Brian M. Goehle Architect & Project Manager bmgoehle@gmail.com 31 5 . 5 6 0. 1 6 5 6
Moglin Residence - Evanston, IL - 2008-2009
The 2,200 square foot Design Evanston 2010 Award Winning addition to this Tudor landmark preserved the existing garage, converting the space into a new kitchen. Also included was a two car garage, with a master bedroom, bathroom, and closet above. The addition required approval by the Evanston Historic Preservation Board. before proposed addition after
before
after
all work performed at rugo|raff architects, ltd
Brian M. Goehle Architect & Project Manager
| 3
Moglin Residence - Evanston, IL - 2008-2009
ground and second floor plans
after: keeping room
before: kitchen
all work performed at rugo|raff architects, ltd
after: kitchen
after: living room
Brian M. Goehle Architect & Project Manager
| 5
Moglin Residence - Evanston, IL - 2008-2009
after: master bedroom
after: master bathroom
after: master walk-in closet
all work performed at rugo|raff architects, ltd
Brian M. Goehle Architect & Project Manager
| 7
Sullivan Residence - Wailea Elua, Maui HI - 2009-2011
living room elevation
after: living room
after: soffit detail
after: living room
The existing three bedroom beach front condo was out-dated and in need of upgrades to all finishes and services. The unit was demolished to its framing, and designed with modern details then clad in English sycamore veneer paneling. The project required the full design and detailing of all connections and material transitions.
EXIST'G CATCH BASIN TO REMAIN.
before: living room
REMOVE EXIST'G TRELLIS. REMOVE EXIST'G TERRACE TILE FLOOR FINISH, TYP. REMOVE EXIST'G AIR CONDITIONING CONDENSER.
REMOVE EXIST'G PANEL AND WINDOW. EXIST'G WATER SUPPLY SHUT-OFF ACCESS COVER TO REMAIN.
REMOVE EXIST'G BI-FOLD DOORS AND CLOSET INTERIORS, TYP.
REMOVE EXIST'G AIR HANDLER.
REMOVE EXIST'G WINDOW UNIT & WALL BELOW, FOR NEW SLIDING DOOR UNIT.
EXIST'G GLASS SLIDING DOOR TO BE REPLACED. 2'-9"
EXIST'G DOOR TO REMAIN. REMOVE EXIST'G TRASH ENCLOSURE.
EXIST'G SLIDING DOOR UNIT TO BE REPLACED. REMOVE EXIST'G TILE FLOOR FINISH, TYP.
REMOVE EXIST'G BI-FOLD DOORS.
EXIST'G PARTY WALL.
REMOVE EXIST'G FLOOR FINISH IN STORAGE CLOSET. 2'-9"
REMOVE EXIST'G GATE.
REMOVE EXIST'G TILE FLOOR FINISH, TYP.
EXIST'G WALL FINISH MATERIAL TO REMAIN.
REMOVE EXIST'G WASHER/DRYER UNIT.
CONTRACTOR TO REMOVE CEILING FINISHES TO DETERMINE NEW CEILING HEIGHT & DUCT CONFIGURATION.
REMOVE EXIST'G DOOR JAMB & WALL AT WEST TO ACCOMMODATE NEW 2'-8" DOOR. REMOVE EXIST'G BATH FINISHES AND FIXTURES, TYP.
EXIST'G ELECTRICAL PANEL TO BE RELOCATED.
REMOVE EXIST'G BI-FOLD DOORS & CLOSET INTERIOR, TYP.
REMOVE EXIST'G KITCHEN CABINETS, APPLIANCES, AND FINISHES, TYP.
EXIST'G STRUCTURAL POST TO REMAIN.
REMOVE EXIST'G SOFFIT. EXIST'G DOOR TO BE REMAIN.
REMOVE EXIST'G BATH FINISHES & FIXTURES, TYP. REMOVE EXIST'G DROPPED CEILING FINISH. REMOVE EXIST'G TILE FLOOR FINISH, TYP. REMOVE EXIST'G STAIR. EXIST'G STRUCTURAL POST TO REMAIN.
REMOVE EXIST'G SOFFIT. EXIST'G DOOR TO BE REPLACED.
REMOVE EXIST'G BI-FOLD DOORS AND CLOSET MIRRORS, TYP.
