BEN CHECKLEY
PORTFOLIO
Ben Checkley Architectural Technologist MCIAT
www.linkedin.com/in/ben-checkley-mciat-344b1459
Education, Qualifications and Awards
2015 - 2018
MSc Building Information Modelling and Integrated Design. GRADE: Distinction University of Salford, Manchester
2018
Mott MacDonald Prize for MSc Building Information Modelling & Digital Built Environments
2017/2018
Revit Level 1, Revit Family Creation , Revit MEP Level 1, Navisworks Level 1 - Graitec Training Centre
2010 - 2013
BSc (Hons) Architectural Technology. GRADE: 1st -Liverpool John Moores University
2005 1997 - 2004
City & Guilds AutoCAD Level 2 - Lancaster and Morecambe College
3 A-Levels and 10 GCSE’s including Maths, English and Science - Kirkbie Kendal School, Kendal
Refer to CV for detailed working experience and work duties
Contents
01 Wheelchair Accessible New Build House........1 02 Specialist Veterinary Practice...........................9 03 Hotel & Spa (Concept Project)........................15 04 New Build Housing Development ....................21 05 Low Energy Retro-fit to Old Dwelling............27 Extension, Alterations 06 Residential and Refurbishment...........................................35 07 Documentation..................................................40
01
Wheelchair Accessible New Build House (BUILDING REGULATIONS STAGE 2019)
This new-build dwelling must meet the needs of the 7-year old client who has cerebral palsy. The building will be constructed from a SIPS panel wall and roof system with an insulated raft foundation/floor slab. The highly insulated walls, roof and floor combined with a high level of air tightness will provide an extremely low energy home. The dwelling comprises of 6 bedrooms to accommodate a growing family, carer facilities, sensory room and hydrotherapy pool suite. Additional ceiling height to the GF will allow for ceiling hoists where required. The building is a contemporary design featuring natural timber cladding complementing a crisp white silicone-based render system. Natural Westmorland Green slate and natural stone landscaping features will ensure the building remains sympathetic to the surrounding buildings and woodland setting.
Project Responsibilities • • • • • • •
1
Team based sketch designs/feasibility studies Production of planning application drawings and documentation. Continuous liaison with quantity surveyor from the outset to enable cost certainty Liaison with consultants such as MVHR consultant, PassivHaus consultant, drainage engineer, land surveyor, ecological surveyor and timber frame manufacturer. 3D modelling and visualisation. Initial technical detailing. Continuous liaison with clients, occupational therapists and solicitors.
2
GROUND FLOOR PLAN
GROUND FLOOR ROOM LAYOUT
FIRST FLOOR PLAN
FIRST FLOOR ROOM LAYOUT
3
ELEVATIONS
NORTH ELEVATION
SOUTH ELEVATION
WEST ELEVATION 4
EAST ELEVATION
Level 03 Top of Ridge 8654
Level 01 1F Ceiling 5410
Level 01 First Floor 2990 Level 00 GF Ceiling
2664
2420
Level 00 Gnd Floor 0
5
Level 03 Top of Ridge 8654
Level 01 1F Ceiling 5410 Level 02 Eaves 4365
Level 01 First Floor 2990 Level 00 GF Ceiling 2420
Level 00 Gnd Floor 0
Level 03 Top of Ridge 8654
Level 01 1F Ceiling 5410 Level 02 Eaves 4365
Level 01 First Floor 2990
Level 00 GF Ceiling 2420
Level 00 Gnd Floor 0
6
Level 03 Top of Ridge 8654
Level 01 1F Ceiling 5410 Level 02 Eaves 4365
Level 01 First Floor 2990 Level 00 GF Ceiling 2420
Level 00 Gnd Floor 0
Level 03 Top of Ridge 8654
Level 01 1F Ceiling 5410
Top of Flat Roof 3089 Level 01 First Floor 2990
Level 00 Gnd Floor 0
7
8
02
Specialist Veterinary Practice (COMPLETED 2015) The need for a specialist veterinary practise to serve the northern end of a large rural town combined with the availability of an ideal location, brought this project to realisation. Detailed end-user liaison was a key factor in ensuring that the correct spaces were created for specialist functions such as emergency surgery and dental work. The building interior features fair-faced bucket handle pointed blockwork with a paint finish, providing a surface where items can be easily affixed to walls whilst also being low maintenance. The building frontage features a subtle translucent blue/green theme to the new windows, doors and timber cladding to ensure harmonisation with the surrounding woodland backdrop. Natural stone and a modern glass canopy complete the principle elevation.
Project Responsibilities • Measured building survey. • Team based sketch designs. • Liaison with consultants such as structural engineer, MEP consultant and telecoms engineer. • Team based building regulations/construction detailing and documentation. • 3D modelling and visualisation including bespoke furniture design. • Full furniture and commercial fit-out design and installation management. • Team based tender package creation, tender evaluation and contractor appointment. • Continuous liaison with clients and contractor. • Team based project management and cost management duties. • Team based site snagging and final account duties. 9
10
PROPOSED SITE PLAN
PROPOSED ELEVATIONS
UNIT 1
UNIT 2
UNIT 3 1
wash
dry
store FD30S SC
2
3
4
5
boiler, HW & cleaners store
FD30S SC
TP1
shelving (addit dispens)
6,000 FD30S
FD30S
fd30 Hold open
FD30S SC
6,000
1
6,000
2
6,000
3
4
5
PROPOSED SOUTH WEST ELEVATION electric
scales
SPC 1 HVC 1 DIS SPC 2 D
PARKING & TURNING
HVC 2
C
B
A
A
A
A
B
C
D
SPC 3 P11 SPC 4
P12
P13
SPC 5 P14 4,240
HVC 3 D
HVC 4
4,240
4,240
C
B
4,240
PROPOSED NORTH WEST ELEVATION
4,240
4,240
B
C
D
PROPOSED SOUTH EAST ELEVATION
HVC 5
5
4
6,000
5
3
6,000
4
2
6,000
3
PROPOSED NORTH EAST ELEVATION
11
1
6,000
2
1
PLAN VIEW STRUCTURE 2
S1
1
IC1
6,000
290
3
S2
PLAN VIEW FIXTURES AND FITTINGS
6,000
994
100
110
918 D03 918 x 2,025
320
100
100
1,450 100 3,200
1,500 918 x 2,025 D07
100
750 100
782
4,673
1,245 1,965
360
800
570
360 100
918
120
3,085
115
D05 918 x 2,025
3,085 x 2,250 1,767
918 x 2,025 D06 110
2,630
715
100
3,085
340
1,492
100
1,245
360
2,600
918 x 2,025 D15 1,360 100
100
918
842 x 2,025 D09
115 100
100
2,300 75
100
918
550
367
1,245 x 2,025
1,327
2,115
2,625
1,707
918
215
210
4240
1941
994 110 D01 994 x 2,025
900
1,500 x 975 SCR01
100 3,050 100
450
1,941
100
100
918 x 2,025 D04 2,355
1,327
1,200
100
994 x 2,025 D02 100
918
1,200
375 1,500 x 2,025 D12
994
3,590 110
167
1,250
100
1,765
100
75
2,850
100 D10 994 x 2,025
600
100
800 x 900 SCR02
W05 910 x 1,050
Reception
1,900
2,350
918 x 2,025 D14 890
1,060
3,350
3275
3,045
B
918
45
100 1,135 675
Dispense Consult Room 2
W08 490 x 600
100
918 x 2,025 D08
100
100
110
4,240
1,810
100
Consult Room 3
1,550
100
115
1,500
Lab
446
2,225
Cat Cages
Consult Room 1
3,950
440
100
C
1,500 x 2,025 D11
Operating
2,475
Staff
Prep Area
D13 918 x 2,025
1,575 4,240
Plant
100
100
WC
Dog Cages
W06 910 x 900
Post Mortem
1,100
100
