Architectural Design Portfolio

Page 1

BUSANG MAKHELE

ARC HIT E CT URAL P O RT F O L IO SELECTED WORK


01

C O M M U N I T Y DESIGN

MI N I

S P O R T S

TREATI SE

P ROJ E C T

02

l i f e s t y l e URB AN

DESI G N

GROU P

-

4

Y E AR

T H

e s t a t e P ROJ E C T

-

4

T H

C E N H on .

U R B A

Y E AR

H O N .

03 T H E A T R E DESIGN

FI N AL

d e s i g n

PRO J E C T

-

3

RD

Y E AR

04 t e c h n i c a l hon .

+

pre v ious

w or k

d r a w i n g s projects


c o n t e n t

T R E

N

d e s i g n

D E S I G N


COMMUNITY SPORTS CENTRE A CATA LYT IC T O O L FO R UR B A N TRANSFORMATION

01


Type: Public Recreational | Location: Korsten, Port Elizabeth | Year: 2020

The project began with a contextual analysis of Korsten, a township on the outskirts of Port Elizabeth, where residents, like those in many other townships, have been denied basic infrastructure and resources. The project was motivated by key issues discovered on the site. Among the youth, there is a high percentage of unemployment, a lack of resources, gangsterism, and alcohol abuse. In addition to that, t here are also a number of schools in the area which indicates a large influx of school-aged children who frequent the area.

There is a significant lack of recreational spaces in the community, so the goal of the design was to use sports and education as a vehicle of change by providing the community with the necessary recreational and educational facilities, which would ultimately change the narrative of the Korsten community.


page 02

building mass

Building Roof-scape

The design represents itself as a mass in the context that covers the entire site.

The main concept of the design, is

building as an extension of the recreational landscape.

Creating a canopy of activity to happen on the inside and outside of the building.


Public Forecourt

spatial organization

The strategy was to pull the building back in order to create a forecourt, that would include landscaping in order to improve interaction that the building has with pedestrians.

There are four main spaces that make up the design.

s p a t i a l

They organized by the means of their nature, from the most public spaces to the more specialized spaces.

s t r a t e g y

d i a g r a m

The spatial strategy in the building was developed around a central atrium that would serve as both the major movement circulation space and a space where people could experience the building and all of its activities. The atrium is intended to serve as an extension of the forecourt as public space, and this is accomplished by reducing the distinctions between inside and outside by using hard surfaces used on the exterior space of the building and using the natural landscape found in the forecourt area.

The various spaces of the building are organized according to hierarchical size and proximity. A privacy gradient is achieved through several thresholds. The ground floor is public space but there is clear distinction in the level of publicness. Recreational spaces are located further away from the main entrance, in the southern area of the building because they are less public and social spaces are located closer to the entrance (the front). While the private spaces in the building are located on the first floor.

A C atalytic tool for Ur b a n Tr a n s f o r m a t i o n

page 03


Acco m m o d at i on

S c he dul e

1 - Public Forecourt 2 - Games Area 3 - Foyer - Reception - Security 4 - Food Court/ Cafeteria 5 - Courtyard 6 - Commercial Retail 7 - Boxing Facility 8 - Swimming Facility 9 - Mechanical Room

07

09

10 - Educational Resource Centre

06

02

11 - Multi Purpose Hall 12 - 5 Aside indoor soccer pitch

03

13 - Admin Block and Lounge

01

14 - Office and Boxing Lounge 15 - Security

04

16 - Recreational Pool

grou n d

page 04

08

05

floor

e

x

t

e

r

i

o

r

v

i

e

w

t o

w a

r

d

s

m

a

i

n

e

n

t

r

a

n c

e


16

14

12

10

15

11 13

fi r s t

floor

p

u

b

l

i

c

f

o

r

e

c

o

u

r t

A C atalytic tool for Ur b a n Tr a n s f o r m a t i o n

page 05


s

e

c

t

i

page 06

o

n

a

- a

p a

r t

w a

l

l

s

e

c

t

i

o

n


Sustainability Principles 1. Water recycling

4. Natural Ventilation and Lighting

2. Infiltration

5. Health and Wellness

3. Photovoltaic Solar Panels

A C atalytic tool for Ur b a n Tr a n s f o r m a t i o n

page 07


page 08

e

s

w

i

m

m

i

n g

f a c

i

l

x

i

t

t

e

y

r

i

o

r

r

e

c

r

e

a t

i

o

n

a

l

s

p a

a t

r


a c

i

e

u

s

m

+

s

e

c

o

n d

a

r y

e

n t

r

a

n

c

e

b

o x

i

n g

g

y

m

A C atalytic tool for Ur b a n Tr a n s f o r m a t i o n

page 09


THE WETLANDS LIFESTYLE ESTATE S u s ta in ab le and int er active living in the ur ba n e nv i r o nment

02


Type: Urban Design | Location: Summerstrand, Port Elizabeth | Year: 2020

The Nelson Mandela University Investment Company (NMUI), a fully owned subsidiary of the University, invited the fourth year (Hon.) class to compete in a Lifestyle Estate competition. The development’s goal was to establish and operate a facility that would generate revenue and income for NMUI, as well as to provide a facility for the continued training of students in NMU’s hospitality department. The main concept for the development was to build a sustainable and integrated living community that incorporates

environmental experiences in various forms and volumes. Through a contextual analysis and developing an understanding of existing conditions and potential connections on site, the idea was to create a primary central space that would be the main public space, integrating this with natural green system, and creating centers of meeting that would be characterized and edged by public spaces and buildings.


01

page 12

02

p

u

03

b

l

i

c

s

04

q

u a

r

e

05

06

i

n

t

07

e

g

r

w

i

a t t

h

e

d

p

u

n

b

a

l


Water Treatment System 1 - Grease traps:

removal and increase in oxygen production

Eliminates large elements

5 - Filter Treatment:

2 - Sediment Pond:

Removal of iron and other metals, pathogens and chemicals in water supply

Separates suspended solids through the process of clarification in lagoons

6 - Aeration Water Cascade:

3 - Vertical Flow Wetland Removes total suspended solids providing high levels of oxygen

Adding additional oxygen supplies to water 7 - Free Water Surface Wetland:

4 - Horizontal Sub-surface Flow Wetland:

Storage of water supply before recirculation into the community

Nitrogen and Phosphorus

t i

u

c

r

s

a

l

p a c

s

e

y

s

s

t

e

m

s

p

u

b

l

i

c

s

q

u a

r

e

S u s t a i n a b l e and I n t e r a c t i v e li v ing

page 13


h o t e b o u t i q u e page 14

FLOO

R

P

L

SECTION

m

a

i

A N

A

n

-

A

e

n

t

r

a

n c

e

a t

r

i

u

m


3

D

SECTIONAL

a t

r

i

u

m

PE

R

SPECTIVE

p

o

n d

s

p a c

e

S u s t a i n a b l e and I n t e r a c t i v e li v ing

page 15


U N IT S LI V I N G HI G H - E N D page 16

FLOO

R

P

L

SECTION

p

e

d

e

s

t

A N

S

A

-

A

r

i

a

FLOO

n

s

t

r

e

e

t

c

e

n

R

P

L

A N

S

t r

a

l

p

u


SECTION

b

l

i

c

s

B

-

p a c

e

B

p

e

d

e

s

t

r

i

a

n

p

u

b

l

i

c

s

p a c

S u s t a i n a b l e and I n t e r a c t i v e li v ing

e

page 17


HT G R I F E LI page 18

FLOO

R

P

L

SECTION

p

e

d

e

s

t

A N

S

A

-

A

r

i

a

n

s

t

r

e

e

t

c

o

u

r t


t

FLOO

y a

r

d

R

P

L

A N

S

p

e

d

e

s

t

r

i

a

n

s

t

r

e

e

t

S u s t a i n a b l e and I n t e r a c t i v e li v ing

page 19


ABANTU THEATRE cu lt u r a l m eaning and memory throu gh A f ric an s t o ry t el l ing

03


Type: Theatre | Location: Motherwell, Port Elizabeth | Year: 2019

This design was inspired by the idea of architectural storytelling in the African context. The location of the site is in Motherwell, a township located on the outskirts of Port Elizabeth. In this design, I sought to explore an appropriate architectural design that would tell the forgotten, rejected and suppressed narratives of Africa’s indigenous peoples as a result of the colonialism legacy. The intention of the design was to distinguish itself from colonial architecture by embracing the rich heritage of African cultures and beliefs which would result in an architectural intervention that

embraced Africa in all her splendor. The building as an extension of theatre and story-telling.


c o n c e p t

d e v e l o p m e n t

Traditional African settlements impacted the design’s fundamental concept.

residences were constructed around the Kraal. The Theatre design makes use of curves in its shape to emphasize the organic sense of the design and is spatially designed around a central space, the grand foyer, which not only serves as a circulation space but also serves as a public gathering and meeting space within the design.

These settlements were organic in nature, constructed of natural materials and centered on a central space. The central space was made up of gathering and communal places, as well as ‘lesaka’ in seSotho, known as the Kraal, which housed the settlements livestock. The inhabitants’

page 22

p

u

b

l

i

c

s

q

u a

r

e


gr o u n d

floor

f

o

r

e

c

o

u

r t

+

p

u

b

l

i

c

s

e

a t

i

n g

s

p a c

e

C u l t u r a l M e a n i n g and M e m o r y through A frican story telling

s

page 23


s

e

c

t

i

page 24

o

n

a

- a

f

o

r

e

c

o

u

r t

+

m

a

i

n

e

n t

r

a

n

c

e


s

e

c

o

n d

a

r y

e

n t

r

a

n

c

e

C u l t u r a l M e a n i n g and M e m o r y through A frican story telling

page 25


TECHNICAL DRAWINGS s ch oo l + w o r k

04


This section of the portfolio document is a selection of work showing technical drawings of both school and work that I have produced. The first part - 01, are technical drawings made up of my Community Sports Centre Design. The second part - 02, are technical drawings made up of the refurbishment of a University residence project.


COPYRIGHT: Busang Makhele is the proprietor of all rights including copyrights in this material. No reproductions are permitted without written consent. The client accepts the responsibilty of materials content and statement.

14

13

12

11

10

9

18416

20319

7 110

2257

5373

110 948 110

6

230

4315

5256

5

1101000110

230 1206 11010001101000

1830

5350

1101000110

1830

4

3

174

2

The elements shown on this drawing are prototypical design only, they may not be utilized, altered, the specifications changed, or implemented in part, or in whole, in any structire without notification and written approval being issued by Busang Makhele.

1

20885

GENERAL NOTES

10001101000110 1300 174

© ALL DOCUMENTATION IS COPYRIGHTED AND REMAINS IN THE PROPERTY OF NELSON MANDELA UNIVERSITY ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH SABS CODE 0400 N.B.R & LOCAL AUTHORITY BYLAWS. USE FIGURED DIMENSIONS ONLY - DO NOT SCALE. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. CONSTRUCTION WITHOUT THE APPLICABLE MUNICIPAL APPROVAL IS AT THE OWNER'S RISK. THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: - SETTING OUT OF THE BUILDING WITH REFERENCE TO BOUNDARIES AND BUILDING LINES. - BUILD IN APPROVED D.P.C'S TO ALL EXTERNAL WALLS, AROUND WINDOWS, UNDER SURFACE BEDS AND PROVIDE VERTICAL D.P.C'S TO ALL CHANGE IN FLOOR LEVELS. - DRAWINGS PREPARED ON SURFACE EXAMINATION OF SITE. FOUNDATIONS TO BE MIN. 300mm BELOW N.G.L. - BUILD IN PRE CAST CONCRETE LINTELS ABOVE ALL OPENINGS, UNLESS OTHERWISE DIRECTED. - ALL BUILDERS RUBBLE TO BE REMOVED FROM PREMISES AND SITE LEFT CLEAN. - IDENTIFY EXISTING SERVICES AND PROTECT FROM DAMAGE.

