Built Work SOUTH PLATTE RIVER VISION - P. 2 FISH CREEK PUBLIC INFRASTRUCTURE PROJECT - P. 8 STEEL WORKS PARK - P. 12 CREEKSIDE AT AMERICA THE BEAUTIFUL PARK- P. 16 SHERPA TRAIL- P. 18 SOUTH ST. VRAIN CREEK RESTORATION - P. 20 ESTES PARK PRIORITY PROJECTS - P. 24 ESTES PARK HYDROPLANT RESTORATION - P. 26

Master Plans FRASER RIVER CORRIDOR MASTER PLAN - P. 28 BIG THOMPSON RIVER CORRIDOR MASTER PLAN - P. 36 BIG DRY CREEK RIVER CORRIDOR MASTER PLAN - P. 42

Educational Publications LWOG HANDBOOK - P. 48

Environmental Experiments LUNKER BOXES - P. 50 FISH BAFFLES - P. 52

Advertising and Branding ADVERTISING AND BRANDING EXAMPLES - P. 54

1


South Platte River Vision: Overland Pond to Grant Frontier Park

WHERE

ROLE: PROJECT MANAGER & LEAD DESIGNER EMPLOYMENT: THK ASSOCIATES AWARDS: 2016 CASFM GRAND AWARD WINNER

Denver, CO

Spread 1 of 4

GENERAL PROJECT INFORMATION

DETAILED PROJECT DESCRIPTION

Client: City and County of Denver

South Platte River Vision (SPRV) is a large longterm initiative conducted by the City and County of Denver to make the South Platte River corridor the premier outdoor recreation

Budget: $7,500,000

destination and an environmental educational resource for the City and the State of Colorado.

Team: CDM Smith - Engineer (Prime)

The Overland Pond to Grand Frontier Park portion of the vision activates approximately

THK Associates, Inc. - LA

one mile of underutilized open space along the South Platte River from Florida Avenue to Evans Avenue by developing regional trail connections, increasing river access, improving

2012

2013

2014

2015

2016

2017

PROJECT RESPONSIBILITIES

hydraulic functions, developing habitat enhancements and the creation of two riverside parks - Pasquinel’s Landing and Grant Frontier Park. In the summer of 2013, a cost estimate revealed that the 90% plans of the SPRV were significantly over budget. The City requested a redesign of the two riverside parks and

Conceptual Re-design

significant value engineering to be done on the entire project. After only graduating from

Cost Estimating and Value Engineering

undergrad 8 months prior, I was tasked to lead the redesign effort and take over project

Construction Documentation

management duties.

Specification Preparation

Project Management

Contractor Coordination

Construction Observation and Administration

Post Construction Public Speaking

Over the next four years, our team successfully redesigned the corridor to be within budget while still meeting the design intent and goals of the City, project stakeholders and funding agencies.

1 2 3 4 5 6 7

Overland Pond Park

1 2 3

Overland Pond Park ADA Accessible Dock Jetty #1

8 9

River Overlook #2 Instream Riffle Structure

Regional Trail Connection Under W. Florida Ave.

10

River Overlook #3

River Overlook #1

11

Jetty #2

Instream Drop Structure at W. Florida Ave.

12

Pasquinel’s Landing Park

Constructed Riparian Bench

13

Grant Frontier Park

Pedestrian Crusher Fines Trails

4

5

6 8

9

W. Flo rid

a Ave

.

7

Sout

S. Pla tte

N 2

h Pla

River

tte R

Dr.

iver


ENVIRONMENTAL NEED:

THE SOUTH PLATTE RIVER VISION IMPROVED THIS CONDITION BY INTEGRATING NATURAL SYSTEM DESIGN WITH RECREATIONAL IMPROVEMENTS

Over the last century, the South Platte

The channelization created

River has been channelized causing a

steep armored banks reducing

variety of issues

recreational access to the river

ENVIRONMENTAL APPROACH:

EXISTING CONDITION:

DESIGN CONCEPT:

EXECUTION:

Steep banks make the river

Lay banks back to increase

Banks were laid back to increase floodplain

inaccessible and concentrate

accessibility, reduce flood risk and

connectivity and access to the river.

flows, increasing velocities

open river to recreation.

Recreational elements were included and

during flood stage.

ADA access was developed.

13

W. Evans W.Ave. Evans Ave.

12

11 10

S. Lipan St.

3


SPRV: PASQUINEL’S LANDING PARK Pasquinel’s Landing Park brings individuals down to rivers edge where an island has been created to encourage river access and environmental learning in a safe secondary channel. A pedestrian loop trail runs throughout the entire park providing access to the island and framing the great lawn before culminating at a new adult fitness area along the South Platte Regional Trail. The goals for this park were to create increased floodplain conveyance, river access, promote outdoor environmental learning, produce active public spaces and incorporate unique fitness opportunities, all while increasing circulation and regional connectivity along the South Platte River. Conceptual Plan Legend: Instream Riffle Structure

2

Secondary Channel

3

Low Water Crossing

4

Boulder Seatwall (18” Max.)

5

Natural Cobble Area

6

Native Riparian Vegetation

7

Native Grasslands

8

Great Lawn

9

6’ Wide Sandfinished Concrete Trail

10

Adult Exercise Area

11

Boulder Seatwall (18” Max.)

12

12’ Wide Concrete Regional Trail

13

Native Shrub Plantings

1

12

11

S. Huron St.

10

9

W. Evans Ave.

1

8 2

7

3

1

4

13 6

5 tte S. Pla

Dr River

ive

N

2

1. Pasquinel’s Landing Park Plan 2. Aerial of Pasquinel’s Landing Park

4


1

2

3

1. Arching 6’ wide ADA accessible path to the river 2. Seating area at the secondary channel and constructed island 3. Natural grass lands boarding the active interior of the park

5


SPRV: GRANT FRONTIER PARK Grant Frontier is a 5 acre park located at one of the first gold strikes on the South Platte River in the City of Denver. This deep connection to the river had been forgotten as the river was channelized during the 20th century. During this time, the banks of the river were raised over 15 feet eliminating natural ecosystem process and all recreational access to the river’s edge. The redesign took into account the areas historic character, community input and environmental need to design a Park that uses functional forms to tell the story of the place and create a community driven vision for its future. A formal plaza and picnic area radiate from a two hundred year old cottonwood tree that provides shade and historical context for the educational workshops that are now conducted there. An arching staircase flows, from the plaza, past a perennial rock garden and boulder terraces that mark the five, ten and one hundred year flood level before arriving at the secondary channel. This channel separates the main Park from an island built into the river and provides individuals a safe environment for interaction with the river and an active play area along its banks. All access to the river and island is ADA compliant allowing all members of the City to enjoy their Park.

DESIGN PROCESS/CONCEPT

CONCEPT DEVELOPMENT

R

CONSTRUCTION DOCUMENTS

CONSTRUCTION

1

1. Grant Frontier Park during seasonal high flow (1 year post construction)

6


1

2

3

1. Concrete and stone staircase to the river 2. Central plaza around the two hundred year old oak tree 3. Overlook at the central plaza

7


Fish Creek Public Infrastructure Project ROLE: PROJECT MANAGER & LEAD DESIGNER EMPLOYMENT: THK ASSOCIATES ACKNOWLEDGMENT: PRESENTED AT THE INTERNATIONAL ECOLOGY AND TRANSPORTATION CONFERENCE AND THE SUSTAINING COLORADO WATERSHED CONFERENCE IN 2017

WHERE

Estes Park, CO

Spread 1 of 2

GENERAL PROJECT INFORMATION Client: Larimer County

The Fish Creek Public Infrastructure Project restored and improved the environment along Fish Creek in Estes Park, following the historic2013 floods. During this event, Fish Creek

Budget: $11,000,000

flowed between 2,000 - 4,000 CFS, over 5 times the pre-flood 100 year volume. This flooding

Team: HDR Engineering (Prime)

caused the destruction of Fish Creek Road, the Estes Park Multi-use Trail, almost all existing

THK Associates, Inc. - LA

2012

2013

2014

DETAILED PROJECT DESCRIPTION

2015

2016

utilities, large portions of the natural environment and many homes.

2017

As the project manager for THK, my primary focus for this project was reconnecting the disjointed Estes Park Multi-use trail, designing adaptive fish passage structures, in-stream grade control structures and comprehensive revegetation and habitat stabilization measures.

PROJECT RESPONSIBILITIES

This focus allowed me to work with local organizations, like Colorado Park and Wildlife

Graphic Preparation

improvements that reduce future impacts that flooding may have on private property and

Cost Estimating and Value Engineering

public infrastructure.

Permitting Coordination

Construction Documentation

Specification Preparation

Project Management

Construction Observation and Administration

Post Construction Public Speaking

(CPW), to create a resilient ecosystem along Fish Creek, as well as develop infrastructure

The design team worked with the Colorado Department of Transportation (CDOT), Federal Emergency Management Agency (FEMA) and the Federal Highways Administration (FHWA) throughout this process and ensured full reimbursement for the Town of Estes Park and Larimer County.

1

2

1. Post flood condition 2. Rendering of restoration improvements

8


1

2

3

1. Trail adjacent to Fish Creek 2. Trail adjacent to road 3. Typical channel section

9


1

2

3

1. Reconstructed creek and trail (6 months post construction) 2. Healthy riparian vegetation along creek banks 3. Six inch stone drop structure

10


1

2

3

1. Vegetation on the left bank installed per specification 2. Gabion basket wall supporting Fish Creek Road 3. Fish baffles provide fish passage through culverts

11


The Steelworks Park

WHERE

ROLE: LANDSCAPE DESIGNER EMPLOYMENT: THK ASSOCIATES

Pueblo, CO

Spread 1 of 2

GENERAL PROJECT INFORMATION Client: Steelworks Center of the West

DETAILED PROJECT DESCRIPTION The Steelworks Park in Pueblo Colorado honors the historic EVRAZ Steel Mill in Pueblo which was integral to the City’s growth throughout the 19th Century. The Park was collaboratively

Budget: --

designed with the Mill and the Client to tell the story of the Steel Mill through form, sculpture

Team: THK Associates, Inc. - LA

and education. The Park’s plaza evokes the industrial nature of the steel mill by focus participants circulation

2012

2013

2014

2015

2016

2017

down a large axis bordered on either side my historic artifacts of the Mill. The pattern of the ground plane reflects the building layout of the sprawling Mill facility while the artifacts provide a powerful sense of scale and historic reference for the place. Educational signage was

PROJECT RESPONSIBILITIES

developed to tell the story of the individual artifacts and the rich history of the Mill.

Concept Development

As the landscape designer, I worked with a senior landscape architect to develop the conceptual

Graphic Preparation

design and preliminary construction documents for the Park

Cost Estimating

Construction Documentation

1

1. Lumion rendering of the Steelworks Park Main Plaza

12


1

Conceptual Plan Legend:

1

Historic Mary Go Round

2

Park Entrance

3

Brick Plaza

4

Mine Cart

5

Bronze Sculpture

6

Small Ladle

7

Educational Sign

8

Rail Rollers

9

Ore Carts

10

Parking Lot

11

Bus Pickup/Drop-off

12

Davenport Engine

13

Large Ladle

13

8 10

12

7

9 9 6

8

5 4

3

2

1

1. Steelworks Park Conceptual Plan

13

11


1

1. Steelworks Park Grading Plan

14


2

2

3

1. Davenport Engine Section Detail 2. Final Constructed Statue and Plaza 3. Mix Media Rendering of Mature Condition

15


Creekside at America the Beautiful Park ROLE: LANDSCAPE DESIGNER EMPLOYMENT: THK ASSOCIATES

WHERE

Colorado Springs, CO

Spread 1 of 2

GENERAL PROJECT INFORMATION Client: City of Colorado Springs

DETAILED PROJECT DESCRIPTION Creekside at America the Beautiful Park was an expansion of one of Colorado Springs largest regional parks. The existing park provided excellent active recreational opportunities and

Budget: --

family gathering spaces. However, the existing park turned its back on Monument Creek by

Team: THK Associates, Inc. - LA

cutting off creek access from the Park via a large berm. The Creekside expansion removed the large berm to create a strong connection to Monument

2012

2013

2014

2015

2016

2017

Creek, increased the diverse recreational and educational opportunities, reconnected the floodplain and expanded riparian plant communities. The Park now provides ADA accessibility for all users to the Creek edge and natural play elements to foster experimental play and

PROJECT RESPONSIBILITIES

increase the connections to the natural world.

