B R I G I T T E
N G O
Selected Works | 2012 - 2017
objective.
education
academic distinction
To contribute to your studio’s ingenuity and practice by utilizing my design sensibility in tangent to diversifying my professional and creative work background. In effect, build a strong ground to support my pursuit of a fruitful career in Architecture.
PRATT INSTITUTE | Brooklyn, NY Graduate School of Architecture and Urban Design, GAUD Candidate for a Masters Degree in Architecture Expected graduation date: May 2016
Nominated for Center for Architecture’s Womens Auxiliary Eleanor Allwork Scholarship, 2015
COLUMBIA_GSAPP | New
York City, NY Graduate School of Architecture, Planning, and Preservation New York/Paris Program, 2012-2013
UC San Diego| La Jolla, CA Earl Warren College_Urban Studies and Planning Bachelor of the Arts, 20092012
UC Los Angeles |
Westwood, CA Jumpstart into Architecture Program, 2010
Archived Student Work for InProcess, FA13, SP14 & SP16 Provost Honors, 2012 - 2010
work experience
MTP Architects
Designer, Associate San Francisco, CA | SU15-PRESENT
Storefront for Art & Architecture Curatorial & Gallery Production Agent
New York, NY | FA 2014 – SP 2015 - Coordinated Storefront’s membership events and lectures - Assisted in the construction and maintenance of temporary installations including: SituationNY. an exhibition by Marc Fornes The Very Many and Jana Winderman BLUEPRINT an exhibition on self-reflection and identify a place of origin involving a façade design by SO-IL.
Pratt Budgeting Department
Graduate Assistant Brooklyn, NY | SU&FA 2014 - Wrote enrollment and budget reports bi-weekly involving extensive Excel work - Reconciled mathematical issues in Pratt’s Revenue reportsPratt Institute’s Budgeting Office
Pratt School of Architecture
Graduate Teaching Assistant Brooklyn, NY | FA 2014 SP & FA 2015 - Assisted professor in students design proposal in their creative rocess in answering the studio brief during their 1st year M.Arch students Core Studio.
c. (415) 866. 6499 f. (949) 715. 3547 e. brige.ngo@gmail.com current address: 1518 8TH AVE., SAN FRANCISCO, CA 94122 permanent address: 24 VIA DIAMANTE, NEWPORT BEACH, CA 92657
work experience
Sawyer | Berson Architects New York, NY | SP-SU 2013 - CAD Drafting - Developed the media/press page of S/B’s website. - Organized a computer archive and tangible report of all previous and current S/B projectsInstallation Assistant
Predock + Frane Architects Santa
Monica, CA | SU 2010 - Worked on the “Luminous Passage” by Architects Hadrian Predock and John Frane during the Glow Event. - Handled electroluminescent wire at an ambitious scale in order to construct the project
Avery Architecture & Fine Arts Library
other experience
Split Studio
Brooklyn, NY | SU-FA 2014 Freelance to design and produce a mock up of Split Studio’s selected projects portfolio Pratt Institute | Brooklyn, NY | FA 2014
Pratt Young Scholars Program Teaching Assistant Brooklyn, NY | FALL 2014
UCSD Green Campus Initiative
La Jolla, CA | SU 2011 - SP 2012 Allocated an outreach team for Campus Conservation Nationals Project Wrote grants to help fund Green Campus projects Participated in the LEED Certification of UC San Diego’s Village Apartment Buildings. Sustainability Campus Coordinator
New York, NY | FA 2012 - SU 2013 - Worked with the library manager to maintain the extensive academic resources of Avery Library
skills
Digital Experienced with Rhinoceros 3D, AutoCad, Adobe Illustrator, InDesign and Photoshop, Archicad Proficient in Revit, Grasshopper, Maya, 3DS Max, Microsoft Excel and Geographical Information System Language Proficient in spoken Vietnamese; Proficient in spoken and written French and Spanish.
B R I G I T T E
N G O
Selected Works | 2012 - 2017
C O N T E N T S
academic
OBJECTS IN THE MIRROR
01
WAVE
47
LATTICE
59
SHELL
67
ELEVATED / AUTONOMOUS
81
pro f essional
TWIST HOUSE MOUNT TAMALPAIS
103
HOUSE
109
OCTAVIA HOUSE
119
assembly
BLUEPRINT
123
SITUATION NY
129
OBJECTS IN THE MIRROR partners_Sandra Berdick & Jianing Song critic_Kutan Ayata site sustainability_ Meta Brunzema mechanical_Robert Kearns structural_Sarrah Khan facade_Sameer Kumar
The studio will explore the supermarket typology as a bridge-building above Interstate 5 in Washington State connecting two rest stops situated on either side of the highway. The conceptual focus of the studio will be the d evelopment of an architectural object that is experienced at two very different speeds; one at 65 mph through the windshield, second at a walking pace from the parking lot. How does one negotiate the translation of such difference in perception? What are the architectural ramifications in embracing this difference as a strategy of design? How does an object come into focus? How does speed influence the resolution of articulation? How does its character shift on approach? How does it look in the rear-view mirror? Closer for sure, but perhaps stranger... In response to this brief, we decided to make big use of the close to 5 acre site located in Smokey Point while keeping in mind designing for different views from cars and pedestrians that approach the building at various directions and velocities. We are looking to explore the sense of elongation and transparency through the implementation of materials and precise modeling the structures edges.
SMOKEY POINT, WASHINGTON
2
SITE
I N T E R S T A T E 5 - S M O C K Y P O I N T, W A
Stereographic Diagra
PNRœ
Nëí=gì å PMMœ
Nëí=j ~ó
OURœ
Nëí=^ é ê
OTMœ
Nëí=j ~ê ORRœ
Nëí=c ÉÄ OQMœ Nëí=g~å NS
OORœ
W ind Fre q ue nc y (H rs )
P NRœ
P MMœ
I N T E R S TAT E 5 OURœ
ARLINGTON
t bpq
ORRœ
OQMœ
OORœ
Prevailing Winds - Summ
31 5°
300°
285°
W EST
255°
240°
SITE
225°
Prevailing Winds - Winter
31 5°
300°
285°
SMOCKY POINT W EST
255°
240°
225°
Optimum Orientation
PNRœ
PMMœ
2
OURœ
OTMœ
ORRœ
OQMœ
M a ximum T e mp e ra ture (°C)
œ`
RM
Stereographic Diagram
œ`
k PQRœ
QRH QM
NRœ
PPMœ
PR PM OR OM
PMœ
QM
==NMœ PNRœ
NR NM R YM
QRœ ==OMœ
PM ==PMœ
