2
Hello
I’m Bedatri Anand.I am a fourth Year undergraduate architecture student from Birla Institute of Technology, Mesra. A curious student and highly efficient architecture student, having good teamwork and leadership skills. I like to notice things around me and get motivated by them. Coming up next is the assortment of my scholarly task up to this point, which mirrors my energy for architecture and design. DOB - 04/04/2000 Phone - +91 - 7992415807 Email - b.annanndd@gmail.com Nationality - Indian
A
Curriculum Vitae Education 2018-2023
Department of Architecture and planning, BIT Mesra, Ranchi
2018
The Pentecostal Assembly School,Bokaro
2016
Jusco School Kadma, Jamshedpur
Bachelor of Architecture
Senior Secondary Education Secondary Education
Roles And Responsbilities 2020-2021
Unit Secretary NASA India
2020-2021
Creative Head of SSA
2019-2020
Unit Designee
2019-2020
Executive Member of SSA
2018-2019
Design Team Vajra
2018-2019
Design Team Bitotsav
Bit Mesra
NASA India Bit Mesra Bit Mesra Bit Mesra
Workshops And Experiences 2021
Rhino+Grasshopper Interactive Course Organised by Design Interventions
2021
Youth Architecture Festival
2020
Freelancing
2019
Autodesk Revit Workshop
2019
Arch and Brickwork Hands On workshop
4
Organised By IIA Jharkhand Chapter Worked on 3 Residence Projects Organised BY LOMOS Archilabs Organised By AXIS Architects and Urban Planners
Competitions 2021
The House 2.0 - A Temple for the Body And Soul Organised byArchdais
2020
Node Pavillion Design Challenge
2020
Housing For Migration Workers
2020
120 Hrs
2020
The Habitat - Rethinking Student Housing
2019
Annual NASA Design Competition
Organised by IDHA Labs
Organised by The Drawing Board Organised by 120 hrs Organised by Archmello
Organised by NASA India
Skillset Autocad | Revit | Lumion | Rhino | Photoshop | InDesign | 3DS Max | Sketchup | Keyshot | Vray | Microsoft Suite
References Dr. Satyaki Sarkar
HOD, Department of architecture and Planning BIT Mesra +91-9431597302 hodarchitecture@bitmesra.ac.in
Ar. Rizwan Kazmi
Assistant Professor ,Department of architecture and Planning BIT Mesra +91-6200810109 rizwan@bitmesra.ac.in
A
CONTENTS.
6
Viridescent Shelters
Candor
Advaitya Gallery
Working
Art
Expanse
Shuchi
Drawings
Miscellaneous
A
01 VIRIDESCENT SHELTERS. 3 STAR hotel
Viridescent Shelters announces it identity in the busy area of patratu - Rajbhawan road , a lushy green hotel that connects its visitors to the region’s natural beauty. Ranchi is famous for its hills and soothing waterfalls. Taking inspiration from nature ,the hotel is built to view the majestic hills surrounding it and sense of calmness into the busy urban area where the building stands. The southern and western face of the site recieves direct view of the rock garden and the lake . The place its known for their beauty in the entire cityscape.Taking advantage of abundant wind and in selecting strong , versatile materials that surmount climate challenges. autocad, revit, lumion , photoshop
8
A
1. entrance 2. service entry 3. adminstrative section 4. bar 5. core 6. service core 7. all day dining 8. corridor 9. banquet hall 10. prefunction area 11. pantry 12. kitchen and dining 13. outdoor seating 14. waterbody 9
13
14
3
10
12 10 11 7
6 8
5 4 3
2 1
11
composite wall panels 12
corten steel in the facade
cellulose fiber for roof insulation
100% rainwater is harvested, 100% of grey water is recycled via an on-site sewage treatment plant into flushing, air-cooling and landscaping systems attesting to water-efficiency. Small terraces created in all blocks to promote interaction with external Wenvironment. 13
PLANS
3
2
Legend: 1. core 2. service core 3. pantry 4. gym 5. cafe 6. outdoor seating 7. kids totlot
1 4
5
7
6 7
PLAN AT LVL +4600
4 2
4
5
1
3
5
6
4
PLAN AT LVL +13900 14
Legend: 1. core 2. service core 3. housekeeping 4. suite rooms 5. deluxe rooms 6. premium rooms
Legend: 1. core 2. service core 3. housekeeping 4. premium rooms 5. deluxe rooms
