[JT05]
9
4
8 72
3
[JAi04]
1
12
2
[JAi01] 12
7
2
7
[JD03]
12
12
4
b
6
6 12
5 3
[JI] 5
5
72
1
12
[JAi02]
48
6
6
6
c [JD01]
[JA01]
[JA02]
[JAi03]
[JD02]
[JA03]
DIGITAL - ATMOSPHERIC GARDEN, HANGZHOU I CARLOS DÍAZ-MONÍS BARONE USP CEU I July 2016
Architecture Thesis Porfolio
work experience 2016 2014 2013
Tutor at the Master in Urban Interior Design [MUID] Madrid, Spain Nieto Sobejano Arquitectos GMBH Berlin, Germany Marsá Architecture Studio Madrid, Spain
education & workshops 2014 - 2016
Final Thesis Project at San Pablo CEU
“Digital - Atmospheric Garden in Hangzhou”
Carlos Díaz - Monís Barone Sept. 1990
carlosdiazmonis@gmail.com + 34 667 7 2 4 2 6 0
about me instagram.com/baroglio pinterest.com/carlosdiazmonis linkedin
2012
Exchange Program at Politecnico di Milano
2008 - 2014
Bachelor & Master in Architecture
2008
Nuestra Sra. Del Recuerdo School of Madri d
2014 2014 2012 2011
Sustainable Urban Regeneration Workshop - R. Plunz, Madrid San Pablo CEU-Zhejiang University Hangzhou Workshop, Hangzhou Drawing the Genius, Milano Architecture versus design - P. Eisenman, Madrid
San Pablo CEU University of Madrid, Spain
awards 2013 2013 2014
First Prize at “Temporary Artistic Spaces” Competition Madrid HM at“Arquideas International Gastronomic Center” Competition Brussels Finalist at “The Archie Cebada Community Center” Competition Madrid
publications 2012 2012 2012 2011 2011
COAM (Madrid College of Architects) + Antonio Bienvenida Gallery
Best TT3 project USP CEU Bullfighting Farming and Cuttle Rising project
TT Plazas de Toros desmontables Madrid Fusión - Cuisine Academy project at Matadero Madrid TT Cocinando Espacios languages & skills Native Spanish Advanced English Advanced Italian Basic German
AutoCAD, CypeCAD, Rhinoceros, Sketchup Adobe (Illustrator, InDesign, Photoshop) Microsoft Office (Excel, Powerpoint, Word)
[JT05]
9
4
8 72
3
[JAi04]
1
12
2
[JAi01]
7
2
7
[JD03]
12
12
4
b
6
6
5 12
5 3
[JI]
5
72
1
12
[JAi02]
12
48
6
6
6
c [JD01]
[JA01]
[JA02]
[JAi03]
[JD02]
D I G I TA L - AT MO S P H E R I C GA R D E N another way to imagine the Post-Industrial riverside of the Grand Canal Beijing - Hangzhou
Hangzhou - China
[JA03]
D I G I TA L - AT MO S P H E R I C GA R D E N post-industrial regeneration planning of abandoned areas along the Grand Canal B-Hz
production activity
decontamination visibility
MANAGEMENT PLAN OF SOIL, WATER, AIR AND DIGITAL TECHNOLOGY
The plan develops the empty and degraded areas near the Grand Canal proposing a programmatic temporal stratification that allows, adapting to the instability of the urban landscape of Hangzhou, the regeneration of the (decadent) ecological axis of the city, condensing plurality of paths and activities through its relationship with digital technology and connecting either population and the increasingly atomised functional (and less human) public space.
the concept
[AN_01]
the global framework
{of metropolitan areas and urban context in China}
main issues
1
2
+
3
+
the project
5
4
JARD�N DIGITAL-ATMOSFÉRICO
a. network of thematic public gardens + b. urban infraestructures & facilities 35
a 30
25
20
top!
S
+
15
10
5
5
10
15
20
25
30
35
40
45
+
b
global framework
[AN_02]
the global framework
{of metropolitan areas and urban context in China}
ijin g-
02
03
04
05
06
07
08
09
10
11
Gra
nC ana
l Be
01
Ha ngz hou
Quiantang delta
a1
d roa
to
ai
gh
an
Sh
a2
b1
b2
de
se
* c1
mb
oc
ad
ura
rĂo
Q
uia
ng
c2
c3
urban context
tan
g
[AN_03] the urban context
Hangzhou
HANGZHOU, THE RECREATIONAL GARDEN OF SHANGHAI Used to be known as the most beautiful city in the world, Hangzhou was frequented by Shanghai citizens, due to its geographical proximity, to rest and relate to the nature. Today the balance that existed between nature and historical city is over. The current city is marked by an urban structure characterized by two main axes. These axes, ecological and urban growth, are those who lead the city expansion. The urban axis has suffered a great expansion in a very short period of time. Oppositely, the ecological axis has been blurred and has lost its influence in the city.
[AN_04] the master plan
Hangzhou soft line
THE VALUE OF THE GRAND CANAL AND ITS MASTER PLAN The real value of the Grand Canal has not been recognized in the last years, especially its cultural landscape defined along the last 2,000 years, which has now turned into its carelessness and abuse. The widenings (especially in the north) have also dried up the canal and have become impassable by boat, while some areas have been reduced to industrial cesspools with persistent contamination. Hangzhou city is analyzed along the entire route of the canal due to the influence that it has on the city. Touristically influenced areas due to its historical value appear along the Canal, as well as the legacy of industrial architecture left in the city. This reality has a direct impact on the develop of the proposed master plan along the canal.
[AN_05] the diagnosis
Hangzhou soft line Yuhang
a
Yunhe new town 11.45km² sección
Gonsgchen 12.88km²
[PE01]_Construcciones recuperables
eje de actividad peatonal
área parking ferryboat
con valor: -histórico -cultural -arquitectónico
VO_01
[PE04]_Jardines preexistentes área parking coches
Gonsghu 6.35km²
Downtown
Vacío de oportunidad área: 68.863 m2
Daguan 7.06km²
Westlake
[VO.01]_Zona de actuación
Shenua 11.15km² [PE01]_Construcciones con valor:
área parking privado
-histórico -cultural -arquitectónico
punto de actividad
MAIN ISSUES 1.Instability of the urban landscape
Due to construction and demolition cycles and to a short life of buildings around 10-30 years
1 eje movilidad tráfico rodado 2 eje movilidad TNM conexión universidad Zhejiang equipamientos deportivos 2
área de actividad
[PE04]_Jardines preexistentes
rd
hipya
ahe S
_01 D
n PE
secció
área de desembarco
2. Urban nomadism & loss identity of the place
[PE01]_Construcciones recuperables
The historical legacy of the Grand Canal and the agricultural fabric have given way to architectural, stylistic and energetic low quality residencial towers. Valuable monuments and historical buildings along the Grand Canal have also been demolished, which has caused urban voids and the impoverishment of the city center.
áreas parking privados
con valor: -histórico -cultural -arquitectónico
[VO.02]_Vacío de oportunidad
sección VO_02
Posible ampliación área: 44.544 m2 museo 2
parada ferrybus
plaza Xihu
3. Out of scale growth of city and population
eje de actividad peatonal
[PE01]_Construcciones recuperables con valor: -histórico -cultural -arquitectónico
This is the origin of the overall failure of the city: - resources, infrastructure and buildings - industrial displacement out of the G.C. - transport and urban mobility & increased air pollution - densification residential areas
museo 1
[PE05 ]_Recorridos temáticos plan general. Histórico, cultural, turístico.
punto de actividad
[VO.03]_Vacío de oportunidad
calle histórica conservada
Posible ampliación área: 34.712m2
equipamientos deportivos 1
[PE04]_Jardines preexistentes
4. Fragmentation and segregation of public space
sección VO_03
eje movilidad tráfico rodado
área parking privado
ón
cci
se
área parking privado
[PE04]_Jardines preexistentes
área degradada por la actividad
[PE04]_Jardines preexistentes
[PE01]_Construcciones recuperables con valor: -histórico -cultural -arquitectónico
[VO.04]_Vacío de oportunidad
parada ferrybus
punto de actividad
área histórica-calle Xiaohezhijie
Posible ampliación 150642m2 a'
eje de actividad peatonal
action area of the Grand Canal at Gongshu district
eje movilidad tráfico rodado
4
_0
VO
Public spaces have been replaced by new technologies while increasing efficiency, focused on satisfying mobility needs.This causes a balance -loss between city & nature and excessive zoning, where infrastructures are segregating public space.
[AN_06] the intervention
Vo i d t o v o i d Yuhang Yunhe new town 11.45km²
Gonsgchen 12.88km²
Gonsghu 6.35km²
Downtown
[PEC01]_Conservación Construciones con valor: -histórico -cultural -arquitectónico
E.J.01 P.F.01
[PEA04 ]_Ampliación Jardines preexistentes
D.P.01
Daguan 7.06km²
Westlake
P.F.02
Shenua 11.15km²
THE PROPOSAL
[ZI.01] _Zona de actuación área: 353.710m2 nuevo uso
1. Green areas network. Atmospheric & digital gardens
área de equipamientos culturales Investigación Tratamiento natural Red pedagógica
[PEC01]_Conservación Construciones con valor: -histórico -cultural -arquitectónico
- continuos public space in connection with the Canal and city - naturalization and permeabilization of urban soils - atmospheric and digital bubble- improved weather conditions, communication and digital accessibility - catalogue of architectural preexistences
D.P.02
[PEA04 ]_Ampliación Jardines preexistentes
D.P.03
[PEC01]_Conservación Construcciones con valor -histórico -cultural -arquitectónico
2. Dotacional network
- leisure, rest and gastronomy network - educational, productive and connective network - research, art and natural treatment facility buildings
[ZI.02] _Zona de actuación área: 183.974m2 nuevo uso: Jardín público Red pedagógica
P.F.03 [PEC01]_Conservación Construcciones con valor: -histórico -cultural -arquitectónico
3. Management and exhibition centres
P.A.01
- overall atmospheric & digital gardens coordination - management and maintenance of wireless networks - coordination interactivity - screens and applications
Parking en altura
E.J.02
plaza Xihu
4. Open source programs
E.J.03
[DZI.03] _Zona de actuación área: 220.598m2 nuevo uso huerto productivo y lúdico red docente y de investigación
5. Educational structures network
D.P.04
- educational collaboration between colleges and universities -workshops and classrooms related to gardens (landscape, natural treatment, air pollution, technological)
D.P.05
[PEA04 ]_Ampliación Jardines preexistentes
[PEA04 ]_Ampliación Jardines preexistentes
[PEC01]_Conservación Construcciones con valor: -histórico -cultural -arquitectónico
P.F.04
EJ E O
IC G
LÓ O a lo o
rg
la
área de reciclaje digital y natural Red pedagógica
EC
[ZO.04] _Zona de intervención área: 329.795m2 nuevo uso
- collaborative management models & virtual workshops - exchange ideas platforms &- relational platforms between residents
al
an
lc
de
urban intervention - occupation of urban voids and continuity of public space
[AN_05] the diagnosis [V01]
Integrated voids
[V02]
[V03]
[V04]
[ZI.01]
[ZI.02]
[ZI.03]
[ZI.04]
Cultural facilities, research and natural treatment and educational network area
Public Garden and educational network area
Productive and recreational orchard & educational and research network area
Digital and natural recycling and educational network area
[Z.I.01]_Intervention area [353.710m²]
urban void new use: cultural building + research + natural treatment + educational area applied plan: [VO] = [ZI] public garden area: 113.634m² pedestrian area: 19.425m² infiltration garden: 18.836m² atmospheric garden: 69.346m²
[IM_01] 背景
las fases
P a s o
a
p a s o
[AR_01] the system
A different concept of urban plot
VACÍO OPORTUNIDAD > ZONA ACTUACIÓN
05
04 03 02 01
imagen
THIS IS FOR AD
Vallado publicitario - Ciudad Lienzo
Vallado perimetral -exclusión del espacio en la ciudad
TYPICAL HANGZHOU´S CONSTRUCTION SITE - CONSTRUCTION SYSTEM PROPOSED [capaz de generar actividades mientras se construye]
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
[AR_02] the proposal [ARQ_02]
Digital - atmospheric garden la propuesta
背景
E l
j a r d í n
d i g i t a l - a t m o s f é r i c o
R
b
a
[ZI.01] Área de equipamientos culturales, de investigación y tratamiento natural+Red pedagógica
Tres planos se superponen (dos para el hombre,uno para la atmósfera: · el suelo, genera recorridos libres con pequeñas plataformas que hacen más 'vivible' la topografía de la parcela · el elevado , de recorridos más controlados · la cubierta , generadora de umbrales
Estrategias arquitectónicas de ocupación Intentando huir de la clásica forma de construir en la ciudad, donde el espacio se cerca con vallas publicitarias (se convierte en solar en construcción) que provocan una segregación constante del espacio público (debido al alto grado de ciclos construcción-destrucción: 2004-2006 1.3 millones m² demolidos y a una vida media de las construcciones de 10-30 años) y una ciudad superpuesta a la existente (la ciudad lienzo con fines económicos), el proyecto se concibe desde la superposición tanto temporal como programática y se va construyendo a diferentes ritmos. Es capaz de habitarse desde el primer momento y formar parte del tejido urbano generando actividades y programas al tiempo que se construye.
Tras la aparición de los jardines se incorporan 3 cuerpos diferenciados según su pograma: Media Art Center[MAC], Centro de Arte Digital e Interactividad [CAD], Centro de Tratamiento Natural [CTN] y un pequeño módulo independiente para la parada de ferry.
N
0
10
50
escala 1.1000
Se parte de lo existente en las fases anteriores (Jardines) entendiéndolo como preexistencia susceptible de ser habitada. Así se incorporan plataformas (a) y cubiertas (b) .
100m
Plano de actuación en VO1 Planta de cubiertas
Los jardines, conexión entre programas
Las cubiertas, protegiendo a sus 'inquilinos'
[JT05 ] Jardín de tierra 10.200m² HAFS 10 50m² (2m²/h -e)
32
CA
33
34
CB
35
[CTN] Ce Tratam ntro ien Natural to 950m²
CD CE CF
CA CB CD
paulo wnia tomentosa plantación 1.
CG
5 x 3m 1000m² 253 uds
CH
CE CF
[JAi04]
CI
CG
CJ
CH
CK
CI
CL
CJ
CM
CK
CN
CL
CO
CM
CP
CN
CQ
CO
CR
CP
CS
[JAi02] Jardín de aire
[JAi01] Jardín de aire
02
03
04
6 infraestructura depuradora aire 3 plantación oxigenante 5.715m² 05 06
[JA02] Jardín de agua
07
08
09
3 infraestructura depuradora aire 1plantación oxigenante 4.410m²
10
11 12
13
14
FMF 830m² HAFS 1.440m² HAFSS 1.350m² 9.021m²
15
16
17
18
[JAi03] Jardín de aire
DA
CT aire 7 infraestructura depuradora 3plantación oxigenante 7.528 m²
DB
19
20
DC
21
23
24
25
26
27
28
DC
CS
DD
CT
DE
DE
32
DF
plaza
DB
CR
22
DD
Fase 1. JT.
DA
CQ
AA
35
Fase 1. JT.
70% área HAFS 1170 permeable m² (2m² /h-e)
AB
DF
33
plaza pública digital 34 1.235m²
[JI] Jar dín infiltraci de ón 8.841m²
AA
área de exposiciones
AB
AC
Fase 1. JT.
AD
AC
Fase 1. JT.
HAFS
área de exposiciones área de eventos AE
paulownia tomentosa
paulownia tomentosa
plantación - bosque productivo 1 x 1 m 230m²
plantación - bosque oxigenante 1.5 x 3m 790m²
AD
[JD03]
Fase 1. JT.
Fase 1. JT.
AF
pabellón abierto
pabellón abierto
AE AF
[CAD] Centro Arte Digital 4.100m²
AG
06
AH
AH
05
AI
AI
AJ
AJ
AG
carga y descarga material
HAFSS
AK
AM a AN
Fase 1. JT.
FMF
FMF
AP
HAFS
AQ AR
AS
AS
AT
AT
AU
AU
AV
AV
AW
AW
AX
AX
AY
[JA02]
BB
BB
BC
02
03
04
05
07
06
09
10
11 12
FMF 1.116m² HAFS 1.742m² HAFSS 638m² 9.750m²
5 pantalla LED 1 proyector 3.608m² 13
14
15
16
[JA03]
[JA03] Jardín de agua BD
[JD02_03] Jardín digital
218m²
FMF 326m² HAFSS 857m² 1.940 m²
08
HAFSS
BC
Ferry Station
[JD01 Jardín digital [JA01] Jardín de agua 3 pantalla LED 1 proyector 1.930m²
FMF
AZ BA
2 pantalla LED
FMF
AY
[JA01]
AZ BA
[JD] Jardín digital 720m²
arquitectura
AO
AR
BD
01
AN paulownia tomentosa plantación - bosque
lúdico 6 x 3m 410m²
AP
ex-área industrial [almacén naves] 3.300 m²
02
AM a'
aula proyecciones
AQ
[PE_comercial] área comercial revitalizada
03
AL
AO
centro comercial
04
AK
AL
17
18
19
20
21
22
23
24
25
26
27
28
[VU] VACÍO URBANO 79.482 m²
Zona de actuación vegetación purificadora 01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
[PE_comercial] ZONA EX-INDUSTRIAL
cota +20.20m cota +17.20m cota +15.40m
Edificios pre-existentes Naves industriales >> centro comercial 5.525m²
6 infraestructura depuradora aire
[JD01 Jardín digital 1.930m²
3 plantación oxigenante 5.715m²
[MAC] Media Art Center
[JAi01] Jardín de aire
[CTN] Centro Tratamiento Natural [CAD] Centro Arte Digital
[PE_res] ZONA RESIDENCIAL
Edificios pre-existentes. altos bloques de viviendas
cota +20.20m cota +17.20m cota +15.40m cota +9.20m
cota +9.20m cota +4.70m
cota +4.70m
V07 vía tráfico rodado perimetral
[JD] Jardín digital 720m²
t n 01
- FMF
V06 vía tráfico rodado perimetral - ancho vía 9.70m conexión ferry station
[JAi02] Jardín de aire 4.410m²
[JA02] Jardín de agua [JA01] Jardín de agua 1.940 m²
9.021m²
[JAi03] Jardín de aire 7.528m²
[JD02_03] Jardín digital 3.608m²
ARCHITECTONIC STRATEGIES FOR OCCUPATION The project proposes to escape to the classical way of building, where lots are fenced with billboards (becoming construction sites) and cause a constant segregation of public space also due to the intensive constructiondemolition cycles: in 2004-06 period,1,3m m² were demolished. The proposal conceives a temporal and programmatic overlap, being built at different rhythms. Therefore the implementation permits the use of the space since the beginning generating activities and programs inside the public space while continues developing further steps. PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
- ancho vía 9.70m logística y aparcamiento lineal
[AR_03] [ARQ_04]
la propuesta 背景 the proposal E l
j a r d í n
d i g i t a l - a t m o s f é r i c o
Digital - atmospheric garden [ARQ_04] 背景 E l
j a r d í n
a
2
12
6
1 7
9
12
3
b
2
1 7
[JAi02]
5
6 6
5 12
[JD01] 12
5 [JA01] 12
c
9
Leyenda
[JAi04]
nuevo perímetro canal área tratamiento primario, secundario, perímetro parcela terciario del agua pavimento preexist impermeable cultivos fitorremediadores viga canal zona ajardinada pavimento impermeable jardín infiltración escorrentía superfcial humedal artificial flujo horizontal pórtico lineal 1m subsuperficial
1 2 7 4
pórtico 3m cultivos lineal fitorremediadores
recorrido acceso principal zona ajardinada
[JD03] 8 [JAi04]
área plantación jardín infiltración oxigenante escorrentía superfcial arbolado protección viento nuevo perímetro canal zona tratamiento ajardinada primario, secundario, área terciario del aguaescorrentía superfcial jardín infiltración cultivos fitorremediadores proyección zona ajardinada pantalla led
1 6 2 7 6 [JD02] [JD03]
5 [JA02]
8
3
[JI]
12
zona ajardinada jardín infiltración escorrentía superfcial
[JT05]
11
12
3 4
N
12
12
[JAi01] 12
cultivos fitorremediadores
3
[JI]
6
6 6
c
5
4
humedal artificial flujo horizontal subsuperficial
d i g i t a l - a t m o s f é r i c 4o
[JAi02]
12
pavimento preexist impermeable viga canal
la propuesta
a 5
perímetro parcela
pavimento impermeable
11 [JAi01]
Leyenda
[JT05]
12 [JAi03]
espacio cubierto escorrentía superfcial jardín infiltración
c
pórtico lineal 1m punto visualización según malla LED pórtico lineal 3m plaza digital recorrido acceso principal zona ajardinada área plantación oxigenante zona comercial
[JA03]
arbolado protección viento
6
zona ajardinada jardín infiltración escorrentía superfcial
0
escala 1.600
10
20
b
30
6
40
50
100m
proyección pantalla led
Alzado de actuación en V01
espacio cubierto
c
punto visualización según malla LED plaza digital
[JD01]
N
0
escala 1.600
10
20
30
40
[JA01]
[JA02]
zona ajardinada
[JA03]
[JD02]
[JAi03]
50
zona comercial
100m
Alzado de actuación en V01
07 06 05
04 03 02 01 07
arquitectura
[VU] VACÍO URBANO
06 05
79.482 m² Zona de actuación vegetación purificadora
04 03 01
02
03
05
04
06
07
08
09
10
11 12
13
15
14
16
17
18
19
20
21
22
23
24
25
26
28
27
[PE_res] ZONA RESIDENCIAL
[PE_comercial] [VU] VACÍO URBANO
ZONA EX-INDUSTRIAL [JD01 Jardín digital
[JAi01] Jardín de aire
Edificios pre-existentes Naves industriales >> centro comercial 5.525m ²
02
03
05
04
06
07
08
09
[CAD] Centro Arte Digital
Ferry Station
[MAC] Media Art Center
01
[CTN] Centro Tratamiento Natural
79.482 m² Zona de actuación vegetación purificadora
1.930m²
6 infraestructura depuradora aire 3 plantación oxigenante 5.715m²
Edificios pre-existentes. altos bloques de viviendas
10
11 12
13
15
14
16
17
18
19
20
21
22
23
24
25
26
28
27
[PE_res] ZONA RESIDENCIAL
[PE_comercial] ZONA EX-INDUSTRIAL
Edificios pre-existentes. altos bloques de viviendas
[JD01 Jardín digital
[JAi01] Jardín de aire
Edificios pre-existentes Naves industriales >> centro comercial 5.525m ²
[CTN] Centro Tratamiento Natural
1.930m²
6 infraestructura depuradora aire 3 plantación oxigenante 5.715m²
[CAD] Centro Arte Digital Ferry Station
[MAC] Media Art Center [JD] Jardín digital 720m²
[JAi02] Jardín de aire
V06 vía tráfico rodado perimetral
t n 0 1 - FMF
4.410m²
- ancho vía 9.70m conexión ferry station
[JAi03] Jardín de aire
[JA02] Jardín de agua
[JD02_03] Jardín digital
7.528m²
9.021m²
V07 vía tráfico rodado perimetral
3.608m²
- ancho vía 9.70m logística y aparcamiento lineal
[JA01] Jardín de agua
1.940 m² 36,2
01
6,2
02
4,7
03
13,2
04
2,5
18,8
05 06
[JD] Jardín digital
27,5
07
08
7,4
15
09
10
1,6
17,6
11 12
14,8
13
22,9
14
9,2
16
10,6
17
8,3
18
9,8
19
9,4
20
15,6
21
7,4
22
7,4
23
12,5
24
15,1
25
[JAi03] Jardín de aire
[JA02] Jardín de agua
4.410m²
- ancho vía 9.70m conexión ferry station
15,4
15
[JAi02] Jardín de aire
V06 vía tráfico rodado perimetral
t n 0 1 - FMF
720m²
12,2
26
26,4
9
27
28
11
30
29
[JD02_03] Jardín digital
7.528m²
9.021m²
7,7
V07 vía tráfico rodado perimetral
3.608m²
- ancho vía 9.70m logística y aparcamiento lineal
[JA01] Jardín de agua
1.940 m² 36,2
01
6,2
02
4,7
03
13,2
04
2,5
05 06
18,8
27,5
07
12,2
7,4
15
1,6
17,6
14,8
22,9
15,4
9,2
10,6
8,3
9,8
9,4
15,6
7,4
7,4
12,5
It is able to being inhabited from the beginning and become part of the urban fabric generating activities and PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 programs while being built. After the appearance of the gardens three different bodies are incorporated by pogram: Media Art Center [MAC], Center for Digital Art and Interactivity [CAD] Natural Treatment Center [CTN] and a small separate module for the ferry stop. It starts from what exists in previous phases (gardens) considering a potential pre-existence of habitability. Thus PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 platforms (a) and covers (b) are incorporated. 08
09
10
11 12
13
14
15
16
17
18
19
UNIVERSIDAD SAN PABLO CEU
UNIVERSIDAD SAN PABLO CEU
20
21
22
23
24
15,1
25
7,7
26
26,4
9
27
28
11
29
30
02 01
arquitectura
[AR_04] the proposal
The gardens
Recovery infrastructure for contaminated soils
Grand Canal depuration and recycling infrastructure
Air decontamination and environmental comfort infrastructure
Accessibility, recycling and digital communication infrastructure
PHASE 1 [JT]
PHASE 2 [JA]
PHASE 3 [JAi] Air garden
PHASE 4 [JD]
esquema - tipo jardín de agua
I
Di g i t a l sección cc'
a b u j u r
pórticos infraestructurales
b
b2
pórticos infraestructurales cubierta - umbral sección dd'
sección bb'
The decontaminating infrastructure continues to grow and the canal water becomes part of the purification process. These gardens are understood as an extension of the wetland landscape, characteristic of the city. Phytoremediation water plants and different type of filters will be settled to stimulate the water cleaning process. This water will be recicled and used in forthcoming phases for programatic needs.
