
1 minute read
Figure 8: Post Development 2024 AM / PM Peak Hour Traffic
3.5 2024 POST DEVELOPMENT ANALYSIS RESULTS
The 2024 post development conditions were analyzed during the AM / PM peak hour within the study area. See Figure 8 and Table 4 for the 2024 post development traffic volumes and conditions during the AM / PM peak hour.