3
4
2
1
5
5
4
4
4
PLAN AT LVL +10600
Legend: 1. core 2. service core 3. housekeeping 4. premium rooms 5. terrace 6. spa 7. deck 8. infinity pool
3
2
4
6
1
5
4 4 7 4
8
PLAN AT LVL +21400 15
SECTIONS
SECTION XX’
16
SECTION YY’
17
02 CANDOR EXPANSE. library
The site is located in Patna . It covers an area of 3.38 acres(13728 sqm). Idea was to coordinate the scene and the structure so it becomes one element. Also, to accomplish this a rectangle (inclined) molded rooftop plane has outgrown the scene and accordingly frames a space of outside seating for reading, recreational space and an open space for youngsters. These all highlights makes peacefulness and tranquility in the space. The yard in the focal point of the structure gives light and breeziness to every one of the spaces inside the structure encompassed by the patio. autocad, revit , lumion , photoshop
18
A
Legend:
1. entrance 2. staff entrance 3. parking 4. outdoor seating 5. roof
2
1 3
5
3
LVL +8000
5
slope gradient 1:16
LVL +4000
4
5 slope gradient 1:16
LVL +0,0
5
4
20
4
terracotta Cladding in the facade
Site View
21
PLANS
PLAN AT LVL +600
PLAN AT LVL +4000 22
Outdoor seating
Outdoor seating
23
24
The inside of the structure has open arrangement of spaces of the library. The incline of the roof is steep on the western side of the library where general segment is found and where users of any age come over and cooperate with one another. The slope turns out to be more progressive towards the finish of the chronicle segment with the goal that the guests feel a liberating sensation in the midst of the timberland of books. 25
SECTIONS
SECTION XX’
26
SECTION YY’
27
03 shuchi.
a modular toilet Shuchi is a modular toilet design for the girls residing in the rural areas . The point of the venture is to assemble a legitimate hygenic latrines for young ladies in the school premises so they can go to the school with next to no concerns . A great deal of young ladies quit school throughout the year the whole way across the nation because of absence of disinfection and security . So it is our responsibilty to plan something practical and financially savvy to get their and our future
revit, lumion , photoshop
28
29
CONSTRUCTION PROCESS
plain
foundation placement
wall panelling
interior framing
interior wall panelling
placement of wooden panel (roof)
30
placement of wooden connectors
central structural frames assembly
placement of floor panel
framing for floor and roof
placement of recycled corrugated sheet
customized gable assembly 31
EXPLODED VIEW
32
PLAN
sections
33
04 ADVAITYA ART GALLERY. VISUALIZATION
Located in the the confluence of Zanskar and Indus; Nimmu Valley the area is covered by lofty snow capped mountains, rugged terrains and deep valley. The aim was to create a serene space to enjoy art in the embrace of nature. A space that can offer us Fascinating views of the mountains, water and nature. Creating a structure that intensifies the charm of towering himalayas and clear blue skies. Where people can enjoy the art amidst the serene gurgling sound of the rivers and the calm atmosphere that pushes one towards their spiritual self.
rhino , vray , lumion , photoshop
34
A
ADVAITYA
ADVAITYA
ART GALLERY
36
37
WORKING DRAWINGS X
BALCONY WIDTH 4000MM
1880
1370
610
620
290
710
Y'
Y
20mm THICK GRANITE COUNTER TOP
OVERHEAD STORAGE LEVEL SINK AS PER SPEC
GAS STOVE
GAS CYLINDER SPACE BELOW COUNTER
600
5000X2000 KITCHEN
700
Z'
300
300
510
500
650
Z
1290
10 MM FLOOR DROP
STORAGE CABINET
X'
STORAGE CABINET
REFRIGERATOR
PLAN
350
100
SLAB AS PER SPEC BEAM AS PER SPEC
450
EXHAUST FAN AT 2460 MM
550
OVERHEAD STORAGE CABINET 550
DOOR AS PER SPEC
CHIMNEY AT 1700 MM
2100
2290
630
TAP FOR WASHING DISHES AT 920 MM BEAM AS PER SPEC 20mm THICK GRANITE COUNTER TOP STORAGE CABINET
920
DISHWASHING MACHINE
3960 1090
350
100
FLOOR FINISH
SECTION YY'
38
BIRLA INSTITUTE OF TECHNOLOGY, MESRA NOTE : 1.
