By: Preston Doerrfeld & Blake Phillips Arch 411-Craig Babe-Spring 2022
TITLE PAGE
Project Contents 01 02 03 04 05 06 07 09 11 15 16 18 20 21 22 23 24 28 32 48
Urban Context Zoning Form FInding Program Site Plan Nolli Plan Elevations Sections Plans Life Safety UL Walls Framing Plans 3D Strucutral Isometric Building Systems Daylighting Rainwater Retention Stairs Details Renders Precedent Study
Project Info
Fire Truck Access
Project Location: Haymarket District, Lincoln, NE Address: 109 S Canopy St. Lincoln NE, 68508
P Street
P Street
Canopy Street
IBC Code Compliance
300’
Mixed-Use Occupancy Group A2 - Restaurant Group A3 - Art Gallery Group M - Market Hall Group R2 - Apartments Type IV A Construction (per 2021 IBC) Building Code Zoning Constraints (Lincoln Municipal Code) No Setbacks 18’ minimum height x width constraints for alleyway 75’ Maximum Height Zoning (275’ height variance granted) 110’ x 300’ Site Boundary No Required Parking (No Accessible Parking Added) FAR (FLOOR AREA RATIO) - 2.35 Allowable Building Area: 135,000 sq/ft (per 2021 IBC Table 506.2) Actual Building Area: 77,612 sq/ft Allowable Building Height: 270’ (per 2021 IBC) 75’ (per Lincoln code) Actual Building Height: 263’8” to roof, 275’ to pinnacle of mechanical penthouse Fire Resistive Requirements Structural Frame 3 HOUR CLT/Glulam Exterior Bearing Walls 3 HOURS UL: W460 Interior Bearing Walls 3 HOURS UL: W460 Non-bearing Interior Walls 2 HOURS UL U419 Floor Construction 2 HOURS Heavy Timber Composite 6” CLT Slab and 4” Concrete Roof Construction 2 HOURS Heavy Timber Composite 6” CLT Slab and 4” Concrete Shaft Enclosure 3.5 HOURS Carbonate Aggregate Concrete 12” Exit Corridoor Walls 3.5 HOURS Carbonate Aggregate Concrete 12” The building is equipped with an automatic sprinkler system
110’
O Street
80’ 40’
Canopy Street
20’ 0’ 10’
Our Site sits on the edge of the historic Haymarket and the new Haymarket developments. This site is a literal crossroads with high pedestrian traffic traveling through our site from the parking garages to the west. Our building design with an entire site spanning bridge maintains an urban streetfront presence across the entire canopy street side while allowing free-flowing access to the public square set back within the site’s footprint.
Urban Context
01
Type IV A Construction 2021 IBC
Zoning
400 Feet
275 Feet
275 Feet
257 Feet 220 Feet 190 Feet 176 Feet
166 Feet
02
Graduate Hotel 1974
Wells Fargo Center 1976
Sharp Tower 1927
US Bank Tower 1970
Lied Place 2022
9 Lincoln Park (Proposal)
Market Station (Proposal)
Nebraska Capital 1932
Our Form finding began with identifying major alignments between our site and the surrounding context. We identified the northern portion of the site as an ideal place for the market hall as it is the most heavily trafficked area while the services would back up to the O Street overpass. This created distinct forms surrounding a public square in the middle. Maintaining an urban street front was another focus so the second floor became a site spanning bar that allowed the building to have a block spanning presence but also framed the public square. The final piece of the form is the tower. While the lower levels respond to the older Haymarket context, the tower responds to the new Haymarket. We also wanted to provide additional residential units that drove the tower upwards as we wanted to limit the residential footprint on the overall site.
