Moglin Residence - Evanston, IL - 2008-2009

The 2,200 square foot Design Evanston 2010 Award Winning addition to this Tudor landmark preserved the existing garage, converting the space into a new kitchen. Also included was a two car garage, with a master bedroom, bathroom, and closet above. The addition required approval by the Evanston Historic Preservation Board. before proposed addition after

before

after

all work performed at rugo|raff architects, ltd

Brian M. Goehle Architect & Project Manager

| 3


Moglin Residence - Evanston, IL - 2008-2009

ground and second floor plans

after: keeping room

before: kitchen

all work performed at rugo|raff architects, ltd

after: kitchen

after: living room

Brian M. Goehle Architect & Project Manager

| 5


Moglin Residence - Evanston, IL - 2008-2009

after: master bedroom

after: master bathroom

after: master walk-in closet

all work performed at rugo|raff architects, ltd

Brian M. Goehle Architect & Project Manager

| 7


Sullivan Residence - Wailea Elua, Maui HI - 2009-2011

living room elevation

after: living room

after: soffit detail

after: living room

The existing three bedroom beach front condo was out-dated and in need of upgrades to all finishes and services. The unit was demolished to its framing, and designed with modern details then clad in English sycamore veneer paneling. The project required the full design and detailing of all connections and material transitions.

EXIST'G CATCH BASIN TO REMAIN.

before: living room

REMOVE EXIST'G TRELLIS. REMOVE EXIST'G TERRACE TILE FLOOR FINISH, TYP. REMOVE EXIST'G AIR CONDITIONING CONDENSER.

REMOVE EXIST'G PANEL AND WINDOW. EXIST'G WATER SUPPLY SHUT-OFF ACCESS COVER TO REMAIN.

REMOVE EXIST'G BI-FOLD DOORS AND CLOSET INTERIORS, TYP.

REMOVE EXIST'G AIR HANDLER.

REMOVE EXIST'G WINDOW UNIT & WALL BELOW, FOR NEW SLIDING DOOR UNIT.

EXIST'G GLASS SLIDING DOOR TO BE REPLACED. 2'-9"

EXIST'G DOOR TO REMAIN. REMOVE EXIST'G TRASH ENCLOSURE.

EXIST'G SLIDING DOOR UNIT TO BE REPLACED. REMOVE EXIST'G TILE FLOOR FINISH, TYP.

REMOVE EXIST'G BI-FOLD DOORS.

EXIST'G PARTY WALL.

REMOVE EXIST'G FLOOR FINISH IN STORAGE CLOSET. 2'-9"

REMOVE EXIST'G GATE.

REMOVE EXIST'G TILE FLOOR FINISH, TYP.

EXIST'G WALL FINISH MATERIAL TO REMAIN.

REMOVE EXIST'G WASHER/DRYER UNIT.

CONTRACTOR TO REMOVE CEILING FINISHES TO DETERMINE NEW CEILING HEIGHT & DUCT CONFIGURATION.

REMOVE EXIST'G DOOR JAMB & WALL AT WEST TO ACCOMMODATE NEW 2'-8" DOOR. REMOVE EXIST'G BATH FINISHES AND FIXTURES, TYP.

EXIST'G ELECTRICAL PANEL TO BE RELOCATED.

REMOVE EXIST'G BI-FOLD DOORS & CLOSET INTERIOR, TYP.

REMOVE EXIST'G KITCHEN CABINETS, APPLIANCES, AND FINISHES, TYP.

EXIST'G STRUCTURAL POST TO REMAIN.

REMOVE EXIST'G SOFFIT. EXIST'G DOOR TO BE REMAIN.

REMOVE EXIST'G BATH FINISHES & FIXTURES, TYP. REMOVE EXIST'G DROPPED CEILING FINISH. REMOVE EXIST'G TILE FLOOR FINISH, TYP. REMOVE EXIST'G STAIR. EXIST'G STRUCTURAL POST TO REMAIN.

REMOVE EXIST'G SOFFIT. EXIST'G DOOR TO BE REPLACED.

REMOVE EXIST'G BI-FOLD DOORS AND CLOSET MIRRORS, TYP.

REMOVE EXIST'G TILE FLOOR FINISH.

