CAMERON GORDON PROJECTS

Page 1


EPHEMERAL ARCHITECTURE DESIGN STUDIO. - RICHARD & MICHELLE BLACK







ECO VILLAGE

CREMORNE

BB

AA


CLUSTER AA PLAN 1:100

CLUSTER AA 1:100


A CONCEPT FOR AN AFFORDABLE HOUSING PROJECT MADE UP OF PLUG-AND-PLAY MODULAR UNITS BUILT AROUND A STEEL FRAME. THE SELFSUSTAINABLE HOUSING CONCEPT INCORPORATES RAINWATER COLLECTION, SOLAR POWER AND THE USE OF LOCAL RESOURCES TO TRULY INTEGRATE INTO THE SURROUNDING COMMUNITY WHILE REMAINING FLEXIBLE TO THE CHANGING ENVIRONMENT AND NEEDS OF IT’S RESIDENTS.



KITCHEN POD

SIPS - THREE 3000 x 1200 PANELS + ONE 3000 x 900 PANEL (PER WALL) STANDARD WINDOWS FIT (PREFERABLY 1200 WIDE) INTERNAL CLADDING - PLASTERBOARD OR PLYWOOD EXTERNAL CLADDING - Fibre Reinforced Cement Sheet, OSB WINDOW SHADING - STEEL SHEETING AND OSB WHERE POSSIBLE

AUNDRY POD TESLA POWER WALL ENERGY STORAGE SOLUTION

L WATER SUPPLY OUT TO REUSE RAIN WATER TOILET FLUSHING, WASHING ARDENING.

BLADDER TANK UNDER THE FLOOR FOR RAINWATER RETENTION & REUSE.

THE ABILITY TO CONNECT AND SHARE MULTIPLE SERVICES EASILY ACROSS THE SITE. COLORBOND ROOF WATER COLLECTION 3 DEGREE FALL FOR

FLEXIBLE WALL PANELS FOR OPTIMISED ORIENTATION

NESS

EN SPACE

PASSIVE SOLAR DESIGN PRINCIPLES TO MINIMISE ENVIRONMENTAL IMPACT

STEEL 150 I-BEAM FRAME AND COLUMNS

SPIRAL STAIRCASE PERFORATED STEEL DESIGNED TO FILTER LIGHT THROUGH TO OTHER LEVELS

DENTIAL

WALLS, ROOF AND FLOORS INSULATED TO MINIMISE HEAT GAIN/LOSS

DOUBLE GLAZING UNITS WITH PERFORMANCE GLAZING FOR THERMAL COMFORT

PERSPECTIVE SECTION BB

SCREW FOOTINGS ARE USED AS FOUNDATION TO MINIMISE IMPACT OF SITE



2.

5.

DW UP

3.

7.

1.

1.

FIRST FLOOR

FOURTH FLOOR

2. 8.

1. 4.

1. BEDROOM 2. LIVING SPACE 3. DINING SPACE 4. LAUNDRY POD 5. BATHROOM POD 6. W/C 7. KITCHEN POD 8. DECKING AREA 9. CARPORT 10. OFFICE SPACE 11. WINTER ROOM

9.

YEAR FIVE 1:100

8.

GROUND FLOOR

THIRD FLOOR

2.

8. 5.

DW UP

3.

1.

7.

1800

1.

8.

1.

1200.00

FOURTH FLOOR

FIRST FLOOR

10. 2.

1.

1800

4.

9.

YEAR TEN 1:100

1. BEDROOM 2. LIVING SPACE 3. DINING SPACE 4. LAUNDRY POD 5. BATHROOM POD 6. W/C 7. KITCHEN POD 8. DECKING AREA 9. CARPORT 10. OFFICE SPACE 11. WINTER ROOM

GROUND FLOOR

8.

