kim liên city
bùi quý sơn
kim liĂŞn city volume 3 design development
Area around Hoan Kiem Lake, Hanoi Early XX century
Thanh Xuan District, Hanoi Photo Franรงois Carlet-Soulages, 2016
Kowloon City, Hong Kong Photo Greg Gerard, ca. 1989
University of Ruhuna, Sri Lanka Geoffrey Bawa, 1988
Plan of Hanoi, 1873
Plan of Hanoi, 1885
Plan of Hanoi, 1936
Plan of Hanoi, 2014
reference point / collectivity img. 14
img. 10
img. 09
img. 13
img. 06
img. 02
img. 05
img. 01
series 01
img. 15
img. 11
img. 07
img. 03
img. 16
img. 12
img. 08
img. 04
the ground, the roof, the tiger cage, the water tank
the ground the roof
protection / rejection
dialog / dynamism img. 31
img. 27
img. 23
img. 19
“kim liên city” – transformations of a post-war subsidy-era collective housing area in hanoi
img. 32
img. 28
img. 24
img. 20
03/06/17 15:57
the water tank
KLC_Series01_B1.indd 1
functionality / core
kadk / ibd / sdpd / master’s thesis spring 2017 / bui quy son / supervisor tom mose
img. 30
img. 26
img. 25
img. 29
img. 22
img. 18
img. 21
img. 17
the tiger cage
50m
4 B1 3 B1
4 B1
2 B1
0
B1
1 B1
0 B1
) ew
(n
0 B1
d)
l (o s
bi B9
B7
B8
B7
) ew
(n
B7
l (o s
bi
d)
B6
B5
B4 B3
B4
B2
B1
metro station (project)
metro line 2 (project)
internal roads of the project area
primary internal roads of klc
external roads (outside the boundaries of klc)
healthcare
office
education
retail and service
housing
playground and free space (ground level)
retail and street food (ground level)
{L} project area: 60,000 sqm
original facades (1962)
stairs 1
level 4
level 3
level 2
level 1
–01
–02
–03
–04
–05
–06
–07
–08
–12
–11
–10
–09
stairs 2
level 4
level 3
level 2
level 1
–16
–15
–14
–13
1:200
–13
northwest southeast
stairs 2
–09
–10
–11
–12
–13
–14
–15
–16
–04
–03
–02
–01
stairs 1
–08
–07
–06
–05
–04
2017.04.19
original layout 2 1
4
4
3
3
5
5
1
5
2
2
5
1
5
4
4
3
3
2 1
5
5
5
6
6
6
5 6
6 6 Type 02
Type 01
immediate adaptations upon arrival of residents
2 1
5
4 3
1
2
5
Type 01
Type 02
Type 03
4
4
3
3
2 1
Type 04
4
1
3
5
5
6
6
Type 03
2
4 3
1
2
5
Type 04
Type 05
phase 00 – 1962
1+2. Anteroom + Kitchen: 11.6 / 16.4 sqm 3. Bathroom: 1.7 sqm 4. Toilet: 1.7 sqm 5. Multifunctional room: 10.2 / 18.4 / 22.2 sqm 6. Balcony: 1.1 / 4.0 sqm Total 32 units 32 households (4 per floor per staircase)
Type 01 1+2. 16.4 sqm 3. 1.7 sqm 4. 1.7 sqm 5. 22.2 sqm / 18.4 sqm 6. 4.0 sqm Total: 60.4 sqm
Type 02 1+2. 11.6 sqm 3. 1.7 sqm 4. 1.7 sqm 5. 22.2 sqm / 18.4 sqm / 10.2 sqm 6. 1.1 sqm / 4.0 sqm Total: 65.8 sqm
Original flooring in cement tiles 20 x 20 cm
Type 03 1+2. 11.6 sqm 3. 1.7 sqm 4. 1.7 sqm 5. 22.2 sqm / 18.4 sqm 6. 4.0 sqm Total: 55.6 sqm
Type 04 1+2. 16.4 sqm 3. 1.7 sqm 4. 1.7 sqm 5. 18.4 sqm / 18.4 sqm 6. 4.0 sqm / 4.0 sqm Total: 56.6 sqm
Floor in unfinished concrete
phase 01 – 1962-1985
Shared between 2 households 1. Anteroom: 7.8 / 10.3 sqm 2. Kitchen: 3.5 / 5.6 sqm 3. Bathroom: 1.7 sqm 4. Toilet: 1.7 sqm Private to each household 5. Multifunctional room: 10.2 / 18.4 / 22.2 sqm 6. Balcony: 1.1 / 4.0 sqm
5
6
Total 32 shared units (4 per floor per staircase) 64 households (8 per floor per staircase)
Type 01 1. 10.3 sqm 2. 5.6 sqm 3. 1.7 sqm 4. 1.7 sqm 5. 22.2 sqm
