1
South Elevation
3
1 : 20
C
B
System Section 1 : 20
A
A R01
+5.62
11 10
30 +5.62
+5.62 Callout 1
+5.04
R01
+3.80 +3.73
+3.80 +3.73
100
h:10
h:10
210 100
101
170
h:70
60
2
Callout 1 1 : 10
1. F03 -Timber Cladding (20 mm) -Oriented Strand Board (15 mm) -Timber Post (150 mm) -Gypsum Ceiling Board (15 mm)
+3.40
W03
210
+4.00
Bedroom
299
+4.01
60
+4.01
4
W02
+4.24
W03
+4.24
1
162
+4.75
2. WA01: -Vertical Wooden Weatherboarding (20 mm) -Air Barrier (3 mm) -Vapour Barrier (3 mm) -Rockwool Insulation (75 mm) -Wall Panel (12 mm)
67
F03
+2.74 +2.70
4 20
+2.55 +2.50
+2.55 +2.50
h:190
WA01
170 60
60
+2.55 +2.50
W02
+2.80 +2.70
579
Callout 2
+2.80 +2.70
240
h:10
h:10
210 240
WC
1
2
270
210
W01
W01
+1.90
184
G03
F02
5
WA01 Callout 3
+0.10
33
43 46
Lin Frost
29
3 8 82
30
W at
1 : 10
1. R01 -Asphalt Roof Tiles (10 mm) -Aluminum Cladding Panel (30 mm) -Air Barrier (3 mm) -Vapor Barrier (3 mm) -Air Cavity (75 mm) -Rockwool Insulation and framing (75 mm) -Roof panel (20mm)
2. WA01: -Vertical Wooden Weatherboarding (20 mm) -Air Barrier (3 mm) -Vapour Barrier (3 mm) -Rockwool Insulation (75 mm) -Wall Panel (12 mm)
46
-0.15 -0.21
-0.21
33
-0.21
23
+0.06 +0.00
-0.05
46
+0.10
Callout 2
e
able er T
11 10
87
A
WC
+2.74
+2.74
F01
G01
F02
240
10
14
Living Room
G03 223 240
113
81
28
21
250 161
B
21 10
79
10
C
5
28
10 10
41
87
10 10
D02 76
203
41
21
113
11 10
10 10
14
10
223
5
223
21
240 7 7
1 : 20
223
10 11
Level 0
240
10
2
A
B
C
2
WA01: -Vertical Wooden Weatherboarding (20 mm) -Air Barrier (3 mm) -Vapour Barrier (3 mm) -Rockwool Insulation (75 mm) -Wall Panel (12 mm)
F02 -Ceramic Tiles (15 mm) -Mortar (30 mm) -Waterproof Membrane (3 mm) -Oriented Strand Board (15 mm) -Rockwool Insulation (75 mm) -Timber Beam (150 mm) -Waterproof Membrane (3 mm) -Oriented Strand Board (15 mm) R01 -Asphalt Roof Tiles (10 mm) -Aluminum Cladding Panel (30 mm) -Air Barrier (3 mm) -Vapor Barrier (3 mm) -Air Cavity (75 mm) -Rockwool Insulation and framing (75 mm) -Roof panel (20mm)
WA02 TBM: 23 -Ceramic Tiles (15 mm) -Water Barrier (3 mm) -Gypsum Wall Board (15 mm) -Metal Stud (640 mm) -Gypsum Wall Board (15 mm) -Water Barrier (3 mm) -Ceramic Tiles (15 mm) F03 -Timber Cladding (20 mm) -Oriented Strand Board (15 mm) -Timber Post (150 mm) -Gypsum Ceiling Board (15 mm)
6
Callout 3 1 : 10 1. F02 -Ceramic Tiles (15 mm) -Mortar (30 mm) -Waterproof Membrane (3 mm) -Oriented Strand Board (15 mm) -Rockwool Insulation (75 mm) -Timber Beam (150 mm) -Waterproof Membrane (3 mm) -Oriented Strand Board (15 mm) -Gravel fill
Bengi Bayar, 2022