Form Finding
03
Program Spaces Studios - 4,392 sq/ft Offices - 285 sq/ft Gallery - 3,723 sq/ft Gallery Storage - 432 sq/ft Market Hall - 9,772 sq/ft Restaurant - 1,686 sq/ft Café - 1,033 sq/ft Apartments - 26,102 sq/ft Kitchen - 350 sq/ft Loading - 441 sq/ft Recycling - 143 sq/ft Garbage - 177 sq/ft Lobby - 549 sq/ft Janitor - 122 sq/ft Storage - 150 sq/ft Bathroom - 1,242 sq/ft
Program Analysis Live/Work Residential Community Gallery Gallery Storage Private Studio Space
Program
Residential Lobby Cafe Dining Area Facilities Office Kitchen Market Hall Restrooms Storage Circulation Garbage Janitor Closets
04
Loading Dock Mechanical Recycling Vertical Circulation
Studios - 4,392 sq/ft Offices - 285 sq/ft Gallery - 3,723 sq/ft Gallery Storage - 432 sq/ft Market Hall - 9,772 sq/ft Restaurant - 1,686 sq/ft Café - 1,033 sq/ft Apartments - 26,102 sq/ft
Kitchen - 350 sq/ft Loading - 441 sq/ft Recycling - 143 sq/ft Garbage - 177 sq/ft Lobby - 549 sq/ft Janitor - 122 sq/ft Storage - 150 sq/ft Bathroom - 1,242 sq/ft
P Street
Canopy Street
P Street
The high traffic passageway to the north of the site directly connects to our market hall allowing people to easily access the space. The market hall’s form guides people from the old Haymarket into the public square where outdoor markets can be set up. The upper bar also extends beyond the site boundaries framing passageways on the north and south sides of the site. The residential tower stands tall on the south side of the site sheltering the public square from the noise of the overpass. This also gives residents views into the Haymarket from their balconies.
Site Plan
O Street
40’
Canopy Street
80’
20’ 0’ 10’
05
The Nolli plan shows accessible space to the public within our building. The public is able to freely flow through the market hall into the public square and then to the cafe on the south of the site. With our support spaces backing up to the overpass we maintain an entirely public presence along canopy street.
P Street
Canopy Street
P Street
Nolli Plan
O Street
06
40’
Canopy Street
80’
20’ 0’ 10’
The ground floor of Market Station features the market hall to the north and the residential lobby and restaurant/cafe to the south. The ground level makes use of lots of glass and brick to tie into the existing context of the Haymarket district. The second-floor bar contains artist studio spaces as well as a gallery to house community art exhibitions. The second floor makes use of a glass and metal panel system to distinguish itself from the ground floor. The residential tower is mostly glass with light-colored sandstone and metal panel accents.
Elevations
10 0 5
30 20
Elevation 1 - West
50 40
Feet 100
07
The north side of the residential tower provides balconies that look down into the public square and market hall area.
Elevations
10
08
0 5
30 20
50 40
Elevation 2 - North
Feet 100
The north side of the site is our most public space containing the market hall and gallery and begins to get more private towards the south with the residential tower, lobby, and art studios.
Sections
10 0 5
30 20
Section 1 - West
50 40
Feet 100
09
The art studios span over our major entrance into the public square. This was meant to create an interaction between artists and the community as the artists will have views into the public square, and the public will have partial views into their studios with large picture windows that they can use to display their art to the public. The public square was designed with a large amount of open space so that the market hall can house more stalls outdoors during nice weather.
Sections
10
10
0 5
30 20
Section 2 - North
50 40
Feet 100
The basement contains the primary mechanical spaces. The two basements include space for the chiller, boiler, water cisterns, and other air handling units.
Floor Plans ELEV. No. 2
1
1
Basement Floor Plan 5
20 10
1. Mechanical
40 30
50
11
The first floor features our primary public spaces including the market hall, cafe, and the residential lobby. Also featured on the southeast section of the site are the support spaces including the kitchen, trash room, loading dock, and mailroom. The market Hall is positioned at the crossroads of the site to take advantage of the foot traffic between the old and new Haymarket. The cafe is removed from the street front and faces onto the public square providing a quiet atmosphere. The residential lobby is located directly off canopy street and serves as the main entrance for residents and the resident-only elevator.
8
Floor Plans
2
Sec. 2 10
7
9
6 5
9
4
ELEV. No. 2
1
Elev. 2 08
9
9 3
Sec. 1 09
12
Ground Floor Plan 5
20 10
40 30
50
1. Market Hall 2. Cafe 3. Lobby 4. Mail Room 5. Trash 6. Recycling
7. Loading Dock 8. Kitchen 9. Restroom
Elev. 1 07
The second floor contains slightly fewer public spaces including the studio spaces, gallery, and office space. This level connects the two separate first floors and frames the public square. The studio space is then able to overlook directly onto the public square. This allows a visual connection from the studio spaces to the public.
