1 minute read

CHAPTER 3: Case Studies

Next Article
Bibliography

Bibliography

Building Location Year Climate Technique used

Consorcio Santiago Building

Advertisement

Santiago, Chile 1990 Warm Temperate Mediterranean Green Wall Façade supported green wall.  Climatic analysis  Need of green wall for the building  Evolution of design  Detail study of green wall used  Irrigation system  Effect of green wall on the building  Placing other techniques other than green wall  After effects on building (regarding energy consumptions)  Green coverage calculation

ACROS Fukuoka Perfectural International Hall

Fukuoka, Japan 1994 Warm Temperate Moderate Green Roof Green Wall  Climatic analysis  Need for techniques  Evolution of design  Detail study of techniques used  Irrigation system  Effect of technique on the building  After effects on building (regarding energy consumptions)

Parameters for analysis

One PNC Plaza

Pittsburgh, USA 2014 Warm Temperate Green Wall Façade integrated living wall.  Climatic analysis  Evolution of design  Detail study of technique used  Irrigation system  Effect of technique on the building  Green coverage calculation

Spire Edge IT Park

Manesar, Gurgaon, India Ongoing Warm Temperate Green Wall, Green Roof  Climatic analysis  Need for technique  Detail study of the technique  Future assumptions and results

Table 8: Analysis and selection criteria of case studies  Green coverage calculation

This article is from: