Bonnie Mills Architectural Portfolio 2019
One Wellington Project Type: Mixed-Use, Multi-Res, 202 Apts, 28 Stories Location: One Wellington St, St Kilda, Victoria. Team: KPDO & Plus Architecture Kerry Phelan - Director -KPDO Rainer Strunz - Direcor - PLUS Katherine Christian - Associate Bonnie Mills - 2IC Client: LAS Group & Qualitas Role: 2IC to Associate Design & Documentation 3D Modelling Consultant Co-ordination TP for Endorsement DD for Coordination Marketing Drawings Tender Package
3D Modelled by Bonnie Mills, Rendered by Gabriel Saunders
Rendered by Gabriel Saunders 2
P6
3
P6
W-ST13
P6
W-ST13
F-T12
4
P6 590
1
S4
380
S4 W-ST13
NICHE STEPS INCORPORATED INTO POOL SHELL WITH STAINLESS STEEL POOL HANDRAIL. QTY & LOCATIONS OF NICHE STEPS & POOL HANDRAIL TBA BY POOL CONSULTANT.
F-T12
W-ST13 W-AF12
C PROVISION FOR DDA ACCESS POINT
W-ST13
F-T14
POOL & AMENITY
S1
FW S1
F-T11 F-T12
F-T12
F-T12
OPEN SHOWER W-ST13
02 A1112 W-ST13 F-T12
1 345
P8
P8
P8
FW STEAM
F-T11 FINAL SURFACE APPLICATION TO WEST WALL: TBC BY CLIENT
W-ST13
FW SAUNA W-ST13
J-CP11
J-CP11
Hc W-AF12
W-AF11
WALL TO BE UTILIZED POTENTIALLY AS 'PROJECTION IMAGERY WALL'
W-ST13
W-AF11
J-CP11
W-AF12 C-FT1
POOL AND SPA OVERFLOW EDGE, WET DECK GRATING COLOUR TO BE CUSTOM MATCHED TO W-T12
S01
STORAGE BELOW STAIRS FOR DDA POOL ACCESS EQUIPMENT W-AF11
A1113 F-T12
F-T12 P7
P8
S4a J-P17
FHR
W-AF12
S4
S4 KEX
F-T12
ELEC
BIN
S4 W-AF12
D
S4
LIFT 01
F-T12
COMM
LIFT 02
03 A1112
F-T12
1 177
20M POOL
CEX
F-T14
S4a
S4
F-T12
01 A1112
F-ST11
S4
W-AF12 W-P13
SP RELIEF
CCW
W-P13
W-AF12 S4
F-T12
J-P17
S1
S4
F-T12
Common Area Fitout Plan - Pool, Tender
FE
F-C11 S4
SP
E S4
S1
CONCEALED JOINERY CUPBOARD FOR FIRE EXTINGUISHERS IN APARTMENT CORRIDORS
F-T14 FINAL SURFACE APPLICATION TO EAST WALL: TBC BY CLIENT
S4
NG
LEVEL 04 LIFT LOBBY
F-T12
SPA
HYDR RISER S4
SP
1
Apartment Reflected Ceiling Plan, Tender
Modelled by Bonnie Mills, Rendered by Gabriel Saunders
Apartment Fitout Plan, Tender
P U N T
R O A D
SOUTH ELEVATION
Areas referred to on this ma have been determined acc Property Council of Austr (Method of Measurement property) and method of measu relate to the boundaries describ the Plan of Subdivision for this d
Elevation South, Marketing
Facade Section, DD
Date of issue: 5/09/2
3D Modelled by Bonnie Mills, Rendered by Gabriel Saunders
Level 06 Floorplan, Tender
3D Modelled by Bonnie Mills, Rendered by Gabriel Saunders
Drummond Street Project Type: Multi-Res, 80 Apts Location: 102-108 Drummond St, Oakleigh, Vic. Team: Plus Architecture Ian Briggs - Director Katherine Christian - Project Architect Drew Caddy - Grad Bonnie Mills - Grad Client: Alpha 14 Property Group Role: Sketch Design 3D Modelling Planning Site Analysis Floorplan Layouts/BADS TP Package
3D Modelled by Bonnie Mills, Rendered by Plus Architecture