Floor Plans
6 5 1
9
9
2
2
2
2
2
2
2
ELEV. No. 2
3 2
4 5
Second Floor Plan 5
20 10
40 30
50
1. Gallery 9. Restroom 2. Studio 3. Office 4. Resident Amenity 5. Storage 6. Janitorial Closet
13
The private residences portion of this project stack vertically into an 8-story tower. This allowed us to greatly increase the volume of residential units providing 28. The residences are configured in a loft with the bedroom and bathroom being on the second floor. The residences sit on a single loaded corridor allowing each unit unobstructed views to the North and South with the loft. All units have a private north-facing balcony right off the living room. The eastern and western units also feature a second-level balcony off of the bedroom. The Roof features our air intakes and other HVAC equipment as well as a roof deck for residents
1 2
1
1 1
Floor Plans
1 1 1
ELEV. No. 1
ELEV. No. 1
2
1
1
1
Apartments Typical Floor Plan 5
14
20 10
5
40 30
1. Apartment 2. Electrical
Apartments Loft Typical Floor Plan
50
20 10
40 30
1. Apartment Loft
Roof Floor Plan 5
50
20 10
40 30
1. Mechanical 2. Roof Deck
50
Conext Building
Conext Building
Conext Building
The building is equipped with an automatic sprinkler system
75ft
2.
60ft
1.
Basement Floor Plan 5
20 10
Egress Path
30
3.5 Hours
1. Occupancy Load Basement 19 Max Travel Distance 200ft 2. Occupancy Load Basement 21
40 50
Conext Building
Conext Building
Conext Building
125ft
2.
3.
2.
2.
2.
2.
4. 2.
2.
Life Safety Plans
2.
1. 3. 20ft
38ft
Second Floor Plan 5
20 10
3.5 Hours
Dead End Corridor
2 Hours
50
1.
1.
Max dead end corridor 50ft Max Travel Distance 200ft 1. Occupancy Load Gallery 249 2. Occupancy Load Studios 3 Per Unit (24 Overall) 3. Storage 4. Janitoral Closet
40 30
Egress Path
Conext Building
Conext Building
Conext Building
1.
Conext Building
2 1.
ELEV. No. 1
ELEV. No. 1
72ft
Conext Building
75ft
2.
2. 1.
1.
50ft
Apartments Typical Floor Plans 5
20 10
40 30
5 50
Egress Path 125ft 30ft
Egress Path
Ground Floor Plan Life Safety Comman Path 5
20 10
Dead End Corridor
40 30
3.5 Hours Max Travel Distance 200ft
50
Max dead end corridor 50ft 1. Occupancy Load Market Hall 326 2. Occupancy Load Resturant 84
Roof Floor Plan
Max Travel Distance 200ft 3.5 Hours 2 Hour 1. Occupancy Load Apartment 5 Per unit (20 Per Floor,140 Overall)
20 10
40 30
50
Egress Path Max Travel Distance 200ft 3.5 Hours 2 Hour 1. Occupancy Load Roof Deck 46 2. Occupancy Load Mechanical 6
15
UL DESIGN NO. U419 FIRE RATING: STC: SOUND TEST: SYSTEM THICKNESS:
2 Hour 53 RAL-TL11-126 6 1/8"
24"
6 1/8"
24"
GYPSUM BOARD:
UL Wall
THREE LAYER 5/8" THICK GYPSUM BOARD (UL TYPE ULIX\U+2122)
ASSEMBLY OPTIONS: GYPSUM BOARD:
TWO LAYERS 5/8" THICK GYPSUM BOARD (UL TYPE SCX\U+2122)
STEEL STUDS:
3-5/8" STEEL STUDS, EQ25 (0.018"), SPACED 24" O.C.
INSULATION:
3 1/2" GLASS FIBER BATT INSULATION IN CAVITY
GYPSUM BOARD:
TWO LAYERS 5/8" THICK GYPSUM BOARD (UL TYPE SCX\U+2122)
NOTES: STUD AND INSULATION SIZES ARE MINIMUM UNLESS OTHERWISE STATED IN DESIGN. FOR THE MOST UP-TO-DATE INFORMATION OR ASSEMBLY OPTIONS, REFER TO THE UL FIRE RESISTANCE DIRECTORY. REFER TO THE UL FIRE RESISTANCE DIRECTORY FOR INFORMATION REGARDING PRODUCT ORIENTATION AND FASTENING REQUIREMENTS.