REMOVE EXIST'G TILE FLOOR FINISH.
REMOVE EXIST'G NON-STRUCTURAL FRAMING. REMOVE EXIST'G SOFFIT.
REMOVE EXIST'G NONSTRUCTURAL FRAMING
REMOVE EXIST'G TILE FINISH, TYP. EXIST'G SLIDING DOOR UNIT TO BE REPLACED.
REMOVE EXIST'G WOOD CEILING.
EXIST'G DOOR TO REMAIN.
REMOVE EXIST'G TILE FLOOR FINISH, TYP.
EXIST'G FLOOR FINISH TO BE REMOVED.
EXIST'G SLIDING DOOR TO BE REPLACED.
1. REMOVE ALL EXIST'G INTERIOR WALL & CEILING GYPSUM BOARD FINISH TO FRAMING, UNLESS OTHERWISE NOTED.
EXIST'G WALL FINISH MATERIAL TO REMAIN.
NOTES:
EXIST'G DOOR TO REMAIN. EXIST'G WALL FINISH MATERIAL TO REMAIN.
2. REMOVE ALL EXIST'G INTERIOR DOORS.
EXIST'G TILE FLOOR FINISH TO BE REMOVED.
3. REMOVE ALL EXIST'G APPLIANCES.
REMOVE EXIST'G TERRACE TILE FLOOR FINISH, TYP.
4. REMOVE EXIST'G AIR HANDLER & CONDENSER. 5. REMOVE ALL EXIST'G PLUMBING FIXTURES & FITTINGS. 6. REMOVE ALL EXIST'G CABINETRY & BASE TRIM.
demolition plan
7. REMOVE ALL EXIST'G INTERIOR FLOOR FINISH TO SUBFLOOR. DRAWING KEY EXIST'G TO REMAIN. EXIST'G TO BE REMOVED.
DEMOLITION PLAN SCALE 1/4" = 1'-0
before: living room
Xref P:\2803 all work performed at rugo|raff architects, ltd
Brian M. Goehle Architect & Project Manager
| 9
Sullivan Residence - Wailea Elua, Maui HI - 2009-2011
after: kitchen
before: kitchen
after: kitchen
before: kitchen
Brian M. Goehle Architect & Project Manager
| 11
Sullivan Residence - Wailea Elua, Maui HI - 2009-2011
kitchen cabinet b
kitchen cabinet c
cabinet detail aa
cabinet detail cc
island cabinet a
cabinet detail ee
cabinet detail bb
all work performed at rugo|raff architects, ltd
Brian M. Goehle Architect & Project Manager
| 13
Sullivan Residence - Wailea Elua, Maui HI - 2009-2011
after: master bedroom
after: master bedroom
master closet detail
before: master bedroom
side table detail
all work performed at rugo|raff architects, ltd
Brian M. Goehle Architect & Project Manager
| 15
Vassallo Residence - Wilmette, IL - 2010- Present
The family of five purchased this house intending to create an addition which contained an upgraded kitchen, family room, and master suite on the second floor. The integration of existing materials and details seemlessly joined the existing house with the addition. Site and landscape design is underway.
entry detail
before: exterior
after: exterior
before: exterior
all work performed at rugo|raff architects, ltd
after: exterior
Brian M. Goehle Architect & Project Manager
| 17
Vassallo Residence - Wilmette, IL - 2010- Present
1'-61 2"
DN 1R
DN 8R
4'-10"
NEW STONE COUNTERTOP @ 36" AFF.
NEW 2x12s EXIST. 2x10s
FILL EXISTING DOOR OPENING. SALVAGE EXISTING DOOR.
EXISTING MILLWORK BOOKSHELVES AND MANTLE TO REMAIN.
109
1'-5" 2'-8"
108
8'-33 4" 17'-1"
104
105 107
EXISTING FIREPLACE AND SURROUND TO REMAIN.
CABLE SERVICE
ALL NEW EXTERIOR WALLS TO HAVE R-13 INSULATION.