Nëí=gì ä
Nëí=gì å PMMœ
SMœ ==QMœ
Nëí=^ ì Ö
OM Nëí=j ~ó
GEM|NA
==RMœ ==SMœ
OURœ
TRœ Nëí=p Éé
==TMœ Nëí=^ é ê
NM
==UMœ
OTMœ
M
VMœ
Q
Nëí=l Åí
Q
U
U
NO NS
Nëí=j ~ê ORRœ
NO
OM
NMRœ
NS
OQ Nëí=k ç î
OM
OU PO
Nëí=c ÉÄ OQMœ
NR
V NQ
NP
OORœ
NO
NM
NN
eê
QM
Nëí=g~å NS
OQ
PS
NOMœ Nëí=a ÉÅ
QU NPRœ
RO
BRIGITTE NGO
t â ONMœ
NRMœ
NVRœ
NSRœ NUMœ
SANDRA BERDICK JIANING SONG
W ind Fre q ue nc y (H rs ) - Spring / Autumn k l o qe P QRœ
RM=â ã LÜ
Üêë
NRœ
NVTH P P Mœ
P Mœ
NTT NRT
QM=â ã LÜ
NPT P NRœ
QRœ
NNU
km/ h
Av e ra g e W ind S p e e d (k m/ h)
VU
PM=â ã LÜ
50 km/ h
TU P MMœ
S Mœ
45+ 40
RV PV
OM=â ã LÜ
YNV
OURœ
35 30 25 20
40
TRœ
NM=â ã LÜ
t bpq
ARLINGTON
DESIGN
15 10 5 <0
30 b^pq
meta brunzema
MECHANICAL
20 ORRœ
kutan ayata
SITE
robert kearns
NMRœ
STRUCTURAL
10 OQMœ
sarrah khan
NOMœ
0 4 OORœ
FA C A D E
4
8
NP Rœ
16 ONMœ
12
20
NRMœ
NVRœ
16
24
NS Rœ
20
28
pl r qe
32
24
36
Hr
40
Prevailing Winds - Summer
sameer kumar
8
12
44 NOR T H 345°
50 km/ h
48
hrs
1 5°
52
382+ 330°
30°
343 305
40 km/ h
Wk
267 31 5°
45°
229 191
30 km/ h
152 300°
60°
114 76
20 km/ h
<38
285°
75°
10 km/ h
W EST
E AS T
255°
1 05°
240°
1 20°
225°
1 35°
21 0°
R e la tiv e H umid ity (% )
B
B
VMH UM
NMM
1 50°
1 95°
TM SM RM QM
1 65° SOU T H
PM OM NM YM
UM
Prevailing Winds - Winter SM NOR T H 345°
50 km/ h
hrs
1 5°
175+ 330°
30°
157
QM
140
40 km/ h
122 31 5°
45°
105
OM
87
30 km/ h
70 300°
60°
52
M
35
20 km/ h
Q
Q
U
<17
U
NO 285°
NS
75°
NO
OM
10 km/ h
NS
OQ
OM
OU PO W EST
E AS T
OQ
PS
eê
QM QQ QU 255°
1 05°
RO t â
240°
1 20°
225°
1 35°
21 0°
1 50°
1 95°
1 65°
I N T E R S TAT E 5
SOU T H
smokey point washington state Av e ra g e Clo ud Co v e r (% )
%
%
90+ 80
100
Optimum Orientation
70 60 50 40
k PQRœ
NRœ â t ÜLã — =
_ Éëí
PPMœ
PMœ OKTM=
t ç êëí
=PMKMœ=
30 20 10 <0
80
OKQM= PNRœ
QRœ OKNM=
NKUM= PMMœ
60 SMœ
NKRM=
SUPERMARKET
NKOM=
40
MKVM= OURœ
TRœ
shopping center artisan bazaar farming co-operative bridge cafe
MKSM=
MKPM=
20 OTMœ
VMœ
0 4 ORRœ
NMRœ
8 12 16 20 24
` ç ã NOM é êç ãœáëÉW =NOMKMœ=
OQMœ
28 32 OORœ
NSRœ
16 20
44
NRMœ
NVRœ
12
Hr
40 ONMœ
8
24
36
NPRœ
4
^ å å ì ~ä=^ î Éê~ÖÉ r å ÇÉêÜÉ~íÉÇ=mÉêáç Ç l î ÉêÜÉ~íÉÇ=mÉêáç Ç
48 52
NUMœ
Site & Enviroment Analysis 5 .1 0. 2 01 5
Wk
REVISION 001 4.3.2015 REVISION 002 4 .1 6 . 2 01 5 REVISION 003
TRUCK LANE
BERM
BERM
TRUCK LANE
U N D E R G R O U N D PA R K I N G
CAR LANE
GARDEN
5 .N 1 0E2 5 C A R4 .L2 A
4
SMOCKY POINT
CAR LANE
A B OV E G R O U N D PA R K I N G
TRUCK LANE
IVECO
BERM
225°
1 35°
21 0°
R e la tiv e H umid ity (% )
1 95°
B
B
VMH UM
NMM
1 50°
TM SM RM QM
1 65° SOU T H
PM OM NM YM
UM
Prevailing Winds - Winter SM NOR T H 345°
50 km/ h
hrs
1 5°
175+ 330°
30°
157
QM
140
40 km/ h
122 31 5°
45°
105
OM
87
30 km/ h
70 300°
60°
52
M
35
20 km/ h
Q
Q
U
<17
U
NO 285°
NS
75°
NO
OM
10 km/ h
NS
OQ
OM
OU PO W EST
E AS T
OQ
PS
eê
QM QQ QU 255°
1 05°
RO t â
240°
1 20°
225°
1 35°
21 0°
1 50°
1 95°
1 65° SOU T H
Av e ra g e Clo ud Co v e r (% )
%
%
90+ 80
100
Optimum Orientation
70 60 50 40
k PQRœ
NRœ â t ÜLã — =
_ Éëí
PPMœ
PMœ OKTM=
t ç êëí
=PMKMœ=
30 20 10 <0
80
OKQM= PNRœ
QRœ OKNM=
NKUM= PMMœ
60 SMœ
NKRM= NKOM=
40
MKVM= OURœ
TRœ MKSM=
MKPM=
20 OTMœ
VMœ
0 4 ORRœ
NMRœ
8 12 16 20 24
` ç ã NOM é êç ãœáëÉW =NOMKMœ=
OQMœ
28 32 OORœ
NSRœ
16 20
44
NRMœ
NVRœ
12
Hr
40 ONMœ
8
24
36
NPRœ
4
^ å å ì ~ä=^ î Éê~ÖÉ r å ÇÉêÜÉ~íÉÇ=mÉêáç Ç l î ÉêÜÉ~íÉÇ=mÉêáç Ç
48 52
NUMœ
Wk
BERM
TRUCK LANE
LONG VEHICLE
LONG VEHICLE
U N D E R G R O U N D PA R K I N G
CAR LANE
GARDEN
6
7
2 A3 00
ARTISAN MARKET 10,697 sq. ft + 24.5 ft
COURTYARD 3,585 sq. ft + 0.0 ft
3 A300
3 A300
8
BRIDGE AISLE 4,985 sq. ft + 24.5 ft
9
E
10
OFFICE 575 sq. ft + 24.5 ft
MEZZANINE 16,838 sq. ft + 24.5 ft
DELI + PRODUCE 5,160 sq. ft + 16.0 ft 1 A300
A3
2 00
1 A300
2 A3 00
G Glass Fibre Reinforced Gypsum
3 A300
3 A300
D
SI
Flush Glazing
M
ST
FA Glass Fibre Reinforced Gypsum
Glazing
Glass Fibre Reinforced Gypsum
BATHROOMS 752 sq. ft + 16.0 ft
STAFF / BACKROOM 564 sq. ft + 16.0 ft
Gypsum Wall Board Glazing STORAGE 537 sq. ft + 16.0 ft
Glass Fibre Reinforced Gypsum
DELI + PRODUCE 5,160 sq. ft + 16.0 ft
CHECKOUT 832 sq. ft + 16.0 ft
STORAGE 1,220 sq. ft + 16.0 ft 1 A300
1 A300
ENTRANCE 530.5 sq. ft + 16.0 ft
reflected ceiling plan 1/16” = 1’
2 00
02 A3
01
entrance plan 1/16” = 1’
BATHROOMS 752 sq. ft + 16.0 ft
STAFF / BACKROOM 564 sq. ft + 16.0 ft
STORAGE 537 sq. ft + 16.0 ft
DELI + PRODUCE 5,160 sq. ft + 16.0 ft
CHECKOUT 832 sq. ft + 16.0 ft
STORAGE 1,220 sq. ft + 16.0 ft
ENTRANCE 530.5 sq. ft + 16.0 ft
02
entrance plan 1/16” = 1’
TRUCK UNLOADING 2,565 sq. ft + 0.0 ft
MECHANICAL 1,524 sq. ft + 0.0 ft
GEM|
CHECKOUT + VENDING 9,968 sq. ft + 0.0 ft
BRIGITTE N
SANDRA BER
COURTYARD 3,585 sq. ft + 0.0 ft
JIANING SO
3 A300
3 A300
DESIGN SITE
m
MECHANICAL STRUCTURAL FA C A D E
I N T E R S TAT
smokey po washington s
SUPERMAR
shopping ce artisan baz farming co-op bridge ca
BASEMENT P
05.10.15 1/16” = 1 MECHANICAL 1,222 sq. ft + 0.0 ft
n STORAGE 975 sq. ft + 0.0 ft
1 A300
1 A300
A3
2 00
TRUCK UNLOADING 4,300 sq. ft + 0.0 ft
A - 10
2 A-401
Z Clip
1 A-401
2
2
GFRC Panels, black Waterproof render, teal Stucco Rigid Insulation Plywood 1 +Sheathing 1/2” = 1’
A-401
01Metal Stud
1 A-401
Plywood Sheathing GFRG
2
01
1 + 1/2” = 1’
3 A-401
3
3 A-401
3
Insulated Glazing Unit Aluminum mullion Steel T structure
02
1” = 1’
02
1” = 1’
Glass rail Polished Concrete Floor Composite Decking Rail support
Steel Tube Structure
Suspended GWB Ceiling
03
1” = 1’
03
1” = 1’
Aluminu Mullion
Trench
Concret
Gravel
Rigid In
Concret
Waterp 4 A-401
4 A-401
04
1 + 1/2” = 1’
BRIGITTE NGO
02
SANDRA BERDICK
1” = 1’
BRIGITTE NGO JIANING SONG SANDRA BERDICK Z Clip
JIANING SONG
DESIGN SITE DESIGN MECHANICAL SITE STRUCTURAL MECHANICAL FAC A D E STRUCTURAL
1
01
1 + 1/2” = 1’
k u t aSteel n Tube a y aStructure ta
2 A-401
A-401
1 + 1/2” = 1’
Polished Concrete F Composite Decking Rail support
Z Clip GFRC Panels, black Waterproof render, teal Stucco Rigid Insulation GFRC Panels, black Plywood Sheathing Waterproof render, teal Metal Stud Stucco Plywood Sheathing Rigid Insulation GFRG Plywood Sheathing
