büşra ateş, undergraduate portfolio

Page 1

undergraduate portfolio büşra ateş

middle east technical university architecture 2013-2017


büşra ateş contact

language turkish(native) english

phone: 0506 991 66 78 e-mail: busraates93@gmail.com

education

experience

middle east technical university(METU) bachelor of architecture (barch), architecture 2012 - 2017

internship at architectural firm boyut’84 architecture co. 2016, june-august

etimesgut anatolian high school 2007 - 2011

internship at construction site mahall ankara, türkerler holding 2015, june-august

skills & expertize photoshop illustrator indesign autocad revit rhinoceros grasshopper sketchup office programs

internship at building surveying yeşilada eğirdir, ısparta 2014, june internship at türk eğitim şantiyesi akg gazbeton izocam tukder marshall rigips 2014, june


content co-house project in eskişehir

second year studio güven arif sargın, yıldırım yavuz, barış yağlı, fatih yavuz, yiğit acar

house project in eskişehir

second year studio güven arif sargın, yıldırım yavuz, barış yağlı, fatih yavuz, yiğit acar

accomodation complex in yüzün-

third year studio m. haluk zelef, hasan okan çetin, ensar temizel

multi-service support center for

third year studio m. haluk zelef, hasan okan çetin, ensar temizel

cüyıl

ayvalık

ankara citadel walls: a proposal for new urbanities; mural terrain

hydro-ruled spaces centro studentesco servizi collectivi in filippo re, bologna

fourth year studio ayşen savaş, arzu gönenç sorguç, funda baş bütüner, onat öktem, pınar yazdıç

graduation project ayşen savaş, arzu gönenç sorguç, onat öktem, pınar yazdıç



co-house house

anatolian university

the site co-house house

osmangazi university

the site is located in eskiĹ&#x;ehir, in the side way of porsuk. in the eskiĹ&#x;ehir, there are two university which means that there are lots of students who live in here. in the side way of porsuk, there are lots of places which serve the young community. the site is located in the interaction area of existed urban settlement. the aim of the project is to create an architectural program which will be serve to that community and to create a living space for society.


co-house

ground level plan -2,00

a - 1,50

+- 0,00

-2,00

+- 0,00 -1,50

mentioning about “community�, there will be no privacy. it will be the place in which everything will be clear and visible. every life will be transparent. there will be no boundary because it serves the whole community. interpretation of the co-house is become to connection house. connection between interior and exterior space human and environment. people can come here and produce or consume together. the architectural program will serve students because they are the major population.

c

b

n

section a +10,50 +9,50

+10,50 +9,50

+6,00 +4,50 +2,50

+-0,00 -1,50


second level plan

first level plan

level organization second

+6,00

+2,50

+4,50

first ground

details

flat roof

section b

section c

+10,50

+10,50

+9,50

+9,50

slab +6,00

+6,00

+4,50 +2,50

+2,50

+-0,00

+-0,00 -1,50

stair


house

ground level plan

-2,00

+-0,00 -0,93

+0,51

+1,05

+1,05

+0,69

+-0,00

c

the house is full of men, one is teenage and the other 3 of them are adults. the house consist, a small bakery, collection and one man who divorced from his wife. dividing the house in main three parts, one for circulation, the other one for common usage and the last one for private needs. this parts also divide segments which be derived from the usage of space. main inspriations are from the house na and pompidou.

section a +10,50

+10,50

+7,35 +6,77 +4,83 +4,47 +4,11

+4,83

+1,05

+1,05 +0,69

+0,51

+-0,00 -0,93 -2,00

a b


second level plan

first level plan

+7,35

+-0,00

+-0,00

+7,27

+4,11

+6,27

+4,83

+4,47

+6,27 +4,83

+4,83

+4,83

+7,17

+4,11

+-0,00

+7,35

section c

section b +10,50

+7,35

+10,50

+10,50

+7,35

+7,35

+6,77

+4,83 +4,11

+4,47 +4,11

+4,11

+1,05

+1,05 +0,69

+1,05 +0,51

+-0,00 -0,93 -2,00

+7,17


details

roof

courtyard slab

slab

stair




accomodation complex in yüzüncüyıl

the site

main aim of the project was to connect the both commercial center together and create a new commercial, public platform between them.