106
2'-8"
1'-61 2"
3 A1.2
2'-03 8" DS
103
10'-0"
2
W
1'-93 8"
002
8'-33 4"
PROPOSED BASEMENT PLAN
2
2'-41 8"
3'-2"
CL
LINE OF CEDAR DECK ABOVE. T/NEW FOOTING
96" - V.I.F. CEILING HEIGHT
-8'-6"
T/NEW CONCRETE T/NEW SLAB
2
+0'-91 2" -8'-2"
2'-8"
1'-23 8"
3 A1.2
CL
007
NEW WINDOWS IN BASEMENT. SEE SCHEDULE ON A2.2.
17'-53 8" CABLE SERVICE
001
2
12" x 12" CONCRETE PAD AT STAIRS.
(2) 1-3/4" x 11 7/8" LVLs
16'-73 8"
008 003
CL ABOVE GRADE.
NEW CONCRETE
2
2'-8"
NEW 10"Ø CONCRETE SONOTUBE FOUNDATION WITH 12" BELL FOOTING FOR DECK ABOVE. 3'-6" DEPTH AND 6"
1'-0"
2x10s @ 16" O.C. CLG. FRAMING
9'-0"
3'-65 8" DN 1R @ 8"
2x10s @ 16" O.C. CLG. FRAMING
ALL EXISTING BASEMENT WINDOWS TO REMAIN.
12'-0"
2
PROVIDE NEW 4" FOUNDATION DRAIN TILE IN 6" GRAVEL BED W/ SOIL CLOTH LINER, TYP.
NEW BASEMENT
3 A1.2
10'-71 4"
MAINTAIN ALL EXISTING FOUNDATION WALLS.
T/EXIST'G SLAB V.I.F.
3'-6"
EXIST. 2x10s @ 16" O.C. CLG. FRAMING
8"
4 A1.2 DN 1R @ 8"
FD D
RELOCATE EXISTING WASHER AND DRYER.
2
-8'-2"
6'-53 8"
RE-USE EXISTING LAUNDRY CHUTE. RECONFIGURE OPENING TOWARD LAUNDRY ROOM. 2
VERTICALLY, EPOXY SET, 4" MINIMUM EMBEDMENT, TYP.
NEW SUMP PIT FOR NEW PUMP WITH BATTERY BACK UP.
RE-USE EXISTING DOOR AT LAUNDRY ROOM.
EXISTING CONCRETE
(2) 1-3/4" x 11 7/8" LVLs
EXIST. 2x10s @ 16" O.C. CLG. FRAMING
002
LAUNDRY ROOM
881 2" - V.I.F. CEILING HEIGHT
NEW CABINETS.
EXISTING BRICK COLUMNS TO REMAIN.
3'-13 4"
EXISTING CONCRETE
EXISTING CONCRETE
EXISTING FOUNDATION AND SLAB TO REMAIN.
103 4"
6'-37
8'-0"
2'-6"
EXISTING BASEMENT HALL
PROVIDE CONTINUOUS WATERSTOP. DOWEL NEW POURED CONCRETE WALL TO EXISTING FOUNDATION WITH
CL (2) #5 REBAR AT 12" O.C.
003 2'-6" 8"
30'-01 8"
EXISTING BASEMENT
2
3'-23 4"
NEW SUMP
3'-17 8" 004
(2) 1-3/4" x 11 7/8" LVLs 3'-6"
NEW LAUNDRY SINK BASIN.
1'-0"
2'-0" CL
3
EXISTING CONCRETE
7'-91 2"
MINIMUM 3'-0" HEIGHT AT NEW EJECTOR PIT.
CL
3'-9"
2'-7"
EXISTING 200 AMP ELEC. PANEL. 3
EXIST. SUMP
UP 8R
5'-75 8"
7'-11 4"
1'-81 2"
EXIST 75 GAL HWH
4'-113 8"
2'-0"
2'-2"
FD
1'-0"
MECH 2
6'-37 8" NEW EJ. PIT
CL 2'-4"
9'-8"
9'-0"
EXISTING CONCRETE
006
7'-4"
MECH 1
3'-0"
AD
004
TIE IN EXISTING FOUNDATION DRAIN TILE TO NEW FOUNDATION DRAIN TILE. VERIFY CONDITION OF EXISTING DRAIN TILE WITH ARCHITECT BEFORE CONNECTION.
