The Grant Avenue Connect Parkway will be Springfield’s first smart urban multi-use path and will serve as the glue that brings all of the City’s other major investments together. The proposed tree-lined multi-use-path along Grant Avenue will connect the City’s major employers, universities, cultural destinations, and new environmental features through a 3-mile urban connector. The project includes advisory bike lanes, a roundabout, two raised intersections, three protected intersections, a grade separated crossing at Fassnight Creek, bridge enhancement, utility upgrades, fiber connectivity, additional crossing and signal timing improvements, outdoor incubator, and creek daylighting.