1,012
3,100
W
100
D W
W07 490 x 600
265
XD02 1,012 x 2,100
2660
Cat Waiting
Dog Waiting
ceiling at 2400mm above FL
Cat Waiting Area
2660
11865
Dog Waiting Area
910 x 1,800 W04
910 x 1,800 W03
110
OPENING DETAIL AT D15 367
75 100 100
326 1360
12
OPENING DETAIL AT D02 918
166
1135
994
2,830 x 2,100 XD01
2
S1
1
910 x 1,800 W02
100 110
75 100
S2
A
265
Dog scales
Gas meter
910 x 1,800 W01
3
PLAN VIEW CEILING GRID 2 A
3
1
D
2
S1
1
3
WC
16 A: 4.88 m2 P: 9.35 m H: 2.40 m
Boiler Room 11 A: 2.56 m2 P: 6.43 m H: 2.40 m
10 A: 2.79 m2 P: 6.90 m H: 2.40 m
Dog Cages 15 A: 9.06 m2 P: 12.60 m H: 2.40 m
Staff
2.3.520 Borrowed light shaft
800
1200 x 900 borrowed light
14 A: 9.84 m2 P: 12.56 m H: 2.40 m
175 x 75 C16 @ 1200c/c
Operating Room 175 x 75 C16 @ 1200c/c
C
C
3,100
12 A: 23.02 m2 P: 25.40 m H: 2.40 m
C
1,100
905
09 A: 6.77 m2 P: 10.63 m H: 2.40 m Carpet
Prep Areas
3
Acoustic ceiling
D
D Store/Utility
2
175 x 75 C16 @ 1200c/c
B
1
PLAN VIEW UPPER DECK S2
PLAN VIEW ZONES
175 x 75 C16 @ 1200c/c
Cat Cages 13 A: 4.03 m2 P: 8.07 m H: 2.40 m
2.3.520 Borrowed light shaft 1,700
1200 x 900 borrowed light
1,245
2,950
2.3.520 borrowed light shaft 1,100
400
1800 x 900 borrowed light
800
07 A: 4.16 m2 P: 8.61 m H: 2.40 m
08 A: 11.35 m2 P: 19.40 m H: 2.40 m
800
Laboratory Corridor
2.3.150 loft hatch over
Dispensary 05 A: 2.46 m2 P: 6.43 m H: 2.40 m
Consult 1
Consult 2
04 A: 5.76 m2 P: 11.81 m H: 2.40 m Carpet
03 A: 5.90 m2 P: 9.73 m H: 2.40 m
B
B
Reception
Consult 3
02 A: 8.97 m2 P: 12.52 m H: 2.40 m
06 A: 6.96 m2 P: 10.56 m H: 2.40 m
2.3.510 Roof void access hatch
Light fittings as M&E proposals
Waiting Room
175 x 63 C16 @ 1200c/c
B
01 A: 31.23 m2 P: 29.26 m H: 2.70 m
A
A
A 600
1
3
SECTION A A
3
1
SECTION B B C
B
A
A
B
C
1779
D
2
S2
2 A
S1
B
1
D
3.3.110 plasterboard lining to ceilings
2,400
2,700
fire shutter to dispensary hatch
2,400
2,250
225
3.3.110 plasterboard lining to ceilings
2025 1125
4,240
D
13
4,240
C
4,240
B
4,240
A
A
4,240
B
4,240
C
D
600
2
3
14
03 Hotel & Spa (CONCEPT PROJECT) A contemporary multi-use hotel & spa concept project fully modelled in Autodesk Revit. The building features natural material finishes to integrate the building with a forest setting whilst large curtain walls allow natural light to flood key areas. The building comprises of mixed-size accommodation, spa/pool facilities, lounge areas, restaurant, bar, business function rooms, auditorium and gymnasium.
