ARCHITECTURE
ROOF PLAN GENERAL NOTES 1. NOTIFY ARCHITECT, ROOFING SUPPLIERS, MANUFACTURERS, INSTALLERS, AND SHEET METAL SUBCONTRACTORS A MINIMUM OF 7 DAYS BEFORE COMMENCING ROOF WORK. DO NOT BEGIN WORK WITHOUT HOLDING A PRE-ROOFING CONFERENCE PER THE SPECIFICATIONS. 2. MINIMUM SLOPE AT ALL ROOFS SHALL BE 1/4" PER FOOT AND AT CRICKET VALLEYS SHALL BE A MINIMUM OF 1/4" PER FOOT. DO NOT SCALE PLAN FOR CRICKET DIMENSIONS. 3. ALL CRICKET SLOPES SHALL BE ACHEIVED BY BUILDING UP TAPERED INSULATION OVER THE ROOF DECK UNLESS NOTED OTHERWISE. THERE SHALL BE NO MORE THAN 1/8" DIFFERENCE IN HEIGHT AT THE MEETING EDGES OF SEPARATE PIECES OF DECKING. CRICKET SLOPES ARE TO BE TWICE THE GENERAL ROOF SLOPE. 4. ROOFING SUPPLIERS, MANUFACTURERS AND INSTALLERS SHALL REVIEW ALL ROOFING DETAILS AND ADVISE ARCHITECT ON ANY RECOMMENDED CHANGES. UNLESS NOTED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED THE DETAILS SHOWN. 5. PRIME ALL METAL TO CONTACT ROOFING MATERIALS. 6. SEE MECHANICAL FOR ROOF EQUIPMENT CURBS, ETC.. ALSO SEE PLUMBING AND ELECTRICAL FOR EQUIPMENT, PIPING, CONDUITS, ROOF DRAIN LEADERS, ETC.. PROVIDE CRICKETS BEHIND ALL MECHANICAL EQUIP., CURBS, ROOF HATCH CURBS, ETC.. TYPICAL, PROVIDE CURBS AND FLASHING AT ANY EQUIPMENT NOT PROVIDED WITH PREMANUFACTURED CURBS. 7. SEPARATE DISSIMILAR METALS AS THEY OCCUR PER MANUFACTURERS RECOMMENDATIONS. REVIEW METHODS AND MATERIALS WITH ARCHITECT. 8. PROVIDE FLASHING PER DETAILS AT ALL CONDUIT AND HVAC LINES PENETRATING THE ROOF. 9. CONTRACTOR AND ALL SUBTRADES SHALL BE AWARE AND EXERCISE THE NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF. THIS SHALL INCLUDE ALL SHARP MATERIALS, TOOLS, MATERIAL SCRAPS OR MATERIALS HAVING A DELETERIOUS AFFECT ON THE ROOFING MATERIAL. 10. SEE MEP PLANS FOR RTU LOCATIONS.
BLGY ARCHITECTURE 2204 FORBES DRIVE SUITE 101 AUSTIN, TX 78754 (512) 977-0390
07/14/2016 ASSOCIATE ARCHITECT FUSE ARCHITECTURE STUDIO 702 SAN ANTONIO ST. AUSTIN, TX 78701 512-992-1520
CIVIL HALFF ASSOCIATES 4030 W BREAKER LN. SUITE 450 AUSTIN, TX 78759 512-777-4600
STRUCTURAL JASTER-QUINTANILLA & ASSOC. 1608 W. 6TH SUITE 100 AUSTIN, TX 78703 512-474-9094
MEP HENDRIX CONSULTING ENGINEERS 115 E. MAIN ST. ROUND ROCK, TX 78664 512-218-0060
LANDSCAPE COLEMAN & ASSOCIATES 9890 SILVER MOUNTAIN DR. AUSTIN, TX 78737 512-476-2090
FUELING SSG 17041 EL CAMINO REAL SUITE 200 HOUSTON, TX 77058 281-486-1943
F F & E TECHCENTER DESIGN P.O. BOX 91705 AUSTIN, TX 78709 512-407-8447
ACOUSTICS BAi 4006 SPEEDWAY AUSTIN, TX 78751 512-476-3464
TECHNOLOGY & SECURITY TRUE NORTH CONSULTING GROUP P.O. BOX 2169 HEWITT, TX 76643 254-229-0099
ROOFING/WATERPROOFING
2
A
B
C
3/ Ae-5.01
Ae-5.02
D
E
F
127'-8 3/4" 1'-4 3/8"
25'-0"
25'-0"
25'-0"
25'-0"
25'-0"
1'-4 3/8"
3'-0"
8" WIDE PREFINISHED METAL GUTTER
1
PREFINISHED METAL COPING
3" / 12"
25'-0"
PREFORMED, PREFINISHED METAL PANEL ROOF AS SPECIFIED
1
1
Ae-5.02
CONT. PREFINISHED METAL RIDGE VENT
25'-0"
3" / 12"
4/ Ae-5.01
56'-0"
RIDGE LINE
2/ Ae-5.01
2
Ae-5.02
PROJECT NO.:
3'-0"
3
WILLIAMSON COUNTY 3151 SE INNER LOOP
NORTH CAMPUS FACILITY
ARMKO 4705 PINEHURST DR. S AUSTIN, TX 78747 512-415-3411
ISSUE DATE
1/ Ae-5.01
15-2800
07/14/2016
2 Ae-5.02
E M S T R A IN IN G
1
ROOF PLAN 1/8" = 1'-0"
PLAN TRUE NORTH NORTH
STO RA GE RO O F PLAN
KEY PLAN
A e - 2 .0 2