REMOVE EXIST'G NON-STRUCTURAL FRAMING. REMOVE EXIST'G SOFFIT.

REMOVE EXIST'G NONSTRUCTURAL FRAMING

REMOVE EXIST'G TILE FINISH, TYP. EXIST'G SLIDING DOOR UNIT TO BE REPLACED.

REMOVE EXIST'G WOOD CEILING.

EXIST'G DOOR TO REMAIN.

REMOVE EXIST'G TILE FLOOR FINISH, TYP.

EXIST'G FLOOR FINISH TO BE REMOVED.

EXIST'G SLIDING DOOR TO BE REPLACED.

1. REMOVE ALL EXIST'G INTERIOR WALL & CEILING GYPSUM BOARD FINISH TO FRAMING, UNLESS OTHERWISE NOTED.

EXIST'G WALL FINISH MATERIAL TO REMAIN.

NOTES:

EXIST'G DOOR TO REMAIN. EXIST'G WALL FINISH MATERIAL TO REMAIN.

2. REMOVE ALL EXIST'G INTERIOR DOORS.

EXIST'G TILE FLOOR FINISH TO BE REMOVED.

3. REMOVE ALL EXIST'G APPLIANCES.

REMOVE EXIST'G TERRACE TILE FLOOR FINISH, TYP.

4. REMOVE EXIST'G AIR HANDLER & CONDENSER. 5. REMOVE ALL EXIST'G PLUMBING FIXTURES & FITTINGS. 6. REMOVE ALL EXIST'G CABINETRY & BASE TRIM.

demolition plan

7. REMOVE ALL EXIST'G INTERIOR FLOOR FINISH TO SUBFLOOR. DRAWING KEY EXIST'G TO REMAIN. EXIST'G TO BE REMOVED.

DEMOLITION PLAN SCALE 1/4" = 1'-0

before: living room

Xref P:\2803 all work performed at rugo|raff architects, ltd

Brian M. Goehle Architect & Project Manager

| 9


Sullivan Residence - Wailea Elua, Maui HI - 2009-2011

after: kitchen

before: kitchen

after: kitchen

before: kitchen

Brian M. Goehle Architect & Project Manager

| 11


Sullivan Residence - Wailea Elua, Maui HI - 2009-2011

kitchen cabinet b

kitchen cabinet c

cabinet detail aa

cabinet detail cc

island cabinet a

cabinet detail ee

cabinet detail bb

all work performed at rugo|raff architects, ltd

Brian M. Goehle Architect & Project Manager

| 13


Sullivan Residence - Wailea Elua, Maui HI - 2009-2011

after: master bedroom

after: master bedroom

master closet detail

before: master bedroom

side table detail

all work performed at rugo|raff architects, ltd

Brian M. Goehle Architect & Project Manager

| 15


Vassallo Residence - Wilmette, IL - 2010- Present

The family of five purchased this house intending to create an addition which contained an upgraded kitchen, family room, and master suite on the second floor. The integration of existing materials and details seemlessly joined the existing house with the addition. Site and landscape design is underway.

entry detail

before: exterior

after: exterior

before: exterior

all work performed at rugo|raff architects, ltd

after: exterior

Brian M. Goehle Architect & Project Manager

| 17


Vassallo Residence - Wilmette, IL - 2010- Present

1'-61 2"

DN 1R

DN 8R

4'-10"

NEW STONE COUNTERTOP @ 36" AFF.

NEW 2x12s EXIST. 2x10s

FILL EXISTING DOOR OPENING. SALVAGE EXISTING DOOR.

EXISTING MILLWORK BOOKSHELVES AND MANTLE TO REMAIN.

109

1'-5" 2'-8"

108

8'-33 4" 17'-1"

104

105 107

EXISTING FIREPLACE AND SURROUND TO REMAIN.

CABLE SERVICE

ALL NEW EXTERIOR WALLS TO HAVE R-13 INSULATION.

106

2'-8"

1'-61 2"

3 A1.2

2'-03 8" DS

103

10'-0"

2

W

1'-93 8"

002

8'-33 4"

PROPOSED BASEMENT PLAN

2

2'-41 8"

3'-2"

CL

LINE OF CEDAR DECK ABOVE. T/NEW FOOTING

96" - V.I.F. CEILING HEIGHT

-8'-6"

T/NEW CONCRETE T/NEW SLAB

2

+0'-91 2" -8'-2"

2'-8"

1'-23 8"

3 A1.2

CL

007

NEW WINDOWS IN BASEMENT. SEE SCHEDULE ON A2.2.

