PROTOTYPE_2 MODULE
x
2 Copyright Š 2013 EPIC Collaborative Sdn Bhd
THINGS TO KEEP IN MIND
1. SAFETY FIRST! Always wear the required safety gear on site helmet, gloves and appropriate footwear.
2. COLLABORATE Work with your group to maximize efficiency and minimize mistakes.
3. HELPING HAND When handling large materials, get a partner to avoid causing injuries to yourself and damaging precious materials!
4. CONFUSED? If unsure on instructions, consult the Specialist or Master Builder.
3 Copyright Š 2013 EPIC Collaborative Sdn Bhd
BUILDING DESIGN
SHERA ROOF SHEET
PURLIN COVER GUTTER
PURLIN
GUTTER SUPPORT
RAFTER GABLE FRAME
KITCHEN WALL STUDS
GABLE BOARDS
WINDOW SILL
CEILING JOISTS
WALL STUDS SHERA WALL CLADDING
CEILING BOARDS KITCHEN ROOF SHADE
SMALL PANELS
MONSOON WINDOW JOISTS SECONDARY FRAME
DOOR SUPPORT PANEL FLOOR TRACK FOYER LEGS
SHERA STRIP BIG PANELS FLOOR JOISTS SHERA FLOOR BOARDS CONCRETE FOOTING Will not be used in UM Workshop Prototype 3100
1000 1000 1000 950
450
68 1
2125
LOWER ROOF BEAM LEVEL
449 TOP OF FOOTING
4 Copyright © 2013 EPIC Collaborative Sdn Bhd
770
GROUND FLOOR LEVEL
CUTTING SCHEDULE
COMPONENTS
ITEM Foyer Legs
FLOORING
WALLS
CEILING
ROOFING
PANELS
Floor Joists Shera Floor Planks Panel Floor Track A Panel Floor Track B
SHERA PRODUCT -
4" x 4"
6 Ft
-
2" x 4"
10 Ft
24
2
TIMBER PILE
25 x 200 x 3000
-
QTY
EXTRA
CUT SIZE
PIECES
1
-
100 x 100 x 670**
2
10
1
100 x 50 x 3040
10
[see Flooring Section]
-
1" x 2"
10 Ft
1
-
25 x 50 x 3010
1
-
1" x 2"
8 Ft
1
-
25 x 50 x 2255
1
Wall Studs Monsoon Window Joists Kitchen Wall Studs
-
2" x 2"
10 Ft
3
1
50 x 50 x 720
12
-
2" x 2"
10 Ft
1
-
50 x 50 x 450
6
-
2" x 2"
10 Ft
2
-
50 x 50 x 1285
4
Door Support
-
2" x 2"
10 Ft
1
-
50 x 50 x 2085**
1
Window Sill Shera wall cladding [SWC]
-
2" x 3"
10 Ft
2
-
75 x 50 x 3010**
2
13
1
8 x 200 x 3000
-
[see Cladding Section]
Ceiling Joists A
-
2" x 4"
10 Ft
1
-
100 x 50 x 3040
1
Ceiling Joists B
-
2" x 4"
10 Ft
3
-
100 x 50 x 3040
3
Ceiling Boards
-
1" x 8"
10 Ft
4
1
Gable Frame
-
2" x 2"
10 Ft
7
-
Gable Boards [SWC]
20 x 200 x 1000 12 [see Gable/Pre-structure Section]
8 x 200 x 3000
14
1
Purlins Purlin Gutter Support Purlin Cover [SWP] Shera roof Sheet Shera roof Sheet [Transparent] Kitchen Roof Support Kitchen Roof Shade [SWC] Shera Strip
-
[see Gable Section]
-
2" x 3"
14 Ft
7
2
75 x 50 x 4300
7
-
2" x 2"
14 Ft
1
-