Dimensions are to be read & not to be scaled. 2. Contractor must verity all dimensions of site before commencement of any work and report to the Architect any discrepancy prior to commencement of the project. 4. All drawings and revisions to be read in conjunction with all the relevant drawings.
SLAB AS PER SPEC BEAM AS PER SPEC
20
20
200 20 200 20
200 30
OVERHEAD STORAGE CABINET
CHIMNEY AT 1700 MM
30
30
30 200 30 200
20 200
300
All mechanical and electrical drawings shall be read jointly with the architectural drawings in order to establish a complete list of works.
6.
Refer to separate drawings for any structure cutouts.
7.
All door window opening to be verified as per schedule.
GLASS PARTITION OF 40 MM
130
1700
STORAGE CABINET
380
30
380
30
940
240
20
20
1700
240
20
130
40
630
TILES
5.
SKETCHES INCORPORATED DETAILS DATE DESCRIPTION
100 MM BRICK WALL
590
710
100
500
REV.
350
350
100
75 MM BRICK WALL
G. F. C DRAWINGS DESCRIPTION
SECTION XX'
DATE
REV.
DATE
REV.
REVISIONS DESCRIPTION
KEY PLAN: FIRE REFUSE DECK WIDTH-900 TREAD-250 RISER-150 CAR GARAGE
UP
CAR LIFT
WIDTH-1200 TREAD-250 RISER-150
ELECTRICAL DUCT
UP
FIRE DUCT
RESIDENTIAL LOBBY 9500X6100 SERVANT ROOM 3500X2600
BAR CORRIDOR 2000
TOILET 3000X1800
350
100
SLAB AS PER SPEC
VRV DUCT
ROOM 3 6000X3100
LIFT CAPACITY 680 KGS
BEAM AS PER SPEC
TOILET 2000X1200
TOILET 3000X1800
TOILET 2000X1200 LIVING ROOM DINING SPACE 9000X4600
ROOM 2 6000X3100
BALCONY WIDTH 3100
DRAWING ROOM 6000X4000 ROOM 1 4000X3100
KITCHEN 5000X2000
BALCONY WIDTH 4000
BALCONY WIDTH 3100
BALCONY WIDTH 4000
N Architects : Student architects of BIT Mesra, BIT Mesra, Ranchi, Jharkhand Structures :
540
540
OVERHEAD STORAGE CABINET
650
1290
650
2500
ENTRANCE ARCH
REFRIGERATOR
1300
20mm THICK GRANITE COUNTER TOP
700
Plumbing & : Fire Fighting
880
900
1320
STORAGE CABINET
STORAGE CABINET
Electrical :
350
100
FLOOR FINISH
HVAC :
Landscape :
SECTION ZZ'
CLIENT : BIRLA INSTITUTE OF TECHNOLOGY, MESRA, RANCHI JOB TITLE :
DRAWING TITLE :
KITCHEN DETAILS
Job No. : Drawn By : BEDATRI ANAND Checked By : Date :
BIT / H14 / __
Scale :1:25
39
SOAP HOLDER AT HT.1200 MM TAP AT 800 MM HT.
FLOOR TRAP WC AS/ SPEC
X'
250
Y'
150
C.L C.L
C.L
C.L
300
350
270
C.L
270
240
C.L
80
FLOOR TRAP
C.L C.L
Z
Z'
C.L
150
C.L
770
680
C.L
C.L
C.L
C.L
C.L
TOILET PAPER HOLDER AT HT. 850 MM JET SPRAY AT HT. 850 MM
TOILET 2200X1530 C.L
760
2200
C.L
GYSER AS/ SPEC AT HT. 2100 MM
C.L
C.L
WASHBASIN AT HT. 800 MM 390
C.L
C.L
SOAP HOLDER AT HT. 800 MM
C.L
780
C.L
280
1530 620
1320
CLOTHES HOLDER AT HT.1200 MM
150
C.L
10 MM FLOOR DROP
X
Y
PLAN
C.L
C.L 250
BEAM AS PER SPEC
100
250
SLAB AS PER SPEC
1100
410
550
GYSER AS/ SPEC AT HT. 2100 MM
DOOR AS PER SPEC DADO TILES OF 300MM X 300 MM FROSTED GLASS PARTITION 30 MM THICK
2100
CLOTHES HOLDER AT HT.1350 MM
800
1350
TAP AT 800 MM
2200 770
420
10 MM FLOOR DROP
280
100
250
250
C.L
C.L
SECTION XX'
40
BIRLA INSTITUTE OF TECHNOLOGY, MESRA C.L
C.L
C.L
NOTE : 250
BEAM AS PER SPEC
100
SLAB AS PER SPEC
1100
120
GYSER AS/ SPEC AT HT. 2100 MM
1.