Concept Development

As the landscape designer for the project I was responsible for developing the conceptual plan

Graphic Preparation

creating graphics and assisting with the preliminary site grading.

Preliminary Site Grading

1

1. Creekside Park Concept Plan

16


1

2

3

1. Aerial of Creekside Park 2. New natural play area and overlook 3. New natural play area

17


Sherpa Trail

WHERE

ROLE: PROJECT MANAGER & LEAD DESIGNER EMPLOYMENT: THK ASSOCIATES

Colorado Springs, CO

Spread 1 of 1

GENERAL PROJECT INFORMATION Client: University of Colorado Colorado Springs

crusher fines trail until it was deemed unsafe for student travel and closed in 2015.

Kiowa Engineering 2014

Colorado Springs (UCCS) Campus. The trail linked student housing with the main campus by and underlying friable bedrock compounded to cause progressive erosion of the previous

Team: THK Associates, Inc. (Prime)

2013

The Sherpa Trail was once a prominent pedestrian corridor on the University of Colorado – traversing a hillside on the north end of the campus. Frequent storm events, steep trail grades

Budget: $250,000

2012

DETAILED PROJECT DESCRIPTION

2015

2016

2017

In the summer of 2015, I wrote the winning proposal to redesign the Sherpa Trail to improve drainage, reduce erosion and design a resilient sustainable trail with a low environmental impact. The Sherpa Trail alignment has over 15% slopes in key areas and exposed bedrock on

PROJECT RESPONSIBILITIES

the hillside contributes to increased destructive runoff during storm events. In order to ensure

Graphic Preparation

with the new trail surface.

Alternative Development

Construction Documentation

Specification Preparation

Cost Estimation

Project Management

long term sustainability, it was essential to separate the natural drainage patterns in this area

Due to existing environmental and budgetary constrains, I received approval to use U.S. Forest Service standards and details to design an elevated boardwalk system that steps up the hillside and maintains a minimum six inch separation from the bottom of the boardwalk to the top of the exposed bedrock, allowing natural drainage patterns and environmental function to remain while providing a safe route for pedestrian travel up the steep grade. Informational signage was installed in four locations along the route to educate visitors on the unique environmental conditions of this area and new recreational programing aims to increase trail usage and further connect students with their environment on the UCCS campus. Now, over 30,000 individuals a summer use the trail!

1

2

1. 15% exposed bedrock slope 2. Elevated boardwalk staircase fit within the existing staircase

18


1

2

3

1. Rendering of stormwater under the elevated boardwalk 2. Construction profile of the elevated boardwalk 3. The completed elevated boardwalk over the UCCS campus

3 19


South St. Vrain Restoration at Hall Ranch ROLE: PROJECT MANAGER & LEAD DESIGNER EMPLOYMENT: THK ASSOCIATES

WHERE

Lyons, CO

Spread 1 of 2

GENERAL PROJECT INFORMATION Client: Boulder County

South St. Vrain Creek experienced significant flooding in 2013 which rerouted the creek channel and caused substantial damage to existing infrastructure. Emergency response work

Budget: $2,300,000

immediately after the flooding identified the 3.2 mile section of South St. Vrain Creek at Hall

Team: Matrix (Prime)

Ranch as a priority for improvement to minimize the threat to existing infrastructure and

THK Associates, Inc. - LA

restore stable ecologic function.

Otak 2012

2013

2014

DETAILED PROJECT DESCRIPTION

2015

2016

2017

Boulder County Parks and Open Space (BCPOS) tasked our team to develop a 30% restoration plan with the goal of fostering public support for the project, reducing infrastructure risk, stabilizing the creek channel and restoring ecologic function to the riparian corridor.

PROJECT RESPONSIBILITIES

Following the 30% design, the Design Team was contracted to develop 80% construction

Public Outreach

was completed in the fall of 2017. Restoration at Hall Ranch included constructing a stable

Graphic Preparation

channel width, adding naturalistic in-stream structures, sculpting deep holding pools,

Revegetation Design

increasing floodplain capacity and restoring the natural riparian environment by planting over

Bioengineering Design

Technical Writing

Construction Documentation

Specification Preparation

Project Management

Construction Observation and Administration

documents for over a mile of the creek and perform construction observation as the project

two dozen plant species that were naturally occurring prior to the 2013 flood. As the project manager for THK, I lead the public outreach process, revegetation effort and bioengineering design for the project.

1

2

1. Post flood condition 2. Drone Image of post construction condition

20


BIOENGINEERING DESIGN One of the most important design considerations for this project was the use of bioengineering for bank stabilization. This process involved working with a 2D SRH model to evaluate the velocities and sheer stresses that would occur during a 10 year storm on this section of the South St. Vrain Creek. Profiles of each bank were created by the engineers and I worked closely with them to design bioengineering measures that would stand up to these erosive forces. Each bioengineering method used not only provided bank armoring but provides ecosystem benefits and incorporates native vegetation. This process was integral in fulfilling the main goals of the project to reduce the risk to infrastructure and restoring ecosystem function.

LEGEND 9 FPS

5 FPS

7 FPS

3 FPS

Bank Stabilization: Bioengineering Treatments February 3, 2017 Station Location Item #

Bioengineering Treatment Station Start

Left Bank

Right Bank

Total Length (L.F.)

SRH 2D Model Velocity (FT./S)

Station End

Initial Premissible Velocity (FT./S)

Established Premissible Velocity (FT./S)

1 2 3 4 5

Willow Cuttings in Cobble Toe Willow Cuttings in Ex. Riprap Boulder Toe Willow Cuttings in Cobble Toe Willow Cuttings in Cobble Toe

Main Channel 102+00 - 88+50 99+40 97+00 96+24 93+23 94+30 92+94 92+34 92+24 91+29 88+50

L L L -

R R

260 288 149 10 297

4 to 10 4 to 10 10 to 16 4 to 10 4 to 10

5 to 10 5 to 10 14 to 18 5 to 10 5 to 10

10+ 12+ 18+ 10+ 10+

6 7 8 9

Willow Cuttings in Cobble Toe Willow Cuttings in Cobble Toe Willow Cuttings in Ex. Riprap Willow Cuttings in Cobble Toe

Main Channel 88+50 - 76+50 88+50 87+23 82+25 82+80 82+75 80+80 77+93 76+50

L L L

R -

134 256 256 153

4 to 10 4 to 10 4 to 10 4 to 10

5 to 10 5 to 10 5 to 10 5 to 10

10+ 12+ 12+ 10+

The above matrix is an excerpt from the bank stabilization chart that was supplied as part of the design report to show the bank stabilization treatments below and their corresponding bank velocities.

21


:,//2: &877,1*6 ,1 &2%%/( 72( &+$11(/ 29(5)/2: &+$11(/ $ /(1*7+ /) 67$ 6+((7 /' ,7(0

6+((7 1R /

& /'

:,//2: &877,1*6 ,1 &2%%/( 72( &+$11(/ 0$,1

/(1*7+ /) 67$ 6+((7 /' ,7(0

1

& /'

628

7 9

Call before you dig.

5$,1

'5

67

$7(

+:

< ) /'

7+ 6

R

Know what's below.

:,//2: &877,1*6 ,1 (; 5,35$3 &+$11(/ 0$,1

/(1*7+ /) 67$ 6+((7 /' ,7(0

,1( 67 $

$

,1( +/ 7&

67

$*

,1*

$5

($

67

$

$5(

0$

,1*

67$*

+/

0$ 7&

'

52$

5$,1

67 9

287+

2/' 6

& /'

:,//2: &877,1*6 ,1 &2%%/( 72( &+$11(/ 0$,1

/(1*7+ /) 67$ 6+((7 /' ,7(0

127( 5(9(*(7$7,21 $5($ 727$/6 $5( $3352;,0$7( ,1 1$785( &2175$&725 6+$// 5()(5 72 7+( 5(9(*(7$7,21 6&+('8/( $1' 127(6 )25 (;$&7 5(9(*(7$7,21 $5($ 48$17,7,(6 $1' 727$/6

2

3

1. Revegetation plans 2. Bioengineering detail 3. Wetland plug plantings in overflow channel backwaters

3 22


1

2

3

1. Riparian and wetland vegetation establishment after 6 months 2. Large woody material located in areas of high velocity 3. Upland vegetation establishment after 6 months

3 23


Estes Park Priority Projects ROLE: PROJECT MANAGER & LEAD DESIGNER EMPLOYMENT: THK ASSOCIATES

WHERE

Estes Park, CO

Spread 1 of 1

GENERAL PROJECT INFORMATION Client: Estes Valley Watershed Coalition

as follows:

Team: Otak (Prime) THK Associates, Inc. - LA

Reach 1: Cheeley Camp experienced severe downcutting, bank erosion and lateral channel

Matrix 2013

The Estes Priority Projects were a series of four reaches on Fall River and Fish Creek in Estes Park. Each reach was severely effected by the 2013 floods and faced its own series of challenges

Budget: -

2012

DETAILED PROJECT DESCRIPTION

2014

migration. 2015

2016

2017

Reach 2: Scott Avenue experienced heavy bank erosion and sediment deposition. Reach 3: Elkhorn faced heavy sediment deposition and infrastructure damage. Reach 4: Antler’s Point experienced significant downcutting and revegetation lose. The design

PROJECT RESPONSIBILITIES

team was responsible for 30% design plans; however due to federal procurement policy, was excluded from the construction process.

Revegetation Design

Bioengineering Design

My role on the project was to work with the engineers and geomorphologists to develop

Construction Documentation

four distinct 30% design plans that addressed the issues on each reach while restoring the

Project Management

reaches to a naturalized state. I aided in the concept development, initial grading and lead the revegetation design on the project. Due to federal procurement proceedures, our team was excluded from preparing the final 100% construciton plans. However, many principles from the 30% design were incorporated into the final construciton.

1

2

1. Post flood condition 2. Post construction condition based on the 30% design

24


1

2

3

1. Natural beaver dams on the Cheeley Camp Reach 2. Beaver Dam Analogs (BDAs) were installed to mimic beaver dams found naturally along Fish Creek 3. Brooke trout using newly created habitat

25


Estes Park Hydroplant Restoration ROLE: PROJECT MANAGER & LEAD DESIGNER EMPLOYMENT: THK ASSOCIATES

WHERE

Estes Park, CO

Spread 1 of 1

GENERAL PROJECT INFORMATION Client: City of Estes Park

Fall River was one of the most significantly impacted streams of the 2013 floods. The Hydroplant and Upper Fish Hatchery Project restored two reaches of Fall River adjacent to

Budget: -

Rocky Mountain National Park to a more resilient and sustainable conditions by increasing

Team: Otak (Prime)

stream health and hydraulic conveyance in anticipation for future flood events. Due to the

THK Associates, Inc. - LA

expodited time frame of the Colorado’s Community Development Block Grant - Disaster

FlyWater - Contractor 2012

2013

DETAILED PROJECT DESCRIPTION

2014

2015

Recovery (CDBG-DR) Infrastructure Program, the design build team worked closely to 2016

2017

ensure all funds were expended by March of 2016. Within less than one year, the design team surveyed post-flood conditions, analyzed hydrology and hydraulics, designed channel improvements, secured a Floodplain Development Permit with the Town, notified the

PROJECT RESPONSIBILITIES

community of the project and finished construction of both reaches.