75 x 50 x 4300
1
8 x 200 x 2150
2
8 x 200 x 3000
-
2
-
5 x 500 x 1200
-
48
5
-
5 x 500 x 1200
-
2
-
-
1
-
50 x 50 3190
1
-
2" x 2"
12 Ft
8 x 200 x 3000
-
4
-
8 x 200 x 550
16
8 x 100 x 3000
-
56
4
8 x 100 x 668**
221
***Cut length to be double checked on site due to inconsistencies during process
5 Copyright Š 2013 EPIC Collaborative Sdn Bhd
BUILDING SEQUENCE 1
COLUMNS
2
GROUND BEAMS & TOP BEAMS
4
FLOOR & CEILING JOISTS
pg.14
3
RAFTERS
pg.20
6 Copyright © 2013 EPIC Collaborative Sdn Bhd
5
FLOOR BOARDS & CEILING BOARDS
6
SECONDARY FRAME
pg.26
7
WALL STUDS, MONSOON WINDOW JOISTS & WINDOW SILL pg.32
8
WALL CLADDING
pg.36
7 Copyright © 2013 EPIC Collaborative Sdn Bhd
9
PURLINS & GUTTER
10 GABLE FRAME & BOARDS pg.40
11 ROOF SHEETS
12 WALL PANELS pg.52
8 Copyright © 2013 EPIC Collaborative Sdn Bhd
pg.44
pg.56
GROUPS & TASK SCHEDULE
1
2
3
4
Pre-structure Preparation
Cut Floor/Ceiling Joists
SMALL PANELS
Pg. 10
Pg. 20
Cut Wall Studs, Monsoon Window Joists, Window Sill
STRUCTURE SEQUENCE
Pg. 32
Cut Floor boards & Ceiling Prepare Secondary Frame Boards (Kitchen Frame)
Pg. 14
Pg. 56 -
Pg. 26 -
BIG PANELS
INSTALL FLOOR/CEILING JOSTS
INSTALL SECONDARY FRAME
Pg. 56
Pg. 20
Pg. 26
-
INSTALL FLOOR BOARDS & CEILING BOARDS
INSTALL WALL STUDS, M.W. JOISTS, WINDOW SILL
Pg. 20
Pg. 32
Pg. 36
Cut Door
Prepare/Cut Gable Frame & Boards
Prepare/Cut Purlins & Gutter
INSTALL WALL CLADDING
Pg. 44
Pg. 40
Pg. 36
INSTALL GABLE FRAME & BOARDS
INSTALL PURLINS & GUTTER
Prepare Roof Sheets
Pg. 44
Pg. 40
Assist leftover tasks
Assist leftover tasks
INSTALL DOOR
Assist leftover tasks
Prepare Wall Cladding
INSTALL ROOF SHEETS
Pg. 52
9 Copyright © 2013 EPIC Collaborative Sdn Bhd
PRE-STRUCTURE PREPARATION MATERIAL CHECKLIST x6 Steel Parts x1 Column C2 x1 Column C4 x1 Roof Beam RB1 x1 Roof Beam RB2 x2 RAFTER x5 Timber [2 x 2 x 10ft] x2 Gable frame [2” x 2” x 980mm] x2 Gable frame [2” x 2” x 2900mm] x2 Gable frame [2” x 2” x 2870mm]
a b c
C2 C4 a b c
RB1 RAFTER
RB2
10 Copyright © 2013 EPIC Collaborative Sdn Bhd
1 50
108
50
20
20
a
a 980
C2
C4
x2 COMPONENTS
11 Copyright © 2013 EPIC Collaborative Sdn Bhd
3
50
b
2900
b
50
RB2 x2
12 Copyright Š 2013 EPIC Collaborative Sdn Bhd
RB1
4
RAFTER
RAFTER
1035
2870
c c
1495
x2
13 Copyright © 2013 EPIC Collaborative Sdn Bhd
