Design Studio Beta Portfolio Semester 1, 2019 Hang Jiang, Studio 6 Brett Lynch 916343
Final Drawings - Assignment 1 Design Studio Beta, Semester 1, 2019 Hang Jiang, Studio 6 Brett Lynch 916343
Field Diagrams
Studio Beta & Earth
Exercise Name Assignment 1
Drawing Title Field Diagram 1 - Random
Student Name:
Tutor Name:
Brett Lynch- ID 916343
Hang Jiang
Coordinators Name:
Date:
Comments
Random shapes placed randomly throughout the page
Scale 1 : 125@A3 (drawn in millimeters) 0m
Leire Asensio Villoria and David Mah
22 / Mar / 2019
0.5m
North
Drawing No
01
1m
01 of 09
Field Diagrams
Studio Beta & Earth
Exercise Name Assignment 1
Drawing Title Field Diagram 2 - Random
Student Name:
Tutor Name:
Comments
Brett Lynch - ID 916343
Hang Jiang
Playing with the white space
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
22 / Mar / 2019
Scale 1 : 125@A3 (drawn in millimeters) 0m
0.5m
1m
North
Drawing No
02 02 of 09
Field Diagrams
Studio Beta & Earth
Exercise Name Assignment 1
Drawing Title Field Diagram 3 - Random
Student Name:
Tutor Name:
Comments
Brett Lynch - ID 916343
Hang Jiang
Playing with random lines and shapes
Coordinators Name:
Date:
Scale 1 : 125@A3 (drawn in millimeters) 0m
Leire Asensio-Villoria and David Mah
22 / Mar / 2019
0.5m
North
Drawing No
03
1m
03 of 09
Field Diagrams
Studio Beta & Earth
Exercise Name
Drawing Title
Assignment 1
Field Diagram 4 - Random
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio Villoria and David Mah
22/ Mar / 2019
Comments
Random blocks divided and deleted
Scale 1 : 125@A3 (drawn in millimeters) 0m
0.5m
North
Drawing No
04
1m
04 of 09
Field Diagrams
Studio Beta & Earth
Exercise Name Assignment 1
Drawing Title Field Diagram 5 - Rule
Tutor Name:
Comments
Brett Lynch- ID 916343
Hang Jiang
Coordinators Name:
Date:
Must be a straight sided shape or semi circle All shapes must be white
Leire Asensio Villoria and David Mah
22 / Mar / 2019
Student Name:
Scale 1 : 125@A3 (drawn in millimeters) 0m
0.5m
1m
North
Drawing No
05 05 of 09
Field Diagrams
Studio Beta & Earth
Exercise Name Assignment 1
Drawing Title Field Diagram 2 - Rule
Student Name:
Tutor Name:
Comments
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Must be a straight sided shape or semi circle All shapes must be black
Leire Asensio-Villoria and David Mah
22 / Mar / 2019
Scale 1 : 125@A3 (drawn in millimeters) 0m
0.5m
1m
North
Drawing No
06 06 of 09
Field Diagrams
Studio Beta & Earth
Exercise Name Assignment 1
Drawing Title Field Diagram 3 - Rule
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
22 / Mar / 2019
Comments
Combination of rules - Clusters, linked assemblies and collision Rule - Must have at least 1 connection
Scale 1 : 125@A3 (drawn in millimeters) 0m
0.5m
North
Drawing No
07
1m
07 of 09
Field Diagrams
Studio Beta & Earth
Exercise Name
Drawing Title
Assignment 1
Field Diagram 4 - Rule
Tutor Name:
Comments
Brett Lynch - ID 916343
Hang Jiang
Rule - Mosaic
Coordinators Name:
Date:
Leire Asensio Villoria and David Mah
22 / Mar / 2019
Student Name:
Scale 1 : 125@A3 (drawn in millimeters) 0m
0.5m
North
Drawing No
08
1m
08 of 09
40000mm
Studio Beta & Earth
Exercise Name
Drawing Title
Assignment 1
Site Plan
Student Name:
4000mm
Tutor Name:
Brett Lynch- ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio Villoria and David Mah
22 / Mar / 2019
Comments
SIDEWALK
STREET
30000mm
SIDEWALK
Schematic Site Plan
10000mm
4000mm
Scale
North
1 : 200@A3 (drawn in millimeters) 0m
1m
2m
5m
Drawing No
09 01 of 09
Final Drawings - Assignment 2 Design Studio Beta, Semester 1, 2019 Hang Jiang, Studio 6 Brett Lynch 916343
DN
UP
DN UP
0m
1m
3m
UP
UP DN
UP
DN
DN DN DN
0m
1m
3m
0m
1m
3m
0m
1m
3m
0m
1m
3m