01
Glass rail
2
Metal Stud Plywood Sheathing GFRG
03
1” = 1’F A C A D E 3
A-401
meta brunzema kutan ayata r o b e r t 01k e a r n s meta brunzema GWB Ce s a r rSuspended ah kha n robert kearns sameer kumar sarrah khan 1 + 1/2” = 1’
sameer kumar
3
Insulated Glazing Unit Aluminum mullion Steel T structure Insulated Glazing Unit Aluminum mullion Steel T structure
4 A-401
02
1” = 1’
03
1” = 1’
04
1 + 1/2” = 1’
4 A-401
02
1” = 1’ 01
wall secton - courtyard 1/2” = 1’
GEM|NA
BRIGITTE NGO SANDRA BERDICK JIANING SONG
H O R I Z O N TA L M E TA L S T U D S U P P O R T E D B Y R I B S T O S U P P O R T S U R FA C E S L A B S
DESIGN
kutan
SITE
meta bru
MECHANICAL
robert
STRUCTURAL
sarra
FA C A D E
sameer
H O R I Z O N TA L M E TA L S T U D
R I B S S PA N B E T W E E N T H E T O P A N D B O T T O M T R U S S C O R E S T O S U P P O R T M E TA L S T U D S
RIB & MULLION
R I B S S PA N B E T W E E N T H E T O P A N D B O T T O M T R U S S C O R E S T O S U P P O R T M E TA L S T U D S
I N T E R S TAT E 5 smokey point washington state
FLOOR & EDGE BEAMS TRUSS SUPPORTED BY COLUMNS TO SUPPORT FLOOR/EDGE BEAMS
SUPERMARKET shopping center artisan bazaar farming co-operative bridge cafe
COLUMNS SUPPORT BOT TOM TRUSSES TRUSS Structural Axon 5.8.2015
REVISION 001 2 .1 5 . 2 0 1 5 REVISION 002 3.24.2015 REVISION 003 4.3.2015
BELOW- GRADE COLUMNS
S - 100
E1
0
E1
1
E1
GEM|N
E1
2
3
E9
E1
4
E8
E7 E1
5
E6
BRIGITTE NGO E5
SANDRA BERDICK JIANING SONG
E4
E3
E1
E2
6
DESIGN
kuta
SITE
E1
meta br
MECHANICAL
robert
STRUCTURAL E1
7
T12
FA C A D E
sarra
sameer
E1
8
T1
1 E1
9
T1
0
T9
E2
0
T8 E2
1
T7 T6 E2
T5
2
T4 E2
3
T3 E2
4
T2 E2
5
T1
E2
6
E2
7
W1
E2
8
E2
W2
9
T1
4
W3
W4
T1
6
W5 W6
T1
7
W7 T1
W8
8
T1
9
W9 T2
0
W10
I N T E R S TAT E 5
T2
1
smokey point washington state
T2
2
W11
T2
3
W12
T2
4
SUPERMARKET
T25
W13
W14
shopping center artisan bazaar farming co-operative bridge cafe
W34
W34 W15
EDGE BEAM
W33
Structural Floor Plan W32
W16
5 .1 0. 2 0 1 5 1/32”=1’
FLOOR BEAM W31
REVISION 001 4.3.2015 W30
REVISION 002 4 .1 6 . 2 0 1 5
W17 W29
TRUSS B
REVISION 003 4 . 2 5 .1 02 5
W28
W27
W26
W18
W25
W19
W20
W21
W22
W23
W24
STRUCTURE FLOOR PLAN
1/32”=1’
S - 103
GEM|NA
BRIGITTE NGO SANDRA BERDICK JIANING SONG
DESIGN
kutan ayata
SITE
meta brunzema
MECHANICAL
robert kearns
STRUCTURAL
sarrah khan
FA C A D E
sameer kumar
I N T E R S TAT E 5 smokey point washington state
SUPERMARKET shopping center artisan bazaar farming co-operative bridge cafe
CONCRET CONCRET
M E TA L D E C K I N G
M E TA L D E C K I N G FLOOR BEAM
FLOOR BEAM
TRUSS
I N S U L AT I O N
BEAM
FA C A D E
Structural Details 5.8.2015 1”=1’
REVISION 001 2 .1 5 . 2 01 5
I N S U L AT I O N
REVISION 002 3.24.2015
FA C A D E
REVISION 003 4.3.2015
S T R U C T U R E D E TA I L
S T R U C T U R E D E TA I L
1”=1’
7.50
1”=1’
7.53
7.48
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
S - 300
GEM|NA
BRIGITTE NGO SANDRA BERDICK JIANING SONG
7.50
7.53
7.48
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50 DESIGN
kutan ayata
SITE
meta brunzema
MECHANICAL
robert kearns
STRUCTURAL
sarrah khan
FA C A D E
9.60
9.60
9.60
9.60
8.55
sameer kumar
I N T E R S TAT E 5 smokey point washington state
SUPERMARKET shopping center artisan bazaar farming co-operative bridge cafe
Tr u s s E l e v a t i o n 5.8.2015 1/16”=1’
REVISION 001 2 .1 5 . 2 0 1 5 REVISION 002 3.24.2015 REVISION 003 4.3.2015
9.60
9.60
9.60
9.60
9.60
19.60 S T R U C T U R E E L E VA T I O N
1/16”=1’
S - 200
E1
E1
E1
1
0
G
E1
2
3
E9
E1
4
E8
E7
7.01
7.20
7.01
6.33
7.04
11.05
E1
5
12
.11
0 7.0
5
E6
6.4
2
14.10
6.2 9
6.7
E5
E4
6.2
1
E3
E2
E1
6
9.50
6.2 0
DE
SIT
6
E1
6.2
ME
6.4 5
STR E1
7
.69
6.9 8
FA C T1
E1
18
2
6.7
2
8
T1
1 6.2
.09
6
T7
6
11.1
T6
9.79
9.27
T1
W6
6.37
6.37
4
5
6
7
8
9
T2
0
T2
1
9
10.9
9
9
T1
9.65
7.1
W11
6
7
8
E2
T1
4
10.6
6
7.8
E2 E2 E2 3
T1
9.72
9.15
6.31
W10
3
4
T1
9.66
9.38
6.21
E2
E2
T1
10.05
11.91
W7 W8
2
T1
9.70
10.03 9.80
1
E2
5
T1
9.21
9.56
W3 W4
E2
6.86
E2
9.62
9.52
9.95
W5
6.54
13.96
9.54 9.67
W1
6.14
6.13
15.38
9.70
W2
W9
6.41
9.55
T2
0
7.0
.77
11
T5
E2
3
T9
T8
T4
9
6.
.96
13
0
T3
E1
09
1
T1
T2
2
T2
3
T2
15
W12
.98
6 7.8
6.1
9
4
W13
T2
11
.31
6.8
8
5
W14
6.2
2
1
6.2
W34
3
0
7.0
W15
6.0
W33
6.6 8
7.03 6.1 4
W16
W32
RIB
6.64
5.4
5
W31
W30
TRUSS A
5.5
0
W17
7.9 3
5.9
8
W29
W28
5
5.3 7.39
5.93
5.90
5.09
5.32
5.43
W27
5.60 W26
W18
W25
W19
W20
W21
W22
W23
W24
STRUCTURE ROOF PLAN
1/32”=1’
47
WAVE project type_ Mixed-Use Housing studio critic_Eric Schonennberger site_SoHo, New York size_ 10,000 sq.ft The studio will explore the supermarket typology as a bridge-building above Interstate 5 in Washington State connecting two rest stops situat ed on either side of the highway. The conceptual focus of the studio will be the development of an architectural object that is experienced at two very different speeds; one at 65 mph through the windshield, second at a walking pace from the parking lot. How does one negotiate the trans lation of such difference in perception? What are the architectural rami fications in embracing this difference as a strategy of design? How does an object come into focus? How does speed influence the resolution of articulation? How does its character shift on approach? How does it look in the rear-view mirror? Closer for sure, but perhaps stranger... In response to this brief, we decided to make big use of the close to 5 acre site located in Smokey Point while keeping in mind designing for different views from cars and pedestrians that approach the building at various directions and velocities. We are looking to explore the sense of elongation and transparency through the implementation of materials and precise modeling the structures edges.
48
49
6’
5’ D. B.
30’
22’
A.
C.
12’
E.
5’’ BROADWAY 8’
25’
28’
9’
50 34’
30’
32’
26’
175’
22’
18’
14’
6’
5’ D. B.
30’
22’
A.
C.
12’
E.
5’’ BROADWAY 8’
25’
28’
9’
34’
30’
32’
26’
22’
18’
14’
175’
A. GALLERY
SPRING ST.
B. CAFE C. BOOKSTORE D. PUBLIC SPACE E. READING ROOM
PLAN | SECOND FLOOR 1’=1/16”
51
A. GALLERY
SPRING ST.