282

174

17782

596

320

H

8

stoneclad ut polyurea screed

30 m²

timber panels

timber panels

7 m²

7 m²

25522

Wall assembly: Double skin brick with plaster finish as per arch. spec to comply with SANS part K

GENERAL CONSTRUCTION NOTES

Wall assembly: Double skin brick with plaster finish as per arch. spec to comply with SANS part K

230

4955

230

6585

230

3372

7339

10174

44 m²

Aluminium curtain wall system to Arch. Spec. and specialists detail

9800

06 05

04 03

1798

250

28210

3324 250

3519

3447

4450

08

1000

20349

1830 1000

Outside Seating Area

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

1260

1000

12800

182 m²

Wall assembly: Single skin brick of 110mm to comply with SANS part K

Aluminium curtain wall door system to Arch. Spec. and specialists detail

timber panels

Duct

1855 3712

Stone pebble tree planter

3109

ø 1400 Internal Courtyard

09

timber panels

Ramp at 1:12 as per SANS 10400-S

77 m²

6317

900

2050

1000

07

1830

1800

900 200 900

28000

400

concrete lintel above opening

5000 3726

s214107124@mandela.ac.za

Green Planter as per arch. spec.

1000

stoneclad ut polyurea screed

Wall assembly: Single skin brick of 110mm to comply with SANS part K

59 m²

Stone pebble tree planter

36 m²

BAS Bachelor of Architectural Studies

5035

28800

6000

6000

ARTS

Depaertment of Architecture

320mm retaining brick with cavity, to be filled with 25MPa concrete with wall ties at every 2 brick coarses, as per eng. details and spec.

2353

OF

280

330

FACULTY 270

416

416

616

2566

1800 416

: busangmakhele@gmail.com

9043

8000

Cafe Kitchen

porcelain tile

Wall assembly: Single skin brick of 110mm to comply with SANS part K with plaster finish as per arch. spec

: 214 107 124

10150

Wall assembly: Double skin brick plastered as per arch. spec. with 50mm cavity insulation to comply with SANS part K

Female Ablutions & Change Room Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

Student No. Email

Grass strip in brick paving as per arch. spec.

1800

110

5660

4990

400

130

2605

Wall assembly: Single skin brick of 110mm to comply with SANS part K with plaster finish as per arch. spec

Green landscaping as per arch. spec.

1114

2050

950

4000

8000

236 m²

130

8400

8000

06

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

7022

stoneclad ut polyurea screed

Green landscaping as per arch. spec.

37 m²

05

1633

320

19510

3930

porcelain tile

concrete lintel above opening

° 3.02 12

3490

3029

04

porcelain tile

Stone pebble tree planter

1090

3264

Social Space _ Food Court Seating Area

° 3.02 12

Timber stairs as per finishing schedule

Wall Assembly: Toilet cubicle partioning manufactured using 12mm compact partioning walls and cubicle doors as per arch. spec.

130

Spider-glass curtain wall system to Arch. Spec. and specialists detail Green planter as per arch. spec.

5912

Male Ablutions & Change Room

STAIR 03

919 m²

1800

80mm thick interlocking brick paving on 50mm sand blinding and compacted hardcore to engineer's specificaton

3765

Spider-glass curtain wall system to Arch. Spec. and specialists detail

250

03

Wall assembly: Single skin brick of 110mm to comply with SANS part K with plaster finish as per arch. spec

500

800

Stone pebble tree planter

ø 1400

UP

B

230

Pre-cast concrete stairs as per finishing schedule Riser Height: 180mm Tread Depth: 300mm

6 m² 2340

02

Swimming Facility

Date

Public Forecourt Plaza

STAIR 02

UP

5362

Seating bench as per arch. detail

Description

6365

39 m²

02 01

stoneclad ut polyurea screed

01

736

08 07

No.

Riser Height: 150mm Tread Depth: 300mm

Reception

4268

130

Riser Height: 180mm Tread Depth: 250mm

A

10 09

REVISIONS :

Grass strip in brick paving as per arch. spec

Pre-cast concrete stairs as per finishing schedule

stoneclad ut polyurea screed

Aluminium curtain wall door system to Arch. Spec. and specialists detail

130

Wall assembly: Single skin brick of 110mm to comply with SANS part K with plaster finish as per arch. spec

4047

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

UP

Stainless steel balustarade with 50 diameter handrail to comply with SANS 10400 Part M

3786 concrete lintel above opening

18626 2369

1174

1800

77 m²

3000

C

3000

33416

stoneclad ut polyurea screed

130 900 130

2402

Seating Area

4. All workmanship and materials to be of the best available quality. All materials and components to be as per architects specification and used in accordance with the manufacture's specification and method statement. 5. Any errors, discrepancies, omissions or queries arising from this documentation to be reported to the architect immediatley, for clarification before such work is put in hand.

14799

2800 4087

3694 8596

400

5035

400

3. All structural components to be verified and inspected by the structural engineer.

Stone pebble tree planter

5800

ø 2800

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

1175

6200 8000

7796

4994

18716

400

Aluminium curtain wall door system to Arch. Spec. and specialists detail

2. All building work to be carried out in accordance with NBR, SABS and local authorities building laws and regulations.

Wall assembly: Double skin brick with plaster finish as per arch. spec to comply with SANS part K

16400

Arrival Area

Stone pebble tree planter

Green landscaping as per arch. spec

Arch. Spec. and specialists detail

1301000 280

STAIR 01

80mm thick interlocking brick paving on 50mm sand blinding and compacted hardcore to engineer's specificaton

577 m²

11

51 20 Aluminium curtain wall system to

10 m²

6000

7400 10786 13050

12250

13050

1800

D

porcelain tile

concrete lintel above opening

Stone pebble tree planter

2800

Atrium

ø 2800

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

44 35

1860

Security

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

9200

concrete paving

ø 2800

130

10 m²

300

2800

Wall assembly: Single skin brick of 110mm to comply with SANS part K with plaster finish as per arch. spec

1600

porcelain tile

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Green landscaping as per arch. spec.

4993 9200

130

Reception

3536

6000

Stone pebble tree planter

2800

1980

3000

concrete lintel above opening

49072 8426

230

230 1000

44 05

1000

1300

2696

87 83

4063

31 23

400

2000

1000

280

2000

concrete lintel above opening

2768

7596

3422

1000

5415

2885

4183

230

stoneclad ut polyurea screed

43 m²

3598

stoneclad ut polyurea screed

30 m²

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Spider-glass curtain wall system to Arch. Spec. and specialists detail

454

stoneclad ut polyurea screed

6655

Food Retail Store

Aluminium curtain wall door system to Arch. Spec. and specialists detail

Green seating and planter as per arch. spec.

Seating bench as per arch. detail

8000

Food Retail Store

155 m² Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Wall assembly: Double skin brick plastered as per arch. spec. with 50mm cavity insulation to comply with SANS part K

E

Reception & Waiting Area

stoneclad ut polyurea screed

320mm retaining brick with cavity, to be filled with 25MPa concrete with wall ties at every 2 brick coarses, as per eng. details and spec.

8000

7755

Gym Area

1. The drawing is not to be scaled , use figured dimensions only. All dimensions, heights and angles to be checked and verfied before any work commences on site or in contrators workshop and any discrepancies must be reported to the architect immediately.

Wall assembly: Double skin brick plastered as per arch. spec. with 50mm cavity insulation to comply with SANS part K

concrete lintel above opening

183 m²

3472 4500

304 m²

230

5112

Office

Social Space _ Games Area stoneclad utpolyurea screed

3372

2619

Firts Aid & Physio

1757

280

110

18581

16337

2645

230

929 10088

18116

stoneclad ut polyurea screed

Wall assembly: Double skin brick with plaster finish as per arch. spec to comply with SANS part K

19579

1400

20777

Food Retail Store

28 m²

33 m² 110

Mechanical Pump Room 320

280 1000110

stoneclad ut polyurea screed

1890

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

Stone pebble tree planter

Storage

Female Ablutions & Change Room porcelain tile

1945

2200

1227

7252

900

230 1400

concrete lintel above opening

concrete lintel above opening

6115

Wall assembly: Single skin brick of 110mm to comply with SANS part K with plaster finish as per arch. spec

Wall Assembly: Toilet cubicle partioning manufactured using 12mm compact partioning walls and cubicle doors as per arch. spec.

2651

7052

2200 1830

concrete lintel above opening

320mm retaining brick with cavity, to be filled with 25MPa concrete with wall ties at every 2 brick coarses, as per eng. details and spec.

F

polished concrete

3 m²

1000 110

1000

2178

2257 5175

11797

concrete lintel above opening

310 m²

1600

320

8000

1220

stoneclad ut polyurea screed

Riser Height: 180mm Tread Depth: 250mm

concrete lintel above opening

3 m²

1830

Boxing Area

Timber stairs as per finishing schedule

4385

Duct

15353

01

900

Cleaners polished concrete

04 03 02

2600

08 07 06 05

STAIR 04

Spider-glass curtain wall system to Arch. Spec. and specialists detail

33 m²

110

2178

10 09

UP

G

porcelain tile

Duct

80mm thick interlocking brick paving on 50mm sand blinding and compacted hardcore to engineer's specificaton

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Cleaners 1830

8288

8000

concrete lintel above opening

35 m²

5562

porcelain tile

4742

33 m²

Wall Assembly: Toilet cubicle partioning manufactured using 12mm compact partioning walls and cubicle doors as per arch. spec.

Male Ablutions 4742

Female Ablutions

110

porcelain tile

3897

Male Ablutions & Change Room 320mm retaining brick with cavity, to be filled with 25MPa concrete with wall ties at every 2 brick coarses, as per eng. details and spec.

4610

6000

6000

6000

140

5362

6000

174

8785

6000

280

6000

11908

6000

280

6000

4440

1220

6000

6000

6000

PROJECT TITLE

80333

KORSTEN COMMUNITY SPORTS CENTRE LOCATION

KORSTEN, PE CLIENT

NMU_ACU 403V Busang Makhele

JP Basson

DRAWN BY

CHECKED BY

SIGNATUR REG. #

DRAWING TITLE

GROUND FLOOR PLAN FOR

SCA

1:

WORKING DRAWIGS DRAWING CODE

1

0

1

2

3

4

5 m

SCALE 1: 100

W101

01/02/2021

0003

ISSUE DATE

PROJECT DRAWING NUMBER

COPYRIGHT: Busang Makhele is the proprietor of all rights including copyrights in this material. No reproductions are permitted without written consent. The client accepts the responsibilty of materials content and statement.

13

12

11

10

9

8

7

6

5

4

9426 1000

1000

1000

1000

6665

1000

10344

6928

42129

Columns: 500x200mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

3087

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Screen: 76x76mm timber screen as per arch. spec and details

600

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

34666

2284

SECOND FLOOR

Spider-glass curtain wall system to Arch. Spec. and specialists detail

5690

360

FIRST FLOOR

1053

16033

1174

18624

2602

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

Stainless steel balustarade with 50 diameter handrail to comply with SANS 10400 Part M

Spider-glass curtain wall system to Arch. Spec. and specialists detail

80mm thick interlocking brick paving on 50mm sand blinding and compacted hardcore to engineer's specificaton

Wall assembly: Double skin brick with plaster finish as per arch. spec to comply with SANS part K

GROUND FLOOR 360

1530

2730

5160

4029

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

Wall Assembly: Toilet cubicle partioning manufactured using 12mm compact partioning walls and cubicle doors as per arch. spec.

Seating bench as per arch. detail

Reinforced concrete raft foundation as per eng. details and spec.

1053

3570

1053

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Wall assembly: Single skin unplastered brick of 110mm to comply with SANS part K

Wall assembly: Single skin brick of 110mm to comply with SANS part K with plaster finish as per arch. spec

1 W104 5555 2353

8798 6000

12000 6000

6000

7602 6000

4800

1053

4885

6000

6000

1152

4361 6000

9029 6000

12235 6000

6000

5737 6000

1910 6000

4090

4000 6000

81353

1000

© ALL DOCUMENTATION IS COPYRIGHTED AND REMAINS IN THE PROPERTY OF NELSON MANDELA UNIVERSITY ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH SABS CODE 0400 N.B.R & LOCAL AUTHORITY BYLAWS. USE FIGURED DIMENSIONS ONLY - DO NOT SCALE. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. CONSTRUCTION WITHOUT THE APPLICABLE MUNICIPAL APPROVAL IS AT THE OWNER'S RISK. THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: - SETTING OUT OF THE BUILDING WITH REFERENCE TO BOUNDARIES AND BUILDING LINES. - BUILD IN APPROVED D.P.C'S TO ALL EXTERNAL WALLS, AROUND WINDOWS, UNDER SURFACE BEDS AND PROVIDE VERTICAL D.P.C'S TO ALL CHANGE IN FLOOR LEVELS. - DRAWINGS PREPARED ON SURFACE EXAMINATION OF SITE. FOUNDATIONS TO BE MIN. 300mm BELOW N.G.L. - BUILD IN PRE CAST CONCRETE LINTELS ABOVE ALL OPENINGS, UNLESS OTHERWISE DIRECTED. - ALL BUILDERS RUBBLE TO BE REMOVED FROM PREMISES AND SITE LEFT CLEAN. - IDENTIFY EXISTING SERVICES AND PROTECT FROM DAMAGE.

1000

4913 1022

2970

3878

Wall assembly: Single skin brick of 110mm to comply with SANS part K with plaster finish as per arch. spec

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

5.71°

page 28

320mm retaining brick with cavity, to be filled with 25MPa concrete with wall ties at every 2 brick coarses, as per eng. details and spec.

Beams: 200x600mm Gluman columns bolted to steel bracket as per arch. and eng detail and spec

1570

Aluminium curtain wall system to Arch. Spec. and specialists detail

80mm thick interlocking brick paving on 50mm sand blinding and compacted hardcore to engineer's specificaton

2430

8960

2956

Columns: 400x200mm Glulam columns bolted to steel plate as per eng. spec.

Spider-glass curtain wall system to Arch. Spec. and specialists detail

Floor: Lightweight composite floor with 60mm concrete on 5ply CLT

1206

7383

Spider-glass curtain wall system to Arch. Spec. and specialists detail

3800

2945

Wall assembly: Double skin brick unplastered as per arch. spec. with 50mm cavity insulation to comply with SANS part K

Floor: Lightweight composite floor with 60mm concrete on 5ply CLT

Beams: 200x600mm Gluman columns bolted to steel bracket as per arch. and eng detail and spec

12646

Columns: 200x150mm Glulam columns bolted to steel plate

4382

6352

Wall Assembly: 100mm reinforced pre-cast concrete

3727

2192

GENERAL NOTES 12897

Green roof: Garden soil on 50mm sand layer on 100mm stone layer on 400mm polystyrene on waterproofing 40mm insulation blanket on 10mm screed

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Columns: 500x200mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

3800

The elements shown on this drawing are prototypical design only, they may not be utilized, altered, the specifications changed, or implemented in part, or in whole, in any structire without notification and written approval being issued by Busang Makhele.

174

6.00°

Screen: 76x76mm timber screen as per arch. spec and details

1

2156

5743

22961

5343

2

Double glazing skylight fixed to glulam timber structure bolted to steel plates fixed to GRP wall panels as per arch and specialist details and spec.

86476

174

3

4046

14

GENERAL CONSTRUCTION NOTES: 1. The drawing is not to be scaled , use figured dimensions only. All dimensions, heights and angles to be checked and verfied before any work commences on site or in contrators workshop and any discrepancies must be reported to the architect immediately. 2. All building work to be carried out in accordance with NBR, SABS and local authorities building laws and regulations. 3. All structural components to be verified and inspected by the structural engineer. 4. All workmanship and materials to be of the best available quality. All materials and components to be as per architects specification and used in accordance with the manufacture's specification and method statement. 5. Any errors, discrepancies, omissions or queries arising from this documentation to be reported to the architect immediatley, for clarification before such work is put in hand.

REVISIONS : No. 1

0

SCALE 1: 100

1

2

3

4

Description

Date

5 m

Student No.

: 214 107 124

Email

: busangmakhele@gmail.com s214107124@mandela.ac.za

FACULTY

OF

ARTS

Depaertment of Architecture BAS Bachelor of Architectural Studies

PROJECT TITLE

KORSTEN COMMUNITY SPORTS CENTRE LOCATION

KORSTEN, PE CLIENT

01

NMU_ACU 403V Busang Makhele

JP Basson

DRAWN BY

CHECKED BY

SIGNATURE REG. #

DRAWING TITLE

SECTION FOR

SCALE

WORKING DRAWINGS

1 : 100

DRAWING CODE

Korsten community sports centre

W103

01/02/2021

0003

ISSUE DATE

PROJECT DRAWING NUMBER

REV


COPYRIGHT: Busang Makhele is the proprietor of all rights including copyrights in this material. No reproductions are permitted without written consent. The client accepts the responsibilty of materials content and statement. The elements shown on this drawing are prototypical design only, they may not be utilized, altered, the specifications changed, or implemented in part, or in whole, in any structire without notification and written approval being issued by Busang Makhele.

A

B

606

C

8000

D

8000

E

8000

F

8000

G

8000

H

8000

8000

GENERAL NOTES

482

© ALL DOCUMENTATION IS COPYRIGHTED AND REMAINS IN THE PROPERTY OF NELSON MANDELA UNIVERSITY ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH SABS CODE 0400 N.B.R & LOCAL AUTHORITY BYLAWS. USE FIGURED DIMENSIONS ONLY - DO NOT SCALE. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. CONSTRUCTION WITHOUT THE APPLICABLE MUNICIPAL APPROVAL IS AT THE OWNER'S RISK. THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: - SETTING OUT OF THE BUILDING WITH REFERENCE TO BOUNDARIES AND BUILDING LINES. - BUILD IN APPROVED D.P.C'S TO ALL EXTERNAL WALLS, AROUND WINDOWS, UNDER SURFACE BEDS AND PROVIDE VERTICAL D.P.C'S TO ALL CHANGE IN FLOOR LEVELS. - DRAWINGS PREPARED ON SURFACE EXAMINATION OF SITE. FOUNDATIONS TO BE MIN. 300mm BELOW N.G.L. - BUILD IN PRE CAST CONCRETE LINTELS ABOVE ALL OPENINGS, UNLESS OTHERWISE DIRECTED. - ALL BUILDERS RUBBLE TO BE REMOVED FROM PREMISES AND SITE LEFT CLEAN. - IDENTIFY EXISTING SERVICES AND PROTECT FROM DAMAGE.

57076 25843

5700

25545

Double glazing skylight fixed to glulam timber structure bolted to steel plates fixed to GRP wall panels as per arch and specialist details and spec.

THIRD FLOOR 12760 Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Screen: 76x76mm timber screen as per arch. spec and details

3800

2162

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Mesh: Aluminium mesh screen with green fixed to aluminium framing

Columns: 400x200mm Glulam columns bolted to steel plate as per eng. spec.

SECOND FLOOR

4708

8960 Mesh: Aluminium mesh screen with green fixed to aluminium framing

Columns: 400x200mm Glulam columns bolted to steel plate as per eng. spec.

Spider-glass curtain wall system to Arch. Spec. and specialists detail

2724

600

3400

600

3400

600

3400

600

3400

600

4182

Spider-glass curtain wall system to Arch. Spec. and specialists detail

1212

3800

Stainless steel balustarade with 50 diameter handrail to comply with SANS 10400 Part M

FIRST FLOOR

3564

Spider-glass curtain wall system to Arch. Spec. and specialists detail

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

GENERAL CONSTRUCTION NOTES:

GROUND FLOOR

Wall assembly: Single skin unplastered brick of 110mm to comply with SANS part K

1360

360

4800

5160 Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

360 N.G.L

Stainless steel balustarade with 50 diameter handrail to comply with SANS 10400 Part M

20870

12713

Wall assembly: Double skin brick unplastered as per arch. spec. with 50mm cavity insulation to comply with SANS part K

23506

1. The drawing is not to be scaled , use figured dimensions only. All dimensions, heights and angles to be checked and verfied before any work commences on site or in contrators workshop and any discrepancies must be reported to the architect immediately.

0

2. All building work to be carried out in accordance with NBR, SABS and local authorities building laws and regulations. 3. All structural components to be verified and inspected by the structural engineer. 4. All workmanship and materials to be of the best available quality. All materials and components to be as per architects specification and used in accordance with the manufacture's specification and method statement. 5. Any errors, discrepancies, omissions or queries arising from this documentation to be reported to the architect immediatley, for clarification before such work is put in hand.

REVISIONS : No. 1

1

0

2

3

4

Description

Date

5 m

SCALE 1: 100

COPYRIGHT: Busang Makhele is the proprietor of all rights including copyrights in this material. No reproductions are permitted without written consent. The client accepts the responsibilty of materials content and statement.

The elements shown on this drawing are prototypical design only, they may not be utilized, altered, the specifications changed, or implemented in part, or in whole, in any structire without notification and written approval being issued by Busang Makhele.

G

482 6000

8000

8000

6000

6000

25545

21435

8000 6000

8000

6000 25843

13500

3

2

Columns: 500x200mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

6000

6000

6000

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Double glazing skylight fixed to glulam timber structure bolted to steel plates fixed to GRP wall panels as per arch and specialist details and spec.

THIRD FLOOR

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

12760 Raised pavers system fixed to composite roof structure as per arch. detail and spec.

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

8206

SECOND FLOOR

3800 360

5894

4613

FIRST FLOOR 5160

Double glazing skylight fixed to 100mm concrete wall as per arch. spec. and details Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

Wall assembly: Double skin brick unplastered as per arch. spec. with 50mm cavity insulation to comply with SANS part K

22062

8960 2430

CLT sloping ramp fixed to composite roof structure as per arch and specialist detail and spec.

Spider-glass curtain wall system to Arch. Spec. and specialists detail

Spider-glass curtain wall system to Arch. Spec. and specialists detail

Wall assembly: Double skin brick with unplaster finish as per arch. spec to comply with SANS part K

Wall assembly: Double skin brick with plaster finish as per arch. spec to comply with SANS part K

4913

3873

12468

5660

1910

4090

GENERAL CONSTRUCTION NOTES

GROUND FLOOR

FACULTY

360

OF

ARTS

1. The drawing is not to be scaled , use figured dimensions only. Allofdimensions, Depaertment Architecture heights and angles to be checked and verfied before any work BAS Bachelor Architectural Studies workshop and commences on of site or in contrators any discrepancies must be reported to the architect immediately.

N.G.L

Wall assembly: Single skin unplastered brick of 110mm to comply with SANS part K

Wall assembly: Double skin brick unplastered as per arch. spec. with 50mm cavity insulation to comply with SANS part K

44226

- ALL BUILDERS RUBBLE TO BE REMOVED FROM PREMISES AND SITE LEFT CLEAN. - IDENTIFY EXISTING SERVICES AND PROTECT FROM DAMAGE.

FIRST FLOOR Stainless steel balustarade with 50 diameter handrail to comply with SANS 10400 Part M

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

18519

Stainless steel balustarade with 50 diameter handrail to comply with SANS 10400 Part M Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Columns: 400x200mm Glulam columns bolted to steel plate as per eng. spec.

5160

Green roof as per arch. detail and spec.

