiet farmland escape from the city as a result of the vast open spaces and agricultural land use.
Leppington is dominated by a residential land use with the respective acres of land that accommodates the agricultural nature and land use of the suburb.
Residential Land Use
Commercial Land Use Community Land Use Bodies of Water Creeks
Site Boundary
E
Roads
Lot Boundaries Train Line
B
C
A
D
Figure 3.0 Site Map Scale 1:15,000
0
15
75
Figure 4.0 Land Use Map Scale 1:15,000
150
STREET HIERARCHY MAP
ABORIGINAL ARCHEOLOGY MAP Leppington Station
Building High Sensitivity Moderate Sensitivity Bodies of Water Creeks
Figure A New wide multi-laned primary roads with constant car presence
Figure B Secondary road that transitions from gravel to asphalt material approaching the primary road
Site Boundary
Figure C Tertiary road that is purely gravel with no solid line markings
Roads Lot Boundaries Train Line
STREET HIERARCHY MAP
ABORIGINAL ARCHAEOLOGY MAP
Building
Bodies of Water Creeks Primary
The street hierarchy of Leppington is significantly determined by the main that provide the most direct routes across and along the suburb edge. Secondary
B
Tertiary
A
Site Boundary
Aboriginal sites along natural hyrdological landscape, owned by private agricultural land use with minimal reconciliation of country.
Roads
Lot Boundaries Train Line
Figure 4.2 Street Hierarchy Map Scale 1:15,000
C
0
15
75
150
Figure 4.3 Aboriginal Archeology Map Scale 1:15,000
LANDSCAPE (HYDROLOGICAL) MAP Leppington Station
EE K
Figure C Subtle extension flow from creeks passing the suburb
CR
Figure B Reflective blue lake/pond seems to be maintained
M PS
Figure A Brown lake/pond as a result of the surrounding soil
B
KEMPS
CREEK
Leppington Station
KE
HYDROLOGICAL MAP Building
Main Creeks
Bodies of Water
The hydrological landscape in Leppington is greatly determined by creeks that go through and extensively flow outwards into other parts of the suburb. Extension Flow From Creeks Site Boundary
RILEYS CREE K
Roads
Lot Boundaries Train Line
A
C
B
A
C
0
15
75
Figure 4.1 Landscape (Hydrological) Map Scale 1:15,000
150
0
15
75
150
INFRASTRUCTURE DEVELOPMENT MAP Leppington Station
Leppington Station
Indicative School Location Community Centre Retail/Commercial Area Retail Core Mixed Use Civic Precinct Light Industrial Medium Density Residential Low Density Residential
INFRASTRUCTURE DEVELOPMENT MAP Environmental Living Open Space Drainage
Environmental Conservation Site Boundary Train Line
Dominance of residential development has caused a significant loss of green space and Aboriginal reconciliation of country.
0
15
75
150
Figure 4.4 Infrastructure Development Map Scale 1:15,000
0
15
75
banzoc designs | leppington landscape
150
21
Proposal Masterplan Leppington Station
ABORIGINAL AGRICULTURE This area was created in respect of the high sensitivity classified Aboriginal significance that is associated with the land. As such, it is deemed appropriate that the space be used to re-introduce Aboriginal agricultural practices that are considered to contribute towards Australia’s own agricultural future.
Leppington Station
COMMUNITY GARDEN Intended to provide all residents an opportunity to engage themselves with the agricultural stories and existing landscape of Leppington and build upon a sense of active community efforts and collaborations. The gardens are prepped with plantation beds, composting systems, and pedestrians and delivery access.
Leppington Station
WALKABILITY / CYCLABILITY The bicycle lanes are to encourage active movement coming from the major centre into the open spaces of Leppington. The Wianna-Matta Walk is a public pedestrian incentive for more activity beyond the major centre, following the directional flow of the creek enabling the public to appreciate the existing landscape.
banzoc designs | leppington landscape
22
Leppington Station
Regional Context Relation
WESTERN PARKLANDS
EDMONDSON REGIONAL PARK
MACQUARIE LINKS
DHARAWAL NATIONAL PARK
VARROVILLE RESERVE
Figure 1.0 Greater Context Relation Map Scale14.0 1:3,000 Figure Regional Context Relation Map Scale 1:3,000 @ A3 0
3
15
Major Parkland Open Spaces Sydney’s Green Belt Surrounding Green Grid
REGIONAL CONTEXT RELATION 0 3
15
30
Major Parkland Open Spaces
Through a regional scale, the structure plan links the major parkland open spaces towards the east through
Varroville Edmonson Regionalthe Park and Dharawal National Park. It is throughlinks this that itthe further major Through a Reserve, regional scale, renewed masterplan extends the capacity of the Greater Sydney Green Belt by allocating more semi rural landscape intended for Sydney’s Green Beltparkland open spaces towards the east through Varroville Reserve, both Aboriginal and community angriclture to be retained and better connected to the north with the Western ParklandsRegional and the south with the Campbelltown-Macarthur Surrounding Green Edmonson Grid Park and Dharawal area. National Park. It is through this that it further extends the capacity of the Greater Sydney Green Belt by allocating more semi rural landscape intended for both Aboriginal and community angriclture to be retained and better connected to the north with the Western Parklands and the south with the CampbelltownMacarthur area.
banzoc designs | leppington landscape
24
Leppington Station
Proposed Masterplan (1:2000 @ A3)
Leppington Station
Reflection of the harmony between low residential housing to accommodate the population growth alongside Aboriginal heritage sites and existing agricultural lands. Figure 1.2 Final Design Zoomed Location Map Scale 1:2,000 @ A3
banzoc designs | leppington landscape
27
3.0 ST PETERS TERRACE This terrace was completed as a collaborative project with colleague Jasmine Phaktham, located in the St Peters suburb of Sydney, as a reconstruction proposal of the existing housing unit owned by an architectural couple. As such this process required the approval of an application form, lodgement checklist, statement of environmental effects accompanied with a BASIX Report, and the necessary DA Drawings including the site plan and analysis, proposed plan drawings, elevation drawings and cross section drawings.
L A N D SCA PE +
SKL
SKL
SKL
SKL
The landscape and vegetation element req the lot size of the terrace through a generou that is continued along the side of the towar prioritises the creation of a variation of shade impression of a calming santuary that is as However, it also distinguishes the social op SITE BOUNDARY 3.66M 151° 43'
QUIET SPACE AREA 18.9 m2
GREEN SPACE
INDOOR COURTYARD AREA 1.8m2
LANDSCAPING
1 & 2 STOREYED METAL
METAL ROOF
ROOF
LOT 2 DP 913615
No. 17
SITE BOUNDARY 22.175M 61° 32' BATHROOM AREA 5.16 m2
COUNCIL STREET
SKL
SKL
SKL
INDOOR COURTYARD AREA 1.8m2
COUNCIL STREET
SKL
SKL
QUIET SPACE AREA 18.9 m2
INDOOR COURTYARD AREA 1.8m2
1 & 2 STOREYED BRICK TERRACE EX W
EX W
SITE BOUNDARY 22.175M 61° 32' METAL
METAL ROOF
PREVAILING WINDS
LOT 2 DP 913615
ROOF
No. FP 17
FP
KITCHEN AREA 5.9 m2
TOILET 1 AREA 3.26 m2
SKL
EX W
LIVING ROOM AREA 7.07m2
COURTYARD AREA 17.6 m2
DINING ROOM AREA 7.17 m2
STUDIO AREA 8.05 m2
CAROLINE LANE
INDOOR COURTYARD AREA 1.8m2
EX D
COUNCIL STREET
LAUNDRY AREA 1.87 m2
SITE BOUNDARY 22.175M 61° 32' 1 & 2 STOREYED
GROUND FLOOR
LOT 2
METAL
BRICK TERRACE
BATHROOM AREA 5.16 m2
METAL ROOF
DP 913615
ROOF
No. 17
COUNCIL STREET
SKL
SKL
SKL
22545.21 mm INDOOR COURTYARD AREA 1.8m2
SITE
COURTYARD AREA 17.6 m2
19 COUNCIL STREET, ST PETERS
TASK/DRAWING TITLE METAL ROOF CONCEPT DESIGN
1 & 2 STOREYED BRICK TERRACE METAL ROOF
DRAWING NO. 4
3.88
SCALE
LOT 2
DP 913615
1:100
No. 17
SUPPLY ROOM
CLIENT: AREA 8.05 m2
PUBLIC SPACE
CAROLINE LANE
FIRST FLOOR
EX W
LIGHT ENTRY KITCHEN AREA 5.9 m2
TOILET 1 AREA 3.26 m2
SKL
EX W
LIVING ROOM AREA 7.07m2
DINING ROOM AREA 7.17 m2
COURTYARD AREA 17.6 m2
STUDIO AREA 8.05 m2
INDOOR COURTYARD AREA 1.8m2
1 & 2 STOREYED
METAL
BRICK TERRACE
ROOF
METAL ROOF
GROUND FLOOR
PRIVATE SPACE
SITE BOUNDARY 22.175M 61° 32'
FP
FP
EX D
COUNCIL STREET
LAUNDRY AREA 1.87 m2
EX W
PRO GRA M O R
TASK NO. PROJECT NAME The concept has prioritised a predominan 4 BDES3025 isTITLE: heavily FLOOR influenced DRAWING PLANSby maximising the lig plan that integrates the kitchen and dining DRAWN toCOUNCIL the rear ST, garden through bi-fol JASMINE19 (480376169) CLARE (48037137 PROJECT:connected ST PETERS N.S.W 204 the outdoor environment. This is compared the first floor that are strictly for owner usage quiet space. The segregation of the studio only by passing through the rear garden als
SITE BOUNDARY 3.66M 151° 43'
BEDROOM AREA 19.38 m2
PROGRAM ORGANISATION
SECONDARY LIGHT ENTRY
CAROLINE LANE
FIRST FLOOR
GROUND FLOOR
DP 913615
SKL
No. 17
SKL
LOT 2
ROOF
METAL ROOF
SUNLIGHT AND VENTILATION
METAL
BRICK TERRACE
CI R CU L A T I O N
Much like the precedent study, the conc SU ST I Nbackyard ABILIT transition from the entrance to A the creating the illusion of two large spaces fro With the desire to the improve thethe amount lig and then towards rear of terraceoftha (U-Valye: 3.6, SHGC: 0.68, VLT: 82%) along which provides the owners the freedom of m of which the spaces well). The ensure staircasethat aligned with theand frontthe do uncomfortable temperatures it iso is further reiterated in how it However, leads to an so as except to maximise existing and easterly doors for thethe bathroom front an ba on site. It is from this that cross ventilation precedent study was also achieved in this PRIMARY and operable windows as well.