17'-53 8" CABLE SERVICE

001

2

12" x 12" CONCRETE PAD AT STAIRS.

(2) 1-3/4" x 11 7/8" LVLs

16'-73 8"

008 003

CL ABOVE GRADE.

NEW CONCRETE

2

2'-8"

NEW 10"Ø CONCRETE SONOTUBE FOUNDATION WITH 12" BELL FOOTING FOR DECK ABOVE. 3'-6" DEPTH AND 6"

1'-0"

2x10s @ 16" O.C. CLG. FRAMING

9'-0"

3'-65 8" DN 1R @ 8"

2x10s @ 16" O.C. CLG. FRAMING

ALL EXISTING BASEMENT WINDOWS TO REMAIN.

12'-0"

2

PROVIDE NEW 4" FOUNDATION DRAIN TILE IN 6" GRAVEL BED W/ SOIL CLOTH LINER, TYP.

NEW BASEMENT

3 A1.2

10'-71 4"

MAINTAIN ALL EXISTING FOUNDATION WALLS.

T/EXIST'G SLAB V.I.F.

3'-6"

EXIST. 2x10s @ 16" O.C. CLG. FRAMING

8"

4 A1.2 DN 1R @ 8"

FD D

RELOCATE EXISTING WASHER AND DRYER.

2

-8'-2"

6'-53 8"

RE-USE EXISTING LAUNDRY CHUTE. RECONFIGURE OPENING TOWARD LAUNDRY ROOM. 2

VERTICALLY, EPOXY SET, 4" MINIMUM EMBEDMENT, TYP.

NEW SUMP PIT FOR NEW PUMP WITH BATTERY BACK UP.

RE-USE EXISTING DOOR AT LAUNDRY ROOM.

EXISTING CONCRETE

(2) 1-3/4" x 11 7/8" LVLs

EXIST. 2x10s @ 16" O.C. CLG. FRAMING

002

LAUNDRY ROOM

881 2" - V.I.F. CEILING HEIGHT

NEW CABINETS.

EXISTING BRICK COLUMNS TO REMAIN.

3'-13 4"

EXISTING CONCRETE

EXISTING CONCRETE

EXISTING FOUNDATION AND SLAB TO REMAIN.

103 4"

6'-37

8'-0"

2'-6"

EXISTING BASEMENT HALL

PROVIDE CONTINUOUS WATERSTOP. DOWEL NEW POURED CONCRETE WALL TO EXISTING FOUNDATION WITH

CL (2) #5 REBAR AT 12" O.C.

003 2'-6" 8"

30'-01 8"

EXISTING BASEMENT

2

3'-23 4"

NEW SUMP

3'-17 8" 004

(2) 1-3/4" x 11 7/8" LVLs 3'-6"

NEW LAUNDRY SINK BASIN.

1'-0"

2'-0" CL

3

EXISTING CONCRETE

7'-91 2"

MINIMUM 3'-0" HEIGHT AT NEW EJECTOR PIT.

CL

3'-9"

2'-7"

EXISTING 200 AMP ELEC. PANEL. 3

EXIST. SUMP

UP 8R

5'-75 8"

7'-11 4"

1'-81 2"

EXIST 75 GAL HWH

4'-113 8"

2'-0"

2'-2"

FD

1'-0"

MECH 2

6'-37 8" NEW EJ. PIT

CL 2'-4"

9'-8"

9'-0"

EXISTING CONCRETE

006

7'-4"

MECH 1

3'-0"

AD

004

TIE IN EXISTING FOUNDATION DRAIN TILE TO NEW FOUNDATION DRAIN TILE. VERIFY CONDITION OF EXISTING DRAIN TILE WITH ARCHITECT BEFORE CONNECTION.

2

EXISTING ELEC. METER EXTENT OF ADDITION TO REMAIN. NEW DISCONNECT REQ'D. 7'-17 8" EXISTING STAIR TO REMAIN WITH ELEC TELE. 6'-8" HEAD HGT. SERVICE METER

EXISTING CONCRETE

6'-0"

GAS METER

EXISTING TELEPHONE SERVICE TO REMAIN.

