405 final presentation (1)

Page 1

LOS ANGELES FAR EAST ARENA Christopher Riley / Genesis Anaya / Pepe Mero / Behamin Barootkoob Rocky Chen / Jaime Garcia Instructors: Axel Schmitzberger + Mikhail Gershfeld


See Zone 7

See Zone 6

See Zone 7A

See Zone 11

See Zone 11 1

See Zone 14

See Zone 14

See Zone 14A

See Zone 15

See Zone 15

See Zone 15A

See Zone 15A

See Zone 17A

See Zone 15A

See Zone 15

See e Zone 16

See Zone 15

See Zone 14A

See Zone 14

See Zone 13

See Zone Zon 12

See Zone on 13 3

See Zone 13 3

See Zone 16

SSee Zone 16

See Zone Z 4

See Zone 3

See Zone 2 See Zone 5

See Zone 7A

SSee Zone 10

See Zone 7

See eZ Zone 7

See Zone 7A

See Zone 10

See Zone 7

See Zone 7 See Zone 12

See Zone 7

SSee Zone 6

See Zone 9

See Zone Zo 6

See Zone 5

See Zone 9

See Zone 17

See Zone 6

See Zone 17A

See Zone 3

See Zone 5

See e Zone 2

See Zone 5

See Zone 4

See Zone 8

See Zone 1

See Zone 4

See Zone 3A













SECTION 3/16”= 1’-0”


17.2”

Photocell button 9.88”

3.0”

4.9”

4.3”

4.3”

30.23”

3.0”

LIGHTING FIXTURE 1”= 1’-0”

PLAN 1/64”= 1’-0”


2.9"

95.3"

2.9"

48.0"

1.6" 5.7"

3.4" 1.8"

5.9"

3.8"

4.3"

LIGHTING FIXTURE 1”= 1’-0”

60

O

65

O

70

O

LIGHTING COVERAGE 3/8”= 1’-0”

LIGHTING PLACEMENT 1/4”= 1’-0”

2.9"

1.6" 5.7"

3.4"

16.5" 1.6"

5.9"

5.7"

3.4" 1.8"

3.8"

4.3"

1.8"

3.8"

5.9" 4.3"


A

A

B

B E

E C

C

D

D G

F

G

F

G

H

G

I

I

H

G

G F

J

J

K

K

F C

C

M

L

L

B

B

M E

E A

UNDERGROUND FLOOR PLAN SCALE: 1/32”=1’-0”

A

A B C D E F G H I J K L M

SHOWER CHANGING ROOM COACH ROOM COACH OFFICE FITNESS ROOM/POOL REFEREE ROOM LOBBY NUETRAL MIXED PRESS ROOM FIRST AID STUDIO DOPING


S

W R

P

T

Q U

O

O

O

O

W

V W

Field of Play

N

N

W V

W

O

O

O

O

U R T

P S

Q

W

48.0000

FIRST FLOOR PLAN SCALE: 1/32”=1’-0”

N O P Q R S T U V W

TICKETING AREA CONSESSION STAND POLICE OFFICE DETAINING ROOM BRIEFING ROOM SECURITY OFFICE CHANGING ROOM IT/BUILDING OPERATIONS FAN RESTAURANT RESTROOMS


AA

AA

Y

Y

Z

W

W

AA

AA

AA

AA

W

W

Z

Z

Y

Y

AA

AA

X

SECOND FLOOR PLAN SCALE: 1/32”=1’-0”

W RESTROOMS X VIP BOX Y VIP RESTAURANT Z CATERING AA POLICE/FIRE DEP. BOX


W

O

O

O

O

W

W

O

O

W

THIRD FLOOR PLAN SCALE: 1/32”=1’-0”

O CONSESSION STAND W RESTROOMS




Dead Loads Roof Truss ~ 3 ft 6 in 20 in 12 in

Risers Upper Tier Raker Beam Lower Tier Raker Beam Column (4’x4’) Beam-Column (5’x4’) Hollow-Core Slab (8” thick)

~12 psf 475 plf or 153 psf 3.5 kip/ft 2.6 kip/ft 2.4 kip/ft 3 kip/ft 92 psf


Live Loads LRoof

Live Load

Psf

Roof

20

Grandstand ASCE 7-10

100

LStands


Seismic Forces Risk Category III Soil Classification D- “Stiff Soil” SS

2.206

S1

0.791

SMS

2.206

SM1

1.186

SDS

1.471

SD1

0.791

Level

W (kips)

Whk

Csx

Fx (kips)

Ta

0.66 seconds

Roof

130

11213

0.28

112

Cs

0.23 g

3rd Floor

391

15953

0.39

156

W

1740 kips

2nd Floor

524

13318

0.33

132

Vbase

400 kips

1st Floor

0

0

0

0

Ȉ = 4084


Wind Loads Risk Category

III

Basic Wind Speed

115 mph

Exposure Category

C

Gust Effect Factor, G

0.85

qz

33 psf

Horizontal Pressure

40 psf

Maximum Horizontal Force

99 kips

Uplift Pressure

-11 psf


Gravity System


Frame System


Roof Analysis

퓨Allowable = L/180= 4.3 in 퓨actual = 2.5 in.


Gravity System Analysis AXIAL Diagram

SHEAR Diagram

MOMENT DIAGRAM

DIFLECTION DIAGRAM


Riser Beam


Upper Tier Raker Beam


Main Beam Member


Short Column


Lateral Load System


Thank You.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.