THIRD FLOOR


A REDESIGN OF LACATON & VASSAL, LATAPIE HOUSE FOCUSED ON ITS USE OF LOCAL BUILDING MATERIALS. INFLUENCED BY THE ORIGINAL GREENHOUSE DESIGN, RESEARCH AND DOCUMENTATION AIMED TO APPLY THIS CONCEPT TO OUR CLIMATE AND SITE.



AIRGARAGE CONCEPT


FITZROY INDOOR POOL DESIGN


D1

WT M.2

WT M.2

WT M.1

3226

WT M.2

WT M.2

BALUSTRADE AS PER BCA D2.12A: 700MM MIN HEIGHT BARRIER AT MEZZANINE

1570

1020 6401

WT G.1

2748

FAMILY WC

D3

970

CW1409 - 970 x 1370 Aluminium framed operable double glazed window.

Formed steel sheet Flushing

SHR

D3

16

203

203 25 50 16

1009

Aluminum frame design to hold the operable skylights for both light and ventilation.

SHR

2001

DANPALON 1040 width sheets 16mm thick multiwall polycarbonate Reflective Grey R-value - 0.65 m2co RHS - Rectangular Hollow Sections AS/NZS 1163 Grade C35OLO 50 x 25mm - 3mm thick Galvanized Steel

WT G.1 100 UC - Universal Column - Galvanized Steel

W R.2

103

25 50

Water proof water tight seal

16

Pool Drainage Overflow

18

400

250

100 UC - Universal Column - Galvanized Steel

203

900

Gravel standard

25 50 16

Water Barrier

400 50 25

150

200

120110

270

W R.2

40 40

100

125 100

WT G.1

180


D2

970

CW1409 - 970 x 1370 Aluminium framed operable double glazed window.

Formed steel sheet Flushing

Formed steel sheet Flushing

203 25 50 16

SL R.1

64

GIRTS RHS - Rectangular Hollow Sections AS/NZS 1163 Grade C35OLO 50 x 25mm - 3mm thick Galvanized Steel 2400mm spacing as per Danpalon requirements

PURLINS RHS - Rectangular Hollow Sections AS/NZS 1163 Grade C35OLO 50 x 25mm - 3mm thick Galvanized Steel 2400mm spacing as per Danpalon requirements

25 50 16

1009

Aluminum frame design to hold the operable skylights for both light and ventilation.

203

DANPALON 1040 width sheets 16mm thick multiwall polycarbonate Reflective Grey R-value - 0.65 m2co RHS - Rectangular Hollow Sections AS/NZS 1163 Grade C35OLO 50 x 25mm - 3mm thick Galvanized Steel

W R.2

D1

100 UC - Universal Column - Galvanized Steel

203 25 50 16

103

200 UC - Universal Column (203mm x 203mm) Galvanized Steel

228 400

Formed steel sheet flushing/capping the Danpalon sheets.

50 25

150

200

120110

270

W R.2

40 40

100

125

RHS - Rectangular Hollow Sections AS/NZS 1163 Grade C35OLO 50 x 25mm - 3mm thick Galvanized Steel

100

203

16

DANPALON 1040 width sheets 16mm thick multiwall polycarbonate Reflective Grey R-value - 0.65 m2co


1

3902

1799

A

1043

1043

WT G.1

6000

1043

RECEPTION

380

968

1

1603

WT G.3

3021

690 WT G.3

2

693

3

4

6

7

WT G.2

COL

COL

COL

10

B

1043

8 9

FAMILY WC

5

1043

WT G.2

WT G.3

1527

WOMENS WC

MENS WC

COL

1505

1043

803

SHR

SHR

VB

VB

773

9611

SHR

1043

WC

8266

803

766

WC

WC

766

803

6000

1043

769 3913 803

3913

3913

1043

1610

1043

TO THE MEZZANINE

VB

1507

1580

900

1291

1903

2666

825

COL

769

2721

COL

900

COL

1043

C

<1514>

1514

630

COL

DT G.2

1495

1043

12579

18782

1043

6000

1043

WT G.1

666

CONC.