Type 02 1. 7.8 sqm 2. 3.5 sqm 3. 1.7 sqm 4. 1.7 sqm 5. 22.2 sqm
Modifications of the built structure
Type 03 1. 10.3 sqm 2. 5.6 sqm 3. 1.7 sqm 4. 1.7 sqm 5. 18.4 sqm 6. 4.0 sqm
Type 04 1. 7.8 sqm 2. 3.5 sqm 3. 1.7 sqm 4. 1.7 sqm 5. 18.4 sqm 6. 4.0 sqm
Type 05 1. 7.8 sqm 2. 3.5 sqm 3. 1.7 sqm 4. 1.7 sqm 5. 22.2 sqm / 10.2 sqm 6. 1.1 sqm
redivision of dwelling units and start of extensions 5
5
5
6 2
1
2
3
1
3
1
2
3
5
5
6
6
1
2
3
1
2
3 3
4
4
Type 01
Type 02
4
4
Type 03
Type 04
4
Type 05
Construction of B8a and B8b blocks ; Residents to build courtyard of the Martyrs and courtyard of Uncle Ho to protect collective space
Inauguration (April) ; First residents moving in and immediate adaptations (May)
1962
First extensions on the southeast facade (balcony side)
First wave of residents to move out ; Illegal changeover to new residents (between individuals)
1975
1982
1984 1985
Permiss individua renova First extensions on the ground level
1988
199
Type 01 1. 6.0 sqm 2. 5.6 sqm 3. 22.2 sqm
Total 64 units 64 households (8 per floor per staircase)
Type 02 1. 5.4 sqm 2. 2.0 sqm 3. 22.2 sqm 6. 4.5 sqm
Type 03 1. 6.0 sqm 2. 5.6 sqm 3. 18.4 sqm
Extensions on the facade
Type 04 1. 5.4 sqm 2. 2.0 sqm 3. 18.4 sqm 6. 4.5 sqm
Type 05 1. 5.4 sqm 2. 2.0 sqm 3. 22.2 sqm / 10.2 sqm 6. 4.5 sqm
Extensions on the ground
Demolition of the original B4 and B14 blocks ; Construction of new 21-storey B4 and B14 blocks
Construction of 11-storey additional B7 and B10 blocks on former football pitches ; Construction of B7 bis and B10 bis for temporary resettlements (which finally remained and ended up being sold to out-of-towners)
Boom of extensions due to regulations loosened
Decree 61 legalising privatisation of dwelling units (transfer of state-owned properties to individuals) ; First extensions on the northwest facade (hallway side)
2000
Start of extensions’s taxes
2006
2010
Approved project to rebuild 41 ha of KLC
2013
2016 2017
important dates and events
90
phase 02 – 1985-2000
sion for al interior ations
1. Kitchen: 5.4 / 6.0 sqm 2. Bathroom + Toilet: 2.0 / 5.6 sqm 3. Multifunctional room: 10.2 / 18.4 / 22.2 sqm 4. Extension on the facade: from 7.2 to 15.1 sqm 5. Extension on the ground: approx. 10.0 sqm 6. Hallway: 4.5 sqm
original facade and sections (1962)
level 4
level 3
level 2
level 1
level 4
level 3
level 2
level 1
1:200
southwest, northeast aa, bb
2017.04.19
a
b
a
b
main streets with access to all veh
ground occupation: relaxation sp
ground occupation: sports faci
ground occupation: motorbike par
ground occupation: trade acti
buil
main streets with access to all veh
ground occupation: relaxation sp
ground occupation: sports faci
ground occupation: motorbike par
ground occupation: trade acti
street food st
buil
Ink wash landscape painting Sesshu Toyo, late XV century
Parc de la Villette competition entry, Paris OMA, 1982
Villa Verde, Constituciรณn ELEMENTAL, 2010
House of the Future, London Alison and Peter Smithson, 1956
open / collective
closed / intimate
xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
a b
c d
e
f
g
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
x
ix
viii
vii
vi
v
iv
iii
ii
i
2.38
6.54
2.38