SUPPLY ROOM AREA 8.05 m2
SITE BOUNDARY 22.175M 61° 32' 3.88 1 & 2 STOREYED
FIRST FLOOR
COURTYARD AREA 17.6 m2
CAROLINE LANE
SITE BOUNDARY 3.66M 151° 43' SITE
BEDROOM AREA 19.38 m2
SITE BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M 151° 43'
GROUND FLOOR
BOUNDARY 3.66M 151° 43'
CAROLINE LANE
22545.21 mm
BRICK TERRACE
LOT 2
22545.21 mm
FIRST FLOOR
COUNCIL STREET
SITE BOUNDARY 22.175M 61° 32'
LANDSCAPE AND VEGETATION
Landscape Area Calculations: 28.35m2
CAROLINE LANE
DP 913615
No. 17
22545.21 mm
SITE
DRAWING NO.
CLIENT:
TASK NO.
PROJECT NAME
7
8
9
1 & 2 STOREYED
10 11 12 13
01 CAROLINE LANE
DA08
BRICK TERRACE EXISTING TERRACE FACADE AND ELEMENTS INCLUDING METAL ROOF FIREPLACE TO BE RETAINED No. 17
No. 17EX W
COUNCIL STREET
LAUNDRY AREA 2.57m2
EX W
COUNCIL STREET
BRICK PARTY RETAINED
SKL WALL INTENDED
15.20
EX D
2
3
4
5
6
7
8
9
BATHROOM AREA 5.16 m2
COUNCIL STREET
03
DA08 STUDIO SPACE AREA 16.29m2
ROOF
SKL
DP 913615
SKL
DP 913615
ROOF
MASTER BEDROOM AREA 27.40m2
LOT 2
METAL
METAL ROOF No. 17
12.39
LOT 2
METAL
BRICK TERRACE
No. 17
EN SUITE AREA 7.06m2
SKL
COURTYARD AREA 17.6 m2 SUPPLY ROOM AREA 8.05 m2
INDOOR COURTYARD AREA 1.8m2 15
BRICK PARTY WALL INTENDED TO BE RETAINED
1 & 2 STOREYED 1 2 3
4
5
6
7
01 CAROLINE 10 11 12 13 DA08
8
9
BRICK TERRACE
3.88
22545.21 mm
14
LANE
02 DA08
METAL
METAL ROOF
03 DA08
LOT 2
ROOF
BATHROOM AREA 5.16 m2
COUNCIL STREET
SKL
1:100
FP
EX W
INDOOR COURTYARD AREA 1.8m2 15
EX W
TOILET1 1& 2 STOREYED 1 2 3 AREA 3.26 m2 BRICK TERRACE
FP
TG 18.21
14
4
5
6
7
8
9
10 11 12 13
METAL
LIVING ROOM AREA 7.07m2
No. 17 30 o
30
ROOF
3.88 KITCHEN AREA 5.9 m2
LOT 2
SKL
DP 913615 COURTYARD AREA 17.6 m2 2
DINING ROOM 2 AREA 7.17 m2 o
o
SUPPLY ROOM AREA 8.05 m2
TG 15.05
STUDIO AREA 8.05 m2
o
o
2
INDOOR COURTYARD AREA 1.8m2
1 & 2 STOREYED BRICK TERRACE METAL ROOF EX W
No. 17
TG 18.19
CAROLINE LANE
22545.21 mm
LEGEND 30 PROPOSED DEMOLISHED o
DP 913615 EXISTING GUTTER PROPOSED TO BE ALTERED ACCORDING TO ENGINEER DETAIL
TG 15.05
TG 18.21
FP
30
KITCHEN AREA 5.9 m2 SKL
LIVING ROOM AREA 7.07m2
SITE
CLIENT:
o
1 & 2 STOREYED
METAL
BRICK TERRACE
ROOF
METAL ROOF
o
2
DRAWING TITLE:
o
TASK/DRAWING TITLE PROPOSED PLANS
INDOOR COURTYARD AREA 1.8m2
TOILET AREA 2.56m2
AA DA07
RIGHT OF WAY
22545.21 mm
Total Area/ Land area = FSR 94.3 m2/85.36 m2 =1.105
ADDITIONAL TOILET WITHIN STUDIO AREA FOR CLIENT CONVENIENCE
SKILLION ROOF MADE FROM CORRUGATED IRON (COLOURBOND MID GREY) ANGLED IN ORDER TO MAXIMISE THE SUNLIGHT OPPORTUNITIES FROM THE NORTH
1A
DRAWING NO. NO. TUTOR PROJECT NAME TASK NORTH IONA DEBRA WILLIAMS SKILLION ROOF BDES3025 1 MADE FROM CORRUGATED IRON 11.09.2020 FLOOR PLANS (COLOURBOND MID GREY) ANGLED INDATE: ORDER TO MAXIMISE THE SUNLIGHT OPPORTUNITIES FROM THE NORTH SCALE DRAWN DRAWING NO. 1:100 @ A3PROJECT: JASMINE19 (480376169) CLARE (480371371) DA021:100 @ A3 COUNCIL ST, ST PETERS N.S.W 2044 SCALE
DATE STUDIO 8.05 m2 09 NOVAREA 2020
COURTYARD
AREA 17.6 m2 19 COUNCIL STREET, ST PETERS 2
DINING ROOM 2 AREA 7.17 m2
o
Floor Space Ratio
ADDITIONAL TOILET WITHIN STUDIO AREA FOR CLIENT CONVENIENCE
LOT 2
METAL
ROOF CAROLINE LANE SITE BOUNDARY 22.175M 61° 32'
TOILET 1 AREA 3.26 m2
EX W EX D
COUNCIL STREET
LAUNDRY
1:100 AREA 1.87 m2
SKL
COURTYARD EXISTING PROPOSED TO BE ALTERED AREA 17.6 GUTTER m2 ACCORDING TO ENGINEER DETAIL
EN SUITE CAROLINE LANE SITE BOUNDARY AREA 7.06m2 22.175M 61° 32'
FP
METAL ROOF
EX D
COUNCIL STREET
EX W
LAUNDRY AREA 1.87 m2
CAROLINE LANE
MASTER BEDROOM AREA 27.40m2
TG 18.19
COUNCIL STREET
COUNCIL STREET
SKL
OPEN FLOOR PLAN CONTAINING BEDROOM AREA 19.38 m2 MERGED PROGRAMS FOR CLIENT CONVENIENCE
94.3 m2/85.36 m2 =1.105
DP 913615
CAROLINE SITE BOUNDARY 22.175M 61° 32' LANE
1:100
ROOF PLAN COUNCIL STREET
10 11 12 13
1 & 2 STOREYED
METAL ROOF
EX W
02 DA08 12.17
BRICK TERRACE
OPEN FLOOR PLAN CONTAINING MERGED PROGRAMS FOR CLIENT CONVENIENCE
3
SKL
EX W
FIRST FLOOR PLAN
12.18
12.11
12.15
AA DA07
WINDOWS ALONG NORTHERN FACADE INTENDED TO MAINTAIN HERITAGE AESTHETIC VALUE OF EXISTING TERRACE
11.87
DINING AREA AREA 11.14m2
14
1
No. 17
2
LOT 2 DP 913615
CAROLINE SITE BOUNDARY 22.175M 61° 32' LANE
1 & 2 STOREYED
1:100
22545.21 mm
LANE
INDOOR COURTYARD AREA 1.8m2 15
LIVING ROOM AREA 20.92m2
BEDROOM AREA 19.38 m2
FIRST FLOOR PLAN
01 CAROLINE DA08
TOILET AREA 1.93m2
QUIET SPACE AREA 18.9 m2
REAR GARDEN AREA 12.56m2
KITCHEN AREA 15.65m2 SKL
TO BE
BI-FOLDING DOORS TO ALLOW CROSS VENTILATION
SITE BOUNDARY 22.175M 61° 32'
SKL
FP
LOT 2
11.74
ROOF
03 DA08
12.39
DP 913615
METAL
EX W
COUNCIL STREET
AA DA07
METAL