1043

13000

1043

D

1043

CONC.

1043

1043

6000

1043

1043

Water Barrier

957

CONC.

3686

DT G.3

2510

3411

1548

3270

592

PUMP ROOM CHEMICAL ROOM

25

SLAB EXTENTS

DT G.1

965

DT G.1

1548

CONC.

180 400 250

3800

DT G.1

W G.5

553

DT G.2

STORE ROOM

100 UC - Universal Column - Galvanized Steel

WT G.1

WT G.1

2

3

368

3290

18 16

19203 3800

3800

3902

WT G.4

Gravel standard

900

Pool Drainage Overflow Water proof water tight seal

50 103

16

203

4

5

6 D3

1043

E

48000

1043

51619

1043

1043

WT G.1

6000

1043

1043

F

1043

1043

26277

25800

25800

1043

6000

1043

1043

1043


A

B

E

6000

6000

6000

6000

SL R.1

SL R.1

SL R.1

SL R.1

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

WT G.4

3903

ML 3121

D

C

RL 0

I

H

G

3801 1802

6000

W M.2

F

6000

W M.2

W M.2

W M.2

6000

W M.2

W M.2

W M.2

6000

W M.2

2657 2020

ML 3121

RL 0

SUBJECT :

ARCH1014 ARCHITECTURE

NO

DATE

REVISION

E

PROJECT TEAM :

- CAMERON GORDON - ROSE MACMAHON

SHEET NOTES :

W M.2

W M.2

W M.2


211 QUEENSBERRY

OFFICE TOWER DESIGN

F

W M.2

G

H

I

6000

6000

6000

6000

SL R.1

SL R.1

SL R.1

SL R.1

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

W M.2

BRACING 25MM AS PER ENGINEERS RECOMMENDATION

D

C

6000

W M.2

B

6000

W M.2

W M.2

W M.2

CLIENT :

CITY OF YARRA

A

6000

W M.2

W M.2

W M.2

6000

W M.2

W M.2

DRAWING NAME :