STRUCTURE SEQUENCE MATERIAL CHECKLIST x20 Steel Parts x4 Column [ C1, C2*, C3, C4* ] x4 Ground Beam [ GB1, GB2, GB3, GB4 ] x4 Roof Beam [ RB1, RB2, RB3, RB4 ] x2 Foyer Beam [ T1, T1A ] x2 Truss [ T2 ] x2 Rafter w/ pre-installed timber x2 Typical Rafter x1 Timber [4 x 4 x 6ft] x2 Foyer Legs [4” x 4” x 675mm**] [ a ]
RAFTER* RAFTER
C2
RB4 RAFTER*
RB1
C4
C1 GB4
RB2
RB3 GB1
T1A
C3
14 Copyright © 2013 EPIC Collaborative Sdn Bhd
T2
GB3
GB2
T1 T2
FOYER LEG
a
C2
1
PRE-INSTALLED TIMBER
C1 ga
pb
etw
~2
ee
nc
95
olu
mn
0 pla
te
n ce
r 00cente 31ter-to-
C3 d1
Bolt on outside
2 Nut on inside
GB1
GB3
15 Copyright Š 2013 EPIC Collaborative Sdn Bhd
3 C4 PRE-INSTALLED TIMBER
4
GB4
GB2
d1
16 Copyright © 2013 EPIC Collaborative Sdn Bhd
5 RB1 PRE-INSTALLED TIMBER
d1
RB2 PRE-INSTALLED TIMBER
6
RB3
RB4
d1
17 Copyright © 2013 EPIC Collaborative Sdn Bhd
7 TYPICAL RAFTER TYPICAL RAFTER
RAFTER w/ PRE-INSTALLED TIMBER
RAFTER w/ PRE-INSTALLED TIMBER
d1
18 Copyright © 2013 EPIC Collaborative Sdn Bhd
8
T1A T2
a
T1 T2 a
x6 screws ~670
GROUND
double check on site
d1 19 Copyright Š 2013 EPIC Collaborative Sdn Bhd
JOIST & FLOORING SEQUENCE MATERIAL CHECKLIST x14 TIMBER [2 x 2 x 10ft] x1 Ceiling Joist [ 3000mm length ] a x13 Typical Joist [ 3040mm length ] b x4 TIMBER [1 x 8 x 10ft] x12 Ceiling Boards [ 1000mm length ] c x24 SHERA FLOOR PLANKS x16 Full 3000mm length d x16 1220mm** length e Leave one Typical Joist aside for Secondary Frame Team
3000mm
a
3040mm
b c
1000mm
e
x12 3000mm
d 1220mm
20 Copyright Š 2013 EPIC Collaborative Sdn Bhd
x13
x16
x16
1
d2
x3 Philip screw
a
21 Copyright Š 2013 EPIC Collaborative Sdn Bhd
2 b
d2
b
3 d2
b x10
22 Copyright Š 2013 EPIC Collaborative Sdn Bhd
4
last board will need to be cut in width
d
x16
first board in line with column
23 Copyright Š 2013 EPIC Collaborative Sdn Bhd
5
e
24 Copyright Š 2013 EPIC Collaborative Sdn Bhd
x16
6
50 50 50
c
x12
25 Copyright Š 2013 EPIC Collaborative Sdn Bhd
SECONDARY FRAME SEQUENCE MATERIAL CHECKLIST x16 Steel Parts x1 S1 x2 S2 x3 SB1 x4 SB2, SB3, SB4, SB5 x2 T3 / T3A x2 T4 / T4A x2 T5
T3 SB1
T3A
SB2
SB1 T4 T5
SB4
26 Copyright © 2013 EPIC Collaborative Sdn Bhd
SB3
S1
T4
1
S2
T4A
T3A S2 T3
1500
d3
5mm GAP
d1 90°
x2 Self-tap screw 27 Copyright © 2013 EPIC Collaborative Sdn Bhd
2
SB4
ALIGNED! Make sure top & bottom brackets are aligned for wall studs!
28 Copyright Š 2013 EPIC Collaborative Sdn Bhd
3 T3
T3A
4
b
consult Joist/Flooring group for Ceiling Joist
SB1
T5
SB5
ALIGNED!