3.15
3.00
3.00
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
plan layout
plan layout
stairs 2
stairs 1
plan layout
plan layout
stairs 2
stairs 1
316 216
215
214
213
218
212
211
210
209
208
207
416
315 206
415
314 205
115
114
113
1:200
217
414
413
1:200
1:200 116
313
112
111
110
109
108
107
106
105
1:200
level 2
level 3
201-216: single-storey, 3 beds, 56-59m² 217-218: single-storey, 1 bed, 28m²
301-316: single-storey, 2 beds, 48-50m² 317-318: double-storey (level 3+4), 1 bed, 41m²
stairs 2
stairs 1
level 1
level 4
101, 102, 104, 107, 110, 113: single-storey, 3-4 beds, 71m² 103, 106, 114: beauty salons, 71m² 105: office, 71m² 108, 109, 112, 115, 116: restaurants / cafés, 71m² 111: nursery, 71m²
401-416: single-storey, 1 bed, 40-42m² 317-318: double-storey (level 3+4), 1 bed, 41m²
stairs 2
318 204
318
stairs 1
312 203
412
311 202
411
310
103
2017.04.19
308
307
306
305
317
304
303
302
301
409
408
407
406
405
317
404
403
402
401
201
410
2017.04.19
2017.04.19 104
309
102
101
2017.04.19
plan layout xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
a b
a b c d a b e c df
e g c df
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
e g
f
g
1:200
the bearing
x
ix
viii
vii
vi
v
iv
iii
ii
i
2.38
x
ix
viii
vii
vi
v
iv
iii
ii
i
6.54 2.38
x
ix
viii
vii
vi
v
iv
iii
ii
i 2.38 6.54 3.15 2.38
3.00 2.38 6.54 3.15 3.00
3.00 2.38 3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60 3.15 3.00
3.00 3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
existing load-bearing columns (reinforced concrete) load-bearing walls (ggbfs 2.70existing 3.60 3.60 3.60concrete) 3.60 additional columns (steel) existing structural grid additional structural grid existing load-bearing columns (reinforced concrete) load-bearing walls (ggbfs 2.70existing 3.60 3.60 3.60concrete) 3.60 additional columns (steel) existing structural grid additional structural grid
2017.04.25
existing load-bearing columns (reinforced concrete)
3.00
plan layout xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
a b
a b c d a b e c df
e g c df
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
e g
f
g
1:200
the separation
x
ix
viii
vii
vi
v
iv
iii
ii
i
2.38
x
ix
viii
vii
vi
v
iv
iii
ii
i
6.54 2.38
x
ix
viii
vii
vi
v
iv
iii
ii
i 2.38 6.54 3.15 2.38
3.00 2.38 6.54 3.15 3.00
3.00 2.38 3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60 3.15 3.00
3.00 3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60 3.00
3.60
3.60
3.60
3.60
2.70
3.60
3.60
2017.04.25
3.60
3.60
plan layout xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
a b
a b c d a b e c df
e g c df
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
e g
f
g
1:200
the permeable
x
ix
viii
vii
vi
v
iv
iii
ii
i
2.38
x
ix
viii
vii
vi
v
iv
iii
ii
i
6.54 2.38
x
ix
viii
vii
vi
v
iv
iii
ii
i 2.38 6.54 3.15 2.38
3.00 2.38 6.54 3.15 3.00
3.00 2.38 3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60 3.15 3.00
3.00 3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60 3.00
3.60
3.60
3.60
3.60
2.70
3.60
3.60
2017.04.25
3.60
3.60
plan layout xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
xix
xviii
xvii
xvi
xv
xiv
xiii
xii
xi
x
a b
a b c d a b e c df
e g c df