Revegetation Design

Together both reaches included the removal of sediment deposition, channel grading to

Construction Documentation

reconnect the channel to the floodplain, including a low flow channel and floodplain benching,

Project Management

establishment of more defined pools and riffles, incorporating aquatic habitat features

Construction Observation and Administration

riparian revegetation and removal of two fish barriers located in the reach.

throughout, stabilization of banks using natural materials found onsite, planting native

As the landscape designer on the project, I assisted with the development of the site grading and lead the revegetation design. Due to the expedited schedule, I worked collaboratively with the contractor and the City of Estes Park to adjust the revegetation design as on-site materials became available.

1

2

1. Pre-constructed condition 2. Reconstructed channel and floodplain

26


1

2

3

1. Native wildflower/grass seeding on constructed overflow channel 2. Large woody material strategically located for fish habitat 3. Constructed step pool channel with willow stakes in boulder toe

3 27


Fraser River Corridor Master Plan

WHERE

ROLE: PROJECT MANAGER AND LEAD DESIGNER EMPLOYMENT: THK ASSOCIATES

Fraser, CO

Spread 1 of 4

GENERAL PROJECT INFORMATION

DETAILED PROJECT DESCRIPTION

Client: Town of Fraser

Fraser River Corridor Master Plan creates a community driven vision for the 120-acre Cozens

Team: THK Associates, Inc. (Prime)

Ranch Open Space between the Town of Fraser and Winter Park. The plan identifies needs, goals and strategies to activate this under-utilized open space asset. This Master Plan built a

Grand Environmental

consensus for the planning effort with the desired outcome of protecting the land, river and

Wright Water Engineers

wildlife while increasing river access, recreational activities and educational opportunities in order to connect residents and visitors to the beauty and serenity of the Fraser River.

2013

2014

2015

2016

2017

2018

• •

PROJECT RESPONSIBILITIES •

Proposal Writing

Public Outreach

Master Plan recommendations include:

• •

Protect existing floodplain capacity and willow shrubland along the Fraser River Implement Best Management Practices (BMPs) for stormwater runoff by working with Grand County Water Information Network (GCWIN) Enhance fish passage and aquatic habitat in degraded areas and roadway crossings Work with developers to ensure responsible ecologic stewardship and connections to recreational amenities in new developments Activate the Lions Ponds Area through the creation of a year round riverside park Establish a Town of Fraser Parks Division under the umbrella of the Public Works Department Construct a pilot project in 2018 to build momentum for additional future projects

Branding

Field Work and Data Compilation

GIS Mapping

3D Modeling

Graphic Preparation

As the project manager on this project, I was responsible for writing the initial proposal,

Project Management

scoping the project, managing the budget, coordinating with the client, public outreach, design

Technical & Creative Writing

development, project management, all graphic preparation and document compilation.

• • •

OVERALL CORRIDOR PLAN An illustrative map of the corridor was developed early in the design process. The map was presented at ever public meeting and comments received were incorporated into the final document.

NORTH POND

LIONS PONDS AREA

LEGEND - Existing Picnic Areas

- Restroom

- Proposed Wildlife Overlook

- Existing Interpretative Signage

- Proposed Picnic Area

- Proposed Plumbed Restroom

- Existing Wayfinding Signage

- Proposed Interpretative Signage

- Proposed Composting

- Restored River Access Point

- Proposed Wayfinding Signage

28

Restroom


Three public workshops were conducted during the Fraser River Corridor Master Plan. Custom invitations were developed for each workshops and distributed to the community at least two weeks prior to the meeting. The community was very engaged throughout the process allowing the project team was able to engage with them in a variety of different environments.

YOU ARE INVITED! TO THE FRASER RIVER CORRIDOR MASTER PLAN STRATEGIC PLANNING SESSION

THURSDAY SEPTEMBER 28TH AND FRIDAY SEPTEMBER 29TH The Fraser River Corridor Master Plan aims to develop a long-term vision to protect and enhance recreation and environmental stewardship for the Cozen’s Ranch Open Space. We invite you to join us whenever you can during this two-day event to share your experience and ideas for the Fraser River Corridor. THIS CAN ONLY BE ACCOMPLISHED WITH YOUR INPUT! At this event, the Planning Team will:

Introduce the h objective bj i of the Master Plan and share current site analysis efforts

Listen to the h community’s experience to help understand the vision for the Fraser River

Brainstorm potential i l design d ideas and collaborate on concepts for the Master Plan

STRATEGIC PLANNING SESSION SCHEDULE THURSDAY SEPTEMBER 28TH: 9:00 AM - 12:00 PM: Planning Team And Project Introductions Come by anytime to learn about the Master Plan and meet the Team Where: Lions Pond Pavilion, 45 County Rd. 804, Fraser, CO 80442

1:30 PM - 3:00 PM: Team Led Walking Tours Of The Project Area Experience the project area firsthand and share your thoughts and ideas Tours will meet and depart from the Lions Pond Pavilion every 30 minutes Where: Lions Pond Pavilion, 45 County Rd. 804, Fraser, CO 80442

3:30 PM - 5:00 PM: Open House At Headwaters Trails Alliance (HTA) Review the Team’s research on the project area and continue discussions on the community’s vision for Cozen’s Ranch Open Space Where: HTA Offices, 120 Zerex St., Fraser, CO 80442

FRIDAY SEPTEMBER 29TH: 9:00 AM - 12:00 PM: Planning Team And Project Introductions Come by anytime to learn about the Master Plan and meet the Team Where: Lions Pond Pavilion, 45 County Rd. 804, Fraser, CO 80442

3:30 PM - 5:30 PM: Community Presentation Collaborate on concepts and ideas for the Master Plan and continue discussions on the community’s vision for Cozen’s Ranch Open Space Where: Fraser Historic Church, 107 Eisenhower Dr., Fraser, CO 80442

6:00 PM - 8:00 PM: Open House & Happy Hour At The Foundry Connect with Team and community members to promote the project Where: 22 Second St., Fraser, CO 80442

For more information on this event or the Fraser River Corridor Master Plan, please contact Catherine Trotter: ctrotter@town.fraser.co.us

Public workshop flyer

Public engagement

SOUTH POND

- Formal River Access Point

- Proposed Bridge Crossing

- Informal River Access Point

- Proposed Western Trail Connection - Existing Fraser River Trail

- Existing Bridge Crossing

- Proposed External Trail Connection - Proposed Split Rail Fence

29

- Existing Trailheads


OVERALL CORRIDOR RENDERINGS LEGEND Cozens Ranch Open Space Ponds and River Existing Trails

A

US Hwy 40

B

Collector Roads Boardwalk

C

Western Regional Trail Hiking/Biking Trail

Section Lines

SECTION A

10'

450'

Western Regional

Riparian Corridor

Trail

SECTION B

20'

500'

Boardwalk Trail

Riparian Corridor

and Wildlife Overlook

SECTION C

100'

15'

35'

Vegetative

Existing

Existing Maintenance Road

Screen and

Maintenance

and Wildlife Overlook

Drainage

Road

30


Outdoor picnic area

30'

10'

River

Fraser River

Channel Width

Trail

30'

10'

River

Fraser River Channel Width Trail

260' Riparian Corridor

40'

160'

10'

150'

River Access

Riparian

Fraser

Linear Section of

Point

Corridor

River Trail

Channel

31


LIONS PONDS AREA ALTERNATIVES ALTERNATIVE A: YEAR ROUND ACTIVATION Lions Ponds Alternative A transforms the Lions Ponds area into a highly programmed park space through a diverse range of uniquely Fraser experiences and elements. Balanced by the surrounding natural environment of Cozens Ranch Open Space, and to better serve the desires of the community and visitors to Fraser, this alternative aims to maximize recreational activity and event opportunities in the disturbed area around the Lions Ponds.

ALTERNATIVE B: EDUCATION AND EXPLORATION Lions Ponds Alternative B balances increased recreational opportunities with natural restoration and environmental education around the Lions Ponds. Pockets of recreation are focused in the center of the site, while a series of outdoor rooms and trail networks create exploratory experiences that blend education and exploration with the natural environment at the edges of the Lions Ponds area.

ALTERNATIVE C: LEAVE IT NATURAL Lions Ponds Alternative C restores the previously disturbed Lions Ponds area to a healthy upland ecosystem, while incorporating minimal recreational features. This alternative approaches the Lions Ponds area as a continuation of the natural ecosystem and aims to increase interaction with natural systems through passive elements such as trails, small gathering spaces and small natural play areas dispersed throughout the site.

32


LIONS PONDS AREA PREFERRED ALTERNATIVE

3 13 14 12

10

9

11

6 8 7

15

5

17 4

16

3

19 18

3 3 20

2

21 1

1

GATEWAY AT US HIGHWAY 40

12

DISPERSED PICNIC AREA

2

FRONTAGE ROAD IMPROVEMENTS

13

NATURAL PLAYGROUND AT OUTFALL #2

3

PARKING

14

ADA ACCESSIBLE RIVERSIDE DOCK

4

RIVERSIDE PARK TRAILHEAD

15

SLOPED AMPHITHEATER

5

LIONS PONDS TRAILS

16

POND-SIDE FIRE PIT

6

TREE CANOPY

17

CROSSROADS STATION

7

FISHING ACCESS AT OUTFALL #1

18

FISHING POINT

8

MEMORIAL AREA

19

BIKE PLAYGROUND

9

CENTRAL PLAZA

20

NATURAL EXPLORATION COURSE

10

POND ACCESS

21

CONSTRUCTED WETLANDS

11

RIVER FRONT

33


1

2

3

1. Lumion rendering of site overview 2. Lumion rendering of ADA trails 3. Lumion rendering of plaza

34


1

2

3

1. Lumion rendering of river access 2. Lumion rendering of natural play 3. Lumion rendering of outdoor education

35


Big Thompson River Corridor Master Plan ROLE: PROJECT MANAGER AND LEAD DESIGNER EMPLOYMENT: THK ASSOCIATES PROJECT WEBSITE: WWW.ABETTERBIGT.COM

WHERE

Loveland, CO

Spread 1 of 3

GENERAL PROJECT INFORMATION

DETAILED PROJECT DESCRIPTION

Client: City of Loveland Public Works

The Big Thompson Master Plan encompasses a 9-mile section of the Big Thompson River

Team: WWE (Prime)

through the City of Loveland. This stretch of riverfront is an amazing resource for the citizens of Loveland, with broad undeveloped floodplains, trails, parks and open space. The 2013 flood

THK Associates, Inc. - LA

caused damages along the corridor from undersized crossings, out of bank flows and erosion,

Matrix Design Group

2012

2013

2014

2015

among other factors.

2016

2017

THK assisted the City of Loveland and Wright Water Engineers to develop a long-term vision for the Big Thompson River Corridor and to develop plans for enhancements that can be implemented in a phased manner in the coming decades. A major objective of this effort

PROJECT RESPONSIBILITIES

was to increase the benefits that the river and corridor to provide the citizens of Loveland

Public Outreach

habitat for aquatic and terrestrial wildlife, all while improving the level of flood protection and

Branding

resiliency.

Field Work and Data Compilation

GIS Mapping

Graphic Preparation

Project Management

Technical Writing

by providing additional open space and recreational opportunities and enhancing natural

Through this planning and engineering effort, the Big Thompson River Corridor will transform into a landmark for the City, a recreational destination, a haven for wildlife in the midst of an urban environment and a more resilient river corridor. Most importantly, the River Corridor Master Plan will build on recent flood recovery efforts to identify potential projects that will reduce the flood hazards along the Big Thompson River, and provide additional protection of the health, safety, and welfare of the community. This Corridor will include a network of interconnected greenways, parks, open space and natural areas that provide the public with opportunities for recreation and interaction with the river and nature.

1

1. Lumion rendering of constructed wetlands and wildlife overlook

36


Presentation boards were prepared for each public meeting. The presentation boards were used to update the public on project progress and facilitate input. All input received was compiled, analyzed and graphically formatted for incorporation into the Master Plan document.

Project Schedule

Welcome!