2
EXISTING ELEC. METER EXTENT OF ADDITION TO REMAIN. NEW DISCONNECT REQ'D. 7'-17 8" EXISTING STAIR TO REMAIN WITH ELEC TELE. 6'-8" HEAD HGT. SERVICE METER
EXISTING CONCRETE
6'-0"
GAS METER
EXISTING TELEPHONE SERVICE TO REMAIN.
3'-65 8"
NEW 90% EFFICIENT VARIABLE SPEED GAS-FIRED FURNACE AND AIR-HANDLER. VENT TO EXTERIOR.
EXISTING CONCRETE
005
RELOCATE EXISTING 75 GALLON 90% EFFICIENT GAS-FIRED HOT WATER HEATER. RETURN AIR DUCT, TYP. REPLACE EXISTING HVAC DUCTS AND UTILIZE EXISTING CHASES.
FUTURE POWDER ROOM
FUTURE MECH 3
3
7'-4"
3'-8"
1'-0"
1 A2.1
NORTH
SCALE: 1/4" = 1'-0
EXISTING GAS METER TO REMAIN .
8'-0"
NEW WINDOW. SEE SCHEDULE ON A2.1.
PROPOSED FIRST FLOOR PLAN ASK 2.1
3'-0"
EXTENT OF ADDITION
2 A2.1
2'-41 8"
EX. DS
NEW DOUBLE HUNG WINDOW UNIT. SEE WINDOW SCHEDULE ON A2.2. NEW NEWEL POST AND RAIL, TYP.
1'-5"
EX. HB
3
NEW FRENCH DOOR UNIT. SEE DOOR SCHEDULE ON A1.1.
2
REPLACE EXISTING SHEET METAL BASE WITH NEW STUCCO AT EXISTING BAY.
TRENCH EXISTING CONCRETE FOR NEW INTERIOR DRAIN TILE. CONNECT TO NEW SUMP.
5'-0"
DS
102
LINE OF EXISTING FLOOR ABOVE.
SISTER NEW JOISTS TO EXISTING WITH BOLTS @ 12" O.C. 16'-55 8"
2
110
FAMILY ROOM
NEW HARDWOOD
2x12s @ 16" O.C. CLG. FRAMING
2
DN 4R
2'-01 8"
EXIST. 2x10s @ 16" O.C. CLG. FRAMING
3
2x10s @ 16" O.C. FL. FRAMING
101
8'-11"
DESK
E100 DN 1R
9'-0"
CASED OPENING. BROOM STORAGE. FRAME AROUND EXISTING LAUNDRY CHUTE.
111 8"
2'-0"
NEW WOOD COUNTERTOP @ 42" AFF. NEW CHIMNEY HOOD, VENT HOOD TO EXTERIOR.
2'-05 8"
NEW 1 2" WATER SUPPLY FOR ICEMAKER.
EXISTING HARDWOOD, TO BE RE-FINISHED.
2
DECK
NEW WOOD
3'-55 8"
8'-0"
26'-0"
5'-0"
2'-05 8"
2'-6"
D/W
EQ.
CASED OPENING.
EXISTING DINING ROOM
EXIST. 2x10s @ 16" O.C. CLG. FRAMING
100
1'-3"
3'-9" REF./ FREEZER
4'-55 8"
FILL EXISTING OPENING.
102
NEW MILLWORK CABINETS.
4" 2'-8"
NEW HARDWOOD
TRASH/ REC.
4"
EXISTING HARDWOOD, TO BE RE-FINISHED.
NEW WOOD MILLWORK BANQUETTE AND TABLE.
NEW HARDWOOD
MICRO. DWR.
FIRST FLOOR HALL
PANTRY
ALL EXISTING MILLWORK BEAMS AND TRIM TO REMAIN, FOR NEW CLEAR FINISH. REPAIR, AS NECESSARY.
KITCHEN
9'-0"
DOUBLE OVENS
8'-11"
APPLIANCE GARAGE
3'-2"
NEW TILE
4'-0"
EQ.
EXISTING LIVING ROOM
2
4'-81 2"
2'-33 4" 2'-4" 3'-4" V.I.F.
2'-4" 101
4'-55 8"
EXISTING WALLS AND FINISHES TO REMAIN.
POWDER ROOM
3'-11" STONE THRESHOLD.
3'-75 8" 6'-0"
T/ FINISHED FLOOR EL: +0' - 0"
EXISTING WINDOWS TO REMAIN. SEE SCHEDULE ON A2.2.