Dimensions are to be read & not to be scaled.
2.
Contractor must verity all dimensions of site before commencement of any work and report to the Architect any discrepancy prior to commencement of the project.
3.
All drawings and revisions to be read in conjunction with all the relevant drawings.
4.
All mechanical and electrical drawings shall be read jointly with the architectural drawings in order to establish a complete list of works.
5.
Refer to separate drawings for any structure cutouts. All door window opening to be verified as per schedule.
6.
DADO TILES OF 300MM X 300 MM WINDOW AT 1410 MM
2660
SOAP HOLDER AT HT.1200 MM
SKETCHES INCORPORATED DETAILS DESCRIPTION
DATE
REV.
DATE
REV.
DATE
REV.
2110
CLOTHES HOLDER AT HT.1200 MM
G. F. C DRAWINGS DESCRIPTION
1180
750
1200
1190
1410
WC AS/ SPEC TAP AT 750 MM
1530 370
270
550
10 MM FLOOR DROP
330 250
REVISIONS
100
250
250
C.L
C.L
DESCRIPTION
C.L
SECTION ZZ' C.L
KEY PLAN: C.L
C.L
C.L
FIRE REFUSE DECK WIDTH-900 TREAD-250 RISER-150
250
CAR GARAGE
UP
CAR LIFT
250
BEAM AS PER SPEC
WIDTH-1200 TREAD-250 RISER-150
ELECTRICAL DUCT
VRV DUCT
ROOM 3 6000X3100
RESIDENTIAL LOBBY 9500X6100 SERVANT ROOM 3500X2600
BAR TOILET 3000X1800
CORRIDOR 2000 LIFT CAPACITY 680 KGS
SLAB AS PER SPEC
100
UP
FIRE DUCT
TOILET 2000X1200
TOILET 3000X1800
BALCONY WIDTH 3100
TOILET 2000X1200 DRAWING ROOM 6000X4000
LIVING ROOM DINING SPACE 9000X4600
ROOM 2 6000X3100
ROOM 1 4000X3100
KITCHEN 5000X2000
BALCONY WIDTH 4000
BALCONY WIDTH 4000
BALCONY WIDTH 3100
1090
N Architects : Student architects of BIT Mesra, BIT Mesra, Ranchi, Jharkhand Structures : WINDOW AS PER SPEC
Plumbing & : Fire Fighting
DADO TILES OF 300MM X 300 MM
2110
MIRROR AT HT. 910 MM
Electrical :
TOILET PAPER HOLDER AT HT. 850 MM SOAP HOLDER AT HT. 800 MM JET SPRAY AT HT. 850 MM
HVAC :
790
Landscape :
WC AS/ SPEC
400 680
850
850
WASHBASIN AT HT. 800 MM
2200 150
490
10 MM FLOOR DROP
880
100
250
250
C.L
C.L
C.L
C.L
CLIENT : BIRLA INSTITUTE OF TECHNOLOGY, MESRA, RANCHI JOB TITLE :
DRAWING TITLE :
TOILET DETAILS
SECTION YY'
Job No. : Drawn By :
BEDATRI ANAND
Checked By : Date :
BIT / H14 / __
Scale : 1:20
41
1
2
4
3
5600
5600
5
5600
6
5600
7
5600
8
5600
5600
+23600.00 MUMTY
+22500.00 PARAPET
PARAPET
PARAPET
PARAPET
+21500.00 TERRACE
WASHROOM
+18550.00 SIXTH FIN LVL.
GAP
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
GAP
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
GAP
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
GAP
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
GAP
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
GAP
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
GAP
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
FLOOR DROP
+18500.00 TOP OF SLAB
WASHROOM
+15550.00 FIFTH FIN LVL.
FLOOR DROP
+15500.00 TOP OF SLAB
WASHROOM
+12550.00 FOURTH FIN LVL.