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60
e g
f
g
1:200
the adaptable
x
ix
viii
vii
vi
v
iv
iii
ii
i
2.38
x
ix
viii
vii
vi
v
iv
iii
ii
i
6.54 2.38
x
ix
viii
vii
vi
v
iv
iii
ii
i 2.38 6.54 3.15 2.38
3.00 2.38 6.54 3.15 3.00
3.00 2.38 3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60 3.15 3.00
3.00 3.60
3.60
3.60
3.60
2.70
3.60
3.60
3.60
3.60 3.00
3.60
3.60
3.60
3.60
2.70
3.60
3.60
2017.04.25
3.60
3.60
plan layout
notes
spaces & functions: 1. hallway 2. unit’s entrance 3. common areas 4. light well 5. toilet 6. bathroom 7. intimate spaces 8. balcony garden
1 2
3
4 5 6 7 8
412
411
tectonic elements: existing load-bearing columns (reinforced concrete) existing load-bearing walls (ggbfs concrete) separation walls envelope walls with openings curtain rails
Kunstnernes Hus Hariton Pushwagner, 2015
9 columns 66.4 44 concrete columns 1.5 1.5 14
32 concrete beams 1.5 1.6 (h) 17.5
17 columns 15.8 24 concrete t-beams 0.5+0.5+0.5 1.6+1 (h) 12.65
38 steel trans. beams 0.75 0.75 17.25
12 steel columns 0.75 0.75 20.5
9 steel columns 0.75 0.75 66.4
12 steel long. beams 0.75 0.75 14.625
4 steel long. beams 0.75 0.75 11.525
1 steel long. beam 0.75 0.75 31.95 measurements in cm for 1:20 model / 2017.05.01
12 column 20.5 (roof)
12 concrete t-beams 0.5+0.5+0.5 1.6+1 (h) 32.7
10 steel vertical beams 0.75 0.75 15.85
24 steel long. beams 0.75 0.75 14.25
1 steel long. beam 0.75 0.75 21.6
1 steel long. beam 0.75 0.75 21.375
1 steel long. beam 0.75 0.75 21.875
24 beams 14.2
1 steel long. beam 0.75 0.75 22.1
12 beam 14.6
52 beams 17.2
ns
0.75 11.53 9.10 11.75 9.60 11.53
17.25
1.00 1.60 14.00 14.00
15.85
14.00 10.00 14.00
0.75 5.00
25.60
66.40
15.85 15.35
0.75
20.50
19.25
14.62
15.85
0.75 14.25 14.25
17.25
4.25 3.31
9.25 45.38
58.00
3 beams 31.9 3.31
37.50
6 beams 11.45
ms 6
EXTENSION STRUCTURE all: wooden sticks 0.8 x 0.8 cm
measurements in cm for 1:20 model / 2017.05.01
FW 2011 RTW Collection Stella McCartney, 2010
FW 2010 RTW Collection Balenciaga by Nicolas Ghesquière, 2009
02
odel 1:20 djust Structure (Rhino)
03
- Model 1:20
04
- Model 1:20 presentation planpresentation plan - Trans. Sections 03-04 1:100
- Model 1:20
- Plans Units 403-404 1: 100
ori
ori
gin
gin
al exi
al exi
stin
stin
g re an mov d a ed dd ed
presentation plan
09
re an mov d a ed dd ed
10 ap
xon. 1:100
pro
- Axon. 1:100
g
m 1
11 ap
pri
ate
- Axon. 1:100 d
pro
pri exterior ate visual d
exterior visu
- Axon. 1:100 original
existing
r an
south elevati 1:100
map hanoi 1:500,000
long. section 1:100 map klc 1:5,000
{L} axonometric 1:500
{L} axonometric 1:500
{M} axonometric 1:100
{M} axonometric 1:100
interior visual
interior long. visu section 1:100
map e
photo registration
4 4 32 3 1
long. section 1:100
16
Visuals int updated presentation Crit 3 odel 1:500
17
- CRIT 3 map existing 1:2,000
{L} axonometric 1:500
exterior visual
- Long. Section 3 1:100 - FINISH ALL {M} DRAWINGS
- FINISH ALL + {M+S} CONC - FINISH ALL (except 1:10)
plan level 3 1:100
plan level 5 1:200
plan level 4 1:200
map project 1:2,000
{M+S} architectural concept
{L} urban strategy
context video
18
{L} context model 1:500
process drawings and models
{M} drawing
1:10
NISH Axon. 1:100 context video