3'-65 8"

NEW 90% EFFICIENT VARIABLE SPEED GAS-FIRED FURNACE AND AIR-HANDLER. VENT TO EXTERIOR.

EXISTING CONCRETE

005

RELOCATE EXISTING 75 GALLON 90% EFFICIENT GAS-FIRED HOT WATER HEATER. RETURN AIR DUCT, TYP. REPLACE EXISTING HVAC DUCTS AND UTILIZE EXISTING CHASES.

FUTURE POWDER ROOM

FUTURE MECH 3

3

7'-4"

3'-8"

1'-0"

1 A2.1

NORTH

SCALE: 1/4" = 1'-0

EXISTING GAS METER TO REMAIN .

8'-0"

NEW WINDOW. SEE SCHEDULE ON A2.1.

PROPOSED FIRST FLOOR PLAN ASK 2.1

3'-0"

EXTENT OF ADDITION

2 A2.1

2'-41 8"

EX. DS

NEW DOUBLE HUNG WINDOW UNIT. SEE WINDOW SCHEDULE ON A2.2. NEW NEWEL POST AND RAIL, TYP.

1'-5"

EX. HB

3

NEW FRENCH DOOR UNIT. SEE DOOR SCHEDULE ON A1.1.

2

REPLACE EXISTING SHEET METAL BASE WITH NEW STUCCO AT EXISTING BAY.

TRENCH EXISTING CONCRETE FOR NEW INTERIOR DRAIN TILE. CONNECT TO NEW SUMP.

5'-0"

DS

102

LINE OF EXISTING FLOOR ABOVE.

SISTER NEW JOISTS TO EXISTING WITH BOLTS @ 12" O.C. 16'-55 8"

2

110

FAMILY ROOM

NEW HARDWOOD

2x12s @ 16" O.C. CLG. FRAMING

2

DN 4R

2'-01 8"

EXIST. 2x10s @ 16" O.C. CLG. FRAMING

3

2x10s @ 16" O.C. FL. FRAMING

101

8'-11"

DESK

E100 DN 1R

9'-0"

CASED OPENING. BROOM STORAGE. FRAME AROUND EXISTING LAUNDRY CHUTE.

111 8"

2'-0"

NEW WOOD COUNTERTOP @ 42" AFF. NEW CHIMNEY HOOD, VENT HOOD TO EXTERIOR.

2'-05 8"

NEW 1 2" WATER SUPPLY FOR ICEMAKER.

EXISTING HARDWOOD, TO BE RE-FINISHED.

2

DECK

NEW WOOD

3'-55 8"

8'-0"

26'-0"

5'-0"

2'-05 8"

2'-6"

D/W

EQ.

CASED OPENING.

EXISTING DINING ROOM

EXIST. 2x10s @ 16" O.C. CLG. FRAMING

100

1'-3"

3'-9" REF./ FREEZER

4'-55 8"

FILL EXISTING OPENING.

102

NEW MILLWORK CABINETS.

4" 2'-8"

NEW HARDWOOD

TRASH/ REC.

4"

EXISTING HARDWOOD, TO BE RE-FINISHED.

NEW WOOD MILLWORK BANQUETTE AND TABLE.

NEW HARDWOOD

MICRO. DWR.

FIRST FLOOR HALL

PANTRY

ALL EXISTING MILLWORK BEAMS AND TRIM TO REMAIN, FOR NEW CLEAR FINISH. REPAIR, AS NECESSARY.

KITCHEN

9'-0"

DOUBLE OVENS

8'-11"

APPLIANCE GARAGE

3'-2"

NEW TILE

4'-0"

EQ.

EXISTING LIVING ROOM

2

4'-81 2"

2'-33 4" 2'-4" 3'-4" V.I.F.

2'-4" 101

4'-55 8"

EXISTING WALLS AND FINISHES TO REMAIN.

POWDER ROOM

3'-11" STONE THRESHOLD.

3'-75 8" 6'-0"

T/ FINISHED FLOOR EL: +0' - 0"

EXISTING WINDOWS TO REMAIN. SEE SCHEDULE ON A2.2.

