Blue Benington: Student Architecture Portfolio 2015

Page 1



CONTENTS THIRD YEAR: 2015 5. SALT RIVER URBAN DESIGN 9. URBAN-TIMBER EDUCATION CENTRE (FINAL PROJECT) 20. SALT RIVER YOUTH CENTRE 26. DES BAKER ‘15

SECOND YEAR: 2014 28. ELANDSBAAI MARINE RESEARCH AND CONSERVATION CENTRE 33. TABLE MOUNTAIN CINEMA NOUVEAU 36. MOULIE POINT BEACH PROMENADE 38. KHAYALITSHA URBAN INTERVENTION 40. UPPINGTON DESERT HOUSE


THIRD YEAR:

SALT RIVER - CAPE TOWN ENVISIONING THE FUTURE CITY URBAN DESIGN

4


5


6


7


8


THIRD YEAR:

SALT RIVER - CAPE TOWN FINAL PROJECT ‘Urban-Timber Education Centre’ My major project sought to address the densification needs by introducing a new building technology that would be a sustainable alternative to our current methods. The idea is that the building can become a training facility for local craftsman to learn how to build bigger and bigger timber buildings; as well as for it to become a public hub of education, commerce and research. The building would facilitate public movement over the railway lines as well as market and workshop space. It showcases my ideas for the utilisation of the goods rail lines; the bridging of the rail divide; the growth of the new city out of the old; frame and infill; public and community integration.

9


10


11


12


13


14


15


16


17


18


19


THIRD YEAR:

SALT RIVER - CAPE TOWN MINOR PROJECT

Salt River Youth Centre A mixed use ‘Merchant House’ typology that becomes a training facility with internet cafe and student housing.

20


21


22


1

2

3

4 11

5 13

A002

A002

6

10 A002

40mm box profile IBR sheeting 405 sisilation insulation foil 38 x 38mm steel purlins @ 300mm centers

aluminium frame clerstory window

200 x 75mm galvanised steel channel 100 x 75mm galvanised metal stud

aluminium box gutter

14 A002

12

07 Roof

A002

13200 2hr metal stud ext wall with box Profile IBR cladding 120mm thermoacoustex fibre

7

2hr metal stud interior partition wall with painted plywood finish

38 x 38mm steel purlins @ 300mm centers

A002

6

timber door frame

15mm gypsum board ceiling

A002

timber door frame with treated plywood pannels 305 x 305 galvanised steel H column timber frame door with painted plywood finish

aluminium frame sliding door

300 x 300mm galvanised steel H column

Merch hous

square hollow steel section with timber finish ballustrade

30mm tubular steel balustrade with 2mm steel cables @ 80mm centres

203mm brick wall with laster and paint finish 230mm brk wall with plaster and paint finish

5mm torch on waterproofing 7mm dorkin sheeting

polished screed balcony finish

steel cantilever balcony

100mm agricultural drain 240 x 75mm galvanised steel channel

8

305 x 185mm galvanised steel I beam

A002

06 Third Storey 10200

5 A002 100mm tubular steel bracing

2hr metal stud interior partition wall with painted plywood finish

2hr metal stud ext wall with box Profile IBR cladding

timber door frame aluminium frame sliding door

No.

timber frame door with painted plywood finish

aluminium frame cantilever window

Descriptio

305 x 305 galvanised steel H column

15mm laminate flooring 10mm gypsum board 40mm ridgid sound insulation

230mm brk wall with plaster and paint finish

10mm gypsum board 100 x 45mm galvanised steel channel floor rafters

05 Second Storey

3

7200

2

A002

A002 'L' angle (15mm bolt) connection 120mm thermoacoustex fibre 38 x 38mm metal stud layer

2hr metal stud interior partition wall with painted plywood finish

steel cable suspended ceiling

100mm tubular steel bracing

15mm gypsum board ceiling

timber door frame

timber frame door with painted plywood finish

timber frame door with painted plywood finish

50 x 350mm aluminium mullion aluminium frame cantilever window

aluminium frame curtain wall

aluminium frame sliding door 300 x 300mm reiniforced concrete column to eng specs

aluminium window frame 280mm brk cavity wall with plaster and paint finish 15mm laminate flooring 30mm rigid sound insulation 175mm reinforced concrete slab to eng specs