EAST WEST ELEVATION AND SECTION

W M.2

W M.2


3

4

2

1

CONC-3

Roof Top 42900

Roof Top 42900

VERTICAL HARDWOOD LOUVER SYSTEM PANEL 2.00 SEE MANUFACTURES DETAILS

Level 12 39600

Level 12 39600

HORIZONTAL HARDWOOD LOUVER SYSTEM PANEL 1.00 SEE MANUFACTURES DETAILS

FINISHES LEGE

Level 11 36300

Level 11 36300

VERTICAL HARDWOOD LOUVER SYSTEM PANEL 2.00 SEE MANUFACTURES DETAILS

CONC- 1

CONC- 2

CONC- 3

TILE-1

Level 10 33000

Level 10

TM-1

33000

HORIZONTAL HARDWOOD LOUVER SYSTEM PANEL 1.00 SEE MANUFACTURES DETAILS

GL-1

WL-1

Level 9

Level 9

29700

29700

WL-2

CONC-4

VERTICAL HARDWOOD LOUVER SYSTEM PANEL 2.00 SEE MANUFACTURES DETAILS W4

Level 8 26400

W6

W4

Level 7 23100

P-3 W5

W4

W4

W6

W6 P-3

W6 P-3

P-3

W5

W5

W5

W4

W4

W4

W4

Level 6

W6

19800

W5

W5

W5

W5

W5

W5

W4

W4

W4

W4

W4

W4

W6 P-3

W4

W6 P-3

W6 P-3

W6 P-3

P-3

Level 5

W6

16500

W5

W5

W5

W5

W5

W5

W5

W5

W4

W4

W4

W4

W4

W4

W4

W4

W6 P-3

W6

W6

P-3

P-3

W6 P-3

W6 P-3

W6 P-3

P-3

Level 4

W6

13200

W5

W5

W5

W5

W5

W5

W5

W5

W4

W4

W4

W4

W4

W4

W4

W4

W6 P-3

W6

W6

P-3

P-3

W6 P-3

W6 P-3

W6 P-3

P-3

Level 3

W6

9900

W5

W5

W5

W5

W5

W5

W5

W5

W4

W4

W4

W4

W4

W4

W4

W4

W6

W6

W6

W6

W6

W6

W6

W6

W6 P-3

W6

W6

P-3

P-3

W6 P-3

W6 P-3

W6 P-3

P-3

6600

16500

13200

Level 3

W6 P-3

19800

Level 4

W6 P-3

C

9900

Level 2

QUE

6600 STEEL BRACING

W7

W7

W7

W7

W7

W7

W7

W7

W10

W10

W10

P-5

P-5

P-5

P-5

P-5

P-5

P-5

P-5

P-7

P-7

P-7

W9

W9

W9

W8

W11

W11

W11

W7

Level 1

Level 1 3300

R

Level 5

W6 P-3

No.

