Brochure - Level Crossings Authority

Page 1

C O M P A N Y O V E R V I E W

In Partnership With:


“IT’S

ABOUT LEAVING A

LEGACY” Written by Niki Waldegrave Produced by Josef Smith



We set Speed Records.

New technological developments provided by Vossloh set standards for the construction and operation of modern rail infrastructure. Vossloh holds the record for high-speed switch crossings – with trains travelling at 560 km/h! The company’s leading position in the field of track fasteners and switch systems is further enhanced by innovative solutions for track and switch maintenance. Our products and services in the fields of rail infrastructure and transportation technology are characterised by safety, low lifecycle costs and environmental compatibility – not only, but also when it comes to high-speed transport.

www.vossloh.com


Global expertise… Local capability Vossloh is the world’s leading supplier of slab track solutions and has over 130 years of experience in manufacturing track components. Slab track is the preferred solution for low maintenance which is necessary today with ever increasing demands on railway networks. Vossloh’s expertise is being recognised in Australia and relied upon for signature projects. Slab track—Urban transport

GCLR with Vossloh System 300 UTS on precast plinth.

The Gold Coast Light Rail project (GCLR) adopted a range of slab track solutions from Vossloh. The 300-series fastening together with Precast Plinth is now widely regarded as the preferred slab track solution for elevated track. It combines the benefits of track accuracy, quick & easy construction and low cost. Where possible Vossloh recommends the use of precast for slab track to minimise on-site works and maximise the quality of track.

System DFF30HH with in-situ plinth slab at Port Botany & Port of Brisbane

Slab track—Heavy haul The demands on the rail infrastructure at container ports are extreme, not only for loading conditions of the cranes but also due to the marine environment exposure and corrosion risk. Vossloh specialises in such extreme conditions and has developed a new heavy-haul generation of a fastening system dedicated to the special requirements of rail-mounted container traffic: the system DFF 30 HH. Now in both Port Brisbane and Sydney‘s Port Botany, these fastening systems are successfully in use.

Newcastle Coal Freight Line and System DFF 304 with IVES precast slab

Vossloh has partnered with Rhomberg Rail to develop a low cost and versatile slab track system that can be fully installed in a matter of days. This provides an innovative slab track construction approach for the most demanding application.

Queensland NGRS project in Wulkuraka and System W 21 with pedestal mounting on slab

Slab track—Suburban & freight rail In Queensland, again the preferred solution on slab track was Vossloh. System W21 is usually found in ballasted track. But with elastomeric rail pads can also be adapted as an economical slab track fastening.

Vossloh is proud to be associated with the Level Crossing Removal Project – Caulfield to Dandenong. This is a world class project relying on Vossloh global expertise and local capability.

Melbourne ‘Skyrail’ project with System 300-1 & precast plinth slab


THIS IS CHISHOLM. THIS IS TAFE.

1498_0117 RTO 0260

We are up-skilling workers and have a dedicated training hub to help deliver Victoria’s Caulfield to Dandenong Level Crossing Removals Project. With over 500 courses delivered on campus, online or in the workplace, we can also train you or your workforce today.


AUSTRALIA

How do you update 72 kilometres of rail track while freeing up 225,000 square metres of green open space? Elevation! Brett Summers, Project Director for the Level Crossing Removal Authority, explains why.

T

he Level Crossing Removal Authority was established in May 2015 when the government pledged $2.4 billion from the 2015-2016 budget to remove 50 dangerous and congested level crossings across Melbourne by 2022. The Authority will ensure all level crossings are removed in a coordinated and efficient manner, and is responsible for all aspects of the project including planning and development, stakeholder engagement, procurement, through to construction and delivery. Project Director Brett Summers, a civil engineer, is heading up the $1.6 billion Caulfield to Dandenong Level Crossing Project to remove nine

Brett Summers project director for the Level Crossing Removal Authority

Brett has extensive leadership and project management skills developed in a range of multi-disciplinary large scale projects over varying industries spanning 18 years in both the private and public sector. With 12 years of rail specific experience he has delivered projects in both green and highly complex brown field environments. Brett previously worked with the Regional Rail Link Authority, Victoria Australia.

w w w. L e v e l c r o s s i n g s . v i c . g o v. a u


LEVEL CROSSINGS AUTHORITY

Cox Architecture is a proud member of the Caulfield to Dandenong Team.