The garden grows, evolves.
If not seen, it does not exist. Visibility.
B
pórticos infraestructurales
u
B
b2
j a
*
[JD**]
[JA**]
B
o s f é At m
FMF
[JA**]
r
r
u B
Hangzhou SOFT LINE grows out of its roots: land gardens generate a plant tissue located in the postbrownfields that have appeared along the Grand Canal. With the decontamination of soil considered as a landscape regeneration, creates a network of productive, ludic, educational and leasable urban gardens that, along with its associated programs, constitute the soil garden.
a FMF
plaza
u
sección aa'
c1
b
d2
canales infraestructurales
b
r
r c
b2
j a
d1
o s f é At m
r
o s f é At m
d3
u
i c a I
bh h
[JT**]
HAFS
i c a I
d1
u
h
j a
i c a I
I
c
esquema - tipo jardín digital
esquema - tipo jardín de aire
I
d2
h
b1
Digital garden
b1
d_ac
r
esquema - tipo jardín de tierra
b1
Water garden
u
b1
b HAFSS
Soil garden
The dangerously polluted air of the city, is filtered through the air gardens: is where purification processes are carried out through different plantations (oxygenating and capturing PM) and electrostatic filters + condensers for improving climate comfort. The result provides a public elevated garden with walkways over the continuous growing vegetation.
The digital garden is addressed to make evident the decontaminating processes that are produced in the previous gardens associated to other programs. It is a tool for visibility, connectivity and accessibility to digital / virtual window. Connects people and interests while responsible for activating the public space with screens, projections and wireless networks.
[AR_05] the proposal
The gardens objetivos huerto lúdico, huerto docente
paisaje urbano productivo - fitorremediación
talleres virtuales participativos
jardín público
8
perímetro parcela pavimento preexist impermeable viga canal
b1
pavimento impermeable
10
humedal artificial flujo horizontal subsuperficial cultivos fitorremediadores
h
b social
zona ajardinada
-contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza
jardín infiltración escorrentía superfcial
h
d1
bh
10
h
d3
[JT**]
1 área eventos 2 área exposiciones 3 enfermería 4 aula proyecciones 5 pabellón abierto 6 plaza 7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento
c
d2
b2
a atmosférico -activación espacio público (desde inicio de plan) -descontaminación suelo urbano degradado -regeneración paisaje canal -permeabilización suelo urbano -consolidadción tejido urbano (línea blanda Hangzhou)
Leyenda
natural) b centro comercial * parcela sin datos conocidos
2
O2
naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes
CO
R
R
humedales de regeneración agua del canal, pluvial, residual y de uso doméstico {en parcelas libres adyacentes a canal}
objetivos
centro de tratamiento natural y mecánico de agua
a atmosférico -descontaminación agua canal -disminución fangos (olores,enfermedades) -mejora calidad agua -reciclaje agua -permeabilización suelo urbano -ampliación biodiversidad canal
Leyenda área descontaminación agua del canal
b1
viga canal nuevo perímetro canal
d_ac
d2
c
área tratamiento primario, secundario, terciario del agua cultivos fitorremediadores
HAFS
b social
zona ajardinada
d1
FMF
b HAFSS
a FMF
c1
-contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza
jardín infiltración escorrentía superfcial
[JA**]
*
13 aula móvil a guardería (convenio clases tratamiento
Leyenda
O2
área descontaminación agua del canal
pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía
NO
plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo
3
2
NO
CO
x
natural) * acceso mercancías canal
objetivos
materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación
a atmosférico -mejora calidad aire -microclima en burbuja atmosférica -mayor confort climático conexión ciudad-canal -reducción afecciones respiratorias
pórtico lineal 1m pórtico lineal 3m b1
recorrido acceso principal
b social
área plantación oxigenante
-ampliación espacio público -tejido público no privativo -red lúdica junto a naturaleza
arbolado protección viento zona ajardinada jardín infiltración escorrentía superfcial
[JA**] b2
12 plataforma formativa a guardería (convenio clases tratamiento natural)
R
Leyenda área descontaminación agua del canal proyección pantalla led b1
espacio cubierto punto visualización según malla LED plaza digital zona ajardinada zona comercial
plaza
[JD**] b2
11 punto de visualización pantalla a guardería (convenio clases tratamiento natural) b espacio comercial activado c acera de visualización
red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online
pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental
paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales
red de reciclaje de desechos digitales
objetivos
a atmosférico -visibilidad procesos atmosféricos -concienciación acerca de los procesos
b social -visibilidad procesos ciudadanos -nuevas zonas encuentro, intercambio ideas -programas código abierto -red virtual y digital
c tecnológico -mejora y aumento superficie conectividad -nueva accesibilidad digital -integración de plataformas digitales
[AR_05] the proposal
The gardens
huerto lúdico, huerto docente
paisaje urbano productivo - fitorremediación
talleres virtuales participativos
jardín público
Leyenda 8
perímetro parcela pavimento preexist impermeable viga canal
b1
pavimento impermeable
10
humedal artificial flujo horizontal subsuperficial cultivos fitorremediadores
h
zona ajardinada jardín infiltración escorrentía superfcial
h
d1
bh
10
h
d3
[JT**]
1 área eventos 2 área exposiciones 3 enfermería 4 aula proyecciones 5 pabellón abierto 6 plaza 7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento
c
d2
b2
natural) b centro comercial * parcela sin datos conocidos
2
O2
naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes
CO
R
R
humedales de regeneración agua del canal, pluvial, residual y de uso doméstico {en parcelas libres adyacentes a canal}
centro de tratamiento natural y mecánico de agua
Leyenda área descontaminación agua del canal
b1
viga canal
objetivos
nuevo perímetro canal
d_ac
d2
c HAFS huerto lúdico, huerto docente
paisaje urbano productivo - fitorremediación
talleres virtuales participativos
d1
perímetro parcela
a FMF
c1
pavimento preexist impermeable
FMF
cultivos fitorremediadores zona ajardinada
a atmosférico
jardín público
-activación espacio público (desde inicio de plan) -descontaminación suelo urbano degradado -regeneración paisaje canal -permeabilización suelo urbano -consolidadción tejido urbano (línea blanda Hangzhou)
jardín infiltración escorrentía superfcial
b HAFSS
Leyenda
área tratamiento primario, secundario, terciario del agua
[JA**]
viga canal pavimento impermeable
*
humedal artificial flujo horizontal subsuperficial cultivos fitorremediadores
13 aula móvil a guardería (convenio clases tratamiento natural) * acceso mercancías canal
jardín infiltración escorrentía superfcial
Leyenda
O2
área descontaminación agua del canal pórtico lineal 1m pórtico lineal 3m recorrido acceso principal
b1
1 área eventos 2 área exposiciones 3 enfermería 4 aula proyecciones 5 pabellón abierto 6 plaza 7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento
zona ajardinada
[JA**] b2
12 plataforma formativa a guardería (convenio clases tratamiento natural)
Leyenda
2
O2
naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes
CO
R
humedales de regeneración agua del canal, pluvial, residual y de uso doméstico b1 {en parcelas libres adyacentes a canal}
R
centro de tratamiento natural y mecánico de agua
área descontaminación agua del canal proyección pantalla led espacio cubierto punto visualización según malla LED plaza digital
Leyenda
zona ajardinada zona comercial plaza
viga canal área tratamiento primario, secundario, terciario del agua cultivos fitorremediadores zona ajardinada jardín infiltración escorrentía superfcial
13 aula móvil
NO
arbolado protección viento
jardín infiltración escorrentía superfcial
R
nuevo perímetro canal
materialidad descontaminante y elementos constructuvos
-contacto comunidades reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y intereses similares energía en fabricación -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza
área plantación oxigenante
natural) b centro comercial * parcela sin datos conocidos
área descontaminación agua del canal
pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía
x
b social
plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo
3
2
NO
CO
zona ajardinada
[JD**]
PHASE 1. [JT] Soil garden
b2
red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online
pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental
objetivos
a atmosférico -descontaminación agua canal -disminución fangos (olores,enfermedades) -mejora calidad agua -reciclaje agua -permeabilización suelo urbano -ampliación biodiversidad canal
11 punto de visualización pantalla a guardería (convenio clases tratamiento natural) b espacio comercial activado c acera de visualización
b social -contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza
paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales
red de reciclaje de d
huerto lúdico, huerto docente
paisaje urbano productivo - fitorremediación
talleres virtuales participativos
jardín público
Leyenda 8
perímetro parcela pavimento preexist impermeable viga canal
b1
pavimento impermeable
10
humedal artificial flujo horizontal subsuperficial cultivos fitorremediadores
h
zona ajardinada jardín infiltración escorrentía superfcial
h
d1
[AR_05]
bh
huerto lúdico, huerto hdocente
paisaje urbano productivo - fitorremediación
d3
Leyenda
[JT**]
talleres virtuales participativos
c
the proposal
d2
b2
perímetro parcela
10
The gardens
pavimento preexist impermeable viga canal
objetivos
a atmosférico
jardín público
1 área eventos 2 área exposiciones 3 enfermería 4 aula proyecciones 5 pabellón abierto 6 plaza 7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento natural) b centro comercial * parcela sin datos conocidos
pavimento impermeable
-contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza
viga canal nuevo perímetro canal
jardín infiltración escorrentía superfcial
área tratamiento primario, secundario, terciario del agua
d_ac
d2
c
cultivos fitorremediadores
HAFS
zona ajardinada
d1
a FMF
c1
FMF
jardín infiltración escorrentía superfcial
b HAFSS
1 área eventos 2 área exposiciones 3 enfermería 4 aula proyecciones 5 pabellón abierto 6 plaza 7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento
centro de tratamiento natural y mecánico de agua
uso doméstico {en parcelas libres adyacentes a canal}
b social
área descontaminación agua del canal
b1
2
Leyenda
zona ajardinada
O2
naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes
CO
R
humedal artificial flujo horizontal subsuperficial cultivos fitorremediadores
-activación espacio público (desde inicio de plan) -descontaminación suelo urbano degradado -regeneración paisaje canal -permeabilización suelo urbano -consolidadción tejido urbano (línea blanda Hangzhou) R humedales de regeneración agua del canal, pluvial, residual y de
[JA**]
*
13 aula móvil a guardería (convenio clases tratamiento
Leyenda área descontaminación agua del canal
pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía
NO
plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo
3
2
O2
NO
CO
natural) b centro comercial * parcela sin datos conocidos
x
natural) * acceso mercancías canal
materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación
pórtico lineal 1m pórtico lineal 3m recorrido acceso principal
b1
2
O2
naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes
CO
R
R
humedales de regeneración agua del canal, pluvial, residual y de uso doméstico {en parcelas libres adyacentes a canal}
centro de tratamiento natural y mecánico de agua
objetivos
área plantación oxigenante arbolado protección viento zona ajardinada
a atmosférico
jardín infiltración escorrentía superfcial
-descontaminación agua canal -disminución fangos (olores,enfermedades) -mejora calidad agua -reciclaje agua -permeabilización suelo urbano -ampliación biodiversidad canal
Leyenda [JA**]
área descontaminación agua del canal
b2
viga canal nuevo perímetro canal
12 plataforma formativa a guardería (convenio clases tratamiento
área tratamiento primario, secundario, terciario del agua
natural)
cultivos fitorremediadores
R
zona ajardinada Leyenda
jardín infiltración escorrentía superfcial
área descontaminación agua del canal proyección pantalla led b1
espacio cubierto punto visualización según malla LED plaza digital
red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online
pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental
b social
-contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza
zona ajardinada zona comercial plaza
[JD**] b2
11 punto de visualización pantalla a guardería (convenio clases tratamiento
13 aula móvil a guardería (convenio clases tratamiento
natural) b espacio comercial activado c acera de visualización
Leyenda área descontaminación agua del canal pórtico lineal 1m pórtico lineal 3m recorrido acceso principal área plantación oxigenante arbolado protección viento zona ajardinada jardín infiltración escorrentía superfcial
12 plataforma formativa
O2
plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo
pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía
NO
2
3 NO
CO
x
natural) * acceso mercancías canal
materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación
PHASE 2. [JA] Wa t e r g a r d e n
objetivos
a atmosférico -mejora calidad aire -microclima en burbuja atmosférica -mayor confort climático conexión ciudad-canal -reducción afecciones respiratorias
b social -ampliación espacio público -tejido público no privativo -red lúdica junto a naturaleza
paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales
red de reciclaje de
7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento
* parcela sin datos conocidos
O2
natural) b centro comercial * parcela sin datos conocidos
naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes
2 CO
R
R
humedales de regeneración agua del canal, pluvial, residual y de uso doméstico {en parcelas libres adyacentes a canal}
centro de tratamiento natural y mecánico de agua
Leyenda área descontaminación agua del canal
b1
viga canal nuevo perímetro canal
cultivos fitorremediadores
c1
Leyenda
a atmosférico -descontaminación agua canal -disminución fangos (olores,enfermedades) -mejora calidad agua -reciclaje agua -permeabilización suelo urbano -ampliación biodiversidad canal
the proposal
*
viga canal
objetivos
[AR_05]
[JA**]
área descontaminación agua del canal
centro de tratamiento natural y mecánico de agua
The gardens
nuevo perímetro canal
13 aula móvil a guardería (convenio clases tratamiento natural) * acceso mercancías canal
área tratamiento primario, secundario, terciario del agua
CO
2
cultivos fitorremediadores
O2
Leyenda
zona ajardinada
plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo
b social
pórtico lineal 3m recorrido acceso principal
b1
materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación
-contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza
área descontaminación agua del canal pórtico lineal 1m
jardín infiltración escorrentía superfcial
pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía
x
humedales de regeneración agua del canal, pluvial, residual y de uso doméstico {en parcelas libres adyacentes a canal} a FMF FMF
jardín infiltración escorrentía superfcial
NO
R
b HAFSS
2 CO
O2
naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes
d1
3
HAFS
zona ajardinada
R
NO
c
área tratamiento primario, secundario, terciario del agua
d_ac
d2
área plantación oxigenante arbolado protección viento zona ajardinada jardín infiltración escorrentía superfcial
[JA**] b2
12 plataforma formativa a guardería (convenio clases tratamiento natural)
13 aula móvil a guardería (convenio clases tratamiento
R
natural) * acceso mercancías canal
red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online
Leyenda
pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental
área descontaminación agua del canal proyección pantalla led
Leyenda
O2
área descontaminación agua del canal
NO
pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental plaza frente a viento protección captación recursos del aire para su aprovechamiento - agua + energía
x
b1
plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo
3
2
NO
CO
materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación
espacio cubierto punto visualización según malla LED plaza digital zona ajardinada
b2
pórtico lineal 3m 11 punto de visualización pantalla a guardería (convenio clases tratamiento
recorrido acceso principal
natural) b espacio comercial activado c acera de visualización
área plantación oxigenante
a atmosférico -mejora calidad aire -microclima en burbuja atmosférica -mayor confort climático conexión ciudad-canal -reducción afecciones respiratorias
zona comercial
[JD**]
pórtico lineal 1m
objetivos
b social -ampliación espacio público -tejido público no privativo -red lúdica junto a naturaleza
arbolado protección viento zona ajardinada jardín infiltración escorrentía superfcial
12 plataforma formativa a guardería (convenio clases tratamiento natural)
R
Leyenda
red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online
pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental
paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales
área descontaminación agua del canal proyección pantalla led espacio cubierto punto visualización según malla LED plaza digital zona ajardinada zona comercial
11 punto de visualización pantalla a guardería (convenio clases tratamiento natural)
red de reciclaje de desechos digitales
objetivos
a atmosférico -visibilidad procesos atmosféricos -concienciación acerca de los procesos
b social
PHASE 3. [Ja] Air garden
-visibilidad procesos ciudadanos -nuevas zonas encuentro, intercambio ideas -programas código abierto -red virtual y digital
c tecnológico -mejora y aumento superficie conectividad -nueva accesibilidad digital -integración de plataformas digitales
paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales
red de reciclaje de d
O2
Leyenda
natural) * acceso mercancías canal
plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo
área descontaminación agua del canal
pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía
3
2
13 aula móvil a guardería (convenio clases tratamiento
NO
CO
NO x
* acceso mercancías canal
materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación
pórtico lineal 1m pórtico lineal 3m recorrido acceso principal
b1
área plantación oxigenante
Leyenda
O2
plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo
área descontaminación agua del canal
pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos [JA**] del aire para su aprovechamiento - agua + b2 energía
3 NO
2
NO x
arbolado protección viento
CO
materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación
[AR_05]
pórtico lineal 3m
a atmosférico -mejora calidad aire -microclima en burbuja atmosférica -mayor confort climático conexión ciudad-canal -reducción afecciones respiratorias
the proposal
The gardens
pórtico lineal 1m
objetivos
zona ajardinada jardín infiltración escorrentía superfcial
12 plataforma formativa a guardería (convenio clases tratamiento natural)
recorrido acceso principal
b social
área plantación oxigenante
R
arbolado protección viento
red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online
Leyenda
zona ajardinada
-ampliación espacio público -tejido público no privativo -red lúdica junto a naturaleza
pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental
área descontaminación agua del canal proyección
jardín infiltración escorrentía superfcial
pantalla led b1
espacio cubierto punto visualización según malla LED plaza digital zona ajardinada zona comercial
plaza
[JD**] b2
11 punto de visualización pantalla a guardería (convenio clases tratamiento natural) b espacio comercial activado c acera de visualización
12 plataforma formativa a guardería (convenio clases tratamiento natural)
R
Leyenda
red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online
pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental
paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales
área descontaminación agua del canal
red de reciclaje de desechos digitales
objetivos
a atmosférico -visibilidad procesos atmosféricos -concienciación acerca de los procesos
b social -visibilidad procesos ciudadanos -nuevas zonas encuentro, intercambio ideas -programas código abierto -red virtual y digital
proyección pantalla led espacio cubierto punto visualización según malla LED plaza digital
c tecnológico -mejora y aumento superficie conectividad -nueva accesibilidad digital -integración de plataformas digitales
zona ajardinada zona comercial
11 punto de visualización pantalla a guardería (convenio clases tratamiento natural) b espacio comercial activado c acera de visualización
PHASE 4. [JD] Digital garden
paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales
red de reciclaje de
[AR_06] the proposal
The gardens
- huerto urbano (a lúdico b docente c productivo d privado) - talleres taller de análisis de las preexistencias, fotografía y dibujo, mantenimiento y jardinería ecológica - jardín público - eventos/celebraciones ocasionales
2 Agentes intervinientes
depósito acumulación depósito secundario aljibe
4 Funcionamiento AGUA - captación agua riego - riego - reciclaje agua + depuración
e depósito acumulación depósito c secundario
bh
a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) riego c personal de mantenimiento, investigadores d agricultores d2
3 Espacio generado
depósito primario
d3
superficies ajardinadas talleres de uso sostenible del agua, ecología, medioambiente, paisajismo c jardín público
c
*
4 Funcionamiento
VEGETACIÓN - plantación - remoción plantas conservación - secado semillas - recolección de residuos
b2 - banda canal AGUA - captación - pretratamiento - tratamiento natural conservación - cloración - AFS/ACS - reciclaje VEGETACIÓN - plantación y mantenimiento
JARDÍN DE AGUA dededescontaminación y reciclaje de agua [JI]Plan Jardín infiltración
JARDÍN DE TIERRA
Plan de regeneración de suelos contaminados
del canal 1 Método de descontaminación b1 - banda viario
1 Método de descontaminación fitorremediación > especies vegetales a árboles
b arbustos c plantas
2 Agentes intervinientes a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) c turistas d personal de gestión, investigadores e agricultores
3 Espacio y actividad generada - huerto urbano (a lúdico b docente c productivo d privado) - talleres taller de análisis de las preexistencias, fotografía y dibujo, mantenimiento y jardinería ecológica - jardín público - eventos/celebraciones ocasionales
4 Funcionamiento AGUA - captación agua riego - riego - reciclaje agua + depuración VEGETACIÓN - plantación - remoción plantas conservación - secado semillas - recolección de residuos
depósito primario depuración agua
depósito acumulación depósito secundario aljibe
ACS/AFS
pretratamiento - desbaste + desarenado + desengrasado fitodepuración - especies vegetales a FMF macrófitas flotantes T. PRIMARIO b HAFFS humedal flujo horizontal subsuperficial T. SECUNDARIOd1
c HAFS humedal flujo horizontal superficial riego T.TERCIARIO d cascada aireación e cloración
2 Agentes intervinientes
depósito acumulación depósito c secundario
depósito primario
d3
superficies ajardinadas talleres de uso sostenible del agua, ecología, medioambiente, paisajismo c jardín público
4 Funcionamiento
c
b2 - banda canal AGUA - captación - pretratamiento - tratamiento natural conservación - cloración - AFS/ACS - reciclaje
VEGETACIÓN - plantación y mantenimiento
1. 2. 3. 4.