4

30mm ridig insulation pannels

230mm brk wall with plaster and paint finish

galvanised steel wire tie

concrete upstand

300 micron stepped DPC

45mm diametre PVC gargoyle

04 First Storey

weephole

A002

4200

305 x 95 galvanised steel channel

305 x 150mm galvanised steel 'I' beam

fullbore with torch on bonded around the funnel

9

75mm diameter PVC drain to column

35 x 35mm steel angle bolted to slab

A002

screed fall 1:200

38 x 38mm metal stud layer

4mm torch on

steel cable suspended ceiling

30mm polished screed floor finish 305 x 185mm galvanised steel I beam bolted to concrete column with nylon expansion joint

15mm gypsum board ceiling

300 x 300mm reiniforced concrete column to eng specs 50 x 350mm aluminium mullion

330 x 330mm non-structural brk column with plaster paint finish on pavement

aluminium frame cantilever window 300 x 300mm reiniforced concrete column to eng specs

50mm polished screed floor finish

03 Ground

175mm reinforced concrete floor slab to eng specs

1200 40mm slate stair tile

150 x 500mm reinforced non structural concrete beam

reinforced concrete stair to eng specs 300 x 300mm reinforced concrete column to eng specs 90mm permeable brick paving aluminium frame cantilever window

galvanised steel plate staircase

aluminium frame curtain wall

40mm timber tred

precast concrete paver

02 Pavement

380mm cavity brick retaining wall

Sectio

0

30mm rigid foam insulation pannels galvanised steel wall tie every 5 courses 100mm precast polishe concrete slab 300 x 300mm reiniforced concrete column to eng specs

110mm brk wall with plaster and paint finish

50mm polished screed floor finish 175mm reinforced concrete floor slab to eng specs

polished screed floor finish 110mm permeable brick paving 200mm copact fill

500x900mm concrete pad footings to eng specs

500 micron DPM lapped up cavity and tucked into 7th brick course

500 micron DPM

4mm torch on

loose layered reinforced brick, layed on 1st surface bed

screed to fall 1:200

01 Basement

300mm layer of 15mm diameter gravel

-1500 00 Foundation

100mm agricultural drain to sump 100mm agricultural drain to sump 300x500mm reinforced concrete ground beam to eng specs

-2000

300 x 500mm reinforced concrete ground beam to eng specs

120mm mesh reinforced surface bed

1

Section 2 1 : 25

1

2

A001

600x900mm concrete sump

3

Blue

Checked by

500x900mm reinforced concrete pad footings to eng specs

600x900mm concrete sump

Date Drawn by

400 x 1675mm reinforced concrete pad footings to eng specs

Underground gutters take water to agricultural drains

Project number

4

5

6

23 Scale


A

B

1

C

D

A

B

1

C

D

A001

A001

10417

10417 5232

3200

5232

1985

3200

1985

280x 280mm gully to stormwater

1500

1

fire shutter with fuseable link

1279

6

11 12 13

26

UP

25

21 20

5

2

6 7

1800

8

330 x 330 non-structural masonry column with plaster and paint finish

9

18

UP

25

30

24 44

31

43 23

32

22 42

33

21 41

34

20 40

35

19 39

36

18 38

37

11 12

1500

galvanised hoop iron

300x 300mm steel reinforced concrete column to eng specs

2500 aluminium frame folding and stacking door

aluminium framed window

No.

Descripti on

precast concrete wall element to eng specs

1400

UP 1500

galvanised hoop iron

3842

1100mm wide class B SCFD

Lounge

precast polished concrete seating slab

precast polished concrete seating slab

1100

2

aluminium framed window

1800

1100

1100mm wide class B SCFD

1140

1540

280mm class B FR bwk with plaster and paint finish

14

700mm high 230 brk wall with plaster and paint finish 30mm tubular steel handrail