the project site is located in ankara, yüzüncüyıl. the site is located between two main commercial centers of yüzüncüyıl. the project aim was to connect that commercial centers via a platform, in which proposed commercial areas will be accomodated. it was a group project, which consist of three different sites come together and create the total proposal. while that composition come together, the platform is the main connector between them.

circulation

exploded diagram

common area private usage

management

structure

platform public usage units


ground floor level

A

B

section a

section b


key plans

typical floor plans





multi-service support center for ayvalık

The Ayvalık coast line was changed in time to meet the needs of developing town of Balıkesir. The sea was filled and the land-use area of the town was increased. The site which is located in filled area. the historical coastline intervene with new one and their relation with the sea generate the project.

Circulation Commercial Facilities Eating Facilities Multi-functional Hall

Cultural and Social Facilities Offices for Instructors Educational Facilities Library Archieve Medical Care Unit Nursery and Child Care Unit

NGO Center

NGO Offices

Circulation Commercial Facilities Shops Eating Facilities

To focus on the long span structure and create a vista which goes through from the sea to multi-function hall, the coastline has given a V like shape. Then, the settlement layout is designed the attention to be led towards to multi-function hall.

The circulation of upper levels are connected because their functional organization is related with each other.

Cultural and Social Facilities Workshops

NGO Center Lobby Meeting Rooms


site plan 10 5

20


ground floor level Circulation Commercial Facilities Shops Eating Facilities

Cultural and Social Facilities Workshops

NGO Center Lobby Meeting Rooms

+1,00

+1,00

+1,00

+1,00

+1,00

+0,00 +0,00 +1,00

+1,00

+0,50 +1,00

+1,00

+0,00 +0,50

+0,00 +0,00

a

section a

b

+10,50 +8,00 +5,00

+1,00

+8,00 +5,00


first floor level Circulation Commercial Facilities Eating Facilities Multi-functional Hall

Cultural and Social Facilities Offices for Instructors Educational Facilities Library Archieve Medical Care Unit Nursery and Child Care Unit

+1,00

NGO Center

NGO Offices

+1,00

+1,00

+0,00 +1,00 +5,00

+0,50 +5,00 +7,50

+0,00

+4,00

a

section b

b

+7,00

+8,00 +5,50

+4,00 +1,50 +-0,00


key plans

column-floor connection

rope-floor connection

rope-column connection

structural shell connection



ankara citadel walls: a proposal for new urbanities mural terrain

wetland of ankara

water presence from 1920s to 2000s

1920s

hydro-ruled spaces the project site is located between the slope of the citadel walls of ankara and bent deresi. bent deresi was the main water source of the citadel. water resources, which have played an important role in the development of civilizations throughout the history, are at the top among the most important natural and strategic resources today. bent deresi was burried under the ground and the habitation was changed. for the proposal for new urbanities, water will be the main factor that shape the architectural program.

1960s

1980s

1924

2000s


site analysis

precipitation moisture temperature

January December

February

November

wind distribution in valley

March

October

April

September

May

August

June July

shadow distribution yearly

wind direction yearly

N NNW

NNE

NE

NW

WNW

ENE

W

E

ESE

WSW

SE

SW

SSE

SSW S

tones

air composition according to expanded road nitrogen oxigen carbonmonoxide and others

1000

2000

3000

4000

5000

1000

precipitation water consumption available water

6000

available water in time

1920s

years

1 900

1910

1 920

1 930

1940

1 950

1960

1 970

1 980

1 990

1 980

1990

2 000

2010

2 020

2 030

2 040

2 050

water resources, which have played an important role in the development of civilizations throughout the history, are at the top among the most important natural and strategic resources today. unlike other natural sources, water resources constitute the main element of life.