6000

12760

SECOND FLOOR

8960

Wall Assembly: 100mm reinforced precast concrete to comply with SANS part K

Spider-glass curtain wall system to Arch. Spec. and specialists detail

THIRD FLOOR

Screen: 76x76mm timber screen as per arch. spec and details

2278

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

© ALL DOCUMENTATION IS COPYRIGHTED AND REMAINS IN THE PROPERTY OF NELSON MANDELA UNIVERSITY ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH SABS CODE 0400 N.B.R & LOCAL AUTHORITY BYLAWS. USE FIGURED DIMENSIONS ONLY - DO NOT SCALE. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. CONSTRUCTION WITHOUT THE APPLICABLE MUNICIPAL APPROVAL IS AT THE OWNER'S RISK. THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: - SETTING OUT OF THE BUILDING WITH REFERENCE TO BOUNDARIES AND BUILDING LINES. - BUILD IN APPROVED D.P.C'S TO ALL EXTERNAL WALLS, AROUND WINDOWS, UNDER SURFACE BEDS AND PROVIDE VERTICAL D.P.C'S TO ALL CHANGE IN FLOOR LEVELS. - DRAWINGS PREPARED ON SURFACE Student No. : 214 107 124 EXAMINATION OF SITE. FOUNDATIONS TO BE MIN. 300mm BELOW N.G.L. Email : busangmakhele@gmail.com - BUILD IN PRE CAST CONCRETE LINTELS ABOVE ALL OPENINGS, UNLESS OTHERWISE s214107124@mandela.ac.za DIRECTED.

1000

15988

Double glazing skylight fixed to glulam timber structure bolted to steel plates fixed to GRP wall Double glazing skylight fixed to glulam timber panels as per arch and specialist details and spec. structure bolted to steel plates fixed to GRP wall panels as per arch and specialist details and spec.

Columns: 200x150mm Glulam columns bolted to steel plate

1000

GENERAL NOTES

1

606

6000

28625

3800

3800

A

1206

1292

B

8000 6000

5700

4

Screen: 76x76mm timber screen as per arch. spec and details

Columns: 200x150mm Glulam columns bolted to steel plate

Wall assembly: Double skin brick unplastered as per arch. spec. with 50mm cavity insulation to comply with SANS part K

800

0

4000

2. All building work to be carried out in accordance with NBR, SABS and local authorities building laws and regulations.

PROJECT TITLE

KORSTEN COMMUNITY SPORTS CENTRE

3. All structural components to be verified and inspected by the structural engineer.

LOCATION

KORSTEN, PE

4. All workmanship and materials to be of the best available quality. All materials and components to

CLIENT

NMU_ACUbe403V as per architects specification and used in

accordance with the manufacture's specification SIGNATURE statement.

Busang Makheleand JPmethod Basson DRAWN BY

CHECKED BY

DRAWING TITLE

REG. #

5. Any errors, discrepancies, omissions or queries arising from this documentation to be reported to the architect immediatley, for clarification before

such work is put in hand. ELEVATIONS FOR

SCALE

1 : 100

WORKING DRAWIGS DRAWING CODE

1

0

SCALE 1: 100

1

2

3

4

5

1

0

1

2

3 m

4

5

1

2

3

4

5

6

7

8

9

10

11

86476 6000

6000

6000

6000

6000

15988

6000

6000

13

Sim

14 4

W104

6000

6000

16433

W104

Roof: 6000 Raised pavement system placed on light weight composite roof as per eng. spec. and detail

6000

25430

6.00°

3800

Wall: Translucent and insulated GRP wall panel fixed to thermally broken aluminium framing

3800

13006

600

2400

600

2400

600

2400

600

2400

600

2400

600

2400

600

2400

600

2400

600

2400

600

2400

600

2400

600

2400

600

2400

600

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Screen: 76x76mm timber screen as per arch. spec and details

Screen: 76x76mm timber screen as per arch. spec and details

Mesh: Aluminium mesh screen with green fixed to aluminium framing

3700

GENERAL NOTES 1476

7960

8960

The elements shown on this drawing are prototypical design only, they may not be utilized, altered, the specifications changed, or implemented in part, or in whole, in any structire without notification and written approval being issued by Busang Makhele.

Sim

Beam: 200x600mm Gluman columns bolted to steel bracket as per arch. and eng detail and spec

8076

SECOND FLOOR

No reproductions are permitted without written consent. The client accepts the responsibilty of materials content and statement.

15

Smooth gravel/ washed pebble border

246

THIRD FLOOR

6000

Double glazing skylight fixed to glulam timber structure bolted to steel plates fixed to GRP wall panels as per arch and specialist details and spec.

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

12760

3

6000

28625

12

3800

6000

1400

Columns: 200x150mm Glulam columns bolted to steel plate

Wall assembly: Double skin brick unplastered as per arch. spec. with 50mm cavity insulation to comply with SANS part K

Stainless steel balustarade with 50 diameter handrail to comply with SANS 10400 Part M

5160

4800

GROUND FLOOR N.G.L 0

Curtain Wall: Double glazing Spider-glass curtain wall system to Arch. Spec. and specialists detail

4930

Spider-glass curtain wall system to Arch. Spec. and specialists detail

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

4000

20885

19815

16346

FACULTY

KORSTEN COMMUNITY SPORTS CENTRE

3. All structural components to be verified and LOCATION inspected by the structural engineer.

PEand materials to be of the best 4.KORSTEN, All workmanship available quality. All materials and components to CLIENT be as per architects specification and used in NMU_ACU 403V accordance with the manufacture's specification and method statement. Busang Makhele JP Basson

SCALE 1: 100

2

3

4

2

5

SIGNATUR

BY CHECKED BY # 5.DRAWN Any errors, discrepancies, omissions or REG. queries arising from this documentation to be reported to the architect immediatley, for clarification before DRAWING TITLE such work is put in hand.

ELEVATION_02

Foundation: Reinforced concrete footing as per eng. spec and details

1

ARTS

2. All building work to be carried out in accordance with NBR, SABS and local authorities building laws PROJECT TITLE and regulations.

Paving: 80mm thick interlocking brick paving on 50mm sand blinding and compacted hardcore to engineer's specificaton

0

OF

1. The drawing is not to be scaled , use figured Depaertmentheights of Architecture dimensions only. All dimensions, and angles to be checked and verfied before any work Bachelor of Architectural commences on siteBAS or in contrators workshopStudies and any discrepancies must be reported to the architect immediately.

25430

Columns: 800x400mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

1

© ALL DOCUMENTATION IS COPYRIGHTED AND REMAINS IN THE PROPERTY OF NELSON MANDELA UNIVERSITY ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH SABS CODE 0400 N.B.R & LOCAL AUTHORITY BYLAWS. USE FIGURED DIMENSIONS ONLY - DO NOT SCALE. ALL LEVELS AND DIMENSIONS TO BE VERIFIED PRIOR TO COMMENCEMENT OF ANY WORK. CONSTRUCTION WITHOUT THE APPLICABLE MUNICIPAL APPROVAL IS AT THE OWNER'S RISK. THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: - SETTING OUT OF THE BUILDING WITH REFERENCE TO BOUNDARIES AND BUILDING LINES. - BUILD IN APPROVED D.P.C'S TO ALL EXTERNAL WALLS, AROUND WINDOWS, UNDER SURFACE BEDS AND PROVIDE VERTICAL D.P.C'S TO ALL CHANGE IN FLOOR LEVELS. Student No. : 214 107 124 - DRAWINGS PREPARED ON SURFACE EXAMINATION OF SITE. FOUNDATIONS TO BE Email : busangmakhele@gmail.com MIN. 300mm BELOW N.G.L. - BUILD IN PRE CAST CONCRETE LINTELS s214107124@mandela.ac.za ABOVE ALL OPENINGS, UNLESS OTHERWISE DIRECTED. - ALL BUILDERS RUBBLE TO BE REMOVED FROM PREMISES AND SITE LEFT CLEAN. - IDENTIFY EXISTING SERVICES AND PROTECT FROM DAMAGE.

GENERAL CONSTRUCTION NOTES:

Floor: Lightweight composite floor with 60mm concrete on 5ply CLT

Wall: Translucent and insulated GRP wall panel fixed to thermally broken aluminium framing

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Wall assembly: Double skin brick unplastered as per arch. spec. with 50mm cavity insulation to comply with SANS part K

360

FIRST FLOOR

360

REV

Busang Makhele is the proprietor of all rights including copyrights in this material.

3800

1000

Date

PROJECT DRAWING NUMBER

COPYRIGHT:

Green Roof: Garden soil on 50mm sand layer on 100mm stone layer on 200mm polystyrene on waterproofing 40mm insulation blanket on 10mm screed

2

W105 Description

0003 No.

ISSUE DATE

m

SCALE 1: 100

1

REVISIONS :

01/02/2021

360

6352

6000

5

6.00°

Columns: 500x200mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

4266

D

57088

6000

Columns: 500x200mm Glulam columns bolted to steel plate bolted to reinforced concrete foundation as per eng. spec.

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

6 C

86476 8000

8000 6000

6928

Wall Assembly: Translusecent GRP wall panels with 150mm insulation fixed to thermally broken aluminium framing

Screen: 76x76mm timber screen as per arch. spec and details

E

7

4800

6000

8

4570

1476

9

246

H

10 F

2162

11

3800

12

13006

13

360

14

360

15

FOR

SC

REVISIONS : WORKING DRAWIGS DRAWING CODE

No.

Sim

W104

1:

Description

Date

W106

01/02/2021

0003

ISSUE DATE

PROJECT DRAWING NUMBER

m

0.5

0

SCALE 1: 50

0.5

1

1.5

2

2.5 m

Column: 800x400mm Glulam column bolted to steel plate fixed to reinforced concrete foundation as per eng. spec.

Bolts: 4M3U Grade 8.8 bolts

Soil/ growing medium

Smooth gravel/ washed pebble border

Waterproofing layer membrane

Filter sheet

80mm Thermal insulation

Rigid drainage membrane

Concrete slab as per Engineer specification

Base Plate: 20mm Steel base plate fixed to concrete footing

Green Roof

3

1 : 10

Student No.

: 214 107 124

Email

: busangmakhele@gmail.com s214107124@mandela.ac.za

Rebar: Adequate rebar to anchor into foundation to resist uplift force

Concrete Pavers

Siphonic roof drainage Bauder insulated outlet

Bolts: 4M3U Grade 8.8 bolts

FACULTY

Waterproofing mebrane

Footing: Reinforced concrete footing as per engineer specification

Concrete slab as per Engineer specification

OF

ARTS

Depaertment of Architecture BAS Bachelor of Architectural Studies

80mm Thermal insulation PROJECT TITLE

KORSTEN COMMUNITY SPORTS CENTRE LOCATION

KORSTEN, PE

2

Column Base Connection

Raised Pavement System

4

1 : 10

1 : 10

CLIENT

NMU_ACU 403V Busang Makhele

JP Basson

DRAWN BY

CHECKED BY

SIGNATURE REG. #

DRAWING TITLE

SECTION AND DETAILS FOR

SCALE

WORKING DRAWINGS

As indicated

DRAWING CODE

0.5

0

SCALE 1: 50

0.5

1

1.5

2

2.5 m

100

0

SCALE 1: 10

100

200

300

400

500

W104

01/02/2021

0003

ISSUE DATE

PROJECT DRAWING NUMBER

REV

mm

T e c h n i c a l D ra w ings

page 29


1 B C200 (A0L)

W1 DEMOLISH EXISTING WALL

ABLUTION DEMOLITION NOTES: • Demolish existing internal walls • Remove all sanitary ware, fittings & piping

D12 WET DUCT

4500 3800

W1 DEMOLISH EXISTING WALL

WET DUCT

1 NORTH BLOCK

700

D19 REMOVE EXISTING DOOR KEEP FRAMED

2591 96 853 D20 ASBESTOS DO NOT TOUCH, TO BE REMOVED BY OTHER

Circulation

1642

ABLUTIONS

Elec. FHR

Cleaners

Elec.