23100

Level 6

W6 P-3

26400

Level 7

W6 P-3

W5 VERTICAL HARDWOOD LOUVER SYSTEM PANEL 2.00 SEE MANUFACTURES DETAILS W4

Level 2

Level 8

W6 P-3

W5 HORIZONTAL HARDWOOD LOUVER SYSTEM PANEL 1.00 SEE MANUFACTURES DETAILS

W8

D-09

P-7

3300

El Nor

PROJECT N D-09

D-09

W8

DATE P-6

Ground Floor 0

P-6

P-6

Ground Floor 0

DRAWN BY

CHECKED B

2

North 1 : 100

Scale @A1


1 300

2

1408

3

1 A301

7200

4

7200

A

7200

1392

300

D-06

D-06 SINGLE COURSE OF BLOCKWORK TO DOOR OPENING

WATERTANK ROOM

UP

0.004

MECHANICAL PLANT ROOM

RL -3.000

RL -3.000 0.001

5000

UP PUMP & SPRINKLER VALVE ROOM

10,000L WATER TANK

10,000L WATER TANK

0.002

UP

RL -3.000

ACCESS RAMP FOR BIKES SINGLE COURSE OF BLOCKWORK TO DOOR OPENING

B

D-06

REFER TO CITIPOWER SUBSTATION DRAWINGS FOR COORDINATION AND DETAILS SINGLE COURSE OF BLOCKWORK TO DOOR OPENING

MAIN SWITCH ROOM

D-06

ELECTRICAL SUBSTATION ROOM

0.005

GAS METER ROOM

0.001

RL -3.000

0.003

RL -3.000

RL -3.000 SINGLE COURSE OF BLOCKWORK TO DOOR OPENING

D-06

FX-01

SW-03

7700

BENCH SEATING

D-02

D-06

1

30mm TOILET PARTITION

A300

SW-03

MALE SHOWER

22000

FX-01

D-02

0.014

RL -3.000

SW-03

D-01

BIKE STORE 0.001

LIFT 1

72 BIKE SPACES

C

D-02

FIRE ISOLATED STAIR

LIFT 2

D-03

UP

RL -3.000

AIRLOCK SW-03

0.013

D-05

MECHANCIAL VOID

FIRE CUPBOARD

D-03

D-02

ACCESS PANEL

SW-03

DISABLE WC

D-03

COMMUNICATIONS

0.006

1.029

D-02

RL -3.000

SW-01

D-04

7700

SW-02

FX-01

9102

D-03

AIRLOCK 0.012

SW-03

FX-01

D-02 D-03 SW-02

30mm TOILET PARTITION

SW-03

SW-02 SW-01

SW-01

SW-01

SW-01

AIRLOCK

AIRLOCK

0.007

D-02

D-02

D-02

D-02

0.010

D-02

FEMALE SHOWER 0.011

MALE WC D-03

D-03

RL -3.000

FEMALE WC 0.009

0.008

RL -3.000

RL -3.000

D-03

D-03

D-02 BENCH SEATING

D SITE BOUNDARY LINE

1

Basement 1 : 50

25000

SW-03

FD


1

2

3

1 A301

7200

4

7200

7200

STEEL BRACING

A BENCH SEATING

DN

BENCH SEATING

DN 5000

D-09 BENCH SEATING

BENCH SEATING

DN

D-09

COFFEE HUT

BENCH SEATING

LOBBY 2 1.016

1.023

RL 0.000 STEEL BRACING

126 .47 °

B RL 0.000

D-07 DASHED LINE OF LEVEL 1 VOID OVER.

D-09

RETAIL: BIKE SHOP 1.018

WL-3

RL 0.000

D-09

7700

.53° 143 DASHED LINE OF LEVEL 1 VOID OVER.

1 A300

WL-3

FOYER 1.017

RL 0.000

RECEPTION MEETING ROOM 1

D-08

1.015

D-01

RL 0.000

FIRE ISOLATED STAIR

LIFT 1

C

LIFT 2

UP

DUMPSTER

SECURITY 1.022

RL 0.000 D-07

D-05

MECHANCIAL VOID

FIRE CUPBOARD

D-07 ACCESS PANEL

D-03

LOADING BAY

DISABLE WC

COMMUNICATIONS

1.024

1.029

DN

ROLLER DOOR OVERHEAD

7700

1.021

RL 0.000

D-06

RL 0.000

SW-01

SW-02 DUMPSTER

D-04

SW-02

SW-01

DUMPSTER

SW-01

SW-02 SW-01

SW-01

AIRLOCK

AIRLOCK

1.025

D-02

D-02

D-02

WL-2

DUMPSTER

CLEANER'S STORE 1.020

RL 0.000

D SITE BOUNDARY LINE

1

Ground Floor 1 : 50

D-03 D-07

D-03

D-02

BIKE WORKSHOP

1.028

1.019

RL 0.000

WL-2

MALE WC 1.026

RL 0.000

FEMALE WC 1.027

RL 0.000

D-03

D-03


A

B

C

D

CONC-3

CONC-3

MECHANICAL PLANT CONC-3

P-8

P-8

P-8

P-8

CONC-3

P-8

P-8 CONC-2

Roof Top W2

W2 L-2

W2 L-2

42900

W2

W2 L-2

COMMS

L-2

COMPOUND CEILING TILES 600 X 600mm

CONC-3

CONC-3 COMPOUND CEILING TILES 600 X 600mm

STEEL BRACING

CONC-1

CONC-1

W1

W1

W1

FEMALE WC

W1 W1

WL-2

W3

W3

W3

W3

W3

W2

W2

W2

W2

W2

L-2

L-2

L-2

CONC-2

Level 12 39600 COMMS

L-2

CONC-3

CONC-3

COMPOUND CEILING TILES 600 X 600mm

FINISHES LEGEND

W1

CONC- 1

STANDARD FINISH INSITU CONCRETE STRENGTH GRADE TO AS/NZS/ISO 9000

CONC- 2

POLISHED INSITU CONCRETE STRENGTH GRADE TO AS/NZS/ISO 9000

CONC- 3

STANDARD FINISH PRECAST CONCRETE STRENGTH GRADE TO AS/NZS/ISO 9000

COMPOUND CEILING TILES 600 X 600mm

W1

W1

W1

W1

FEMALE WC

STEEL BRACING

CONC-1

CONC-1

WL-2

W3

W3

W3

W3

W3

W2

W2

W2

W2

W2

CONC-2

Level 11

CERAMIC TILE 150X100MM GLOSSY BLACK

TILE-1

HARDWOOD TIMBER FLOOR BOARDING BLACKBUTT 860X190MM

TM-1

L-2 GL-1

DOUBLE GLAZED GLASS 25MM

WL-1

DOUBLE BRICK WALL

WL-2

30mm LAMINATED MDF

L-2

L-2

36300 COMMS

L-2

CONC-3

CONC-3

COMPOUND CEILING TILES 600 X 600mm

COMPOUND CEILING TILES 600 X 600mm

CONC-1

CONC-1

W1

W1

W1

W1

W1

FEMALE WC

110mm CONCRETE BLOCK WORK

CONC-4

WL-2

W3

W3

W3

CONC-2

W3

W3

Level 10 33000

No.