Project Responsibilities •
15
Full design, 3D modelling and visualisations
16
SITE PLAN
Level 4
Level 4
14500
14500
Level 3
Level 3
10500
10500
Level 2
Level 2
7500
7500
Level 1
Level 1
4500
4500
Level 0 0
Level 0 0
NORTH ELEVATION
Basement -4900
Level 4
Level 4
14500
14500
Level 3
Level 3
10500
10500
Level 2
Level 2
7500
7500
Level 1
Level 1
4500
4500
Level 0
Level 0
0
0
Basement
Basement
-4900
EAST ELEVATION 17
WEST ELEVATION
-4900
SOUTH ELEVATION
LOWER-GROUND FLOOR LAYOUT FUNCTION ROOM 1 69 m² 744.5 SF
AUDITORIUM 239 m² 2576.0 SF
FUNCTION ROOM 2
HALL
52 m² 557.7 SF
57 m² 609.2 SF
FUNCTION ROOM 3 48 m² 519.9 SF
UP
HALL
65 m² 704.1 SF
WCs
45 m² 483.8 SF
SPA RECEPTION
STAFF 27 m² 293.5 SF
STORE
STORE
26 m² 281.5 SF
19 m² 209.7 SF
LOBBY
77 m² 831.1 SF
150 m² 1609.4 SF
BAR/LOUNGE 786 m² 8461.9 SF
MASSAGE/ SPA 104 m² 1123.6 SF
GYM
STAFF
HALL
101 m² 1090.6 SF
112 m² 1203.7 SF
111 m² 1193.4 SF
STAFF 23 m² 248.4 SF
Room Type
CHANGING/SHOWERS 66 m² 706.8 SF
STORE 19 m² 203.3 SF
AUDITORIUM BAR/LOUNGE CHANGING
STORE
CHANGING
CHANGING/SHOWERS
20 m² 219.7 SF
48 m² 512.4 SF
FUNCTION ROOM 1 FUNCTION ROOM 2
STORE 6 m² 59.4 SF
POOL
FUNCTION ROOM 3
319 m² 3435.5 SF
GYM HALL LOBBY MASSAGE/ SPA POOL SPA RECEPTION STAFF STORE WCs
GROUND FLOOR LAYOUT
FIRST FLOOR LAYOUT
ESCAPE 18 m² 189.7 SF
DN
STORE ESCAPE LOBBY 61 m² 657.1 SF
12 m² 134.2 SF
STAFF 36 m² 383.8 SF
DN
UP
ROOM
KITCHENS 68 m² 727.4 SF
WCs
STORE
7 m² 80.0 SF
44 m² 477.4 SF
ROOM
ROOM 44 m² 476.0 SF
ROOM 44 m² 476.0 SF
ROOM 60 m² 643.1 SF
59 m² 630.8 SF
71 m² 765.3 SF
9 m² 93.0 SF
ROOM 26 m² 283.5 SF
ROOM
105 m² 1130.1 SF
ROOM 24 m² 258.8 SF
ROOM 51 m² 548.4 SF
RECEPTION 144 m² 1547.9 SF
273 m² 2937.7 SF
HALL/ LOBBY
ROOM
329 m² 3543.3 SF
51 m² 548.4 SF
RESTAURANT BREAKFAST
230 m² 2480.6 SF
ROOM 51 m² 548.4 SF
ROOM
ROOM
51 m² 548.4 SF
LOUNGE 110 m² 1180.3 SF
HALL
ROOM
85 m² 910.8 SF
44 m² 477.4 SF
ROOM 44 m² 477.4 SF
ROOM 44 m² 477.4 SF
ROOM 44 m² 477.4 SF
ROOM 44 m² 477.4 SF
ROOM 53 m² 569.0 SF
ROOM 85 m² 919.3 SF
62 m² 672.6 SF
ROOM
ROOM
94 m² 1013.7 SF
51 m² 548.4 SF
ROOM 51 m² 548.4 SF
Room Type
UP UP
BREAKFAST ESCAPE KITCHENS LOBBY LOUNGE RECEPTION RESTAURANT STAFF WCs
18
ROOM 51 m² 548.4 SF
UP ESCAPE 24 m² 263.2 SF
UP
Room Type ESCAPE HALL
TERRACE 50 m² 533.0 SF
HALL/ LOBBY ROOM STORE TERRACE
EXTERIOR LOWER PANEL CLADDING SYSTEM DETAILS Rigid insulation (tapered)
51
SUBGIRT DEPTH
SUBGIRT DEPTH
Fully adhered weather and vapour check membrane
GALVANIZED ANGLE
FIXING & ADJUSTING FASTENERS #10 x 5 8" HWH SD #2 (AS REQUIRED)
DI-ELECTRIC SEPARATOR #12 x 1" PANCAKE TEK #3 - 1/CLIP
External timber cladding: Accoya or similar durable engineered timber Treated external grade softwood batten and counter battens
INTEGRAL THERMAL ISOLATOR
STANDARD SUPPORT CLIP @ 405mm O.C.