Caulfield to Dandenong Melbourne, Victoria

Gold Coast Airport Gold Coast, Queensland

Barangaroo Ferry Hub Sydney, New South Wales

We pride ourselves on creating architecture for public life across a range of sectors and typologies. In the transport and urban design arena we produce work that enhances both utility and community - whether it be for rail, road, air or water.

Melbourne Jet Base Melbourne, Victoria

South Morang Rail Extension South Morang, Victoria

Jim Stynes Underpass Bridge South Morang, Victoria

Thomastown Station Melbourne, Victoria

Cheltenham Station Sydney, New South Wales

Brisbane Ferry Terminal Brisbane, Queensland

North Melbourne Station Melbourne, Victoria

Helix Bridge Singapore

COX ARCHITECTURE — MELBOURNE · SYDNEY · BRISBANE · PERTH · CANBERRA · ADELAIDE · ABU DHABI · KUALA LUMPUR For further information please contact info@cox.com.au — www.coxarchitecture.com.au


AUSTRALIA

of these level crossings, creating more capacity for trains to access the city, which is renowned for its ‘four seasons in one day’ weather. With six kilometres of elevated track involved, this is the first elevated rail project of this scale in Australia. He says: “Being in Victoria we have our own unique challenges with the operational environment. We’ve certainly looked to other projects around the world, to

take lessons from them and adopt them where we can.” What’s particularly interesting is the massive potential for innovation and design presented by the project’s use of an elevated rail option. Raising up three sections of the rail line will open up a linear corridor for the public to use, replacing what would be typically functional, uninspiring transport infrastructure with playgrounds, parks, cycle and pedestrian paths.

w w w. L e v e l c r o s s i n g s . v i c . g o v. a u

9


We manage your

PROACTIVE QUALITY MANAGEMENT PTY LTD

Quality so you can

lead your business

Quality Control / Quality Inspection

ProQM provides 3rd party surveillance within the Construction, Major projects and Oil & Gas industry sectors. We represent our clients at the supply chain, to inspect and provide surveillance for: Steel fabrication Coatings inspection and testing Welding inspection & Testing Manufacturers Data Record (MDR) reviews and compilation Quality Auditing Our highly trained professionals with years of experience in all fields have worked with large Tier 1 construction companies on major projects throughout Australia with “first-time-right” approaches.

LEARN MORE...

Heavy Fabrication

Coating Inspection

PreCast Cover Check

Final Inspection

Proactive Quality Management Pty Ltd T/A – ProQM

SERVICING ALL STATES Ph: +61 430 880 439 Email: enquiries@proqm.com.au

www.proqm.com.au


AUSTRALIA

“One of the reasons we were really intrigued by this solution is that of all the areas in Melbourne, this has some of the least amount of green open space,” says Summers. “That kind of set off a light bulb moment for us where we thought, ‘let’s take a nontraditional approach and consider elevating the structure’. Basically, everything we elevate, we open up that space underneath. “Historically, when level crossings have been removed in Victoria, the train line is dropped into a ditch and that’s it. But on

this particular job we’ve flipped that whole concept on its head.” In the end, there were several compelling factors that led to the choice of ‘rail over’ for the project, which is tackling all nine crossings as a package. Putting the rail line down into a trench would require three times the amount of rail closures and a dramatic increase in the number of trucks – particularly excavators - on the road. The innovative plans mean the area opens up to 225,000 square metres – that’s a whopping 11

“It’s actually about leaving a legacy behind that improves everybody’s lives”

RILEY RESERVE ACTIVE SPACE

w w w. L e v e l c r o s s i n g s . v i c . g o v. a u 1 1


Complete Rail Cable solutions. Just sit back and enjoy the ride.

Prysmian is the world’s largest manufacturer of top-notch cables, covering all angles of the railway enterprise. On every continent, our cable solutions sit at the heart of significant railway projects. As your one stop shop, we provide you with a full market offer – everything from power, signalling to data and telecom. Furthermore, we can provide you with all the services you might need – before, during and after. Just like we’re doing it right now for the Level Crossing Removal Project in Victoria, Queensland Rail, Aurizon and Sydney Trains. We’re happy to tell you more: Ph: 1300 300 304 Fx: 1300 300 307 Email: sales.au@prysmiangroup.com www.prysmiancable.com.au