16
Carbonate aggregate concrete 12” FIRE RATING: SYSTEM THICKNESS:
3 1/2 Hour 12”
Life Safety
Path of Egress (Transparency Denotes Fire Rated Assembly)
Common Path of Travel
Fire Truck Access
Basement
17
C A
B
E D
C
H F
A
G
6 8
Framing Plans
F
C
G
A
B
E D
H F
C
G
A
1
1
2
2
2
2
3
3
3
3
4 5
6
7
8
9
4
5
6
7
8
9
4
5
6
7
8
9
10
11
11
11
11
12
12
12
13
13
13
14
14
14
15
15
15
15 Foundations Plan 5
Ground Floor Framing Plan
Basement Framing Plan
20 10
50
5
5
20 10
50
G
Ground Floor Roof Framing Plan 5
20 10
F
9
10
14
D
H
7
10
13
B
E
5
10
12
18
D
H
1
1
4
B
E
50
20 10
50
C A
4
6 8
B
E D
H F
C A
G
1
1
2
2
3
3 4
5
6
7
8
9
B
E D
H F
C
G
A
B
E D
C
H F
A
G
5
6
7
8
9
2
2
3
3 4
5 6
7
8
9
9
10
10
11
11
11
11
12
12
12
12
13
13
13
13
14
14
14
14
15
15
15
15
5
5
20 10
50
Tower Framing Plan 5
Framing Plans
Tower Half Level Framing Plan
20 10
20 10
G
7
10
2nd Floor Roof Framing Plan
F
5
10
2nd Floor Framing Plan
D
H
1
1
4
B
E
5 50
20 10
50
50
19
The tower structure of Market Station utilizes two large concrete beams which are tied into the concrete cores. The rest of the structure above the concrete beams is a long-span CLT/Glulam system which is able to take advantage of the concrete beams below in order to prevent longterm sag and bending of the wooden structure. The entire structure is either tied into and supported by the two concrete beams or the concrete cores.
3D Structural Diagram
20
Market Station utilizes a central hydronic HVAC system to heat and cool the majority of the building. Apartment Units are provided air through the central heating and cooling system but feature individual VRF units to further heat and cool the space to their liking. A DOAS (Dedicated Outside Air System) is included on the roof of the residential tower to provide fresh air to occupants of the tower. Water retention systems collect rainwater from the roof surfaces and drain it into cisterns in the basement. Hot and cold systems throughout the building utilize the same ductwork. The central heating and cooling system are adjusted for different seasons to maintain a comfortable temperature, and apartments utilize VRF (Variable Refrigerant Flow) systems to individually heat and cool further to their liking.
Building Systems
21
The daylighting strategy for the building focused entirely on the western facade. The Southern facade is shaded on the lower levels by the overpass. We identified the market hall to be the only space in need of minimizing daylight exposure. To minimize sun exposure in the market hall during afternoon hours we exploited vertical shades that are placed at ten-foot intervals across the facade.
Daylighting
22
Before
After
Our rainwater retention system is able to collect around 50,000 gallons of greywater for use throughout the building. It also makes use of a green roof which is able to retain water and slow its drainage into city stormwater systems.
Rainwater Retention
23
Roof 4’
5’
4’
5’
4’
5’
3’8”
50’4”
3’8”
18’8”
North Market Hall Stairs
3
24
Second Floor 5’3”
31’8”
5’3”
Stairs
3’8”
31’8”
5’3”
5’3”
3. Second Floor
5’3”
5’3”
3’8”
By: Blake Phillips
2
2. Ground Floor
24
Ground Floor
-15’9”
3’8”
24
Basement
1
24
3’
5’3”
3’8”
5’3”
15’9”
5’3”
0’0”
1. Basement
Roof 50’4”
1”
7”
3’8”
18’8”
11”
3
3’8”
25
Second Floor
Our stair section demonstrates our egress stair meets the code requirements. All steps have a 7-inch rise with a 12-inch run with nosing. Handrails stand 36 inches high and have 2-inch spacing from the wall. There is a 44inch egress path between railings and the minimum required door size of 36 inches. All Doors swing in the path of egress.