B. CAFE C. BOOKSTORE D. PUBLIC SPACE E. READING ROOM
PLAN | SECOND FLOOR 1’=1/16”
52
53
LOW - E D OUB LE GL AZI NG
WATERPROOFI NG MEMB RANE
POU RED CONCRETE FOU N DAT IO N WALL
FOOT ER #4 RE-B ARS COARS E GR AVEL GROU ND
D RAI N
S TONE B ASE CLEAN STONE
55
56
57
58
59
LATTICE project type_ Animating Media studio critic_Jeff Johnson site_Brooklyn, NY size_ 10,000 sq.ft
60
61
62
63
64
65
66
67
SHELL project type_ Health & Wellness Facility studio critic_Jason Vigneri Beane site_Coney, Island, New York size_ 10,000 sq.ft The studio will explore the supermarket typology as a bridge-building above Interstate 5 in Washington State connecting two rest stops situat ed on either side of the highway. The conceptual focus of the studio will be the development of an architectural object that is experienced at two very different speeds; one at 65 mph through the windshield, second at a walking pace from the parking lot. How does one negotiate the trans lation of such difference in perception? What are the architectural rami fications in embracing this difference as a strategy of design? How does an object come into focus? How does speed influence the resolution of articulation? How does its character shift on approach? How does it look in the rear-view mirror? Closer for sure, but perhaps stranger... In response to this brief, we decided to make big use of the close to 5 acre site located in Smokey Point while keeping in mind designing for different views from cars and pedestrians that approach the building at various directions and velocities. We are looking to explore the sense of elongation and transparency through the implementation of materials and precise modeling the structures edges.
68
67
70
71
72
3 2 1
73
4
5
6
7
8
9
10
11
13
12
14
13 11
12
74
Waterfront Infrastructure | coney Islan
programatic circulation
landscape circulation
75
76
77
78
cafe kitchen
14’ 9’
section A - A
lobby/arrival 2nd floor ramp
10’
section B - B
examination rooms
dressing room bathroom /showers
16’
section C - C
79
80
81
ELEVATED/AUTONOMOUS project type_ New Settlement studio critic_Henry Smith Miller site_Brooklyn Naval Yard, New York size_ 10,000 sq.ft The studio will explore the supermarket typology as a bridge-building above Interstate 5 in Washington State connecting two rest stops situat ed on either side of the highway. The conceptual focus of the studio will be the development of an architectural object that is experienced at two very different speeds; one at 65 mph through the windshield, second at a walking pace from the parking lot. How does one negotiate the trans lation of such difference in perception? What are the architectural rami fications in embracing this difference as a strategy of design? How does an object come into focus? How does speed influence the resolution of articulation? How does its character shift on approach? How does it look in the rear-view mirror? Closer for sure, but perhaps stranger... In response to this brief, we decided to make big use of the close to 5 acre site located in Smokey Point while keeping in mind designing for different views from cars and pedestrians that approach the building at various directions and velocities. We are looking to explore the sense of elongation and transparency through the implementation of materials and precise modeling the structures edges.
82
83
84
85
86
87
88
91
92
93
94
95
96
VO ID
LIV
IN
G
RO
OM
E2
BE
su
DR
nr
OO
oo
m
M BE
DR
OO
M KI
TC
HE
N TE
RR
AC
E3
E LIV
IN
G
RO
OM
BE
DR
OO
M BE
DR
OO
M KI
TC
HE
N
E4
TE
RR
AC
E
E5
CL
AS
SR
OO
MS
C1 CL
AS
SR
OO
MS
E6
C2 CL
AS
SR
OO
MS
E7
C3 CONFERENCE OPEN SPACE/ VOI
D
C4
LIV
IN
G
RO
KITCHEN
CAFE
CAFE
OM
BEDROOM
BEDROOM
TERRACE
LIVING ROOM
BEDROOM
BEDROOM
KITCHEN
CENTER
TERRACE
sunroom
E8
BE
DR
OO
M BE
DR
OO
M
su
nro
om
C5
KIT
CH EN TER
RA
CE LIV
IN
G
RO
OM
BE
DR
OO
M BE
DR
F6
C6
OO
M KIT
F4
F5
F1
F2
F3
CH
EN TER
RA
CE
GA
LLE
RY
C7 OF
FIC
E
LO
BB Y
E CENTE
R
LOBB
Y
OFFIC
E
D1
KITCH
EN
TERRA
CE
OPEN
SPAC
E/ CONF
ERENC
D2
TERRA
CE
LIVIN
G ROOM
BEDRO
OM
BEDRO
OM
D3
CAFE
KITCH
EN
BEDRO
OM
sunro
om
BEDRO
OM
D4
CAFE
D5
D6
B7
B6
B5
B4
B3
B2 B1
CAFE
A7
CAFE KITCHEN WORKSPA
SPACE LOBBY
GA
LLE RY
A5
TE RR
AC
E
A4
E
LIV IN
G
RO
OM
BE
DR
OO
M
BE DR
OO
M
KI
TC
HE N
A3
OM RO G IN LIV ID VO
97
m oo nr su
BE DR
OO M
BE DR
OO M
KI TC
HE
N
TE RR
AC
A2
A1
CE/ STUDIO
A6
98
99
100
101
102
103
TWIST HOUSE project type_ Private Residence studio_MTP Architects site_San Francisco, CA size_ 4,000 sq.ft
.
104
1
1.8
2
2.5
3
3.8
4
5 1
1.8
2
2.5
3
3.8
4
5
15'-6 3/4"
ADJACENT BUILDING D6 PP-9
8
7
1
ADJACENT BUILDING
3 7
1'-3 3/4"
31
DW
37
KITCHEN 1
5'-0" 6'-5"
2 18'-11 3/4"
D1 PP-9 DOWN
J1 PP-11
ENTRY
4
C
37
W S
(N) WD FLR
D1 PP-9
(E) WD FLR
CAB.
UP
DOWN
(N) WINDOW SEAT
3'-8"
1410X96
3
(N) CLOS. 1310X58
2
D
STAIR LANDING
1
1
DOWN
7'-4"
1
E
UP
6
11
DOWN
13'-8"
10
J1 PP-12
(N) LAUNDRY /STORAGE 90X41
3
D 3'-8"
6
(N) LIBRARY 1310 X 132
36
G1 E PP-12
(N) M.BED 175X130
D1 PP-10
E
J1 N PP-12
36
1
1
LIVING 1
S
E
OW
D1 PP-10
4
W
(N) M.BATH 146X87
(N) ROOF BEL
1'-4 3/4"
4 6
C
5
31
30
B
F
5
2
(N) BUILT-IN CAB.
BED1
BATH 1
1
A
RG
36
B
VANITY
A
D6 PP-9
E D7 PP-10
7'-3"
D7 PP-10
ADJACENT BUILDING
ADJACENT BUILDING
D2
D2
FIRST FLOOR PLAN
1
1.8
2
2.5
3
3.8
4
3rd FLOOR PLAN
5 1
1.8
2
2.5
3
3.8
4
15'-4 3/4" 13'-4"
ADJACENT BUILDING D6 PP-9
12
A
21
29
DW
1
3533
6'-4 3/4"
ROOF DECK
5'-0"
24 36
S1
2
ADJACENT BUILDING
A
38
166X95 S2
E
W.C. FRIDGE.
BDRM 1 23 38
TV CAB.
11
(N) KITCHEN
D1 PP-11
G1 N1 PP-11
8 5
FRIDGE.
W2
B
11
G1 N2 PP-11
PANTRY
4
36
9
(N) MUSIC
141X129
PREP
B
10
SLOPES SLOPES DN
6
J10 PP-11
ENTRY 12'-6"X9'-6"
E
19
FRIDGE.
1'-6"
D7 PP-10
1
3
2
4
5
6
9
37
UP
88X35
(N) CLOS.
36
DOWN
3
(E) ROOF TO REMAIN
3
2
WC/POWDER 3'-8" 2'-2 1/2"
E
T (N) FLA W BELO
7
D
(N) SKYLIGHT 118X36
E
1
ADJACENT BUILDING ADJACENT BUILDING
E2
2nd FLOOR PLAN
(E) RIDGE
ROOF 8
DWR
C
DOWN
DWR
5
7
(N) ROOF BELOW
138X100
1
D
LIGHT (N) SKY W BELO
D1 PP-9
(N) DINING DM
139X130
14'-5 1/2"
(E) ROOF TO REMAIN
DN
(N) FAMILY ROOM D1 PP-10
DN
3
DN
3
C
SHELVES
W1 D1 PP-11
SLOPES SLOPES
W1
G11 PP-11
9
E2
ROOF PLAN
5
106
107
108
109
MT. TAMALPAIS HOUSE project type_Private Residence studi0_MTP Architects site_Mount Tamalpais size_ 6,000 sq.ft Gently resting on the slope of Mount Tamalpais, this residence is designed as a place of calm focused on the unique views and natural landscape of the site. With the mountain to the west and the San Fran cisco skyline to the south modern accents frame and display the range of scenic discovery.
110
111
112
113
114
115
116
117
OCTAVIA HOUSE project type_ Renovation of Private Residence studio_MTP Architects site_Pacific Heights, San Francisco, CA size_ 4,000 sq.ft
.
