6 minute read

2.3.2 Installations

Next Article
Bibliography

Bibliography

In conclusion to this, composite climate of India is warm temperate climate according to koeppen’s classification.

Techniques Green Walls Suitable Climate

Advertisement

Metal Mesh Green Wall All climatic regions Cable-Supported Green Wall All climatic regions Rigid Green Wall All climatic regions

Living Walls

Green Roofs

Vegetated Mat Living Wall Warm temperate, tropical humid Hanging Pocket Living Wall Warm temperate, tropical humid Modular Living Wall Warm temperate, tropical humid Intensive green roof All climatic regions Extensive green roof All climatic regions Semi-intensive green roof All climatic regions

Table 3: Landscape techniques suitable climate

2.3.2 Installations Cable supported green wall. Materials that are required in the installation of a cable supported green wall are:

Stainless steel hubs, 3mm dia. Stainless steel cable/wire, Wood screws and Plastic wire caps 1. Firstly, façade is marked as per the steel hubs distances. Equally divide the façade in grids.

Figure 20- The marking on the walls/façade is done with the help of ruler scale or spirit level so that there is no deviation and the line is straight. Source- youtube.com

2. Then the stainless steel hubs are screwed on the façade at those nodes of the marking with leaving the space for insertion of the cable or wire. The screws are first fit in the hub and then fixed in the walls/façade with the help of screw driver. It can be done manually as well as by machine.

Figure 21- The screw of the hub is fixed first manually and then it is fixed with screw driver. Source- youtube.com

3. Steel wire or cables are passed through the holes and are fixed tightly with the hub so that it does not gets misplaced during overlapping it with vegetation.

Figure 22- Steel wires are passed through the holes given in the steel hub horizontally through all of the hubs. Sourceyoutube.com

Figure 23- Steel wires are then passed vertically and then are tighten respectively. Source- youtube.com

Rigid green wall

For installation of rigid green wall trellises are required which are made up of stainless steel. They are constructed in two-dimensional as well as three-dimensional as per the requirement of the client and the design.

Figure 24- The wires used in this technique is galvanized steel wires which are stiff and lightweight. Manually installation of the frame attached to the wall. Source- youtube.com

Metal mesh green wall.

Materials required for the installation for a metal mesh green wall are:

Galvanized steel mesh, bungee cords, screws and mild steel frame. 1. Firstly, the galvanized steel is cut in the size that is required for the wall.

Figure 25- Galvanised steel mesh is being cut for appropriate size. Source- youtube.com

2. The steel mesh is then temporarily fixed in the frame with the help of bungee cords and holes are made to fix the screws in it.

Figure 26- Temporary fixation of metal mesh with bungee cords and holes being made with the help of screw driver in the frame. Source- youtube.com

3. The metal mesh is then fixed with the main frame with the help of screws and the total frame is placed on the required place.

Figure 27- Metal clips are used to fix the metal mesh with the frames. Source- youtube.com

Hanging pocket living wall.

The following are the steps to install hanging pockets living wall.

1. Pocket panels are lightweight panels which are modular and are attached to a rigid plastic board. The panels are hung on hooks, nails, or deck screws.

Figure 28- Pocket panels that are hung by their mounting tabs. Source- youtube.com

2. Before planting, the pockets are stretched so that a required space for planting is achieved. A minimum of 2.5 inches’ gap is required.

Figure 29- Stretching the pockets of panel. Source- youtube.com

3. The bottom flap of the pocket of the upper panel is tucked behind the top flap. This is very important for watering also.

Figure 30- Tuck in flaps. Source- youtube.com

Vegetated mat living wall.

Following are the steps for installing a vegetated mat living wall. 1. Firstly, levelling and marking of the wall is done, so that the frames are placed at exact position. Frame is usually made of aluminium or wood.

Figure 31- Marking on wall using measuring tape. Source- youtube.com

2. Then the frames are screwed to the wall. The frames are placed first vertically then horizontally.

Figure 32- Placement of frames in order of first vertical and then horizontal. Source- youtube.com

3. The fabric is placed all over the frame with the help of screws after the placement of waterproofing sheet and then simultaneously 5 inch holes are made with knife or scissor.

Figure 33- Steps of placement of fabric, cutting of fabric and placing plants. Source- youtube.com

Modular living wall.

Materials that are required for the installation of a modular living wall are:

 Vertical rails.  Module holder.  Holding side clips.  Screws and bolts.

Figure 34- Views of materials used in the modular living wall. Source- youtube.com

Following are the steps to install:

1. Firstly, the marking is done on the wall and the vertical rails are placed on the position with screws.

Figure 35- Placing of vertical rails. Source- youtube.com

2. Then the module holder is fixed with the vertical rails along with the holding clip.

Figure 36- Module holder and holding clips. Source- youtube.com

3. Lastly the modular containers are filled with the planting media that is soil and the plants are placed in it. After placing the plants, the frame is fixed on the rails with holding clips and the base support will be the module holder.

This article is from: