SXMPREFAB.COM your Supplier for Affortable & Hurricane Proof Category 5 ( 180mph-289km/h ) Prefab Houses & Office Solutions
•
• Education
•
•
Smart region Companies
Local Authorities
This plan IS approved for the High Velocity Hurricane Zone (MiamiDade and Broward Counties)
Apartment 9.6 ✓ ✓ ✓ ✓
1 bedroom 1 bathroom 31m2 / 334 square feet 101m3 / 3,566 cubic feet
Apartment 9.9 ✓ ✓ ✓ ✓
1 bedroom 1 bathroom 47m2 / 506 square feet 156m3 / 5,510 cubic feet
Home 9.6 ✓ ✓ ✓ ✓
2 bedrooms 1 bathroom 61m2 / 657 square feet 205m3 / 7,240 cubic feet
Home 9.9 ✓ ✓ ✓ ✓
2 bedrooms 1 bathroom 95m2 / 1,023 square feet 318m3 / 11,230 cubic feet
Apartment 9.6
Apartment 9.9
Home 9.6
Home 9.9
Materials USD 57,130 *
Materials USD 73,800 *
Materials USD 86,750 *
Materials USD 120,000 *
What’s included
What’s included
What’s included
What’s included
-
-
-
-
Materials for the structure Doors & Windows Heating and Ventilation Electrical installation Plumbing installation Kitchen Bathroom & Toilet
Can only be delivered by two. Price per apartment.
Materials for the structure Doors & Windows Heating and Ventilation Electrical installation Plumbing installation Kitchen Bathroom & Toilet
Can only be delivered by two. Price per apartment.
Materials for the structure Doors & Windows Heating and Ventilation Electrical installation Plumbing installation Kitchen Bathroom & Toilet
Materials for the structure Doors & Windows Heating and Ventilation Electrical installation Plumbing installation Kitchen Bathroom & Toilet
Apartment 9.6
Apartment 9.9
Home 9.6
Home 9.9
What’s not included:
What’s not included:
What’s not included:
What’s not included:
-
-
-
-
-
Un-skilled Labor: - 400 hours for assembling the home/apartment * - 20 hours for placing the home/apartment on the location and finishing Foundation: screw piles are being advised No exterior finishing (options available) The covered porch 13m2 / 140 sq. feet Transport from the Netherlands to every country on the world. Adjustments for local regulations
-
Un-skilled Labor: - 570 hours for assembling the home/apartment * - 20 hours for placing the home/apartment on the location and finishing Foundation: screw piles are being advised No exterior finishing (options available) The covered porch 13m2 / 140 sq. feet Transport from the Netherlands to every country on the world. Adjustments for local regulations
-
Un-skilled Labor: - 640 hours for assembling the home/apartment * - 40 hours for placing the home/apartment on the location and finishing Foundation: screw piles are being advised No exterior finishing (options available) The covered porch 26m2 / 280 sq. feet Transport from the Netherlands to every country on the world. Adjustments for local regulations
-
Un-skilled Labor: - 920 hours for assembling the home/apartment * - 40 hours for placing the home/apartment on the location and finishing Foundation: screw piles are being advised No exterior finishing (options available) The covered porch 26m2 / 280 sq. feet Transport from the Netherlands to every country on the world. Adjustments for local regulations
How it looks
How it looks
How it looks
How it looks
• • • •
YES
SXMPREFAB.COM FAX +31 718871364 Whats App +31624311402