3'-4"

UP 4R

UP xR

100

2'-10"

SAND AND PAINT ALL WALLS IN EXISTING HOUSE.

T/ FINISHED FLOOR EL: -0' - 11 4"

NFSC DN 5R

UP 4R

3

DS

3'-0"

11" DS

NEW GAS HOOK-UP FOR PORTABLE GRILL.

NEW MILLWORK PANTRY CLOSET.

FLOORING PITCH

REPLACE EXISTING IRON RAILING WITH NEWEL POSTS AND RAIL.

HALL 1

NEW HARDWOOD

103

EXISTING TILE

10'-0"

SERV. 1 ELEC 5'-9 2"

117 METER

CASED OPENING.

6"

111

EXISTING ENTRY

6'-2" V.I.F.

E101

2'-10" V.I.F.

NEW STRINGERS TO RECEIVE EXTENDED WIDTH OF STAIR.

4'-7"

9'-4"

LINE OF EXIST. CONCRETE STAIRS TO REMAIN.

FRONT PORCH

NEW WOOD DN 6R

115

114

112

2'-7"

COVER EXISTING CONCRETE WITH NEW WOOD DECKING ON WOOD SLEEPERS.

2'-2"

GAS EX. METER DS

2

NEW NON-FREEZE HOSE BIB.

2'-01 8"

E102

116

REPLACE EXISTING PORCH OVERHANG. NEW T&G BEADBOARD CEILINGS, FOR PAINTED FINISH.

EXISTING STAIRS TO REMAIN WITH 6'-8" HEAD HEIGHT.

NEW WOOD STAIRS WITH TREAD 1 FOR STAIN, RISERS FOR PAINT. A2.2 4T @ 10", V.I.F.; 5R @ 7 5 8", V.I.F. 2x6 FRAMING AT ALL EXTENT OF ADDITION PLUMBING WALLS, TYP. 35 8" 7'-0" TELE.

113

EXISTING STAIRS TO REMAIN.

COVER EXIST. CONCRETE STAIRS WITH WOOD TREADS AND RISERS. SEE DETAIL 8/A2.1.

NEW AIR CONDENSOR UNITS. TO BE LOCATED 10'-0" FROM PROPERTY LINE.

ground floor plan

28'-93 8"

EXISTING STAIRS TO REMAIN. REPLACE EXISTING WOOD TREADS, FOR STAIN, AND RISERS, FOR PAINT.

EXTENT OF ADDITION

NORTH

PROVIDE CONTINUOUS WATERSTOP. DOWEL NEW POURED CONCRETE WALL TO EXISTING FOUNDATION WITH (2) #5 REBAR AT 12" O.C. VERTICALLY, EPOXY SET, 4" MINIMUM EMBEDMENT, TYP.

SCALE: 1/4" = 1'-0

before: kitchen

after: kitchen

after: kitchen

all work performed at rugo|raff architects, ltd

after: rear hallway

Brian M. Goehle Architect & Project Manager

| 19


4'-6"

2x10 VA

LLEY

3'-2"

NEW MEDICINE CABINET.

300

2x10s @ 16" O.C.

1 A2.1

2'-4"

DS

301

LLEY

ALL EXISTING MILLWORK TRIM TO REMAIN, FOR NEW CLEAR FINISH. REPAIR, AS NECESSARY.

2x10s @ 16" O.C.

2x10 VA

R FLASHING AT ALL YS, TYP.

EQ. NEW COPPER FLASHING AROUND, AS REQUIRED.

301 5'-73 4" V.I.F.

NEW FLUSH STONE 28'-111 4" THRESHOLD.

302

220

NEW TILE

11'-11 2"

EXISTING HARDWOOD

BATH 2

NEW 2x6 FRAMED WALL, FOR GYP. BD. FINISH.

GUEST BEDROOM/ PLAYROOM

16'-01 4"

303

302

2x10s @ 16

SAND AND PAINT ALL WALLS IN EXISTING HOUSE.

G WINDOWS TO N. SEE SCHEDULE ON

NEW 90% EFFICIENT VARIABLE SPEED GAS-FIRED FURNACE AND AIR-HANDLER. VENT TO EXTERIOR.