AUSTRALIA

Melbourne Cricket Grounds’ worth of green open space. Local involvement But the proposed development of the nine-metre-high elevated rail hasn’t been without controversy. In December 2016, protest group Lower Our Tracks lost a Supreme Court bid to stop the project, claiming the Government failed to properly consult the public and kept the plans secret to avoid a political outcry. Residents opposing it claimed it would lower property values due to being ugly and noisy, but Summers says opinions are slowly changing. “Obviously, the biggest challenge we’ve faced on this job is changing that perception and history that’s come before us,” he says. “Early on, that was a challenge, but over the last 12 to 18 months we have seen the pendulum swing from the broader community that can see the benefits.” Summers stresses the importance of the community having an active role in the future

of the new open space, and has formed an independent expert panel to make sure the right mix of local knowledge and technical expertise feed in to the design. Chaired by the head of the Royal Botanic Gardens, Professor Tim Entwisle, the Community Open Space Expert Panel also includes members of local communities, councils, and organisations such as Bicycle Victoria, Victoria Police and the Office of the Victorian Government Architect. They will present their recommendations to LXRA later in 2017. “A lot of it came back to wanting to leave a legacy behind,” he explains. “This isn’t just about removing level crossings in a transport project. It’s actually about leaving a legacy that improves everybody’s lives there. A dedicated $15 million maintenance fund will be established to make sure the space is well-cared-for long after the project has wrapped up. But getting the community on board early on is just as

w w w. L e v e l c r o s s i n g s . v i c . g o v. a u

13


SMARTON® - A COMPACT CRANE FOR CONSTRUCTION & ASSEMBLY USE EQUIPMENT Overhead Cranes Electric Chain Hoists Custom Cranes Hazardous Environment Cranes Industrial Cranes Open Winch Cranes Electric Wire Rope Hoists Manual Hoists Jib Cranes Light Cranes Systems Air Balancers/ Vertical Lifters Lift Trucks Port Cranes Container Handling Equipment Shipyard Cranes Bulk

SERVICE Crane Maintenance Crane Modernizations Crane Safety Inspection Crane Recertification Spare Parts Training / Remote Services

Konecranes is a world-leading group of Lifting Businesses™, serving a broad range of customers, including manufacturing and process industries, shipyards, ports and terminals.

CONTACT US TODAY! 31 SALES & SERVICE LOCATIONS ACROSS AUSTRALIA & NEW ZEALAND: AU 1300 937 637 / NZ +64 9634 5322 sales.magazines@konecranes.com | www.konecranes.com.au/BusinessreviewAU


AUSTRALIA

important, says Brett. “If we want it to be nice and green – not graffitied or run down within five years, then we have to build something they’re passionate about. Because if we build something the community doesn’t want or embrace, they’re less likely to use it.” Summers says the Panel has spent the last 10 months brainstorming ideas, which they’re now testing with the broader public via an online portal. The community have also

been given ‘carte blanche’ to submit ideas, which have so far ranged from bike repair stations to activity hubs and markets. “One idea is an open outdoor

51-200

Number of Employees at LevelsCrossing Removal Authority

& 2,000+ jobs created as a result of project

w w w. L e v e l c r o s s i n g s . v i c . g o v. a u

15


RIZZANI DE ECCHER

A UNIQUE SOLUTION FOR THE BRIDGE CONSTRUCTION INDUSTRY

Headquarter Via Buttrio, 36 / Frazione Cargnacco Pozzuolo del Friuli / Udine www.rde.it

General contractor

DEAL has been chosen for the Caulfield to Dandenong Level Crossing Removal Project (Melbourne)

Engineering and special equipment for bridge and viaduct construction

Structural engineering and post tensioning systems


AUSTRALIA

art gallery,” he reveals. “Taking the structural columns that actually hold up the elevated bridge and putting local community and artist artwork on there - you can wander between the columns and it becomes an open air, outdoor art gallery. So far the response has been overwhelmingly positive. People see it as a real key to those local precincts and it’s trying to change the mindset from it just being a transport corridor to get from point A to point B. “This flips that concept on its head and tries to turn

