
1 minute read
Cambodia Projects
Project Description
Beng Mealea School Kitchen Built a new kitchen to replace dilapidated wooden thatch open structure, improving hygiene for 900 pupils and staff. 3 years 2012
Reservoir Dam Repair Repaired and reinforced walls of reservoir, restoring clean water supply to 5 villages and thousands of people. 2 Years 2012
Classroom Improvement Reinforced walls and replaced roof (contractors only) at Beng Mealea.
Accommodation Block
Constructed accommodation for schoolteachers at Beng Mealea who were previously ‘squatting’ in a classroom overnight.
3
2013
Clean Water Initiative Provision of clean water to Beng Mealea school. Included construction of large water storage tanks to store water during the dry season.
2
2015 Teuk Lich Recycling Constructed recycling area to encourage school to manage waste in a more environmentally conscious way. 1
Beng Mealea Library Built and equipped new school library. Subsequent extension for reading room completed in 2017.
Camp O Romchek Village Wells Built two chicken houses for two families and bought chickens for them to raise on their farms.