pressurized hydraulic lift car. 1800x 1800mm shaft 2600x 2010mm

20 stairs risers @ 150mm tred @ 300mm ground storey to first storey- 3000mm

3842

30mm diameter tubular steel ballustrade

13

FE

26

29

10

1400

17 stairs risers @ 150mm tred @ 300mm basement to ground storey- 2550mm

28

balcony with polished screed floor finish

200mm class B structural concrete lift shaft

0

19

300x 300mm steel reinforced concrete column to eng specs

4

pressurized hydraulic lift car. 1800x 1800mm shaft 2600x 2010mm

22

1500

38mm steel tube handrail

3

23

27

100mm drain from sump to stormwater

1 2

24

aluminium frame window

Mercha house

700mm high110mm brk wall with plaster and paint finish

80

16

1000

200mm class B structural concrete lift shaft

0

15

27

30mm tubular steel handrail 280mm class B FR bwk with plaster and paint finish

boundary line

75

14

1

3692

10

2

640

3692

9

3

1279

280mm class B FR bwk with plaster and paint finish

0

8

4

1279

1

planter

fire shutter with fuseable link

75mm diameter PVC down pipe from balcony to stormwater drain

75

7

5

1500

UP

1500

300x 300mm steel reinforced concrete column to eng specs

9kg

Apartment

Laminate flooring

3

0

0

75mm diameter PVC down pipe from balcony to stormwater drain 280mm class B FR bwk with plaster and paint finish

4mm rubber expansion joint between brick and concrete

4mm rubber expansion joint between brick and concrete

Office Kitchen

0

19068

3842

280mm class B FR bwk with plaster and paint finish

80

19068

3842

75

100mm drain from sump to stormwater

3

80

75

FHR 900x 350mm

FFL105,700

0 precast concrete wall element to eng specs

timber framed door with painted plywood finish

600mm high 110mm brk wall with plaster and paint finish

Bedroom 1

140mm class B FR interior partition wall with timber board finish

0

0

Internet cafe

300

polished screed

762 Bedroom 2

800

twin booster with 120mm diameter connection point

timber framed door with painted plywood finish

800mm wide class B FD aluminium frame sliding door

75mm diameter PVC down pipe from roof to stormwater drain

Bathroom Tile floor finish

5

5

280x 280mm gully to stormwater

2000

60 0 8 7

5 4

Ground a First stor plans

concrete balcony with polished screed floor finish

aluminium frame sliding door

4444

6

Main bedroom

31 84

4444

reinforced concrete stairs with slate tile tread 8 stairs riser @ 187,5mm tread @ 300mm pavement to ground storey -1500mm

1530

31 48

precast polished concrete seating slab

3248

230mm class B FR bwk with plaster and paint finish

3248

FFL102,700

aluminium frame curtain wall

4

80

75

4

71 5

3

40 69

2

300mm diameter reinforced circular concrete column to eng specs

1

UP

2473

41 10

71 5

1092

6

715

952

6

2459

Date

Issue pavement

Drawn by

Blue beni 5232

3

03 Ground 1 : 50

A

3200

B

5232

1985

C

D

4

04 First Storey 1 : 50

A

3200

B

1985

C

A102 D

Scale

24


A

B

1 A001

C

D

A

B

1 A001

5232

3200

5232

1985

1

fire shutter with fuseable link

50

44 64

51

63 43

52

62 42

53

61 41

54

60 40

55

59 39

56

58 38

57

1500

200mm class B structural concrete lift shaft

planter

balcony with polished screed floor finish

fall pressurized hydraulic lift car. 1800x 1800mm shaft 2600x 2010mm

2000

1800

UP 1500

1400

67

700mm high 230mm brk wall with plaster and paint finish

68

66

69

65

700mm high 110mm brk wall with plaster and paint finish

70

64 84

71

83 63

305x 305mm galvanised structural steel H column

1100

aluminium frame sliding door

2

30mm tubular steel handrail

80 60

75

79 59

76

78 58

30mm tubular steel handrail

aluminium framed window

No.

Descripti on

3842

0

UP

3

Laminate flooring

Lounge 225mm metal stud wall with interior timber finish and exterior IBR box profile cladding