*
b
-
d
bosque productivo jardín oxigenante jardín vertical pre-t jardín público talleres contaminación atmosférica espacio de exposición
-
d
d - d bosque productivo jardín oxigenante jardín vertical pre-t jardín público talleres contaminación atmosférica espacio de exposición
-
+ +
d
4 Funcionamiento AIRE - filtrado - condensación - atemperamiento - deshumidif. canal AGUA - captación - descontaminación - almacenaje - uso
multiconexión
2 Agentes intervinientes
b1 - banda viario
+
+
+
-
-
-
-
+ +
+
-
3 Espacio generado jardín sensorial jardín de eventos plaza pública interactiva paisaje sonoro y lumínico - visibilidad de procesos atmosféricos r y de depuración
s i
C
c s
4 Funcionamiento CONEXIÓN - pto. acceso (PA) - servidor industrial (SI) - router b2 - banda canal ADSL(R) - radio enlace wifi (RE) - firewall
CURRENT SITUATION Rapid urban development > surpassed rainwater drain = MICRO INFRASTRUCTURE Surface water runoff > rapid concentration Natural water cycle > broken Water quality > Very low
-
+ +
+
i
C
p01
todos los públicos
aire [contaminado]
-
s
aire [contaminado]
b pantalla led, proyección, iluminación s led, sensor, cámara,
b
-
-
4 Funcionamiento
micrófono ambiental
3 Espacio generado
jardín sensorial jardín de eventos plaza pública interactiva paisaje sonoro y lumínico - visibilidad de procesos atmosféricos r y de depuración
1 Método de conexión y comunicación i r a wifi libre (público, privado), bluetooth, fibra óptica,
v
-
3 Espacio generado
CONEXIÓN - pto. acceso (PA) - servidor industrial (SI) - router b2 - banda canal ADSL(R) - radio enlace wifi (RE) - firewall
-
intervinientes a FMF
+
-
c s
+ + DIGITAL JARDÍN
especies vegetales - paulownia tomentosa (O2), acer pseudoplatanus (PM) deshumidificación - condesación filtrado - PM, CO, SO2
b HAFFS
v
Plan de conexión, comunicación , interactividad y accesibilidad digital RGB -
+
todos los públicos
AIRE - filtrado - condensación - atemperamiento - deshumidif. canal AGUA - captación - descontaminación - almacenaje - uso
JARDÍN DE AIRE
a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) c turistas d personal de gestión, investigadores e agricultores
2 Agentes intervinientes
4 Funcionamiento
remoción de contaminantes en el aire Plan de confort ambiental
HAFS 2 Agentes
micrófono ambiental
b HAFFS
d_ac
e
multiconexión
a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) c turistas d personal de gestión, investigadores e agricultores
1 Método de descontaminación / confort
bh
a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) riego c personal de mantenimiento, investigadores d agricultores d2
3 Espacio generado
b1 - banda viariode Plan
+
b pantalla led, proyección, iluminación s led, sensor, cámara,
2HAFSAgentes intervinientes a FMF
d
+ +
b1 - banda viario
1 Método de conexión y comunicación i r a wifi libre (público, privado), bluetooth, fibra óptica,
especies vegetales - paulownia tomentosa (O2), acer pseudoplatanus (PM) deshumidificación - condesación filtrado - PM, CO, SO2
3 Espacio generado
-
-
1 Método de descontaminación / confort
c HAFS humedal flujo horizontal superficialriego T.TERCIARIO d cascada aireación e cloración
depuración agua
-
d_ac
RGB
3 Espacio y actividad generada
depósito primario
+ + DIGITAL JARDÍN
Plan de conexión, comunicación , interactividad y accesibilidad digital RGB
uso no sanit
b arbustos c plantas
a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) c turistas d personal de gestión, investigadores e agricultores
ACS/AFS
pretratamiento - desbaste + desarenado + desengrasado fitodepuración - especies vegetales a FMF macrófitas flotantes T. PRIMARIO b HAFFS humedal flujo horizontal subsuperficial T. d1 SECUNDARIO
fitorremediación > especies vegetales a árboles
JARDÍN DE AIRE
remoción de contaminantes en el aire Plan de confort ambiental
RGB
del canal 1 Método de descontaminación b1 - banda viario
1 Método de descontaminación
2 Agentes intervinientes
b1 - banda viario Plan de
uso no sanit
JARDÍN DE AGUA dededescontaminación y reciclaje de agua [JI]Plan Jardín infiltración
JARDÍN DE TIERRA
Plan de regeneración de suelos contaminados
p01
STRATEGY a. Rainwater drain infrastructure b. Technical installation band c. Infiltration garden d. Purifying rainwater filter
p02
b
p02
b
[AR_07] the proposal
The gardens
El jardín El jardín insertado insertado
Phytoremediation Phytoremediation VI VI Phytoremediation Phytoremediation III III
b1 b1
Festuca Festuca arundinacea arundinacea Panicum Panicum virgatum virgatum
0
e 1:200 e 1:200
Phytoremediation Phytoremediation II II
Trifolium Trifolium repens repens Cynodon Cynodon dactylon dactylon
10
2 1
2
5
5
20m 20m
programa programa asociado asociado
Phytoremediation Phytoremediation I I
Helianthus Helianthus annusannus Trifolium Trifolium repens repens
10 10
50m²50m² 2x aula-taller 2x aula-taller 30m²30m² enfermería enfermería aula aula proyecciones proyecciones 50m²50m²
MorusMorus rubrarubra Populus Populus deltoides deltoides PinusPinus nigranigra Robinia Robinia pseudoacacia pseudoacacia
120m120m ² ² área área de exposición de exposición ² ² área área de eventos de eventos 205m205m bañosbaños 18m²18m²
h h a a
a´ a´
h h d1 d1bh bh h h
d3 d3
c
c
[JT**] [JT**] d2 d2
b2 b2
c
c
tn-ft5tn-ft5
tn-ft4tn-ft4
d3
0 PRET 0 PRET
b1 b1
a FMF a FMF FMFFMF
d1
bh bh
tn-ft3tn-ft3
tn-ft2tn-ft2
tn-ft1tn-ft1
h1
Phytoremediation Phytoremediation I I Iris Iris pseudacorus pseudacorus Iris Iris pallida pallida Polemonium Polemonium caeruleum caeruleum
desarenado desarenado desengrasado desengrasado
Cyrtomium Cyrtomium falcatum falcatum
h1
1b HFSS 1b HFSS
Phytoremediation Phytoremediation II II
Valores Valores reducidos reducidos
>
Ligustrum Ligustrum delavayanum delavayanum Ligustrum Ligustrum japonicum japonicum HostaHosta sieboldiana sieboldiana CannaCanna indica indica
Iris Iris pseudacorus pseudacorus TyphaTypha angustifolia angustifolia TyphaTypha latifolia latifolia Butomus Butomus umbellatus umbellatus Arundo Arundo donaxdonax Chaerophyllum Chaerophyllum hirsutum hirsutum Phragmites Phragmites australis australis
NH4NH4 amonio amonio NO3NO3 nitratonitrato > P fósforo P fósforo C.O.C.O. carbono carbono orgánico orgánico SS sólidos SS sólidos suspendidos suspendidos
a´ a´
b HAFSS b HAFSS
c1 c1
d1
desbaste desbaste
d_ac d_ac
d1 d1
h2
Pretratamiento Pretratamiento
c HAFS c HAFS a a
h2
1a FMF 1a FMF
Ø20 Ø20 - Ø60mm - Ø60mm Ø0.2mm Ø0.2mm grasasgrasas Ø6 - Ø12mm Ø6 - Ø12mm material material flotante flotante
d2 d2
d3
[JA**] [JA**] d-d-d d-d-d
**
desbaste-desarenado-desengrasado desbaste-desarenado-desengrasado
c1
b1 b1
c1
pre-t pre-t
a FMFa FMF
Plantación Plantación
Jardín Jardín vertical vertical
Bosque Bosque productivo productivo O ₂ IO ₂ I
AcerAcer pseudoplatanus pseudoplatanus
Bignonia Bignonia radicans radicans Bouganbvilla Bouganbvilla glabra glabra Jasminum Jasminum
'Mao'Mao pao tong' pao tong' Paulownia Paulownia tomentosa tomentosa
tipo caducifolio tipo caducifolio crecimiento crecimiento rápido rápido alturaaltura < 30m < 30m densidad densidad 610 610 – 680 – 680 Kg/m3 Kg/m3 franjafranja térmica térmica 20º C 20º - 40º C -C 40º C captación captación PM2.5 PM2.5 y PM10: y PM10: 0,021g/m2/año 0,021g/m2/año
a a
a´ a´
[JA**] [JA**] b2 b2
b1 b1
a a
a´ a´
plaza plaza
[JD**] [JD**] b2 b2
a FMFa FMF
tipo caducifolio tipo caducifolio crecimiento rápido crecimiento rápido alturaaltura < 20m < 20m floración abril abril - mayo (fructifica en agosto - septiembre) floración - mayo (fructifica en agosto - septiembre) densidad 290 290 - 250- 250 kg/m3 densidad kg/m3 franjafranja térmica 20º C - 40º térmica 20º C -C 40º C absorción CO2:CO2: 21,721,7 kgCO2/árbol/año (23.950 kgCO2/ha/año) absorción kgCO2/árbol/año (23.950 kgCO2/ha/año) producción O2: O2: 5,9 kgO2/árbol/año (6.486 kgO2/ha/año) producción 5,9 kgO2/árbol/año (6.486 kgO2/ha/año)
d1
d1
b HAFSS b HAFSS
d_ac d_ac
Bosque Bosque productivo productivo O ₂ II O ₂ II
[AR_08] the method
System implementation
[IM_02]
背景 L a
consecuencias del sistema
h i s t o r i a
d e l
m u r o
11 10
09 08 07 06 05
04 03 02 01
imagen
p01
p02
p03 p04
p05
p06
p07
p08
p02a
p02b
p02c
p02d
p02e
Estado inicial del vacío de oportunidad 01 [V01] viga pp viga pp con vigaalta contaminaciónppdel viga pp vigaal desuso de la zona y su actividad precedente. Actualmente la parcela Se trata de un áreapp post-industrial de pequeñas edificaciones, terreno debido 25kN/m se encuentra a medio camino³ entre descampado y zona de acumulación de escombros, con pequeñas áreas de plantaciones espontáneas. p02a
p02b
p02c
p02d
p02e
Se propone la limpieza mediante los Jardines de Tierra del terreno, al tiempo que se retiran las preexistencias en estado de decadencia. La parcela comienza a usarse en este estado inicial, donde la actividad que se realiza es el cultivo de plantas descontaminantes por parte de los barrio oseturistas interesados. Lasresidentes vigas delcanal apoyan sobre
p01
p02
p03 p04
p05
p06
p07
p08
encepados ejecutados in situ. En una primera fase no necesitarían estar armadas, sin embargo se dimensionan par la fase última, en la que entran en carga pasarelas, cubiertas y espacios cerrados. - Esta fase puede ser estable en si misma y perdurable en el tiempo. -acciones a considerar: peso propio de la viga sobre el terreno
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
CURRENT SITUATION The plot is a post-industrial area of small buildings with high soil contamination due to the disuse of the area and its previous contaminating activities. Currently, the area is located halfway between vacant land and debris accumulation area, with small areas of spontaneous plantations. The proposed cleaning of the terrain is in charge of the Soil Gardens phase, while pre-existing buildings in state of decay are removed. The plot begins to be used in this initial state by carrying out the activity of growing decontaminating plants by neighborhood residents or tourists interested.
[AR_09] the method
System implementation
[IM_02]
背景 L a
consecuencias del sistema
h i s t o r i a
d e l
m u r o
11 10
09 08 07 06 05
04 03 02 01
imagen
p01
p02
p03 p04
Mav
p02
p07
p08
p02a
p02b
p02c
p02d
p02e
p02a
p02b
p02c
p02d
p02e
pp viga
av
p01
p06
av
av
pp viga 25kN/m³
p05
Mav
av
p03 p04
p05
p06
p07
p08
Las pórticos lineales debido a su esbeltez y ligereza son susceptibles de sufrir las acciones del viento provocando el agotamiento de la biela a tracción. A este efecto contribuye con su peso propio la viga canal, compensando el momento generado por la carga de viento.
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
GREEN AIR PATH The prefabricated canal beams rest on made-in-situ grillage foundation. At an early phase they don’t need to be reinforced, but in any case had to be sized according to the last phase, where walkways, roofs and closed spaces are incorporated.This phase can be stable itself and maintained over time overlapped with further phases. Actions to be considered: the weight of the beam on the ground. The thinness and lightness of the linear gantries are susceptible of tensile rod depletion due to the wind actions. This effect is balanced by the weight of the concrete canal beams, offsetting the bending moment generated by wind load.
[AR_10] the method
System implementation
[IM_02]
背景 L a
consecuencias del sistema
h i s t o r i a
d e l
m u r o
11 10
09 08 07 06 05
04 03 02 01
imagen
p01
p02
p03 p04
p05
p06
p07
p08
pp n1 scu C1
pbarand
p02a
p02
p03 p04
p05
p06
p02c
p02d
p02e
p02b
p02c
p02d
p02e
pp n1 sc u C1
p02a
p01
p02b
p07
p08
Los módulos estructurales lineales se dimensionan para una sobrecarga de uso C3 junto con una carga asimetrica aplicada de 3KN/m². Acciones sobre forjados exteriores Tierra SC=10KN/m² Nieve N1= 0.05KN/m² PP=0.18 El peso propio de la barandilla ayuda a centrar las cargas y compensa la carga de viento producida en el pórtico.
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
THE AIR PATH PLATFORMS Linear structural modules are dimensioned for use overload C3 along with an asymmetric loading applied 3kN/m². Actions on external platforms SC = 10 KN /m² Snow N1 = 0.05KN / mPP = 0.18 The weight of the handrail helps to focus the loads and compensates wind load produced on the gantry.
[AR_11] the method [IM_03]
System implementation el módulo
背景
E l
j a r d í n
d e
a i r e
[JA03] Jardín público IP1 huerto lúdico+docente (a,b,c,d) IP2 talleres virtuales participativos (b,e)
ID1 paisaje urbano productivo - fitorremediación terreno (h, tn02)
[JAi01]
- fitodepuración agua (tn03)
El contacto con el agua - canal [JD01]
[JA01]
[JA02]
[JAi03]
Naturalización de los límites del canal: [JD02]
[JA03]
tn02 paisaje de macrófitas depurativo en el borde del canal tn03 especies depuradoras flotantes Miradores puntuales (f,g)
tn02
g
h
h
22 21
tn03
20 19
c
18
d
b
17
f
16
e
15 14 13 12 11 10
09
a
08 07 06 05
04 03 02 01
imagen
[JT05]
Hangzhou: el jardín de recreo de Shanghai La escala: Jardín vs Parque Jardín del fr. jardin, dim. del fr. ant. jart 'huerto', y este del franco *gard 'cercado'; cf. a. al. ant. gart 'corro', ingl. yard 'patio'. 1. m. Terreno donde se cultivan plantas con fines ornamentales. 2. (jardín botánico) m. Terreno destinado para cultivar las plantas que tienen por objeto el estudio de la botánica.
Parque
del fr. parc. 1. m. Espacio cercado, con vegetación, destinado a recreo o caza, generalmente inmediato a un palacio o a una población.
La experiencia en el jardín en China
El contacto con el terreno- Pavimentos exteriores
conjunto equilibrado por una red de muros
leyenda ver panel24
Regido por el principio de no acción, la menor acción posible sobre la naturaleza (hombre=elemento negativo y destructivo que debe adaptarse para poder participar en la armonía universal). 'Yuanye' se rige por 3 principios: 1. adaptación al entorno 2. imitación de otros paisajes 3. la creación de un mundo en miniatura (el mundo en un grano).
'La reproducción desescalada de una realidad vuelve a ésta mágica o mística.' La arquitectura Tiene un papel destacado a la hora de concebir el jardín: los pabellones, comunicados entre sí por un conjunto de galerías permiten escoger visuales y puntos de vista que se quiere dar al visitante. La contemplación - el espectador Enmarcada o fraccionada del jardín en espacios independientes se realiza a través de galerías y los muros
pe_06 pe_01
árido comp. y cerámica
cultivo extensivo
pe_10
pe_03
pe_03
p01
p07 p04 p06
p08
p09
p10
p11
p12
p13
p10
p05
pe_06
pe_05
p14
p09
p10
p05
p15
p16
p17 p09
pe_08
pe_07
prefabricado de hormigón drenante
grava estabilizada tráfico rodado
losa de piedra reciclada
reciclada
pe_02
p01 p02 p03 p04 p05
pe_04
pe_03
pe_02
pe_01
cultivo intensivo
p18
p19
p10 p05
p05
p20 p19 p10
pe_01 pe_10
p10
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
pe_09
ipavement [wifi]
gravilla
apisonada
p22
pavimento luminiscente
p21
p10
p05
[ST_01] the construction system
From gardens to colonization
d
etapa con grandes emisiones CO2 11.otro uso
10.transporte
b
1.obtención materia prima
9.reciclaje
1
2.transporte
2
3
4
5
6
7
8
9
(Y) Financiación
c 3
8.desmontaje
3.transformación/producción 6.reutilización
2
3'.reciclaje residuos 7.matenimiento
4.transporte
1
5.montaje en obra 6.uso/vida útil
-0.30
0
-0.30
a
construction system
The modular arrangement is based on a (M) fundamental module as the measure from which the rest of measures, both structural elements and finishes, will be adapted. The submodules (sb) are obtained by dividing the fundamental module between an integer while the multimodules (mm) are integral multiples of the fundamental module. M = 100mm mm multiples of M {3M = 300mm 6M = 600mm} Sb = M / nª integer {Dimensions <3M}
(T) tiempo
[ST_02]
the construction system [EST_01] 背景
el sistema
From gardens to colonization El sistema constructivo
Las unidades básicas constructivas
FASE 1
� La modulación La ordenación modular se realiza a partir de un (M) módulo fundamental como medida fundamental a partir de la cual se adecuarán el resto de medidas, tanto de elementos estructurales como de acabados. Los submódulos (sb) se obtienen al dividir el módulo fundamental entre un número entero mientras que los multimódulos (mm) son múltiplos enteros del módulo fundamental.
M = 100mm mm múltiplos enteros de M
3
2
1
n 600
1
300
3 4
6
6m
6
6
6m
6
{núcleo 1M}
1m
c
Sobre las vigas se apoyan pilares dobles tubulares, mediante un mecanismo (apoyado sobre una chapa metálica de gran espesor) de unión atornillada con pernos roscados pasantes (orificios previstos en viga) que, finalmente, se sella con un mortero sin retracción (ver panel CO_06)
Las vigas canal prefabricadas se apoyan sobre unos encepados previamente ejecutados. Llevan un machihembrado en forma de pirámide tronco-cónica con 4 apoyos por pilote (a hueso). Para asegurar la continuidad de las vigas canal tambien se machiembran en el plano longitudinal. (ver panel CO_04)
La modulación en planta {escala urbana} de los núcleos infraestructurales lineales se realiza en base a dos módulos básicos
2
200 150 120
La combinatoria del sistema b
a
[núcleo infraestructural lineal]
d
Una vez alzados los 4 pilares dobles se arriostran mediante perfiles en T, siguiendo la modulación establecida, pasantes y atornillados a pletina metálica en la parte interior de los pilares. (ver panel CO_06)
e
f
Unos cables de acero ubicados en cada pórtico lineal aseguran la estabilidad de la estructura ante acciones de viento.
Las vigas principales son perfiles tubulares rectangulares pasantes biapoyados entre los dos tubulares de los pilares dobles.
g Para la construcción de los siguientes módulos se sigue el mismo sistema, manteniendo siempre los pilares como elementos de referencia (no se duplican). Las vigas quedan a eje con los pilares por lo que la instalación de las siguientes no resultará un problema.