T5 29 Copyright Š 2013 EPIC Collaborative Sdn Bhd
5 SB1 SB2 ALIGNED!
SB1 SB3
30 Copyright © 2013 EPIC Collaborative Sdn Bhd
S1
31 Copyright Š 2013 EPIC Collaborative Sdn Bhd
TIMBER STUDS SEQUENCE MATERIAL CHECKLIST x7 Timber [2 x 2 x 10ft] x12 Wall Studs [ 720mm length ] x6 Monsoon Window Joists [ 450mm length ] x4 Kitchen Wall Studs [ 1285mm length ] x1 Door Support [ 2085mm length ]
[ a ] [b] [c] [d]
x2 Timber [2 x 3 x 10ft] x2 Window Sill [ 3010mm length ]
[e]
32 Copyright Š 2013 EPIC Collaborative Sdn Bhd
1
b x6
a x6
a x6
33 Copyright Š 2013 EPIC Collaborative Sdn Bhd
2
d
c x4 34 Copyright Š 2013 EPIC Collaborative Sdn Bhd
3 100
30 800
800 100
x4 self-tap screws
e e 35 Copyright Š 2013 EPIC Collaborative Sdn Bhd
WALL CLADDING SEQUENCE MATERIAL CHECKLIST x13 Shera Wall Cladding [8 x 200 x 3000] x8 Full size [3000mm] [ a ] x16 435mm length [b]
b x8 a x4
36 Copyright © 2013 EPIC Collaborative Sdn Bhd
a x4 b x8
1
20 overlap 20 overlap 20 overlap ~15 overlap
a x4
a x4 37 Copyright Š 2013 EPIC Collaborative Sdn Bhd
2
b x8
b x8
38 Copyright Š 2013 EPIC Collaborative Sdn Bhd
20 overlap
~30 overlap
39 Copyright Š 2013 EPIC Collaborative Sdn Bhd
PURLINS & GUTTER SEQUENCE MATERIAL CHECKLIST x1 Timber [2 x 2 x 14ft] x1 Purlin Gutter Support [ 4300mm length ] x7 Timber [2 x 3 x 14ft] x1 Purlin [ 4300mm length ]
[b]
x2 [SWC] Shera Wall Cladding [8 x 200 x 3000] x2 Purlin Cover [ 2150mm length ] x1 Gutter
40 Copyright Š 2013 EPIC Collaborative Sdn Bhd
[a]
[c]
1 a
b
MARK
575
2
575
41 Copyright Š 2013 EPIC Collaborative Sdn Bhd
3 GUTTER
4 b x6
575 575
42 Copyright © 2013 EPIC Collaborative Sdn Bhd
5
x4 screws (confirm with Specialist)
c c
43 Copyright Š 2013 EPIC Collaborative Sdn Bhd
GABLE FRAME & BOARD SEQUENCE MATERIAL CHECKLIST x2 Timber [2 x 2 x 10ft] x1 Gable Frame A [ 2900mm length ] x2 Gable Frame B [ 880mm length ] x1 Gable Frame C [ 830mm length ]
[ a ] [b] [c]
x1 Timber [2 x 2 x 14ft] x1 Kitchen Roof Support [ 3190mm length ]
[d]
[SWC] Shera Wall Cladding [8 x 200 x 3000] x16 Kitchen Roof Shade [ 550mm length ] x7 Gable Cladding [ full 3000mm length ] x2 2700mm [g] x2 2300mm [h] x2 1870mm [i] x2 1500mm [j] x2 1050mm [k] x2 690mm [l] x2 280mm [m]
44 Copyright Š 2013 EPIC Collaborative Sdn Bhd
[e] [f]
1
x2 timber-to-steel screws
b b
45 Copyright Š 2013 EPIC Collaborative Sdn Bhd
2
L-Bracket
a
46 Copyright Š 2013 EPIC Collaborative Sdn Bhd
c
3
d Screw onto [ a ]
47 Copyright Š 2013 EPIC Collaborative Sdn Bhd
4
e x16
48 Copyright Š 2013 EPIC Collaborative Sdn Bhd
5 35 overlap 35 overlap
f x5