280mm class B FR bwk with plaster and paint finish

3

1

Bedroom 1

3

0

0

60

2

4

4

Office

5

5 6

6

Kitchen

7

7

10

11

11

0

9

10

19068

3842

8

60

0

9

19068

3842

60

8

12

12

Bedroom 1

13

140mm class B FR interior partition wall with timber board finish

14

15

4

60 0

0

Bedroom 3 timber framed door with painted plywood finish

75mm diameter PVC down pipe from roof to stormwater drain

Bathroom Tile floor finish

75mm diameter PVC down pipe from roof to stormwater drain

Bathroom Tile floor finish

5

5 Bedroom 4

Bedroom 3 Main bedroom

715

40 93

406

30mm tubular steel handrail

715

305x 305mm galvanised structural steel H column

2411

aluminium frame sliding door

762

41 78

cantilever steel balcony with polished screed floor finish

Second a Third sto plans

700mm high 230mm brk wall with plaster and paint finish

4444

30mm tubular steel handrail

Main bedroom

60 0

4444

aluminium frame sliding door

762

31 84

1530

700mm high 230mm brk wall with plaster and paint finish

1530

60 0

406

3248

3248

timber framed door with painted plywood finish

4

16

16 stairs risers @ 187.5mm tred @ 250mm second storey to third storey- 3000mm

60

Bedroom 2

140mm class B FR interior partition wall with timber board finish

14

16

280mm class B FR bwk with plaster and paint finish

Bedroom 2

13

15

31 41

Student housing

FFL111,700

60

3

2

aluminium framed window 1100mm wide class B SCFD

1100

3842

0

Laminate flooring FFL108,700

2

2000 aluminium frame sliding door

1400

305x 305mm galvanised structural steel H column

balcony with polished screed floor finish 1100

fall

1800

UP 1500

700mm high 110mm brk wall with plaster and paint finish

planter

pressurized hydraulic lift car. 1800x 1800mm shaft 2600x 2010mm

60

60

1100

Student housing

1

74

700mm high 230mm brk wall with plaster and paint finish

galvanised hoop iron

225mm metal stud wall with interior timber finish and exterior IBR box profile cladding

galvanised hoop iron

UP

81 61

200mm class B structural concrete lift shaft

20 stairs risers @ 150mm tred @ 300mm second storey to third storey- 3000mm

Lounge

1050

82 62

73

1500

aluminium framed window 1100mm wide class B SCFD

72

77

aluminium framed window

20 stairs risers @ 150mm tred @ 300mm first storey to second storey- 3000mm

Mercha house 3692

45

1

280mm class B FR bwk with plaster and paint finish

3692

49

1985

30mm tubular steel handrail

280mm class B FR bwk with plaster and paint finish

46

3200

fire shutter with fuseable link

30mm tubular steel handrail

47

D

10417

10417

48

C

305x 305mm galvanised structural steel H column cantilever steel balcony with polished screed floor finish

2411

6

6 5232

3200

1985

Date

Issue Drawn by

A 5232

5

05 Second Storey 1 : 50

A

3200

B

1985

C

D

6

06 Third Storey 1 : 50

A

B

C

A103

D Scale

25

1


THIRD YEAR:

SALT RIVER - CAPE TOWN DES BAKER

‘Future City’ Film and Poster Ndikwingcinga Zam, meaning ‘deep in my thoughts’, is set in Cape Town and depicts the current condition of our city through the narrative of an individual’s everyday life (bound by the ghosts of apartheid city planning, Cape Town’s urban environment remains largely segregated and disconnected). Through their eyes we see the opportunity and possibilities that we as South Africans have to create our cities of the future. The film addresses rapid urbanisation and the city’s growing needs for densification with an understanding that the future city will grow out of the existing urban fabric. On that basis we looked at the possibility of new city nodes forming in places of high density with growing urban development. Through just the right balance between top down planning and bottom up development, urban frameworks can allow for the specific needs of communities and individuals to be met. Thus the future city is born out of the creative cultural diversity that exists here in South Africa. We must also work towards a city that is resilient and that can respond to an uncertain changing natural environment.

26


27


SECOND YEAR:

ELANDSBAAI - WESTERN CAPE Marine Research and Conservation Centre A public centre where research and educational activities can take place. A facility to teach conservation to locals and visitors about the surrounding environment. There would be spaces provided for workshops and retail as well as a backpackers and small restaurant, allowing for a diverse mix of uses. The intervention also sought to create a human bridge between mountain and sea in order to connect people back to their environment and history.

28


29


30


31


32


SECOND YEAR: CAPE TOWN

Table Mountain Cinema Nouveau Using a narritive to explore and capture the sublime eternal force of the mountain, an interplay between reality and illusion.

33


34


35


SECOND YEAR: CAPE TOWN

Moulie Point Kinetic Promenade Kinetic structures bringing movement and life to wind and tidal power while creating a shaded promenade, an outdoor cinema and public tidal pool.

36


37


SECOND YEAR: CAPE TOWN

Khayalitsha Urban Intervantion The project from a travelling studio from Durban to Cape town, investigating the thresholds of formal and informal. The proposal sought to blur the divide created by an unfriendly main road by pushing and pulling public infrastructure across the boundaries.

38


39


SECOND YEAR: UPPINGTON

Desert House Designing a small home specific to human needs in a harsh environment that is “of the earth� and completely self sustaining.

40


41


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.