What is important to you on the Big Thompson River Corridor?

Note: Dates shown are Mondays. Dates highlighted in blue are exact dates for festivals.

Mapping

5.1

5.8

5.15 5.22 5.29

6.3

6.5

6.12 6.19 6.26

7.3

7.4

7.8

7.10

7.13 7.15

7.17 7.24 7.29 7.31

8.6

8.14 8.20 8.21 8.26 8.28 9.4

9.9

9.11

9.18 9.23 10.2 10.16 10.30

11.6

11.20

12.4

12.18

Data Collection & Configuration

Thank you for being a part of the City of Loveland’s Big Thompson River Corridor Master Plan. Today, we would like to learn what is important to you about the Big Thompson and learn what you already know about the River. Please feel free to ask questions throughout the day and provide your input on the project.

Public Outreach National Trails Day Launch Website

City of Loveland City Project Manager

Project Purpose

2 Day Workshop with Evening Hours

Chris Carlson, P.E., CFM

July 4th Celebration

WWE Principal-in-Charge nt me age Man Project

Jonathan Jones, P.E., D.WRE

The Big Thompson River Corridor is an amazing resource for the citizens of Loveland, with broad undeveloped floodplains, trails, parks and open space. The Big Thompson River Corridor Master Plan will build on this resource to increase resiliency and enhance ecological, recreational and public benefits and functions of the Big Thompson River Corridor through the City. The Big Thompson River Corridor Master Plan team will be led by Chris Carlson, P.E. of the Public Works Department along with the selected consultants, Wright Water Engineers, Inc., THK Associates, Inc. and Matrix Design Group.

Cherry Pie Festival

WWE Project Manager and Lead Engineer

Foote Lagoon Summer Concert

Andrew Earles, Ph.D., P.E., D.WRE

THK Lead Planner

On-Line Survey

Kevin Shanks, RLA, ASLA

Planner s

Kim Elorriaga, RLA, ASLA

Farmer’s Market

WWE Project Engineer

ers an d

Engi ne Pro je c t

The overall vision for the Big Thompson River corridor through Loveland is a fully “Connected Corridor” that includes a network of interconnected greenways, parks, open space and natural areas that provides the public with opportunities for recreation and interaction with the River and nature, while at the same time, providing a healthy river and riparian ecosystem for aquatic and terrestrial wildlife and reducing flood hazards.

Loveland Downtown Celebration

THK Project Planner

Corn Roast Festival

Shannon Tillack, P.E., CFM

Matrix Design Group River Restoration & Civil Engineer

High Water Mark Sign Unveiling

Scott Schreiber, P.E.

Matrix Design Group GIS & Mapping Specialist Jeff Clonts, GISP

Planning & Engineering

IRIS Mitigation Wildlife & Wetland Biologist

Preliminary Analysis

Blair Leisure

Te ch n ic

al

Ex

pe

rts

The plan will include planning, land use, recreational and corridor management recommendations as well as a list of prioritized projects that best meet the vision and goals for the corridor.

WWE (adjunct) Stream Corridor Management & Master Planning Efficiency Expert

Engineering

Ben Urbonas, P.E., D.WRE

Land Planning

WWE (adjunct) Institutional Management, Stormwater Utility & Financing Expert L. Scott Tucker, P.E.

Master Plan & Implementation

Blue Mountain Consultants Geomorphologist & Aquatic Biologist Jim Nankervis

Draft Master Plan Due City Council Presentation Master Plan Compilation Final Master Plan Due

Agency Stakeholder Members

Delineates project milestones

• • • • • • • •

Pedestrian bridge over the Big Thompson River.

Pedestrian trail alongside the Big Thompson River and gravel ponds near River’s Edge Natural Area.

Pedestrian trail through open upland area next to the Big Thompson River.

Special Stakeholder Groups

Big Thompson Watershed Coalition Big Thompson Watershed Forum Colorado Water Conservation Board Northern Colorado Water Conservancy District U. S. Army Corps of Engineers Colorado Parks and Wildlife Colorado Department of Transportation Larimer County

• Ditch Companies - Greeley / Loveland Irrigation Co. (Big Barnes Ditch, Chubbuck Ditch, Boyd Lake Outlet Exchange) - Home Supply Ditch (Mariano Exchange) - Big Thompson Ditch & Manufacturing Co. - South Side Ditch (Ryan Gulch Exchange) - Rist & Goss Ditch - Reorganized Farmers Ditch. Co.

• Jan Lanting, Elementary Science Coordinator, 5th Grade program • Trout Unlimited

Big Thompson River adjacent to Centennial Park.

Big Thompson River Corridor Master Plan

Big Thompson River Corridor Master Plan

What happened during the 2013 floods?

What Could the Big Thompson Be? What would you like to see?

7$)7 $9(

(,6(1+2:(5 %/9'

'ZD\QH :HEVWHU 3DUN

:,/621 $9(

*$5),(/' $9(

)

1DPDTXD 1DWXUDO $UHD 1DPDTXD 3DUN

0DULDQD %XWWH

Bridge cell filled with sediment at Taft Ave. Healthy riparian vegetation establishment

&RWWRQZRRG 5XQ 1DWXUDO $UHD

6XQQ\VLGH 3DUN

/RYHODQG 6SRUWV 3DUN

7+ 67

:HVWVLGH 3DUN

'

5

Increased meanders - more river bends for slower water and more habitat

0$',621 $9(

-U $FKLHYHPHQW 3DUN

&/(9(/$1' $9(

1DPDTXD :HVW

%2<' /$.( $9(

$ $9

)

6RXWK 6KRUH 3DUNZD\

/RFK 0RXQW 3DUN

1$0 $48

2[ERZ 1DWXUDO $UHD

:DUG 7UXVW

'(19(5 $9(

(

8SVWUHDP 6WXG\ (QG

0RUH\ :LOGOLIH 5HVHUYH

Big fish! More habitat

/,1&2/1 $9(

What we have seen...

In September of 2013, heavy rainfall caused the Big Thompson River to swell through the City of Loveland. This event damaged property, destroyed infrastructure and caused large amounts of habitat and ecosystem destruction along the Big Thompson River Corridor. Undersized crossings, out of bank flows and erosion, along with many other factors, contributed to the negative impacts of the floods and will be evaluated as part of this project.

Aquatic Restoration Options

Existing Aquatic Conditions

&2

59

86

&LYLF &HQWHU 3DUN

&HQWHQQLDO 3DUN

)

67 67

5HFUHDWLRQ 7UDLO 1DWXUDO $UHD

&2817< 52$' (

&HQWHQQLDO 1DWXUDO $UHD 2VERUQ 3DUN

-D\KDZNHU 3RQGV 3IHLII

7H[W

5LYHU V (GJH 1DWXUDO $UHD

Grade control structures with natural materials

Connected floodplain

) )DLUJURXQGV 3DUN

5LYHU¶V (GJH 1DWXUDO $UHD

Channelized section at Fairgrounds Park

) 2OG 6W /RXLV 1DWXUDO $UHD

%RHGHFNHU :HVW 1DWXUDO $UHD

/RFK /RQ 3DUN .LQJV &URVVLQJ 1DWXUDO $UHD

Irrigation Diversion Options

Existing Irrigation Diversions

'RZQVWUHDP 6WXG\ (QG

:DWHUIRUG 3ODFH &(

+,*+:$<

7+ 67

Safe boating passage at irrigation diversion

>ŽǀĞůĂŶĚ͕ ŽůŽƌĂĚŽ

<HDU)ORRG3ODLQ

ϮϬϭϯ &ůŽŽĚ džƚĞŶƚƐ DĂƉ

Ϭ

&RXQW\ 3DUNV DQG 2SHQ 6SDFH

Diversion east of Wilson Ave.

ŝŐ dŚŽŵƉƐŽŶ ZŝǀĞƌ ŽƌƌŝĚŽƌ DĂƐƚĞƌ WůĂŶ

<HDU)ORRG3ODLQ

&2817< 52$' (

&LW\ 3DUNV DQG 2SHQ 6SDFH

:

ϰϬϬ

ϴϬϬ

DĂLJ ϮϯƌĚ͕ ϮϬϭϳ

&2817< 52$' & 2817 7< 5

&DQDO

&2817< 52$'

)ORRGZD\

%LJ 7KRPSVRQ 5LYHU

817< 52$'

6KHUUL 0DU 3DUN

&LW\ %RXQGDU\ )ORRG ([WHQWV

ϭ͕ϲϬϬ &ĞĞƚ

2817< 5 $' &2817< 5 &

:HVWHUQ 6HJPHQW

Vegetated irrigation ditches

&HQWHU 6HJPHQW

E\ +LOO 3DUN E \+

&2817< 52$'

/D]\ - %DU 6 &(

Existing irrigation channel east of Rossum Dr.

Stone access at irrigation diversion

Safe boating passage at irrigation diversion

Fish passage on irrigation diversions

&2817< 52$' (

&2817< 52$'

/HJHQG

&2817< 52$' &

What would you like to see?

/,1&2/1 $9(

What we have seen...

&2817< 52$' &

Natural grade control and fish habitat

%2,6( $9(

Healthy shaded vegetated river

(DVWHUQ 6HJPHQW

5 $' 17< 5 17<

5\DQ *XOFK

Posted warning signs and buoys

What are your ideas?

) Rossum Drive

Big Thompson River Corridor Master Plan

) Namaqua Road

) 1st Street

) Fairgrounds Park

) Hwy 287 - Lincoln Avenue

Big Thompson River Corridor Master Plan

An on-line public input survey was created to allow the City of Loveland residents and surrounding community members an opportunity to share their concerns and ideas for the Big Thompson River Corridor Master Plan. Overwhelmingly, the survey results showed that people prefer a natural aesthetic with passive recreation activities and features.

37


H&H AND RECREATIONAL MASTER PLAN MAPS Namaqua Skyline Natural Area

Hidden Valley

Meadowbrook Natural Area

+:<

+:<

1DPDT

Oxbow Natural Area

Morey Wildlife Reserve

Ward 7UXVW

Namaqua Natural Area

Namaqua West Natural Area

U

'

1 7DIW $YH

XD 5G

1 :LOVRQ $YH

XP

V RV

Namaqua Park

5

Mariana Butte

1DPDTXD 5G

Cottonwood Run Natural Area

City of Loveland Recycling Center Loveland Water and Power

Centennial Park

River’s Edge Natural Area

Centenn Natural A

6 7DIW $YH

6 :LOVRQ $YH

Jayhawker Ponds

River’s Edge Natural Area

WK 6W

Namaqua Skyline Natural Area

Hidden Valley

HWY. 34

Ward Trust 2

Namaqua Natural Area

Namaqua West Natural Area

. Dr

Namaqua Park Mariana Butte

Cottonwood Run Natural Area

Namaqua Rd.

City of Loveland Recycling Center Loveland Water and Power

Centennial Park

Jayhawker Ponds

River’s Edge Natural Area

S. Taft Ave.

S. Wilson Ave.

um ss Ro

N. Taft Ave.

Oxbow Natural Area

Morey Wildlife Reserve

N. Wilson Ave.

34

Namaq ua Rd .

HWY.

Meadowbrook Natural Area

River’s Edge Natural Area

14th St.

38

Centenn Natural A


+:<

+:<

Underpass Big Thompson River High Flow Path Floodplain Areas

WK 6W

1 5DLOURDG $YH

Roadway Work Major Roadways Dam Replacement Bank Stabilization Riparian Buffer 2YHUÀRZ 3URWHFWLRQ 2YHUÀRZ 3URWHFWLRQ Constructed Wetland Lower and Regrade

WK 6W

City Boundary Sid Sidewalks d lk Railroads <HDU )ORRGSODLQ

Downtown Loveland

<HDU )ORRGSODLQ Floodway Storm Gravity Main Pressurized Main Water Main State of Colorado City of Loveland Larimer County Conservation Easement

WK 6W

VW 6W

Barnes Park Fairgrounds Park

Willow Bend Park and Natural Area

Simpson Ponds

Loveland Wastewater

6 /LQFROQ $YH

6 5RRVHYHOW $YH

6 &5 (

6 6W /RXLV $YH

6 %RLVH $YH

VW 6W

ial Area

King’s Crossing Natural Area Waterford Place CE WK 6W

0

200

400 Feet

°

HWY. 34

HWY. 34

Natural River Access

Main River Access

N. Railroad Ave.

8th St.