5’3”
31’8”
Step Detail
5’
4’
5’3”
31’8”
5’3”
5’3”
3. Second Floor
Stairs
5’3”
3’8”
5’3”
3’8”
By: Preston Doerrfeld
2
25 4’
Ground Floor 0’0”
5’3”
2. Ground Floor
5’3”
3’8”
25 5’
-15’9”
1. Basement
4’
Basement
3’8”
3’
5’3”
15’9”
5’
1
25
3’6” 10’6”
Roof
3’8”
7’
275’
4
12’4”
26
Fifth Floor 122’6”
5
7’
26
Tenth Floor
4’
5’
Fourth Floor
4’
4. 10th Floor
4
26
5’
7’
7’
28’
7’
7’
28’
7’
3’8”
7’
262’6”
4
26
7’
7’
94’6”
Ninth Floor
3’8”
7’
7’
28’
7’
7’
28’
7’
3’8”
7’
234’6”
4
26
Third Floor 7’
66’6”
4
7’
26
Eighth Floor 206’6”
7’
Stairs
3. Floors 3-9
7’
4
3’8”
7’
7’
7’
3’8”
28’
7’
35’
7’
By: Preston Doerrfeld
7’
26
3
Seventh Floor
26
7’
178’6”
7’
4’
5’
7’
3’8”
7’
7’
31’6”
28’
7’
7’
2. Ground Floor
4
7’
26
Sixth Floor
150’6”
2
3’6”
7’
26
Ground Floor
7’
7’ 3’6”
17’6”
3’
7’ 15’9”
1
1’9”
26
Basement -15’9”
4’
1. Basement
5’
26
3’8”
0’0”
3’8”
3’8”
3’8”
3’6”
3’8”
10’6”
Roof
4
12’4”
4’
27
Fifth Floor
4’
7’
275’
122’6”
5
7’
27
Tenth Floor
7’
7’
28’
7’
7’
28’
7’
7’
262’6”
4
27
Fourth Floor
5’
5’
4
4. Floors 3-9
5. 10th Floor
27
7’
7’
94’6”
Ninth Floor
28’
7’
7’
234’6”
3’8”
7’
7’
3’8”
3’8”
5’
7’
7’
28’
3’8”
4
4’
27
Third Floor 7’
66’6”
4
7’
27
Eighth Floor 206’6”
7’
7’
Stairs
4
4’
7’
4’
7’
7’
28’
7’
35’
7’
By: Preston Doerrfeld
7’
27
3
Seventh Floor
27
178’6”
3. 2nd Floor
Second Floor 7’
31’6”
3’8”
7’
7’
7’
31’6”
5’
28’
7’
7’
7’
3’8”
4
7’
27
Sixth Floor
150’6”
2
3’6”
7’
27
Ground Floor
1
7’
4’
7’
3’6”
17’6”
15’9”
3’
7’
0’0”
1’9”
27
Basement -15’9”
1. Basement
2. Ground Floor
27
Detail 1
Detail 2
Detail 3
Details
Detail 4
Detail 5
28
1
2
3
1. Green Roof 2. Substrate Layer 3. Resevoir Layer 4. Gravel 5. EPS Insulation 6. Metal Roofing System 7. Moisture/Vapor Barrier 8. Wooden Blocking 9. CMU 10. Sheathing 11. Steel Slab Edge 12. Concrete Slab 13. CLT Slab 14. Slab Thermal Break 15. Gypsum Board 16. Metal Stud Framing 17. Aluminum Rain Screen 18. Finished Floor
4
5 9 6
14
8
7
17
10
5
15
11
7
16 10
15
13
R Value Breakdown Outside Air: .17 Metal Panel: .01 Air Gap: 1 Insulation: 21.6 Sheathing: .45 Metal Stud: .43 5/8” Gyp Board: .45 Inside Air: .68
10
12
7 R-Value: 24.79
18
5
12
13
Details
14 17
11
16
0 2
12
6
Inches
24
0 2
Detail 1
12
6
Inches
24
Detail 2
29
4. Gravel 5. EPS Insulation 6. Metal Roofing System 7. Moisture/Vapor Barrier 8. Wooden Blocking 10. Sheathing 11. Steel Slab Edge 12. Concrete Slab 13. CLT Slab 15. Gypsum Board 16. Metal Stud Framing 17. Aluminum Rain Screen 18. Finished Floor 19. Mullion System 20. Glass 21. Joist 22. Pier 23. Structural Silicone 24. Shading System 25. Brick 26. Drainage System 27. Excavated Ground
17 15
15
16
10 6 8
7 18
11
21
12
22
20 19
19 12
13
Details
23 20
27
4
25
23 24 5 26
21
0 2
12
6
30
0 2
Inches
24
Detail 3
12
6
Inches
24
Detail 4
A 1
30
31
32
27
5 7 33
26
28
34
33
5. EPS Insulation 7. Moisture/Vapor Barrier 26. Drainage System 27. Excavated Ground 28. Undisturbed Ground 30. Column 31. Basement Slab 32. Foundation Wall 33. Grade Beam 34. Pile Cap 35. Piles 36. Sloped Footing
Details
35
36
1
5
Feet
0 2
10
Detail 5
31
Renders
32
Renders
33
Renders
34
West Stairs
Renders
35
Renders
36
Renders
37
Renders
38
Renders
39
Renders
40
Renders
41
Renders
42
Renders
43
Renders
44
Renders
45
Renders
46
Renders
47
Market Hall in Ghent Beligium Architects- Marie-Jose Hee, Robbrecht and Daem Completed 2012
5
6
1 2 3
Precedent
48
4
Precedent
49