118
A
B
C
14'-6"
D
14'-2"
LEGEND
E
20'-3 1/2"
CONSTRUCTION
17'-3 1/2"
B1 B
-
2 HOUR PARTITION
JACKSON STREET
-
1 HOUR WALL
D1 A204
A301
(N) BEARING WALL
A8 A400
155 Montgomery St Suite 201 San Francisco, 94104 CA
FULL HGHT PARTITION EXTENDED TO SLAB ABOVE, NOT RATED
F6 A400
Tel. 415 407 2772
6'-0" 18
17
www. mtparchitects.com
1
EXISTING WALL/ STRUCTURE TO REMAIN
8R 7T VIF
6'-0"
6'-6 1/2"
5
UP
(N)LANDING 012
(N)
LOW HEIGHT PARTITION,
UP
7
(E)GARAGE
(N) BEDROOM 16'-1" x 13'-8" 003
1
2255 OCTAVIA STREET
19
007
WALL OF ADJACENT RESIDENCETO REMAIN, TYP, NIC
FD
10
1
(E) (N)
8'-9 1/2"
2 10
5'-1 1/4"
7'-6"
3'-2 1/2"
007
W
G1 1.9 1.8 1.7 1.6 A208
(N)
G1 1.3 1.5 1.4 A209
W WINE SOUTH ELEVATION
E
13
A300
(N) ENTERTAINMENT 16'-4" x 24'-3" 001
E
S
25
33 (N) PR
37
010
5
32 41
5'-0"
6
6R 5T
UP
6
(N) DN
9
4
4R 3T
N
D1 A205
UP
10 15 6
3
W
J1 G6 G1 C8 C7 A208
UP
E
1
(N)
S
4R 3T
G5 13 R A401 12 T
25 4
21
UP
2
3'-7 1/2"
SECTION
1
2
A9
(N)HALL 008
10
(N)
G1 1.2 1.1 J1 A208
A402
SHEET NOTES
12
1. REFER TO SHEETS A000, A001, & A120 FOR ADDITIONAL INFORMATION. 2. PATCH AND REPAIR AND PREP ALL PARTITIONS AS REQ'D PRIOR TO FINAL FINISH APPLICATIONS. 3. NEW PARTITIONS, (TYPICAL UNLESS OTHERWISE NOTED TO BE 2X4 WD STUDS AT 16" O.C. WITH ONE LAYER OF GWB SCREWED ON EACH SIDE. FROM TOP OF FLOOR TO FINISHED CEILING UNLESS OTHERWISE NOTED. 4. ALL DRYWALL CONSTRUCTION, BOTH EXISTING CONSTRUCTION TO REMAIN AND NEW CONSTRUCTION, IS TO BE TAPED AND SANDED TO A SMOOTH AND CONTINUOUS LEVEL 5 FINISH AND TO BE PRIMED TO RECEIVE SPECIFIED FINISHES. 5. UNLESS OTHERWISE NOTED, REFER TO SHT A001 FOR ALL TYPICAL MOUNTING HEIGHTS. 6. PROVIDE AND INSTALL ALL FIRE EXTINGUISHERS AS REQUIRED BY STATE AND LOCAL CODES. 7. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL BLOCKING AS REQUIRED. 8. ALL NEW CONSTRUCTION SHALL MATCH EXISTING CONSTRUCTION WHEREVER POSSIBLE. VERIFY COORDINATION AND RELOCATION OF MILLWORK, PANELING, ETC... WITH ARCHITECT. 9. CONTRACTOR TO COORDINATE WITH CUSTOM FURNITURE/MILWORK VENDOR TO PROVIDE BLOCKING AS REQUIRED.
E
S
2
2 (N)
4'-3 1/2"
ALIGN FLUSH TYP.
(N) PLANTING
(N)
24
24 4'-3 1/2"
A8 A400
ALIGN FLUSH TYP.
4'-3 1/2"
6
B1 B A301
D1 A206
N
BASEMENT CONSTRUCTION PLAN
NTS 1/4"= 1'0" 0
PROVIDE (N) REINFORCED CONC. SLAB @ +/- 9'-0" BELOW (E) FIRST FLOOR FRAMING TYP. SEE WALL SECTIONS SHT A900 & STRUCT DRWGS.
3
PROVIDE (N) 3/8" TEMP GLASS @ WINE STORAGE MOUNT ON STAIR STRINGER. SEE INTERIOR ELEVATIONS ON SHEET A208.
4
K +24'-2" TOP OF RIDGE
+21'-0" 2ND FLOOR CEILING
I
14
PROVIDE (N) SLIDING DOOR FOR (N) POWDER ROOM
EQUIPMENT SUPPLIED BY OWNER
15
PROVIDE (N) SLIDING GLASS DOOR W/ CONCEALED GLIDES
1
PERSONAL COMPUTER
14
WIRELESS ROUTER
26
WATER DISPENSER
39
16
ALIGN (N) PARTITION W/ (E) PARTITION ABOVE SEE STRUCT DWG FOR TY NOTES & DIM.
2
HOME AUTOMATION SYSTEM CONTROL
15
VIDEO INTERCOM
27
INSTA/HOT
40
FAUCET #1
17
TOP OF (E) RETAINING WALL. SEE (E) ELEVATIONS
3
ENTERTAINMENT CENTER
16
28
ON-DEMAND HOT WATER HEATER
41
FAUCET #2
18
(N) LANDSCAPE STAIR. MATCH (E) LANDSCAPE STAIRS IN GARDEN
HOME AUTOMATION SYSTEM PERSONAL INTERFACE
4
VIDEO PROJECTOR
29
POT FILLER
42
SHOWER
5
MEDIA SERVER
30
FREE STANDING BATHTUB
Tel. 415 407 2772
6
SATELLITE HOOKUP
31
SHOWER PAN
www. mtparchitects.com
7
RETRACTABLE TELEVISION
32
23" BLU BATHWORKS SINK
8
TELEVISION
20
STACKABLE WASHER & DRYER
33
TOILET - KOHLER
9
DVD PLAYER
21
DISHWASHER
34
24" LAUNDRY SINK
10
TELEPHONE
22
MICROWAVE
35
SS BAR SINK
11
CABLE TV JUNCTION BOX
23
WINE COOLER
36
REFRIGERATOR DRAWER
37
TOILET- DURAVIT
38
MIRROR-EVERLIFE
19
LOCATION OF (E) SANDTRAP CONNECT TO ALL (N) & (E) PERMETER DRAINS & ANY REQ'D BELOW SLAP DRAINS
PROVIDE (N) LANDING RISERS & TREADS @ (E) STAIR AS REQ'D TO ACCOMODATE LOWER FLOOR
20
2X4 CLR WHITE OAK SLATES @ VANITY MATCH WHITE OAK FLOOR
REUSE (E)MECHANICAL EQUIPMENT
21
(N) 2 X CLR OAK CAP @ (N) FURRING ALIGN FLUSH W/ WINDOW SILL
22
(N) LOW HT PARTITION W/ CLR WHITE OAK TOP CAP MATCH WHITE OAK FLOOR FIN TO ACTS AS NEW LONG SHELF
RELOCATE (E) STACKABLE WASHER & DRYER REMOVE (E) RISERS & TREADS AS REQUIRED TO ACCOMODATE LOWER FLOOR SLAB. PROVIDE (N) FULL HEIGHT PARITION WITH DOOR TYP.
10
PROVIDE (N) WD FLOOR
11
PROVIDE (N) CERAMIC TILE FLOOR & WALLS @BATH TYP
12
PROVIDE (N) SITE WALL
23
(E) STAIRS & WALK WAY
24
(N) LIGHTWELL. SEE STRUCTURA DWGS. PROVIDE DRAIN CONNECTED TO (N) PERIMETER DRAIN SYSTEM 10
25
(N) HANDRAIL. SEE E1/A209 & E6/A209 FOR TYP NOTES & DIMS
17
WARMING OVEN
19
REFRIGERATOR SUB-ZERO 48"
12
DSL JUNCTION BOX
24
GARBAGE DISPOSAL
13
MODEM
25
BUILT-IN COFFEE MAKER
CONSTRUCTION REV
08/24/17
9.
CONSTRUCTION REV
07/27/17
8.
PERMIT REVISION
07/26/17
7.
CONSTRUCTION DOCUMENTATION
05/15/17
6.
DESIGN DEVELOPMENT
04/10/17
5.
PERMIT
03/16/17
4.
SCHEMATIC DESIGN
02/13/17
3.
ADDENDUM
02/12/17
2. 1.
PRICING SET DESIGN CONCEPT
01/18/17 10/27/16
REVISIONS/SUBMISSIONS
DATE
Copyright 2016 by M.T.P Architects. All rights reserved.No part of this work may be reproduced, charged, copied, or transmitted in any form or by any means electric, or mechanical, including but not limited to photocopying and recording or by any storage and retrieval system, except as may be expressly permitted in writing by M.T.P Architects.
SINK
DRAWING 155 Montgomery St Suite 201 San Francisco, 94104 CA
STEAM OVEN
18
10
NO.
EQUIPMENT SUPPLIED BY GENERAL CONTRACTOR
6
9
16
PROVIDE (N) SLIDING GALSS DOOR w/ CONCEALED GLIDES
(N) LOWER LANDING AS REQ'D FOR FLUSH EXIT FROM (N) DOORS. PROVIDE BRICK ON SAND, BRICK TO MATCH (E) BRICK @ GARDEN
8
8
13
5
7
J
REMOVE WALL BETWEEN 1ST FLOOR FRAMING & STAIR STRINGER. PROVIDE (N) HANDRAIL.