FLOOR DROP
+12500.00 TOP OF SLAB
WASHROOM
+9550.00 THIRD FIN LVL.
FLOOR DROP
+9500.00 TOP OF SLAB
WASHROOM
+6550.00 SECOND FIN LVL.
FLOOR DROP
+6500.00 TOP OF SLAB
WASHROOM
+3550.00 FIRST FIN LVL.
FLOOR DROP
+3500.00 TOP OF SLAB
WASHROOM
+500.00 PLINTH FIN LVL.
FLOOR DROP
+450.00 TOP OF SLAB
±0.0 GROUND LVL.
SECTION THROUGH XX'
A 1700
4300
E
D
C
B
2000
4300
F 1700
+23600.00 MUMTY
MUMTY
+22500.00 PARAPET
PARAPET +21500.00 TERRACE
BALCONY
ROOM
CORRIDOR
ROOM
ROOM
CORRIDOR
ROOM
ROOM
CORRIDOR
ROOM
ROOM
CORRIDOR
ROOM
ROOM
CORRIDOR
ROOM
ROOM
CORRIDOR
ROOM
ROOM
CORRIDOR
ROOM
BALCONY
+18550.00 SIXTH FIN LVL. +18500.00 TOP OF SLAB
BALCONY
BALCONY
+15550.00 FIFTH FIN LVL. +15500.00 TOP OF SLAB
BALCONY
BALCONY
+12550.00 FOURTH FIN LVL. +12500.00 TOP OF SLAB
BALCONY
BALCONY
+9550.00 THIRD FIN LVL. +9500.00 TOP OF SLAB
BALCONY
BALCONY
+6550.00 SECOND FIN LVL. +6500.00 TOP OF SLAB
BALCONY
BALCONY
+3550.00 FIRST FIN LVL. +3500.00 TOP OF SLAB
BALCONY
BALCONY
+500.00 PLINTH FIN LVL. +450.00 TOP OF SLAB
±0.0 GROUND LVL.
SECTION THROUGH YY'
42
BIRLA INSTITUTE OF TECHNOLOGY, MESRA NOTE :
9
10
5600
12
11
5600
5600
13
5600
14
5600
1. 2.
5600
3.
PARAPET
LIFT MACHINE ROOM
MUMTY
PARAPET
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
No.OF STEPS - 20 RISER (R)- 150 MM TREAD (T)- 300 MM WIDTH OF STAIRS-1240MM
ROOM
LIFT
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
MID LANDING STEP 130 LVL +20050
No.OF STEPS - 20 RISER (R)- 150 MM TREAD (T)- 300 MM WIDTH OF STAIRS-1240MM
ROOM
MID LANDING STEP 110 LVL +17050
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
No.OF STEPS - 20 RISER (R)- 150 MM TREAD (T)- 300 MM WIDTH OF STAIRS-1240MM
ROOM
MID LANDING STEP 90 LVL +14050
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
No.OF STEPS - 20 RISER (R)- 150 MM TREAD (T)- 300 MM WIDTH OF STAIRS-1240MM
ROOM
MID LANDING STEP 70 LVL +11050
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
No.OF STEPS - 20 RISER (R)- 150 MM TREAD (T)- 300 MM WIDTH OF STAIRS-1240MM
ROOM
4. 5. 6. 7. 8. 9. 10.
Dimensions are to be read & not to be scaled. Contractor must verity all dimensions of site before commencement of any work and report to the Architect any discrepancy prior to commencement of the project. This drawing, as an instrument of service is the exclusive property of Department Of Architecture, BIT Mesra and may nol be reproduced and/or copied without prior permission The information shown on this drawing is for use on the specified project only, and shot of be Used otherwise. All drawings and revisions to be read in conjunction with all the relevant drawings. All mechanical and electrical drawings shall be read jointly with the architectural drawings in order to establish a complete list of works. Refer to separate drawings for any structure cutouts. All door window opening to be verified as per schedule. Refer to General Notes in drawing No. _____ for all legends, abbreviations, labels. All columns are centrally aligned with the grids U.N.O. For column sizes refer Column Schedule.
SKETCHES INCORPORATED DETAILS DESCRIPTION
DATE
REV.
DATE
REV.
DATE
REV.
