Selected Works - UW - Urban Design 2021 - 2023

Page 1

SELECTED WORKS 2021-2023 Brian Njoroge

BRIAN NJOROGE

linkedin.com/in/brian-njoroge-design/ njorogeb@uw.edu

Educational Experience

2021 - 2024

Hello, My name is Brian Njoroge, a graduating Urban Designer from the University of Washington Tacoma. Excited about my upcoming journey in design, I’m passionate about delving into the cultural aspects of architectural and urban spaces and their connections to social dynamics and power relations. Envisioning a future where design collaboration fuels change, I’m eager to explore new ideas, acquire skills, and push the boundaries of design.

Bachelor of Science in Urban Design

University of Washington Tacoma

Professional Experience

October 2023

Present Housing Developer and Project Manager Internship

GS Consulting & ALLY Community Development

Provided support in outreach to inform housing projects, worked on project feasibility reports, and contributed in various capacities to project funding, management, as well as supporting projects in various stages of design and construction.

Softwares Interests

Design

SketchUp - AutoCad

3D Rendering

Lumion

Adobe Creative Suite

InDesign - Illustrator - Photoshop

Geo-spatial

Esri ( Arcgis ) - Qgis

Design

Urbanism

History

Sustainability

Languages

Swahili

English

2

RETROFITTING A SMALL URBAN SPACE

URBAN DESIGN STUDIO 3

2022

CONTENTS

FOSS

URBAN DESIGN STUDIO 4

2023

OTHER WORK

URBAN SPACE AND THE REPRODUCTION OF INEQUALITIES CLASS PROJECT 2023

SOCIAL PRODUCTION OF SPACE

PERSONAL PROJECT

PROJECT : RESIDENTIAL RE - USE

PERSONAL DESIGN EXPLORATION

2022

3
WATERWAY
REVITALIZATION
44 5 BRT Ballard Bridge NW Market ST Sound Transit Station Re-Working Connections Proposed Light Rail Existing Metro Bus Routes Complete Burke-Gilman Urban Street-Scape Street- scape for 14th Ave, Green-scape and Mobility Priority 14th ave street- scape while connecting Burke Gilman Trail Improve Pedestrian and Cycling experience under Ballard Bridge

RETROFITTING A SMALL URBAN SPACE

SUMNER , WA

URBAN DESIGN STUDIO 3

PROFESSOR : KO WIBOWO

WINTER 2022

Site location : Sumner WA

Condition of the site

In our urban design studio, we collaborated to activate a site in downtown Sumner, WA, responding to a fire that had previously destroyed the existing structure. Engaging with both the city and property owners, our goal was to propose innovative and inviting temporary uses for the site while awaiting the development of a permanent reconstruction plan. My proposal entails the creation of a low-maintenance pop-up public space featuring two prefabricated structures suitable for retail or food purposes, complemented by an interactive wooden play bench adaptable for various uses. This concept aligns with residents’ visions and needs for a versatile space open beyond regular hours, catering to events, leisure, and play. The strategic location of the site offered an ideal opportunity to explore possibilities in introducing unexpected elements within a downtown space.

4
Rendered Proposals of the site

Central to my study and proposal was a thorough consideration of the desire for an adaptable and inviting space, addressing their needs for play and leisure. While the owners and city were supportive, concerns arose due to the site’s developmental future. To meet this, my proposal introduced a prefabricated modular structure that could serve temporary needs and be easily relocated to a different suitable site a solution welcomed by both the owners and the city.

The space surrounding the structure would be programmed with landscaping and pergolas, offering flexibility for various site requirements. Additionally, the easily transportable pergolas and furniture could be utilized across different locations.

Selected Works 5 N
Overview of the proposed site plan and examples of modular structures.
https://doi.org/10.3390/su11143884
Installation of prefab modules by Ike Homes, UK : Iuorio, Ornella, Andrew Wallace, and Kate Simpson. 2019. “Prefabs in the North of England: Technological, Environmental and Social Innovations” Sustainability 11, no. 14: 3884. Prefab modules for a restaurant Colonconstrucation, UK : conlonconstruction.co.uk/modular-buildings

Invitation to slowdown

Creation of seating options for all abilities to create social interaction Ideas of multi-use in space can be adapted by space users for various uses.

Covered sections of the space make it usable through the various weather and seasons. Possible integration of the back alleyway to continue the movement to the adjacent alleyway

6
Bryant Park - Midtown NYC Project for Public spaces - pps.org/projects/bryant-park Unexpected elements in a small town Views of the proposed prefab modules with cafe style seating Rendered view of the proposed site from the street

In a small urban setting, open space is ingeniously crafted through the strategic orientation of modular structures, accompanied by the implementation of grass and concrete elements. This thoughtful arrangement enhances the flow within the compact area, creating a welcoming environment.

The addition of cafe-style outdoor seating introduces versatility, ensuring the space remains dynamic and adaptable to a variety of uses.

7
Rendered views of the sites Views of the site from the front and rear

BALLARD , WA

URBAN DESIGN STUDIO 5

PROFESSOR : Bára Šafárová, Ph.D.

AUTUMN 2023

Site location : Ballard WA

My focus was on integrating housing, care, and climate justice into a historically non-residential site in Seattle’s Ballard neighborhood. While much of Seattle has undergone significant changes in rezoning and transit-focused developments. Ballard preserved its industrial character, fostering a vibrant hub of artist studios, independent breweries, and restaurants. The impending light rail station construction in Ballard offers an opportunity for transit-oriented projects that address climate, housing, and care. To gauge program viability, I analyzed transit data, population trends, and projected growth, with a specific focus on current space use and envisioning the completion of the Burke-Gilman trail.

The study underscored the critical need to link the upcoming light rail station and recommend rezoning to reclaim an underutilized section of the waterfront, transforming it into public space. Envisioned as a sanctuary, this park would not only celebrate Ballard’s rich indigenous and historical legacy but also provide daily utility and access for both its current and future users.

History of Ballard

Incorporated / town Annexed

European Settlers

Duwamish Tribe

Homelands for at least 12,000 years

World War I World War II Ballard Lock / Bridge

1850s

1890 1906 1918

Urban Village

1990s

2000s

8
2039? Ballard Light Rail
HOUSING + CARE = CLIMATE JUSTICE

Vision for the Ballard Waterfront

To restore and revitalize the The Ballard Waterfront into a multi functional economic and Eco sensitive waterfront, this is done by carefully revitalizing its streets, public spaces, landscapes, and waterways.

Selected Works 9
Environment Local Industries Commercial attractiveness Residential Mixed Commercial Manufacturing / Industrial Burke-Gilman Trail Road Network Grocery Store Parking Spaces 0.17 0.33 0.5 Mi N Urban Form Analysis Potential Ballard Link Rail Station Burke-Gilman Trail 15th AVE NW 14th AVE NW 8th AVE NW Leary Wy NW Urban Street scape Burke-Gilman Trail Mixed Commercial Manufacturing / Industrial Burke-Gilman Trail Grocery Store New waterfront Urban Form Proposal 0.17 0.33 0.5 Mi N EndPublicboatramps& park Potential Ballard Link Rail Station 15th AVE NW 14th AVE NW 8th AVE NW
Focus Areas

The re-imagined Ballard urban bike corridor taps into already established routes. The addition of the light rail and a proposed Ballard station creates opportunity to leverage the value of alternative modes of transit into this car reliant district.

This corridor will see : Completed

Complete street scape improvements along 14th Ave would establish a corridor designed to encourage pedestrian and bicycle interaction by formalizing comprehensive sidewalks and bike lanes, fostering a sense of embrace, consideration, and opportunities for deviation. Enhanced landscaping and neighborhood branding further elevate the user experience, acting as catalysts for the impact of the nearby transit station. This initiative aims to connect residents, workers, and visitors to the waterfront its parks, creating a beautifully curated network of connected streets capes. This transformation not only invites new residents but also provides a welcoming and safe community for current users and residents alike.

connection for the Burke - Gilman trail 1 Neighborhood Green Way Painted Bike Lane Proposed Protected Bike Lane Proposed Bike Lane Link Bike Ways & Connections 44 5 40 D BRT D Ballard Bridge NW Market ST Sound Transit Station Re-Working Connections Proposed Light Rail Existing Metro Bus Routes Complete Burke-Gilman Urban Street-Scape Street- scape for 14th Ave, Green-scape and Mobility Priority 14th ave street- scape while connecting Burke Gilman Trail Improve Pedestrian and Cycling experience under Ballard Bridge A
0.33 mi 0 N
0.17
Mixed Light Industrial
Mixed Commerial
Mixed Residential

Case study Source : mnlandscape.com/hudson_square_streetscape_master_plan

The street sections along the 14th Ave segment reveal wide possibilities for implementation. Currently, the street’s existing conditions prioritize parking with two side parking allotments and parallel parking in the middle of the drive lanes. While studying the site I discovered that this section was on a decommissioned rail line, covered with gravel and re purposed for parking, the current programming significantly impacting neighborhood accessibility and users. The proposed changes involve replacing parking on this major street with a fully protected bike lane, redistributing the space to widen the sidewalk and introduce a green buffer between vehicular traffic and bike/ pedestrian users. Drawing insights from the Hudson Street scape project, these modifications aim to achieve cohesion among different user levels, mobility options, and traffic considerations.

Selected Works 11 Current conditions 14th Ave NW Current conditions 14th Ave NW
Hudson Square Street scape Master Plan MNLA, 2022 Hudson Square Street scape Master Plan MNLA, 2022 Existing
Proposed

FOSS WATERWAY REVITALIZATION

TACOMA , WA

URBAN DESIGN STUDIO 4

PROFESSOR : GARETH ROE, ANDRES DE WET

CONTRIBUTORS : ANGELINA AKINSHEV, MIRYAN MANJARREZ-HURTADO, RAMAZAN MAMATOV

SPRING 2023

Developing a vision for a waterfront that has suffered severe pollution and neglect requires careful consideration and strategic planning. As a valuable asset to the city, the Thea Foss waterfront has been central to the region’s economic growth. However, in the decades since the factories and warehouses that once relied on this waterfront shuttered, after heavy pollution and abuse it eventually became a Superfund site . Working in groups, our approach was to develop a vision for this area through a series of design choices that would safeguard and enhance the public realm.

This vision aimed to take advantage of waterfront access, strengthen the connection between the city and the waterway, and create a space for refuge and reclamation for the indigenous Puyallup tribe, which holds great historical and cultural significance. This vision seeks to become a space of refuge and reprieve for the residents of Tacoma who have been exposed to the pollution and damage emitted by previous users.

12
Site location : Tacoma WA

Legend

Outdoor Underutilized (1.1M sq ft)

Outdoor In Use (468k sq ft)

Structures In Use

Structures Not In Use

Boat Storage

Recreation N

A comprehensive study of the green and tree canopy in the district highlighted a severe lack of vegetation. This is a matter of great concern, especially as we were in the process of developing a master plan for the waterfront, where the incorporation of a robust canopy is crucial. A closer look at the land utilization survey provided insights into the primary uses within the waterfront district. Predominantly, a significant portion of the land was either unused or utilized for boat storage.

The flood analysis played a pivotal role in identifying opportunities within the area, considering the threat of rising sea levels and the occurrence of more frequent flooding. These analyses and addressing the overarching objectives outlined in our brief, we formulated the Foss Waterway Reclamation Master plan. This plan aims to explicitly address the dire lack of canopy, optimize land usage, reclamation of space for parks, waterfront access and incorporate measures to mitigate the challenges posed by rising sea levels and flooding in the waterfront district.