En los jardines de aire las pieles verticales se realizan con cables tensados. Esta subestructura permite también la adaptabilidad de otros subsistemas para la adición de pieles superpuestas. (ver panel CO_05)
El sistema constructivo permite la adopción de fases/subfases temporales proyectuales como fases de estado últimas o estables en el tiempo. Se empieza construyendo desde los jardines atmosféricos: en los jardines de tierra todos los elementos utilizados están insertados en el terreno; únicamente se construye con las vigas se empiezan a elevar las estructuras de los pórticos canal. En los jardines de agua y aire lineales. se incorpora la cubierta umbráculo. En el jardín digital
5
100
1 2
6
75
8
60
10
50
12
40
15
30
20
25
24
3
4
5 6
3
4
5 6
3m
{núcleo 3M}
{ 3M=300mm 6M=600mm}
sb = M/nª entero
n2·M
{dimensiones <3M}
n1·M
n1·M
n1·M
La modulación en alzado {escala humana} de los núcleos infraestructurales lineales se realiza en base a una serie de módulos básicos
n1·M
a módulos estructurales verticales Cable acero semi-rígido 6 x19 Acabado - inoxidable RI Perfil L 100 x 70 x 8 L=1.200mm doble en T unión genérica Acero laminado S275 Acabado RI Perfil L 100 x 70 x 8 � chapa soldada 80 x 50 x 8mm L=1.200mm doble en T unión genérica Acero laminado S275 Acabado RI Perfil TUB 200 x100 x 8mm L=6.000mm Acero laminado S275 Acabado RI -
Perfil TUB 200 x50 x 10 mm L=11.500mm doble con unión genérica Rigidizadores pletina soldada/150cm Acero conformado S275 Acabado RI -
{modulación 1M}
{modulación 3M}
a1 h
a2
450
600
h= 100
300
450
m1
Cable acero rígido 1 x19 Acabado - inoxidable
6 1m
a2
FASE 2
a
[umbráculo-cubierta de atado]
La modulación en planta de los elementos estructurales de cubierta se realiza en base a un módulo básico de 150cm. Ésto es posible gracias a la previa disposición de los pórticos estructurales verticales (lineales) a distancias múltiplo del multimódulo {d=1,5·n} para n=número entero
v
b
Las cubierta se compone de dos ordenes de vigas. Las principales - de unión rígida- vienen divididas en tramos si su longitud es superior a la máxima transportable En el caso de vigas de 15m de luz, se dividen en 3 tramos
c Las vigas secundarias , articuladas, se atornillan a casquillos en U pre-instalados en fábrica, de forma que únicamente girando y encajándolas se realiza el montaje.
Los extremos de las vigas, que vienen premontados, a excepción del montante interior al pórtico lineal, se atornillan a ocho pletinas soldadas a los pilares. Un mecanismo de machihembrado permite insertar el tramo central.
, a 31 de la luz.
d
1
2
3
4
1
2
3
4
Arriostramiento realizado con cable semirrigido atornillado a pletinas metálicas situadas enrasada en la parte superior de las .
c02
c03
c01
150
p
600 150
600 300
300
100
b
cerchas de cubierta Cable acero semi-rígido 6 x19 Acabado - inoxidable RI -
6m
a pórticos exentos y en voladizo
Los pórticos lineales pueden funcionar como pantallas, lienzos o jardines verticales que co-existen con otros pórticos que llevan instalados forjado elevados. Los voladizos testados para los dos casos de los pórticos lineales (1m y 3m) son de un máximo de tres metros a cada lado, con una sobrecarga de uso uniforme de 5KN/m² - correspondiente a la categoría C3 (DB-SE-AE).
600
6
300
b
1 2
h
m2 h= 100 300
a1
La modulación en alzado de los elementos estructurales de cubierta se realiza en relación a la luz existente entre módulos estructurales verticales (siempre d=1,5·n) h= 0,75 m
h=1,5 m
h=1,8m
d < 7,5m
7,5 m<d <12,0 m
12< d <15,0 m
cubierta bi-apoyada
Los jardines digitales se desarrollan bajo una cubierta de acero biapoyada en dos estructuras soporte paralelas. La geometría de la cubierta permite un vuelo testado de 4.5m desde el último punto de apoyo, siempre que esta sea de categoría G (CTE SE-AE)
1
2
3
4
1
2
3
4
p
Perfil TUB 100 x40 x 6mm L=200mm Acero conformado S275
c
Perfil TUB 70 x70 x 7mm L=2.250mm Acero laminado S275
m
Perfil 2xTUB 80 x 50 x 8 L=6.000mm +casquillo U (acero laminado S275) Acero laminado S275
Perfil 2xTUB 150 x 50 x 8 L=6.000mm +casquillo TUB 150x50x7 L=200mm (acero laminado S275) Acero conformado S275
FASE 3
vs�c
[instalación de forjados]
a
b
{forjados en voladizo}
Existen tres tipos de forjados dentro de sistema - voladizo - apoyado - descolgado+apoyado
c
El pavimento sobre las viguetas es de madera y tramex para las zonas exteriores de pasarelas, apoyándose en perfiles metálicos dobles en L sobre las viguetas.
Todos los forjados se han dimensionado para una sobrecarga de uso teniendo en cuenta que es un espacio público. Se decide resolver todos ellos con el mismo perfil: dos UPE270 separados 20cm - unión con platabanda soldada in situ - pasantes atornillados (6 tornillos) a pletinas soldadas a los pilares y apoyadas sobre las vigas principales del pórtico (perfil tubular de acero 200 x100mm).
El forjado acabado tiene un canto de 52cm, pero al estar compuesto por elementos apoyados y acabados permeables el canto real percibido es mucho menor, permitiendo transparencia en el plano vertical y horizontal.
a,b
c
{apoyo y descuelgue de forjados} Ejemplo del caso más desfavorable de instalación de forjado descolgado. La estructura necesita llevar la carga mediante cables de acero trefilado hasta desde las vigas principales de forjado el punto más alto del pórtico - pasando por la cubierta - .
c
09 08 07
vp�c
1
a
10
bi-descolgado de infraestructura lineal
Desde el pórtico lineal se pueden instalar cubiertas independientes que trabajen de forma uniforme al introducir cables tensados que las recorren longitudinalmente. Se pueden descolgar de éstos forjado a diferentes alturas y con un voladizo exterior al punto de entrada en carga de los cables.
2
3
06
4
05
04
a
03
Sobre los forjados, se instalan viguetas dobles T invertida colocadas a 1cm de distancia y a 75cm a intereje de vigueta.
Perfil TUB 200 x50 x 10 L=11.500mm doble con unión genérica Rigidizadores pletina soldada/150cm Acero conformado S275
02
p
01
estructuras b
c
b
La modulación de las viguetas permite que vaya apoyada en uno de los perfiles UPE mientras que la vigueta del móudulo siguiente se apoyará en el perfil UPE libre.
forjados Perfil L 150 x 100 x 10 doble en T unión soldada pletina 10mm Acero conformado S275
Perfil L=7.000mm doble en I con presillas/150cm Acero laminado S275
vgt
vf
FASE 4
1
a
[cerramiento de espacios]
El sistema ofrece la base para ser colonizada por arquitecturas que conforman espacios cerrados. Una vez terminados los forjados, las subestructuras que conforman la envolvente estanca se apoyan sobre perfiles perimetrales sobre las viguetas.
La subestructura que conforma el espacio cerrado se apoya sobre un perfil en T colocado sobre las viguetas y sobre una vigueta de borde perimetral compuesta por un perfil en L150 y un UPE 150.
b Se colocan los montantes (metálicos/madera) para la ubicación de los diferentes cerramientos.
c Los travesaños de cubierta se descuelgan de la subestructura y se apoyan en los montantes previamente dispuestos.
d La envolvente estanca de los espacios cerrados queda siempre bajo cubierta. Sobre ella, se instalan pieles con diferentes funciones de control climático y atmosférico.
2
3
4
d descolgado de cubierta
Desde las cubiertas se descuelgan forjados si el vuelo de éstos es superior al máximo permitido por el sistema. Los cables se sitúan a eje con las vigas dobles pasantes de cubierta que estarán alineadas con los forjados de doble UPE pasante. El `tirón` por tanto se lo llevan las vigas principales de cubierta compuestas por perfiles dobles tubulares de 150x50mm. (ver detalle panel EST_04)
1
2
3 4
1
2
3 4
5
6
7
8
5
6
7
8
Se conforman los espacios de forma independiente a la estructura en cuanto a funcionamiento estructural. En cuanto a la espacialidad, se cuadra con la modulación propuesta explicada anteriormente.
d cimentación y viga centradora
características subestructura: - autoportante - metálica o de madera - subestructura bajo cubierta descolgada - pieles superpuestas interiores y exteriores a la estructura
Hormigón HA50 Yc=1.5 Acero B500S Yc=1.15 Tipo ambiente IIa viga canal HA prefabricado - 1m de ancho
vc
tipos de pieles: PC
- 3m de ancho
tela-tejido
vidrio
malla metálica
membrana PVC
tubo TiO2
papel-papiro
bambú-cáñamo
Armadura encepado a superior 6Ø16 a inferior 6Ø16 estribos horizontales 9Ø16 estribos verticales Ø16c/13 Pilote D=350mm - HA prefabricado método - hincado separación interejes=3D
*ejemplo de posible espacio cerrado bajo cubierta
e
FASE 5
e pórtico mixto
Combinando opciones pueden aparecer cubiertas apoyadas en tres pórticos, forjados descolgados o biapoyados entre pórticos o forjados en voladizo. Es recomendable siempre que en situaciones en las que el momento producido por el descuelgue de un forjado bajo la cubierta pueda producir el colapso del sistema, compensar con el descuelgue de otro forjado que genere un momento de valor opuesto.
{desmontaje} ver panel IM_02
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
[AR_12] the proposal
Cover threshold
32
CA
33 35
18,5
CB
CD
[C15] CT N Centr A=1 .221m²
CE
o Trat.
CA
Nat.
CB CF CD
35,8
CG
CE
66
CH CF
CI 16,5
CG CJ 3
CK
3
12,5
1
CH [C14] CT N Centr o Trat. Nat.
A=1.18 8m²
10
3
CI
3
CL CJ CM CK CN CL
18,5
CO 72
CM 72
CP
CN CQ CO CR CP CS
DA
CQ
DA
CT
DB
CR
15
02
03
04
05 06
07
08
09
10
11 12
13
14
15
16
17
18
19
20
DC
21
22
23
24
25
26
DC
DE
15
32 23
DB
DD
CT
DE
23
28
16,5
DD
52
27
CS
10
33
DF
20
34
DF 35
6
AA 6
AA
AB
AB 6
5,3
12,2
3
3
15
3
3,6
3
3
14
15
AC 6
AC
AD 6
AD
AE
AF
6
AF
48
48
6
AE
AG
6
72
AG
AH
6
66
84
AH
AI
AI
6
[C04] Jardín digital+MTC A=672m²
AJ
AJ 168
6
14
AK
6
18
AK
AL
AL
6
[C03] Jardín digital+MTC 60
A=1.656m²
[C09] Jardín digital
6
AM
A=264m²
AN 6
[C02] Jardín digital
18
12
14
AM
AN
15
A=1.932m²
AO
6
AO
26
25
12
6
23
AP
6
AP
AQ
AQ
6
[C10]CAD Centro Arte Digital A=1.080m²
AR
AR
6
18
AS
72
6
66
36
AS
AT 60
6
AT
AU
AU
6
[C01] Jardín digital 60
A=720m²
AV 54
AV 6
20
AW
AW 6
22
AX
15
[C11] Jardín digital+CGU
54
6
[C07] Jardín digital+CINV
12
6
24
6
AZ
[C12] JD Jardín Digital+CAD Centro Arte Digital
26
[C13] Jardín digital+CAD Centro Arte Digital
6
A=648m²
A=1.440m²
AZ
BA
12
24
6
AY
A=1.500m²
[C06] Jardín digital
BA
AX
A=2.520m²
A=1.872m²
AY
BB
15
1 3
6
3 1
BB
[C08] Ferry Station A=1.269m²
BC
BC
6
24
BD
BD
6,2
02
4,7
03
13,2
04
2,5
05 06
18,8
27,5
07
12,2
08
7,4
15
09
10
1,6
11 12
17,6
14,8
13
22,9
14
15,4
15
9,2
16
10,6
17
8,3
18
9,8
19
9,4
20
15,6
21
7,4
22
7,4
23
12,5
24
15,1
25
7,7
26
9
27
28
[AR_12] the proposal
The under cover implantation gardens [ARQ_03] la propuesta
背景 E l
j a r d í n
d i g i t a l - a t m o s f é r i c o
6
CB
CD CA
6
[JT05]
CE
CF +3.00
CD
CG
[JAi04]
paulownia tomentosa plantación 1 . 5 x 3m
120m²
CH
1000m²
CE
253 uds
CF
6
8
i.art test lab
6
3
CB
6
4
11
[CTN] Ce ntro Tratam iento Na 950m² tural
6
9
a
1
5
3 4
b
12
12
12
6 6
6
CG
CJ
2 7
i.art deck
6
5
5
1
+3.60
[JD03]
CJ
CM
6
a
CN
[JA02]
6
[JA03]
[JD02]
[JAi03]
aula proyec
114m²
CO
bajos comerciales
100m
Plano de actuación en VO1
405m²
o docen te
CO
CR
[PE_comercial]
Planta baja
CN
h2 huert
b
6
50
6
[PE_comercial]
10 escala 1.600
CL
ciones
CP
CQ
0
CK
op
CM
6
[JA01]
land.art wo rksh
80m²
6
[JD01]
1.880m²
CI
CL
6
c
N
CH
90m²
CK
6
7
12
[JI]
12
6
12
6
2
[JAi02]
6
[JAi01]
CI
c
acer pseudo plat
CS
bajos comerciales
500m²
DA
50uds
CPAA
anus planta ción
DA
CQ
6
1.826m²
CT
DB
c 02
03
04
05 06
07
08
09
10
11 12
13
14
15
16
17
18
19
20
DC
21
22
23
24
DD
[JAi01] Jardín de aire
[JAi02] Jardín de aire
[JA02] Jardín de agua
[JAi03] Jardín de aire
6 infraestructura depuradora aire 3 plantación oxigenante 5.715m²
3 infraestructura depuradora aire 1plantación oxigenante 4.410m²
FMF 830m² HAFS 1.440m² HAFSS 1.350m² 9.021m²
7 infraestructura depuradora aire 3plantación oxigenante 7.528 m²
[JI] Ja rdín de25 infiltra ción 8.8
DE
32
children books 50m²
6
AF
HAFS 1.440m²
productivo 1 x 1 m 230m²
c/d
6
media office 30m²
cafe
AI
AC
oxigenante 1.5 x 3m 790m²
AD
6
AK 6
6
nave cedida uso almacén + dotaciones jardín de tierra 426m²
AL
AF
[CAD] Centro Arte Digital 4.100m²
info.point
10
09
AI
08 07
AJ
06
f
enfermería 6
paulownia tomentosa plantación - jardín
toilet 15m²
oxigenante 6 x 3m 880m²
storage
6
11
AH
HAFSS 908m²
30m²
AK
aulas-taller de paisajismo y renegeración del terreno
AL
1024m²
AM
05
04 03 02 AN
01
6
AN
12
AG
oxigenante 6 x 3m 1330m²
45m² AM
AE
e
paulownia tomentosa plantación - jardín
380m²
AJ
AA
540m²
HAFSS 355m²
AH
950m²
c/d
paulownia tomentosa plantación - bosque
6
AG
HAFSS 423m²
paulownia tomentosa plantación - bosque
c a 23 camino de aire
95m²
60m²
c a 21 camino de aire
storage
35m²
c a 14 camino de aire
6
free lecture
cuisine
DF 35
plaza pública digital
AB
6
AE
waste
11m²
DE 20,3
34
1.235m²
c a13 camino de aire
rest area
15m²
paulownia tomentosa plantación - jardín productivo 6 x 3m; 1.5x3m 400m²
AD
DD
9,8
d
c a 18 camino de aire
storage
35m²
DC
CS
28
CT
33
DF
c a01 camino de aire
plaza pública digital 1.260m² 1 pantalla LED 1 proyector
6
AC
plantación - bosque productivo 6 x 3m 450m²
27
14,7
toilet 12m² toilet PMR 6m²
paulownia tomentosa
c a05 camino de aire
c a0 3 camino de aire
6 6
AB
26
41m² 70 % áre a HAFS 11 permeabl 70 m² (2m e ²/h-e)
media center 400m² AA
DB
CR
aula 170m²
FMF 424m²
AP
paulownia tomentosa plantación - bosque
6
[JD] Jardín digital
6
co-working office
200m²
lúdico 6 x 3m 410m²
720m² 2 pantalla LED
AQ
29
FMF 417m²
AO
HAFS 1.736m²
AQ
AR
6
AR
30
AP
c a 22 camino de aire
6
AO
arquitectura
toilet 12m² toilet PMR
6
office
160m²
AU
6m²
AS
[PE_m ov] calle res
idencial
HAFSS 617m²
6
AT
c a 29 camino de aire
AT
c a 18 camino de aire
6
c a 17 camino de aire
AS
AU
FMF 670m²
AV
6
AV
6
AX 6
inner terrace
230m²
AX
AY
6
AY
AW
c a 21 camino de aire
AW
AZ 6
AZ
BA 6
BA
BB
BB
ex-área industrial [almacén naves] 3.300 m² 6,2 4,7
02
03
04
13,2
2,5
05 06
18,8
27,5
07
12,2
08
[JD02_03] Jardín digital
FMF 326m² HAFSS 857m² 1.940 m²
3 pantalla LED 1 proyector 1.930m²
09
JA01_capt. agua 7,4
15
10
218m²
1,6
11 12
17,6
14,8
13
22,9
14
15,4
15
9,2
16
10,6
17
8,3
18
9,8
19
9,4
20
JA02_capt. agua
21
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
15,6
7,4
22
7,4
23
12,5
24
15,1
25
BC
FMF 1.116m² HAFS 1.742m² HAFSS 638m² 9.750m²
5 pantalla LED 1 proyector 3.608m²
Ferry Station
n borde canal tn_03naturalizació
[JA03] Jardín de agua
6
BD 36,2
[JA01] Jardín de agua
[JD01 Jardín digital
[PE_comercial] área comercial revitalizada
6
BC
7,7
26
BD
26,4
9
27
JA03_capt. agua
28
72,2
11
29
30
[AR_12] the architectural colonization
M背景e dla colonización i [ARQ_05] a t harquitectónica eque E l
j a r d í n
d i g i t a l - a t m o s f é r i c o
El Jardín digital-atmosférico Hangzhou, ciudad de rápido crecimiento en los último años ha visto su crecimiento tanto en superficie como en altura. Grandes torres residenciales sin valor arquitectónico, estilístico o paisajístico han ido rodeando la principal obra estructural acuática de China. El proyecto, junto con el desarrollo de la línea blanda de Hangzhou propone un modelo-sistema arquitectónico sin carácter definido, de baja densidad inicial y con una altura máxima de 20 m sobre el nivel del agua en su punto más alto. Este sistema será posteriormente colonizado por arquitecturas y programas basados en los planes de desarrollo de la Línea Blanda, siendo su principal uso público y dotacional-educativo.
