CHS FACILITY ENHANCEMENT PROJECT

BUILDING PROJECT UPDATE

CONSTRUCTION CONTINUES

Advertisement

Drains in the indoor / outdoor kennels Dog kennels

Renovations Underway - February 2021 WHERE WE ARE AS OF MARCH 2021

On the exterior of Calgary Humane Society:

The structure for the new additions has been erected. Hoarding is up, and heat has been blown in to remove the frost from the ground so new electricity, mechanical and plumbing can be roughed in. In the coming weeks, exterior walls for the three additions will be framed in. The next big exterior push is to get the roof on before we see rainfall in May and June, which could slow us down!

Preparation for our new dog kennels and the dog isolation ward continues! So begins the installation of new water lines and rough-in’s for mechanical and electrical components to support our new and improved dog facilities.

The new dog kennel designs are complete. The new clinic and surgery suite design is nearing completion. New cat kennels are underway.

On the interior of Calgary Humane Society:

On the design side:

Finally, the CHS Board of Directors has approved additional funding for heated concrete slabs for the dog runs. This means the indoor/outdoor dog kennels can be used year-round! So even in cold and snowy weather, our dogs can still enjoy their outdoor time!