Vassallo Residence - Wilmette, IL - 2010- Present 303

RETURN AIR DUCT, TYP. REPLACE EXISTING HVAC DUCTS AND UTILIZE EXISTING CHASES.

(2) 2x10s @ RIDGE

EXISTING ATTIC

NUOUS RIDGE VENT,

2x10s @ 16" O.C.

SHPALT COMPOSITE TO MATCH EXISTING

EXISTING HARDWOOD

4'-43 4" 2'-8"

NIMUM ICE AND R SHIELD AT ALL EAVES DGES, TYP.

4'-4"

300

HEDULE ON A1.1.

3

NUOUS EAVE VENT,

ROOF TO HAVE R-30 INSULATION.

3 A1.2

2

EX. DS DS

EXTENT OF ADDITION

Ø ALUMINUM SPOUT, FOR PAINT.

HALF ROUND NUM GUTTER, FOR

EX. DS

2 A2.1

EX. DS

second floor plan

PROPOSED ATTIC FLOOR PLAN

NORTH

SCALE: 1/4" = 1'-0

EXISTING FIXTURES AND PLUMBING TO REMAIN.

EXTENT OF ADDITION

1 A2.2 4"

EXISTING HARDWOOD, TO BE RE-FINISHED.

EXISTING BEDROOM 2

ED CONCRETE SLAB "x6" WELDED WIRE ON 8 MIL. VISQUEEN BARRIER ON MIN. 4" L BED.

EXISTING HARDWOOD, TO BE RE-FINISHED. 211

208

207

2'-2" 219

202

3'-15 8" 2'-8" 2'-8"

NEW HARDWOOD

2x10s @ 16" O.C. CLG. FRAMING

DS

2

1'-5"

FILL EXISTING WINDOW OPENING.

1'-5"

221

2'-8"

206 208 207

EXTENT OF ADDITION

PROPOSED SECOND FLOOR PLAN

NEW WOOD MILLWORK VANITY.

NEW INTERIOR WOOD DOOR, TYP. SEE DOOR SCHEDULE ON A1.1. EXISTING WINDOW TO REMAIN. REPLACE GLAZING WITH MIRRORED GLASS. FOAM INSULATE AND DRYWALL BEDROOM SIDE.

NEW WINDOW, TYP. SEE WINDOW SCHEDULE ON A2.2.

204

14'-47 8" EXISTING LAUNDRY CHUTE TO REMAIN.

209

NEW FLUSH STONE THRESHOLD.

51 2"

203

EXISTING HARDWOOD, TO BE RE-FINISHED.

EXISTING CLOSET 3

210

E200 202

EXISTING BEDROOM 3

205

NEW TOWEL BAR LOCATION.

NEW MILLWORK CABINET.

8"

MASTER BEDROOM

6"

NEW 14"Ø DAYLIGHTING TUBE, BY SOLATUBE, OR EQ.

EXISTING CLOSET 2 EXISTING HARDWOOD, TO BE RE-FINISHED.

EXISTING HARDWOOD, TO BE RE-FINISHED.

EX. DS

220

EXISTING TILE

EXIST. 2x10s @ 16" O.C. CLG. FRAMING

D INSULATION, NUOUS.

EX. DS

11'-47

204

EXIST. 2x10s @ 16" O.C. CLG. FRAMING

2

EXISTING BATH 1

201

2'-8"

G WINDOWS TO N. SEE SCHEDULE ON

2'-5"

NEW CUSTOM SHOWER PAN, FOR TILE FINISH.

51 2"

LINEN CLOSET

2'-6" 203

FUR OUT EXISTING WALLS TO MATCH EXISTING DEPTH.

7'-83 8"

NEW TILE

200

2'-8"

ALL EXISTING MILLWORK TRIM TO REMAIN, FOR SANDING AND PAINTING. REPAIR, AS NECESSARY.

3'-6"

NEW HARDWOOD

200

4'-93 8"

3'-6"

EXISTING HALL 2

EXISTING HVAC AIR VENT, TYP.

MASTER HALL

NEW JAMB AT EXISTING DOOR.

209

G WALLS AND FINISHES AIN.

43 4"

MASTER BATHROOM

2'-8"

2'-3"

DN xR

UP 11R

211 SAND AND PAINT ALL WALLS IN EXISTING HOUSE.

2'-57 8"

1 A2.1

CASED OPENING.