3'-4"
UP 4R
UP xR
100
2'-10"
SAND AND PAINT ALL WALLS IN EXISTING HOUSE.
T/ FINISHED FLOOR EL: -0' - 11 4"
NFSC DN 5R
UP 4R
3
DS
3'-0"
11" DS
NEW GAS HOOK-UP FOR PORTABLE GRILL.
NEW MILLWORK PANTRY CLOSET.
FLOORING PITCH
REPLACE EXISTING IRON RAILING WITH NEWEL POSTS AND RAIL.
HALL 1
NEW HARDWOOD
103
EXISTING TILE
10'-0"
SERV. 1 ELEC 5'-9 2"
117 METER
CASED OPENING.
6"
111
EXISTING ENTRY
6'-2" V.I.F.
E101
2'-10" V.I.F.
NEW STRINGERS TO RECEIVE EXTENDED WIDTH OF STAIR.
4'-7"
9'-4"
LINE OF EXIST. CONCRETE STAIRS TO REMAIN.
FRONT PORCH
NEW WOOD DN 6R
115
114
112
2'-7"
COVER EXISTING CONCRETE WITH NEW WOOD DECKING ON WOOD SLEEPERS.
2'-2"
GAS EX. METER DS
2
NEW NON-FREEZE HOSE BIB.
2'-01 8"
E102
116
REPLACE EXISTING PORCH OVERHANG. NEW T&G BEADBOARD CEILINGS, FOR PAINTED FINISH.
EXISTING STAIRS TO REMAIN WITH 6'-8" HEAD HEIGHT.
NEW WOOD STAIRS WITH TREAD 1 FOR STAIN, RISERS FOR PAINT. A2.2 4T @ 10", V.I.F.; 5R @ 7 5 8", V.I.F. 2x6 FRAMING AT ALL EXTENT OF ADDITION PLUMBING WALLS, TYP. 35 8" 7'-0" TELE.
113
EXISTING STAIRS TO REMAIN.
COVER EXIST. CONCRETE STAIRS WITH WOOD TREADS AND RISERS. SEE DETAIL 8/A2.1.
NEW AIR CONDENSOR UNITS. TO BE LOCATED 10'-0" FROM PROPERTY LINE.
ground floor plan
28'-93 8"
EXISTING STAIRS TO REMAIN. REPLACE EXISTING WOOD TREADS, FOR STAIN, AND RISERS, FOR PAINT.
EXTENT OF ADDITION
NORTH
PROVIDE CONTINUOUS WATERSTOP. DOWEL NEW POURED CONCRETE WALL TO EXISTING FOUNDATION WITH (2) #5 REBAR AT 12" O.C. VERTICALLY, EPOXY SET, 4" MINIMUM EMBEDMENT, TYP.
SCALE: 1/4" = 1'-0
before: kitchen
after: kitchen
after: kitchen
all work performed at rugo|raff architects, ltd
after: rear hallway
Brian M. Goehle Architect & Project Manager
| 19
4'-6"
2x10 VA
LLEY
3'-2"
NEW MEDICINE CABINET.
300
2x10s @ 16" O.C.
1 A2.1
2'-4"
DS
301
LLEY
ALL EXISTING MILLWORK TRIM TO REMAIN, FOR NEW CLEAR FINISH. REPAIR, AS NECESSARY.
2x10s @ 16" O.C.
2x10 VA
R FLASHING AT ALL YS, TYP.
EQ. NEW COPPER FLASHING AROUND, AS REQUIRED.
301 5'-73 4" V.I.F.
NEW FLUSH STONE 28'-111 4" THRESHOLD.
302
220
NEW TILE
11'-11 2"
EXISTING HARDWOOD
BATH 2
NEW 2x6 FRAMED WALL, FOR GYP. BD. FINISH.
GUEST BEDROOM/ PLAYROOM
16'-01 4"
303
302
2x10s @ 16
SAND AND PAINT ALL WALLS IN EXISTING HOUSE.
G WINDOWS TO N. SEE SCHEDULE ON
NEW 90% EFFICIENT VARIABLE SPEED GAS-FIRED FURNACE AND AIR-HANDLER. VENT TO EXTERIOR.