DATE
FINISHES LEGEND AF1 APPLIED FINISH - LIGHT AF2 APPLIED FINISH - DARK GL1 GLAZING GLASS - CLEAR GL2 GLAZING GLASS - DARK GREY
A
B 5 800
C
AL1 ALUMINUM - DARK
D
6 300
E
7 900
F
5 075
6 100
G 8 770
H 4 150
AHD+80 200
SITE BOUNDARY
SITE BOUNDARY
Design Process Diagrams - Town Planning
+79 100 8 ROOF 3 200
GL2 AHD+77 000
5 307
+75 900 7 LEVEL 07 3 200
GL2 AHD+73 800 AHD+72 700
AHD+73 800 2 449
AL1
3 200
+72 700 6 LEVEL 06
GL2
GL1
+69 500 5 LEVEL 05
19 924
LANE
OVERALL BUILDING HEIGHT
OVERALL BUILDING HEIGHT
CONSU
STRUCTU
SERVICE
16 729
3 200
+63 100 3 LEVEL 03
3 043
21 320
3 200
+66 300 4 LEVEL 04
DALGETY STREET
3 200
AL1
AF1
GL2
BUILDING
+59 900 2 LEVEL 02
FIRE ENG
ESD
3 200
110 DRUMMOND ST GL2
PROJE
+56 700 1 LEVEL 01
102 OA
AHD+54 100
AHD +54 010
FOR
1 100
767 1 100
1 100
AHD+54 100
AF1
1 503
+53 000 0 GROUND
AHD +54 700
ALP LEV MEL
238
3 700
ENTRANCE LOBBY
NGL
Elevation North - Town Planning
DRAWI
ELE
TO
DAT E
A
B
C
D
E
F
G
H
21/1
D RAW
BM
JOB N
126
In accepti agrees th ACN 0916 retain all c including recipient a purpose o against P changes; without th Under no be deeme warranties The Build to any wo take prec
3D Modelled by Bonnie Mills, Rendered by Plus Architecture - TP
D AH
ELECTRICITY
3 +5 3 +5 D AH
0 58
0 62
0 71
1 +5
D AH
Ens
F
T12 2 BED 2 BATH 74 m2
APT G07
APT G08
3 000
3 000
APT G09 D
D
B1
0 70 1 +5 0 71
0 82
Ba
Ba
WM Ens
Ens WM
Ba
WM
B2 FE
0 83 NOT FENCED
Ba
GATE
W
0 90
1 +5
D AH
1 +5
2 BED 2 BATH A: 85 m2
WM
D
APT G05
B. 15 m2
16 262
K
0 92
APT G10
F
L 1700MM HIGH PRIVACY SCREEN
COMMUNAL SPACE 195 m2
REFER TO LANDSCAPE ARCHITECT DRAWINGS B2 K D
P
Ba
B. 10 m2
L
T03
F
T14
WM
P
2 BED 2 BATH A: 88 m2
B. 23 m2
K
1700MM HIGH PRIVACY SCREEN
APT G04 B1 Ba
FE 2 907
24KL RAINWATER TANK
B2
B1
T20
D AH
SERVICES 43 m2
48.76 420
0 38
2 +5
2 +5
D AH
2 0 +5 29 HD A
D AH
2 +5
2 857 GMR SERVICES 4 m2
0 45
COMMS
LOBBY 183 m2 SCV
CWB
TREATMENT PLANT
RAMP 1:20
2 BED 2 BATH 84 m2
SERVICES 3 m2
RAMP 1:20
Ens
F
2 +5
2 +5
0 51
1 882
2 +5
0 51
D AH
D AH
AHD +53 000
0 57
S. V: 6.0 m3
2 +5
WM
9 24
DRAWING TITLE
GROUND FLOO
MSB ROOM
S. V: 4.8 m3
B2
LANDSCAPE 8 m2
S. V: 4.8 m3
B2
0 80 2 FOOTPATH +5 D AH
POS 18 m2 3 030
Ba
SUBSTATION
B. 21 m2
B1
TOWN PLA
4 998
STRIP
NOT FENCED
L
B1
6 800
G
G
S. V: 6.5 m3 PLANTER 11 m2
D AH
6 200
2 +5
3 +5
3 +5
2 +5
2 +5
0 00
0 01
0 94
0 90
L A N E
(BITUMEN)
D AH
0 99
0 96
2 +5
A TP220[-]
2 +5
SEWER PIT52 + 52.98(TOP) D AH
D AH 0 94
CONCRETE CROSSING 0 99 2 +5 00 D 9 AH +52 D AH
GRATED PIT 52.70(TOP)
1
2
S TP202[-]
B TP221[-]
SEWER PIT 52.90(TOP)
3 60 .6
Ground Floor Plan - Town Planning
3D Modelled by Bonnie Mills, Rendered by Plus Architecture - TP
4
5
6
CHECK
DC
KC
12603
GATE
2 +5
0 91
0 81
2 +5
D AH
2 +5
D AH
0 87
0 78
LANE EXTENSION
SITE BOUNDARY 40.2M APPROX. CENTRE OF LANE
21/12
D RAW N
J O B N o.