CLEANERS D19 REMOVE EXISTING DOOR KEEP FRAMED

W1 DEMOLISH EXISTING WALL

F.E. Stair WET DUCT

D12 WET DUCT

2

1

C200 (A0L)

C200 (A0L)

D19 REMOVE EXISTING DOOR KEEP FRAMED

10925

2118

D20 ASBESTOS DO NOT TOUCH, TO BE REMOVED BY OTHER

4 COMMUNAL BLOCK D20 ASBESTOS DO NOT TOUCH, TO BE REMOVED BY OTHER

D20 ASBESTOS DO NOT TOUCH, TO BE REMOVED BY OTHER

6104

2 MIDDLE BLOCK WALL TO BE DEMOLISHED TO LINTEL HEIGHT 2400 mm

761

WALL TO BE DEMOLISHED TO LINTEL HEIGHT 2400 mm

STAIR

7428

996

W1 DEMOLISH EXISTING WALL

3089

2250

W1 DEMOLISH EXISTING WALL

4339

D20 ASBESTOS DO NOT TOUCH, TO BE REMOVED BY OTHER

W1 DEMOLISH EXISTING WALL

7428

ABLUTION DEMOLITION NOTES: • Demolish existing internal walls • Remove all sanitary ware & fittings & piping

W1 DEMOLISH EXISTING WALL

FHR

Elec. 510

WET DUCT

2591 A

96 853

A

Circulation

1642

C200 (A0L)

Circulation

D20 ASBESTOS DO NOT TOUCH, TO BE REMOVED BY OTHER

Elec.

1892

C200 (A0L)

FOYER

247 996

3601

1345

6295 7640

96 853

2750

F.E. Stair

2080

10364

ABLUTIONS D19 REMOVE EXISTING DOOR KEEP FRAMED

1548

W1 DEMOLISH EXISTING WALL

Cleaners

1775

STORE ROOM

940

1184

2724 3344

ABLUTION DEMOLITION NOTES: • Demolish existing internal walls • Remove all sanitary ware & fittings & piping

W1 DEMOLISH EXISTING WALL

D19 REMOVE EXISTING DOOR KEEP FRAMED

2718

5. KITCHEN

5170

D12 WET DUCT

W1 DEMOLISH EXISTING WALL

3 SOUTH BLOCK

W1 DEMOLISH EXISTING WALL

D20 ASBESTOS DO NOT TOUCH, TO BE REMOVED BY OTHER

10696

D20 ASBESTOS DO NOT TOUCH, TO BE REMOVED BY OTHER

ABLUTION DEMOLITION NOTES: • Demolish existing internal walls • Remove all sanitary ware & fittings & piping

2 C200 (A0L)

WET DUCT D19 REMOVE EXISTING DOOR KEEP FRAMED

W1 DEMOLISH EXISTING WALL

FHR

Elec.

2623 96 853 D20 ASBESTOS DO NOT TOUCH, TO BE REMOVED BY OTHER

1674

ABLUTIONS Elec.

D19 REMOVE EXISTING DOOR KEEP FRAMED

Cleaners 3682

700

4382

WET DUCT

D19 REMOVE EXISTING DOOR KEEP FRAMED

W1 DEMOLISH EXISTING WALL

W1 DEMOLISH EXISTING WALL

D12 WET DUCT

STEEL COLOUMNS TO BE RETAINED

B

6 BACK OF HOUSE BLOCK

1133

3276

1373

C200 (A0L)

7312

4566

1000

WALL TO BE DEMOLISHED TO LINTEL HEIGHT 2100 mm

2207 1 C200 (A0L) 600

W010 0 GROUND FLOOR PLAN DEMOLITION

1458 1355

1820

4446

1 : 100 1373

6598

HETN001 General Notes

Revisions A

Description

Date

Issued for Target Costing - Additional information added to Fire Door Schedule. Ablution internal shower walls replaced with Cubicle Solution partitioning. Fire doors at Ground Floor fire escape stair re-added. FF&E layouts added. Issued for Construction

1

Checked

20170823

Busang

20170912

Busang

115

1800

115

4500

230 1195 230

WB 018

WB 016

WB 014

WB 012

WB 010

WB 008

WB 006

Room Type 1 008 9 m²

Room Type 1 006 9 m²

WB B004

WB 002

WA WC001.2

WA 002

Room Type 1 024 9 m²

BIC 024b

Room Type 1 022 9 m²

ED1 026

ED1 024

ED2 U007

D1 U027

ED2 U006

Room Type 1 016 9 m²

BIC 018b

ED1 022

Room Type 1 014 9 m²

BIC 016b

ED1 020

Room Type 1 012 9 m²

BIC 014b

ED1 018

Room Type 1 010 9 m²

BIC 012b

ED1 016

BIC 010b

ED1 014

BIC 008b

ED1 012

ED1 010

Tea Kitchen 002 17 m² 4500

BIC 004b

ED1 021

ED1 019

BIC 023b

ED1 017

BIC 021b

ED1 015

BIC 019b

ED1 013

ED1 008

BIC 017b

ED1 011

ED1 006

BIC 015b

ED1 009

ED1 004

BIC 013b

ED1 007

BIC 011b

853 163

ED1 005

BIC 009b

wc

wc

964

964

A0

Land parcel:

R002

0 GROUND FLOOR PLAN DEMOLITION

PROFESSIONAL NUMBER

7176

NAME

SIGNATURE

Reon Van Der Wiel

Consultants in office Drawing number

Drawing number Campus

Land parcel

Discipline

R 002

Series

Drawing number

Revision

A R W010

Stage

1

Room Type 1 019 9 m²

Room Type 1 017 9 m²

Room Type 1 015 9 m²

Room Type 1 013 9 m²

Room Type 1 011 9 m²

BIC 007b

Room Type 1 009 9 m²

BIC 005b

Room Type 1 007 9 m²

BIC 003b

Room Type 1 005 9 m²

BIC 001b

Room Type 1 003 9 m²

WB 023

WB SW002

355

4114

WB 021

WB 019

D3 085

Elec. U004 1 m²

ED5 U004

WB 015

WB 013

WB 011

WB 007

WB 009

WB 005

WB 003

Slop

WET DUCT D3 U001 086 1 m²

ED9 C002

WB 001

W10 TOILET CUBICLE WC WC001.2

whb whb whb

ED4 CLEANERS U002 U002

Room Type 1 001 10 m²

E.J.

WB 017

D12 WET DUCT

WC WC001.3

ED1 001

D2 REPLACE BALUSTRADE

W6 NEW INTERNAL WALL WC WC001.1

2

1

C200 (A0L)

C200 (A0L)

W4 NEW CERAMIC WALL TILES

WA WC001.3

4 COMMUNAL BLOCK

W14 SHOWER CUBICLE

WA WC001.4

853

355

13790

2502

27573

36439 WD C001.1

D12 WET DUCT

2440 WD 0.11

WB 042

WB 040

WB 038

WB 036

WB 034

WB 032

WB 030

WB 028

Room Type 2 040 9 m²

Room Type 2 038 9 m²

Room Type 2 036 9 m²

Room Type 2 034 9 m²

Room Type 2 032 9 m²

Room Type 2 030 9 m²

Room Type 2 028 9 m²

WB C003.4

WB C003.3

WB C003.2

WB C003.1

ED1 036

ED1 037

D2 035

BIC 039b

BIC 037b

BIC 030b

D2 034

ED1 033

D2 030

F.E. Stair SW003 12 m²

WB SW003

Room Type 2 039 9 m²

WB 041

Room Type 2 037 9 m²

D2 031

WB 039

WB 037

WB 035

Room Type 2 031 9 m²

WB 033

WB 031

BIC 027b

WB 029

W6 NEW INTERNAL WALL 230

2441

115

2441

115

2441

115

2441

115

2441

115

W10 TOILET CUBICLE 2441

115

2441

wc

115

WD 027.2

WC WC002.6

2916 972

972

ABLUTIONS WC002 19 m²

1571

1571

shr

2822

853

Circulation C001 61 m²

4713

2441

115

2441

115

2441

115

12665

115

2440

115

2449

115

2441

115

2530

115

W6 NEW INTERNAL WALL W6 NEW INTERNAL WALL

WJ 0.7.5

WJ 0.7.6

STORE ROOM S001 7 m²

ED4 0.4

WE F001.4 WE 0.4

W6 NEW INTERNAL WALL

3535

STORE RM 0.4 8 m²

2157

230 356

ED4 WC004

DUCT U023 1 m² UNISEX whb WC004 9 m² whb

WC 0.4.2

CW1 2

355

3126

WD C001.5

355

3105

345

CW1 8

FHR U030 0 m²

2390 ED3 U030

D29 WC005

WC WC004.1

WB 072

WB 070

WB 068

WB 064

WB 062

WB 060

WB 058

WB 056

WB 054

WJ 0.7.9

WJ 0.7.10

ED4 SW005

A

CW1 5

C200 (A0L)

UP

PARAPLEGIC WC005 5 m² wc

wc wc

WC WC004.2

4008

950

DINING 0.7 255 m²

230

WC WC005

FHR

DINING HUDDLE 0.6 35 m²

3496

CW1 7 ED4 0.8.1 WJ 0.7.11

STAIRS SW005 12 m²

CW1 6 WL 0.8.1

D3 RE-PAINT BALUSTRADE 115 950

2200

WE 0.6.1

WE 0.6.2

WE 0.6.3

WE 0.6.4

WL 0.8.5

WE 0.6.5

1518

10374

D12 WET DUCT WD C001.6

5 KITCHEN BLOCK

W8 DRY WALL

3303

2470

8082

4308

WL 0.8.2

WL 0.8.6

10462

4866

KITCHEN 0.8 115 m²

W14 SHOWER CUBICLE

5333

WL 0.8.3

W6 NEW INTERNAL WALL

W12 BRICK UP WINDOW/DOOR OPENING

WB 066

WJ 0.7.8

wc

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS 115 465 115

3563

CIRCULATION C0.3 37 m²

D07 C0.1

CIRCULATION C0.1 32 m² 267 ED4 U023

CW1 4

CIRCULATION C0.2 38 m²

D5 0.3

W12 BRICK UP WINDOW/DOOR OPENING

WD C001.4

2530

WJ 0.7.7

WL 0.8.7

355

WB 052

WB 050

WB 048

ED9 F003

WA WC003.2

WA WC003.1

365

WB 074

WJ 0.7.4

36439 5170

115

WJ 0.7.3

230 1115

LOBBY F0.1 43 m²

RS 0105

355

10009

2441

ED9 F001

WE F001.3

WC 0.4.1

WD 0.9

355

135

FHR 0.25 0 m²

WC WC002.4

33775

3 SOUTH BLOCK

3500

D3 0.8.30

D3 S001

SECURITY OFFICE 0.3 11 m²

D10 0.2

FOYER F001 18 m²

W6 NEW INTERNAL WALL

696 115 629115

355

WE F001.2

WC WC002.3

W14 SHOWER CUBICLE

115

WARDENS OFFICE 0.2 11 m²

WC WC002.5

shr

WC WC002.2

WE F001.1

UP

1571

shr

WC WC002.1

WE C001

WE 0.2.1 WE 0.2.2

WB C001.2

wc

2500

5000

WD 027.1

WET DUCT U008 2 m²

D

wc

696 whb

Room Type 3 027 15 m²

WB 027

W

972

whb

BIC 029b

Room Type 2 029 9 m²

1500

D2 WC002

D2 027

BIC 031b

Room Type 2 033 9 m²

W6 NEW INTERNAL WALL 355

Circulation C003 64 m²

ED1 029

BIC 033b

BIC 035b

Room Type 2 035 9 m²

DUCT U012 1 m²

ED1 028

853

Room Type 2 041 9 m²

ED5 U010

ED3 U011

BIC 028b

ED1 032

D5 0.1

STAIR SW001 12 m²

ED5 U008

DINING HUDDLE 0.5 31 m²

355

W12 BRICK UP WINDOW/DOOR OPENING

D2 039 BIC 041b

BIC 032b

BIC 034b

D2 038

ED9 C003b

115

UP D2 REPLACE BALUSTRADE

BIC 036b

ED1 040

ED1 041

Cleaners U013 3 m²

BIC 038b

D2 042

FHR U028 0 m²

ED2 U013

Elec. U014 1 m²

BIC 040b

ED1

1350 115 044

D1 U028

WET DUCT U022 1785

ED2 U014

D13 C0.2

WB C001.1

E.J.

