BELINDA J ESS ICA ARCHITECTURE PORTFOLIO
B. ARCH M. ARCH
CONTENT COMMUNITY PRECINCT 1
PLAY HOUSE 9
FUNCTION CENTRE & RESTAURANT DOLTONE HOUSE ESTATE PROJECT (PROPERTY OF CULLEN FENG ARCHITECT)
15
ALTERATION AND ADDITION PROJECT RESIDENTIAL SINGLE DWELLING (DA) (PROPERTY OF H&D DESIGN STUDIO)
19
DUAL OCCUPANCY PROJECT (DA) (PROPERTY OF H&D DESIGN STUDIO)
21
MIXED USED DEVELOPMENT (CC) (PROPERTY OF H&D DESIGN STUDIO)
23
DINING TABLE IN THE CITY
Joynton Avenue, Green Square People Democratic Precinct. This project is from, by, and for people. Each of our reality counts as each individual form the community and its character. As there are big developments and new residents in Green Square, the community identity is being shifted and modified to this date. With that condition on the background, creating a precinct for Old Resident + New Resident + Forcibly Displaced People which is combined and create the new identity of Green Square. Looking through the future development of Green Square Town Centre and the high density of new residency, it forecast the lack of green spaces for people to gather and socialise. More people, more waste produced, more food supply is needed, more green spaces to gather is needed.
Master Plan
Section 2
Human nature to seek the presence of nature and the increasing food demand in the area throw us back to the traditional way to grow food on the garden by using the waste that we produced daily. This will allow the presence of nature, producing food supply, and recycling waste at the same time. Looking from a different perspective, food is not only part of the survival but also initiating social interactions. It is also argued that food as an experience and events opening the opportunity of social interactions (Fisker & Olsen, 2008). Food-related activities can be enjoyed indoor and outdoor in the design of restaurant, cafes, market, barns, field, and street pavement along the city street under the sun. Entering the meal and food products in the cultural manner and performative experience potentially
Section 1
PLAY HOUSE This project was completed in my last year of architecture postgraduate degree course. The main scope of the co-housing apartment is designed for old people living together with family with progressive community-based activity. This intergenerational scope embraces the importance of play in both generations which will help improve their mental health. The project introduced the idea of friendly common spaces such as common kitchen, laundry, and dining. Other facilities such as commercial shops, workshops, library, roof garden, plant garden, movie area and co-working space.
F E A S I B I L I T Y S T U DY / P R O C E S S MO D E L
INITIAL STUDY MODEL
SIDE VIEW
ELEVATION BACK VIEW
TOP VIEW
F I N A L MO DE L
FINAL MODEL
GROUND FLOOR PLAN
EAST ELEVATION
SECTION 2
LEVEL 1 PLAN
LEVEL 2 PLAN
LEVEL 4 PLAN
LEVEL 6 PLAN
FUNCTION CENTRE NORTH ELEVATION
DOLTONE HOUSE
FUNCTION CENTRE & RESTAURANT INVOLVEMENT AT CULLEN FENG ARCHITECTS
RESTAURANT This project was the first project during my employment in Cullen Feng Architects. I was responsible for the preliminary documentation of the restaurant under supervision of the director. It was a large collaboration of engineer and other consultant which improve my skill in communication and meetings. I was involved in preparing the preliminary CC & Tender Documentation with architectural schedule such as widow, door, lighting, fitting, and finishes.
DOLTONE HOUSE MASTER PLAN
PORTE COCHERE
FUNCTION CENTRE
RESTAURANT CROSS SECTION -NTS
FUNCTION CENTRE
RESTAURANT LONGITUDINAL SECTION-NTS
RESTAURANT GROUND FLOOR -NTS
PROPOSED ALTERATION AND ADDITION H&D Design Studio
65 BALACLAVA ROAD, EASTWOOD INVOLVEMENT: DESIGN PLANNING, 3D MODELING, FACADE DESIGN, PRE- DA DOCUMENTATION
65 Balaclava is one of the most remarkable projects for an alteration and addition of the design scheme in H&D Design Studio. Regardless of the small and narrow site, the spaces that were created in the house are comfortable. The signature of balaclava is its curve metal roof that draws our eyes up to the ceiling looking at the cascade window
and it affects the space and the corridor in a way that it does not feel crammed anymore. I was commanded to be significantly involved in the design planning and it was such an exciting process. I was also committed to complete the pre-Development Application documentation.
FIRST FLOOR PLAN
SOUTH ELEVATION
CROSS SECTION
LONGITUDINAL SECTION
PROPOSEDH&D DUAL OCCUPANCY Design Studio 30 HOLDEN STREET, MAROUBRA INVOLVEMENT: 3D MODELING, FACADE DESIGN, DA DOCUMENTATION
ALFRESCO
VOID
FAMILY
LIVING
STUDY
SECTION B-B
BED
GARAGE
ALFRESCO
STUDY/ GUEST
GARAGE
ALFRESCO
LIVING
LOUNGE
LDRY
DINING
KITCHEN
SHR
SHR
KITCHEN
DINING
LDRY
ALFRESCO
LOUNGE
ALFRESCO
LIVING
STUDY/ GUEST
GARAGE
GROUND FLOOR PLAN METAL ROOFING AS PER SCHEDULE
CAPPING
CAPPING
FLASHING
FLASHING
BATTEN INSULATION WITH REFLECTIVE FOIL R 2.4
CAPPING
METAL ROOFING AS PER SCHEDULE
RAFTER
INSULATION WITH REFLECTIVE FOIL R 2.4
FLASHING TIMBER BATTEN
RAFTER
FLASHING
BOX GUTTER
BATTEN
BATTEN
SHADOW LINE
SHADOW LINE
PLASTERBOARD LINING, PAINT FINISH AS PER SCHEDULE
PLASTERBOARD LINING, PAINT FINISH AS PER SCHEDULE
BATTEN SHADOW LINE
AL. CHANNEL DRIP GROOVE
PLASTERBOARD LINING, PAINT FINISH AS PER SCHEDULE
TIMBER FRAMING F.C. SOFFIT LINING
CEILING JOIST
F.C. BOARD SUPPORT ON PACKERS TO CREATE FALL
WALL INSULATION PLASTERBOARD LINING, PAINT FINISH SKIRTING AS PER SCHEDULE FLOOR FINISH AS PER SCHEDULE
AL. ANGLE TRIM
PLASTERBOARD LINING, PAINT FINISH AS PER SCHEDULE SKIRTING AS PER SCHEDULE FLOOR FINISH AS PER SCHEDULE
CEMENT RENDER, PAINT FINISH BREATHER MEMBRANE FLASHING WEEPHOLE
MIN. 1° FALL
SILL FLASHING WEEPHOLE
RAFTER
RAFTER
SHADOW LINE
SHADOW LINE
PLASTERBOARD LINING, PAINT FINISH AS PER SCHEDULE
PLASTERBOARD LINING, PAINT FINISH AS PER SCHEDULE
CEMENT RENDER, PAINT FINISH BREATHER MEMBRANE PLASTERBOARD LINING, PAINT FINISH AS PER SCHEDULE
SKIRTING AS PER SCHEDULE
FLASHING OVERFLOW WITH MESH COVER
WEEPHOLE
DRAIN
FLOOR FINISH AS PER SCHEDULE
F.C. RENDER & PAINT
PLASTERBOARD LINING, PAINT FINISH AS PER SCHEDULE SKIRTING AS PER SCHEDULE FLOOR FINISH AS PER SCHEDULE
SKIRTING AS PER SCHEDULE
BATTEN SHADOW LINE PLASTERBOARD LINING, PAINT FINISH AS PER SCHEDULE
SECTIONAL WALL DETAIL WALL DETAIL
D
E
C
B
ROOF
LOBBY
LIFT
BEDROOM
BEDROOM
BEDROOM
STORE
PARKING
BEDROOM
BEDROOM
BEDROOM
BEDROOM
LIVING
LIVING
LIVING
LIVING
LOBBY
LOBBY
LOBBY
ROOF LEVEL
RL23
LEVEL 5
RL20
LEVEL 4
RL17
LEVEL 3
RL15
LEVEL 2
RL12
LEVEL 1
RL8.3
BASEMENT 1
RL 5.
LIVING
ROOF
BEDROOM
A
LIVING
LIVING
LIVING
LOBBY
DRIVEWAY
UTLINE OF UILDING
SECTION
MIXED USED DEVELOPMENT H&D Design Studio
51-53 HOWARTH STREET, WYONG INVOLVEMENT: WET AREA DETAILS AND KITCHEN DETAILS 26
D
A C
30
B
KITCHEN DETAIL POST ADAPTABLE - PLAN AND ELEVATION
D
A C
B
BATH DETAIL PRE ADAPTABLE - PLAN AND ELEVATION
D
A C
B
BATH DETAIL POST ADAPTABLE - PLAN AND ELEVATION
T
H
A
N
K
Y
O
U
COPYRIGHT© 2019 BY BELINDA JESSICA
BELINDA J ESS ICA ARCHITECTURE PORTFOLIO
B. ARCH M. ARCH