4
EQUIPMENT LEGEND
KEY NOTES 2
FLOOR DRAIN NOT IN CONTRACT MILLWORK
1 N
(N)
PROVIDE (N) DBL DOORS. PLEASE SEE DOOR SCHEDULE SHT G003.
HOSE BIB
22
2
14
(N)
2
1
NATURAL GAS HOOK-UP
H.B.
(N)
1 6'-6"
(N)
6'-6"
8
4
EQUIPMENT TAB
N.G.
FD
10
(N)
2 2'-11" (N) 20 LNDRY 006
(N)
1'-0"
32 38 40
EXPANSION TANK
5 (N) CLO.
(N) CLO.
32 38 40
37
(N) BATH 005
5
3'-1 1/2"
1
HYDRONIC STORAGE TANK
(N)
(N) BATH 009
(N)
14'-1 3/4"
(N)
ALIGN FLUSH TYP.
1
5
42 31
3'-5 3/4"
6'-1/2"
10'-1/4"
3
42 31
(N) (N)
3'-9 1/4"
(N)
2'-7"
S
D1 A207
KEY NOTE
DETAIL BUBBLE
A
N
4'-0" x 8'-0"
2'-1/2"
N
RENOVATIONS
NEW DOOR REFER TO DOOR SCHEDULE SHT. G001
ELEVATION TAG
1
(N) MECH. 4'-1"
12'-5 3/4"
A300
A1 A402
(N) WINE CELLAR 011
16
A
1
OCTAVIA STREET
8'-9"
7 (N) BEDROOM 9'-7" x 13'-1/2" 004 2'-1/2" 3'-5 3/4"
-
23
2
L
A8 A400
(E)
Designed
MTP
Date
06.09. 2017
Drawn
BN
Scale
1/4"= 1'0"
Checked
MTP
Project No.
1619.1
MTP
Sheet
____ of ____
Reviewed Stamp.
2255 OCTAVIA STREET
5
GSPublisherVersion 0.0.100.100
1
H 3
2 4 6
+0" 0 1ST FlOOR -1'-0" (E)BSMNT FLR CEILING
F -10'-0" (N)BASEMENT FLOOR
-14-4" GARAGE FLOOR
E
1/4"=NTS 1'0"
D1 PROPOSED NORTH ELEVATION
D
0
4
8
16
9.
CONSTRUCTION REV
07/27/17
8.
PERMIT REVISION
07/26/17
7.
CONSTRUCTION DOCUMENTATION
05/15/17
6.
DESIGN DEVELOPMENT
04/10/17
5.
PERMIT
03/16/17
4.
SCHEMATIC DESIGN
02/13/17
3.
ADDENDUM
02/12/17
2. 1.
PRICING SET DESIGN CONCEPT
01/18/17 10/27/16
REVISIONS/SUBMISSIONS
DATE
NO.
Copyright 2016 by M.T.P Architects. All rights reserved.No part of this work may be reproduced, charged, copied, or transmitted in any form or by any means electric, or mechanical, including but not limited to photocopying and recording or by any storage and retrieval system, except as may be expressly permitted in writing by M.T.P Architects.
119
C
B
KEY NOTES
DRAWING
Drawing No.
A110
RENOVATIONS
+11'-0" 1 2ND FLOOR +10'-0" 1ST FLR CEILING
G
BASEMENT CONSTRUCTION PLAN
(N) NORTH ELEVATION
1
(N) MARVIN FRENCH DOOR TO BEDROOM 2. SEE DOOR SCHEDULE REF DOOR 7
2
(E) RETAINING WALL BEYOND VIEW
Designed
MTP
Date
06.09. 2017
3
(N) STAIRS @ LANSCAPE
Drawn
BN
Scale
1/4"= 1'0"
4
(N) GRADE @ FACE OF BUIDING
Checked
MTP
Project No.
1619.1
L LIFT & DROP SPACE
L 2x6 FURING LIFT & DROP SPACE
(N) PAINT GRADE BASE TO MATCH (E) UPSTAIRS
K
1/2" GWB
K
2x4 1/2" STUD GWB
5/8" TYPE X GWB EA SIDE HEADER 1/4" FRY REGLAT REVEAL. 5/8" TYPE X GWB EATYP. SIDE PAINT FLAT BLACK CS122 LED CHANNEL. SEE LIGHTING SCHED @ G003 CS122 LED CHANNEL. SEE LIGHTING SCHED @ G003
1/4" FRY REGLAT REVEAL. PAINT FLAT BLACK TYP. 3/4" SOLID OAK FRAME WD STILE & RAIL 3/4" SOLID OAK FRAME DOOR TO MATCH FRAME
I
WD STILE & RAIL DOOR TO MATCH FRAME
I
(N) ENGINEERED HARDWOOD RISER W/(N) NATURAL MATTEHARDWOOD SEALER, TYP ENGINEERED
HALL 011
5/8" GWB 1/4" 5/8" REVEAL GWB 1/4" REVEAL 2x4 CLR OAK SLAT. SIDE NAILED INTO TOP CAP COUNTERSINK NAIL & FILL WITH MATCHING FILLER 2x4 CLR OAK SLAT. SIDE NAILED INTO TOP CAP COUNTERSINK NAIL & FILL WITH MATCHING FILLER
DOUBLE HEADER
JOIST HANGER SUPPORTS, TYP 2x12 STRINGERS
(N) LED LIGHT CHANNEL. SEE A121 FOR TYP NOTES &DIMS
1 1/8"
MATCH (E) HARDWOOD TREAD MATCH (E) HARDWOOD TREAD
JOIST HANGER DOUBLE HEADER SUPPORTS, TYP
(N) 3/8" x 1 CHANNEL. 1/2 " NOSE (N) LED LIGHT TO MATCH RISER SEE A121 FOR TYPTREAD NOTES&&DIMS
1 1/8" 1 1/2"1 1/2"
1/4" 1/4"
J
HALL 011
TREAD W/ NATURAL MATTE SEALER, TYP (N) ENGINEERED HARDWOOD TREAD W/ NATURAL MATTE (N) 3/8" x 1 1/2 " NOSE SEALER, TYP TO MATCH TREAD & RISER
HEADER 2x4 STUD
J
2x6 FURING
(N) PAINT GRADE BASE TO (N) ENGINEEREDMATCH HARDWOOD RISER (E) UPSTAIRS W/ NATURAL MATTE SEALER, TYP
2255
FIRE 2x12 BLOCKING STRINGERS
3/4" CLR OAK TOP CAP
5/8" TYPE X GWB, FIRE BLOCKING TYP.
GARAGE 007
2255
1/4" REVEAL 3/4" CLR OAK TOP CAP PAINT FLAT BLACK TYP
5/8" TYPE X GWB, TYP.
1/4" REVEAL PAINT FLAT BLACK TYP
3/8" GARAGE 007
3/8" STAIR NOSE DETAIL
H
6"= 1'-0"
STAIR NOSE DETAIL
H
G G
6"= 1'-0"
DETAIL @ DOOR HEAD (JAMB SIM)
G1
DETAIL @ DOOR HEAD (JAMB SIM) G1
3"= 1'-0" NTS
G5
STAIR DETAIL 1 STAIR DETAIL 1
3"= 1'-0"
G5
1 1/2"= 1'-0" NTS
G11
STAIR SLAT DETAIL @ (N) STAIR STAIR SLAT DETAIL @ (N) STAIR
1 1/2"= 1'-0"
G11
3"= 1'-0" NTS
3"= 1'-0"
BOTTOM OF (E) JOIST (N)INTERIOR WALL W/ GWB FIN
LIFT & DROP SPACE BOTTOM OF (E) JOIST
6
F F LED LIGHT STRIP
2x6 FURING LIFT & DROP SPACE
26
(N)RIGID INSUL (N)INTERIOR WALL W/ GWB FIN 1/4" REVEAL (N)RIGID INSUL
2x6 FURING 2
1/4" REVEAL
5/8" GWB
10
CONST
LED LIGHT STRIP
9.
CONST
STACT PANEL
8. 10 7. 9.
PERMIT CONST CONST CONST
1/4" REVEAL 2x8 CLR OAK SLAT
6. 8. 5. 7.
DESIGN PERMIT PERMIT CONST
2x8 CLR OAK SLAT
4. 6. 3. 5.
SCHEM DESIGN ADDEN PERMIT
2. 4. 1. 3. NO. 2.
PRICIN SCHEM DESIGN ADDEN REVISIO PRICIN
1.
DESIGN
3/4" CLR OAK FRAME
E E
MTL RAIL PANEL PROVIDED BY STACT STACT PANEL
LED LIGHT STRIP ALL ROUND
1/2" CONTRACTOR MTL PLYWOOD RAIL PANELBY PROVIDED BY STACT
ANGLE AWAY
HALL 011
D 1/2" PLYWOOD BY CONTRACTOR 5/8" TYPE X GWB EA SIDE
D
5/8" GWB 1/4" REVEAL
3/4" CLR OAK FRAME LED LIGHT STRIP ALL ROUND
ANGLE AWAY
HALL 011
LIGHTWELL LIGHTWELL
2x4 WD STUDS 16" OC 5/8" TYPE X GWB EA SIDE R-19 INSULATION 2x4 WD STUDS 16" OC
3/4" CLR OAK FRAME PRESSURE TREATED SUBSTRAIGHT 3/4" CLR OAK FRAME
9"
B
2
1/4" FRY REGLAT REVEAL. PAINT FLAT BLACK TYP.