MID LANDING STEP 50 LVL +8050
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
No.OF STEPS - 20 RISER (R)- 150 MM TREAD (T)- 300 MM WIDTH OF STAIRS-1240MM
ROOM
MID LANDING STEP 30 LVL +5050
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
No.OF STEPS - 20 RISER (R)- 150 MM TREAD (T)- 300 MM WIDTH OF STAIRS-1240MM
ROOM
G. F. C DRAWINGS DESCRIPTION
MID LANDING STEP 10 LVL +2050
LIFT PIT 1500 MM DEPTH
REVISIONS DESCRIPTION
KEY PLAN:
LEGEND:CONCRETE N
300MM SUNK
Architects : Student architects of BIT Mesra, BIT Mesra, Ranchi, Jharkhand Structures :
FLOOR FINISH
BRICKWORK
Plumbing & : Fire Fighting Electrical :
HVAC :
Landscape :
CLIENT : BIRLA INSTITUTE OF TECHNOLOGY, MESRA, RANCHI JOB TITLE :
BOYS HOSTEL, BIT MESRA, RANCHI DRAWING TITLE :
SECTIONS Job No. : Drawn By : BEDATRI ANAND
Checked By :
BIT / H14 / 004
Date : 12/4/21 Scale : 1:150
43
1
2
4
3
5
8
7
6
+23650.00 MUMTY FIN LVL. +23600.00 TOP OF SLAB
+21550.00 SEVENTH FIN LVL. +21500.00 TOP OF SLAB -3500
±0.0
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W1
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W1
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
PLASTERED WITH PAINT AS PER APPROVAL +18550.00 SIXTH FIN LVL. +18500.00 TOP OF SLAB
-3500
±0.0
+15550.00 FIFTH FIN LVL. +15500.00 TOP OF SLAB
-3500
±0.0
+12550.00 FOURTH FIN LVL. +12500.00 TOP OF SLAB
-3500
±0.0
W1
+9550.00 THIRD FIN LVL. +9500.00 TOP OF SLAB
-3500
±0.0
W1
+6550.00 SECOND FIN LVL. +6500.00 TOP OF SLAB -3500
±0.0
W1
+3550.00 FIRST FIN LVL. +3500.00 TOP OF SLAB
±0.0
W2
W1
W2
W2
W2
W2
W2
W2
W2
W2
W2
D1
-3500
W2
W2
RAILING AS PER DETAIL
+500.00 PLINTH FIN LVL. +450.00 TOP OF SLAB
±0.0 GROUND LVL.
% $ & . ( / ( 9 $ 6 & $ / (
' , $ 0 ( 7 ( 5 + 2 / / 2 : 0 6 3 , 3 ( $ 6 + $ 1 ' 5 $ , / 6 & 5 ( : ( ' 7 2 : $ / /
260
1050
335
F.D. 1
335
260
+ 2 5 , = 2 1 7 $ / 5 $ , / 6 $ 1 ' 9 ( 5 7 , & $ / 3 2 6 7 6 : ( / ' ( ' 7 2 ( $ & + 2 7 + ( 5
' , $ 0 ( 7 ( 5 + 2 / / 2 : 0 6 3 , 3 ( $ 6 9 ( 5 7 , & $ / 3 2 6 7 6 6 & 5 ( : ( ' 7 2 % 5 , & . ' ( & . , 1 *
F.D. 2
' , $ 0 ( 7 ( 5 + 2 / / 2 : 0 6 3 , 3 ( $ 6 0 , ' 5 $ , / 6 6 & 5 ( : ( ' 7 2 : $ / /
% $ / & 2 1 < 6 ( & 7 , 2 1 ' , $ 0 ( 7 ( 5 0 6 9 ( 5 7 , & $ / 3 2 6 7 : ( / ' ( ' 7 2 3 / $ 7 (
' , $ 0 ( 7 ( 5 0 6 + $ 1 ' 5 $ , / : ( / ' ( ' 7 2 3 / $ 7 (
' , $ 0 ( 7 ( 5 0 6 3 / $ 7 ( 6 & 5 ( : ( ' 7 2 7 + ( : $ / /
' , $ 0 ( 7 ( 5 0 6 3 / $ 7 ( 6 & 5 ( : ( ' 7 2 7 + ( : $ / /
0 0 % 5 , & . ' ( & . , 1 *
0 0 6 / $ % 0 0 % 5 , & . : $ / /
) , ; , 1 * ' ( 7 $ , /
) , ; , 1 * ' ( 7 $ , /
% $ / & 2 1 < 6 ( & 7 , 2 1 6 & $ / (
44
BIRLA INSTITUTE OF TECHNOLOGY, MESRA 9
10
12
11
13
14
NOTE : 1.