Vassallo Residence - Wilmette, IL - 2010- Present 303
RETURN AIR DUCT, TYP. REPLACE EXISTING HVAC DUCTS AND UTILIZE EXISTING CHASES.
(2) 2x10s @ RIDGE
EXISTING ATTIC
NUOUS RIDGE VENT,
2x10s @ 16" O.C.
SHPALT COMPOSITE TO MATCH EXISTING
EXISTING HARDWOOD
4'-43 4" 2'-8"
NIMUM ICE AND R SHIELD AT ALL EAVES DGES, TYP.
4'-4"
300
HEDULE ON A1.1.
3
NUOUS EAVE VENT,
ROOF TO HAVE R-30 INSULATION.
3 A1.2
2
EX. DS DS
EXTENT OF ADDITION
Ø ALUMINUM SPOUT, FOR PAINT.
HALF ROUND NUM GUTTER, FOR
EX. DS
2 A2.1
EX. DS
second floor plan
PROPOSED ATTIC FLOOR PLAN
NORTH
SCALE: 1/4" = 1'-0
EXISTING FIXTURES AND PLUMBING TO REMAIN.
EXTENT OF ADDITION
1 A2.2 4"
EXISTING HARDWOOD, TO BE RE-FINISHED.
EXISTING BEDROOM 2
ED CONCRETE SLAB "x6" WELDED WIRE ON 8 MIL. VISQUEEN BARRIER ON MIN. 4" L BED.
EXISTING HARDWOOD, TO BE RE-FINISHED. 211
208
207
2'-2" 219
202
3'-15 8" 2'-8" 2'-8"
NEW HARDWOOD
2x10s @ 16" O.C. CLG. FRAMING
DS
2
1'-5"
FILL EXISTING WINDOW OPENING.
1'-5"
221
2'-8"
206 208 207
EXTENT OF ADDITION
PROPOSED SECOND FLOOR PLAN
NEW WOOD MILLWORK VANITY.
NEW INTERIOR WOOD DOOR, TYP. SEE DOOR SCHEDULE ON A1.1. EXISTING WINDOW TO REMAIN. REPLACE GLAZING WITH MIRRORED GLASS. FOAM INSULATE AND DRYWALL BEDROOM SIDE.
NEW WINDOW, TYP. SEE WINDOW SCHEDULE ON A2.2.
204
14'-47 8" EXISTING LAUNDRY CHUTE TO REMAIN.
209
NEW FLUSH STONE THRESHOLD.
51 2"
203
EXISTING HARDWOOD, TO BE RE-FINISHED.
EXISTING CLOSET 3
210
E200 202
EXISTING BEDROOM 3
205
NEW TOWEL BAR LOCATION.
NEW MILLWORK CABINET.
8"
MASTER BEDROOM
6"
NEW 14"Ø DAYLIGHTING TUBE, BY SOLATUBE, OR EQ.
EXISTING CLOSET 2 EXISTING HARDWOOD, TO BE RE-FINISHED.
EXISTING HARDWOOD, TO BE RE-FINISHED.
EX. DS
220
EXISTING TILE
EXIST. 2x10s @ 16" O.C. CLG. FRAMING
D INSULATION, NUOUS.
EX. DS
11'-47
204
EXIST. 2x10s @ 16" O.C. CLG. FRAMING
2
EXISTING BATH 1
201
2'-8"
G WINDOWS TO N. SEE SCHEDULE ON
2'-5"
NEW CUSTOM SHOWER PAN, FOR TILE FINISH.
51 2"
LINEN CLOSET
2'-6" 203
FUR OUT EXISTING WALLS TO MATCH EXISTING DEPTH.
7'-83 8"
NEW TILE
200
2'-8"
ALL EXISTING MILLWORK TRIM TO REMAIN, FOR SANDING AND PAINTING. REPAIR, AS NECESSARY.
3'-6"
NEW HARDWOOD
200
4'-93 8"
3'-6"
EXISTING HALL 2
EXISTING HVAC AIR VENT, TYP.
MASTER HALL
NEW JAMB AT EXISTING DOOR.
209
G WALLS AND FINISHES AIN.