CAROLINE LANE 1 & 2 STOREYED ROOF SITE BOUNDARY BRICK TERRACE 22.175M 61° 32'
FP
1:100
02 DA08
TOILET AREA 2.56m2
22545.21 mm
6
SITE BOUNDARY 3.66M 151° 43'
5
Total Area/ Land area = FSR
22545.21 mm
4
RIGHT OF WAY
3
SITE BOUNDARY 3.66M 151° 43'
EX D
2
METAL ROOF
GROUND FLOOR PLAN
DINING AREA AREA 11.14m2
14
1
Floor Space Ratio
22545.21 mm
LIVING ROOM AREA 20.92m2
STUDIO SPACE AREA 16.29m2
12.17
INDOOR COURTYARD AREA 1.8m2 15
SITE BOUNDARY 3.66M 151° 43'
15.20
SITE BOUNDARY 3.66M 151° 43'
EX W
COUNCIL STREET
TOILET AREA 1.93m2
QUIET SPACE AREA 18.9 m2
SITE BOUNDARY 3.66M 151° 43'
SKL
EX W
2
12.18
12.11
12.15
SITE BOUNDARY 3.66M 151° 43'
SKL
WINDOWS ALONG NORTHERN FACADE INTENDED TO MAINTAIN HERITAGE AESTHETIC VALUE OF EXISTING TERRACE
11.87
SKL
11.42
GROUND FLOOR PLAN
REAR GARDEN AREA 12.56m2
KITCHEN AREA 15.65m2
SKL
FP
03 DA08
BI-FOLDING DOORS TO ALLOW CROSS VENTILATION
11.74
SITE BOUNDARY 22.175M 61° 32'
EX W
LAUNDRY AREA 2.57m2
FP
AA DA07
1
02 DA08
SITE BOUNDARY 3.66M 151° 43'
COUNCIL STREET
EX W
1
LANE
CAROLINE LANE SITE BOUNDARY 22.175M 61° 32'
SITE BOUNDARY 3.66M 151° 43'
01 CAROLINE DA08
EXISTING TERRACE FACADE AND ELEMENTS INCLUDING FIREPLACE TO BE RETAINED
11.42
LOT 2 DP 913615
No. 17
3
ROOF PLAN
22545.21 mm
1:100
LEGEND PROPOSED DEMOLISHED
SITE
CLIENT:
19 COUNCIL STREET, ST PETERS
TASK/DRAWING TITLE PROPOSED PLANS
1A
DRAWING NO. NO. TUTOR PROJECT NAME TASK NORTH IONA DEBRA WILLIAMS BDES3025 1 11.09.2020 FLOOR PLANS DATE: SCALE DRAWN DRAWING NO. 1:100 @ A3PROJECT: JASMINE19 (480376169) CLARE (480371371) DA021:100 @ A3 COUNCIL ST, ST PETERS N.S.W 2044 SCALE
DATE 09 NOV 2020
DRAWING TITLE:
CAROLINE LANE
SKL
SITE BOUNDARY 3.66M 151° 43'
COUNCIL STREET
SITE BOUNDARY 22.175M 61° 32'
SKL
SKL
SKL QUIET SPACE AREA 18.9 m2
INDOOR COURTYARD AREA 1.8m2
1 & 2 STOREYED BRICK TERRACE
METAL
METAL ROOF
ROOF
Floor Space Ratio Total Area/ Land area MATERIALS LEGEND = FSR AW ALUMINUM WINDOW CORRR LW BWK RT TB
LOT 2
COLOUR LEGEND
DP 913615
AW 01
RL 21.39
SKL
SITE BOUNDARY 22.175M 61° 32'
SKL
RL 20.59 BATHROOM AREA 5.16 m2
INDOOR COURTYARD AREA 1.8m2 SKL
SKL
SKL BEDROOM AREA 19.38 m2
COURTYARD AREA 17.6 m2
1 & 2 STOREYED BRICK TERRACE
METAL
INDOOR COURTYARD AREA 1.8m2
METAL ROOF
RIGHT OF WAY
1 & 2 STOREYED
METAL
BRICK TERRACE
LOT 2
ROOF
METAL ROOF RL 15.39 No. 17
RL 15.04
SUPPLY ROOM AREA 8.05 m2
3.88
No. 17
FIRST FLOOR FFL +15.20
TOG 18.21
LOT 2
DP 913615
ROOF
LW
RL 15.04
02 CAROLINE LANE
01
RL 14.57
DP 913615
LW
CORRR
RL 15.20
01
CORRR
BWKW
02
04
AW 01
CAROLINE LANE
COUNCIL STREET COUNCIL STREET
SITE BOUNDARY 22.175M 61° 32'
EX W
SKL
SKL
RL 12.06
BEDROOM AREA 19.38 m2
SKL
FP
RL 12.00
RL 11.81
TOILET 1 AREA 3.26 m2
INDOOR COURTYARD LIVING AREA ROOM1.8m2 AREA 7.07m2
EX W
LAUNDRY AREA 1.87 m2
FP
AW
1 & 2 STOREYED 01
AW
AW 01
AW
AW
RT 03
AREA 1.8m2
RL 14.57
DINING ROOM AREA 7.17 m2
METAL
TB
AW
03
01
COURTYARD AREA 17.6 m2 AW
01
RL 11.81
TOG 18.21
SUPPLY ROOM AREA 8.05 m2
AW
AW
01
01
01
01
DP 913615
CORRR LW BWK RT TB
EXISTING
CORRUGATED IRON ROOF RETAIN GLASS EXISTING LOUVRED DOWN WINDOW
PIPE 94.3 m2/85.36 m2 BRICKWORK RECYCLED TIMBER =1.105 TIMBER BATTENS
TOG 18.21
TOG 17.39
RETAIN EXISTING COLOUR LEGEND GUTTER CLEAR GLAZING (TOUGHENED) 01 02 COLOUR BOND MID-GREY 03 PAINTED LIGHT OAK 04 PAINTED VIOLINE VERANDA TO BE REPAIRED AND TO MATCH EXISTING VERANDA
RETAIN EXISTING DORMANT CHIMNEY WALLS TO BE REPAIRED AND TO MATCH THE EXISTING RENDER
AW
RETAIN EXISTING DOWN PIPE TOG RL 18.21 11.62
RL 11.60 TOG 17.39
RETAIN GUTTER
EXISTING
01
VERANDA BE REPAIRED AND PROPOSEDTOROTATABLE TO MATCH EXISTING VERANDA TIMBER SLATS
RL 15.20 LOT 2
METAL
DP 913615
ROOF
METAL ROOF
AW
STUDIO AREA 8.05 m2 AW
LOT 2
ROOF
1 & 2 STOREYED RL 15.04 BRICK TERRACE
RL 15.04
COURTYARD AREA 17.6 m2
3.88
METAL ROOF RL 15.39 No. 17
FIRST FLOOR FFL +15.20
KITCHEN AREA 5.9 m2
SKL
01 INDOOR COURTYARD 01 01
BRICK TERRACE
EX D
FFL +18.21
RL 20.59
BATHROOM AREA 5.16 m2
EX W
GROUND FLOOR GFL +12.04
RETAIN
RL 21.39
SITE BOUNDARY 22.175M 61° 32' ROOF RIDGE RL +20.59
Floor Space Ratio DORMANT Total Area/CHIMNEY Land area MATERIALS LEGEND = FSR AW ALUMINUM WINDOW
22545.21 mm
QUIET SPACE AREA 18.9 m2
SITE BOUNDARY
04
SITE BOUNDARY
BWKW
02
151° 43'
SKL
CORRR
01
SITE BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M 151° 43'
LW
CORRR 02 CAROLINE LANE
SITE BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M
RIGHT OF WAY
SITE BOUNDARY
SITE BOUNDARY 22.175M 61° 32' LW
SKL
SITE BOUNDARY
FFL +18.21
COUNCIL STREETCOUNCIL STREET
ROOF RIDGE RL +20.59
CAROLINE LANE
CLEAR GLAZING (TOUGHENED) COLOUR BOND MID-GREY PAINTED LIGHT OAK PAINTED VIOLINE