Selected Works 13
1 2 4 3 4 2 FOSS WATERWAY REDEVELOPMENT 12 Flood Impact Analysis Regulatory floodzones 2% Annual change flood hazard Regulatory floodzones Puyallup levee Overtoping
Flood Zone Analysis Creator : Brian Njoroge Land Utilization Study Created: Ramazan Mamatov Tacoma Green Canopy Creator : Angelina Akinshev

The conditions observed during a site visit highlights an unsafe environment lacking connection of the waterfront district to the downtown center. Currently, there is a noticeable lack of connectivity and inadequate pedestrian access throughout the district. The existing roadways were initially programmed primarily for freight purposes, considering the area’s active industrial status.

New connections proposed must carefully strike a balance to accommodate both freight through traffic, essential for the ongoing industrial activities, and improvements that enhance accessibility for other users. Achieving a safe and well-connected environment is crucial, and careful consideration in the planning and programming of the roadways is necessary to ensure the coexistence of industrial functionality and enhanced accessibility for pedestrians and other users.

14 Tacoma Dome South 25th St eet Union Station/ South 19th Street Convention Center/ South 15th Street Theater District/ South 9th St eet Comme ce St eet/ South 11th Street Highway Arterial road Local road Green spaces Waterfront structures Rail Line Highway Arterial road Current boardwalk Green spaces New Path Highway Rail line Arterial road Green spaces Local road
Proposed Transportation Context
Existing
Selected Works 15 BUILDING TYPOLOGY Foss Waterway Master Plan Foss Water Way Park Proposed Connected Board Walk Proposed Light Industrial Commercial Development Proposed Park / Open Space Proposed Park / Open Space Proposed Underpass Activation
metroparkstacoma.org/project/waterway-park/ Site Plan N
building typesLight Industrial, Commercial development
Foss Water Way Park Proposal - Metro Parks Tacoma
Proposed

URBAN SPACE AND THE REPRODUCTION OF INEQUALITIES

PROFESSOR

WINTER 2022

Under guidance of Professor Lisa M. Hoffman of the School of Urban Studies, this project delves into the intricate realm of the social production of space, with a specific focus on exploring the role of race in the creation of urban areas. My primary objective was to curate a website or blog as a platform for presenting both my findings and commentary on the historical and contemporary interactions contributing to the unequal reproduction of parks and urban spaces. This endeavor involves a thorough investigation into the experiences of marginalized groups traditionally excluded from these spaces.

Seizing the opportunity for deeper exploration, I drew inspiration from Gordon Parks’ work, particularly his resounding photographic series “Outside Looking In, Mobile Alabama 1956,” and the social commentary his photographs evoked on segregation and the imperative need for access to recreation areas. Additionally, I conducted a comprehensive study on the racialized creation of parks, examining Central Park and its history before the creation of the park as we know it by Olmsted and Vaux as they sculpted it into the lungs of the city. This exploration was complemented by examining historical redlining maps of the neighborhoods in proximity to Central Park, providing commentary on the use of nature as a catalyst potentially reinforcing historically segregated communities.

16
SOCIAL PRODUCTION OF SPACE
Selected Works 17 Project link - https://sites.google.com/view/urbanspace-socialproduction
Map source - dsl.richmond.edu/panorama/redlining
Mapping inequalities - Redlining in new deal America

PERSONAL PROJECT

Project: Residential Re - use

Site location , Nairobi, Kenya

I engaged in a simple design exploration during the summer to improve my skills. I landed on a project site in my neighborhood in Kenya. The site was an abandoned end-lot house that I walked past daily. The challenge was to re imagine the site, preserving much of the existing structure. Undertaking this personal project was enjoyable, and I was pleased with the development of the concept.

18
2022
Side View, alleyway Top View Top View, Back Front Corner View, Main Street

BRIAN NJOROGE

SELECTED WORKS 2021 -2023

Selected Works 19

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.