49 Copyright Š 2013 EPIC Collaborative Sdn Bhd
6
Overlap boards 25mm
a b c
d e
Overlap roof beam 30mm
95mm
a 710mm 635mm
b 1250mm 1125mm
c 1740mm 1665mm
d 2280mm 2205mm
e 2820mm 2750mm
f 50 Copyright Š 2013 EPIC Collaborative Sdn Bhd
3000mm
f
3000mm shera board 2205mm
85
710mm
e
a 2820mm
95mm 1250mm
1665mm
85
b
d
635mm
2280mm 1125mm
1740mm
135
c
c *
1740mm
1125mm 250mm 85mm
2750mm
f
115mm
3000mm
CUTTING GUIDE FOR COMPLEMENTARY SIDE 3000mm shera board 2205mm
710mm
85
a
e 2820mm
95mm 1250mm
85
1665mm
b
d
635mm
2280mm 1125mm
1740mm
135
c *
c
1125mm 250mm 85mm 115mm
1740mm 2750mm
f 3000mm
51 Copyright Š 2013 EPIC Collaborative Sdn Bhd
ROOFING SEQUENCE MATERIAL CHECKLIST x48 Shera Roof Sheet [White] x2 Shera Roof Sheet [Transparent]
Typical roof sheet Transparent roof sheet
52 Copyright © 2013 EPIC Collaborative Sdn Bhd
5 4 3 2 1
3 Trilon Fastening Trilon can be used with both Steel and Wood Purlins without pre-drilling. To fix the Trilon tile, use Trilon Color Screw, a 4" self driven screw with neoprene washer as shown in the picture. (Fig.3) To fix Trilon color screw with Purlin, use a 5/16" hexagonal screw tip with screw driver and tighten properly. Trilon Color screw needs to be tightened properly, neither too tight nor too loose (please refer the picture). (Fig. 4). For steel purlin, use a minimum of 400 watt electric screw driver at the speed of 2,000-2,500 rpm. Neoprene Washer 4" Underdriven
Fig. 3
Correctly Driven
Overdriven
Fig. 4
4 Roof Structure Preparation Trilon tiles can be fixed well with both hard wood and metallic roof structure with a roof pitch of5325 to 40 degrees, (depending on ridge system used) Copyright Š 2013 EPIC Collaborative Sdn Bhd The Purlin size and type depend on the design code of each country. All purlins should be in one plane,
1
2
50mm overlap
54 Copyright Š 2013 EPIC Collaborative Sdn Bhd
1
2
200mm overlap
55 Copyright Š 2013 EPIC Collaborative Sdn Bhd
PANELS SEQUENCE MATERIAL CHECKLIST x7 Large Panel Steel Frame [2000mm]
[ P1 ]
x8 Small Panel Steel Frame [1200mm]
[ P2 ]
x15 Steel Bar [674mm]
[ P3 ]
x14 Aluminium U-Channels [1920mm]
[ A1 ]
x16 Aluminium U-Channels [1120mm]
[ A2 ]
x56 Shera Strip [8 x 100 x 3000ft] x221 Panel Planks [ 668mm** length ]
[a]
P1
P3
A1
P2 A2 x7 a 56 Copyright Š 2013 EPIC Collaborative Sdn Bhd
x8
1
A2 P2
A2
57 Copyright Š 2013 EPIC Collaborative Sdn Bhd
2
a x11
3
P3
58 Copyright Š 2013 EPIC Collaborative Sdn Bhd
BIG PANELS P1 x5 screws
A1
x19 planks
59 Copyright Š 2013 EPIC Collaborative Sdn Bhd
Copyright Š 2013 EPIC Collaborative Sdn Bhd