43 4"
MASTER BATHROOM
2'-8"
2'-3"
DN xR
UP 11R
211 SAND AND PAINT ALL WALLS IN EXISTING HOUSE.
2'-57 8"
1 A2.1
CASED OPENING.
212 212
G STAIRS TO REMAIN.
R, HORIZONTALLY.
6'-21 2" 2'-2"
2'-4" 201
31 2"
DS
G DOOR TO REMAIN. HEDULE ON A1.1.
NEW HDWD
2'-85 8"
4'-5"
CLOSET 4 1'-57 8"
OFFICE
213
EXISTING HARDWOOD, TO BE RE-FINISHED.
213
x20" CONCRETE NG.
NEW HDWD
EXISTING BEDROOM 1
DS
6'-33 4"
16'-8"
NTILE IN 6" GRAVEL SOIL CLOTH LINER.
NEW MILLWORK IN CLOSET.
218
6'-61 2"
CLOSET 5
EXISTING CLOSET 1
EXISTING HARDWOOD, TO BE RE-FINISHED.
R WATER STOP, NUOUS.
217
8'-51 4"
4'-93 8"
RIMETER INSULATION.
PROOF MEMBRANE.
216
11'-03 4"
2'-8"
4'-10"
215
210
15'-01 4" 1'-31 2"
5'-63 4"
214
EX. DS
ONTINUOUS NG WITH (3) #4 REBAR, ONTALLY.
2'-81 2"
3'-6"
DS
3'-6"
LLWORK IN CLOSET.
R AT 16" O.C., ALLY. R AT 16" O.C. LAP WITH AL REINFORCING, TYP.
6'-3"
2'-8"
205
3 A1.2
3'-15 8"
G FLOOR FRAMING TO N ABOVE STAIRS.
11'-73 8"
2
2'-03 8" DS
ALL NEW EXTERIOR WALLS TO HAVE R-13 INSULATION.
15'-01 4" 2 A2.1
NORTH
SCALE: 1/4" = 1'-0
before: third floor
after: master bath
before: master bath
after: master bath
after: master bath
all work performed at rugo|raff architects, ltd
after: third floor playroom
after: third floor bath
after: third floor bath
Brian M. Goehle Architect & Project Manager
| 21
McLean Residence - Evanston, IL - 2009 - 2010
The residence was a two bedroom Evanston Landmark. The clients desired to add a master suite; consisting of a bedroom, bathroom, and walk-in closet. The compact site and zoning regulations required the work to remain within the existing garage footprint. The project required approval by the Historic Preservation Board.
preservation process drawings
before: exterior
‘a’
‘c’
before: exterior
final approved scheme
all work performed at rugo|raff architects, ltd
after: exterior
Brian M. Goehle Architect & Project Manager
| 23
McLean Residence - Evanston, IL - 2009 - 2010
after: master bedroom
after: ceiling detail
after: master bath
after: master bath
after: master closet
bedroom concept sketch
after: master closet
collar tie beam detail
after: exterior detail
all work performed at rugo|raff architects, ltd
Brian M. Goehle Architect & Project Manager
| 25
Goldberg Residence - Evanston, IL - 2009- 2010
final floor plan
The project included the renovation and expansion of the existing kitchen, addition of a new breakfast room, and reconfiguration of the side entry and stairs. A rear terrace addition provided outdoor entertaining and dining space. The connection of interior to exterior activated a previously under-utilized rear yard.
final perspective
after: exterior
before: exterior
after: exterior
all work performed at rugo|raff architects, ltd
after: exterior
Brian M. Goehle Architect & Project Manager
| 27
Goldberg Residence - Evanston, IL - 2009- 2010
before: interior entry
after: interior entry
all work performed at rugo|raff architects, ltd
before: kitchen
after: kitchen
before: kitchen
after: kitchen
after: kitchen
Brian M. Goehle Architect & Project Manager
| 29
Schroeder Residence - Winnetka, IL - 2008
kitchen plan
This project consisted of a kitchen design update including improvements to lighting, appliances, and millwork. The renovation included custom millwork cabinets, desk, and door openings. In-filling an under utilized fireplace provided additional storage and cabinet space. New oak flooring replaced existing 6x6 tile.