55.9
D AH
D AH
D AH
0 83
D AH
2 +5
TA TA D AH TELSTRA PITS
D AH
CONCRETE DRIVEWAY
PLOT
21/12/2017
W
WATER METER 2 m2
3 000
DAT E
CARPARK 228 m2
GUTTERING
4 150
EFFICIENT ENERG
W
APT G02 P
5 500
JOHN PATRICK LA
ESD
SINGLE STOREY
RAMP 1:8
CONCRETE
8 770
COMMS/ NBN
S. V: 9.0 m3
D
L
EXISTING CONCRETE CROSSOVER TO BE REMOVED
TRACT CONSULTA
FIRE ENGINEER
ALPHA 14 PROPER LEVEL 7, 256 QUEE MELBOURNE AUST
S. V: 6.1 m3
SERVICES 95 m2
Ba
K
Ens
JBA CONSULTING
BUILDING SURVEYOR
FOR
F
48.76
CONCRETE
D AH
F
P
T07 2 BED 65 m2
WM
K
APT G03
P
SERVICES 6 m2
D F
ADAMS ENGINEER
SERVICES ENGINEER
102-108 DRUMM OAKLEIGH
W
D AH
3 936
K
55.9
CONCRETE CROSSING
GAS RISER
1 704
T19
STRUCTURAL ENGINEER
PROJECT
GF AC CONDENSER AREA ON PLATFORM ABOVE SHOWN DASHED
WM
FE
2 BED 2 BATH 85 m2
E
D
WMB
VOID ABOVE
W
W
W
APT G01
Ba
ELEC FIP
AHD +52 710
CONSULTANTS
60 PA .1 R AP ET
FH
NBN
GUTTERING
EXISTING CONCRETE CROSSOVER TO BE REMOVED
CP EX.
3 557
FBC
12.19
NOT FENCED
L
arch
Melbourne Brisbane
W
SITE BOUNDARY 48.7M APPROX.
0 10
N1 TP204[-]
F
EXISTING TREES TO BE REMOVED
plu
D
APT G11 D
E TP201[-]
1700MM HIGH PRIVACY SCREEN
1 BED A: 53 m2
L
DOUBLE STOREY
W
WM
C
P 60 AR .0 AP ET
W
POS 18 m2
F L LO 52 EV OR .1 EL 2
G
No.20
55.9
0 11 TA
TA
2 +5
TELSTRA PITS
0 17
D AH
2 +5
2 +5
OPEN
D AH
D AH
CONCRETE 0 CROSSING 10
5 075
D K
Ens
IN
REFER TO LANDSCAPE ARCHITECT DRAWINGS
GUTTERING
2 +5 0 97 HD A
SITE BOUNDARY 48.8M APPROX.