324 BIC 042b

D2 046

1350 115 1092 D4 C003

2170

BIC N 044b

Elec. U010 1 m²

FHR U011 0 m²

115

BIC N 046b

Room Type 2 042 9 m²

2001

Room Type 2 044 9 m²

2975

3660

Room Type 2 046 9 m²

FORMAL LOUNGE 0.1 30 m²

W8 DRY WALL

E.J.

WB 044

365

WB 046

D6 NEW B.I.C

WJ 0.7.2

CW1 3

WD C001.3

D14 TIMBER BENCH

W6 NEW INTERNAL WALL

WJ 0.7.1

13771

115

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

W2 REPAIR & RE-PAINT EXISTING EXTERIOR PLASTER WE 0.5.5

4339

2441

WE 0.5.4

3089

115

WE 0.5.3

345

2441

WE 0.5.2

2323

115

WE 0.5.1

2965

2441

WE F0.1.4

4109

115

WE F0.1.3

230

2441

W6 NEW INTERNAL WALL

WE F0.1.2

135

115

WE F0.1.1

3088

2441

WE 0.1.5

912

115

WE 0.1.4

912

2441

WE 0.1.3

912

115

WE 0.1.2

1705

2441

3962

115

W6 NEW INTERNAL WALL

3148

2440

W9 TIMBER ACOUSTIC PANELS

WE 0.1.1

2668

115

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

D3 RE-PAINT BALUSTRADE

2005

10006

2442

W2 REPAIR & RE-PAINT EXISTING EXTERIOR PLASTER

9949

2 MIDDLE BLOCK 355

WD C001.2

10016

9975

9985

1 : 100

1239

Room Type 1 021 9 m²

wc

964

ABLUTIONS WC001 36 m²

2 m²

Room Type 1 023 9 m²

UP F.E. Stair SW002 12 m²

W7 RE-PAINT EXISTING WALL

wc

964

3855

D3 084

115

FHR U003 0 m²

Circulation C002 67 m²

ED1 003

33775

9786

COUNCIL

SACAP

WET DUCT U024 1 m²

355

WET DUCT U005 2 m²

sink

shwr

CW1

49363

Page size

2511

WA WC001.1

D W

Paraplegic Room 004 18 m²

BIC 006b

W12 BRICK UP WINDOW/DOOR OPENING

ED1 023

Cleaners U006 3 m²

Room Type 1 018 9 m²

BIC 020b

FHR U027 0 m²

D4 C002

Elec. U007 1 m²

Room Type 1 020 9 m²

BIC 022b

1600

4015 9786

230 1300 115 1526 115 2130

Room Type 1 026 9 m²

BIC 026b

-305

230 1300 115 1526 115

Scale

Erf:

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

W6 NEW INTERNAL WALL

D14 TIMBER BENCH

WB 004

315

WB 020

W2 REPAIR & RE-PAINT EXISTING EXTERIOR PLASTER

2130

20170912

1630

WB 022

1239

WB 024

D1 004a

W7 RE-PAINT EXISTING WALL

355

Reon

South Campus

9843

W9 TIMBER ACOUSTIC PANELS

W6 NEW INTERNAL WALL

WB 026

10019

Checked

Sol Plaatje University

Campus:

This drawings to be read in conjuction with drawing no:

Requests and enquiries concerning this drawing and the rights subsisting therein should be355 addressed to the copyright owner

3855

Drawing Title

Drawn

Busang

University:

1 NORTH BLOCK

W2 REPAIR & RE-PAINT EXISTING EXTERIOR PLASTER

A

08/21/17

Date

Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution

3082

C200 (A0L)

HETC

This license confers no ownership right in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of

43955

Drawing Info

Project

Contract Number

This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

B

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

W12 BRICK UP WINDOW/DOOR OPENING

Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive license to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.

Signed

C200 (A0L)

6. Refer to project general notes on drawing number C001ARPL001 for a full set of project notes to be adheared to.

D5 REFURBISH B.I.C

Consultant

COPYRIGHT NOTICE:

No.

1 This drawing is not to be scaled, use figured dimensions only. All dimensions, heights, and angles to be checked and verified before any work commences on site or in contractors workshop and any discrepancies must be reported to the architect immediatley. 2 All building work to be carried out in accordance with NBR, SABS and local authorities building laws and regulations. 3 All structural components to be verified and inspected by the structural engineer. 4 All workmanship and materials to be of the best available quality. All materials and components to be as per architects specification and used in accordance with the manufacture's specification and method statement. 5 Any errors, discrepancies, omissions or queries arising from this documentation to be reported to the architect immediatley, for clarification before such work is put in hand.

1239

Project Number:

D1 U029

D2 REPLACE BALUSTRADE

Room Type 1 058 9 m²

ED1 066

ED1 064

ED1 062

ED1 060

BIC 056b

BIC 054b

Room Type 3 052 9 m²

ED1 058

D2 056

D2 054

Room Type 1 067 9 m²

ED1 063 BIC 065b

Room Type 1 065 9 m²

ED1 061 BIC 063b

Room Type 1 063 9 m²

ED1 059

ED1 057

BIC 061b

Room Type 1 061 9 m²

ED1 055

BIC 059b

BIC 057b

Room Type 1 059 9 m²

Room Type 1 057 9 m²

ED1 053 BIC 055b

Room Type 1 055 9 m²

WB SW004

WB 067

355

W2 REPAIR & RE-PAINT EXISTING EXTERIOR PLASTER

WB 065

WB 063

WB 061

WB 059

WB 057

WB 055

W12 BRICK UP WINDOW/DOOR OPENING

D5 REFURBISH B.I.C W7 RE-PAINT EXISTING WALL

1 m²

Slop

D3 Cleaners U016 082

2 m²

Circulation C004 67 m²

D2 048

ED2 078

FHR U017 0 m²

ED5 U018

ED1 046 BIC 051b

Room Type 1 053 9 m²

Room Type 1 051 9 m²

WB 053

D2 050

1099

ED1 051 BIC 053b

whb

Paraplegic Room 049 18 m²

Tea Kitchen 047 16 m²

WB 051

WB B046

D

WB 046

W6 NEW INTERNAL WALL

WB 047

OUTDOOR RECREATIONAL AREA

D14 TIMBER BENCH

ED2 0.8.5

WC WC003.1

WET DUCT U019 wc 2 m²

964

964

964

wc

wc

wc

WL 0.8.10

D43 0.8.1

WA 047

D43 0.8.2

WF 0.8.1

WA WC003.1

ED4 0.8.8 ED8 0.8.9

WA WC003.2 WF 0.8.2

F1 STRIP EXISTING FINISH.

W9 TIMBER ACOUSTIC PANELS

WL 0.8.9

ED2 0.8.4 WC WC003.2

ABLUTIONS WC003 35 m²

964 W

ED4 0.8.3

D3 083

sink

D1 046a

D12 WET DUCT

2

1

C200 (A0L)

C200 (A0L)

ED4 0.8.6

ED4 0.8.7

ED8 0.8.10

G 0.8

W10 TOILET CUBICLE 355

4025

853122

23119

122

2000

115

2882

115

WL 0.8.8

ED4 0.8.2

W6 NEW INTERNAL WALL

WC WC003.3

Elec. whb whb whb U018 1 m²

D3 080 BIC 046b

shwr

wc W12 BRICK UP WINDOW/DOOR OPENING

Room Type 2 048 9 m² BIC N 048b

1350 115

ED1 052

48 853 ED1 065

Room Type 3 050 9 m² BIC N 050b

900 BIC 052b

1220

Room Type 2 054 9 m²

Room Type 2 056 9 m²

785

BIC 058b

21895

BIC 060b

1220

Room Type 1 060 9 m²

BIC 062b

1220

Room Type 1 062 9 m²

9787

ED1 068

BIC 064b

685

Room Type 1 064 9 m²

3033

1000

3033

ED1 070

BIC 066b

822

BIC 068b

BIC 067b

F.E. Stair SW004 12 m²

Room Type 1 066 9 m²

853

FHR U029 0 m² ED1 067

Cleaners U020 3 m²

UP 2130

ED1 072

ED2 U020

BIC 070b

1631

ED2 U021

Elec. U021 1 m²

Room Type 3 068 9 m²

628

D2 074

1350 115 976 115 D4 0.8.51

Room Type 3 070 9 m²

WL 0.8.4

315

W6 NEW INTERNAL WALL

Room Type 3 072 9 m²

BIC N 072b

D3 WET DUCT 087 U015

1600

9786

230 1301 115 1525 115

BIC N 074b

1025

Room Type 2 074 9 m²

D6 NEW B.I.C

628

3660

E.J.

4382

ED8 0.8.11

115

43955

B C200 (A0L)

N

W100 0 GROUND FLOOR PLAN 1 : 100

Project Number:

HETN001 General Notes

02

page 30

1 This drawing is not to be scaled, use figured dimensions only. All dimensions, heights, and angles to be checked and verified before any work commences on site or in contractors workshop and any discrepancies must be reported to the architect immediatley. 2 All building work to be carried out in accordance with NBR, SABS and local authorities building laws and regulations. 3 All structural components to be verified and inspected by the structural engineer. 4 All workmanship and materials to be of the best available quality. All materials and components to be as per architects specification and used in accordance with the manufacture's specification and method statement. 5 Any errors, discrepancies, omissions or queries arising from this documentation to be reported to the architect immediatley, for clarification before such work is put in hand.

6. Refer to project general notes on drawing number C001ARPL001 for a full set of project notes to be adheared to.

Revisions No. A

B C

1

COPYRIGHT NOTICE:

Description

Date

20170823 Issued for Target Costing - Additional information added to Fire Door Schedule. Ablution internal shower walls replaced with Cubicle Solution partitioning. Fire doors at Ground Floor fire escape stair re-added. FF&E layouts added. Issued for Co-ordination - FHR positions to be confirmed by engineer. 20170906 Issued for Co-ordination - Existing door type ED9 on Ground and First floor to 20170907 have Automatic Door Closers installed. Door type ED9 on Second floor to be replaced with Fire Door D9 and also be installed with Automatic door closers. Issued for Construction 20170912

Checked Busang

Signed

Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive license to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.

