Buse Taşeli Portfolio

Page 1

BUSE

.

T A S. E L I

PORTFOLIO


CONTENT PROJECTS 00 01 02 03 04 05 06 07 08

3DLIVE (GRADUATION) GRAFFITI WALLS NOTH’OUSE AN UNDERWATER RESEARCH CENTER MISSION AQUARIOUS SHADE OF THE TOWN LANDSCAPE DESIGN SPEECH AUDITORIUM GÜMÜLDÜR PROJECT INTERIOR RENDERS

P


BUSE

.

T A S. E L I selected works

PORTFOLIO


EXPERTISE

HANDS-ON Model Making Hand-Drawing Photography

2008-2011

Atatürk Secondary School

PERSOAL INFORMATION Name Date of Birth Nationality Adress Contact Language

Izmir

: Buse Taşeli : Edirne, 08 December 1997 : Turkish : Gaziemir/Izmir : busetaseli@hotmail.com +09 506 617 4700 :Turkish

English

Italian

Deutsch


Lumion

SOFTWARE

Archicad

3D Max

Autodesk-Autocad

Adobe - Photoshop

Microsoft - Word

Google Sketchup

Adobe - Illastrator

Microsoft - PowerPoint

Rhinoceros

Adobe - Indesign

Microsoft - Excel

EDUCATION Izmir / Turkey

Izmir University of Economics

Izmir / Turkey

Izmir Anatolian High School

Izmir / Turkey

Atatürk Secondary School

2015-2020 Architecture 2011-2015 2008-2011

EXPERIENCE Render Works Discovery, length in metres and budget studies Workshop Assistant Office Intern Construction Intern Atlier Intern

Bitra FBN İnşaat Mimarlık ve Mühendislik AŞ Hatıra Ağları ARCH+DSGN Summit İzmir Menderes Municipality Musa Çiçek Construction Art-Vital Studio

December-July 2020 November-Deceber 2019 November 2019 September 2019 July-August 2019 July-August 2018 July-August 2017



“And I think that is indeed what architecture is. It is a story. By the way, it is a story that is told through its hard materials. But it is a story of effort and struggle against improbabilities� Daniel Libeskind


PROJECT


Mixed Use Building Live, Work, Play İzmir, Bölge

00 ARCH 98 ARCHITECTURAL DESIGN STUDIO SPRING 2019-2020


3DLIVE aims to develop 3D printer technology and to produce 3D houses and to be used in areas where it is needed. It works to improve the quality of life and strengthen buildings by experimenting and producing different materials. In this process, architects, civil engineers, mathematicians, biochemists work together. At the same time, they test 3D houses by living in the houses they produce. Produced houses can be sent to the communities in need. For example, now for Coronavirus, it can be sent to hospitals with insufficient areas, to people who need to live in a different place due to illness, or to people who are homeless in the Elazig earthquake.


SITE PLAN

SITE SECTION

The site is located in a site area, which is right next to the Bรถlge Metro stop and where those who will go to Bรถlge are used. It is on the Uล ak - Manisa and Orbital Road as a highway. Access to the area by land and rail is very simple.


CONCEPT IDEA As a concept approach, the potential for the use of the surrounding people is incorporated into the land. It was intended to involve land users in the project by showing them the concept of the project. 3D printer technology, on the other hand, has been introduced and taught what can be done, allowing them to have an idea and see that they can use 3D printers themselves. At the same time, by seeing the buildings coming out of the 3D building printer, they have the opportunity to see how they move and structure.


SECTION BB’

FUTURE PROGRAM The building is expected to grow in future years as the building can improve itself. As long as the columns and floors continue, the houses printed on the 3D printer can be added to the building. The building will continue to grow as needed. New experiences, new materials will be able to be experienced at the same time.


ARCHITECTURAL PROGRAM

STRUCTURE

3D LIVING IDEA During the design stages, drawings and modeling are done by architects and engineers as needed. They choose the material selection according to the need and the conditions of the destination. The house that comes out of the 3D Construction Printer is transported in such a way to go to the needy or to be added to the building. And the product is placed in the appropriate place.