01 02 03 04
No. 17
01
CORRUGATED IRON ROOF GLASS LOUVRED WINDOW
94.3BRICKWORK m2/85.36 m2 RECYCLED TIMBER =1.105 TIMBER BATTENS
No. 17
WALLS TO BE REPAIRED AND TO MATCH THE EXISTING RENDER
CAROLINE LANE
SITE
RL 12.00
RL 11.81
TOILET 1 AREA 3.26 m2
AW
AW
01
01
AW
AW
RT
01 INDOOR COURTYARD 01 01
AW
03
CLIENT:
19 COUNCIL STREET, ST PETERSRL 11.81
KITCHEN AREA 5.9 m2
TASK/DRAWING TITLE NORTH ELEVATION
SKL
LIVING ROOM AREA 7.07m2
EX W
LAUNDRY AREA 1.87 m2
DINING ROOM AREA 7.17 m2
TB
AW
03
01
COURTYARD AREA 17.6 m2
DATE 09 NOV 2020 DRAWING TITLE:
SCALE 1:100 @ A3 PROJECT:
AW
AW
AW
AW
STUDIO AREA 8.05 m2 AW
01
01
01
01
01
AREA 1.8m2
EX D
COUNCIL STREET
RL 12.06
SITE BOUNDARY 22.175M 61° 32'
EX W
FP
FP
1 & 2 STOREYED
1
11.09.2020
DRAWING NO. 1:100 @DA05 A3
01
PROPOSED ROTATABLE TIMBER SLATS
DP 913615
ROOF
METAL ROOF
AW
1A
TASK NO.
LOT 2
METAL
BRICK TERRACE
DRAWING NO. TUTOR PROJECT NAME IONA DEBRA WILLIAMS BDES3025 FLOOR PLANS RL 11.62 RL 11.60 DATE: DRAWN JASMINEST,(480376169) CLARE 19 COUNCIL ST PETERS N.S.W 2044 (480371371) SCALE 22545.21 mm
EX W
GROUND FLOOR GFL +12.04
SITE BOUNDARY 3.66M 151° 43'
22545.21 mm
No. 17
22545.21 mm
SITE
CLIENT:
19 COUNCIL STREET, ST PETERS
TASK/DRAWING TITLE NORTH ELEVATION
DATE 09 NOV 2020 DRAWING TITLE:
SCALE 1:100 @ A3 PROJECT:
DRAWING NO. TUTOR PROJECT NAME IONA DEBRA WILLIAMS BDES3025 FLOOR PLANS DATE: DRAWN JASMINEST,(480376169) CLARE 19 COUNCIL ST PETERS N.S.W 2044 (480371371) SCALE
1A
TASK NO.
1
11.09.2020
DRAWING NO. 1:100 @DA05 A3
CAROLINE LANE
SKL
SITE BOUNDARY 3.66M 151° 43'
COUNCIL STREET
SITE BOUNDARY 22.175M 61° 32'
SKL
SKL
SKL QUIET SPACE AREA 18.9 m2
INDOOR COURTYARD AREA 1.8m2
1 & 2 STOREYED BRICK TERRACE
METAL
METAL ROOF
ROOF
Floor Space Ratio Total Area/ Land area = FSR MATERIALS LEGEND AW CORRR LW BWK RT TB
LOT 2 DP 913615
No. 17
RL 21.39
SKL
SKL
SKL
RL 20.59
SKL
SKL
SKL
INDOOR COURTYARD AREA 1.8m2
COURTYARD AREA 17.6 m2 SUPPLY ROOM AREA 8.05 m2
INDOOR COURTYARD AREA 1.8m2
3.88
1 & 2 STOREYED BRICK TERRACE 1 & 2 STOREYED METAL ROOF
ROOF
DP 913615
SITE BOUNDARY 22.175M 61° 32' SITE BOUNDARY 22.175M 61° 32'
RT
TOILET 1 AREA 3.26 m2
KITCHEN AREA 5.9 m2
SKL
SKL
EX W
LIVING ROOM AREA 7.07m2
BEDROOM AREA 19.38 m2
SKL
COURTYARD COURTYARD AREA 17.6 m2 AREA 17.6 m2
DINING ROOM AREA 7.17 m2
3.88 METAL
STUDIO AREASUPPLY 8.05 m2 ROOM AREA 8.05 m2
TIMBER
BRICKWORK RECYCLED TIMBER TIMBER BATTENS
CLEAR GLAZING (TOUGHENED) COLOUR BOND MID-GREY PAINTED LIGHT OAK PAINTED VIOLINE
CORRU-
SLAT
CORRUGATED IRON ROOF TO BE REPAIRED AND TO MATCH THE EXISTING RENDER
LOT 2LOT 2 DP 913615 DP 913615
ROOF
01
RL 11.89 RL 11.74
TOG 18.21
METAL ROOF
BRICK TERRACE METAL ROOF AW METAL ROOF No. 17
PROPOSED STUDIO
RL 20.59
SKL
INDOOR COURTYARD INDOOR COURTYARD AREA 1.8m2 AREA 1.8m2
1 & 2 STOREYED 1 & 2 STOREYED BRICK TERRACE
PROPOSED SKILLION GATED IRON ROOF
RL 21.39
BATHROOM AREA 5.16 m2
03
EX D
COUNCIL STREET COUNCIL STREET
ROOF RIDGE RL +20.59 FLOOR GROUND FFL +12.04
FP
01 02 03 04
RL 15.39
02
RL 15.29
CAROLINE LANE CAROLINE LANE
EX W
CORRR
ALUMINUM WINDOW 94.3 m2/85.36 m2 CORRUGATED IRON ROOF GLASS LOUVRED WINDOW =1.105
COLOUR LEGEND
WALLS TO BE REPAIRED AND TO MATCH THE EXISTING RENDER
SITE BOUNDARY
SITE BOUNDARY
EX W
FP
AW CORRR LW BWK RT TB
LOT 2
No.0117
02
MATERIALS LEGEND
DP 913615
METAL ROOF
CORR
Floor Space Ratio Total Area/ Land area = FSR
CORRUGATED IRON ROOF TO BE REPAIRED AND TO MATCH THE EXISTING RENDER
LOT 2 TOG 18.21
METAL
BRICKNo. TERRACE 17 METAL ROOF AW
CLEAR GLAZING (TOUGHENED) COLOUR BOND MID-GREY PAINTED LIGHT OAK PAINTED VIOLINE
22545.21 mm
QUIET SPACE AREA 18.9 m2 BEDROOM AREA 19.38 m2
LAUNDRY AREA 1.87 m2
SITE BOUNDARY 3.66M 151° SITE BOUNDARY 3.66M 151° 43' 43'
SKL BATHROOM AREA 5.16 m2
02
SITE BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M 151° 43'
COUNCIL COUNCIL STREETSTREET
SITE BOUNDARY 22.175M 61° 32'
01 02 03 04
CORRR
SITE BOUNDARY
SITE BOUNDARY
CAROLINE LANE
FIRST FLOOR FFL +15.20
BRICKWORK RECYCLED TIMBER TIMBER BATTENS
COLOUR LEGEND
CAROLINE LANE SITE BOUNDARY 22.175M 61° 32'
ROOF RIDGE RL +20.59
ALUMINUM WINDOW 94.3 m2/85.36 m2 CORRUGATED IRON ROOF GLASS LOUVRED WINDOW =1.105
WALLS TO BE REPAIRED AND TO MATCH THE EXISTING RENDER
No. 17
RL 15.39
22545.21 mm RL 15.29
EX W
FP
FP
CLIENT:
EX W
LIVING ROOM AREA 7.07m2
19 COUNCIL STREET, ST PETERS
SKL
RL 11.89 RL 11.74
COURTYARD AREA 17.6 m2
DINING ROOM AREA 7.17 m2
STUDIO AREA 8.05 m2
INDOOR COURTYARD AREA 1.8m2
1 & 2 STOREYED
1
11.09.2020
DRAWING NO. 1:100 @DA06 A3
DP 913615
ROOF
METAL ROOF
1A
TASK NO.
LOT 2
METAL
BRICK TERRACE
CORRU-
DRAWING NO. TUTOR PROJECT NAME IONA DEBRA WILLIAMS BDES3025 DRAWING TITLE: FLOOR PLANS SLAT DATE: PROPOSED TIMBER SCALE DRAWN STUDIO 1:100 @ A3 19 COUNCIL JASMINEST,(480376169) CLARE PROJECT: ST PETERS N.S.W 2044 (480371371) SCALE
KITCHEN AREA 5.9 m2
TOILET 1 AREA 3.26 m2
PROPOSED SKILLION GATED IRON ROOF
DATE 09 NOV 2020
TASK/DRAWING TITLE EAST ELEVATION
03
EX D
COUNCIL STREET
SITE BOUNDARY 22.175M 61° 32'
RT
LAUNDRY AREA 1.87 m2
GROUND FLOOR FFL +12.04
EX W
SITE
22545.21 mm
CAROLINE LANE
02
SITE BOUNDARY 3.66M 151° 43'
CORR
FIRST FLOOR FFL +15.20
No. 17
22545.21 mm
SITE
CLIENT:
19 COUNCIL STREET, ST PETERS
TASK/DRAWING TITLE EAST ELEVATION
DATE 09 NOV 2020 DRAWING TITLE:
SCALE 1:100 @ A3 PROJECT:
DRAWING NO. TUTOR PROJECT NAME IONA DEBRA WILLIAMS BDES3025 FLOOR PLANS DATE: DRAWN JASMINEST,(480376169) CLARE 19 COUNCIL ST PETERS N.S.W 2044 (480371371) SCALE
1A
TASK NO.
1
11.09.2020
DRAWING NO. 1:100 @DA06 A3
CAROLINE LANE
SKL
SKL
QUIET SPACE AREA 18.9 m2
INDOOR COURTYARD AREA 1.8m2
1 & 2 STOREYED METAL
SITE BOUNDARY
02
COUNCIL STREET COUNCIL STREET
SITE BOUNDARY 22.175M 61° 32'
SKL SKL
RETAIN EXISTING QUIET SPACE CHIMNEY AREA 18.9 m2
CAROLINE LANE
RL 18.37
INDOOR COURTYARD AREA 1.8m2
No. 17
No. 17
ROOF TOG 17.39
3.88
02
METAL ROOF RL 15.17
CAROLINE LANE
ROOF RIDGE RL +20.59
EX MB
W
EX W
AREA 19.38 m2
LAUNDRY AREA 1.87 m2
FP
FP
CAROLINE LANE
SKL
CAROLINE LANE
EX W
BRICK TERRACE
ROOF
01
1 & 2 STOREYED BRICK TERRACE
EX MB
No. 17
CAROLINE LANE
FP
FP
TOILET 1 AREA 3.26 m2
03
EX D
1 & 2 STOREYED
RL 12.24
RL 12.06
CLIENT:
KITCHEN AREA 5.9 m2
19 COUNCIL STREET, ST PETERS
BWK
RT
04
03
CLEAR GLAZING (TOUGHENED) COLOUR BOND MID-GREY PAINTED LIGHT OAK PAINTED VIOLINE
DATE 09 NOV 2020 DRAWING TITLE:
SCALE STUDIO 1:100 @ A3 PROJECT:
COURTYARD AREA 17.6 m2
AREA 8.05 m2
DRAWING NO. TUTOR PROJECT NAME IONA DEBRA WILLIAMS BDES3025 FLOOR PLANS DATE: DRAWN JASMINEST,(480376169) CLARE 19 COUNCIL ST PETERS N.S.W 2044 (480371371) SCALE
1A
TASK NO.
1
11.09.2020
DRAWING NO. 1:100 @DA04 A3
1:100 @ A3
LOT 2 DP 913615
ROOF
METAL ROOF
TS 03
RL 15.55
RL 12.36
RL 12.17 RL 11.90
METAL
BRICK TERRACE
DP 913615
RL 15.36
TASK/DRAWING TITLE WEST ELEVATION DINING ROOM
01
01 02 03 04
DP 913615
SITE
AW
STUDIO AREA 8.05 m2
LOT 2
AREA 7.17 m2
INDOOR COURTYARD AREA 1.8m2
94.3 m2/85.36 m2 =1.105
COLOUR LEGEND
EX D
WM RL 11.62 RL 11.52 RL 11.42
Total Area/ Land area = FSR
ALUMINUM WINDOW CORRUGATED IRON ROOF GLASS LOUVRED WINDOW BRICKWORK RECYCLED TIMBER TIMBER BATTENS
LOT 2
METAL EX ROOF W
SKL
SUPPLY ROOM AREA 8.05 m2
RL 17.49
mm 22.175M 61° 32' SITE22545.21 BOUNDARY
LIVING ROOM AREA 7.07m2
EX W
LAUNDRY AREA 1.87 m2
RT
04
CAROLINE LANE
EX W
RL SKL 12.24
RL 17.92
COURTYARD AREA 17.6 m2
BWK
RL 15.17
WALLS TO BE REPAIRED AND TO METAL ROOF MATCH THE EXISTING RENDER
RL 12.36 RL 18.58
RL 12.06 COURTYARD AREA 17.6 m2
3.88
AW
INDOOR COURTYARD AREA 1.8m2
No. 17
GROUND FLOOR FFL +12.04
KITCHEN AREA 5.9 m2 SKL
RL 18.37
DINING ROOM AREA 7.17 m2 METAL
1 & 2 STOREYED
VERANDA TO BE REPAIRED AND ROOF TO MATCH EXISTINGMETAL VERANDA
EX W
RL 11.90
AW CORRR LW BWK RT TB
TS
RL 12.17
WM
Floor Space Ratio MATERIALS LEGEND
03
RL 15.55
RL 20.94
RL 20.78
SKL
LIVING ROOM AREA 7.07m2
SUPPLY ROOM AREA 8.05 m2
CLEAR GLAZING (TOUGHENED) COLOUR BOND MID-GREY PAINTED LIGHT OAK PAINTED VIOLINE
RL 21.74
SITE BOUNDARY 22.175M 61° 32' TOG 18.21 RL 11.62 RL 11.52 RL 11.42 INDOOR COURTYARD TOG 17.39 AREA 1.8m2
RL 17.92
LOT 2 DP 913615
RL 15.36
SKL
EX W
TOILET 1 AREA 3.26 m2
EX D
COUNCIL STREET COUNCIL STREET
RL 18.58
EX D
BATHROOM AREA 5.16 m2
CORRUGATED IRON ROOF TO BE REPAIRED AND TO MATCH THE EXISTING RENDER BEDROOM
COURTYARD LOT 2 AREA 17.6 m2 DP 913615
RL 21.58
RL 21.39
SITE BOUNDARY 22.175M 61° 32' RL 20.59 EX
RETAIN EXISTING DORMANT WALLS TO BE REPAIRED AND TO CHIMNEY MATCH THE EXISTING RENDER
COUNCIL STREET
SKL
RL 17.49
CORRR
SITE BOUNDARY
METAL ROOF
BRICK TERRACE
RL 20.94
SKL
TOG 18.21 METAL
BRICK TERRACE
FIRST FLOOR FFL +15.20
RL 20.78
SKL
SITE BOUNDARY
AREA 19.38 m2
1 & 2 STOREYED
FIRST FLOOR FFL +15.20
SKL
INDOOR COURTYARD BATHROOM AREA 5.16 m2 AREA 1.8m2
CORRUGATED IRON ROOF TO BE REPAIRED AND TO MATCH THE EXISTING RENDER BEDROOM 1 & 2 STOREYED
VERANDA TO BE REPAIRED AND ROOF TO MATCH EXISTINGMETAL VERANDA
GROUND FLOOR FFL +12.04
RL 21.74
RL 21.58
RL 21.39
SITE BOUNDARY 22.175M 61° 32' RL 20.59
DORMANT
01 02 03 04
22545.21 mm
SITE BOUNDARY
CORRR
94.3 m2/85.36 m2 =1.105
22545.21 mm
CAROLINE LANE
Total Area/ Land area = FSR
ALUMINUM WINDOW CORRUGATED IRON ROOF GLASS LOUVRED WINDOW BRICKWORK RECYCLED TIMBER TIMBER BATTENS
COLOUR LEGEND
DP 913615
ROOF
No. 17
AW CORRR LW BWK RT TB
SITE BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M 151° 43'
METAL ROOF
Floor Space Ratio MATERIALS LEGEND
LOT 2
SITE BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M 151° 43'
BRICK TERRACE
ROOF RIDGE RL +20.59
SITE BOUNDARY 3.66M 151° 43'
SKL SKL
SITE BOUNDARY 3.66M 151° 43'
COUNCIL STREET
SITE BOUNDARY 22.175M 61° 32'
No. 17
22545.21 mm
SITE
CLIENT:
19 COUNCIL STREET, ST PETERS
TASK/DRAWING TITLE WEST ELEVATION
DATE 09 NOV 2020 DRAWING TITLE:
SCALE 1:100 @ A3 PROJECT:
DRAWING NO. TUTOR PROJECT NAME IONA DEBRA WILLIAMS BDES3025 FLOOR PLANS DATE: DRAWN JASMINEST,(480376169) CLARE 19 COUNCIL ST PETERS N.S.W 2044 (480371371) SCALE
1A
TASK NO.
1
11.09.2020
DRAWING NO. 1:100 @DA04 A3
CAROLINE LANE
SKL
RETAIN EXISTING DORMANT CHIMNEY
SITE BOUNDARY
TOG 18.21 METAL
BRICK TERRACE No. 17 W
RL 21.39
RL 20.59
SITE BOUNDARY 22.175M 61° 32' ROOF W
BEDROOM AREA 19.38 m2
INDOOR COURTYARD AREA 1.8m2
D
SITE BOUNDARY 22.175M 61° 432'3.88
W
21 & 2 STOREYED W 1BRICK TERRACE
D W
W
W
W
LOT 2PROPOSED
ROOF
W
W
W
COURTYARD
SKL
RL 11.60
INDOOR COURTYARD AREA 1.8m2
CAROLINE LANE
D W
EX W
W
4 3.88
5
W
RL 11.81
RL 15.25
PROPOSED TOILET
SUPPLY ROOM 8.05 m2 UNDERAREA STAIRCASE
3
W
W
W
LOT 2
W
4501 mm
5300DPmm 913615
No. 17 KITCHEN AREA 5.9 m2
7728 mm LIVING ROOM AREA 7.07m2
RL 11.62
SKL
RL 11.81
RL 11.81 COURTYARD AREA 17.6 m2PROPOSED
DINING ROOM AREA 7.17 m2
CAROLINE LANE
TOILET
STUDIO UNDER AREASTAIRCASE 8.05 m2
INDOOR COURTYARD AREA 1.8m2 EX W
1:100LAUNDRY EX W
AREA 1.87 m2
EX W
SITE BOUNDARY 22.175M 61° 32'
4600 mm
6391 mm
1 & 2FP STOREYED
FP
TOILET 1 AREA 3.26 m2
7728 mm No. 17
LIVING ROOM AREA 7.07m2
22545.21 mm
SKL
COURTYARD AREA 17.6 m2
DINING ROOM AREA 7.17 m2
STUDIO AREA 8.05 m2
INDOOR COURTYARD AREA 1.8m2
LEGEND PROPOSED 1:100
LOT 2 DP 913615
KITCHEN AREA 5.9 m2
ROOF
METAL ROOF
4501 mm
5300 mm
METAL
BRICK TERRACE
EX D
COUNCIL STREET
W
ROOFmm 4600
6391 mm
FP
TOILET 1 AREA 3.26 m2
RL 11.60
W
SITE BOUNDARY 22.175M 61° 32' METAL
METAL ROOF
FP
1107 mm
BEDROOM LIVING ROOM STUDIO KITCHEN COURTYARD
LONGITUDINAL SECTION
BRICK TERRACE
D EX W
EX D
COUNCIL STREET
BEDROOM LIVING ROOM STUDIO KITCHEN COURTYARD
LAUNDRY AREA 1.87 m2
COURTYARD AREA 17.6 m2
RL 11.81
RL 11.62
SITE
1 & 2 STOREYED
METAL
BRICK TERRACE
ROOF
METAL ROOF No. 17
CLIENT:
19 COUNCIL STREET, ST PETERS
TASK/DRAWING TITLE SECTION AA
LOT 2
DP 913615
DATE 09 NOV 2020 DRAWING TITLE:
SCALE 1:100 @ A3 PROJECT:
SITE BOUNDARY
W
8550 mm
DP 913615
SKL
SKL
MAX HEIGHT
RL 15.39
RL 15.39
RL 12.00
3142 mm
COUNCIL STREET
W
W
SUPPLY ROOM AREA 8.05 m2
3
5
METAL
BATHROOM AREA 5.16 m2
No. 17
AA LONGITUDINAL SECTION
RL 15.25 EXTENDED FLOOR TO ROOF HEIGHT
TOG 18.21
BEDROOM AREA 19.38 m2
1107 mm
AA
COURTYARD AREA 17.6 m2
CAROLINE LANE
TOG 18.21
94.3 m2/85.36 m2 =1.105
5408 3142 mm mm
COUNCIL STREET
SKL
MAX HEIGHT
Total Area/ Land area = FSR
8550 mm
RETAIN EXISTING PROPOSED COURTYARD DORMANT CHIMNEY
SKL
21 & 2 STOREYED
1 2 3 4 5
DP 913615
BATHROOM AREA 5.16 m2
SKL
EX W
1 2 3 4 5
LOT 2
Floor Space Ratio
5408 mm
METAL ROOF
METAL ROOF
GROUND FLOOR FFL +12.04
EXTENDED FLOOR TO ROOF HEIGHT
CAROLINE LANE 1 & 2 STOREYED
TOG 17.39
FIRST FLOOR FFL +15.20
SKL
INDOOR COURTYARD AREA 1.8m2
1
GROUND FLOOR FFL +12.04
DP 913615
ROOF
SKL
RL 20.59
QUIET SPACE AREA 18.9 m2
TOG 17.39
FFL +18.21
METAL RL 21.39
W
RL 12.00
22545.21 mm
No. 17
94.3 m2/85.36 m2 =1.105
22545.21 mm
METAL ROOF SKL
RIGHT OF WAY
BRICK TERRACE
LOT 2
Total Area/ Land area = FSR
SITE BOUNDARY
SITE BOUNDARY 22.175M 61° 32' 1 & 2 STOREYED
Floor Space Ratio
RIGHT OF WAY
SITE BOUNDARY
CAROLINE LANE
FFL +18.21
FIRST FLOOR FFL +15.20
SITE BOUNDARY 3.66M 151°SITE 43' BOUNDARY 3.66M 151° 43'
SKL
INDOOR COURTYARD AREA 1.8m2
TOG 18.21
ROOF RIDGE RL +20.59
SKL
QUIET SPACE AREA 18.9 m2
COUNCIL STREET
ROOF RIDGE RL +20.59
SKL SKL
SITE BOUNDARY 3.66M 151°SITE 43' BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M 151°SITE 43' BOUNDARY 3.66M 151° 43'
COUNCIL STREET
SITE BOUNDARY 22.175M 61° 32'
1A
DRAWING NO. TUTOR PROJECT NAME IONA DEBRA WILLIAMS BDES3025 FLOOR PLANS DATE: DRAWN JASMINEST,(480376169) CLARE 19 COUNCIL ST PETERS N.S.W 2044 (480371371) SCALE
TASK NO.
DRAWING NO. TUTOR PROJECT NAME IONA DEBRA WILLIAMS BDES3025 FLOOR PLANS DATE: DRAWN JASMINEST,(480376169) CLARE 19 COUNCIL ST PETERS N.S.W 2044 (480371371) SCALE
TASK NO.