13 12 11 10
09 08 07 06 05
04 03 02 01
arquitectura
N
0
escala 1.250 Sección longitudinal Sección a-a'
10
20
30
40
50m
[AR_13] the architectural colonization
Mediatheque [ARQ_06]
背景 E l
la colonización arquitectónica
j a r d í n
d i g i t a l - a t m o s f é r i c o
paulownia tomentosa plantación jardín oxigenante 6 x 3m 1330m²
storage
co-working office
30m²
200m²
24 48.40
17.30
24.50
5.80
office
42.40 toilet PMR 6m²
toilet
12m²
160m²
9.00
29.30
6.30
18.20
11.80
18.10
6.30
free lecture 95m²
free lecture
10.10
11
6
5.30
2.80
storage
35m² +0.25
2.90
7.40
24.20 -1.08
-2.23
+0.25
6.60
11.00
11
13.80
1.60
12
95m²
+0.25
+0.25
+0.25
+0.25
+2.23
+0.25
+4.50
+2.16
9.20
+4.50
+0.25
10.20
5.40
+0.25
24
toilet PMR
6 +0.25
6m²
32.20
23.30
-0.72
18m²
60m²
72.80 árbol pre-existente altura:16.5 m
4 +0.25
5.30
12.90
cuisine
locker room
25.80
18.50
14.80
árbol pre-existente altura:8.5 m
árbol pre-existente altura:8 m
1.50
27.90
árbol pre-existente altura:20 m
árbol pre-existente altura:8 m
5.40
9.10
3.00
-1.08
1.40
18.00
16.60
garden
12.80
41.70
3.00
10.80 15.00
+0.25
info.point
+0.25
5.70 2.50
toilet
12m²
25
93.10
22
+0.25
5.90
media office
30m²
2.50
41.70
children books
50m²
5.00
12.50 10
árbol pre-existente altura:10 m
+0.25
14 22
1.90
+0.25
3.80
22.40 54.20
17.50
13 +2.23
12 11 10
árbol pre-existente altura:15 m
árbol pre-existente altura:16.5 m 12.20
-0.72
rest area
15m²
+0.25
4 +0.25
cafe
185m²
7.60
storage
35m²
11m²
7.10
4 +0.25
45.40
09
46.50
-0.72
waiting terrace
08
8.80
9.00
8.90
230m² árbol pre-existente altura:9 m
07
6.10
09
10.90
waste
06
28.50
22
+0.25
+2.23
10.00
15.10
+0.25
+0.25
4.20
04
22
38.10
03
+2.23 4.40
02
12.30
01
info.point
árbol pre-existente altura:9 m
arquitectura
17.50
6.80
44.00
4.00
2.90
+2.23
6.50 6.00
AA
6.00
AB
6.00
AC
6.00
AD
6.00
AE
6.00
AF
6.00
AG
6.00
6.00
AH
AI
N
6.00
6.00
AJ
0
escala 1.200
AK
10
6.00
6.00
AL
AM
20
6.00
AN
6.00
AO
30
6.00
AP
6.00
AQ
40
Planta baja Planta cota +0.25
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
6.00
AR
6.00
AS
50m
6.00
AT
6.00
AU
6.00
AV
7.70
08
2.60
05
22
6.00
AW
6.00
AX
6.00
AY
6.00
AZ
6.00
BA
[ARQ_07]
背景 E l
[AR_14]
la colonización arquitectónica
j a r d í n
d i g i t a l - a t m o s f é r i c o
the architectural colonization
D i gla colonización i [ARQ_07] t a l arquitectónica art centre
背景 E l
j a r d í n
d i g i t a l - a t m o s f é r i c o
b
b'
b
P05
P06
P07
P08
P09
b'
P10
P11
P13
P12
15
P14
14 13 [C13] Cubierta 13 A=648m²
[C11] Cubierta 11 A=2.520m²
12
[C12] Cubierta 12 A=1.500m²
11 10
umbral de sombra
umbral de sombra
09 +15.40
08
+15.40
07
+14.20 +13.70 +12.80
p06
+13.70
06
+12.80
05
umbral seco +11.10
04
[MAC] trabajo artistas A=80m²
03
umbral impermeable
+9.20
+9.20 +8.30
P05
P06
P07
3.00
3.00
3.00
P08
P09
P10
8.70
2.60
P13
P12
11.40
12.60
3.40
7.40
4.00
1.60
01
6.30
pasarela elevada + 4.70
+4.70
[C13] Cubierta 13 A=648m²
[C11] Cubierta 11 A=2.520m²
+8.30
P14
arquitectura
+4.70
pasarela elevada + 4.20
P11
[MAC] exposiciones temporales A=120m²
+4.70
02
+9.20 +8.30
+4.20 [C12] Cubierta 12 A=1.500m²
+4.20
+3.80
+3.80
[CTN] aula-taller A=92m² +2.80
+2.80 2.80
3.10
1.70
5.20
2.70
2.10 de sombra 1.50 umbral
0.80
6.20
3.50
4.10
8.30de sombra umbral
2.20
3.50
3.30
6.90
1.50
1.20
2.60
3.90
+1.00
+15.40
+0.00
+0.00
+15.40
+14.20 +13.70
+13.70
+12.80
+12.80
p06 umbral seco +11.10 [JA01] Jardín de agua + Jardín digital
[JD02] Jardín de agua
[JD03] Jardín digital
[JA04] Jardín de agua
[MAC] trabajo artistas A=80m²
[JA05] Jardín de tierra
umbral impermeable
68.60
+9.20
+9.20
+9.20 +8.30
+8.30
4.60
3.00
3.00
3.00
12.00
3.00
8.70 P05
+4.70
1.00
7.50
3.00
[MAC] exposiciones temporales A=120m²
2.60
15.00
P07
12.60 +4.70
P08
12.00
1.00
+8.30
6.50
arqui
11.40
P06
3.00
P09
P10
3.40
pasarela elevada + 4.70
P11
7.40
4.00
P12
P13
1.60
6.30
P14
+4.70
+4.20
pasarela elevada + 4.20
+4.20
+3.80
+3.80
N
+2.80 2.80
3.10
1.70
5.20
2.70
2.10
1.50
0.80
[CTN] aula-taller A=92m² 0
1
2 3 escala 1.150 6.20
Sección transversal
4
5
10 3.50
20 4.10
8.30
+2.80
30m 2.20
3.50
Sección b-b'
+0.00
3.30
6.90
1.50
1.20
2.60
3.90
+1.00 +0.00
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
1. concrete canal beams
2. linear structural gantries
3. threshold covering
construction & structural development
4. continuity joints
[CO_0
[CO_01]
p01
+15.40
+13.70
+12.80
p03
p02
p05
p04
GESTIÓN DE LA TIERRA - cultivo
GESTIÓN DEL AGUA - riego
t01 fitorremediación del terreno t02 conservación y secado de semillas t03 almacenaje residuos vegetales [contaminados] t04 cultivos suspendidos [en espera finalización proceso fitorremediación] t05 productividad terreno - huerto t06 gestión del huerto - alquiler [docencia] [investigación] [ocio] t07 jardín público
a01 sistema de captación y depuración(I) agua pluvial a02 sistema de captación y depuración(I) agua escorrentía a03 sistema de captación y depuración(II) agua canal
p06
p07
cerramiento cubierta
cc01 [canalón de chapa plegada]
fase 4
e s t r u c t u
sb-ec02 [carpintería metálica para policarbonato]
fase 3 Instalación de forjados volados metálicos ligeros
sb-ec01 [guías nivelación y apoyo cobertura
fase 2 Atado y arriostramiento del pórtico estructural
L a
subestructura cubierta
fase 1 Elevación de pilares dobles
estructura cubierta
fase 0
ec02 [montante viga secundaria]
ec01 [cordón superior viga secundaria]
the system growth
Excavación y asiento canales de hormigón
el cre
背景
Montaje de cubierta bi-apoyada en pórticos lineales
p08
p05
p06
e12
+9.20
+8.30
+4.70 +4.20 +3.80
+2.80
+0.00
a01 t-n07 filtro macrófito en flotación+cascada oxigenación de agua
p01
a01 t-n06 depósito elevado de agua depurada
p02
p03
p01-02 Infraestructura Jardín de tierra {semillero y cultivo suspendido}
a01 t-n05 humedal natural flujo horizontal subsuperficial
a01 cap02 depósito agua
t08
t06
t-
3
p04
p03-04 Infraestructura Jardín de agua no colonizable t01
a01 t-n03
{depósito y devolución agua al canal; oxigenación agua} e12 e11
p05-06 Infraestructura Jardín de aire oxi
t01
t05 t04 t03
t02
{paulownia tomentosa}
e12 e11
cm03
Infraestructura Jardín de agua {depósito enterrado}
p03a
p04a
p05a
p06a
p07a
p08a
p09a
p10a
p05a
p03b
p04b
p05b
p06b
p07b
p08b
p09b
p10b
p05b
bancal de chapa metálica e =1cm elevado con cultivos fitorremediación
acequia longitudinal de chapa metálica plegada apoyada sobre tablestacado de madera Ø25cm
bancal elevado conformado por pilotes de madera Ø25cm
devolución de agua al canal por medio de canalización de macrófitas en flotación+cascada de aireación
p06a
p06b
cm01
capa 60-75cm de grava gruesa capa 60-70 cm de grava fina membrana impermeabilizante
viga ca na l de hormigón HA50
N
0
1
escala 1.75 Sección transversal
2
3
4
p
p p p p p p p
5m
Sección b-b'
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍ
01_02]
[CO_02]
ecimiento
transparente]
abertura cubierta
cc03 [chapa de policarbonato ondulado
ac01 [carpintería abatible policarbonato]
pec01 [bi-lama semi abatible de teja cerámi negra reciclada +lámina PC color]
piel exterior-filtro solar cubiert
h a b i t a d a
cc02 [entoldado textil]
r a
the system growth
r ola os ] a ltr r-fi talític rio toca xte ja fo
ier c ub
ta
le a fi pie 2 [lam ra ctu
a02
c12
c13
c12
1%
p07
p08
p09
c11
1%
p10
p04
1%
ta ier ria] cub secunda
ru super est [cordón c10
a02
io r
vi
ie cub
ga
su
0 pec
ra ny ctu lació tr u nive bes uía s [g
c02 bertu sb-e yo co
1 ec0
rta
ra]
c09
a po
p04
p04
c14
e14
c06
c05 c04 p04
1%
+15.40
x 1,5 c01
P.01[CD]
+
espacio de exposiciones temporales
c ió dula mo
c01 1xPC16mm + cámara de aire 500mm 1xPC 50mm
n cu
+
c02 cerramiento vidrio laminado 6+12+6 templado+lama madera orientable automatizada
espacio de trabajo artistas
c05 filtro solar doble piel ventilada exterior vegetal cable acero tensado
c06
c06 cable estructural doble cerramiento PC+textil regulable + malla trepadora
+9.20
c04 2xmallazo + vegetación +panel papel autoportante con bastidor metalico + cámara aire + aislamiento80mm + acabado tablero madera OSB base grava
c03 umbral solar - rejilla tramex 50x50mm+triple policarbonato+tela PVC tensada solar color DIC80 (naranja oscuro)
Umbral seco grado de confort grado depuración
+8.30
c07 hoja batiente 1xPC20mm+1xPC60mm
[JA04]
Umbral de lluvia
c04
+12.80
P.02[CD]
2xPC50mm+1xPC16mm
c03
+13.70
lamas fijas madera termotratada+malla metálica+LED solar
m 1,5 bierta
c05
[JA01]
c07 c08
c07
grado de confort grado depuración
+
P.01[CD]
Umbral impermeable
+
espacio exposición y venta al público + común de trabajo artistas
calle elevada colonizable por la producción de los centros
+4.70 p05
+3.80 p07 +
p08
P.B.[CTN]
aula-taller de paisajismo y renegeración del terreno
+2.80
espacio no climatizado*
+0.00
p01
p02
p03
a01 -n02 filtro arena
p04
a01 t-n01 filtro percolador
a01 cap01 aljibe
7,5
1
xigenante t01
t09
{protección viento + deshumidificación + captación PM} t06
cm03
t06
Infraestructura comuncativa
t03 t04
t05
3,8
3
0,5
8,4
0,5
p09-10 Infraestructura colonizada Jardín de agua
p07-08 Infraestructura Jardín de aire vertical s01
p09
t02
e12
cm03
1,5
3,5
11,8
p12-13 Infraestructura tecnificada Jardín de aire
p11-12 Infraestructura colonizada Jardín de agua t05 t06 a03 e12 e11
t06
t05 t04 t03
t02
e12
e14
t06
e12 cm03
e11 e12
t07
p02
p03
p05
p07b
p04
pavicesped superficie drenante p01a pieza cruciforme hg prefabricado p01b cama de arena fina p01c arena fertil con semillas p01d terreno compactado p01e grava p01f terreno natural compactado
pavimento teja negra reciclada a hueso cama de grava fina 15cm lámina antipunzonante membrana impermeabilizante
filtro percolador natural p03a cultivo-pavimento drenante h>50mm p03b cama de interfase p03c gotero subterráneo p03d filtro de arena h>300mm p03e filtro de grava Ø30mm-Ø60mm h=800mm p03f membrana
forjado placas 1000x500mm tramex rejilla 30x30mm de doble pletina doble encastado e=30mm
p10a
p05
p09b
p08b
p03
ÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
p09a
p04
p02
t01
e11 e12
a01
{pantalla led solar}
p08a
p01
{filtro solar y de partículas PM10 + humidificación y admisión aire}
Infraestructura comunicación
Infraestructura accesibilidad {wifi}
p01
construcción
1
{pantalla proyección}
p07a
p10
a01 pt-n humedal natural lineal flujo vertical
12
t07 t03
p06
p11a
p04
p11b
p04
forjado interior acabado fibrocemento
forjado elevado placas 1000x500mm tramex rejilla 30x30mm de doble pletina doble encastado e=30mm
p05b tablero madera e=2cm p05c aislamiento lana de roca 5cm p05d tablero madera e=3cm
p07
p10b
p05 p05a fibrocemento e=4cm ejecutado in situ sobre cajetín metálico conformado con chapa e=2mm
p013
p13a
p05
p08
p12b
p08
p13
p07
piscina natural, vaso realizado con tablestaca de acero hincada e impermeabilizada con geomembrana impermeabilizante
forjado exterior acabado madera
forjado interior acabado fibrocemento
forjado exterior acabado madera
p07a listones de madera reutilizadas de encofrado madera 300x15x3cm
p05a fibrocemento e=4cm ejecutado in situ sobre cajetín metálico conformado con chapa e=2mm
p08a listón madera Iroko termotratado
zona filtrado con plantas acuáticas y filtros de grava realizado en chapa plegada e=5mm rebosadero e=5mm
de
chapa
metálica
plegada
p07b forjado tipo p05
p14
p13b
p05
p05b tablero madera e=2cm
p14a
300x15x3cm p08b tramex de doble pletina e=50mm
p10
p11
p14b
p14
p10
cubierta plana 1% ventilada
forjado exterior acabado placas de tramex 3000x500mm entramado 30x30mm doble electrosoldado e=50mm
p14a viguetas 150 doble T invertida p14b tablero madera e=3cm
p14c aislamiento lana de roca e=5cm
p05c aislamiento lana de roca 5cm
p14d tablero madera e =2cm
p05d tablero madera e=3cm
p14e rastreles madera 5x5cm
[ST_03] the horizontal cover
Threshold
[EST_02] 背景 E l
+15.40
la cubierta
u m b r a l
h o r i z o n t a l
C01
C02 C03
+10.00 + 4.20 +0.00 p02a
p02b
p02c
p02d
1 3
p02e
N
0
1
escala 1.100
2
3
4
5
Cubierta [C02]
Franja de cubierta testada del edificio MAC
área= 1.932m²
10
20m
Cubierta [C02]
Sección y planta cubierta
área= 1.932m²
Estructuras cubierta
pp viga p02a
p02b
p02c
p02d
p02e
Cubierta [C02] área= 1.932m²
Las vigas canal se apoyan sobre encepados ejecutados in situ. En una primera fase no necesitarían estar armadas, sin embargo se dimensionan par la fase última, en la que entran en carga pasarelas, cubiertas y espacios cerrados. - Esta fase puede ser estable en si misma y perdurable en el tiempo. -acciones a considerar: peso propio (pp vig a) de la viga sobre el terreno
a5
c2_3
c3_2 a3
c3_1
a6 b15 - b33
c1_3
b34 - b42
a1 p02a
p02b
p02c
p02d
c1_1
b1 - b14 a4
a2
c2_1
a Vigas principales de perfiles duplicados pasantes - sobre pilares dobles - 150x50mm de nudos
b Vigas secundarias articuladas de atado entre cerchas principales, realizadas con perfiles
rígidos empotrados, sin triangulación intermedia entre vanos (excepto arriostramientos superiores), bi-apoyadas sobre pórticos lineales. La modulación en planta de los elementos estructurales de cubierta se realiza en base a un
p02a
p02b
p02c
p02d
c2_2
c1_2
p02e
p02e
c Arriostramiento contra las acciones de viento y estabilidad global de la estructura de la cubierta por medio de cables semirrígidos. No es necesario arriostrar los paños intermedios a los soportes debido a que estos llevan su propio arriostramiento, lo que impide la deformación del sistema.
tubulares duplicados pasantes - bajo vigas principales - de 80x50mm.
módulo básico de 150cm. Ésto es posible gracias a la previa disposición de los pórticos estructurales verticales (lineales) a distancias múltiplo del multimódulo {d=1,5·n} para n=número entero
p02b
p02c
p02d
vs27
vs26
p06
p05
vs25
vs24
vs23
vs22
p04
vs21
p03
vs20
vs19
vs18
vs17
vs16
vs15
vs14
vs13
vs12
p02
vs11
p01
vs10
vs09
vs08
vs07
vs06
vs05
vs04
p02
vs03
p01
p02e
45
área= 1.932m²
área= 1.656m²
17
4b 89°
01 ca
t0
Cubierta [C03]
t0 4a
16
Cubierta [C04]
ca 02
3
Cubierta [C02]
°
pp n1 sc u C1
18
45
°
p02a
vs02
vs01
Las pórticos lineales debido a su esbeltez y ligereza son susceptibles de sufrir las acciones del viento provocando el agotamiento de la biela a tracción. A este efecto contribuye con su peso propio la viga canal, compensando el momento generado por la carga de viento.
área= 672m²
89° 4,5
45
° 45
°
45
45
°
°
15 14
9
° 45
ms15_3
ms14_3
m02b_3
ms13_3
m02a_3
ms12_3
09
2xTUB_150x50
TUB_200x80 + TUB_120x70
08 07
2xTUB_150x50
1
1
1
TUB_200x80 + TUB_120x70
TUB_200x80 + TUB_120x70
ms07_3
ms06_3
3
05
m01b_3
m01a_3
TUB_200x80 + TUB_120x70
06
TUB_200x80 + TUB_120x70
ms03_3
4b 3_ vp
ms05_3
ms04_3
m01b_3
ms03_3
1,8
ms01_3 m01a_3
2xTUB_150x50
TUB_200x80 + TUB_120x70
TUB_200x80 + TUB_120x70
ms08_3
3b t0
3 3
1,5
1,5
1,5
04 1,5
1,5
1,5
1,5
1,5
1,5
1,5
1,5
1,5
1,5
03
1,5
02
TUB_200x80 + TUB_120x70
1,5
TUB_200x80 + TUB_120x70
1,5 TUB_200x80 + TUB_120x70
3
TUB_200x80 + TUB_120x70
p02e
structural system 3
2xTUB_150x50
p02d
11 10
3
3
m01b_3
p02c
t0 3a
m01a_3
p02b
12
°
p02a
4a 3_ vp 45
Los módulos estructurales lineales se dimensionan para una sobrecarga de uso C3 junto con una carga asimetrica aplicada de 3KN/m². Acciones sobre forjados exteriores Tierra SC=10KN/m² Nieve N1= 0.05KN/m² PP=0.18 El peso propio de la barandilla ayuda a centrar las cargas y compensa la carga de viento producida en el pórtico.
ms11_3
p02e
TUB_200x80 + TUB_120x70
p02d
ms09_3
p02c
1,5
p02b
ms10_3
13 p02a
01
estructuras
a1 c1_1
b1 - b14 a4
a2
c2_1
a Vigas principales de perfiles duplicados pasantes - sobre pilares dobles - 150x50mm de nudos
b Vigas secundarias articuladas de atado entre cerchas principales, realizadas con perfiles
rígidos empotrados, sin triangulación intermedia entre vanos (excepto arriostramientos superiores), bi-apoyadas sobre pórticos lineales. La modulación en planta de los elementos estructurales de cubierta se realiza en base a un
[ST_04]
módulo básico de 150cm. Ésto es posible gracias a la previa disposición de los pórticos estructurales verticales (lineales) a distancias múltiplo del multimódulo {d=1,5·n} para n=número entero
the horizontal cover
ticos lineales debido a su esbeltez eza son susceptibles de sufrir las es del viento provocando el miento de la biela a tracción. A este contribuye con su peso propio la anal, compensando el momento do por la carga de viento.
p02c
p02d
vs27
vs26
p06
p05
vs25
vs24
vs23
vs22
p04
vs21
p03
vs13
vs12
p02
vs11
p01
vs10
vs09
vs08
vs07
vs06
vs05
vs04
p02
vs03
p01
p02e
45
área= 1.932m²
área= 1.656m²
4b
t0 4a 89°
01 ca
t0
Cubierta [C03]
Cubierta [C04]
ca 02
3
Cubierta [C02]
°
45
°
p02b
vs02
vs01
Threshold
vs20
p02e
vs19
p02d
vs18
p02c
c Arriostramiento contra las acciones de viento y estabilidad global de la estructura de la cubierta por medio de cables semirrígidos. No es necesario arriostrar los paños intermedios a los soportes debido a que estos llevan su propio arriostramiento, lo que impide la deformación del sistema.
tubulares duplicados pasantes - bajo vigas principales - de 80x50mm.
vs17
p02b
c2_2
c1_2
p02e
vs16
p02d
vs15
p02c
vs14
p02b
área= 672m²
89°
9
° 45
45
°
ms15_3
ms14_3
m02b_3
45
ms13_3
m02a_3
ms12_3
2xTUB_150x50 2xTUB_150x50
1
1
TUB_200x80 + TUB_120x70
TUB_200x80 + TUB_120x70
TUB_200x80 + TUB_120x70
1
TUB_200x80 + TUB_120x70
ms03_3
m01a_3
TUB_200x80 + TUB_120x70
m01b_3
4b 3_ vp
ms05_3
ms04_3
m01b_3
ms03_3
1,8
ms01_3 m01a_3
2xTUB_150x50
ms06_3
3
2xTUB_150x50
m01b_3
1,5
1,5
1,5
1,5
1,5
1,5
1,5
1,5
1,5
1,5
1,5
1,5
1,5
TUB_200x80 + TUB_120x70
1,5
TUB_200x80 + TUB_120x70
1,5
TUB_200x80 + TUB_120x70
1,5
TUB_200x80 + TUB_120x70
3
3
TUB_200x80 + TUB_120x70
3
3
p02e
ms11_3
TUB_200x80 + TUB_120x70
ms08_3
3
ms07_3
3
t0
3b
t0 3a
m01a_3
p02d
°
p02c
45
p02b
4a 3_ vp
TUB_200x80 + TUB_120x70
p02e
ms10_3
p02d
ms09_3
p02c
1,5
p02b
ódulos estructurales lineales se onan para una sobrecarga de uso nto con una carga asimetrica a de 3KN/m². es sobre forjados exteriores SC=10KN/m² N1= 0.05KN/m² 8 propio de la barandilla ayuda a las cargas y compensa la carga to producida en el pórtico.