1 +5
OF
D AH
P B1
R
W
0 98
1 +5
1 BED A: 52 m2
F
W
1 +5
D AH
0 94
P
179°34'30"
L
12.19
359°34'30"
D AH
D AH
7 900
G 55 UT .9 TE
S1 TP204[-]
B1
FE
T21
POS 13 m2
10 709
CONCRETE CROSSING
PA R AP ET 57 .5
Ba
LANDSCAPE 25 m2
T03
EXISTING TREE TO BE REMOVED
PA R AP ET 60 .2
B
Ldry
WM
Ens B1
LANDSCAPE 25 m2
6 100
FF
F
0 78
6 300
1 +5
1 +5 0 70 HD A
D AH
1 +5
S T
P
1 600
D AH
1 +5 D AH
0 0 UNCLASSIFIED 76 78 51 51 PIT +51.71+ D D AH AH
PP
K
P
PA R AP ET 60 .1
Ens
K
1 +5
D AH
CONCRETE CROSSING
F
POS 8 m2
CONCRETE
2 BED 2 BATH 79 m2
D
B1
Ba
T23
T22 2 BED 2 BATH 86 m2
12 909
5 800
1 +5
P B1
B1
L
12.19
D AH
51 CONCRETE D + AH
INVERT
D R U M M O N D
0 69
NOT FENCED
A B2
L
APT G06
E
REVISION
METER L B2
L
2 BED 2 BATH 85 m2
POLE
DATE
GAS S D
B2
1 600
NEW CONCRETE CROSSOVER TO LOCAL COUNCIL REQUIREMENTS
1 +5
0 45
POS 19 m2
T11
ELECTRICITY
TELSTRA TA
BITUMEN FOOTPATH
POS 15 m2
B2
C
H
0 65
1 +5
REFER TO LANDSCAPE ARCHITECT DRAWINGS
POS 19 m2
K
B
SIGN
1 +5
NOT FENCED
STRIP
D AH
D AH
0 79
D AH
GRASSED
A
F
1 +5
6 77
0 71
0 67
0 72
40.23
SIDE ENTRY PIT 51.58(TOP)
NOT FENCED
POS 10 m2
POS 37 m2
SIDE ENTRY PIT 51.57(TOP)
D
D AH
6 110
51.65
6
UNCLASSIFIED PIT
LANDSCAPE 40 m2
EXISTING TREE TO BE REMOVED
W TP203[-]
B TP221[-]
1 +5
1 +5
1 +5
1 +5
SITE BOUNDARY 40.2M APPROX.
CONCRETE CROSSING
5
8 700
D AH
D AH
D AH
TA
0 48
90°10'
8 990
SIDE ENTRY PIT 51.68(TOP)
EXISTING TREES TO BE REMOVED
4
D AH
TELSTRA PIT
TA
7 150
1 +5
TA
0 45 1 0 0 +5 00 00 D 3 3 AH +5 +5 D D AH AH
TELSTRA PITS
D AH
0 00
4 150
CONCRETE CROSSING
S T
NATURE
N TP200[-]
3
0 62
D AH
A TP220[-]
2
1 +5
0 00
GRASSED
D AH
D A L G E T Y
POLE
1
W
56 PA .9 R AP ET
H
W
57 PA .5 R AP ET
W
W
In accepting and utilising this document the recipient agrees that Plus Architecture Pty. Ltd. ACN 091690336, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against Plus Architecture resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of Plus Architecture. Under no circumstances shall transfer of this documen be deemed a sale. Plus Architecture makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prio to any work commencing. Figured dimensions shall take precedence over scaled work.
Silver Fox Project Type: Heritage Renovation/Extension Location: 75 St Vincent St, Albert Park Team: Windust Architects Anthony Windust - Director Bonnie Mills - Architectural Assistant Role: Design & Documentation Client Liason Consultant Coordination Product & Material Selections Detailing Design Development Site Visits
Elevation South - CD
Site Photo by Windust Architects- South Facade
cool, masculine features. flashes of exposed concrete meets the fireplace.
Ground Floor Plan - CD
Section - DD
Section Detail
Oakmont Townhouses Project Type: Townhouses, 91 dwellings Location: 52 Golf Rd, Oakleigh, Vic Team: Plus Architecture Brett Duke - Associate Joe Diaz - Project Architect Shannon Winsor - Architect Bonnie Mills - Grad Role: Masterplanning Diagramming DPO/TP Package Site & Design Analysis
3D Render by Plus Architecture
Key Plan - A
A) Neighbour Interface Section Diagram - TP
B) Neighbour Interface 3D View - TP
Key Plan - B
3 Storey Townhouse Floorplan - TP
Ground Floor Masterplan - TP
Shadow Analysis Diagram - TP
0.1 Landscape Buffer
0.2 Visual Breaks
0.3 Site Access
North Setback & Height Diagram - Town Planning Subject Site
2 Storeys
Landscaping
3 Storeys
1 Storey
Proposed Landscaping on Council Land
3D Render by Plus Architecture
0.4 ESD Principles
0.5 Landscaping
South Setback & Height Diagram - Town Planning
3D Render by Plus Architecture
0.6 Pedestrian Permeability
Window House Project Type: Bathroom Renovation Location: 1/131 Centre Rd, Brighton East, Vic Team: Bonnie Mills Role: Concept Presentation Sketch Design Package
Existing Floorplan
Proposed Floorplan - Sketch Design
Elevation 01 - Sketch Design
Elevation 02 - Sketch Design
Elevation 04 - Sketch Design
Bonnie Mills Architectural Portfolio 2019
Thankyou