B
ENGINEERED WOOD FLOOR BED PROVIDE ADHESIVE SETTING BETWEEN SLATS (N)1/2" PLYWOOD SUBFLOOR PROVIDE ADHESIVE SETTING BED
(N) DRAIN
by any means elec photocopying DRAWINGand except as may be
W
DRAWING Designed
(N)1/2" PLYWOOD SUBFLOOR
Drawn
62
C
(N) DRAIN
FRY REGLAT REVEAL. PRESSURE1/4" TREATED SUBSTRAIGHT PAINT FLAT BLACK TYP.
Copyright 2016 b NO. REVISIO work may be repr by any means elec photocopying and Copyright 2016 b exceptmay as may be work be repr
SLIP SHEET HYDRONIC SLAB
Designed Checked Drawn Reviewed
6
R-19 INSULATION
9"
C
(N) ENGINEERED WOOD FLOOR W/ 1/4" GAP FILL W/ BLACK WOOD FILLER SEALANT (N) ENGINEERED WOOD FLOOR W/ 1/4" GAP FILL W/ BLACK ENGINEERED WOOD FLOOR WOOD FILLER SEALANT BETWEEN SLATS
SLIP SHEET SUB SLAB SLAB HYDRONIC
Checked Stamp. Reviewed Stamp.
SUB SLAB
A A
A1
WALL DETAIL @ (N) WINE CELLAR 011
A1
WALL DETAIL @ (N) WINE CELLAR 011
3"= 1'-0" NTS 3"= 1'-0"
LIGHTWELL DETAIL @ (N) HALL 011 A5 LIGHTWELL DETAIL @ (N) HALL 011 A5
1 1/2"= 1'-0" 1 1/2"= NTS 1'-0"
SLAT DETAIL @ (N) ENTERTAINMENT ROOM 001 A11 3"= 1'-0" SLAT DETAIL @ (N) ENTERTAINMENT ROOM 001 A11 3"= 1'-0" NTS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
isherVersion 0.0.100.100
isherVersion 0.0.100.100
120
W
A
B
C
14'-6"
D
14'-2"
LEGEND
E
20'-3 1/2"
CONSTRUCTION
17'-3 1/2"
B1 B
D1 A204
(E)
(E)
-
1 HOUR WALL
5'-0"
A301
-
2 HOUR PARTITION
JACKSON STREET 8" DEEP NICHE
(E)
(N) BEARING WALL
A8 A400
155 Montgomery St Suite 201 San Francisco, 94104 CA
FULL HGHT PARTITION EXTENDED TO SLAB ABOVE, NOT RATED
F6 A400
Tel. 415 407 2772 www. mtparchitects.com
1
2
(N) ENTRY HALL
A1 A400
102 (E)
6
N
2
1.13 1.12 1.10 1.11 J1 A210
W
(E)
6 (N)RISERS 5 (N) TREDS
DN
8
+5'-0" VIF
6'-6 1/2"
4 (E)
0 sq ft
7 (E)RISERS 6 (E)TREDS
DN
-
LOW HEIGHT PARTITION,
2255 OCTAVIA STREET
(N)
7
WALL OF ADJACENT RESIDENCETO REMAIN, TYP, NIC
E
3
RENOVATIONS
NEW DOOR REFER TO DOOR SCHEDULE SHT. G001
1
S
(E)
(E) DINING
A8 A400
EXISTING WALL/ STRUCTURE TO REMAIN
3
(E)
KEY NOTE
1
104
(E)
(E) SITTING
DETAIL BUBBLE
A UP
105
A300
OCTAVIA STREET
12'-5 3/4"
ELEVATION TAG (E)
A A300
WINE SOUTH ELEVATION
(E)
(E)
7
DN
3
D1 A207
(E) LIVING (E)
C6 G1 A210
(E)
D1 A205
(E)
101
(N) BUTLER PANTRY 103
1
N
G8 A210 1.18 1.17
14'-1 3/4"
W
(E)
1
SECTION
1
EQUIPMENT TAB
N.G.
NATURAL GAS HOOK-UP
H.B.
HOSE BIB FLOOR DRAIN
FD
NOT IN CONTRACT MILLWORK
(E) KITCHEN
WINE MICRO
(E) DEN
106
(E)
SHEET NOTES
109
(E)PANTRY (E)P.R. (E) (E) PLANTING
TRASH
DW
107
DW OVENS
REF.
(E) PLANTING
108
4 10
9
10
B1 B
D1 A206
A301
DN
N
FIRST FLOOR CONSTRUCTION PLAN
1/4"= NTS 1'0" 0
A
B
C
14'-6"
4
8
2
PROVIDE (N)RISERS AS REQ'D TO ACCOMODATE (N)FLOOR LEVEL
3
PROVIDE (N) FULL-HEIGHT PARTITION EA SIDE
10
CONSTRUCTION REV
08/24/17
9.
CONSTRUCTION REV
07/27/17
8.
PERMIT REVISION
07/26/17
7.
CONSTRUCTION DOCUMENTATION
05/15/17
6.
DESIGN DEVELOPMENT
04/10/17
5.
PERMIT
03/16/17
4.
SCHEMATIC DESIGN
02/13/17
3.
ADDENDUM
02/12/17
2. 1.
PRICING SET DESIGN CONCEPT
01/18/17 10/27/16
REVISIONS/SUBMISSIONS
DATE
NO.
Copyright 2016 by M.T.P Architects. All rights reserved.No part of this work may be reproduced, charged, copied, or transmitted in any form or by any means electric, or mechanical, including but not limited to photocopying and recording or by any storage and retrieval system, except as may be expressly permitted in writing by M.T.P Architects.
DRAWING
1ST FLOOR CONSTRUCTION PLAN
LEGEND 4
PROVIDE (N) MTL DOOR. SEE DOOR SCHEDULE SHEET G003.
5
PATCH & REPAIR WALLS @ TV MOUNT LOCATIONS AS REQ'D FOR
6
PROVIDE (N) WD FLOOR TO MATCH (E) 2 HOUR PARTITION
7
REMOVE (E)CARPET REFINISH AND REPAIR(E) WOOD FLOORING 1 HOUR WALL AS REQ'D TO MATCH EXIST SALVAGE (E) BRICK IF PRACTIABLE AND CONSTRUCT NEW FLIGHT OF STAIRS FOR ENTRY. MATCH (E) BRICK STAIRS & LANDINGS A8 (N) BEARING WALL A400 & DIMS (N) LIGHTWELL BELOW. SEE SHT A110 FOR TYP NOTES
SMOOTH AND FLUSH FINISH. OWNER TO SUPPLY COVERINGS CONSTRUCTION
17'-3 1/2"
8
B1 B
D1 A204
(N) MILLWORK BY OWNER CONTRACTOR TO INSTALL. CONTACT CITA ROJAS-SILA, POLIFORM (415) 255-0135
1
E
20'-3 1/2"
KEY NOTES
16
D
14'-2"
1. REFER TO SHEETS A000, A001, & A120 FOR ADDITIONAL INFORMATION. 2. PATCH AND REPAIR AND PREP ALL PARTITIONS AS REQ'D PRIOR TO FINAL FINISH APPLICATIONS. 3. NEW PARTITIONS, (TYPICAL UNLESS OTHERWISE NOTED TO BE 2X4 WD STUDS AT 16" O.C. WITH ONE LAYER OF GWB SCREWED ON EACH SIDE. FROM TOP OF FLOOR TO FINISHED CEILING UNLESS OTHERWISE NOTED. 4. ALL DRYWALL CONSTRUCTION, BOTH EXISTING CONSTRUCTION TO REMAIN AND NEW CONSTRUCTION, IS TO BE TAPED AND SANDED TO A SMOOTH AND CONTINUOUS LEVEL 5 FINISH AND TO BE PRIMED TO RECEIVE SPECIFIED FINISHES. 5. UNLESS OTHERWISE NOTED, REFER TO SHT A001 FOR ALL TYPICAL MOUNTING HEIGHTS. 6. PROVIDE AND INSTALL ALL FIRE EXTINGUISHERS AS REQUIRED BY STATE AND LOCAL CODES. 7. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL BLOCKING AS REQUIRED. 8. ALL NEW CONSTRUCTION SHALL MATCH EXISTING CONSTRUCTION WHEREVER POSSIBLE. VERIFY COORDINATION AND RELOCATION OF MILLWORK, PANELING, ETC... WITH ARCHITECT. 9. CONTRACTOR TO COORDINATE WITH CUSTOM FURNITURE/MILWORK VENDOR TO PROVIDE BLOCKING AS REQUIRED.