Dimensions are to be read & not to be scaled.
2.
Contractor must verity all dimensions of site before commencement of any work and report to the Architect any discrepancy prior to commencement of the project.
3.
This drawing, as an instrument of learning is the exclusive property of Department Of Architecture, BIT Mesra and may not be reproduced and/or copied without prior permission The information shown on this drawing is for use on the specified project only, and should not be used otherwise.
4.
All drawings and revisions to be read in conjunction with all the relevant drawings.
5.
All mechanical and electrical drawings shall be read jointly with the architectural drawings in order to establish a complete list of works.
6.
Refer to separate drawings for any structure cutouts.
7.
All door window opening to be verified as per schedule.
MUMPTY AND WATER TANKS IN ELEVATION
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
W2
D1
D1
W2
W2
D1
D1
W2
±0.0
W1
PLASTERED WITH PAINT AS PER APPROVAL
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
W2
D1
D1
W2
W2
D1
D1
W2
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
D1
W2
±0.0
W1
±0.0
W1
SKETCHES INCORPORATED DETAILS ±0.0
W1
DESCRIPTION
DATE
REV.
DATE
REV.
DATE
REV.
±0.0
W1
G. F. C DRAWINGS
2
W2
W2
W2
W2
W2
W2
W2
W2
W2
±0.0
W1
DESCRIPTION
±0.0
W1
REVISIONS DESCRIPTION
7 , 2 1
KEY PLAN:
A
B
C
E
D
BIT Mesra Sports Complex
N
MUMPTY AND WATER TANKS IN ELEVATION +23650.00 MUMTY FIN LVL. +23600.00 TOP OF SLAB
-67450
Architects : Student architects of BIT Mesra, BIT Mesra, Ranchi, Jharkhand
+21550.00 SEVENTH FIN LVL. +21500.00 TOP OF SLAB +2000
±0.0
+2000
±0.0
+2000
±0.0
+2000
±0.0
+2000
±0.0
HVAC :
±0.0
Landscape :
Structures :
+18550.00 SIXTH FIN LVL. +18500.00 TOP OF SLAB
+15550.00 FIFTH FIN LVL.
PLASTERED WITH PAINT AS PER APPROVAL
+15500.00 TOP OF SLAB
+12550.00 FOURTH FIN LVL. +12500.00 TOP OF SLAB
+9550.00 THIRD FIN LVL. +9500.00 TOP OF SLAB
Plumbing & : Fire Fighting Electrical :
+6550.00 SECOND FIN LVL. +6500.00 TOP OF SLAB +2000
+3550.00 FIRST FIN LVL. +3500.00 TOP OF SLAB +2000
±0.0
CLIENT : BIRLA INSTITUTE OF TECHNOLOGY, MESRA, RANCHI
RAILING AS PER DETAIL
+500.00 PLINTH FIN LVL. +450.00 TOP OF SLAB
JOB TITLE :
±0.0 GROUND LVL.
6 , ' ( ( / ( 9 $ 7 , 2 1 6 & $ / (
BOYS HOSTEL, BIT MESRA, RANCHI DRAWING TITLE :
( / ( 9 $ 7 , 2 1 6 Job No. : Drawn By :
% ( ' $ 7 5 , $ 1 $ 1 '
Checked By : Date :
BIT / H14 / __
Scale :
45
06 miscellaneous Extracurricular are vital to build efficiency and improve imagination. It generally assisted me with investigating the force of inventive reasoning and contributed by implication to scholastics. Photography and visual communication consistently go about as a medium to portray craftsmanship, culture, and stories. Photographs catch the second as well as the entire setting around it. It can have various translations, each prompting innovative idea, while delineations are a theoretical portrayal of suppositions and perspectives. Fostering the outline idea from a thought is an explorative cycle. As far as I might be concerned, an outline ought to identify with individuals, making it seriously interesting and prompting a discussion.
photography, pavillions , workshops
46
47
48
49
50
51
Contact +91-7992415807 b.annanndd@gmail.com