1960s

2000s


hydro-ruled architectural program

site plans

Water is the one of the major element to protect land and to create a productive landscape. In our case, continuation of the land will be accomplished by bringing hidden rivers of Ankara to light. fog wind flow precipitation evaporation

rain harvesting

fog harvesting algae farm

water cycling

algae farm - wastewater treatment - power generation - renewable and carbon neutral - rapid growth rate and not requiring too specific conditions to grow. O2 energy

re-open the bent river, in which algae farm will be accomodated, and create a road network, which provide necessary CO for algaes, upon the river.

light

CO

water

sail type

fog harvesting - collection of humidity - generation of water - power generation moisture

mesh

fog harvesting will be placed on the slope and it collects the humidity, which algaes provided, and convert it again water.

water

stormwater

rain harvesting - harvesing precipitation water - water supply without consumption - sustainable river stone slows down water flow.

permeable surface

stormwater

drain unabsorbed stormwater is discharged into nearby lake through a subsurface drain.

algae farm and fog harvesting compose mutualist relationship and create a cycle of water. in time the proposal will be spread around the ankara and will generate clear water.


site sections


section collage



centro studentesco servizi collectivi in filippo re bologna

bologna is known to be a walled historical city. the wall not only created the city but also marked the peripherial line between the old and the new city. filippo re, the project site, is located just next to the only remaining part of the historical wall. the aim of the project is to protect the wall and also to reveal is as an exhibition object representing the borders of the city.


As a display case

As a light source for the student center

lighting technique

the GLASS BOX

the glass box is designed to stand alone on the site to amplify the existing wall. the main entrance of the proposal should be concieved as a contemporary interpretation of a city gate. the wall becomes part of the proposal and it seperates and connects the given architectural programme. to be able to create a tension between the wall and the glass box all required spaces of the programme are located under the ground; and the glass box turns into a light box for student center. it also provides light for the city at night. to commemorate the existing greenhouse on the site, this proposal uses the glassbox as a green house where the existing greenery particularly the ivies be accomodated.

glass box

slope of the wall

As a light source for the city

reflective surface - water-

As a greenhouse


City Wall

layout scheme

according to light

layout scheme

according to structure

Conventional city gates create point connection between inside and outside of the wall. The main entrance of the proposal should be concieved as a contemporary interpretation of a city gate.


site plan

N

Viale Carlo Berti Pichat

Wall +8,50

+-0,00

Department of Psychology

Library of the Department of Physics

Faculty of Foreign Languages and Literatures

Via F

ilipp o

Re

Department of Educational Sciences

Anatomical Wax Museum "Luigi Cattaneo"


programatic plan scheme Auditorium Exhibition Space

Imagination Lab Sports Lab Art Lab Fab Lab

Resting Spaces - Tweeting Rooms - Coffee Clubs Studio - Shared Kitchens - Living Rooms Open Performance Spaces

Mensa Quite Rooms Studio - Laundry - Living Rooms

Secondhand Bookstore Studio - Shared Kitchens - Living Rooms Open Performance Spaces

Exchange Platform Osteria Student Council Rooms Open Performance Spaces

Studio - Shared Kitchens - Living Rooms Open Performance Spaces

Information Desk - Canile Health Center - Pharmacy - Doctors’ Rooms

Entrance Hall Information Desk - Foyer - Emeroteca Health Center - Emergency Room

floor plans b

b

b

b

b

b

b

b

- 2,00 level plan

- 6,00 level plan

- 10,00 level plan

- 14,00 level plan

- 17,00 level plan

- 20,00 level plan

- 24,00 level plan

- 30,00 level plan

a


section perspectives

worm-eye view


elevation

- 24,00 level plan

section b

- 20,00 level plan

- 30,00 level plan

floor plans

section a

sections

detailed drawings


metal sheet stair

entrance from filippo re

entrance from carlo berti bichat

entrance details

collages


section perspectives

glass box

semi-opaque boxes

with construction detail


general view

interior spaces

collages



thank you.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.