DESIGN PROCESS


PROJECT


Project definition: Art Center Program: Together Location: Alsancak/Ä°zmir

01 ARCH 401 ARCHITECTURAL DESIGN STUDIO V FALL 2019-2020

GRAFFITI WALLS


SITE ANALYSIS

SITE POTANSIAL

SITE PROBLEMS

An art developed in Alsancak ; Graffiti. Walls, streets everywhere, graffiti artists are leaving a piece of themselves. A building that aims to bring artists and people together as a concept. Everyone wonders; how do they make these graffiti? It’s a building concept where people can experience it as they visit the building, and eventually they can experience it. It’s a building that tries to incorporate the surrounding buildings into it by potentially seeing them. People who have to wait around for something are expected to get together with graffiti artists to pick up a piece of them. Areas where they can spend time are designed and areas where they can intertwine with the building and track people who make graffiti are designed. it’s a place where they can sit in a cafe and watch artists. They will be able to see the artifacts inside the building as they pass through the street that was created inside the building.


STRATEGY WALLS

VISITOR

GRAFFITI ARTISTS


CIRCULATION

CONCEPTUAL SPACES

The areas in front of the surrounding buildings formed as social spaces. But it was also intended to gather everyone in the same place with a circulation where those areas could come together. Visitors met with graffiti walls .The building was formed with the strategy to examine, pass, touch and experience graffiti walls while touring the building. While touring the building, the exhibition inside was tsarınlarını by visiting the main exhibition in a way that could be decamable from where they left off. Learning spaces, accommodation spaces were positioned according to the level of need. People who work in the office, live in the accommodation area and come to learn can see the walls


SECTION BB’

SECTION AA’

The most important thing in the building concept study was the potential mass of the surrounding buildings. What we saw in field exploration was there were a lot of people waiting around and they didn’t have areas to wait. A strategy study developed to design areas that could track graffiti walls while creating areas where they could expect them.


PROJECT


An Urban Habitation House for painter and writer Asansör /izmir

02 NORT’HOUSE ARCH 201 ARCHITECTURAL DESIGN STUDIO II FALL 2017-2018


+85 BALCONY

+675

WORKING ROOM

A

A

A

A +675

+75 WC

+85

GUEST BEDROOM

GUEST BEDROOM

WC

GROUND FLOOR PLAN

SCENARIO :

FIRST FLOOR PLAN

Painting and writing require creativity in every sense. While creating, thinking, resting helping to create for itself to leave that eternity of the sea. North’ouse, which was designed to leave itself in the sea in every sense, also does not forget the neighborhood relations at te same time. This house, built on not to obstruct the flow of air in the back home, also allows integration with people walking on the street. And aims to provide a comfortoble life with private part of the house and the whole street.


SITE PLAN

A

A

+370

WC

WC

SECOND FLOOR PLAN

N


NORTH ELEVATION

+965 +940 +915

+655 +630

+370 +345

+85 +50


The purpose of lifting the house up; do not obstruct. the air going home in the east. The neighboors will benefit from the wind blowng in the summer months. There is an air filter to prevent the impurities from the wind where the air pass is. House elevation provides more benefits to the sun. For winter months, insulation material is lagging to protect from cold.

VENTILATION IDEA

+965 +940 +915

+655 +630

+370 +345

+85 +50


EAST ELEVATION

+965 +940 +915

+655 +630

+370 +345

+85 +50

CIRCULATION Transportation is provided by ladder and elevator. At the same time, a house that allows people with difficultly in walking to easily reach their habitat. On the first floor, they can do all the daily.


FORMATION PROCESS

slope

+940

+655

+370

+85 +50

SECTION A-A’


PROJECT


Research center An underwater research center Sığacık/izmir

03 ARCH 202 ARCHITECTURAL DESIGN STUDIO SPRING 2017-2018


SECOND FLOOR PLAN

FIRST FLOOR PLAN

EXHIBITION HALL


SITE PLAN

GROUND FLOOR PLAN

SCENARIO : The purpose of this building, which is

close to the sea to survey the submarine labarotuars. And, also the angle of the buil seperates the building from the surrounding tourist areas. Visitors will able to visit without going into private areas. They can visit restaurant, exhibition hall, library and multi purpose hall. Spaces are spacious and light. Every places are located with a sea view. The large windows give feeling we’re in for if the sea.