before: kitchen
before: kitchen
after: kitchen
all work performed at rugo|raff architects, ltd
after: kitchen
Brian M. Goehle Architect & Project Manager
| 31
Bissell Residence - Grand Rapids, MI - 2007
Bissell Residence - Grand Rapids, MI - 2008
site plan
after: boat house
after: boat house
The boathouse is an accessory building to the newly finished residence. The 825 sq. ft. building includes a bedroom, full bath, living room, and kitchen. Natural lighting floods each room with dormers and floor to ceiling windows. A perception of floating above the water surface is created by the transparency and projection over the lake.
schematic model after: ceiling detail floor plan
all work performed at rugo|raff architects, ltd
Brian M. Goehle Architect & Project Manager
| 33
Cross Section | An Exploration into Assembling Sustainability - Thesis: Syracuse, NY - 2007
life cycle diagrams
I used my thesis as an opportunity to rethink the way we design small scale residential structures using completely sustainable, renewable materials. My thesis tested and compared thermal performance, bearing capacity, and the life cycle of conventional assemblies and compacted straw. The result is an affordable to build and highly efficient to operate home that leaves a neutral environmental impact.
bearing capacity testing
Brian M. Goehle Architect & Project Manager
| 35
Cross Section | An Exploration into Assembling Sustainability - Thesis: Syracuse, NY - 2007
components
assembly section
residential prototype plans
SMU Wall Section
Sustainable Modular Unit Assembly Components
+ 17’ - 1”
scale 1/4” = 1’ - 0”
FULL HEIGHT OPENING
MID WALL OPENING
+ 8’ - 0”
timberstrand engineered top plate and bearing key vertical reinforcing and post tensioning bolt wood plastic composite recycled siding v ply sheathing with vapor retarder
TOP KEY 4” x 4” x 3 1/2”
bearing key and bottom plate
opening unit
VERTICAL KEY 4” x 8” x 3 1/2” + 6’ - 0”
LATERAL KEY 20” x 4” x 3 1/2”
PRIMARY
timberstrand engineered opening box frame + 9’ - 1”
flooring grade osb underlayment
primary unit
UNIT DIMENSIONS 24” x 8” x 8 3/8”
2 x 10 floor joist spaced 12” on center
+ 8’ - 0”
agricore joist blocking
+ 2’ - 6”
compound nut splicing reinforcing
operable lower awning window + 2’ - 0”
lateral key wheatboard interior finish
FILL KEY 2” x 4” x 3 1/2”
compound nut tie to foundation
MINOR KEY 16 1/2” x 4” x 3 1/2”
frame tied to timberstrand bearing plate
MAJOR KEY 27 15/16” x 4” x 3 1/2”
CORNER
0’ - 0”
UNIT DIMENSIONS 24 7/16” x 8” x 8 3/8”
Components_01 20x20.indd 1
12/8/2007 2:07:51 PM
BLOCKING KEY 4” x 4” x 3 1/2” OPENING KEY 12” x 4” x 3 1/2” MAJOR KEY 8” x 8” x 8 3/8”
OPENING
MAJOR UNIT 16” x 8” x 8 3/8”
BOX FRAMING X” x 2” x 3 1/2”
PLATE | BEARING KEY X” x 1” x 8 3/8” X” x 2” x 3 1/2” THREADED REINFORCING 3/8”
FRAMING
JOIST BLOCKING X” x 9 1/4” x 7 ”
Brian M. Goehle Architect & Project Manager
| 37
Urban Re-Development - Novoli - Florence, Italy - 2006
Shopping Plaza Urban Intervention - Syracuse, NY - 2007
city - scape skyline
site model and plan
The project goal was to incorporate new mixed use
This project, set in a rural shopping plaza, involved
programs in the Novoli, Palace of Justice District. A
questioning the purpose and functionality of
new Fiat museum marks the site history of a former
suburban grey fields. Regraining the expansive
car factory. The new museum and Palace of Justice
impervious surface allowed for new green space and
create a new sense of identity for the neighborhood,
circulation. A Fuksas inspired hard/
while reconnecting with central Florence. New public
between retail and residential programs. This surface
programs, transportation, and green space help
activates new connections and revitalizes a disjointed
encourage growth of a neighborhood identity.
suburban condition. site plan
surface weaves
infrastructure massing perspective regraining hardscape
site network
study model
Brian M. Goehle Architect & Project Manager
| 39