Camp Daisy Hindman, Splash Park / Review 1

Page 1

Camp Daisy Hindman

Splash Park and bath house



POOL AREA



ENTRY AREAS







Outdoor seating

Restrooms Picnic Area Showers / Changing Rooms Storage

Splash Park

Outdoor seating

SITE PLAN


SITE SECTION


TREE TRANSPLANT


GENERIC OR PREFABRICATED BARN/SHED


PROGRAMMATIC VOLUMES


Outdoor seating

Sinks

Water Closets

Outdoor showers

Sinks Showers

Storage

Picnic Area

ADA

Storage

Utility

Changing Room Storage

PLAN


SECTION


Schematic design is solidified and documentation begins.

Site work begins immediately for the foundations of two sheds.

FEBRUARYMARCHAPRILMAY

FEB MARCH APRIL MAYFEB


Documentation of interior volumes are underway.

A prefabraicated system of wooden posts and beams is purchased and assembled.

FEBRUARYMARCHAPRILMAY

FEB MARCH APRIL MAYFEB


Construction of interior volumes begin.

Building is clad. One side remains open so volumes can be inserted.

FEBRUARYMARCHAPRILMAY

FEB MARCH APRIL MAYFEB


Construction of interior volumes are completed and they are shipped to site.

Interior volumes are constructed off-site in April and part of May. The volumes are then shipped to the site and placed inside the already completed structure, attached to utilities and the buildings are completely closed off.

FEBRUARYMARCHAPRILMAY

FEB MARCH APRIL MAY


CEDAR SIDING


POLYGAL ROOF \ ~$1.50 PER SF



EAST BUILDING INTERIOR


WEST BUILDING


WEST BUILDING INTERIOR


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.