°
45
45
°
°
4,5
estructur
1
1,5
1
1,5
1,5
p02a
1,5
mp04
1,5
mp06
1,5
mp07
1,5
mp08
1,5
mp09
1,5
mp10
1,5
mp11
1,5
mp12
1,5
1,5
mp13
p03a
vs15
vs14
vp02b
vs13
vp02a
vs12
vs11
vs10
vs09
vs08
1,5
mp05
1,5
mp14
p04a
mp15
30°
34°
vs07
vs06
vs05
vs04
vp01b 1,5
mp03
p01a
39°
2xTUB_150x50
1,5
mp02
34°
1,5
mp01
1,5
mp01
30°
1
39°
1
vs03
vs02
vs01 1,2
vp01a
p02e
1,5
p02d
TUB_120x70 + TUB_200x80
p02c
vp01b
1,8
p02b
vp01a
sección vertical estructura cubierta inclinada C02,C03,C04
TUB_70x70 + TUB_200x80
c0 1
ms01_1
ms02_1
m01_1
ms03_1
m02_1
ms06_1
ms05_1
ms04_1
c0
ms07_1
ms12_1
ms11_1
ms13_1
m03_1
m04_1
ms15_1
ms14_1
ms14_2
ms15_2
121°
c0
4 c0
ms01_3
ms01_3
m01_3
ms02_3
ms03_3
m02_3
ms04_3
ms06_3
ms05_3
ms07_3
ms08_3
ms10_3
ms09_3
ms11_3
6
ms12_3
m03_3
ms13_3
m04_3
ms14_3
ms15_3
1,5
vp02a
p01b
mp03
p02b
mp04
2xTUB_80x50
2xTUB_80x50
2xTUB_80x50
2xTUB_80x50
5,2
3
2xTUB_200x50 3
mp06
mp07
2xTUB_80x50
2xTUB_80x50
Cubierta [C03]
mp08 2xTUB_80x50
A = 165m² 15 27,5
7,3
alzado lateral estructura cubierta inclinada C03
mp05 2xTUB_80x50
sección horizontal estructura cubierta inclinada C03
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
mp09 2xTUB_80x50
mp10 2xTUB_80x50
30°
39°
34°
2xTUB_150x50
1,5 TUB_120x70 + TUB_200x80
vp02b
mp02 2xTUB_80x50
30°
mp01 2xTUB_80x50
2xTUB_200x50 1,8
39°
34°
mp01
mp11 2xTUB_80x50
mp12 2xTUB_80x50
p03b 2xTUB_80x50
mp13 2xTUB_80x50
2xTUB_200x50
p04b
mp14
2xTUB_80x50
2xTUB_80x50
2xTUB_200x50 3
3
mp15 2xTUB_80x50
6,3
m04_2
vs15
ms13_2
vs14
m03_2
vp04
ms12_2
vs13
ms11_2
vp03
ms10_2
vs12
ms09_2
vs11
ms08_2
103°
vs10
ms07_2
vs09
ms06_2
vs08
ms05_2
vs07
vs06
ms04_2
vs05
vs04
vp02
vs03
vp01
m02_2
1,5
1,5
121°
103°
ms03_2
2 c0
ulación en planta de los elementos rales de cubierta se realiza en base
módulo básico de 150cm. Ésto es gracias a la previa disposición de icos estructurales verticales (lineales) ancias múltiplo del multimódulo ·n} para n=número entero
m01_2
113°
TUB_70x70 + TUB_200x80
p02e
ms02_2
c0 4
p02d
ms01_2
vs02
vs01
ms01_2
6
vs01b
TUB_70x70 + TUB_200x80
vs01a
p02c
ms10_1
ms09_1
c0 5
113°
p02b
ms08_1
3
1,5
1,5
c03
ms01_1
p06
vs27
2xTUB_200x50
vs26
2xTUB_200x50
p05
vs25
vs24
vs23
vs21
p04
2xTUB_200x50
p03
vs20
vs19
vs18
vs17
vs16
vs15
vs13
vs12
vs14
2xTUB_200x50
p02
vs11
vs10
vs09
vs07
vs06
3,5
2xTUB_200x50
p01
2xTUB_200x50
vs08
2xTUB_200x50
vs05
vs02
vs01
2xTUB_200x50
vs04
erta G1 transitable únicamente para imiento inclinación <20º erta G1 transitable únicamente para imiento inclinación 25º
7,5
vs22
2,8
p02e
p02
p02d
vs03
p02c
p01
p02b
la cubierta
背景
N u d o
a
n u d o
[ST_03] the horizontal cover
15 16
v.p.-p3
5
6
7
8
9
10 11 12 13 14
15 16
17 18 19
0
v.p.-p3
v.p.-p4
v.p.-p3'
v.p.-p4'
v.p.-v.s1
v.p.-v.s2
v.p.-v.s1
v.p.-v.s2
6
7
8
9
10 11 12 13 14
15 16
17 18 19
2 3
2
2 3
3
v.p.-t1' 0,2
0,2
0,2
BB'
0,07
AA'
0,08
0,07
BB'
0,1
0,05
AA'
0,12
0,05
0,21
0,12 0,05
0,08
0,08
B TU
_1
0 x5 50
6 0 ,1
0,15
4 0 ,2
6 0,0
0,05
0,15
0,08
0,15
0,21
0,08
0,05
2xTUB_80x50
0,42 0,15
0,07
0,15
0,05 0,05
0,12
0,05 0,05
0,06
0,05 5 0 ,0
56
56 °
°
5 0 ,1
5 0,1
1 0 ,2 5 0 ,0
0,05 0,05
0,12
0,05 0,05
TUB_120x70
1,62
1,8
1,63
TUB_120x70
1,8
TUB_120x70
1,72
1,65
2xTUB_200x50
0,09
0,1
4° 0,12
2x
5 0,0
0,2
0,21
12
0,05
0,13
0,08 0,01 0,08
0,08
0,15
0,05
5 0,0 1 0,2
2xTUB_200x50
0,07
0,07
0,04
0,04
0,17 0,07
0,11
0,1
0,06
2xTUB_80x50
0,42 0,15
4 0 ,1
0,26
6 0,0
0,1
0,13
6 0,0
7 0,0
0,51
34°
0,05
0,15
0,15 0,1
0,1
0,08 0,03
2xTUB_80x50
0,2
0,09 0,03
5 0 ,1
0,11
0,2
0,05
4 0,2
0,08 0,02
0,31
0,05
0,09
34°
0,08
0,07
5 0,1
0,08
0,15
50 0x 15
34°
0,05
B_
33°
2xTUB_150x50
TU 2x
0,07
0,08 0,02
0,01 0,05
0,1
0,2
0,12
0,2
0,05
0,3
1,8
5
v.p.-t1
0,05
1,65
4
v.p.-v.s1' v.p.-v.s2'
BB'
0,2
3
v.p.-t1
AA' 0,1
2
v.p.-p4
0,2
0,05
1
TUB_120x70
v.p.-p2'
4
0,1
v.p.-p1'
3
0,08 0,03
v.p.-p2
2
0,06
v.p.-p1
1
1
v.p.-p2
0
1
v.p.-p1
17 18 19
0,08
10 11 12 13 14
0,04
9
0,08
8
0,11
7
unión-tipo atornillada en esquina de viga principal-viga secundaria con montante TUB80x50
0,15
6
V.P.-T
0,14
5
c
0,2
4
unión-tipo atornillada de viga principal-viga secundaria con montante TUB80x50
0,12
3
V.P.-V.S.
0,07
2
b
0,13
1
unión-tipo atornillada de viga principal-pilar estructural lineal 2xTUB200x50
0,16
0
V.P.-P
1
a
12 4°
0,14
C
0,15
0,15
0,07
0,15
C'
0,17
5 0 ,2
0,14
2xTUB_80x50
0,1
0,07
B TU
6 0 ,2
0,12
2xTUB_80x50
0,08 0,15
2x
0 x5 50 _1 4 0 ,1
6 0,1
0,08 0,01 0,08
2xTUB_80x50
0,15
4 0 ,2
6 0,1
0,1
0,15
0,04
0,08 0,02
0,1
0,26
0,07 0,21
5 0 ,1
6 0,1
0,08
C'
0,15
2xTUB_150x50
0,07
0,14
0,11
0,1
0,15
C'
1 24 °
0,11
50 0x 15
0,16
0,07
C
B_
0,1
TU 2x 56 °
C
6 0 ,2
6 0,2
2xTUB_200x50
+
0,08
CC' 0,05
0,08
0,08
B TUB_80x50
TUB_80x50 0,17
TUB_150.50.6
0,04
Perfiles utilizados TUB_150x50
0,08
TUB_150.50.6
0,31
0,12
0,07
0,07 0,07
0,21 0,05
U_135.105.56.3 U_105.56.3
0,06
0,03
TUB_80.50.3 TUB_150x50
TUB_150x50
0,14
0,14
A
TUB_100.40.5
0,06
0,07
0,21 0,05
0,12
0,31
0,07 0,07
U_135.105.56.3
0,07
TUB_80.50.3
0,11
0,05
TUB_150x50
0,08
0,05
0,05 0,06
0,03
U_105.56.3
B' 0,31
TUB_80x50
TUB_80x50 0,05
TUB_150x50
A'
0,21
0,04
TUB_150.50.6
0,05
0,04
A
0,1
0,21
0,08
0,1
0,04
0,05
Perfiles utilizados 0,17
0,05
0,31
2xTUB_100x40
0,07 0,07 0,07
2xTUB_100x40
0,05 0,21
0,04
0,09
0,19
0,05
0,08
0,1
TUB_150x50
0,1
0,05
0,05
0,03 0,07
TUB_200.50.6 0,03
0,05
B
0,19
Perfiles utilizados 0,07 0,03
CC'
0,05 0,08
0,08
TUB_80x50
TUB_80x50
B
0,17
0,09
0,05
0,07
0,21
0,06
0,05
0,21
TUB_200x80
0,05
CC'
0,05
TUB_200x80 +
TUB_200x80
2xTUB_200x50
A'
TUB_200.80.5
A
B'
A' B'
PLET_380.150.6
TUB_80.50.3 TUB_200.80.5 PLET_390.150.6
e 1:15
e 1:15
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
e 1:15
[ST_04] the horizontal cover
d 0
unión-tipo de viga principal-viga secundaria perimetral
V.P.-t 1
2
3
4
5
6
7
8
9
10 11 12 13 14
15 16
e
17 18 19
0
unión-tipo de viga secundaria-montante TUB80X50
V.S.-m 1
2
3
4
5
6
7
8
9
10 11 12 13 14
15 16
f
17 18 19
unión-tipo de viga forjado-tensor descuelgue desde cubierta
V.F.-t 0
1
2
3
4
5
6
7
8
9
10 11 12 13 14
15 16
17 18 19
Cuadro de características según DB-SE-A Tipo de acero Límite elástico Coef. minoración acero Coef. mayoración cargas
v.p.-t1
S 275 JO Su = 2.75 N/mm2 e<16 mm 0º Ga = 1 Ga = 1.5
v.f.-t1
Tipo de cubierta G1. cubiertas accesibles únicamente para mantenimiento. No concomitante con el resto de acciones variables
v.f.-t2 v.p.-t1
v.f.-t1
3
3
3
2
2
2
1
1
1
Sobrecarga de uso 1KN/m² Peso propio Protección contra fuego
v.p.-t1'
v.f.-t1'
AA'
BB'
AA'
BB'
0,2 0,08
BB'
0,07
AA'
0,12 0,05
0,21
0,05
0,08
0,08
0,2
0,14
0,15 0,15
0,12
0,05 0,05
0,07
0,07
0,08 0,01 0,08
0,13
0,04
0,04
0,08
0,15
0,05
0,07
0,14
2xTUB_80x50
0,42
0,06
0,17
7 0,0
0,05 0,11
0,15
0,1
0,1
0,07
0,13
0,08
2xTUB_80x50
0,42 0,15
0,1
0,17 0,06
0,08 0,03
0,08 0,03
0,1
0,08
6 0,0
6 0,0
4 0,2
2xTUB_80x50 0,08
0,08
0,15
0,15
0,19
34°
0,05
0,06
50 0x 15
5 0,1
0,17
0,13
0,05
0,05
0,2
B_
0,07
45°
0,01 0,11
TU 2x
34°
2xTUB_80x50
0,04
0,3
0,12
0,07
0,07
0,05
0,07
0,16
0,2
0,12
0,08
0,06 5 0,0 5 0,1
1 0,2
56 °
0,05 0,05
5 0,0
1,72
0,12
1,72
TU 2x
TUB_120x70
1,8
TUB_120x70
B_
50 0x 15
56 °
6 0,1
0,14
2xTUB_80x50
1 24 °
1,72
TUB_120x70
1,8
TUB_120x70
1,8
1,8
0,07
0,15
0,07
0,08 0,01 0,08
6 0,1
0,15
6 0,1
estructuras t01
6 0,2
TUB_200x80 + TUB_120x80
0,26
C
2xTUB_80x50
C
C'
C' 2xTUB_80x50
t02
0,14
0,08
2xTUB_80x50
TUB_160x80
CC'
0,06
TUB_80x50
Perfiles utilizados 0,14
0,18
t02 0,33
0,08
B
t03 TUB_80x50
TUB_80x50
TUB_80x50 0,06 0,06
TUB_150.50.6
0,07
0,31
0,26
0,12
0,07
0,07
0,21 0,05
U_105.56.3
Perfiles utilizados
A
A
TUB_200.80.5
A'
A' B'
B'
PLET_390.150.6
TUB_70.70.5
0,27
0,14
TUB_80.50.5
0,2
TUB_160.80.5
TUB_80.50.3
0,06
TUB_150x50
0,03
0,07
0,21 0,05
0,07
0,05
0,05
TUB_150x50
0,05
B
0,19
0,17
CC'
0,19
0,05 0,08
0,09
0,08
0,05
0,08
CC'
t04 t06 t05
t01 Terminal laminado gancho acero inoxidable AISI 316 t02 Tensor cerrado acero inoxidable AISI 316 t03 Bloqueo de tensor acero inoxidable AISI 316 t04 Terminal laminado rosca acero inoxidable AISI 316 t05 UPN 200
e 1:15
e 1:15
t06 Cilindro metálico Ø50mm
e 1:15
[ST_05] the joints
e
f
g
h
a
b
c
d
Attempts have always been made in order to find constructive solutions that will ensure the continuity of structural elements avoiding as much as possible the irreversible actions during the construction phase of the building and the lower number of operations on site. Thus, each phase can exist autonomously but be prepared to be able to receive the last phase.
[ST_06] the module
L i n e a l s[EST_02] tructures 背景
L a s
el módulo
e s t r u c t u r a s
l i n e a l e s
ELEMENTOS ESTRUCTURALES VERTICALES
b Unidad básica constructiva - tipo pasarela estructural [6 x 3 m]
AA
IPN 200
191 x 100 x 90
sección dd'-cim2
sección bb'-p1
sección cc'-pe1
.200.100.5
UPN 280 .200.100.5
.200.100.5 .200.100.5
UPN 28 0 .200.100.5
UPN 280 UPN 280 UPN 280 .200.100.5
.200.100.5
.200.100.5
.200.100.5
UPN 280
.200.100.5
.200.100.5
sección dd' pe2
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
08 07
.200.100.5
.200.100.5
+ 6.35
UPN 280
02
IPN 280
IPN 280
.200.100.5
AT
.200.100.5
.200.100.5
.200.100.5
.200.100.5
AY .200.100.5
UPN 280
0 28
.200.100.5
U PN
2 UPN 280 IPN 280
IPN 280
.200.100.5
.200.100.5
.200.100.5
.200.100.5 .200.100.5 .200.100.5
UPN 280
.200.100.5
2 UPN 280
+ 6.35
.200.100.5
AX
.200.100.5
.200.100.5 2 UPN 280
UPN 280
AW
2 UPN 280
.200.100.5
+ 4.09
.200.100.5
UPN 280
BA
UPN 280
BB UPN 280
+ 6.35
.200.100.5
+ 4.09
2 UPN 280
UPN 280
+ 4.09
01
02
Planta estructural Planta primera MAC e 1:300
03
04
AZ
UPN 280 UPN 280
2 UPN 280
05 06
07
08
09 10 11 12
01
estructuras
.200.100.5
280 U PN
03
AV
2 UPN 280
.200.100.5
.200.100.5
UPN 280
.200.100.5
2 UPN 280
2 UPN 280
.200.100.5
IPN 280
UPN 280
2 UPN 280
2 UPN 280
2 UPN 280 + 6.35
2 UPN 280
04
AS
+ 4.09
UPN 280 .200.100.5
AR UPN 280
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5 .200.100.5
2 UPN 280
06 05
2 UPN 280
2 UPN 280
.200.100.5
.200.100.5
UPN 280
.200.100.5 .200.100.5
.200.100.5
2 UPN 280
UPN 280
.200.100.5
.200.100.5 2 UPN 280
2 UPN 280
+ 6.35
09
.200.100.5
.200.100.5
.200.100.5
.200.100.5
UPN 280 UPN 280 IPN 280
10
AQ
2 UPN 280
.200.100.5
2 UPN 280
UPN 280
.200.100.5
UPN 280
.200.100.5
.200.100.5 UPN 280
.200.100.5
.200.100.5 .200.100.5
.200.100.5
UPN 280
280 U PN
UPN 280 UPN 280 UPN 280
IPN 280
IPN 280
.200.100.5
.200.100.5
.200.100.5
.200.100.5
UPN 280
.200.100.5
UPN 280
UPN 280 .200.100.5
.200.100.5 .200.100.5
UPN 280
280
.200.100.5
.200.100.5
U PN
UPN 280 28 0 U PN
IPN 280
IPN 280
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5 .200.100.5 .200.100.5
.200.100.5
UPN 280 UPN 280 UPN 280
.200.100.5
UPN 280
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5 .200.100.5
UPN 280
UPN 280
.200.100.5 .200.100.5
UPN 280
.200.100.5
.200.100.5
.200.100.5
.200.100.5
.200.100.5
28 0
UPN 280
UP N
UPN 280 UPN 280
UPN 280
.200.100.5
.200.100.5
UPN
UPN 280 UPN 280
.200.100.5 .200.100.5 .200.100.5 .200.100.5
.200.100.5 .200.100.5 .200.100.5 .200.100.5
UPN 280
UPN 280
.200.100.5
.200.100.5
d
d
Capacidad portante en situaciones persistentes 250.1 kN Capacidad portante en situaciones accidentales 250.1 kN
.200.100.5
28 0
Ø35.0 cm
UPN 280
2 UPN 280
IPN 280
N20 (Tipo1)
BB
2 UPN 280
2 UPN 280
.200.100.5
Prefabricado de hormigón circular hincado 8xPIL_350_3D (HA50)
BA
.200.100.5
e06 viga principal pórtico tubular acero 200x100x8mm e09 angular en L e10 cable semirígido de ariostramiento e11 angular L pasarela e12 rejilla tramex 30x30x3cm e13 pletina metálica anclaje cable e14 redondo acero corrugado Ø20 e15 UPE 270
2 UPN 280
2 UPN 280
IPN 280
6
LEYENDA
4 Tabla de pilotes
2 UPN 280
11
AP
2 UPN 280
UPN 280
2 UPN 280
2 UPN 280
+ 6.35
.200.100.5
.200.100.5
50
VC.U-1.1 Arm. sup.: 4Ø16 Arm. inf.: 4Ø16 Arm. piel: 8x2Ø16 Estribos: 1xØ8c/20
UPN 280 2 UPN 280
AZ
N19 (Tipo1)
.200.100.5 .200.100.5
UPN 280
.200.100.5
UPN 280
UPN 280 UPN 280
2 UPN 280
2 UPN 280
IPN 280
AY
2 UPN 280
.200.100.5
.200.100.5
2xUPN280
150
VC.S-1.1 Arm. sup.: 4Ø16 Arm. inf.: 4Ø16 Arm. piel: 1x2Ø12 Estribos: 1xØ8c/20
UPN 280
.200.100.5
.200.100.5
.200.100.5 2 UPN 280
AX
2xT
2 UPN 280
2 UPN 280
2xIPE150
2 UPN 280
2 UPN 280
2 UPN 280
2 UPN 280
AW
e12 e11
2 UPN 280
2 UPN 280
e06
.200.100.5
Apoyo de vigueta sobre UPE270
40
6
2 UPN 280 + 6.35
.200.100.5
AV
0,2
2
2 UPN 280
12
AO
0,1
2xIPE150
2xIPE150
+ 4.09
2 UPN 280
.200.100.5
0,2
6
0,7 0,7 0,7 0,7
2x200x50
5,6
0,7
26°
150
2xIPE150
b V.C. U
2xIPE150
a V.C. S-1.1
2xIPE150
El sistema puede usar las vigas centradoras tipo S1.1 en estructuras colonizables.
2xIPE150
Vigas centradoras
2xIPE150
3
2xIPE150
2xIPE150
4 pernos Ø6 placa base 20x20cm
191 x 100 x 90
0,1
2xIPE150
IPN 280
+ 6.35
0,07
+ 6.35
14 13
2 UPN 280
2 UPN 280
UPN 280
UPN 280
.200.100.5
UPN 280
0,27
AT
0,04
2xIPE150
.200.100.5
0,05
0,14
.200.100.5
2xIPE150
2xIPE150
200x100
N21 (Tipo1)
53
53
.200.100.5
UP N
28 0
.200.100.5
IPN 280
IPN .200.100.5 280
UPN 280
0,04
0,7
UPN 280
0,15
2xIPE150
+ 6.35
2 UPN 280
AS
64°
N30 (Tipo1)
.200.100.5
IPN 280
+ 4.09
AN
2 UPN 280
2 UPN 280
.200.100.5
Mecanismo transmisión de cargas
.200.100.5
2 UPN 280
.200.100.5
0,7
0,5
0,4
0,09
2xUPN280
0,03 0,03 0,03
2x200x50
2
.200.100.5
IPN 200
IPN 200 IPN 200
IPN 200 IPN 200
IPN 200
AR
2 UPN 280
16 15
.200.100.5
UPN 280
17
AM
.200.100.5
2 UPN 280
.200.100.5
e10
.200.100.5
e12 e09 e13
.200.100.5
0 28
e15
18
2 UPN 280
2 UPN 280
20 19
2 UPN 280
2 UPN 280
21
AL
UPN
2xT
2 UPN 280
2 UPN 280
Viga principal de forjado (vf) e06
3
2 UPN 280
+ 6.35
AQ
1
3
2 UPN 280
UPN 280
2 UPN 280
UPN 280
Mecanismo arranque de pilares
2 UPN 280
UPN 280
UPN 280 + 6.35
+ 4.73 UPN 280
AP
2 UPN 280
AK
UPN 280 + 4.09
UPN 280
AJ
2 UPN 280
2 UPN 280 2 UPN 280
UPN 280
AI
2 UPN 280
UPN 280
2 UPN 280
2 UPN 280
UPN 280
.200.100.5
.200.100.5
UPN 280
.200.100.5
2xIPE150
0,75
2xIPE150
0,75
2xIPE150
0,75
2xIPE150
0,75
2xIPE150
0,75
2xIPE150
1
2xIPE150
200x100
cota firme asiento cimentación
cota longitud óptima pilote
El mecanismo de arranque de los pilares se realiza mediante unión roscada a la cimentación y unión atornillada entre soporte-pilar.
0,75
AO
2 UPN 280
UPN 280
.200.100.5
Las vigas centradoras pueden ser de dos tipos: viga rectangular HA50 o viga canal prefabricada HA50. 6
-0.95
-11.75
6
2xUPN280
5,6
53
2xT
2 UPN 280
UPN 280
.200.100.5
centradoras(3) y los anclajes de unión de pilares dobles a la cimentación (1,2) . La proximidad al canal y el elevado nivel freático que conlleva, junto con la baja calidad del terreno hacen necesario el pilotaje.
191 x 100 x 90 53
AN EL sistema estructural compuesto, en primer lugar, por los soportes b2 es colonizado por forjados compuestos por vigas principales pasantes (vf) UPE apoyadas sobre las vigas del pórtico y sobre las que se van a atornillar las viguetas doble T invertida de forma que en cada paño de forjado pueden apoyarse en los perfiles UPE interiores - dejando el perfil exterior para apoyar la siguiente.