212 212

G STAIRS TO REMAIN.

R, HORIZONTALLY.

6'-21 2" 2'-2"

2'-4" 201

31 2"

DS

G DOOR TO REMAIN. HEDULE ON A1.1.

NEW HDWD

2'-85 8"

4'-5"

CLOSET 4 1'-57 8"

OFFICE

213

EXISTING HARDWOOD, TO BE RE-FINISHED.

213

x20" CONCRETE NG.

NEW HDWD

EXISTING BEDROOM 1

DS

6'-33 4"

16'-8"

NTILE IN 6" GRAVEL SOIL CLOTH LINER.

NEW MILLWORK IN CLOSET.

218

6'-61 2"

CLOSET 5

EXISTING CLOSET 1

EXISTING HARDWOOD, TO BE RE-FINISHED.

R WATER STOP, NUOUS.

217

8'-51 4"

4'-93 8"

RIMETER INSULATION.

PROOF MEMBRANE.

216

11'-03 4"

2'-8"

4'-10"

215

210

15'-01 4" 1'-31 2"

5'-63 4"

214

EX. DS

ONTINUOUS NG WITH (3) #4 REBAR, ONTALLY.

2'-81 2"

3'-6"

DS

3'-6"

LLWORK IN CLOSET.

R AT 16" O.C., ALLY. R AT 16" O.C. LAP WITH AL REINFORCING, TYP.

6'-3"

2'-8"

205

3 A1.2

3'-15 8"

G FLOOR FRAMING TO N ABOVE STAIRS.

11'-73 8"

2

2'-03 8" DS

ALL NEW EXTERIOR WALLS TO HAVE R-13 INSULATION.

15'-01 4" 2 A2.1

NORTH

SCALE: 1/4" = 1'-0

before: third floor

after: master bath

before: master bath

after: master bath

after: master bath

all work performed at rugo|raff architects, ltd

after: third floor playroom

after: third floor bath

after: third floor bath

Brian M. Goehle Architect & Project Manager

| 21


McLean Residence - Evanston, IL - 2009 - 2010

The residence was a two bedroom Evanston Landmark. The clients desired to add a master suite; consisting of a bedroom, bathroom, and walk-in closet. The compact site and zoning regulations required the work to remain within the existing garage footprint. The project required approval by the Historic Preservation Board.

preservation process drawings

before: exterior

‘a’

‘c’

before: exterior

final approved scheme

all work performed at rugo|raff architects, ltd

after: exterior

Brian M. Goehle Architect & Project Manager

| 23


McLean Residence - Evanston, IL - 2009 - 2010

after: master bedroom

after: ceiling detail

after: master bath

after: master bath

after: master closet

bedroom concept sketch

after: master closet

collar tie beam detail

after: exterior detail

all work performed at rugo|raff architects, ltd

Brian M. Goehle Architect & Project Manager

| 25


Goldberg Residence - Evanston, IL - 2009- 2010

final floor plan

The project included the renovation and expansion of the existing kitchen, addition of a new breakfast room, and reconfiguration of the side entry and stairs. A rear terrace addition provided outdoor entertaining and dining space. The connection of interior to exterior activated a previously under-utilized rear yard.

final perspective

after: exterior

before: exterior

after: exterior

all work performed at rugo|raff architects, ltd

after: exterior

Brian M. Goehle Architect & Project Manager

| 27


Goldberg Residence - Evanston, IL - 2009- 2010

before: interior entry

after: interior entry

all work performed at rugo|raff architects, ltd

before: kitchen

after: kitchen

before: kitchen

after: kitchen

after: kitchen

Brian M. Goehle Architect & Project Manager

| 29


Schroeder Residence - Winnetka, IL - 2008

kitchen plan

This project consisted of a kitchen design update including improvements to lighting, appliances, and millwork. The renovation included custom millwork cabinets, desk, and door openings. In-filling an under utilized fireplace provided additional storage and cabinet space. New oak flooring replaced existing 6x6 tile.