Trail Head Wildlife Overlook Fishing Access

The Foundry 7th St. Multi-family Dev. Downtown Loveland

Gateway 4th St.

Underpass Trail Bridge

Fairgrounds Park

S. Boise Ave.

Willow Bend Park and Natural Area

S. CR 9E

S. St. Louis Ave.

Barnes Park

Major Roadways Recreational R ti lT Trail i Trail Alt. A Trail Alt. B Ex. Soft Trails Prop. S P Soft f T Trails i Bike Bik k Lanes L Bike Routes River Vegetative Screen Lower and Regrade Wetlands

1st St.

1st St.

nial Area

Ex. Trail Heads

Simpson Ponds

Loveland Wastewater

Ex. Diversions

S. Lincoln Ave.

S. Roosevelt Ave.

Ex. Restrooms City Boundary Sid Sidewalks d lk Railroads Floodway y Development p Areas 287Planning g Areas State of Colorado City of Loveland Larimer County Conservation Easement

King’s Crossing Natural Area Waterford Place CE 14th St.

14th St.

0

39

200

400 Feet

°


A series of illustrative maps were created of each reach to illustrate the complex engineering and planning needed to achieve the project goals. Recommendations were identified, budgeted and graphically formatted to make it as easy as possible for City staff to understand and prioritize the proposed recommendations.

2013 overflow path

Overflow in major floods

Proposed Underpass

- Provide portage around diversion dam and public river access area downstream of dam -See parks and recreation maps for additional information on river access area

Centennial Park

Centennial Natural Area Jayhawker Ponds

Reach 34

Reach 33

Reach 33

Reach 32

1 Legend:

Major Roadway Connections Big Thompson River High Flow Path Existing Diversion Dam City of Loveland City Boundary Sidewalks Railroads Floodway 100-year Floodplain Ownership - City of LLoveland oveland ovel and Armored Overflow Protection

River’s Edge Natural Area

S. Taft Ave.

Constructed Wetland Overflow Channel Proposed Elevation of Roadway Bank Stabilization Sanitary Gravity Main Sanitary Pressurized Main

ve dA

Water Pressurized Main

ilr

oa

Stormwater Outfall

Ra

Lower embankments between ponds and provide armored spillway for overflows

.

Lower embankments between ponds and provide armored spillway for overflows Open channel from gravel pit spillway to improved bridge at Railroad Ave. Gravel Pits

400’

0’

Jayhawker and River’s Edge Pond Armoring (gravel pit embankment lowering and armoring in this reach)

800’ Feet

$2,450,000

Mid

$37,000

Near

Utilities 16-Inch Waterline Protection Maintenance Routine Annual Maintenance and Debris Removal (Public and Private)

$24,000

Near

2

h 33 H & H M

Reach 33

ES 9 R

Reach 33

Reach 32

Fi

Reach 34

Reach 33:

Taft Avenue to Railroad Avenue Near-, Mid- and Long-term Prioritization

See UDFCD Urban Storm Drainage Criteria Manual or USACE guidance for riprap sizing, use soil riprap in higher visibility area to soften appearance and provide vegetation

Legend:

Main River Access Point

Natural Play Area Realign trail to create river access and play area

g

istin Ex

TH

Existing Trail Head

xistin

g

E

Centennial Park

Existing Restroom

D

g

istin Ex

Existing Diversion

Railroad Ave.

Natural Play Area

River’s Edge Natural Area

City of Loveland City Boundary Sidewalk Side Sidewalks walkss walk Railroads Floodwayy 100-year Floodplain Potential Future Development Area

Reach 33:

Main river access point with sign on upstream side of the Farmer’s Ditch Diversion Dam and portage around to downstream river access point

S. Taft Ave.

Taft Avenue to Railroad Avenue Near-, Mid- and Long-term Prioritization

Vegetative Screening Jayhawker Ponds

Main river access point downstream of the Farmer’s Ditch Diversion Dam Vegetative screening in front of private fence

Big Thompson River Major Roadway Connections Existing Loveland Recreational Trail Proposed p Recreational Trail Existing Soft Surface Trail Proposed p Soft Surface Trail Ownership - City of Loveland 0’

400’

800’ Feet

Parks & Recreation Centennial Park River Access

$53,000

Mid

Farmers Ditch Diversion Take-Out and Put-In

$80,000

Near

Vegetative Screening

$18,000

Near

Realigned Recreational Trail

$105,000

Near

Trails

1. Reach 33 H & H Map 2. Reach 33 Recreational Map

40


Boise Avenue Site Plan View Lower Grade in this Area to Grade of Existing Cottonwoods Provide 1/2 Percent Pitch Toward River Small Pedestrian Bridge Crossing over Wetland Area Picnic Pavilion

Section A

Big Thompson River

Bigg

Th om pso n

Rivv er

TH Section B

Legend

TH

Proposed Trail Head Heron Rookery

River Access Point

Restroom Facility 10’ +/- Mound ound with Wildlife Overlook

Pedestrian Bridge to Recreational Trail Recreational Trail

Existing Access Road

Parking for 6 Cars +/- (Typ.)

Proposed Wildlife Overlook

IMPROVEMENTS TO THE BIG THOMPSON RIVER CORRIDOR:

Note: Final configuration, including location of parking and structures may be adjusted in subsequent planning and design.

Figure 5-18-A. Boise Avenue Site

Scale: NTS

BOISE AVENUE SITE: December 2017

157

The Master Plan, also recommends redeveloping a historic farm at Boise Avenue to improve floodplain

Crusher Fines Trail C Undulate Ground Plane U tto Allow for Wet Areas reas Existing Grade E

Native Grasses N aand Seat Boulders rs

110’ +/- Mound with Wildlife Overlook W

conveyance and river access. The new improvements will include additional

Big Thompson River

parking, habitat

Existing Cottonwoods to Remain E

enhancements, river Figure 5-18-B. Section A: Boise Avenue Site- North to South Section

Scale: NTS

access points, natural trails and a series of wildlife overlooks to view the existing heron

10’ +/-

rookery on-site.

20’ 10’ +/- Mound with Wildlife Overlook

Pedestrian Bridge P

P Parking

Native Grasses and Seat Boulders Scale: NTS

RIVER ACCESS:

20’

New Cottonwoods

Existing Cottonwoods to Remain

Decades of encroachment have made access to the Big Thompson River

Figure 5-18-C. Section B: Boise Avenue Site- East to West Section

difficult. It is as if the City has turned their back on the river. By formalizing 158 Chapter 5

river access points, this Master Plan opens up this resource for the community once again and encourages people to safely interact with their river.

41


Big Dry Creek Recreation and Floodplain Restoration Master Plan ROLE: RIGHT HAND MAN EMPLOYMENT: THK ASSOCIATES

WHERE

Thornton, CO

Spread 1 of 3

GENERAL PROJECT INFORMATION

DETAILED PROJECT DESCRIPTION

Client: City of Loveland Public Works

The City of Thornton contracted THK to develop a master plan for 6 miles of the Big Dry

Team: THK Associates, Inc. (Prime)

Creek corridor. While the City of Thornton had already developed open spaces along other main waterways, Big Dry Creek was the last remaining underutilized open space needed to

Wright Water Engineers

create an interconnected system of open space corridors in Thornton.

Matrix Design Group

The Big Dry Creek corridor encompasses almost 300 acres of open space areas and provides 2012

2013

2014

2015

2016

2017

outstanding opportunities for passive recreation and wildlife habitat. This land has been strategically acquired by the City of Thornton and Adams County over decades. The ability to understand and overlay the existing ownership, ecology, hydrology, and recreation was

PROJECT RESPONSIBILITIES

essential for created a well rounded corridor master plan.

Public Outreach

The master plan assessed publicly-owned parcels from hydraulic, geomorphic, environmental,

Branding

social and recreational perspective and created a basic framework for publicly owned parcels

Field Work and Data Compilation

to be connected to each other and surrounding context. The key to creating a successful

GIS Mapping

Graphic Preparation

Technical Writing

framework in the master plan was to understand that natural riparian corridors are complex systems that cannot be controlled through hard engineering. As such, the master plan identified a series of natural ‘toolbox’ strategies to repair degraded areas and protect key infrastructure while allowing the creek to move within a defined floodplain area. During the master planning process, I was responsible for providing technical guidance on restoration and recreation strategies, developing plans and toolbox graphics as well as writing sections of the master plan document.

1. Drone aerial of existing big dry creek condition

42


160TH AVENUE

VLcinity Map

113

Washington Street

114

The following three maps were created using GIS and

YORK STREET

were was used to create a baseline understanding of the existing environmental constraints of the site. This information was overlaid on the existing infrastructure to determine new restoration and recreational opportunities.

92 77 75

72 69 66

152ND AVENUE

65

111 107 108 106 109 103 95 104 102 101 93 99 100 94 96 98 88 91 90 87 84 78 86 82 85 74

TRAILSIDE SUBDIVISION

Adobe Suite. The environmental and hydrologic maps

73 71 0 70 67

68

152ND AVENUE

63

60 61 59

62 55 54

E-470

58

57

56

53

52 48

50

WASHINGTON STREET

49

51

47 46 40 45 41

43 44

38 39 33 32 30 27 26 24 23 20 17 18

28 25

22

21

144TH AVE

19

1,000

2,000 Feet

ENVIRONMENTAL 43

Legend

500

Healthy Banks/Transition Zone

0

Invasive/Weeds, Needs Management

I

Riparian, Healthy

4

Upland, Prairie Dog Habitat

3

Upland/Grassland, Healthy

WADLEY FARMS SUBDIVISION

6 7

Upland/Grassland, Needs Improvement

9 8

Wetland Creation Opportunity

12

Environmental Areas

13

Wetlands, Healthy

11

2

29

31

14

10

5

QUAIL VALLEY SUBDIVISION

YORK ST.

16 15

36 37


160TH AVENUE YORK STREET

VLcinity Map

I-25

E-4 7

Map Area

VIII

0

VII E-47 0

VI E-470

M us

ta

ng

Ru n

V

152ND AVENUE

152ND AVENUE dl Wa ey

IV

No rt h

y dle Wa

WASHINGTON STREET

So h ut

III Sh a

Quail Valley Subdivision y

D

itc

h

II 144TH AVE

I

e

Er

ie

Tr ib ut

ar

YORK ST.

La k

y

Wadle y

South

Legend HighPriority_Bank_Reach

Wadley Farms Subdivision

BDC Tributaries Big Dry Creek Study Properties

McKay Lake Drainageway

Big Dry Creek Channel

I

0

500

1,000

2,000 Feet

HYDROLOGY AND BANK EROSION 44

100 Year Floodplain


160TH AVENUE YORK STREET

6XQVHW 9LVWD (VWDWHV 8QLQFRUSRUDWHG $GDPV &RXQW\

TRAILSIDE SUBDIVISION

7+

E-47 0

E-470 TRAIL

E-470

,YH\ :HOO 3DG 6LWH

3LORW 3URMHFW $UHD

)XWXUH 'HYHORSPHQW

152ND AVENUE

152ND AVENUE

7+

)DLU¿ HOG 6XEGLYLVLRQ

&RQQHFWLRQ WR )XWXUH 'HYHORSPHQW

QUAIL VALLEY SUBDIVISION

I-25

WASHINGTON STREET

&RQQHFWLRQ WR )XWXUH 'HYHORSPHQW

E-4 7

Map Area

0

144TH AVE 7+

YORK ST.