AU $1.6 BILLION Levels Crossing Removal Authority Annual Revenue some of these precincts into a destination. We see it as a catalyst for broader improvement around those local precincts. It’s no longer about catching a train to go through an area, it’s actually trying to encourage the community to visit, to shop and

w w w. L e v e l c r o s s i n g s . v i c . g o v. a u

17


PIONEERS IN PRECAST CONCRETE Westkon is an established Australian precast concrete company, which has developed a reputation for providing highly innovative precast concrete structures and products. If you’ve lived in or visited Melbourne you probably have driven on roads, crossed bridges, visited stadiums or hospitals, stayed in apartments or hotels built with Westkon precast components. Westkon has manufactured and constructed precast product for Victoria’s most prominent and largest landmarks, sporting stadiums and road developments. For more information, visit www.westkon.com.au

Melton Plant (Head Office) 133-199 Ferris Road Melton VIC 3337 T: +61 3 8746 1300 E: info@westkon.com.au

Directional drilling company operating 3 different size machines for varying types of underground installations in varying ground conditions. Operating two full time crews we have extensive experience in all sectors including rail, power, water and communications delivering the highest quality installations. LEARN MORE

TRUST YOUR MAJOR DIRECTIONAL DRILLING TO OUR EXPERTISE

2 Jeanette Maree Court, Kilsyth, VIC 3137 Ph: 0417351908 | Email: info@jelmac.com.au

www.jelmac.com.au


AUSTRALIA

just being a transport corridor to get from point A to point B.

CLAYTON ROAD ACTIVATED SPACE

spend money in that area.” Sustainable He says raising the rail line rather than lowering it has benefits from an environmental sustainability point of view, including not needing to move infrastructure, like gas or water mains, or dig up contaminated material that’s been in the rail corridor for a long time. “All we do is once we actually elevate the train line,” he says, “is strip the surface off, so get rid of any of the nasty stuff, and then reinstate a beautiful linear park. And we can actually improve the natural environment. “One of the key design elements is capturing all of that storm water run off from the elevated structure, so from the bridge up in the air, and

Year Founded

2015

using it to irrigate the linear park.” It’s a game of many parts involving stakeholders from councils, Vic Track – who own the land asset – and Metro Trains, who run it. Summers believed it will be the local councils who are ultimately responsible for maintaining each element, “because it’s their constituents that will actually be using it”.

w w w. L e v e l c r o s s i n g s . v i c . g o v. a u

19


1300 826 437

Leading Specialist Civil Contractor

Mitchco Civil Pty Ltd is the leading civil industry specialist, offering a one stop shop for civil construction services, with an energetic and professional team, that provides a quality driven service to our valued clients.

3 Advantage Drive Dandenong South VIC 3175 Email: projects@mitchco.com.au

CALL OR EMAIL THE MITCHCO CIVIL TEAM TODAY!

www.mitchco.com.au

Welcome to our world. GLOBAL LEADER IN POLYMER TECHNOLOGIES. INFRASTRUCTURE SOLUTIONS THAT SEAL DAMP AND PROTECT.

Tel: +61 7 3866 7347 Email: tepa.infrastructure@trelleborg.com www.trelleborg.com/engineeredproducts


‘SECURITY IS MORE THAN PRESENCE. IT’S THE UNDERSTANDING OF PEOPLE AND THEIR BEHAVIORS’ At MA Security Group, we’ve been making a difference to the way security is delivered in the corporate, retail & events sectors throughout Australia since 2009 and we believe that today more than ever, there can be no substitute for experience, professionalism and constant vigilance. Contact us today to find out how we can make a difference to your security needs. ‘Big enough to service national clients. Small enough to deliver customer service’

masecuritygroup.com.au

A FRESH PERSPECTIVE. An initial payment of $15 million, funded through the Level Crossing Removal Project, will be set aside exclusively for maintenance. “It’s been hard,” he admits. “Trying to find that balance between green open space, plus car parking and playgrounds to support the rail environment and get the right mix. But another opportunity that comes with this linear park is we can actually replant trees. If you put a ditch in the ground, there’s no opportunity

to really landscape. But we can replant thousands of plants that can grow to a mature height because the train line is now up in the air, which creates an ecological corridor for flora and fauna. “One of the key concerns from residents is there might be a community of birds or wildlife that live in an adjacent park. But by elevating the train line and reinstating a linear park, we’ll actually draw more wildlife to the area.”

w w w. L e v e l c r o s s i n g s . v i c . g o v. a u

21


121 Exhibition Street Melbourne, Vic Australia 3000 Tel. 03 9027 5574 / +61484 003 226 www. Levelcrossings.vic.gov.au


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.