1
11.09.2020
DRAWING NO. 1:100 @ A3 1:100 @DA07 A3
22545.21 mm
LEGEND PROPOSED
SITE
CLIENT:
19 COUNCIL STREET, ST PETERS
TASK/DRAWING TITLE SECTION AA
DATE 09 NOV 2020 DRAWING TITLE:
SCALE 1:100 @ A3 PROJECT:
1A
1
11.09.2020
DRAWING NO. 1:100 @ A3 1:100 @DA07 A3
CAROLINE LANE
DP 913615
ROOF
No. 17
SKL
RL 21.39
SKL
SKL
SKL
RL 20.59
QUIET SPACE AREA 18.9 m2
INDOOR COURTYARD AREA 1.8m2
EX ROOF VOID LOTTOG 2 18.21
METAL SITE BOUNDARY 22.175M 61° 32'
BRICK TERRACE METAL ROOF
DP 913615
ROOF
No. 17
RL 20.59
EX BED 2
SKL
SKL
SKL BEDROOM AREA 19.38 m2
CAROLINE LANE
RL 15.04
INDOOR COURTYARD AREA 1.8m2
RL 14.57
COURTYARD AREA 17.6 m2
4
TOG 15.05
SUPPLY ROOM AREA 8.05 EX m2
3.88 SITE BOUNDARY 22.175M 61° 32' 1 & 2BRICK STOREYED BRICKWC TERRACE
EX RENDERED MASONRY WALL + PAINT
METAL
BATHROOM AREA 5.16 m2
METAL ROOF
LOT 2 EX KITCHEN
EX HALLWAY
EX DINING ROOM
DP 913615
No. 17
COUNCIL STREET
FIRST FLOOR FFL +15.20
SKL
SKL
RL 12.06
BEDROOM AREA 19.38 m2
RL 12.00
RL 15.04
CAROLINE LANE
EX W
BRICKWC TERRACE
FP
METAL ROOF
TOILET 1 AREA 3.26 m2
LOT 2 EX KITCHEN
EX HALLWAY
EX DINING ROOM
DP 913615
RL 11.81
COURTYARD AREA 17.6 m2
DINING ROOM AREA 7.17 m2
CAROLINE LANE
STUDIO AREA 8.05 m2
INDOOR COURTYARD AREA 1.8m2
EX W
EX W
SITE BOUNDARY 22.175M 61° 32'
TOILET 1 AREA 3.26 m2
ROOF
METAL ROOF No. 17
EX W
1 & 2 STOREYED BRICK TERRACE METAL ROOF
INDOOR COURTYARD AREA 1.8m2
DP 913615 KITCHEN AREA 5.9 m2
SKL
LIVING ROOM AREA 7.07m2
LEGEND PROPOSED DEMOLITIAN
LOT 2
METAL
BRICKFPTERRACE
FP
22545.21 mm
EX D
COUNCIL STREET
SUPPLY ROOM AREA 8.05 m2
SKL
LIVING ROOM AREA 7.07m2
RL 12.00
LAUNDRY AREA 1.87 m2
RL 11.81
KITCHEN AREA 5.9 m2
1 & 2 STOREYED
1
No. 17
EX D
COUNCIL STREET
EX W
RL 15.56
3.88
SITE BOUNDARY 22.175M 61° 32'
EX RENDERED MASONRY WALL + PAINT
METAL FP ROOF
EX W
LAUNDRY AREA 1.87 m2
RL 12.06
1 & 2BRICK STOREYED
COURTYARD AREA 17.6 m2
4
TOG 15.05
INDOOR COURTYARD AREA 1.8m2
RL 14.57
2
GROUND FLOOR FFL +12.04
EX BED 2
SKL
SITE
DINING ROOM AREA 7.17 m2
COURTYARD AREA 17.6 m2
STUDIO AREA 8.05 m2
CLIENT:
19 COUNCIL STREET, ST PETERS
TASK/DRAWING TITLE METAL ROOF DEMOLITIAN SECTION
EX BED 1
ROOF VOID
TOG 18.21
1
ROOF
RL 15.56
94.3 m2/85.36 m2 =1.105
TOG 18.19
RL 21.39
BATHROOM AREA 5.16 m2
Floor Space Ratio Total Area/ Land area = FSR
SITE BOUNDARY
RIGHT OF WAY
CAROLINE LANE 1 & 2 STOREYED
94.3 m2/85.36 m2 =1.105
SITE BOUNDARY
LOT 2
METAL
METAL ROOF
Total Area/ Land area = FSR
TOG 18.19
EX LIVING ROOM
EX BED 1
RL 11.62
RL 11.60
EX LIVING ROOM
22545.21 mm
BRICK TERRACE
Floor Space Ratio
RL 11.62
RL 11.60
22545.21 mm
RIGHT OF WAY
SITE BOUNDARY
SITE BOUNDARY 22.175M 61° 32'
1 & 2 STOREYED
2
GROUND FLOOR FFL +12.04
SITE BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M 151° 43'
CAROLINE LANE
SITE BOUNDARY FIRST FLOOR FFL +15.20
SKL
INDOOR COURTYARD AREA 1.8m2
COUNCIL STREET
ROOF RIDGE RL +20.59
SKL
QUIET SPACE AREA 18.9 m2
COUNCIL STREET
ROOF RIDGE RL +20.59
SKL SKL
SITE BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M 151° 43' SITE BOUNDARY 3.66M 151° 43'
COUNCIL STREET
SITE BOUNDARY 22.175M 61° 32'
1A
DRAWING NO. NO. TUTOR PROJECT NAME TASK NORTH IONA DEBRA WILLIAMS BDES3025 3 11.09.2020 FLOOR PLANS DATE: LOT 2 SCALE DRAWN DRAWING NO. DP 913615 1:100 @ A3PROJECT: JASMINE19 (480376169) CLARE (480371371) DA091:100 @ A3 COUNCIL ST, ST PETERS N.S.W 2044 SCALE
DATE 09 NOV 2020
DRAWING TITLE:
No. 17
22545.21 mm
LEGEND PROPOSED DEMOLITIAN
SITE
CLIENT:
19 COUNCIL STREET, ST PETERS
TASK/DRAWING TITLE DEMOLITIAN SECTION
1A
DRAWING NO. NO. TUTOR PROJECT NAME TASK NORTH IONA DEBRA WILLIAMS BDES3025 3 DRAWING TITLE: 11.09.2020 FLOOR PLANS DATE: SCALE DRAWN DRAWING NO. 1:100 @ A3PROJECT: JASMINE19 (480376169) CLARE (480371371) DA091:100 @ A3 COUNCIL ST, ST PETERS N.S.W 2044 SCALE
DATE 09 NOV 2020
4.0 WILKINSON WORKSPACE This project was informed by an indoor environmental quality (IEQ) assessment and using the conclusions drawn from this assessment to propose a new activity based workspace catered for a law firm. As such the necessary graphical data including thermal comfort, illuminance level and sound pressure level were conducted, alongside the personal control systems that were available. Both levels of the design maximised the opportunity to provide the law firm employees the choice of choosing their desired microenvironment for their specific work task in order to increase their individual productivity.
A C
B
D
3
2 E
G
F I
H
J K
L
O
N
1 Lvl 4 Workspace Floor Plans Scale 1:100 @ A3
LEGEND M
A. Change Rooms B. Private Rooms C. Conference Rooms/Multipurpose Rooms D. Reception Area E. Break Room: Seating Area 1 F. Print/Scan/Copy Room G. Locker Room H. Break Room: Kitchen I. Existing Atrium J. Open Workspace: Team Space K. Break Room: Seating Area 2 L. Open Workspace: Individual/Partner Space M. Open Workspace: Collaborative Space N. Open Workspace: Team Space O. Open Workspace: Collaborative Space
ACOUSTICS
LIGHT
MIND
AIR
FITNESS
THERMAL COMFORT
2 1
SECTION 1
4
5
3
SECTION 2
6
SECTION 3
1 Group meeting room located within the open workspace encourages collaborative work. Thermal comfort consideration is shown via the air conditioning provided specifically for the room with its corresponding local control panel at the entrance of the space (7.5 fitwel). The vertical timber columns acting as the opening wall of the room, allow the fresh air (15 WELL Building) to enter the space provided that the operable window coming from the team workspace is open and is circulated by the ceiling fan.
2 The angled window that frames the existing atrium provides enough daylight to give the occupants relevance to the time of day in relation to their circadian rhythms, but at the same time the window should be able to also reduce the potential heat gain of the space from the skylight atrium (16 WELL Building) as well.
3 The vegetation wall that surrounds the atrium is meant to help ease the stress indusive environment as a means to prioritise occupancy mental health to increase productivity (88 WELL Building, 100 WELL Building and 7.2 fitwel) and act as a cooling and air purifying system.
4 The materiality of the stone internal cladding along with the respective insulation and masonry wall system, regulates the thermal conditions by minimising the heat transfer between the external climate of Sydney and the indoor climate of the workspaces, and acts as an effective thermal mass for the building.
5 The print room positioned between the workspace zone and the reception/visitors lounge is intended to be a social space that engages conversation amongst employees whilst also encouraging the need to move away from the desk (75 WELL Building). The dual entrances provide an open circulation path for all occupants and the vertical timber columns create a semi enclosed space (89 WELL Building).