ANALYSIS

Public area

Privite area

NORTH ELEVATION

Education area


Private Public Vertical circulation

Circulation in the project is designed by separating private and public areas. Incoming visitors do not need to enter special fields. The upper part of the building is for visitors, and the sea level is for educational and private individuals.

CIRCULATION

SITE SECTION


EAST ELEVATION

SECTIOAN A-A’


CAFE

OPEN OFFICE


PROJECT


Project definition: A biomimetic structural system Program: Upside-Down word research center Location: India Group members: Buse Taşeli, İsmail Biçer, Ceren Uğurlu, Ceren Limboz, Yağmur Taylan

04 ARCH 202 ARCHITECTURAL DESIGN STUDIO SPRING 2017-2018

MISSION AQUARIUS


Jellyfish colony

JELLYFISH biomimetically inspired sea creature

UPSIDE-DOWN WORLD RESEARCH CENTER Imagine that you are living in a underwater complex which is totaly eco-friendly. It is not so far. In 2030, ‘Upside-down World’ enables archeologists, scientists, engineers and oceanographers from all around the world to research the area effectively and reveal sunken cities. The capacity of the building is 200. However, it has ability to expand in time. Upside-down World Research Center provides people scientific labs, computer labs, living units and recreation areas. Do you want to search another site? Collapse all structure and go another site by using solar power and current energy. Who doesn’t want to live underwater by seeing natural beauty while not damaging to land?


ARCHAEOLOGICAL SITE Gulf of Khambhat INDIA


Living units Laboratory

JELLYFISH MOVEMENT

UNITS

Attracting attention of fishes by lightining like a JELLYFISH


FISHFARM/HATCHERY Nourishment Collapsable system Convenience for movement Reducing energy Benefit from sun power

MOVABLE SYSTEM


CONNECTOR Limited ability to move Open-Close system Unit can leave PROPELLER Rotation of propeller: 360* So can go every direction


Spired : going easily to surface Photovoltaic panels: getting solar power from every degree Fillet

FROM 2030

to the future....


PROJECT


Project definition: Barbaros Project Program: Walls to building Location: Barbaros Village/Urla

05 ARCH 301 ARCHITECTURAL DESIGN STUDIO FALL 2018-2019

SHADE OF THE TOWN


STREET ELEVATION Barbaros Village is located 20 km from Urla and 50 km from Izmir. The village is also an old Turkish village. There are windmills, wells and ponds in the villge. Agriculture is the main source of income.here are patchwork workshops, activities making strawmen with kids, various competitions, such as best strawman, local cooking, best garden, milking and water extraction at the festival. There are also some exhibitions, such as Bonsai trees, patchworks, photographs, figures made from felt and wedding chests. So , Barbaros village preferred as tourist attractions.

STREET COLLAGE


MANIPULATED SILUET

SITE PLAN


Buildable area

Collages to streets

PLAN

Walls to shading, sitting area and roof


Circulation

Walls to spaces

SHADE OF THE TOWN Building located of the heart of Barbaros village. The people who come to the village are on a path that will surely pass.People can find cafĂŠ, open and closed exhibition hall and library together. There are also 2 different studios in different studios and each studio has an open area. The ruins in the land were restored and converted into accommodation. Stone walls and wood were used as the material to prevent the integrity of the village. The shadows falling on the walls with woods provide a pleasant display for the exhibition grounds.


SECTION BB’

SECTION AA’


SOUTHERN WEST ELEVATION

WEST ELEVATION


PROJECT


Project definition: Barbaros Project Program: Redesign to site Location: Süleyman Ersever Park Balçova/İzmir Group Members: Ceren Uğurlu, Buse Aydın

06 LANDSCAPE IAED 460 CONTEMPORARY ARCHITECTURAL LANDSCAPING FALL 2018-2019


DESIGN IDEA The idea of long trees to isolate from the surrounding building.The idea of removing people from urban life.A project that can be used easily by people from public buildings in the area.Beside we tried to apply new functions too.For example:workshop area , cafe.