Consultant Contract Number

Busang

01/08/16

Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner

University:

Sol Plaatje University

Campus:

South Campus

Drawing Title

Drawn

Checked

Busang

Reon

0 GROUND FLOOR PLAN

Date

This license confers no ownership right in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of

Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution

Drawing Info

Project HETC

This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

Binayka Busang

20170912 This drawings to be read in conjuction with drawing no:

COUNCIL

SACAP

PROFESSIONAL NUMBER

7176

NAME

Reon Van Der Wiel

Erf:

2511

Land parcel:

R002

SIGNATURE

Scale

Page size

1 : 100

A0

Consultants in office Drawing number

Drawing number Campus

Land parcel

R 002

Discipline

Series

Drawing number

A R W100

Sol plaatjie university _ JP Hugo residence

Revision

1

Stage


R4 REPLACE FACIA BOARDS

W10 TOILET CUBICLE C4 FLUSH PLASTERBOARD CEILING

R1 RE COAT ROOF SHEETING

R4 REPLACE FACIA BOARDS

R3 REPLACE GUTTERS AND BARDGE BOARDS

W6 NEW INTERNAL WALL

W7 RE-PAINT EXISTING WALL

R2 REPAIR TO ROOF TIMBER

C6 FLUSH PLASTERBOARD BULKHEAD

C2 ACOUSTIC FLUSH PLASTER BOARD CEILING

D2 030

49572 49 3550

R2 REPAIR TO ROOF TIMBER

WG 371

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

CW1 9

MEDIUM SEMINAR

WE F001.1

WE F001.2ED9 F001

D10 0.2

RECEPTION D5 0.3

CW1 8

LOBBY

COMMON AREA LEVEL 1

7699

3550

WG 372

4170

620 1615

7650

WG 373

WJ 0.7.1

WE 0.5.2

WE 0.5.4

WJ 0.7.2

WJ 0.7.3

DINNING ROOM

WJ 0.7.4

WJ 0.7.7

WJ 0.7.8

WJ 0.7.9

3480

WJ 0.7.10

3480

WE C001

2880

WB C001.2

3480

WC WC002.6

ABLUTIONS

2715

D2 038

STUDY LOUNGE

COMMON AREA WALL PLATE

R4 REPLACE FACIA BOARDS

WG 374

345 255

ABLUTIONS

CLASSROOM

ED9 WC203

WG 375

WK SW101

WB C003.4

2715

D2 042

ED1 028

2558

2558 WE C245

WG 380

1935

1190 ED1 167

WG 381

2040

ED1 168

ED1 032

1190

STUDENT RES ROOMS

WG C248

2740

ED1 169

WB C101

WG C247

2715

STUDENT RES ROOMS

ED1 172

ED1 040

WK SW201

255

ED1 173

WC WC102.3

2715

ED1 174

ED1 044

2412

2715

D2 046

WE C246

1200

0 GROUND FLOOR

D4 C003

WB C201

255

ED1 175

WB C103.4

255

930 2970

C1 CONCRETE SOFFIT, RE-PAINT

WC WC202.3

ABLUTIONS

255

2715

WB C203.4

2715

49 1190 ED1 227

1980

ED1 229

255

ED1 231

2412

STUDENT RES ROOMS

ED1 237

1210

ED1 239

2412

D2 144

01 FIRST FLOOR 2970

ED1 241

1200

WE C103

2715

W7 RE-PAINT EXISTING WALL

2040

2970

5940

ED1 243

255

D2 244

580

02 SECOND FLOOR

WE C203

2715

2970

2400

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

W9 TIMBER ACOUSTIC PANELS

R1 RE COAT ROOF SHEETING

570

R2 REPAIR TO ROOF TIMBER

8910

C6 FLUSH PLASTERBOARD BULKHEAD

2169

R ROOF

WE 0.5.5

W7 RE-PAINT EXISTING WALL

0 GROUND FLOOR

0

0

RC FOUNDATIONS TO ENG. DETAIL

RC FOUNDATIONS TO ENG. DETAIL

W7 RE-PAINT EXISTING WALL

C6 FLUSH PLASTERBOARD BULKHEAD

C1 CONCRETE SOFFIT, RE-PAINT

C4 FLUSH PLASTERBOARD CEILING

W13 EXISTING RC COLUMN

D1 TURNSTILES

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

W200 SECTION A 1 : 100

345

49 2970

2715 255

460

2715

2715

2970

2970

2970

WC WC004.1

2735

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

2275

SW22. Dogleg grabrail to Arch. sanitary schedule ref. to R002AR903 F3 UNDER TILE WATERPROOFING 610/601

T.C.J

W4 NEW CERAMIC WALL TILES

1245

0

W10 TOILET CUBICLE

3225

500

UNISEX WC004 10 m²

0 GROUND FLOOR 3

SW3. Vaal sanitaryware raised paraplegic Entice floor mounted WC to Arch. sanitary schedule ref. to R002AR903. Toilet lid to be removed.

320

230 115

443

C1 CONCRETE SOFFIT, RE-PAINT

Flamingo wash hand basin & tapware to Arch. ROOM sanitary schedule ref. to R002AR903

2715

BIC 057b

SC2 POCELAIN TILE SKIRTING

1830

912 162

255

2715

1190 1780 1190 1780

280

360

1076

924

162

2715

924

912

478 749

1705

ED5 U018

1035

R4 REPLACE FACIA ED4 BOARDS

0

443

STUDY LOUNGE

100

150

600

2723

WD C001.4

D3 RE-PAINT BALUSTRADE

3480

345

D13 WHITE BOARD PAINT PANEL

W605/2

0 GROUND FLOOR

D5 0.1

ED9 F001

LOUNGE

W9 TIMBER ACOUSTIC PANELS WE F0.1.4

W8 DRY WALL

0 GROUND FLOOR

D1 TURNSTILES

1 : 25

0

1239815

COMMON AREA LEVEL 1

W8 DRY WALL

2880

W9 TIMBER ACOUSTIC PANELS

924

3550 ED9 WC203

F3 UNDER TILE W3 REPAIR & REPAINT EXISTING WATERPROOFING EXTERIOR SILLS 610/601 AND LINTELS

WG 378

1935

4170

2970 WI 0.10.11

GAMES ROOM

700

W605 GROUND FLOOR COMMON AREA ABLUTION LAYOUT

WH C334

WD C101.10

D18 NEW BALUSTRADE

01 FIRST FLOOR

WG 342

7030

C2 ACOUSTIC FLUSH PLASTER BOARD CEILING

2970

WL 0.8.2

2200

1400

CW1 6

620

620 R2 REPAIR TO ROOF TIMBER

R3 REPLACE GUTTERS AND BARDGE BOARDS WI 0.10.8

3225

LOBBY

CW1 3

3550

R4 REPLACE FACIA BOARDS

2200

924

255

115

432

0 GROUND FLOOR

7650

WG 343

1020 R.C. BEAMS TO ENG. DETAIL AND SPEC.

3480

2095

W605

3225

600

1413

S.O.P

4

1686

C1 CONCRETE SOFFIT, RE-PAINT

F5 POCELAIN TILE COMMON AREA WALL PLATE

C2 ACOUSTIC FLUSH PLASTER BOARD CEILING

WD C201.10

6423

W7 RE-PAINT EXISTING WALL RC FOUNDATIONS TO ENG. DETAIL

R1 RE COAT ROOF SHEETING W13 EXISTING RC COLUMN

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

1637

W605

SMALL SEMINAR

600

R3 REPLACE GUTTERS AND BARDGE BOARDS

1770

1800

4170

STUDY LOUNGE

W6 NEW INTERNAL WALL

R1 RE COAT ROOF SHEETING

2

CW1 11

SW1. Vaal sanitaryware Entice floor mounted R2 REPAIR TO ROOF WC to Arch. sanitary TIMBER schedule ref. to R002AR903

WC WC005

700 49

620

F3 UNDER TILE WATERPROOFING 610/601

W6 NEW INTERNAL WALL WC WC004.2

SW1. Vaal sanitaryware W9 TIMBERWC Entice floor mounted ACOUSTIC PANELS to Arch. sanitary schedule ref. to R002AR903

C1 CONCRETE SOFFIT, RE-PAINT 3480

Perimeter movement joint as per Arch. finishing schedule ref. to R002ARW901

01 FIRST FLOOR

F5 POCELAIN TILE

F5 POCELAIN TILE

620 3550 255

T.C.J

C1 CONCRETE SOFFIT, RE-PAINT

5940

W605

115

T.C.J

D13 WHITE WC004.1 BOARD PAINT PANEL

C2 ACOUSTIC FLUSH

W9 TIMBER ACOUSTIC PANELS

3225

3480

Perimeter movement EXISTING WALL ROOM joint as per Arch. finishing schedule ref. to R002ARW901

wc

1020 R.C. BEAMS TO ENG. DETAIL AND SPEC. W13 EXISTING RC COLUMN

WC

R2 REPAIR TO ROOF TIMBER

BULKHEAD

0 GROUND FLOOR

BIC 158b

WC004

PLASTER BOARD COMMON AREA WALL PLATE CEILING SW28. Costa Lambrianos 7650 dryer to Arch. hand sanitary schedule ref. toC6 FLUSH R002AR903PLASTERBOARD

COMMON AREA LEVEL 1

H.D

3550

W12 BRICK UP WINDOW/DOOR OPENING

PARAPLEGIC WC005 5 m² 345

ED5 U118

02 SECOND FLOOR

W4 NEW WALL TILES

SW8. Vaal sanitaryware

ROOM

115

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS CERAMIC AND LINTELS

T.C.J WB 060

ROOM

wc

478

T.C.J

50x50x3mm thick SHS support frame as per Arch. detail ref. to dwg. R002ARW801

WD 0.10

ROOM

wc

whb

WET DUCT U024 1 m²

Perimeter movement joint as per Arch. finishing schedule ref. to R002ARW901

BIC 031b

D2 WC002

1190

443

2715

WD 0.9

2715

1190

2715

912

E.T

ROOM

BIC 331

W7 RE-PAINT

WB 157

ROOM

255 WB 032

1750

1 : 100 W6 NEW INTERNAL WALL

WD C101.13

RES COURTYARD

wc

whb

W200 SECTION B

D2 WC102

WD C342 CW1 2

ROOM

UNISEX WC004 10 m²

E.T

D7 U024

BIC 459

ED5 U218

whb

0

SW9. Vaal sanitaryware Cameo wash hand basin & tapware to Arch. sanitary schedule ref. to R002AR903

1455

1780

ROOM

1190

WD 0.11 BIC 013b

ED5 U004

ROOM

ROOM ED3 U030

D12 WC005

8910

R2 REPAIR TO ROOF TIMBER

WB 257

ROOM

T.C.J WB 131

1780

RES COURTYARD

BIC 421

D2 WC202

R ROOF

W13 EXISTING RC COLUMN

F5 POCELAIN TILE WD C201.13

2715

CW1

DUCT U023 1 m²

255 2565

ROOM

WD C101.5

ROOM

162

ED5 U104

2400

1190

WB 012

RC FOUNDATIONS TO ENG. DETAIL

1200

2970

W605

BIC 114b

WB 231

ROOM ED4 WC004

R1 RE COAT ROOF F3 UNDER TILE SHEETING WATERPROOFING 610/601

W605 W13 EXISTING RC COLUMN 1515

49 1190

ROOM

2970

D4 BUILT IN D5 REFURBISH B.I.C COUNTER TOP

ROOM

ED4 U023

T.C.J WB 113

1780

2970

SW27. Costa Lambrianos foam dispenser to Arch. sanitary schedule ref. to C1 CONCRETE SOFFIT, RE-PAINT R002AR903 01 FIRST FLOOR

2715

5940

BIC N 489

ED5 U204

255

C4 FLUSH PLASTERBOARD CEILING

2715

ROOM

C4 FLUSH PLASTERBOARD 4 CEILING

R4 REPLACE FACIA W10 TOILET BOARDS CUBICLE

SW30. Costa Lamrianos toilet roll dispenser to Arch. sanitay schedule fitted by Cubicle Solutions ref. to R002AR903 WD C201.5

WB 213

2400

1190

2970

R4 REPLACE FACIA BOARDS

W4 NEW CERAMIC WALL TILES 1780

02 SECOND FLOOR

0 GROUND FLOOR 3

2 R3 REPLACE GUTTERS AND BARDGE BOARDS W605

D6 NEW B.I.C

2715

W6 NEW INTERNAL WALL

8910

1190

Perimeter R1 movemen RE COAT ROOF joint SHEETING as per Arch. finishing schedule ref. R2 REPAIR TO ROOF to R002ARW901 TIMBER

