The influence of 5D BIM on BIM Preconstruction and Construction Project Management BIM Preconstruction Services


As the construction industry moves to the future to accomplish complex projects, it is extremely vital for construction engineering firms or companies to provide top-notch BIM Preconstruction Services for building owners. In the beginning it was just 2D drawings or 2D geometry, but through constant innovation in the field of AEC & construction engineering, BIM has gained significant value through its processes based on 4D scheduling and 5D cost estimation. The use of information-rich 3D models in the construction mix has been well established through state-of-the-art project visualization, scheduling and cost-estimation. Global AEC firms are breaking the barrier to leverage these various BIM barriers and provide affordable BIM project management services for BIM Construction Project Management. These firms are constantly working with clients to build processes or services for the ever-changing AEC industry and client requirements. This can be achieved through BIM Preconstruction Services that are backed by 4D scheduling and 5D cost estimation. Data is the key to all new and existing projects, a good BIM project management company can drive significant benefits based on high-quality 3D modeling, precise information architecture, and BIM Coordination, and more. When teams are well connected and coordinated, it makes the complete building process easier to execute wherein commercial and time-based decisions can be made with greater accuracy. This leads to an efficient way of bringing people and teams that involves architects, planners, surveyors, etc. that creates a common data environment through standardization of data models and handover of file formats in the form COBie.


5D cost estimation adds immediate business profits through planned economics, it encapsulates all the previous levels of BIM and dimensions viz. 3D modeling & 4D scheduling. It creates a robust business purview that integrates scheduling and cost management into the project mix. Getting the cost aspect in the picture aligns the complete project in favor of BIM, that drives enhanced performance, workforce productivity, greater sustainability & facilities management after on-site construction is done and complete for occupants to live in. With the adoption of 5D BIM, the extent of Preconstruction services can be enhanced to examine various cost futures and building scenarios. Collaboration in the AEC landscape helps align the incentives of various individuals viz. contractors, owners, designers, suppliers, and more. As the uptake of BIM continues in most of the developed and developing nations, it is imperative for individuals or professionals to gain a deeper understanding of BIM for the purpose of construction cost and project management practices.


The adoption of BIM Preconstruction Services in the US has provided significant insights whilst using information as the most important tool to assist in managing the design aspect and construction data as well. Integrating BIM in the Preconstruction Phase creates a greater impact on information, expertise, and experience. Whilst introducing the crucial aspects of BIM in the early stages of the project life-cycle, it becomes easier for external parties to understand project scope, scale, clarifications, and the impact on design, value analysis, phasing and schedule. This makes work for the general contractor easier, as they are exposed to crucial information in the early design phases. Previously, people working in the FM services or Facilities Management Services or sector were brought in the later stages of the project cycle, but through BIM, they’ve started to take part in the very early phases of the project life-cycle. This helps general contractors clarify the scope of work, pull quantities of materials, and designs to various trade contractors.


In the present scenario, 5D BIM helps architects, owners, engineers and builders to collaborate at the earliest stages of the project life-cycle. This could help them evaluate the current design and/or look at revisions that would affect the project at any stage of the project life-cycle. Whilst introducing the crucial aspects of BIM in the early stages of the project life-cycle, it becomes easier for external parties to understand project scope, scale, clarifications, and the impact on design, value analysis, phasing and schedule. This makes work for the general contractor easier, as they are exposed to crucial information in the early design phases. Key Benefits of 5D BIM are: ▪

High-end predictability with visual and data modeling. That includes parametric designs, site equipment and conditions, building materials, phasing, and more

Clear understanding of the proposed design with precise scope, cost and schedule. This eliminates the element of surprise and provides decisions that highly accurate

Real-time data modeling for new development or change

Accurate understanding of the end-product and deliverables

The construction costs change in real-time wherein productive and engaging solutions can be derived for a project(s). A virtual construction planning process identifies key drivers in BIM through advanced software like Autodesk Revit and Navisworks, this software when integrated with the BIM helps create smarter decisions and offers a wide range of cost value to it as well.


Closing Thoughts Companies can build smart as many experienced owners and stakeholders regard BIM preconstruction services in the US yields positive outcomes through positive results, error reduction, enhanced planning and BIM Construction Project Management.