A301
9
(E) LIGHTWELL FULL HGHT PARTITION EXTENDED TO SLAB ABOVE, NOT RATED
10
-
Designed
MTP
Date
06.09. 2017
Drawn
BN
Scale
1/4"= 1'0"
Checked
MTP
Project No.
1619.1
MTP
Sheet
____ of ____
Reviewed
Drawing No.
Stamp.
155 Montgomery St Suite 201 San Francisco, 94104 CA
A111
F6 A400
Tel. 415 407 2772 www. mtparchitects.com
(E)
1
EXISTING WALL/ STRUCTURE TO REMAIN
6'-6 1/2"
(E)
GSPublisherVersion 0.0.100.100
(E)TERRACE
(E)
(E)
204
(E)BATH #2
(E)
WALL OF ADJACENT RESIDENCETO REMAIN, TYP, NIC
(E)
(E)
(E)
12'-5 3/4"
1
203
A300
ELEVATION TAG (E)
(E)
DETAIL BUBBLE
A A300
(E)MASTER BEDROOM
4 WINE SOUTH ELEVATION
SECTION
1
202 D1 A207
3
(E)
CLO.
(E)
4
DN
(E)
D1 A205
(N) LAUNDRY CLO.
NATURAL GAS HOOK-UP
H.B.
HOSE BIB
(E) E
210
4
FD
W/D
14'-1 3/4"
S
NOT IN CONTRACT 1
(E)
1
1
208
MILLWORK
(E) MASTER BATH
(E)BEDROOM #1 (E)
(E)
(E)MASTER CLOSET
4
210
(E)BATH #1
SHEET NOTES 1. REFER TO SHEETS A000, A001, & A120 FOR ADDITIONAL INFORMATION. 2. PATCH AND REPAIR AND PREP ALL PARTITIONS AS REQ'D PRIOR TO FINAL FINISH APPLICATIONS. 3. NEW PARTITIONS, (TYPICAL UNLESS OTHERWISE NOTED TO BE 2X4 WD STUDS AT 16" O.C. WITH ONE LAYER OF GWB SCREWED ON EACH SIDE. FROM TOP OF FLOOR TO FINISHED CEILING UNLESS OTHERWISE NOTED. 4. ALL DRYWALL CONSTRUCTION, BOTH EXISTING CONSTRUCTION TO REMAIN AND NEW CONSTRUCTION, IS TO BE TAPED AND SANDED TO A SMOOTH AND CONTINUOUS LEVEL 5 FINISH AND TO BE PRIMED TO RECEIVE SPECIFIED FINISHES. 5. UNLESS OTHERWISE NOTED, REFER TO SHT A001 FOR ALL TYPICAL MOUNTING HEIGHTS. 6. PROVIDE AND INSTALL ALL FIRE EXTINGUISHERS AS REQUIRED BY STATE AND LOCAL CODES. 7. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL BLOCKING AS REQUIRED. 8. ALL NEW CONSTRUCTION SHALL MATCH EXISTING CONSTRUCTION WHEREVER POSSIBLE. VERIFY COORDINATION AND RELOCATION OF MILLWORK, PANELING, ETC... WITH ARCHITECT. 9. CONTRACTOR TO COORDINATE WITH CUSTOM FURNITURE/MILWORK VENDOR TO PROVIDE BLOCKING AS REQUIRED.
4
201
209 (E)
(E)
FLOOR DRAIN
(E)
(E)
(E)
(E)
D1 A206
121
EQUIPMENT TAB
N.G.
(E)
A1 1.15 1.14 A402
4
KEY NOTE
4 4
207
(E)
RENOVATIONS
NEW DOOR REFER TO DOOR SCHEDULE SHT. G001
(E)
CLO.
206
(E)READING A
1
(E)STUDY
(E)
(E)BEDROOM #2
-
2255 OCTAVIA STREET
205 (E)
2
A8 A400
LOW HEIGHT PARTITION,
(E)
(E)
B1 B A301
1/4"= NTS 1'0" 0
4
8
CONSTRUCTION REV
07/27/17
8.
PERMIT REVISION
07/26/17
7.
CONSTRUCTION DOCUMENTATION
05/15/17
6.
DESIGN DEVELOPMENT
04/10/17
5.
PERMIT
03/16/17
4.
SCHEMATIC DESIGN
02/13/17
3.
ADDENDUM
02/12/17
2. 1.
PRICING SET DESIGN CONCEPT
01/18/17 10/27/16
REVISIONS/SUBMISSIONS
DATE
NO.
Copyright 2016 by M.T.P Architects. All rights reserved.No part of this work may be reproduced, charged, copied, or transmitted in any form or by any means electric, or mechanical, including but not limited to photocopying and recording or by any storage and retrieval system, except as may be expressly permitted in writing by M.T.P Architects.
N
SECOND FLOOR CONSTRUCTION PLAN
9.
16
DRAWING
KEY NOTES 1
PROVIDE (N)COUNTER TOP, BASE CAB & UPPER CAB
Designed
2ND FLOOR CONSTRUCTION PLAN MTP
Date
06.09. 2017
(E) WOOD FLOOR JOIST
L
K
+9'-6 1/2" AFF
(N) ACOUSTIC BATT
J
RCJ
+9'-0" AFF
VAULT UP
(N) 3/4" PLYWOOD SHEATHING
EXT GRADE
(N)KNIFE EDGE ALUMINIUM EXTRUSION LIGHT FIXTURE. SEE LIGHTING SCHEDULE SHEET G003 (REF FIXTURE KE01) & ELEVATION J1 ON SHEET A208 FOR MORE INFO
22
(N) 2x6 WD FURRING
(N) 5/8" GWB
DETAIL CEILING LIGHT COFFER
J6
I
(N) 2xFLAT PRESSURE TREATED FURRING W/ RIGID FOAM INSUL BETWEEN R-13 MIN
(N) 5/8" GWB
H
(N) PANELING W/ PAINT-GRADE 1X2 WD BOARD
2x4WD STUDS @16"OC
5/8" WD FLOORING (N) MVP4 VAPOR PROTECTION OR EQUAL
ACCOUSTIC BATT ISUL
(N) LOW E SLAB SHIELD OR EQUAL
G
(N) 6" CONCRETE RET WALL. SEE STRUCT DWGS
1/4" REVEAL BASE BLOCKING
(N) DOOR. SEE DOOR SCHEDULE
HYDRONIC HEATING SLAB W/TUBING
PRESSURE TREATED SILL PL
STRUC SLAB
EDGE OF EXT WALL
(E) CONCRETE WALL, VIF. SEE STRUCT DWGS
F
F6
INT WALL DETAIL 1/4" FRY REGLAT REVEAL. PAINT FLAT BLACK TYP.
E
(N) 2" FLUSH WD BASE
(N) WOOD FLOOR MATCH EXISTING
(E)BATTERED RET WALL., VIF SEE TRUCTURAL DRAWINGS
(N) COPPER FLASHING @THRESHOLD (N) 5/8" ENGINNEERED WD FLOOR
(N) WOOD SUB FLOOR
10 9. 8. 7.
(E) FLOOR JOISTS
6. 5.
D
PATCH & REPAIR (E) GWB AS REQ'D TO ACCOMODATE (N) STRUCTURAL ELEMENTS. SEE STRUCT DRWGS FOR TYP NOTES & DIM
(N) FURRING AS REQ'D TO RAISE FLR FOR FLUSH ALIGNMENT W/ (E) ENTRY
4. 3. (N) MVP4 VAPOR PROTECTION OR EQUAL
(N) BRICK LANDING & STAIR TO MATCH (E)
2. 1.
(N) HYDRONIC HEATING SLAB W/ TUBING
NO. (N)WATERPROOF MEMBRANE OVER SLIM DRAINAGE MAT
(E) BRICK TO BE REMOVED (N) LOW E SLAB SHIELD OR EQUAL
DOWEL #4 BARS INTO CONCRETE SIDE WALLS 6" MIN AND SET WITH EPOXY
C
Copyrig work m by any m photoco except a
BOT OF 2X FLAT PRESSURE TREATED FURRING @STRUCT SLAB
(N) CONCRETE SUB SLAB. SEE STRUCT DWGS
DRAW #4 @ 12" EW
(N)CONC RETAINING WALL & PIER FOOTING BELOW (E). SEE STRUCT DWGS
CONCRETE FILL FOR (N) STAIRS
Design
Drawn
B
Check
(E) GARGE WALL VIF
Review (N) PERIMETER DRAIN PER GEOTECH REPORT
A
rVersion 0.0.100.100
A1
DETAIL @ (N) EXTERIOR VAULT ENTRY AND STAIR
1
2
3
4
A8
5
6
7
8
BASEMENT WALL SECTION
Stamp
NTS
1 1/2"= 1'-0"
9
10
11
12
13
14
123
BLUEPRINT project type_INSTALLATION GALLERY EXHIBITION studio_STOREFRONT FOR ART AND ARCHITECTURE & S0-iL & JANA WINDERMEN site_SoHo NY
124
125
126
127
128
129
SITUATION NY project type_GALLERY EXHIBITION studio_STOREFRONT FOR ART AND ARCHITECTURE & Marc Fornes The Very Many site_SoHo NY
130
131
132