)DV7UDFN 6WDWLRQ

/HJHQG %LJ 'U\ &UHHN &KDQQHO 'LWFKHV $UHDV RI +LJK %DQN (URVLRQ

)XWXUH 'HYHORSPHQW

7UDLO 2YHUORRNV 9LHZ 3RLQWV DQG 6LJQDJH

3RWHQWLDO &UHHN &URVVLQJ

WADLEY FARMS SUBDIVISION

3RWHQWLDO 5RDG &URVVLQJ

(QYLURQPHQWDO /HJHQG

I

$OO WUDLO DOLJQPHQWV DUH FRQFHSWXDO LQ QDWXUH ([DFW WUDLO DOLJQPHQWV VKDOO EH GHWHUPLQHG DW D ODWHU GDWH

([LVWLQJ 5HJLRQDO 3DYHG 7UDLO

:HWODQG DQG 5LSDULDQ +DELWDW

)XWXUH 5HJLRQDO 3DYHG 7UDLO

/DUJH 3UDLULH 'RJ 3RSXODWLRQV

)XWXUH %'& +HULWDJH /RRS 7UDLO &RQQHFWLRQ

E 141ST AVE

RECREATIONAL 45

3RWHQWLDO 7UDLOKHDG /RFDWLRQ

+HDOWK\ 8SODQG +DELWDW

$UHDV WKDW 1HHG ,PSURYHPHQW *invasive weeds, sparse vegetation, etc.* 0LOHV

7+

)XWXUH 6RIW 6XUIDFH 7UDLOV


One of the most important aspects of the Big Dry Creek Master Plan was translating complex engineering concepts into understandable graphic diagrams for the City’s ‘toolbox’ of restoration strategies. These graphics easily communicate specific restoration treatments to occur along the corridor and provide the City with a repository of details and cost estimates to be used during future construction phases.

Willow or Cottonwood Stakes: Roots Should Extend to Dry Season Water Level

Stabilizing Boulders Footer Log Baseflow Water Surface

Root wad: -Partially Embed into Channel Bottom -Orient Upstream -Partially Submerge

Log Buried in Bank: 8’-12’ Length, 16” Min. Diameter

Riffle Crest Material Large Boulders Smaller Ramp Rocks

Scour Pool Flow Direction

Existing Grade

Bankfull Water Surface (3.5’±) Proposed Grade

2% 2%

1V 4H 2%

Approximately 98’; varies by location and context

2% 1’±

Floodplain Terrace (15’±)

Bankfull Terrace (15’±)

Baseflow Channel (16’±)

Bankfull Terrace (15’±)

Approximately 140’; varies by location and context

46

Floodplain Terrace (15’±)

4:1 MAX


As part of the Master Plan, a Pilot Project was identified and a preliminary design was developed. Based on this design, the City received a grant for additional dditional design and construction funding to construct the Pilot Project in 2019. 30% construction documents were completed under my direction ction on

PILOT PROJECT PRELIMINARY PLAN

C

A

TH

D B

E. 152 nd Ave

A

C ISSUES

ISSUES

• •

• •

LATERAL MIGRATION EROSION

INVASIVE WEEDS LACK OF BIODIVERSITY

IMPROVEMENT STRATEGIES

IMPROVEMENT STRATEGIES

• • • •

• •

CHANNEL REALIGNMENT BANK STABILITY GRADE CONTROL REVEGETATION

B

WEED MANAGEMENT UPLAND RESTORATION

D ISSUES

ISSUES

• • •

LATERAL MIGRATION EROSION HABITAT DEGRADATION

HEAVILY POPULATED PRAIRIE DOG HABITAT WITH SHORT LOW GRASSES THROUGHOUT

IMPROVEMENT STRATEGIES

IMPROVEMENT STRATEGIES

• • • •

• • •

OFF CHANNEL WETLANDS BANK STABILIZATION GRADE CONTROL REVEGETATION 47

POPULATION MANAGEMENT RESTOR PRAIRIE GRASSES INCREASE BIODIVERSITY


LWOG Regional Stream Stewardship & Recovery Handbook ROLE: RIGHT HAND MAN EMPLOYMENT: THK ASSOCIATES PROJECT WEBSITE: WWW.LWOG.ORG/RESOURCES

WHERE

Lefthand Creek, South St. Vrain Creek, Big Thompson River and Little Thompson River, CO

Spread 1 of 1

GENERAL PROJECT INFORMATION

DETAILED PROJECT DESCRIPTION

Client: Lefthand Watershed Oversight Group

The idea for the Regional Stream Stewardship & Recovery Handbook grew out of the recovery efforts following the 2013 Colorado flood. Through these recovery efforts and projects, everyone involved learned valuable lessons about how streams and watersheds function during

Budget: -

and after a record-breaking flood event, as well as the role that good stream stewards can play

Team: THK Associates, Inc. (Prime)

in the watershed. The purpose of the Handbook is to create an educational resource for private landowners to better understand their streamside properties in the context of the larger

2012

2013

2014

2015

2016

watershed, what they can do to practice good stream stewardship and when/how they should

2017

engage outside help for stewardship or recovery projects.

PROJECT RESPONSIBILITIES

The team developed graphics, content and methods to teach and explain complicated subjects

Public Outreach

communities to a wide variety of people/groups. The project included a series of four public

Graphic Preparation

workshops, as well as an Expert Review Panel comprised of landscape architects, engineers,

Revegetation Design

geomorphologists, scientists, emergency management personnel, floodplain managers, forest

Bioengineering Design

Technical Writing

Construction Documentation

Specification Preparation

Project Management

Construction Observation and Administration

of hydraulic engineering, fluvial geomorphology, environmental sciences and vegetative

managers and wildlife specialists. All of these meetings gathered input and ‘field-tested’ elements of the Handbook. As part of the project, real sites within each of the four watersheds were selected and evaluated for stewardship and recovery opportunities. I provided technical guidance on restoration strategies and property owner relations.

Floyd Property (Little

Thompson River) Aquatic Species

In addition to non-entati channel species, riparian corri d heavy sedim aquaonticand dor are obviously hom corridors and othe Thompson River experience al flows. minim elsrwith bodie e to many aquatic spec s of water, aquatic spec y Wide Channel: The Little g multiple chann havinfeatu river lood ies as well. Unique Sedimentation and Overl post-f ies can thrive under a new the res in lish and tryinggytoare estab has resulted to stream the right conditions. just some of the facto the stream isbiolo andfish A widening during the 2013 flood. This Land use, water quali rs that influence a healt commtounity re-form into ablishing along the banks to re-est river is the can ty, stream ation allow help hy fish community. Reco veget ue you on, proteand/ contin ct and preserve it. Belo wner shouldspec ite the sedimentati lando gnizi Desp The r) ng what makes a healt tists area. ies e scien this habit w, in tal you at, as nmen will learn about what well as what to look Riv hy eers, enviro would expect to see n engin you of o what help is the s contr for which With . ibute on p el, and your species thatbanks s to a high quality aqua ull m chann property. You will also help it along Lefthbankf tic pe the live intothecreate learn about some ofObje e Thosingle channel, but they can also do some simple things to and, Big Thom of sedimentation, re-sha the cmore areas. pson, Little Thompson and a single tives common aquatic y (Littl to remove select areas St. Vrain watersheds. vegetation quickly in these ropert HighlishQua sod to estab s, they can create a plan P nd ructor wetla lity d and const Aqu seed river y n or atic Habitat stakes, riparia Flo can also use willow Feet [page 104], HighRemo floodplain terraces. TheyScale qualityval' aqua 150 nt tic habitat is comprised [page 106], 'Sediment ent geme of a number of facto 75 atural Channel Design' much more101] ent than just fish. Aquatic rs. An impo em 0 : 'Terraced/N Strategies gitem 'Riparian Plantings' [page na 119], habitats also support em rtant [page ings' Maconsider is that aquatic habitat refer begin their life cycle ana feto insects and 'Willow Stake Plant nagnon-t aqua M s a in li s to 17 the t wate tic R r. The primary factors C ildanimals as well.enIn lan dM fact, many insect spec of high A le Whabitbitatatare: agem ies tlan qualietyP aquabtic We nvasiv esira Ha k Man e y in I e d ting it f resul g n are x li a d U oc Multiple wide channels ple ass bitat Wil est om ent deposits t a G Liv hP C a H l it is s shallow flows and sedim e b F h e Ha Fis lac ann ess Ch nsect ple P Acc I o Pe eam F Str Page

REGIONAL STREAM

N

STEWAR STEWARDS S ST W S SHIP & REC RECOVERY

HANDBOOK Connectivity

page

The landowner’s guide to itat While non-aquatic organisms A key to aquatic habit rely on a netw Colorado’s ork of patches waterways. at quality

E

Complex living along ity of Hab

is the complexity and corridors of the stream for habitat, itself. Higher quali aquatic habitat ty stream connectivity habitats will have is more straight-f a variety of orward. Fish bank edge cond and insects need itions, bed to be able to C material and in-str move upstream and existing and eam features down flood strea g the 2013 m in river sited by the orderdurin Much of like boulders, riffles and pool to thrive. If there y mate : Woody material was depo s. arerial. ing in additional dead wood Dead Wood in Floodplain provide valuableThis variety will provide areas to sedimentation, result barriers to this still move due can died ment rial since mate , y the have wood This B cottonwood trees for fish and insects orga the landowner. nisms will be conf to the to feed, hide ineda hazar removed or relocated by to a d location that poses a in not is rial this material was already B from limite mate pred d area for breeding ators and breed. r to the soils. This , feeding e, as well as organic matte and shelter. As a resu Dhabitat for wildlif lt, this will also limit downstream bridge. 117] lation. their popu )' [page life Tree/Snag (Dead Wood

Strategies: 'Wild

C

Cover/Shelter

nnel

A

Dead

B

Wood

et

nd

ize Po

Stabil

C

Newly

D

in

odpla

in Flo

utl Inlet/O

at de valuable wildlife habit Dead wood can provi for plant growth and organic material

nd

ed Po

Form

A

ffer

an Bu

Ripari

E

arian

te Rip

Vegeta

F

h

Benc

Regional Stream Stewa

168 nt geme

ana eed M

ive W

G

Invas

nal Regio

S

Ste tream

wards

hip &

Recov

ery H

andboo

k

rdship & Recovery Handb

ook

Strate

gies

Bank

81

Beave

82

Stabili r Dam

zation An

t anage Log R ment ollers LUNK ERS B o xe O s verflo page Water Quantity w Cha 99 nnel M People page anage For many aquatic orga Place 101 ment nisms such as fish, s Alon the stream water is Ripari area that can be heav pa g You their ge a entire habitat. It is n Plan ily impacted by the r Stre a confined103 surrounding activities. tin organisms can be am gs Root W Because of this, fish very vulnerable to page a detri 10 and d ment other aqua fertilizers, oils or pesti 4 tic s al activities next to cides can quickly kill or along streams. Pollu Sedim off large fish population ge 10as tantspasuch ent Re cause low flows down 5 s. Similarly, a blockage stream. While seas mova Stream onal fluctuations are in a strea l pam the water temperatu gecan normal, an irregular/ 10 / Chan re to rise and algae drastic low flow can 6 nel Re to grow very quick amount of oxygen page cause Terrace ly. This can then caus -Align in the water. All of d/Natu 107 e a dramatic reduction ment these changes impa ra in the U l ct the aquatic habit Chann ndesira page at and can cause large 109 el Desi ble W fish die-offs. ildlife gn Uplan page Mana d Plan 111 FALL 2017 g e tin m ent gs Vegeta page ted So 113 il L W ift etland page 115 Creatio Chapter 2: Evaluating n/Exp Wildlif page Your Prop ansion e Hab 117 erty itat M Wildlif63 a n page agem e Tree 119 ent /Snag Willow (Dead Stake Wood Plantin ) Chap gs ter 3: page

Water Quality and

e Cha

y Wid

Overl

page

79

alogu Bould pa Cover in aquatic habit es er Clu at can takege 83 sters Coir L multiple forms. Willo page ogs w w plant 85 s ith growing along the Tubelin Const page streamban ructed gs ks 86 can often provide cove Riffle Cross r for fish pageto ing/Cu 87 hide from predators lvert E . The willows Cross nhance page also shade the ing & ments water, whic88 Culve Drop rt Main cools the temperatu page 89h Struct tenan re during ures ce hot summer days. Fish P ge 90y Deadpawood assag e material also prov Flood ides pa valua ge 91ble p la in cover and shelter Struct forpawildlife. Geote ure R ge 92 xtiles emova Boulders and deep l pools in the Incr easing river can also prov page 93 ide cover/ F lo o d Invasi plain C shelter for fish. Insecpage ve We o 95 use ts will nveya ed Ma n rocks of many sizes pa ce L iv nagem estock as ge shelt 96 er. en M page

C

page

Stew

ardsh

ip an

d Rec

overy

97

98

Strat

egies

77

166

48


LANDOWNER ASSESSMENT QUESTIONNAIRE:

YES Are the threatened structures abandoned?