R ROOF

0

1 : 25 W12 BRICK UP WINDOW/DOOR OPENING

W200 SECTION C

W200 SECTION C1 1 : 100 C7 CEILING & SOFFIT PAINT

W6 NEW INTERNAL WALL

W10 TOILET CUBICLE

160

H.D D7 U024

1830

Sim 5

1300 750

1275 700

SC2 POCELAIN TILE SKIRTING

S.O.P

115 230 115

7176

3763

115

465

Drawing TitleSILLS EXTERIOR

Drawn

Checked

Busang

Reon

AND LINTELS

BUILDING SECTIONS SW22. Dogleg grab rail to Arch. sanitary schedule ref. to This drawings to be read in conjuction with drawing no: R002AR903

Date

W801

South Campus

Erf:

2511

Land parcel:

R002

20170912

280

SIGNATURE

SW8. Vaal sanitaryware Flamingo wash hand basin & tapware to Arch. sanitary schedule ref. to R002AR903

F5 POCELAIN TILE

Scale

Page size

1 : 100

A0

Drawing number Land parcel Push button

asDiscipline per Arch. sanitary

Campus

Consultants in office Drawing number

mirror

Series

Drawing number

Revision

scheduleref. to R 0R002AR903 0 2 A R W300

Stage

1

SW20. Railman hinge grabrail to Arch. sanitary schedule ref. to R002AR903

250 ED3 U030

W6 NEW INTERNAL WALL whb

S.O.P

0 GROUND FLOOR

SW3. Vaal sanitaryware raised paraplegic Entice floor mounted WC to Arch. sanitary schedule ref. to R002AR903. Toilet lid to be removed.

wc

0 GROUND FLOOR 1239815

F3 UNDER TILE WATERPROOFING 610/601

586

SW1. Vaal sanitaryware Entice floor mounted WC to Arch. sanitary schedule ref. to R002AR903

115

8

W3 REPAIR & REPAINT EXISTING

WC WC005

Drawing Info

Sim

Sol Plaatje University

160

Perimeter movement expansion joint as per NAME finishing schedule ref. toVan R002ARW901 Reon Der Wiel

PROFESSIONAL NUMBER

1239815

1150 2200

COUNCIL

SACAP

SW9. Vaal sanitaryware Cameo wash hand basin & tapware to Arch. sanitary schedule ref. to R002AR903

F3 UNDER TILE WATERPROOFING 610/601

150

470 -

S.O.P

University: Campus:

F5 POCELAIN TILE

wc

100

wc

whb

PARAPLEGIC WC005 5 m²

Project

SW31. Costa Lambrianos 2 toliet roll dispenser to 08/21/17 Arch.HETC sanitaryschedule ref. to R002AR903

50x50x3mm thick SHS support frame as per Arch. detail ref. to dwg. R002ARW801

W801 whb

Contract Number

This license confers no ownership right in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of

Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner

SW8. Vaal sanitaryware Flamingo wash hand basin & tapware to Arch. sanitary schedule ref. to R002AR903 SW3. Vaal sanitaryware raised paraplegic Entice floor mounted WC to Arch. sanitary schedule ref. to R002AR903. Toilet lid to be removed.

Busang

Consultant

This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

1275

Sim 8 W801

print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.

W6 NEW INTERNAL WALL

SW28. Costa Lambrianos hand dryer to Arch. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion this drawing in a cinematographic film or television broadcast is an act of copyright sanitary schedule ref.ofinfringement to which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution R002AR903

780

6. Refer to project general notes on drawing number C001ARPL001 for a full set of project notes to be adheared to.

SW22. Dogleg grab rail to Arch. sanitary schedule ref. to R002AR903

SW30. Costa Lambrianos toilet roll dispenser to COPYRIGHT NOTICE: Arch. sanitary schedule Copyright subsists in this drawing. The person or entity whose name appears in the ref. to R002AR903 Checked Signed title block of this drawing is hereby granted a non-exclusive license to use, display, Busang

1150

Date

800

1

Description

20170823 Issued for Target Costing - Additional information added to Fire Door Schedule. Ablution internal shower walls replaced with CubicleWET SolutionDUCT partitioning. Fire doors at Ground Floor fire escape stair re-added. FF&E U024 layouts added. 1 m² 20170912 Issued for Construction

700

Revisions WC No. WC004.1 A

590

UNISEX WC004 10 m²

70

WC WC004.2

PARAPLEGIC WC005 5 m²

100

WC WC005

3225

SW20. Railman hinge grab rail to Arch. sanitary schedule ref. to R002AR903

1 This drawing is not to be scaled, use figured dimensions only. All dimensions, heights, and angles to be checked and verified before any work commences on site or in contractors workshop and any discrepancies must be reported to the architect immediatley. 2 All building work to be carried out in accordance with NBR, SABS and local authorities building laws and regulations. 3 All structural components to be verified and inspected by the structural engineer. 4 All workmanship and materials to be of the best available quality. All materials and components to be as per architects specification and used in accordance with the manufacture's specification and method statement. 5 Any errors, discrepancies, omissions or queries arising from this documentation to be reported to the architect immediatley, for clarification before such work is put in hand.

1245

HETN001 General Notes SW4. Valsir Tropea S Murare WC cistern as per Arch. sanitary schedule ref. to R002AR903

MIRROR SPAN=4 TILES HIGH

W3 REPAIR & REPAINT EXISTING EXTERIOR SILLS AND LINTELS

Project Number:

5 TILES HIGH

1 : 100

C1 CONCRETE SOFFIT, RE-PAINT

SC2 POCELAIN TILE SKIRTING

490

2390

115 230 2735

7118

W605/3

W605/4

1 : 25

1 : 25

HETN001 General Notes

Revisions

1 This drawing is not to be scaled, use figured dimensions only. Alldimensions, heights, and angles to be checked and verified before any work commences on site or in contractors workshop and any discrepancies must be reported to the architect immediately 2 All building work to be carried out in accordance with NBR, SABS and local authorities building laws and regulations. 3 All structural components to be verified and inspected by the structural engineer. 4 All workmanship and materials to be of the best available quality. All materials and components to be as per architects specification and used in accordance with the manufacture's specification and method statement.5 Any errors, discrepancies, omissions or queries arising from this documentation to be reported to the architect immediatley, for clarification before such work is put in hand. 6. Refer to project general notes for a full set of project notes to be adheared to.

No. 1 2

Description

Date

COPYRIGHT NOTICE: Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive license to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.

Checked Signed

Issued for Construction 20171110 20171117 Issued for Construction - First floor common area ablution layout and revised ground floor common area ablution layout to include new door into wet duct.

Busang Busang

Consultant

Project

Contract Number

HETC

Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner

Campus:

PROFESSIONAL NUMBER

7176

SACAP

2

W807

W807

Reon

South Campus

NAME

Erf:

2511

Land parcel:

R002

Page

Drawing number

A1

1 : 25

SIGNATURE

Reon Van Der Wiel

Campus

Consultants in office Drawing number

Land parcel

Discipline

R 002

900

HBS AJ002 Ylouver on HBS ABI612 frame as per manufacturers details

HBS AJ002 Y-louver on HBS ABI612 frame as per manufacturers details

Existing I-Beams

480

3600

Series

Drawing number

Revision

A R W605

Stage

2

HBS AJ002 Ylouver on HBS ABI612 frame as per manufacturers details

HBS ABI612 Ylouver frame as per manufacturers details

Plaster band. Replace 50% of water with 610/601

ALIGN LOUVER TO TOPSIDE OF EXISTING I-BEAMS TO THE NEAREST FULL BRICK

1000

Fibre grating to be placed on topside of I-beams

GROUND FLOOR COMMON AREAS ABLUTION LAYOUT

20171117

HBS ABI612 Ylouver frame as per manufacturers details

610/601 Screed mix. Replace 50% of water with 610/601

570

Checked

Scal

COUNCIL

2040

570

Drawing Title

Drawn

Busang

This drawings to be read in conjuction with drawing no:

HBS AJ002 Y-louvers on HBS ABI612 frame as per manufacturers details

2

Drawing Info Sol Plaatje University

Date

This license confers no ownership right in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of the architect. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution

F3. UNDER TILE WATERPROOFING as per Arch. finishing schedule ref. to R002AR903

University:

08/18/17

This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

1250

Project Number:

725

725

HBS ABI612 Ylouver frame as per manufacturers details

1140

950

2400

3809

950

1450

Existing window to be replaced with HBS AJ002 Y-louvers on HBS ABI612 frame as per manufacturers details

2

4

950

1450

W807 NORTH AND SOUTH LOUVER 1 : 25

3

W807 EAST LOUVER

4

1 : 25

W807 WEST LOUVER 1 : 25

Thermocube (11 000 litres) weighing 12000 kg to sit on fibre grating placed on steel I-beams

280 106

68

106

950

725

9068

725

950

HEAT PUMP ROOM 073

9068

W807

4 3

W807

W7. RE-PAINT EXISTING WALL as per Arch. finishing schedule ref. to R002AR903

890 5

HBS AJ001 as per manufacturers details

942

HBS ABI612 Y-louver frame as per manufacturers details

HBS AJ002 Y-louver on HBS ABI612 frame as per manufacturers details

INDUSTRIAL HAND RAIL: Maclock HS/2A/L 2 medium duty galvanised hand rail with hand and knee rail, with side fix stations at both ends. Finish - galvanised.

Existing window to be replaced with HBS AJ002 Y-louvers on HBS ABI612 frame as per manufacturers details

2106

HBS ABI612 Ylouver frame as per manufacturers details

6 W807 900

5 W807

1140

480

HBS AJ002 Y-louver on HBS ABI612 frame as per manufacturers details

3 W807

2106

Precast Lintels

480

W807

HBS AJ002 Y-louvers on HBS ABI612 frame as per manufacturers details

Plaster band to be applied around new windows and painted. Replace 50% of water with 610/601.

HBS ABI612 Ylouver frame as per manufacturers details

W807

HBS AJ001 as per manufacturers details

Tremco PU515 Polyurethane sealant to inside and outside on entire perimeter of window frame

5352

INDUSTRIAL HAND RAIL: Maclock HS/2A/L 2 medium duty galvanised hand rail with hand and knee rail, with side fix stations at both ends. Finish - galvanised.

HBS ABI612 Ylouver frame as per manufacturers details

Plastered with 610/601 and painted sill

Class II Mortar Existing Access Way 50x50x4mm Steelangle fixed to wall with M10 excalibar bolts at 500mm center to center

1

W807 HEAT PUMP ROOM

5

1 : 50

610/601 plaster mix to be applied on sill. Replace 50% of water with 610/601

W807 LOUVER SECTION 1 : 25

6 Project Number:

HETN001 General Notes 1 This drawing is not to be scaled, use figured dimensions only. Alldimensions, heights, and angles to be checked and verified before any work commences on site or in contractors workshop and any discrepancies must be reported to the architect immediately 2 All building work to be carried out in accordance with NBR, SABS and local authorities building laws and regulations. 3 All structural components to be verified and inspected by the structural engineer. 4 All workmanship and materials to be of the best

Revisions No. A B

Description

Date

Issued for Information 20171127 Issued for Co ordination - Fibre grating 20171211 spec. to be confirmend.

Checked Signed Busang Busang

COPYRIGHT NOTICE: Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive license to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing. This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership right in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of the architect.

Consultant Contract Number

Project HETC

11/21/17

Drawing Info

University:

Sol Plaatje University

Campus:

South Campus

W807 LOUVER SECTION DETAIL 1:5

Drawing Title

Drawn

Checked

Busang

Reon

HEAT PUMP ROOM DRAWING

Date

T e c h n i c a l D ra w ings 20171211

This drawings to be read in conjuction with drawing no:

Scal

Page

page 31


Busang Makhele 2021


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.