Assignment 3 - Ground Conditions Design Studio Beta, Semester 1, 2019 Hang Jiang, Studio 6 Brett Lynch 916343
Defining the Ground
Studio Beta & Earth
Exercise Name Assignment 3
Drawing Title Contours and Building Outlines
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
01 01 of 11
Defining the Ground
Studio Beta & Earth
Exercise Name Assignment 3
Drawing Title Contours and Building Outlines 2
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
02 02 of 11
Defining the Ground
Topography
Summer Shadow Diagram
Micro-Watershed North Western Summer Winds
Northern Winds
Legend: Water/River
Paving
Timber
Gravel
Glass Floor
Grass
Ground Conditions
Studio Beta & Earth
Exercise Name Assignment 3
South Western Winter Winds
Winter Shadow Diagram
Drawing Title Analysis Matrix
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
South Eastern Winter Winds
Wind Analysis
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
03 03 of 11
Defining the Ground Legend: Water/River
Paving
Timber
Gravel
Glass Floor
Grass
Studio Beta & Earth
Exercise Name Assignment 3
Drawing Title Ground Conditions
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
04 04 of 11
Defining the Ground
Legend: Water/River
Paving
Timber
Gravel
Glass Floor
Grass
Studio Beta & Earth
Exercise Name Assignment 3
Drawing Title Ground Conditions and Building Outlines
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
05 05 of 11
Defining the Ground Legend: Water/River
Guest Bathrooms Greenhouse
DN
Paving Guest Laundry
Commercial Kitchen
Timber Function Room
DN
Guest Kitchen
Gravel
Study Glass Floor DN Living Area
Grass
Public Bathrooms
Outdoor Seating and Dinning
DN
Undercover Stage Sanding Area
3 Level Short Stay Apartments
Stage
DN
Studio Beta & Earth
Exercise Name Assignment 3
Drawing Title Site Plan 1
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
06 06 of 11
Defining the Ground Guest Bathrooms
Greenhouse
Legend: Water/River DN
Commercial Kitchen
Guest Laundry
Paving
Guest Kitchen Function Room
Timber DN Gravel Study DN
Glass Floor
Living Area
Grass Public Bathrooms Roof Line DN
DN
3 Level Short Stay Apartments
Undercover Stage Sanding Area
DN Outdoor Seating and Dinning
Stage
DN
Studio Beta & Earth
Exercise Name Assignment 3
Drawing Title Site Plan 2
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
07 07 of 11
Defining the Ground
Studio Beta & Earth
Exercise Name Assignment 3
Drawing Title Axonometric Site View 1
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
08 08 of 11
Defining the Ground
Studio Beta & Earth
Exercise Name Assignment 3
Drawing Title Axonometric Site View 2
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
09 09 of 11
Defining the Ground
Section A
Section B
A
Studio Beta & Earth
Exercise Name Assignment 3
Drawing Title Sequential Sections
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
B
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
C
North
Drawing No
10 10 of 11
Defining the Ground
Section C
A
Studio Beta & Earth
Exercise Name Assignment 3
Drawing Title Sequential Sections
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
03 / May / 2019
Comments
B
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
C
North
Drawing No
11 11 of 11
Assignment 4 - Communication Design Studio Beta, Semester 1, 2019 Hang Jiang, Studio 6 Brett Lynch 916343
Studio Beta & Earth
Exercise Name Assignment 4
Drawing Title Parti Diagram/Ideogram 1
Base Shapes
Curvilinear Extrusions
Curvilinear Roofs
Split Roofs
Split Buildings
Communication
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
31 / May / 2019
Comments
North
Scale NTS 0m
1m
3m
Drawing No
01 01 of 10
Communication
Extrusion
Curvilinear Roofs
Elevated and Depressed Landscape
Studio Beta & Earth
Exercise Name Assignment 4
Drawing Title Parti Diagram/Ideogram 2