Text next to check-boxes are goals. If your answers lead you to these, check the box and proceed with the arrows.

Green arrows direct you if your answer to the question is YES Red arrows direct you if your answer to the question is NO Gray arrows direct you after you have selected a strategy

NO

Question about your property

YES

*

*

Answering this question NO gives you a category of strategies to address your issues.

X

Answering this question YES sends you to a follow-up question.

Follow-up question NO

YES Strategies to look at if you answered YES

Strategies to look at if you answered NO

*

After checking the check-box to indicate you should read that category of strategies, a Grey Arrow indicates you should proceed to the following question.

40

Question

Do you have ORbare areas or areas with minimal Bank Armoring Removal vegetation onPlace yourand property? Leave the Woody Leave in

NO

Watch for Changes Material in Place YES Are there areas of sediment that have settled on your property?

Would you like to increase vegetation in these areas? YES Is the woody material in the main stream channel? Sediment NO Removal YES

NO

Are these areas inNO the stream channel and/or on the streambanks (as opposed to above the banks)? Leave the Woody Material in Place Are there any stream culverts or crossings on your property? YES YES

NO YES Is the woody material blocking the flow of the entire channel? Bank Revegetation Crossing/Culvert Maintenance

NO

NO YES Upland Revegetation DONE WITH FLOOD RISK MANAGEMENT ASSESSMENT Remove/Relocate Woody Material Do your youobjective(s) have wetlands onabove, your property? To see which strategies will accomplish identified see the Contact a local watershed coordinator

'Stewardship and Recovery Strategy Chart' [page 76] or stream restoration professional

YES if you are concerned the material may pose an immediate risk and are considering removing/relocating it. Wetland Management Regional Stream Stewardship & Recovery Handbook

44

34

56

LANDOWNER HOW-TO SHEET: MATERIALS

Anchoring Woody Material

Do you have invasive plants on your property? Leave the (See 'Weed Identification andWoody Management' [page 48] for identification help) Material in Place YES DONE WITH LARGE WOODY MATERIAL ASSESSMENT

Invasive Plant Management

To see which strategies will accomplish your objective(s) identified above, see the 'Stewardship and Recovery Strategy Chart' [page 76] Do you have endangered plants on your property? (See 'Threatened, Endangered and Rare Plants' [page 55] for identification help)

Regional Stream Stewardship & Recovery Handbook

Regional Stream Stewardship & Recovery Handbook

Willow Stake Plantings

NO

DONE WITH LARGE WOODY MATERIAL ASSESSMENT

are questions about your property.

Bank Revegetation

DONE WITH FLOOD RISK MANAGEMENT ASSESSMENT

Color Boxes

YES Are streamflows directed towards structures, particularly during flood events? Remove/Relocate Woody YES Material

Protect the plants/avoid impacts to the plants and their surroundings

DONE WITH VEGETATION ASSESSMENT

To see which strategies will accomplish your objective(s) identified above, see the 'Stewardship and Recovery Strategy Chart' [page 76]

Regional Stream Stewardship & Recovery Handbook

• 3' Length Rebar

• Natural Marking Paint

• Twine

• Clean Soil Fill

TOOLS

Text in

Is the woody material blocking trails, damaging Floodplain property or leaning Increase on healthy trees?

NO

How to Use the Questionnaires

NO

NO

66]

NO

Aquatic Species [page 63]

NO

**If you think large woody material may pose an immediate threat, contact your YES NO local (County or City) Office of Emergency Management for assistance** Stream Re-Alignment

Vegetation Assessment

Vegetation [page 45]

Non-Aquatic Species [page 57]

Floodplain Structure/Debris Removal

Is there dead woody material (large branches, whole Is there space to re-align the stream channel? trees, etc.) on your property? YES

Desired Land & Stream Uses [page

NO

Large Woody Material Assessment

Flood Risk Management Assessment

YES

Flood Risk Management [page 38]

Large Woody Material [page 41]

Are structures on your property threatened by flood events?

YES

Questionnaire Categories Bank Stability [page 35]

NO

Is your property in or near a floodplain?

The Landowner Assessment Questionnaires on the following pages provide a guide to evaluating the existing conditions on your property in order to identify Stewardship and Recovery Objectives. In Chapter 3, you will determine specific Stewardship and Recovery Strategies to achieve these Objectives. Because streams and riparian corridors are complex systems with many moving parts, the Questionnaires are split into 7 distinct categories. Each category plays a role in the riparian corridor and it is important to complete all of the Questionnaires to make a comprehensive plan for your property. As you complete each Questionnaire, fill in your answers and additional notes on the 'Landowner Assessment Worksheet' [page 72].

• Sledge Hammer • Shovel • Shears / Lopers

Installing live willow stakes in streambanks is a simple, yet effective and sustainable solution to eroding bank areas. Lasting benefits include: • Stabilized banks with root growth - Can stand up to lower velocity flows • Increased habitat & food source for birds, insects & terrestrial animals • Increased fish habitats from cooler water temperatures with willow shade • Naturally framed streambank views with tactfully placed willow stands Step 1

• Restricted area access to the stream for people, wildlife or livestock

Determine area along bank needing stabilization in high velocity areas.

Harvesting Willow Stakes Willows grow naturally along waterways - you can often harvest willows right on your own property.

Dormant, no leaves (Fall-Spring)

Step 2

Determine Water Table depth by driving rebar into the ground.

Water Table

6” under water table is optimal for planting.

6 '' to bottom of hole

Water Table

Harvesting must be done when the willows are dormant - this means harvesting in the fall or spring when there are no leaves on them. When selecting a stand to harvest from, pick a healthy group of the type of willows that you want to use. Cut the willows at a diagonal angle near the base and never harvest more than 30% of any given willow stand.

119

After harvesting, the willows should be grouped into bundles & soaked prior to planting (see Step 4 image).

Trim away all but top few branches Step 3 Dormant buds left on stake

Willow Stake will be 3'-4'

Look for natural Willow Stands for harvest.

Harvest dormant Willow Stakes & bundle with twine to a manageable size.

Step 4

Diagonal cut at base

Soaking stakes stimulates root growth at the diagonal cut.

Never take more than 30% of population.

Soak cuttings prior to planting for 7-14 days. Submerge at least 50-80% of each stake.

Visit the following link for a more in-depth guide to willow & cottonwood harvesting: synergy3.org/includes/Willow_Cottonwood_Guide_2016.01.pdf

49


LUNKER Boxes

WHERE

ROLE: COMMITTEE CHAIR EMPLOYMENT: DENVER TROUT UNLIMITED

Denver, CO

Spread 1 of 1 Denver Trout Unlimited worked with the Urban Drainage and Flood Control District (UDFCD) to install LUNKER Boxes along the South Platte River in Denver. LUNKER Boxes have long been used to imitate overhanging river banks that would occur in nature. However, their application is usually used in restoration projects and rarely adapted for urban waterways where they are most needed. The structures that we designed were made out of recycled reinforced concrete pipe and created a structurally sound habitat feature that has provided safe cover for our urban fish population. To illustrate the concept to the engineers and UDFCD I created the following renderings of how the structures could work. Cameras and temperature monitors could be installed on the structures for continued monitoring. The structures were installed in the fall of 2018.

50


51


Fish Baffles

WHERE

ROLE: PROJECT MANAGER AND LEAD DESIGNER EMPLOYMENT: THK ASSOCIATES

Estes Park CO

Spread 1 of 1 One of the greatest issues our design team faced on the Fish Creek Public Infrastructure Project was how to facilitate fish passage through the concrete box culverts used to created the new roadway bridges. During the fall, winter and spring, creek flows became so low that they would spread out over the bottom of the box to a depth of less than 1 inch and fish could not move freely throughout the system. Ideally, natural bottom culverts and cast in place custom baffles would have been used to address this issue. However, these treatments were cost prohibitive and we were too far along in the design process for a change that dramatic. THK was charged with figuring out a way to retrofit the ‘existing’ concrete box culverts with something that would facilitate fish passage without changing other aspects of the design and remain cost effective. After much consideration, we determined we could mount concrete wheel stops to the bottom of the boxes to concentrate the flows and provide sufficient depth for fish passage. Many configurations were considered but after a physical model was built to observe the flows only two types configurations were installed. I worked extensively with Colorado Parks and Wildlife (CPW) throughout this process and they are continuing to monitor the success of the different configurations for use elsewhere in the State. So far, we have observed that both configurations are providing fish passage as planned but we have also observed some ‘happy accidents’. Schools of fingerlings are holding in eddies created by these structures and crawfish have been observed congregating in the calm waters near sediment deposits.

52


53


Advertising & Branding Examples In addition to using graphics to illustrate my design concepts, I also produce advertising and branding material for many of my projects and organizations I work with. The following are examples of some of the advertising and branding graphics that I have produced:

LOGOS

Turtle Island Ecology Center India

United States

Chile

PROPOSAL DOCUMENTS Graphics became especially important during the proposal phase of a project. Often times, I would be subs on the project but be asked to put together the final proposal in a graphic format that cleanly and uniquely communicated our proposed ideas. This approach proved that our team was not only willing to put in the time to format the document and develop graphics but also showed that our final product would be aesthetically pleasing and marketable. While at THK, I was responsible for writing and formatting over a dozen winning proposals.

