reinforcing projects portfolio

Page 1

Reinforcing Projects

Stone Abey Condo

OurBusiness Project

Our company has been specializing in the installation of rebar and post-tension since 2016
02 01 OLRT Tunnel General Contractor Kiev
General Contractor PCL We also provide welding, layout, tieback and more
03 Shepard ave. 44 stories Condo General Contractor Tribute + 700 tons raft slab over 15 000 shear airpins
04 D'or Condo General Contractror Fernbrooks 2 towers 20 and 26 stories 2500 tonnes 600 tonnes raft slab 4 guys for the first raft slab
05 Condo Younge st. General Contractor Axcel 06 Post-tensioning water tank General Contractor / Coffrage Alliance Post-tension conception, supervision and installation. Builder save over 500 00$ with this system

One of the biggest project in 2019

In charge of rebar installation for atypical structure

07
Echangeur Turcot Montreal Genral Contractor / Kiewit , ABF
Read more 09 Cuvert post-stressed High density bars Bonded post tension system Henry IV bridge Quebec city General Contractor CRT 08
11 Concord Bridge Montreal Post-stressed high density bars Solar project Montreal Bonded post-tension system 18 meters span 10 Metro Vendom Montreal First tunnel moving without lifting in north america. In collaboration with Freyssinet 11

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.