0,4
Los componentes más representativos del contacto del módulo con el terreno son la cimentación pilotada (4) , las vigas
2x200x50
N40 (Tipo1)
+ 6.35
AH
2 UPN 280
2 UPN 280
2 UPN 280 UPN 280
AG
2 UPN 280
UPN 280
+ 4.09
2 UPN 280 2 UPN 280
2 UPN 280
AM
d'
d'
N30 (Tipo1)
.200.100.5
IPN 200
IPN 200 IPN 200
IPN 200 IPN 200
IPN 200 IPN 200
IPN 200 IPN 200 IPN 200 IPN 200 IPN 200
3,5 0,1
tirante
28 0
+ 5.99
IPN 200
2 UPN 280
2 UPN 280
UP N
2 UPN 280
sección bb'
46 sección cc'-cim1
UPN 280
0,1 0,9 0,1 2,6 0,3
IPN 200
2,9
3 1 3,1
0,1 0,9 0,1 2,6 0,3
IPN 200
0,1
4,3 0,1 2,9
3 1 3,1 1,5
cotas perfil metálico
2 UPN 280
2 UPN 280
AF
2 UPN 280
2 UPN 280
280
b1 pasarela estructural no colonizable b2 pasarelaestructural colonizable b2.1 colonización baja b2.2 colonización media b2.3 colonización alta
2 UPN 280
2 UPN 280
2 UPN 280
AL Leyenda longitud barras
sección bb'
1250
+ 5.45
IPN 200
2 UPN 280
AE
2 UPN 280
2 UPN 280
+ 6.35
2 UPN 280
IPN 200
2 UPN 280
2 UPN 280
UPN 280
2 UPN 280
2 UPN 280
IPN 200
2 UPN 280
AD
2 UPN 280
2 UPN 280
0 28
+ 4.91
2 UPN 280
AC
2 UPN 280
2 UPN 280
2 UPN 280
IPN 280 UPN 280
UPN
AI
2 UPN 280
2 UPN 280
2 UPN 280
IPN 200
2 UPN 280
U PN
tirante
12
2 UPN 280
+ 4.09
IPN 280
+ 6.35
0 28
AH
IPN 200
0 28
cotas perfil metálico
11
AB
2 UPN 280
2 UPN 280
2 UPN 280
2 UPN 280
3
sección aa'
a1 pantalla estructural no colonizable a2 pantalla estructural colonizable a2.1 colonización baja a2.2 colonización media a2.3 colonización alta
10
UPN
AG
0 28
+ 4.37
IPN 200
N UP
Leyenda longitud barras
46
2 UPN 280
2 UPN 280
AK
3,5
46
IPN 200
UPN 280
2 UPN 280
2 UPN 280
2 UPN 280
c'
sección aa'
09
2 UPN 280
+ 6.35
+ 3.83
IPN 200
UPN 280
2 UPN 280
2 UPN 280
AJ
1,5 1
c
08
2 UPN 280
N UP
V1=0.6 N1= 0.2 kN/m²(nieve) SC-u = 3kN/m² (C1 zonas acceso al público) * carga añadida asimétrica 3kN/m²
b'
IPN 200
0 28
El dimensionado de un conjunto de 3 módulos se realiza de forma idéntica al anterior caso. Sin embargo, existen diferencias de comportamiento estructural, debido a la diferencia de separación entre soportes.Los arriostramientos en el plano vertical podrían suponer un impedimento para el tránsito de personas, por lo que se propone la ubicación de estos en los módulos extremos en el caso b1 o en los módulos que contengan núcleos de comunicación vertical en el caso b2 .
IPN 200
2 UPN 280
pasarela estructural colonizable [por pasarela pública en voladizo]
b'
a2 PP=20kN/m² (tierra)
b
07
2 UPN 280
2 UPN 280
AF
b
06
AA
UPN
V1=0.6 (viento) N1= 0.2kN/²(nieve)
05
.200.100.5
AB
c'
El caso estudiado es el del Jardín de aire, tanto para el pórtico colonizable (colonizado por pasarela pública de 3m de voladizo) como para el pórtico no colonizable. Hipótesis de carga que se han tenido en cuenta:
a1 PP= 20kN/m² (tierra)
IPN 200
+ 3.29
AE
b2
04
2 UPN 280
AD
c
pantalla estructural colonizable [por pasarela pública en voladizo]
03
4,3
4,4
0,2
La pasarela estructural es el segundo tipo de soporte, realizda con los mismos perfiles que la pasarela de 6x1m, ésta permite el tránsito de peronas dentro del núcleo estructural, al contrario de lo que propone el módulo estructural más estrecho.
AC
a2
02
pasarela estructural no colonizable
Los elementos estructurales verticales son pórticos lineales de 6x1m y 6x3m que pueden ser de tipos diferenciados: estructuras colonizables - por forjados, cubiertas y cerramientos - y estructuras exentas no colonizables que pertenecen al jardín.
1,2
4,4
01
b1
IPN 200
pantalla estructural no colonizable
IPN 200
a1
IPN 200
Unidad básica constructiva - tipo pantalla estructural
[6 x 1 m]
0,2
a
[CO_03]
背景
the constructive unit
E l Sección aa'
El camino de aire. Unidad básica construciva de los Jarines de aire
The air path
+11.65
6,85
* It has been developed in more detail, the vertical garden module with flowerbeds for plant climbing elements and elevated walkway.
nudo_
h
1
d
0,25
+4.65
0,25
° 90
+3.45
4,6
3
j
nudo_g
1,5
+0.00
-1.50
d nudo_e nudo_f nudo_
-2.40
c
nudo_
0
0.5
1
escala 1.40
1.5
2m
Sección transversal Sección a-a'
3
b
6,4
nudo_
a
a
nudo_
0,7
Leyenda
The garden continues to grow, the first structural pillars appear, such as linear free portals made entirely with S-275JO steel elements.
From a double modulation of linear structures - of 1x6m and 3x6m width - all the pillars of the project are realized.
It has been chosen the system hof double profiles thinking about the advantages offered by this system with respect to others. The reduction of the size of the steel sections is possible thanks to the duplication of elements and to the double supports. cm01 encepado HA50 95x105x270cm sobre pilotes HA circular prefabricados (hinca) cm02 pirámides invertidas tronco-cónicas en encepado; 4 orificios con pernos pasantes -para unión rígida encepado - viga canal
e06 e10 e13
Sección cota +4.65 - pasarela pública dd'
e05
nudo_
cm03 viga canal HA50 prefabricada 150x150x650cm
cm04 armadura piel Ø16/25cm; armadura refuerzo Ø16/25cm, estribos Ø16/25cm, armado longitudinal Ø16/20cm cm05 membrana amortiguante de caucho e =2cm
2,15
cm 06 chapa de acero plegada e=1mm clipada y apoyada sobre membrana de amortiguación cm07 mortero de nivelación sin retracción para sellado de junta e=5cm
1
From the ground, with massive concrete elements designed to lay the solid foundation of future phases. It is the only moment in which concrete is present - both prefabricated and poured in situ.
Planta pasarela pública elevada
e01 placa de apoyo sobre cimentación de chapón de acero e=3cm 20x20x2cm e02 cabeza metálica cruciforme doble 200x200x120cm prevista de 4 orificios Ø16 para roscado de pernos pasantes solidarizados con mortero cemento e03 chapa de acero e=2cm antipunzonamiento en unión pilar - cimentación e04 vaso metálico - mecanismo de apoyo - de pilares tubulares acero 200x50x8mm e05 tornillos roscados pasantes - tuerca y contratuerca e06 perfil metálico T de arriostramiento atornillado a pilar en 4 puntos e07 viga principal pórtico de acero laminado 200x100x8 mm e08 vigueta de acero doble T invertida 150 L=1100mm separadas 1cm e09 perfil de acero atornillado a pletina - subestructura malla cables trepadoras
g
nudo_
e06 e10 e13 e05 e03
[CO_04] the constructive unit
[CO_03_04]
la unidad básica construtiva
背景 E l
c a m i n o
d e
The air path
a i r e
Sección aa'
El camino de aire. Unidad básica construciva de los Jarines de aire
Sección bb''
b
6,4 +11.65 0,2
+11.65
4,2
4,5
{protección viento + deshumidificación + captación PM}
a03_2.jardín de aire oxigenante
4,4
a03_1.jardín de aire con trepadoras {paulownia tomentosa}
6,95
6,85
a03_3. jardín de aire aromático
a01.sistema de captación natural de agua ambiental A = 2x7.5m²=15m² {675L/mes}
° 54
36°
0,2
81 ° ° 76
14°
76 °
26°
26°
h
54 °
36°
° 81
nudo_
**1 cada 3 módulos
9°
9°
14°
64 °
° 64
6,4
d
0,35
0,35
0,35
0,35
0,35
0,35
0,35
0,35
11,65
2,55
3
2,35
0,15 0,1 0,15 0,15 0,15 0,15 0,1 0,15 0,15 0,15 0,15 0,1 0,15 0,15 0,15 0,15 0,1 0,1 0,1 0,1
0,8
1
0,2
97
2,9
0,2
°
10 5°
90
0,25
2,9
d' +4.65
+4.65
0,45
0,65
0,25
0,6
° 0,55
98
0,7
0,7
0,7 1
°
0,8
10 1°
73
+3.45
0,2
°
79 °
1
0,7
+3.45
0,75
0,7
0,7
0,7
0,7
0,7
0,7
0,7
0,75
6 1
4,65
4,6
3
z01.sistema de captación de agua pluvial + tratamiento natural de agua ambiental y pluvial
2,95
j'
A =12m² {mín: 0.8x12m²x51mm/m²mes=489L/mes} {max: 0.8x12m²x202mm/m²mes=1.939L/mes}
3,05
2,95
j
nudo_g
t-n01. filtro percolador natural t-n01a. t-n01b. t-n01c. t-n01d.
+0.00
cultivo-pavimento drenante h >50mm interfase gotero subterráneo agua ambiental filtro de arena h>300mm filtro de grava Ø30mm-Ø60mm h=800mm
+0.00
-0.05 -0.30 2
0,15 0,5 1,65
1,5
0,5
1% 0,15
-1.50
d nudo_e nudo_f
0,3
0,55
0,3
-1.50
1,5
nudo_
1,05
-2.40
-2.40
0,35
0,35
b'
0,65
2,65
c
nudo_
0
0.5
1
escala 1.40
1.5
2m
0
0.5
1
escala 1.40
Sección transversal
1.5
2m
Alzado longitudinal
Sección a-a'
Sección b-b'
j05
j01
j02
j03
esquema funcionamiento estructural de la jadinera y cargas aplicadas
1
N1=0,05 KN/m² PP=0,18 + 0,15* KN/m² Q1=3,0 KN/m²
1,3
D
0,85
1,6 KN/m
1,15
j05
esquema funcionamiento estructural de la barandilla y cargas aplicadas
1,6 KN/m
0,7
D
0,7
L
0,7
D
0,7
1
D
3
2,15
0,55
0,7
0,7
0,2
2,15
Sección gg' 0,85
0,1
elementos independientes de la jardinera
0,1
0,35
nudo_
b
j07
6
6,4
j08
a
a'
j01 j08
a 4,9
nudo_
j07
2,2
0,7
Planta pasarela pública elevada e05
cm04 armadura piel Ø16/25cm; armadura refuerzo Ø16/25cm, estribos Ø16/25cm, armado longitudinal Ø16/20cm
Sección ii'
planta proyectada jardinera
sección longitudinal jardinera
parterres
Attempts have always been made in order to find constructive solutions that will ensure the continuity of structural elements avoiding as much as possible the irreversible actions during the construction phase of the building and the lower number of operations on site. Thus, each phase can exist autonomously but be prepared to be able to receive the last phase. 0,5
1
cm07 mortero de nivelación sin retracción para sellado de junta e=5cm
2,15
0,05
e19
e18 e17 e05
0,1
0,8
0,05
81°
e01 placa de apoyo sobre cimentación de chapón de acero e=3cm 20x20x2cm
0,85
0,1
1
0,5
0,05
0,85
0,1
2,15
cm 06 chapa de acero plegada e=1mm clipada y apoyada sobre membrana de amortiguación
0,05
0,05
cm05 membrana amortiguante de caucho e =2cm
e02 cabeza metálica cruciforme doble 200x200x120cm prevista de 4 orificios Ø16 para roscado de pernos pasantes solidarizados con mortero cemento e03 chapa de acero e=2cm antipunzonamiento en unión pilar - cimentación
Elementos de contención de tierra
barandilla acero corrugado reciclado y doblado
0,2
e06 e10 e13
h
nudo_
cm03 viga canal HA50 prefabricada 150x150x650cm
Sección hh'
seccoón constructiva barandilla y forjado
0,05 0,07
cm02 pirámides invertidas tronco-cónicas en encepado; 4 orificios con pernos pasantes -para unión rígida encepado - viga canal
Sección ff'
planta constructiva barandilla y forjado
Elementos de protección vertical
Sección cota +4.65 - pasarela pública dd'
cm01 encepado HA50 95x105x270cm sobre pilotes HA circular prefabricados (hinca)
Sección ee'
0,1
Leyenda
5,85
9°
g
nudo_
e06 e10 e13 e05 e03
e04 vaso metálico - mecanismo de apoyo - de pilares tubulares acero 200x50x8mm e05 tornillos roscados pasantes - tuerca y contratuerca e06 perfil metálico T de arriostramiento atornillado a pilar en 4 puntos
e16
e07 viga principal pórtico de acero laminado 200x100x8 mm e08 vigueta de acero doble T invertida 150 L=1100mm separadas 1cm e10 angular metálico en L 50x50mm soldado a perfil e09
Ø0,01 Ø0,03
0,07
e09 perfil de acero atornillado a pletina - subestructura malla cables trepadoras
8
e11 tensor
0,2
0,14
背景
[CO_05] [CO_05]
la unidad básica construtiva
the constructive unit E l
Alzado transversal aa'
Sección transversal bb´
c a m i n o
d e
a i r e
Sección constructiva por viga forjado UPE270 - estructura
Sección constructiva por pasarela de mantenimiento - estructura+malla cables
Alzado constructivo - estructura + malla cables + forjado+ jardinera
e06 e08
e06
e09 e10
11.50 e13
e10
e10 e03
e10
e07
e13
e06
7.00
e05
e09 e13 e10 e03
j06 j05 e12 e12
25
e11
24 23
j01 j04
e02
e06 e12 j03 e09
e06
22 21 20 19
4.00 e09
e05
18 17
j08
16
j02
15 14
e10 e14
13 12
e09 e08
e11
e07
11 10
e06 e06
09
3.00 e09
e05
08 07 06 05
e03
04 03
e04
e04
0.10 e02 e01 cm07
e02 e01 cm07 cm03
cm03 cm04
e03
e10
j02
j03
e12
e10
j01
j02
cm01 cm02
*Ver leyenda plano 24
0
escala 1.15
0.5
1
1.5
2
2.5
3m
Detalles constructivos
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
j06
j01
j02
e03
e10
02 01
construcción
[CO_06]
背景 E l
[CO_06] la unidad básica construtiva
c a m i n o
d e
a i r e
the constructive unit details
0,07
0,2 0,3
a
0,1
0,15
0,35 0,15
0,02
e10 0,0 Ø
2
0,0 Ø
2
+0.26 +0.23
Cota de arranque pilares
e04
Cota de asiento placa base
b'
0,08
0,12
b
0,32
0,15
0,16
e10
e02
° 54
0,03
0,02
0,03
e03 +0.41
e13
e10
a'
37°
e13
0,01
0,04
0,12
0,12
e10
0,1
0,2
e06
0,05
0,05
0,08
0,13
e09
e10
e13
0,1
0,1
0,03
0,1
0,04 0,01
e09
0,2
e08 0,07
e08
0,14
0,05
0,2
e06
0,05
0,05
0,04
0,1
0,05
0,19
e06
0,02
e02 Cota de replanteo y nivelación e01
cm07
0,04
+0.14
0,07
+0.10
Cota terreno 0,05
+0.00
0,06
0,1
cm06
0,06
53 °
e10
cm03
e10
0,3
0,22
0,19
e10
0,0 Ø
2
0,0 Ø
26
0,09
2
cm04
25 24 23
0,15
0,02
0,04
0,03
37°
e13
22 21
e06
20
17 16
e13 0,12
0,05
0,12
15
0,2 0,09
0,1
0,1
0,12
14
26°
0,1
13
0,1
0,05
0,01
0,02
e13
18
0,1
° 81
0,12
e06
0,2
9°
0,2
e06
0,2
19
12 79 °
0,21
° 64
11° 0,0 Ø
2
0,0 Ø
11 10
2
09 08 07
Encuentro pilar-pieza soporte de anclaje roscado Sección a-a'
0,03
0,05
e05
0,1
64 °
0,27
0,12 0,05
0,1 0,05
5 0,0
4 0,1
Encuentro pilar-cimentación. Sección b-b'
4 0,0
j01 7 0,0
e13
0,06
0,08
0,03 0,03
0,03
0,01
0,07
0,09
26°
j03
cm07
0,05
0,22
4 0,0
0,44 0,05
0,1
e06 0,1
j03
0,2
0,06
0,08
e15
0,03 0,05
0,2
0,26
j01
01
0,16
0,08
e10
e05
0,1
e13
0,08
0,22
0,15
0,2
0,2
0,1
0,1
0,04
e01 cm07
e09
0,12
0,09
0,1
0,07
0,06
e06
e13 0,01
e06
0,05
0,2
0,2
e02 e12
0,17 10
7°
0,06
0,1
0,06
0,11 0,22
*Ver leyenda plano 24
0
escala 1.05
0.1
Detalles constructivos
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
03 02
0,05
j04
04
construcción
0,08
0,48
0,05
05
e03
0,03
0,15
j05
0,05
06 0,07
0,16
5°
j05
0,08
0,08
0,09
° 90
10
e12
0,15
0,03 0,03 0,03
0,07
0.2
0.3
0.4
0.5m
[CO_07]
背景 E l
los cerramientos
u m b r a l
f1
v e r t i c a l
f2 f3
[CO_07] the constructive skins 1
sección transversal bb' ver panel CO_01
La cubierta
0,03 0,08
0,010,04 0,03
0,01
0,12
0,030,02
0,17
0,27 0,07
0,02 0,04
0,04
0,03
0,09 0,04
0,07 0,03
0,02 0,03
f38
f37
c03
0,04
e 1/10
0,04
0,04
0,05
Det_08
f17
0,12
i01
Det.Papel Sohi
f18
0,02 0,09
0,06
0,3
0,12
0,04
0,08
0,02
0,06
0,07
f14 f13 f12
0,1
0,1
0,05
f15
0,06
0,08
0,11
0,02
0,06
e 1/10 0,03
0,17
0,16
0,16
Det_03
0,06
0,16
f16
0,04 0,020,02
0,05
f11 f10 0,07
0,09
0,05
f09
0,06
26 25
f33
24 23
22
f29 f28
f08
0,12
21 20
f27
19
Det_02 e 1/10
f07
0,03 0,02
0,07
f06 f05 f04
0,02 0,03
0,05
0,12
f03 f02
0,04
0,11
0,06
0,1
16
f23
15
f04 f22
0,11 0,13
14
f21
13
0,08
0,05
f01
17
f24 0,02
0,04
0,02
c_02 c_01
18
f25
0,05
0,05
c_03
0,21
Det_03
27
f35 f34
f31 f30
0,13
0,19
f36
f32
0,16
e 1/15
f39
0,06
f19
0,04
c_08 c_07 c_06 c_05 c_04
0,08
0,04
0,03
Det_06
Det_10
c15 c14
0,06
0,08
La cubierta de los espacios abiertos (a , c0, c1 ) es de chapa de policarbonato situada sobre el translúcido(a) entramado, de lamas de teja y policarbonato (b), lamas fotocatalíticas ( c1) y de lamas de madera. La cubierta de los espacios cerrados es de policarbonato translúcido (b1), de panel sandwich+tablón de madera machihembrada en ambas caras y aislamiento (c2)
c_10 c_09 i_03 i_02
0,05 0,01 0,04
0,09
vs
0,05
Para la cubierta se utiliza una estructura de acero desarrollada en diferentes niveles, con una distancia variable entre soportes de 7 a 15m de ancho, a los que correspondes tres alturas viga de 1,00m, 1,50 y 1,80m sostenidas por una retícula de pilares a distancias de 1m y 3m.
c03
0,09
Det_01b
e 1/10
0,16
Det_01a
0,04
0,11
c_12 c_11
Det.Vidrio Det_04
0,04
Det_01 e 1/15
b1
f40
f20
12
0,16
a2
c01montante de viga secundario tubular rectangular c02 viga secundaria perfiles tubulares 80x50mm pasantes dobles c03 subestructura correas metálicas dobles pasantes h=5cm c04 viga doble principal tubular metálica rectangular 150x50mm c05 chapa plegada metálica e=0.5mm c06 canalón metálico de chapa apoyado sobre correas de cubierta entre paños c07 angular metálico en U subestructura PC cubierta h=50mm c08 placa grecada de policarbonato 150x300cm atornillada a subestructura c09 subestructura metálica descuelgue desagüe cubierta perfil cuadrado 5x5cm c10 subestructura metálica descuelgue desagüe cubierta rectangular 5x2.5cm c11 sumidero sifónico c12 rastrel perimetral de madera c13c tubo PPE
0,12
Det_10
a1
0,06
0,02
gestión del agua
f43 f42 f41
f39
0,06
La cubierta de los espacios abiertos (a , c0, c1 ) es de chapa de policarbonato translúcido(a) situada sobre el entramado, de lamas de teja y policarbonato (b), lamas fotocatalíticas (c1) y de lamas de madera. La cubierta de los espacios cerrados es de policarbonato translúcido (b1), de panel sandwich+tablón de madera machihembrada en ambas caras y aislamiento (c2)
f44
0,14
0,08
Para la cubierta se utiliza una estructura de acero desarrollada en diferentes niveles, con una distancia variable entre soportes de 7 a 15m de ancho, a los que correspondes tres alturas viga de 1,00m, 1,50 y 1,80m sostenidas por una retícula de pilares a distancias de 1m y 3m.