23
24
- FINISH 2 Detail Axon. 1:10 - PRINT 1:100{S}and section model 1:20 contextAxon. video {S} Drawings - Model 1:500
- FINISH Exterior Visual - Vol. 4{S}(Final Design) section model 1:20
1:10
25
1:10
books
- FINISH Interi - Vol. 4 book
05
06
07
- FINISH + ORDER version 3 Vol. 1 (Program) and Vol. 2 (Registration) - Trans. Sections 15-16 1:100 - Plans Units 315-316 1: 100
- Axon. 1:500
- FINISH Axon. 1:500
original
ual
appropriated
photo registration
removed and added
appropriated original
removed and added
version 4 - exam scenario
13
- Furnish Plan Level 3 1:100 - South Elevation 1:100 long. section 1 - Long. Sections 1 + 2 1:1001:100
- Trans. Section 17 1:100 - Retouch Plans 1:200 plan units 403-404 - Retouchlong. Maps 1:500,000 and section 1 1:100 1:100 1:5,000 - Retouch {M+S} Concepts 15-16 - Model 1:500 trans. section 1:100 trans. section 03-04 1:100
al exis
long. section 2 1:100
g re an mov d a ed dd ed
map project 1:2,000
ap
pro
pri
plan units 315-316 1:100
ate
d
plan units 315-316 1:100
photo registration
n3
{L} STRATEGY CEPT {S} DRAWINGS
3
gs
20
plan level 2 1:200
trans. section 17 1:100
trans. section 17 1:100
1:100
map existing 1:2,000 transformation process 1:2,000
{L} urban strategy
map project 1:2,000
{M+S} architectural concept {L} urban strategy
26
ior Visual {L} context model 1:500
{M+S} architectural concept
- PRINT VISUALS - PRINT {L} VOL. context 4 model 1:500 - Model 1:20
2017.04.28
21
- Axon. 1:100
detail axon. original facade 1:10
detail axon. original facade 1:10
detail axon. original facade {S} drawings 1:10 plan level 2 1:200
plan level 5 1:200
plan level 4 1:200
4 32 1
plan units 217 1:100
detail axon. extensions facade 1:10
plan level 1 1:200
plan level 5 1:200
interior visual
- Axon. 1:100 plan level 3
- PRINT ALL EXPLANATION POSTERS (except {S} drawings) and final Axon 1:500 (if modified) plan level 3 1:100 - Model 1:20
{M} axonometric 1:100
2 1
ks
long. section 3 1:100
19
transformation goals
- FINISH + ORDER Vol. 3 (Process) -plan Model 1:20 units 214-213 1:100 - 2 Visuals
trans. section 15-16 1:100
tin
ual n2
14
trans. section 17 1:100
plan units 403-404 1:100
long. section 2 1:100
gin
existing 1:2,000
trans. section 14 1:100
12
n1
ori
appropriated
trans. section 03-04 south elevation 1:100 1:100
map klc 1:5,000
ion
existing
south elevation 1:100
map klcmap hanoi 1:5,0001:500,000
map hanoi 1:500,000
removed nd added
existing
version 5
{S} section model 1:20
books
plan level 2 1:200
detail axon. extensions facade 1:10
plan level 4 1:200
planaxon. level 1 detail 1:200 extensions facade 1:10 2017.04.28
plan level 1 1:200
27
{M} drawings
- Model 1:20 - Model 1:500
process drawings and models
2017.05.04
{S} drawings
28
process drawings and models
- FINISH ALL MODELS - Gather all process materi - Retouch video - Find podium for books
“kim liên city” transformations of a post-war subsidy-era collective housing area in hanoi bui quy son master’s thesis, spring 2017 under the supervision of tom mose the royal danish academy of fine arts schools of architecture, design and conservation institute of architecture and design spatial design, perception and detail