REV DETAILS

Date STEEL BRACING

W3

W3

W3

W3

W3

W2

W2

W2

W2

W2

L-2

L-2

L-2

COMPOUND CEILING TILES 600 X 600mm

CONC-1

CONC-2

Level 3 9900 COMMS

L-2

CONC-3

CONC-3 COMPOUND CEILING TILES 600 X 600mm

CONC-1

W1

W1

W1

W3

W3

W3

W1

W1

FEMALE WC WL-2

CONC-2

W3

W3

Level 2 6600 COMMS CONC-3

CONC-3

CLIENT: BRIDGESTONE

COMPOUND CEILING TILES 600 X 600mm

211 QUEENSBERRY

STEEL BRACING

FEMALE WC

WL-2 CONC-2

GROUND FLOOR PLAN

Level 1 3300 COMMS CONC-3

PROJECT NUMBER

CONC-3

CONC-3

Project Number

DATE

01/01/2016

DRAWN BY

MLB + CG

CHECKED BY

MLB + CG

COMPOUND CEILING TILES 600 X 600mm

RECEPTION

CONC-1

FEMALE WC WL-2 CONC-2

Ground Floor

A101

0

COMMS CONC-3

COMPOUND CEILING TILES 600 X 600mm

1 : 50

Scale @A1

CONC-3

WATERTANK ROOM

FIRE ISOLATED STAIR

MAIN SWITCH ROOM

10000L WATERTANK

CONC-1

FEMALE WC

CONC-1

WL-2 CONC-2

Basement -3000

Section BB

CONC- 2

CONC- 1

CONCRETE DE TO AS/NZS/ISO 9000

NCRETE ZS/ISO 9000

TILE-1

CONC- 3

GL-1

TM-1 FLOOR BOARDING 0MM

MM

WL-1

GLASS 25MM

SH PRECAST CONCRETE DE TO AS/NZS/ISO 9000

WL-2

REV DETAILS

ALL

CONC-4

No.

CLIENT: BRIDGESTO

211 QUEENSBE

SECTION

Proj

A301

PROJECT NUMBER

DATE

DRAWN BY

CHECKED BY

Scale @A1

MDF

1 : 50

E BLOCK WORK

1


4 STEEL MULLION (HORIZONTAL)

STEEL C BRACKET BELOW

4

4

STEEL MULLION (VERTICAL)

METAL GRATE ACCESS PLATFORM OPERABLE TIMBER VERTICAL LOUVER FOLDED METAL-BACKED SINGLE PLY FLASHING

FINISHES L CONC- 1

STEEL MULLION (HORIZONTAL)

4

CONC- 2

STEEL C BRACKET BELOW

OPERABLE TIMBER VERTICAL LOUVER

CONC- 3

DOUBLE GLAZED GLASS PANEL

A400

STEEL MULLION (VERTICAL)

TILE-1

STEEL MULLION (HORIZONTAL)

TM-1

Level 13

GL-1

CONC-2

42900

WL-1

CONC-1

A

WL-2

CONC-4

CORNER DETAIL PLAN

2A BOX GUTTER

1 : 10

METAL GRATE ACCESS PLATFORM

WATER PROOFING MEMBRANE

Level 13

SCREED

42900

METAL GRATE ACCESS PLATFORM

STEEL C BRACKET BELOW

CONC-2

Level 4 13200

STEEL MULLION (HORIZONTAL)

CUSTOM STEEL BRACKET

STEEL MULLION (VERTICAL)

STEEL MULLION (VERTICAL)

OPERABLE TIMBER HORIZONTAL LOUVER

STEEL C BRACKET BELOW

DOUBLE GLAZED GLASS PANEL

4A

OPERABLE TIMBER VERTICAL LOUVER

PARAPET SECTION 1 : 10

B

No.