6 Collaborative space contains two windows; one that is fixed with double glazing, and one that is operable with transparent horizontal louvres that can be opened to receive fresh air and increase the overall ventilation of the entire workspace (15/19 WELL Building) whilst also contributing to the cooling of the space (16 WELL Building). Windows also helps with the need of views to nature (7.2 fitwel standard), which intends to aid the mental health of occupants. Provision of natural daylight relates to user’s circadian system (61 WELL Building), assisting individual productivity and efficiency. banzoc designs | wilkinson workspace
39
NATURAL LIGHTING AND VENTILATION
PERSONAL CONTROL LIGHTING AND VENTILATION
1
G
H
F
2
B
E
D
A
C
O J N
J
I LEGEND M
K
Lvl 5 Workspace Floor Plans Scale 1:100 @ A3
L
3
A. Senior Partners Office B. Audio/Visual Conference Room C. Curved Staircase D. Archive/Doc Printing and Filing E. Exercise Room F. Change Room/Showers G. Quiet Activity Based Workspace H. Preserntation/Discussion space I. Existing Atrium J. Walking Terrace K. Kitchenette/Break Room L. Private work cells M. Collaborative Activity Based Workspace N. Presentation/Discussion Room O. Toilets
ACOUSTICS
LIGHT
MIND
AIR
FITNESS
1 2
SECTION 1
3
SECTION 2
5
SECTION 3
THERMAL COMFORT
1 The use of external shading device of a fixed overhang is implemented in order to block the high angled sun from entering the space and disrupting user producivity. This is alongside ensuring that no additional heat from the external climate of Sydney increase the room temperature to be uncomfortable for the employees.
2 A partition shelf is added in the case where computer screens are facing the windows as to deflect glare without blocking cross ventilation from one side of the room to the other. This shelf also operates as a divider between the workspace and more communal area facing towards the north western windows overlooking the main roads, thus creating a subtle noise barrier.
3 The materiality of the stone internal cladding along with the respective insulation and masonry wall system, regulates the thermal conditions by minimising the heat transfer between the external climate of Sydney and the indoor climate of the workspaces, and acts as an effective thermal mass for the building. This is in addition to contributing to the overall aesthtics of the office by proviiding a sense of texture to the spaces.
4 The integration of indoor plants to increase access to natural elements within the workspace is intended to reduce stress and improve the mental state of the users (7.2 Fitwel Standard) while also naturally dehumidifying the air, of which additionally improve occupant experience. This is on top contributing towards the overall aesthetic features of the office.
4
5 Operable louvered glass windows are used to allow for maximum air flow where occupants can control via adjustable blades.The windows are positioned vertically spanning from the working plane to the ceiling so as to improve the daylight factor while allowing light to reach the desks at a steeper angle, light diffusion and improve view of the horizon; in addition to providing “stack effect” during still days. (19 well Building standard)
6
6 Double glazing is used to prevent heat transfer from the surrounding atmosphere compared to low-E glass which is more effective in areas exposed to direct sunlight. As such, the north eastern and north western facing facades have the relevant shading devices to further reduce radiant and potential heat gain that can impact employee comfortability and productivity. banzoc designs | wilkinson workspace
43
Curved Staircase Connection between the two levels positioned directly at the entrance of level four without disrupting pedestrian flow or fitness of which is encouraged by the biophelia and bike presence.
Conference Room A temporary collaborative space that engages conversation and many different legal representatives and clients, with the respective controlled lighting and noise elements that assist the function.
Semi Enclosed Activity Based Workspace Evidence of semi enclosed spaces that provide a balance of collabration or the optional individual work that law firm employees can maximise according to their necessary tasks.
Collaborative Activity Based Workspace Combination of different furniture and workplace settings encourage multitudes of collaboration and discussions between law firm employees working on client specific cases.
5.0 UNIVERSITY FACILITY As a collaborative project with colleague my Carla Alkhouri, this university facility was a combination of separate initial design schemes with a user profile of students who wish to enjoy their break/s between lectures or tutorials. However, this facility additionally plans to give students a temporary room or a place to stay over-night if needed. As such this influenced the development of three separate programs that ultimately shaped the kind of activities and spaces that the facility offered including forms of relaxation, loud and proactive venues, and temporary residental rooms.
SITE ANALYSIS Wentworth Building - Food Court - Student Services - Pool Tables - International Student Lounge - Medical Centre - Commonwealth Bank - Cafes - Optometrist - Language Programs
Seymour Centre - Lecture Theatres - Live Performances
Urbanest - Student Accommodation - Long Term Stay - Gym - Pool Tables
SciTech Library Verge Gallery
Cafe
School of Engineering
Merewether Building
Co-op Shop - Stationary Items - Books - USYD Merch Sports and Aquatic Centre - Gym - Swimming Pool - Yoga - Basketball Courts - Showers
Cafe
Childcare Centre
Brydens Stadium
Tafe Business School Service Centre
Church Pub - Music - Drinks - Food
Italian Restaurant
Public Semi-Public Private
Public Semi-Public Private
Public Public Semi - Private Semi-Public Private Private
Traffic noise Vehicular Circulation Vehicular Circulation Pedestrians Pedestrian Circulation Pedestrian Circulation Church bells
Vehicular Circulation
Pedestrian Circulation
Public Semi-Public Private
Traffic noise Traffic Noise Pedestrians Pedestrians Church Bells Church bells
PLAN VehicularSITE Circulation Vehicular Circulatio Pedestrian Circulation Pedestrian Circulat
Morning wind Morning wind Afternoon wind Afternoon wind
Morning Wind
Afternoon Wind
EAST ELEVATION
NORTH ELEVATION
CEMENT BOARD CLADDING
EXTERNAL WALL TO GROUND
30MM 15MM 70MM 50MM
TIMBER STUD CAVITY SHEATHING BOARD WITH WRB STEEL FRAME RIGID INSULATION
10MM GYPSUM BOARD CARPET FLOORING SCREED 100MM THERMAL INSULATION THICKENED END CONCRETE SLAB
10MM 70MM 50MM 10MM
INTERNAL PARTITION TO GROUND
GYPSUM BOARD STEEL FRAME BATT INSULATION GYPSUM BOARD
CARPET FLOORING SCREED 100MM THERMAL INSULATION THICKENED END CONCRETE SLAB
REFERENCE EXTERNAL WALL DETAIL DRAWING
EXTERNAL WALL TO EAVE/WALKWAY
TIMBER FLOOR DECKING UNIVERSAL BEAM SECONDARY STRUCTURE OPEN WEB STEEL JOISTS UNIVERSAL BEAM PRIMARY STRUCTURE
CARPET FLOORING SHEATHING BOARD AND CARPET UNDERLAY THERMAL INSULATION
FLOOR AND CEILING
UNIVERSAL BEAM PRIMARY STRUCTURE DOUBLE LAYER 10MM GYPSUM BOARD PERFORATED CEILING REFERENCE INTERNAL PARTITION DETAIL DRAWING
ROOF COVERING SEPARATING LAYER BOARDING TIMBER STUD CAVITY SHEATHING LAYER BOLTED STEEL PLATE 70 mm THERMAL INSULATION VAPOUR BARRIER 70 mm STEEL FRAME 50 mm RIGID INSULATION PERFORATED CEILING
CARPET FLOORING
ROOF AND EXTERNAL WALL
FLOOR, CEILING AND EXTERNAL WALL
CARPET UNDERLAY AND SHEATHING BOARD THERMAL INSULATION BOTTOM WALL PLATE TIMBER FLOOR JOISTS TIMBER RIM HEADER CLIP ANGLE TOP WALL PLATE THERMAL INSULATION DOUBLE LAYER 10 mm GYPSUM BOARD PERFORATED CEILING
CEMENT BOARD CLADDING 30 mm TIMBER STUD CAVITY 15 mm SHEATHING BOARD WITH WRB 70 mm STEEL FRAME 50 mm RIGID INSULATION 10 mm GYPSUM BOARD CARPET FLOORING FLOORING SCREED 100 mm THERMAL INSULATION
FOUNDATION CHANNEL STUDS BOLTED TO CONCRETE THICKENED CONCRETE SLAB
TERMITE VAPOUR BARRIER
FOUNDATION AND EXTERNAL WALL
6.0 MODEL MAKING Making models is a part of every design process as it allows for an opportunity to develop a deeper understanding of the materials, construction and design of the project. It is from this that it provides a more tangible interpretation of the work being presented whether that be conceptual, site related or an explanation of building technologies. As such various model were curated and demonstrate skills of attention to detail, understanding of site and scale, and overall communication skills.