Jon Altschuld, RLA, ASLA

PROJECT TREACHOVERVIEW

Creek Master Plan Architect, Senior Project Manager wever, the Landscape THK Team is fully aware that budget and time constraints may not allow for such an in-depth n-de -d depth

eam will identify possible funding sources that could be used to complete additional tional

c processes, Team believes that some of These the most usefulwill information ovided n and d ed)the andTHK construction/implementation. sources be specificprovided to thedregion enerated outside of formal Thisinclude is especially towns like Fraser habitat abitatt he Cozens Ranchpublic Opengatherings. Space this will grantstrue thatfor fund trails, education, he economy is driven by tourism andfishing many and of its residents are second home owners wnerss rounds, parking, restrooms, more. Friday for the weekend. To address this reality, the THK Team will hold a 2-day On-Sitee ignaisThursday being finalized, the THK Team will will consist target specific grantand opportunities g Session on and Friday. Thursday of site tours exploration oration nand createe s, and d at will stakeholders, outline which grants be targeted, the dates timeline awards, and interested as wellshould as gathering thoughts and and ideas from for other h The goal of same, this plan willthe beproject to target grants that be leveraged against each will consisted. of more of the while team starts to can compile information mation n h the amount resources the Town Fraser wouldQ&A have and to dprovide r a public meeting that of evening that(cash) would that include a briefofpresentation, open n to match ideal if this design charrette was held in August and coincided with other public eventss ts fall pubces crawl on Friday, Aug. 18 that brings out a large and diverse crowd that is s of these grants include: ed).

rk, CO

nitoring program. To find an appropriate balance, we plan to work with the EVWC to prioritize parameters am meters monitoring that provideLandscape the greatest knowledge andmanager allow for geement Jon Altschuld is awill registered Architect and project withbetter ove over er 8informed future management sions the design He reaches and the watersheds whole.areas, To better facilitate orts, ts, oour ur yearsfor of experience. is experienced in the designas of anatural trails and nd oopen pen the monitoring effort le working matwill prior firms, led thestrategy watershed draft a monitoring including methodology, timeline and responsibilities table and monitoring nittorin ng spaces, ecological restoration, parks, streetscapes, and transportation planning, ingg, he Left Hand Creek watershed. The project locations and has anmap. expertise in presentation graphics, 3D visualizations, and GIS mapping ppiing

oping geomorphic, biologic, and hydrologic risk applications. would be used to projects that wouldWork: 10 – identify Preliminary Permit

Educationency of the watershed to future flood events.

hisJon task, we will inventory appropriate permits thatand willmeetings be required for the project. ticcipate has experience with facilitating public outreach on many projects, roje ects, At this time, we anticipate Masters of Landscape on of the project was spent building a coalition t the required permits willPark include a Section permit theTrails Corps, a econstruction stormwaterr p permit ermit Architecture, Colorado including the John Meade Master Plan, the404 Cherry Hillsfrom Village Master aste r PPlan, laa that would oversee project implementation State University m CDPHE and a Floodplain Development Permit from the Town of Estes Park. We will determine if oother ther

City ofCreek Evans Riverside Park Master Plan, ter PPlan, laan, nding. Left Hand is heavily diverted to Trinidad Trails and Greenways Master

l permits, such as roadway or grading permits, will be required as a part of this task. Bachelor of Science in agricultural community, and thus a key task and the I-25/Cimarron Interchange. Landscape Design and and buy-in ofstart the Left Hand DitchinCompany. this task early the project process for best efficiency, as relevant observations may be m made ade Contracting, st Colorado State will Notable Works: general University ounds of meetings he field or and data discussions to support permit applications may be reviewed during the design analyses. For example, xam mplee

TDOORS COLORADO (GOCO) ng effort is being funded by GOCO, it is unlikely that any additional planning funds ds can n ed forr ugh GOCO. However, GOCO has three separate grant programs that can be used

• Riverside Park Master Plan - Evans, CO assable diversion structures were developed.

will complete a preliminary comparison of 100-year water surface elevations during the design pr process rocess Registration/ as agreed to explore implementation of Plan permitting rovide initialthe insight on potential floodplain approaches. This will be particularly important tan nt ffor or • Trinidad Open Space and Trail Master – Trinidad, CO Licenses urther, provided ches oftheir the Creek to existing stability abilitty wateradjacent rights can be met.development. Not only is the floodplain a concern, but channel sta RLA - Colorado

Memberships

American Society of Landscape Architects

to Cozens Ranch Open Space. Ranger program leading a group ofprovements visitors utdoorr and Outdoor Recreation Grants help build or improve community parks, outdoor

• River’s Edge Natural Area - Loveland, CO

ing iss amenities, outdoor athletic THK Associates has led many multi-disciplinary teams facilities for river and environmental education facilities. Funding e forprojects land acquisitions. corridor planning and design that are pioneering the way s Grants employ Colorado Youth Corps Association crews on projects like building trails,, for developing comprehensive and balanced riparian corridor after forest and master plans. All of thetrol projects the THKfires Team haseradicating completed invasive species. toration Grants improve and restore Colorado’s rivers, streams, wetlands not only have a focus on environmental health and floodplain habitat on permanently conserved land. management, butabout recreational and educational mmunity a project Using visual aids allows forexperiences engagement between Activities such as a community bike ride iss an izedd to collect input at the City the project team during interactive engagement tool that THK utilized as well. Riparian corridors are community complex members systemsandthat require aster Plan Workshop the Clear Creek County Visioning Workshop during the Legacy Loop Trail Design careful planning to achieve a stable and sustainable balance of (CPW) O PARKS AND WILDLIFE environmental, social and economic factors. The THK Team has will also propose holding aupsecond public meeting in early November that will sent and a county Fun provides to $400,000 in matching grants annually topresent local ounty y the experience, the knowledge therecreation expertise to 1departments, achieve thisThis for water master plans,and proposed Phase Project. meeting will beangling particularly important to tantand o others ers forr parkand and districts, organizations THK’s Clear Creek Greenway Trail alongg thee the Town oftFraser, referred to as the Town. residents mprove opportunities in Colorado. from here-to some of theangling more involved and Clear stakeholders. Creek River Corridor

y also factor into the design. It may be desirable or necessary to incorporate materials that can withstand thsttand Park and Alan Hutto Memorial Master rge •flJohn ood Meade event when structures could be atCommons risk. We will usePlan this information to guide discussions with nss w itth dplain regulators EVWC. • City of Cherryand Hillsthe Village Trails Inventory and Master Plan - Cherry Hills, s, CCO O

Thompson River Concepts for IDFEMA HMGP • McCall Downtown Master Plan - McCall, rk, CO

• Colorado State University On-Campus Stadium Feasibility Study - Fort Collins, olliins, CCO O

• BayF: FarmProject Master Plan - Fort Collins, CO tion Schedule

• orts, MehaffOtak ey Park - Loveland, ood recovery eff assisted theCO Town of Estes Park with identification of equ uests covery and restoration projects on theArchitectural Big Thompson through Town for funding requests • I-25/Cimarron Interchange DesignRiver Guidelines re, post post ard Mitigation Grant Program (HMGP). Project sites evaluated included Piccadilly Square, nce areas, and other Downtown reaches.

Brandon Parsons, ASLA

Landscape Designer, Junior Project Manager

ndisFish Creek Corridor Plans for through Brandon Parsons experienced in innovative and responsible design, represented engaging public presentations, graphic representations, conceptual site design, ecologic restroation,rk, construction documentation and detailing, as well as project coordination and CO management. During his time at THK Associates, Inc. Mr. Parsons has taken a lead role in 2014 many of THK’s most comprehensive greenway trail projects, including designing over 15 employed by a prior firm, worked with miles of trail,eand has contributed heavily to planning, designFlyWater and construction of the Fish rshed planningSt.eff orts on Falland River and Platte River Trail. Creek Corridor, Clearmaster Creek Greenway, Vrain Greenway the South he 2013 flood, applying a risk-based approach for

Mr. Parsonsnderstanding has benefited from his extensive Auto-CAD, of the stream knowledge corridors.of Th rough SketchUp, Adobe project stakeholders, recommendations were Photoshop, Adobe InDesign, and GIS to create a variety of projects that enrich the urban y and restoration projects and policies that will and rural fabric of Colorado. As a member of multiple large, multi-disciplinary planning and community, well as forof the design Teamsresiliency Mr. Parsonsforhasthe contributed to theasdevelopment regional communities, while positioning these watersheds for local waterways, urbanalso greenways, and regional parks. e in upcoming flood recovery implementation

y adding the new tools of flood consequence and Notable Works:

• • • •

d identifi to previous inundation mapping, Fish Creek Corridorcation River Restoration and Trail Design - Estes Park, CO prove hazard prediction and inform planning and Estes Priority Projects - Estes Park, CO rts to identify the most critical and cost effective cy Resilien Clear Creek Greenway - Clear Creek County, CO lan for toration projects. ridor P pson sCiolirency per Big Thom South Platte River Vision - Denver,UpCO e n for R la ridoUrpPper Big Th ompso pson Cor Upper Big Thom n Corr

idor Pl a

n for Resi

liency

Recreational Trails Grant Program (Non-Motorized Trails) funds projects eting firms will do be scheduled near the completion the project to around present thethe Tow wfinal master cts forr We have selected andState individuals who have worked on recentofprojects within and Town nts. tional trail grants, small recreational trail grants, trail planning and trail support grants. asespecifically 1 project.on the ThisFraser finalRiver meeting could as a fundraiser to gather munityy the TH HKcommunity of Fraser and Corridor. This double local knowledge, combined with THK ing funds for grant and can also be skills, paired another public n withevent. Team’s extensive experience and applications our outstanding communication willwith provide the Town a O process DEPARTMENT seamless master planning that will be results OF driven.TRANSPORTATION (CDOT) ions Alternatives Program (TAPS) are federal funds that are distributed through State e

es funds through 2020. Additionally, the THK Team has worked Unfortunately, with several different grant agencies and other all funding sources, on agencies. Colorado has expended of itssource TAPS S through design We process, trails are identified as later improvements, future TAPS ies gran including Great Outdoors Coloradothe (GOCO). are intimately familiar with these agencies grant be used. requirements, reimbursement procedures and project closeout procedures.

Education on

8 7-267 Sustainability of Rural Colorado was passed at the end of May and allocatess $1.8

The following pages ansportation outline our approach scope to thisprojects, of which 10% must be used for off highway ghway y relatedand infrastructure project that were designed to not only provideThis the Town a ys. Itt on improvements. couldwith include trails and parking areas near state highways. comprehensive master plan and phase 1 project, but when also create h to understand how and these funds will be dispersed, but given Cozens Ranch excitement in the community anditmomentum for additional US 40, is a potential fundinggrant source. funding. As you read the THK Team’s approach and scope, it will NT the OF LOCAL become clear that we have ability to provideAFFAIRS several unique (DOLA) Impact Assistance Grant an be e services that will lead toeral a comprehensive master planFund that can be (EIAF) is a unique funding opportunity that can en the impact of Henderson Molybdenum Mine is cutting production as it nears a full completed within the Town’s $90,000 budget.

Bachelorr off Science Science in Landscape capee Architecture, turre, Coloradoo State Staate University ty

Education inspires n... preservation...

Minor in Global Gllobal Environmental menttal Sustainability billitty

Memberships rshhipps

y and/ / The purpose of the EIAF Program is to assist political subdivisions that are socially d cally impacted by the development, processing, or energy conversion of mineralss and d from m s. Funds come from the state severance tax on energy and mineral production and ing off the State’s share Planning of royalties toPark thein Evans, federal hered during THK’s 3-day On-site Strategic Session forpaid Riverside CO government for mining and drilling d mineral fuels on federally-owned land.

Americann Society Society of o Landscape pe Architects Archittec

24

9

Project Approach

12

7

Project Approach

5

Project Overview

54

1


POSTERS

Thornton

Colorado

BIG DRY CREEK Open Space & Heritage Trail

1ST ANNUAL

FRIEND FEST

OCTOBER 16 ,17, 18TH TURTLE ISLAND ECOLOGY CENTER PIERCE, COLORADO

A Regenerative Festival Featuring: Permaculture Art Music Camping Yoga Workshops

BIG THOMPSON RIVER CORRIDOR MASTER PLAN

VON STOMPER

PAPAGOYA DEREK BLAKE FREE RANGE PICKENS

FUNKY TUNK HEROES ROBIN LEWIS TALLGRASS MUSTARD LICKS

WOLF VAN ELFMAND CATFISH LOU WOODBELLY SOULACYBIN RUDIE CLASH CHRIS WEIST WHISKEY JOE AND THE JUICEBAR GIGOLOS FLOPPYDISCO KEMOSABI TTOTEM

COLONEL BOYLE AND ROBIN HOOD CYCLES BROOKE LEINA REISS MIKE BEATS - WITH VERY SPECIAL GUESTS...

BONEHEART FLANNIGAN RASTASAURUS SAMOUREYE TECHNOSHAMAN

AVERY RUNNER

SING, CICADADS JOHNNY ROOSE

DIJON VAGABOND PAUL AND GRACE JONES DIMITRI Y RHEANNA DEREK AND ANDREW TREAPHORT ZOE STARWATER YER STATE BIRDS ASHLEY WILLFIRE SETH SNOWDEN LOVEAUTIVITY DAVI-D THE FRIEND FEST ALLSTARS! FOR MORE INFORMATION PLEASE VISIT US ON FACEBOOK: www.facebook.com/turtleislandecology

55

For more information please visit us at: www.abetterbigt.com December 2017


56


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.