CONC-1

CURTAIN WALL PLAN

2B

1 : 10

4 METAL GRATE ACCESS PLATFORM

4

STEEL MULLION (HORIZONTAL)

CONC-2

OPERABLE TIMBER VERTICAL LOUVER

STRUCTURAL COLUMN DOUBLE GLAZED GLASS PANEL

PRE-STRESSED CONCRETE (REFER TO ENGINEER'S DETAILS)

Level 3

SCREED

CUSTOM STEEL BRACKET STEEL C BRACKET BELOW

METAL DECKING

9900

STEEL MULLION (VERTICAL)

1A

QU

STEEL MULLION (VERTICAL)

Level 3

A400

9900 CONC-3

D

CONC-3

BRACKET MULLION

PROJEC

2

DETAIL SECTION

1A

1 : 20

MULLION SLAB SECTION

MULLION PRECAST PLAN

3

1 : 10

DATE

1 : 10

DRAWN

CHECKE

Scale @A

2

2

TILE-1

CONC-4

WL-2

CONC-4

FINISHES LEGEND TILE-1 CONC- 1

STANDARD FINISH INSITU CONCRET STRENGTH GRADE TO AS/NZS/ISO 90

CONC- 2

POLISHED INSITU CONCRETE STRENGTH GRADE TO AS/NZS/ISO 90

CONC- 3

STANDARD FINISH PRECAST CONCR STRENGTH GRADE TO AS/NZS/ISO 90

WL-2 TILE-1

D-03

2600

D-03

D-02 TILE-1

WL-2

D-03

TILE-1

CERAMIC TILE 150X100MM GLOSSY BLACK

TILE-1

TILE-1

2165

D-02

SW-02

D-03

HARDWOOD TIMBER FLOOR BOARDI BLACKBUTT 860X190MM

TM-1

GL-1

DOUBLE GLAZED GLASS 25MM

WL-1

DOUBLE BRICK WALL

WL-2

30MM LAMINATED MDF

FX-03

FX-03

SW-01

SW-01

110MM CONCRETE BLOCKWORK

CONC-4

TILE SETOUTPOINT

TILE SETOUTPOINT

2

ELEVATION (HANDED) 2

TILE SETOUTPOINT

Level 3

Level 3

Level 3

9900

9900

9900

3

1 : 20

6

ELEVATION (HANDED) 3

4

1 : 20

7

ELEVATION (HANDED) 4 1 : 20

8 No.

EQ

2

EQ

1459

EQ

REV DETAILS

D

EQ

2109

2109

1459

SW-02

SW-02 SW-01

SW-01

SW-01

SW-01

WL-2

WL-2 CONC-4

CONC-4

FD

D-02

D-02

D-02

TILE-1

FD

D-02

D-03

CONC-4 CONC-4

TILE-1

D-03

A500

D-03

4 TILE-1

AIRLOCK

MALE WC

CLIENT: BRIDGESTONE

TILE-1

6

2

FD

5

SW-01

3435

ALL CUBICLE DOORS TO BE LIFT OFF HINGE

FD

3

9

A500 8

7 TILE SETOUTPOINT

D-03

D-03

Level 3

TILE-1

FEMALE WC

AIRLOCK

5

ELEVATION (HANDED) 5

9900

211 QUEENSBERR TYPICAL AMENITIES

1 : 20

9 D

1

PROJECT NUMBER

TYPICAL AMENITIES PLAN 1 : 20

Project Nu

DATE

01/01

DRAWN BY

MLB

MLB

CHECKED BY

A500 Scale @A1

As indic



SHIPPING CONTAINER CONVERSION.





Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.