Split Buildings and Roofs
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
31 / May / 2019
Comments
North
Scale NTS 0m
1m
3m
Drawing No
02 02 of 10
Communication
Function Room
Commercial Kitchen
Guest Kitchen Guest Bathrooms and Laundry
Short Stay Apartments
Study
Greenhouse
Public Toilets Interactive Garden
Studio Beta & Earth
Exercise Name Assignment 4
Stage
Living Room
Drawing Title Exploded Circulation Diagram
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
31 / May / 2019
Comments
North
Scale NTS 0m
1m
3m
Drawing No
03 03 of 10
Communication Legend: Water/River
Guest Bathrooms Greenhouse
DN
Paving Guest Laundry
Commercial Kitchen
Timber Function Room
DN
Guest Kitchen
Gravel
Study Glass Floor DN Living Area
Grass
Public Bathrooms
Outdoor Seating and Dinning
DN
Undercover Stage Sanding Area
3 Level Short Stay Apartments
Stage
DN
Studio Beta & Earth
Exercise Name Assignment 4
Drawing Title Circulation Diagram Plan View
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
31 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
04 04 of 10
Communication
Interactive Garden Experience
Legend: Water/River
Guest Bathrooms Greenhouse
DN
Paving Guest Laundry
Commercial Kitchen
Timber Function Room
DN
Gravel
Guest Kitchen
Glass Floor Lookouts
Study Glass Floor DN Living Area
Grass
Public Bathrooms Outdoor Dining Outdoor Seating and Dinning
DN
Undercover Stage Sanding Area
3 Level Short Stay Apartments
Stage
DN
Staged Entertainment Area
Glass Floor Lookouts
Studio Beta & Earth
Exercise Name Assignment 4
Drawing Title Programmatic Diagram Plan View
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
31 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
05 05 of 10
Communication
Studio Beta & Earth
Exercise Name Assignment 4
Drawing Title Experiential Image Outside
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
31 / May / 2019
Comments
North
Scale NTS 0m
1m
3m
Drawing No
06 06 of 10
Communication
Studio Beta & Earth
Exercise Name Assignment 4
Drawing Title Experiential Image Inside
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
31 / May / 2019
Comments
North
Scale NTS 0m
1m
3m
Drawing No
07 07 of 10
Communication
Studio Beta & Earth
Exercise Name Assignment 4
Drawing Title Comic Strip
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
31 / May / 2019
Comments
North
Scale NTS 0m
1m
3m
Drawing No
08 08 of 10
Communication Legend: Gues Gu G uest st Bat Ba B atth thro rroom ro oom omss Gree Gr eenh nhou house use e
9AM
DN DN
12PM Gue Gu G ue est es st Laun La L undr un dryy dr 3PM
Comm Co C omm mmer mme m me erci erc er rcci cial cia ial al Kitc Kit K itc tche hen n DN D N
6PM
Gues Gu G estt Ki Kitc tch ch hen he n
Stu Stud Stu St udy ud dy 9PM DN D N 12AM Liivvin Liv L ing ng A Area Ar re ea
Publ Pub Pu P ub blic bl licc B Bat athr ath a th hroo hro ro ooms oom mss m
Out O Ou uttd tdo do oor oo or Se S Sea ea atin ati at tiin ng an and Dinn Din Di D in nnin nn in ng
DN
Und Un Under U nd n dercov de d errcover e er Stage Stag S ttag ag ge e Sanding S San an nd ng Area Ar A re
3L Lev Le evve el Sho Sh S ho ort or rt St Stay ayy Apa Ap A pa artm ar tmen tm ents en ts s
Stage Sta age
DN D N
Studio Beta & Earth
Exercise Name Assignment 4
Drawing Title Occupational /Time Diagram
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
31 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
09 09 of 10
Communication
Studio Beta & Earth
Exercise Name Assignment 4
Drawing Title Sectional Perspective
Student Name:
Tutor Name:
Brett Lynch - ID 916343
Hang Jiang
Coordinators Name:
Date:
Leire Asensio-Villoria and David Mah
31 / May / 2019
Comments
Scale 1 : 125@A3 (drawn in millimeters) 0m
1m
3m
North
Drawing No
10 10 of 10