before: kitchen

before: kitchen

after: kitchen

all work performed at rugo|raff architects, ltd

after: kitchen

Brian M. Goehle Architect & Project Manager

| 31


Bissell Residence - Grand Rapids, MI - 2007

Bissell Residence - Grand Rapids, MI - 2008

site plan

after: boat house

after: boat house

The boathouse is an accessory building to the newly finished residence. The 825 sq. ft. building includes a bedroom, full bath, living room, and kitchen. Natural lighting floods each room with dormers and floor to ceiling windows. A perception of floating above the water surface is created by the transparency and projection over the lake.

schematic model after: ceiling detail floor plan

all work performed at rugo|raff architects, ltd

Brian M. Goehle Architect & Project Manager

| 33


Cross Section | An Exploration into Assembling Sustainability - Thesis: Syracuse, NY - 2007

life cycle diagrams

I used my thesis as an opportunity to rethink the way we design small scale residential structures using completely sustainable, renewable materials. My thesis tested and compared thermal performance, bearing capacity, and the life cycle of conventional assemblies and compacted straw. The result is an affordable to build and highly efficient to operate home that leaves a neutral environmental impact.

bearing capacity testing

Brian M. Goehle Architect & Project Manager

| 35


Cross Section | An Exploration into Assembling Sustainability - Thesis: Syracuse, NY - 2007

components

assembly section

residential prototype plans

SMU Wall Section

Sustainable Modular Unit Assembly Components

+ 17’ - 1”

scale 1/4” = 1’ - 0”

FULL HEIGHT OPENING

MID WALL OPENING

+ 8’ - 0”

timberstrand engineered top plate and bearing key vertical reinforcing and post tensioning bolt wood plastic composite recycled siding v ply sheathing with vapor retarder

TOP KEY 4” x 4” x 3 1/2”

bearing key and bottom plate

opening unit

VERTICAL KEY 4” x 8” x 3 1/2” + 6’ - 0”

LATERAL KEY 20” x 4” x 3 1/2”

PRIMARY

timberstrand engineered opening box frame + 9’ - 1”

flooring grade osb underlayment

primary unit

UNIT DIMENSIONS 24” x 8” x 8 3/8”

2 x 10 floor joist spaced 12” on center

+ 8’ - 0”

agricore joist blocking

+ 2’ - 6”

compound nut splicing reinforcing

operable lower awning window + 2’ - 0”

lateral key wheatboard interior finish

FILL KEY 2” x 4” x 3 1/2”

compound nut tie to foundation

MINOR KEY 16 1/2” x 4” x 3 1/2”

frame tied to timberstrand bearing plate

MAJOR KEY 27 15/16” x 4” x 3 1/2”

CORNER

0’ - 0”

UNIT DIMENSIONS 24 7/16” x 8” x 8 3/8”

Components_01 20x20.indd 1

12/8/2007 2:07:51 PM

BLOCKING KEY 4” x 4” x 3 1/2” OPENING KEY 12” x 4” x 3 1/2” MAJOR KEY 8” x 8” x 8 3/8”

OPENING

MAJOR UNIT 16” x 8” x 8 3/8”

BOX FRAMING X” x 2” x 3 1/2”

PLATE | BEARING KEY X” x 1” x 8 3/8” X” x 2” x 3 1/2” THREADED REINFORCING 3/8”

FRAMING

JOIST BLOCKING X” x 9 1/4” x 7 ”

Brian M. Goehle Architect & Project Manager

| 37


Urban Re-Development - Novoli - Florence, Italy - 2006

Shopping Plaza Urban Intervention - Syracuse, NY - 2007

city - scape skyline

site model and plan

The project goal was to incorporate new mixed use

This project, set in a rural shopping plaza, involved

programs in the Novoli, Palace of Justice District. A

questioning the purpose and functionality of

new Fiat museum marks the site history of a former

suburban grey fields. Regraining the expansive

car factory. The new museum and Palace of Justice

impervious surface allowed for new green space and

create a new sense of identity for the neighborhood,

circulation. A Fuksas inspired hard/

while reconnecting with central Florence. New public

between retail and residential programs. This surface

programs, transportation, and green space help

activates new connections and revitalizes a disjointed

encourage growth of a neighborhood identity.

suburban condition. site plan

surface weaves

infrastructure massing perspective regraining hardscape

site network

study model

Brian M. Goehle Architect & Project Manager

| 39


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.