PLAN

PLAN CHART

MATERIAL CHART sand

wood deck

concrete

stone

The site has wide and different user profile because of location. Around the area,there are primary school,residences,football field and semt evi. Therefore the design should involved these people who has different ages, gender and status.


PROJECT


Performance Spaces Speech Auditorium Ayşenur Saraçoğlu İsmail Biçer

07 ARCH 390 PERFORMANCE SPACES SPRING 2018-2019

SPEECH AUDITORIUM


EXCEL TABLES FOR REVERBERATION TIME CALCULATIONS

Sound absorbing wooden parquet

Wood carpet

Fabric wrapped absorbing pan


nel

The aim of this project was design a speech or music hall which provide theoretical information about volume acoustics and noise control from Arch 390 performance spaces course and also attach importance to design as an architectural student. We also learned about the acoustical materials and where to use them in the auditorium according to calculations of reverberation time for each material.

Fiberboard Panel (absorbing)

Perforated wooden panel (reflective)


PLAN

B TERRACE

RESTING ROOM

MEETING ROOM

SNACK COUNTER STORAGE MEN ROOM

BACKSTAGE

CONTROL ROOM

STAGE

TICKET OFFICE

ENTRANCE

WOMEN ROOM

STORAGE

WAITING LOUNGE

RESTING ROOM ROOM

TERRACE

B’


SECTION : The areas for different materials on the side walls

Perforated wooden panel (reflective)

TICKET OFFICE

ENTRANCE

15

STAGE

100

425

CONTROL ROOM BACK STAGE

350

Fiberboard Panel (absorbing)

100

FOYER

SPEECH AUDITORIUM Fiberboard Panel Reflective Panels

Perforated wooden panel


SECTION : Ceiling reflections

CONTROL ROOM BACK STAGE

TICKET OFFICE

ENTRANCE

STAGE

Curved reflected panels: SECTION

CONTROL ROOM BACK STAGE

STAGE

TICKET OFFICE

ENTRANCE


Control lines from the mouth of the speaker to the ears of listeners : SECTION

CONTROL ROOM BACK STAGE

STAGE

Fabric wrapped absorbing panel

SECTION B-B’

TICKET OFFICE

ENTRANCE


PROJECT


Project definition : Gümüldür Project Program : Master plan - Concept Location : Gümüldür/İzmir

08 ARCH 302 ARCHITECTURAL DESIGN STUDIO IV SPRING 2018-2019

GÜMÜLDÜR PROJECT


BUILDING CONCEPT Concept idea

Concept model concept Concept mo idea

When separating differences, the unbreakable reality. The design concept shows that by combining natural agricultural products, different species can be united at one point to reveal another product. The products which are the same at the entrance are reunited at the center by placing different new products in the three masses. It sets out a structure based on teaching people that these products emerge as new products from each other and that there is no end to it. In fact, the same product can be in different colors when viewed.

By combining modern world with local agriculture that is suitable for our age , it is building a permanent design and Idea for future generations. He teaches you that when you go to the people of the earth, you can produce completely different products.


GROUP CONCEPT

CONCEPT

Life with all differences is possible

THEME

Agriculture is based on learning.

THE VISION STATEMENT The aim of this study is to protect natural protected areas from intensive structuring and to evaluate the natural and cultural potentials of the area. To create an exemplary Agro-tourism project for sustainability. At the same time, we are aiming to bring mobility to the field with organic agriculture and the activities to provide people to learn and gain experiences in the areas they want by taking agriculture in different ways, with various learning areas.


GROUND FLOOR PLAN

FIRST FLOOR PLAN


EAST ELEVATION

CIRCULATION

SPACES

STRUCTURE


NORTH ELEVATION

SECTION BB’


SECTION AA’


RENDER INTERIOR


Project definition : Gümüldür Project Program : Master plan - Concept Location : Gümüldür/İzmir

08 ARCH 302 ARCHITECTURAL DESIGN STUDIO IV SPRING 2018-2019

GÜMÜLDÜR PROJECT






B

BUSE

.

T T A S. E L I

+(90) 506 617 4700

busetaseli@hotmail.com Gaziemir/Ä°zmir


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.