Fiberglass batt insulation
INSULATION
3mm ALUMINUM PLATE PANEL
INTEGRAL THERMAL ISOLATOR
DI-ELECTRIC SEPARATOR
INSULATION
15
60mm WIDE COMPOSITE SPLINE
ISO CLIP
AIR / VAPOUR BARRIER
3mm ALUMINUM PLATE PANEL
Parapet flashing
50
(102mm - 152mm)
(102mm - 152mm)
#8 x 12" PAN TEK #3 MIDDLE CLIP ONLY
#14 -14 x 2" HWH SD #3 (AS REQUIRED)
#12 x 1" PANCAKE TEK #3 @ 405 O.C. MAX
#14 -14 x 2" HWH SD #3 (AS REQUIRED)
CONTINUOUS STARTER EXTRUSION
AIR / VAPOUR BARRIER THRU-WALL FLASHING
FIXING & ADJUSTING FASTENERS #10 x 5 8" HWH SD #2 (AS REQUIRED)
CAULKING & BACKER ROD
ISO CLIP
GLAZING SYSTEM
Angled timber fillet Perimeter edge of roof insulation wrapped with air control membrane
WINDOW HEAD
HORIZONTAL CONNECTION
Metsä Spruce (II/III) Plywood deck Rigid insulation installed in two staggered layers
#14 -14 x 2" HWH SD #3 (AS REQUIRED) FIXING & ADJUSTING FASTENERS #10 x 5 8" HWH SD #2 (AS REQUIRED)
INTEGRAL THERMAL ISOLATOR AIR / VAPOUR BARRIER INSULATION
MEMBRANE
GALVANIZED HAT-BAR
CONCRETE /SUBSTRATE
#1/4 - 1 3/4 HEX TAPCON #8 x 2" PAN TEK #3 INTO PERIMETER EXTRUSION STAGGERED TERMINATION CLIPS #12 x 1" PANCAKE TEK #3 - 1/CLIP
15
SUBGIRT DEPTH
1
(102mm - 152mm)
Fully adhered roof membrane
Rigid board insulation
50
Fiberglass batt insulation
60mm WIDE PLATE SPLINE
GALVANIZED ANGLE
DI-ELECTRIC SEPARATOR 15
3mm ALUMINUM PLATE PANEL
ISO CLIP 60mm WIDE PLATE SPLINE
3mm ALUMINUM PLATE PANEL
External OSB sheathing board Air control membrane
Self adhesive transition membrane
CURVED PANEL DETAIL
VERTICAL CONNECTION
CURTAIN WALL DETAILS
Fully adhered weather and vapour check membrane OUTSIDE CORNER
OUTSIDE CORNER - BUTT GLAZED
CORNER - STANDARD SPLAY
SPLAYED MULLION
Timber sheathing board Metal deck
Open web steel joist
19
39
PARAPET WALL/CLADDING SECTION DETAIL
SECTIONS
20
04 New Build Housing Development (FEASIBILITY STAGE 2018/2019) This feasibility study considers the potential for a new housing development comprising of 2-3 bed bungalow dwellings to be largely marketed at retired local occupants. A lack of bungalows in the area (and in the UK generally) has been the driving force behind the project brief. Modern, low maintenance building fabrics/finishes are proposed including durable factory finished horizontal cladding and alu-clad composite timber windows. Technical detailing is being explored at an early stage to gauge project budget estimates. Early planning authority engagement has provided positive feedback on the likelihood of consent being granted.
Project Responsibilities • • • • • •
21
Concept design sketches/ feasibility. ‘Establishment of principle’ meetings with Planning Authority. Liaison / design meetings with clients Master planning / site layout Dwelling design including initial technical detailing 3D modelling/visualisation
22
SITE PLAN GROUND FLOOR ROOM LAYOUT Room Layout BED 1 BED 2
BED 1 13 m² 142.3 SF
GARAGE HALL
LIVING/DINING WC
Cupd
KITCHEN 14 m² 147.9 SF
KITCHEN
LIVING/DINING 29 m² 310.4 SF
Cupd
HALL 4 m² 40.3 SF BED 2 8 m² 88.4 SF Cupd
WC 6 m² 60.4 SF
GROUND FLOOR PLAN
Cupd
Cupd
Cupd
23
GARAGE 27 m² 290.2 SF
SOUTH ELEVATION
WEST ELEVATION
EAST ELEVATION
NORTH ELEVATION 24
Level 3 RIDGE 4535
Level 2 U/SIDE of CEILING JOISTS
2415
Level 1 GND FLOOR 0 Level 0 T/O FOUNDATIONS -600
25
26
05
Low Energy Retro-fit to Old Dwelling (CURRENTLY ON SITE 2019) This 1940’s traditional Lake District dwelling has been unoccupied for 2 years, but the new owner has outlined her desire to restore the house to create a highly energy efficient building. Old building fabric, single glazed windows, a lack of insulation and even a rock outcrop living in the lower-ground floor have added to the challenge of achieving an eco-retrofit. The designs feature several carefully selected membranes and tapes to the floor, walls and roof to achieve a high level of airtightness whilst added insulation will aid heat retention. A PassivHaus standard MVHR system is also proposed to ensure that we correctly ventilate the newly sealed dwelling. Tucked away down a private road in a very desirable area of the Lake District National Park / UNESCO World Heritage site, this dwelling is about to become one the most highly sought-after properties in the area.
