Construction 07
Construction
Stage 1: Restart
Initiate setting up factory-like pre-assembly work areas Look at what works can be transferred off site Risks related to cash flow and materials availability issues at suppliers The need for workers on site Duration of works on site Waste needed to be removed from site
Stage 2: Reset
Establish a strategy to exploit systematised, standard products, and pre-assembled elements in future projects. Optimise off site content.
Maximise: • Exploiting assembly type operations with personnel trained in that specific assembly process to minimise the number of people working in the same area • Factory based assembly and quality assurance • In-factory commissioning of building management system and associated equipment.
Stage 3: Reinvent
Understanding how systems engineering methodologies can be applied to the specification and delivery of construction projects
Stage 1: Restart
Possible use of offsite manufacture and assembly centres
7
Et parisciis aut faccusa
Stage 2: Reset
Figure 7.2: Procuring for Offsite (RIBA)
Stage 3: Reinvent
Understanding how systems engineering methodologies can be applied to the specification and delivery of construction projects
The opportunities identified in section 5 are explored on a package and whole building basis. These are applicable across a range of building sectors.