Project Responsibilities • • • • • • • • • 27
Measured building check survey based on drawings by others. Initial sketch designs. Production and submission of planning application drawings and documentation. Liaison with consultants such as MVHR consultant, PassivHaus consultant, structural engineer and asbestos surveyor. Production and submission of building regulations drawings and documentation. Creation of detailed construction drawings and documentation. Creation of tendering package, tender evaluation and contractor appointment. Continuous liaison with clients and tendering contractors. Contract completion and leading pre-start meetings.
28
MVHR INSTALLATION PLANS
SECTION A-A
GROUND FLOOR PLAN
FIRST FLOOR PLAN 29
LOWER-GROUND FLOOR PLAN
MVHR 3D
30
31
32
33
34
06
Residential Extension, Alterations and Refurbishment (COMPLETED 2019) A detailed client brief for this 1920’s Arts and Craft’s style dwelling outlined the desire for increased luxury by constructing a new library, large kitchen/diner, an en-suite with dressing room and large high-end family bathroom. Aesthetically, the single-storey rear extension and 2-storey side extension have remained subservient from the main dwelling. The muted self-coloured render finish and recessed footprint position have ensured subtlety when viewing the principle elevation from the public highway, whilst the private view of the rear elevation has allowed for a more striking and contemporary angular design. The finished dwelling provides a luxurious family home with an effortless flow between the habitable spaces. Phase 2, which provides a separate double garage, studio and workshop, is currently being constructed on site (2019).
Project Responsibilities • • • • • • • • •
35
Measured building survey. Team based sketch designs. Liaison with consultants such as structural engineer, land surveyor, asbestos surveyor and ecological surveyor. Production and submission of building regulations drawings and documentation. Creation of detailed construction drawings and documentation. Creation of tendering package, tender evaluation and contractor appointment. Continuous liaison with clients and contractor. Full project management and contract administration. Leading site meetings and delegating minute meeting write-ups to junior staff.
36
GROUND FLOOR ELECTRICAL LAYOUT PROPOSED A
W21
W29
W26 W22
RAD
USB
SITE PLAN/DRAINAGE PROPOSED
W25
IS
XD5
D16
WC RAD
D20
Utility
W20
Washing Machine & Dryer SFS
D8
Dining
USB
PHASE 1: Extensions & alterations to existing house
D15
Manifolds
MegaFlo
IS
Boiler
Consumer Unit
W24
USB
SFS
SFS
Gas
W23
Cloaks
Library
D3 W5
Living
PHASE 2: New-build Garage/Studio
W27
CP
Kitchen
A
W12
D1 D2
Lobby
W4 W3 RL4
RL1
RL2
W1
W2
XD1
RL5
RL3
RL6
FIRST FLOOR ELECTRICAL LAYOUT PROPOSED A
W17 W28
AAV
RAD
D17
Sp
Shower
En Suite
T/RAD IS
Bedroom 3
W16
IS
RAD
USB
USB USB
Landing
RAD
D18
D19 Sp
D RA
D11
SVP
T/RAD
RAD
USB
USB
D10
Dressing
USB
USB
Bedroom 1
USB
USB
Bedroom 2 USB
W15
W19
RAD
W14
37
RAD
W13
A
38
39
07
Documentation
The following page contains examples of project documentation that I have created. Full versions available upon request.
BUILDING REGULATIONS SPECIFICATION
PRACTICAL COMPLETION CERTIFICATE
40
SCHEDULE OF WORKS
MEETING MINUTES
PRELIMINARIES
SNAGGING LIST
PRE CONSTRUCTION PHASE PLAN
MAKING GOOD CERTIFICATE
DESIGNERS RISK ASSESSMENT
DESIGN & ACCESS/ HERITAGE IMPACT STATEMENT
VALUATION CERTIFICATE
FLOOD RISK STATEMENT
INSTRUCTION CERTIFICATE