f45
e 1/10
0,06
la cubierta impermeable - recoge el agua en su superficie la cubierta solar - protege de la radiación solar excesiva la cubierta permeable - deja pasar el agua a través de la estructura
0,05
a b c
0,09
Det_05
0,07
Det_04
0,07
c3
Det_07 Det_08
0,12
c2
0,08
c1
0,01 0,04 0,01 0,05
0,1
0,1
c0
Det_05 Det_06
0,11
c
b1
a2
Det_02 Det_03 Det_04
0,05
a1
1%
0,01
0,19 0,06
0,07
b
1%
e 1/10
0,14
1%
Det.Policarbonato Det_06
vf viga forjado UPE270 doble pasante empresillada /150cm presillas soldadas p01 vigueta doble T invertida 150/75cm intereje p02 chapa grecada e=4cm p03 tablero de madera Iroko e=3cm p04 subestructura rastreles metálicos + 5cm aislamiento térmico lana de roca p05 tablero de madera e=2cm p06a bastidor metálico 150x300 cm cajón vertido microcemento p06b capa microcemento e=3cm p07 angular L metálico cierre de forjado p08 rastrel de madera 5x5cm atornillado de suelo acabado p09 rastrel metálico omega h=5cm p10 tornillo para madera con cabeza plana p11 plancha metálica e=2mm p12 perfil angular L perimetral bastidor de microcemento p13 microcemento vertido e=3cm
0,07
c14 perfil tubular metálica carpintería abatible atomatizada 6x4cm c15 carpintería ligera de policarbonato alveolar e=20cm f01cable estructural rígido trefilado para sujeción de forjado f02 angular en L de cierre de forjado h=15cm f03 perfil metálico tubular rectangular 120x50mm f04 rastrel de madera perimetral + capa de aislamiento térmico 3cm f05 pre cerco de madera apoyo de carpintería f06 perfil tubular rectangular 100x50mm f07 carpintería vidrio laminado templado 6+12+6 f08 perfil metálico en T armado h=140mm f09 tapa de carpintería realizada en chapa f10 junta de neopreno para apoyo de perfil f11 carpintería metálica tubular 50x10cm f12 tapa de chapa metálica acabado interior carpintería f13 angular en L cierre y fijación cerramiento metacrilato f14 carpintería metálica tubular rectangular subestructura lamas f15 plancha metacrilato e=3cm f16 lama metálica orientable automatizada f17 angular de cierre superior cerrramiento metacrilato f18 carpintería perfil metálico tubular unión tornillos expansible f19 angular L de cierre perimetral f20 chapa plegada para conformar vaso jardinera f21 perfil U soldado a perfil L permietral f22 angular L perimetral h=11cm f23 cerramiento autoportante bastidor de madera +cerramiento papel Sohi f24 bastidor madera 6x6cm f25 cerramiento doble chapa plegada metálica con aislamiento f26 aislamiento térmico lana de roca e=8cm(cara norte) f27 bastidor madera 6x6cm f28 chapa plegada e=0.5mm f29 bastidor madera 12x5cm f30 chapa plegada exterior e=0.5mm f31 acabado interior panel madera fenólico f32 rastrel madera 13x3cm f33 perfil tubular 13x3cm f34 viga superior cerramiento UPN160 f35 cerramiento lámina PVC tensada f36 canalón perimetral chapa plegada e=0.2mm f37 chapa plegada metálica cierre esquina f39cerramiento doble policarbonato con previsión de abertura para ventilación admisión/extracción f40 Aislante 20mm translúcido f41 Panel policarbonato alveolar protección U.V.500x500x20mm f42 Corona de PVC e=2mm f43 Panel policarbonato celular protección U.V. 500x500x40mm f44 Pieza especial de plástico cilindrica e=2mm f45 Cilindro de ventilación de PCe=16mm f46 Sistema de montaje por medio de perfil atornillado para machihembrado de paneles f47 Pieza de PC para sellado de junta f48 Montante en U metálico e=1mm 40x30mm f49 Cámara de aire e=5cm
0,05
Leyenda
Det_01
a
2 La piel vertical
superposición de pieles- cerramiento f25+f23+f50
11
Det_07
f25 piel masa sólida [tablero OSB] f23 piel masa papel+luminaria f50 piel aire vegetal [2xmallazo+ jardinera]
e 1/10
0,01
10
0,1
0,21
3
envolvente estanca climatizada
09
El forjado ligero
0,17
0,05
0,1
0,05 0,01 0,03
0,08
0,1
0,17
0,1
0,1
0,03
0,01
0,11 0,21
forjado int - ext
0,07 0,27
0,14 0,05 0,1
0,2
0,1
0,39
f_42
[2]
f_44 f_45
Det_02
c
p06_b
m01
[3]
f_46
barandilla reciclada de redondo de acero corrugado Ø20
f_47
Det_07
f_48
Bignonia radicans
ver panel CO_03
p04
p05
h<10 m hoja caduca color flor anaranjada
Det_09
f_49
p06_a
p03
vf
[4 ]
p02
b
p01 franja detalle
f1
franja detalle
f2
franja detalle
f3
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
forjado tipo-pavimento interior
vf
04 03
cota de apoyo de viguetas 2xT
02 01
vf
ef_02 ef_01
[1]
f_41
06 05
0,07
a
07
margen de nivelación
0,14
0,04
cota suelo terminado
p01
ef_03 0,03 0,04
f_40
f_43
p06 p05 p04 p03 p02
ef_04
montaje [ 1 , 2 , 3 , 4 ] ver memoria construcción
f_39
0,03 0,04
0,08
0,12
p07
0,03 0,04
0,01
en la doble abertura sellada de PVC se introduce un cilindro de PMMA que aisla y amortigua el tubo de ventilación con respecto al cerramiento
0,12
0,07
0,17
a,b,c
0,01
0,05
0,02 0,04
cerramiento doble policarbonato con previsión de abertura para ventilación admisión/extracción
0,06
08
0,05
0,05
0,14
f_45
0,15
f39
0,03
f_40
0,17
0,05 0,010,04
f_39 Det_05 Det_06
p13 p12 p11 p10 p09 p08
e 1/10
0,05
Det_09
Det_08
0,05
Det_05
e 1/35
0,01
Det_05-06
cota de apoyo vigas 2xUPE cara superior viga tubular lineal (pórtico)
construcción
[INS_03]
[IN_01] 背景
E l
las instalaciones
c o n f o r t
e n
e l
j a r d í n
the sealed skin
Comfort in the garden 10
09
PLV
PLV
PLV
PLV
PLV
08a
09a
08b
11a
09b
100 mm
mm 35
mm 0 50 mm4 50 mm 1 00
mm 50 mm 100 mm
40 mm
832 l/s 665 l/s 332 l/s 166 l/s
100 mm 50 mm
85m²
audiovisual rooms
22
08a
208W/m²
446 l/s ganancias cerramiento
Qpers 0.7 kW
446 l/s
Ø200
166 l/s Qpers 0.7 kW tint 25ºC
17.60
2687l/s
b
20lux
100lux
+0.25
1.60
+14.70
Ø600 2015 l/s
446 l/s
c 335 l/s
Ø600 1679 l/s
Ø600 2675l/s
Ø600 2230 l/s
446 l/s
d 335 l/s
[MAC] digital research A=128m²
Ø500 1343 l/s
446 l/s
e 335 l/s
Ø500 1007 l/s
Ø650 3121 l/s
446 l/s
f
Ø400 671 l/s
Ø650 3125 l/s
446 l/s
g 335 l/s
Ø300 335 l/s
+9.45
5.70
+4.70
+4.95
h
a.3
admisión aire ext expulsión aire ext
renovación aporte aire
20lux
a.4
650x350
08 07
Ø650
335 l/s tint 25ºC
+0.00
+0.25
-1.90
a.5
a.4
Zona instalaciones 2 en cajón de sótano.
UTA Mediateca Primera Planta.
b.1
10.000m3/h MODELO 6.05 WESPACK by AIRWELL 1350 X 1990 X 540 mm (1P)- 65X65cm, 2690 l/s
b.2
UTA Mediateca Planta Baja. 10.000m3/h MODELO 6.05 WESPACK by AIRWELL 1350 X 1990 X 540 mm (PB)- 65X65cm, 2690 l/s
b.3
UTA Oficinas y Almacenes.
MODELO 6.05 WESPACK by AIRWELL 1350 X 1990 X 540 mm (PB)- 55X55cm, 8020 m3/h
UTA Cafetería Planta Baja. 3.000m3/h - 850l/s Modelo TROX, TBS-EC (PB)- 40X40cm, 2995 m3/h - 832 l/s
06 05
a.4
unidad tratamiento aire
7,5
LED TECHO LAMPARA SUSPENDIDA GLOBO
LUMINARIA 2 x 36
5625 m3/h - 1562 l/s 6075 m3/h - 1687 l/s
REJILLA EXTRACCION
5.000m3/h
(Campana)- 40X40cm, 300-450 m3/h (Extracc.)- 15X15cm, 50 l/s
EXTRACCION BAÑOS EXTRACTOR A CUBIERTA CAMPANA HUMOS EXTRACCION A CUBIERTA CONDUCTO DE IMPULSION CONDUCTO DE EXTRACCIÓN
8020 m3/h
BASE T/T 10/16 A BASE T/T 25 A
Extractores en Aseos y Z.Servicio.
VENTUM serie E 1350 X 1990 X 540 mm
BASE SUELO x 4 T/T 10/16/25 INTERRUPTOR SENCILLO INTERRUPTOR TEMPORIZADO INTERRUPTOR CONMUTADO
N
0
escala 1.200
5
Planos instalaciones Planta baja y primera Sección longitudinal y transversal
10
20
12 mm
30m
A.F.S. POLIPROPIENO A.C.S. POLIPROPILENO MONTANTE A.F.S. MONTANTE A.C.S. LLAVE DE CORTE GRIFO MEZCLADOR TEMPORIZADO
BALIZAMIENTO LED EN SUELO RED DE EXTRACCION
VIC-VEC y Extractor
Fontanería - Saneamiento 12 mm
LAMPARA SUSPENDIDA PAPIRO 18 W
5.000m3/h (1B)- 45X45cm, (PB)- 45X45cm,
unidad tratamiento aire
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
I.C.P. SECUNDARIO
PUNTO DE LUZ EN TECHO
- anch
Sección longitudinal MAC e 1.200
Electricidad - Iluminación
UTA Salas Exposiciones
UTA Oficinas y Almacenes. MODELO 6.05 WESPACK by AIRWELL 1350 X 1990 X 540 mm 55X55cm,
20lux
Expulsión al exterior
a.1 unidad tratamiento aire
09
15
Zona instalaciones 1 en cajón de sótano.
a.1
+9.20
[MAC] audiovisual rooms A=90m² 16.40
446 l/s
4.70
+1.70 +0.25
a
166 l/s
11 10
Ø400
+17.00
a.2 9.50
Ø500 1783l/s
12 446 l/s
Qfrio 2351 l/s
335 l/s
13
04
[MAC] terrace A=135m²
Ø500 1337 l/s
tint 25ºC
Qfrio 332l/s
Ø650
5.00
0
Ø650 2351 l/s
Ø650
4,2
+4.95 Ø650 admisión aire ext expulsión aire ext
650x350 Ø650
5.00
446 l/s
4.70
POZO GENERAL EDIFICIO
+4.00 4.80
446 l/s
+4.95
CONEXIÓN FECALES
Ø400 891 l/s
cubierta invernadero (abierta)
446 l/s Qilum 100W
15 14
Ø300
5.00
Ø600
3.80
VENTILACION
Ø300 445l/s
16
Esquema funcionamiento térmico verano Sección transversal bb'
a
b
4.80
FANGOS Y GRASAS
CONEXIÓN PLUVIALES DE CUBIERTAS
Retorno
Ø500
100lux
21
17 protección solar tª max media ext verano 28.9ºC tª media ext invierno 7ºC
altura máxima nave [PE_com]
Ø650
SANEAMIENTO DESCOLGADO EN GALERÍA
Impulsión
d
9.20
ACOMETIDA SANEAMIENTO PUBLICO
9.10
SANEAMIENTO PUBLICO
SUMIDERO SIFONICO
9.50
REGISTRO EN SANEAMIENTO DESCOLGADO
Toma de Aire exterior
Ø500
12a 12b
11b
20
Planta primera MAC e 1.200
2.20
2.20
1.90
1.30 9.50
LINEA DE PROPIEDAD 9.70
FEC
e
Ø400
11a
09b
12,5
c
[MAC] physical research A=160m²
POZO DE REGISTRO
PLV
f
09a
08b
19
+16.00
Ø300
23
03
63.20
umbral jardín de aire
24
446 l/s
b.3 unidad tratamiento aire
precipitaciones 1260mm/año agua total recogida en [C03] 2.086 m²
[C03]Cubierta 03 A=1.656m²
27 25
Ø350 445 l/s
335 l/s
28 26
Esquema funcionamiento térmico invierno Sección transversal aa'
446 l/s
Ø400 891 l/s
446 l/s
a.1
Planta baja MAC e 1.200
Planta cimentación - galerías técnicas
unidad tratamiento aire
7,5
15
Ø450 1.337 l/s
13
12,5
a.4
Ø550 1.783 l/s
11
446 l/s
i 2687 l/s Ø650
10
29
0
árbol prealtura:1
09
lecture
a
f
08
search
PLV
j 335 l/s
36m²
PLV
446 l/s
18
446 l/s
105m²
PLV
166 l/s Ø200
PLV
b Ø650 2351 l/s
a
e
335 l/s tint 21ºC
Qfrio 891 l/s
free lecture
k
Ø650
335 l/s
166 l/s
l
95m²
e
166 l/s
media office
j
PLV
30m²
cafe
185m²
PLV
Ø300
d
b
Qcalef 2351 l/s
2.230 l/s
PLV
446 l/s Ø400
tint 21ºC
radiación solar
446 l/s
335 l/s
2015 l/s Ø600
PLV
332 l/s
PLV
b.1
PLV
c
166 l/s
PLV
b.2
m
d
80m²
Exposiciones Baja
i
FEC
c
virtual search Ø600
Oficina Baja / Exposiciones Primera
PLV
166 l/s Qpers 0.7 kW tint 21ºC
n
335 l/s 1679 l/s Ø600
PLV
a.4
Ø650 2.675 l/s
d
h
Ø300
PLV
Ø700 3.125 l/s
d
499 l/s
PLV
Ø750 3.125 l/s
o
166 l/s
c
mm
c
95m²
PLV
446 l/s
Ø500 1343 l/s
PLV
335 l/s
e
garden
PLV
f
e
166 l/s
Ø350
PLV
b
PLV
cubierta invernadero (cerrada)
b.3 unidad tratamiento aire q
p
g
665 l/s
PLV
free lecture
b
FEC
r
g
40 mm
a.3 Oficina Común Baja / Exposiciones Primera
446 l/s
335 l/s
Ø200
Ø500 1007 l/s
150x150 50 l/s
t
446 l/s
children books
a
PLV
c
f
VEC
50m²
PLV
832 l/s Ø400
PLV
storage
a
Qilum 100W
Qcalef 332l/s
s
g
f
50 mm
150x150 VIC 50 l/s
0
335 l/s
Ø400 671 l/s
c
b.3
PLV
b
VEC
cuisine
PLV
mm
Ø300
Ø400 60m²
PLV
40
150x150 50 l/s VIC
a
PLV
h
h
335 l/s
d
0
a
PLV
Ø300
35m²
u
35m²
PLV
tª max media ext verano 28.9ºC tª media ext invierno 7ºC
mm
toilet PMR
waste
rest area
a.2 PLV
introducción luz
Ø 120 mm
Qpers 0.7 kW
i
40 mm
e
50
mm
pérdidas cerramiento
50 l/s 150x150
e
11m²
PLV
40 mm
mm
50
446 l/s
b
d
Ø 120 mm
a.1
100 mm
PLV
12a 12b
11b
Qcalef 891 l/s
mm
Biblioteca infantil y multimedia Planta Baja
15m²
PLV
PLV
50
mm
Ø 120 mm
40
PLV
PLV
11a
09b
6m²
mm
PLV
50
35
toilet
12m²
0
Búsqueda fisica y virtual Aulas audiovsuales Planta Primera
PLV
mm
35
locker room
10
35 mm
PLV
35 mm
PLV
09a
08b
208W/m²
a.1
FEC
b.3
Sala Cafetería
08a
radiación solar
PLV
PLV
12a 12b
11b
a.5 18m²
Vestuarios Cocina Extracción
11a
FEC
FEC
PLV
PLV
12a 12b
11b
mm
PLV
12
35
PLV
11
100 mm
08
GRIFO / SUMINISTRO 50 mm
SANEAMIENTO PVC BAJANTE PVC BOTE SIFONICO
02 01
instalaciones
[SOS_01]
estrategia sostenible
背景
[SO_01]
E l
c o n f o r t
e n
e l
j a r d í n
sustainable strategy 1. Sostenibilidad urbana, medioambiental y digital
2. El sistema propuesto
PLAN DE ESTRATEGIA URBANA DE ACTIVACIÓN -SOFT LINE
2.1 El material
Los puntos de la línea blanda de Hangzhou
[V01]
11
12
1. Plan regeneración y gestión del suelo 2. Plan de regeneración y uso sostenible del agua 3. Plan de mejora ambiental 4. Plan de amplificación, cobertura y gestión digital 5. Redes de equipamientos
[V03]
[V04]
7
5] [JT0
9 11
2] [JD0
7
6
5
[JI]
3] [JAi0
12
5
a
- eficientes
12
1
9
a problema que agrava el vacío en el espacio
6
[JI01]
3
Todo el acero que se produce en el mundo tiene un contenido de material reciclado que, dependiendo del proceso de producción, varía entre 15% - 95% (acerías eléctricas a arco). Estos valores son de los más altos comparados con otros materiales de construcción.
4
6 b5
2
eje plazas actividas
28 27 26 25 24 23
1
pavimento imp.loseta hormigón
20
2
3 vía TNM
10,5m vía trafico rodado
2m
10,5m
vía trafico rodado
3 vía TNM
18
Actual
2
17
[JI]
1
V01 Xiaohe Road
16
Propuesta
c
b
2
3
sardinel prefabricado (capt. agua) pavimento drenante sin infiltración
franja verde
7 . Ma nt e nim ie nto mínimo
2%
5 vía TNM
10,5 vía trafico rodado
12 ver panel IM03
3. Sistemas naturales de depuración de agua
+
a. Agua escorrentía b. Agua canal c. Agua ambiental b1
1. arbolado y plantación 2.cultivo h > 450 mm 3.depósito de roca de drenaje. 4. subsuelo escarificado 5. tubería de drenaje perforada Ø150 mm 6. Geotextil 7. Sobre flujo (tubo vertical o canal de drenaje) 8. Restrictor de flujo 9. Excedente secundario 10. Tubería de salida al sistema de saneamiento 11. Presa
a . Agua escorrentía
10
09
h
d1
6. Sistema de reciclaje - Recuperación de materiales
El clima de Hangzhou se caracteriza por su alto grado de humedad presente tanto en el suelo como el en aire. La LBH (Línea Blanda de Hangzhou), situada en las proximidades del gran canal, es atravesada en muchos casos por canales secundarios, por lo que cuenta con una circulación del agua freática muy elevada en toda su extensión.
Este hecho implica que los métodos de intercambio de energía con el terreno tendrán una alta eficacia. Se propone implementar, en los pilotes que incorpora el sistema constructivo, dicha técnica, lo que permitiría así gestionar la energía demandada mediante el intercambio de calor y el mantenimiento del entorno del subsuelo del proyecto.
h
bh
d3
[JT**]
En Hangzhou en los ultimos años (2004-2006) se han derribado más de 1.3 millones de m² y durante los siguientes - de acuerdo con el Hangzhou City Construction Plan - están proyectados para ser demolidos 5 millones más durante los próximos 5 años.
Los materiales reutilizados se usarán principalmente para la conformación de pavimentos, elementos de protección vertical y cerramientos y pieles de las envolventes, siguiendo los mismos conceptos de construcción de la arquitectura china, donde elementos portantes estructurales de calidad mientras que los cerramientos pueden ser móviles o transformables.
.\Á RB OLES \Aes cul us turbinata2.png
pe_03_04
Otra especie relevante introducida en el proyecto, debido a su gran captación de PM10 y PM2.5 - 0,021g/m2/año - es el Acer Pseudoplatanus, cuya altura de copa suele llegar hasta los 35m.
c
d2
pe_03
pe_04
reciclada
losa de piedra reciclada
árido comp. y cerámica 1,6 KN/m
35
日本七叶树
30
榉树
1,6 KN/m PP=0,18 + 0,15* KN/m² Q 1=3,0 KN/m²
nivel freático (3-7m)
7
2
5
11
8
10
d1
p10
p11
p12
p13
p10
p05
20
11 UTA Acondicionamiento térmico
Cornus Kousa
Cercidiphyllum japonicum, Katsura Ilex Rotunda
10
Pavimentos de cerámica y losa de piedra reciclada. 5
榉树
5
Trachycarpus
10
棕榈属 (Zōnglǘ shǔ)
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
鐵冬青 (Tiě d ōngqīng)
Aesculus turbinata
15
El proyecto recupera aproximadamente unos 360 ml/módulo de barra de acero corrugado - para elementos de protección vertical - de demoliciones en otros puntos de la ciudad, lo que supone una reducción importante de residuos generados por fabricación y transporte de materiales desde las acerías más próximas.
连香树科 (Lián xiā ng shù kē)
p09
BCG BCG 9
4
17m
四照花 (Sì zhào hu ā)
(Huā qiū shǔ)
Zelkova serrata Sorbus Commixta 榉树
p08
Suelo radiante (no desarrollado en proyecto)
3
(Rìběn q ī yè shù)
花楸属
25
N1=0,05 KN/m²
3
1
05
La vegetación introducida en todos los jardines y áreas verdes de la LBH pertenecen a especies propias del clima de Hangzhou y especies autóctonas de la zona. Para la realización de los jardines de aire se proponen especies de las regiones geográficas de reforestación y agroforestería (R1, R2, R3 y R4) tales como la paulownia tomentosa, especificada como especie de reforestación en la zona R3 (Zhejiang) que además posee el grado más alto de absorción de CO2 entre las especies arbóreas conocidas y la expulsión de grandes cantidades de oxígeno - absorción CO2: 21,7 kgCO2/árbol/año (23,95 tCO2/ha/año) -producción O2: 5,9 kgO2/árbol/año (6,486 tO2/ha/año) Esto unido al rápido crecimiento de la especie permite la generación de áreas boscosas productivas y oxigenantes, que son parte de los Jardines de aire.
Se propone mediante la introducción de Centros de reciclaje ubicados en la LBH, la valoración, reutilización, revalorización de los elementos susceptibles de poder formar parte del sistema ubicados en las parcelas demolidas o por demoler.
b2
2
06
7. La vegetación introducida
h
6
11
07
Este jardín se inserta de forma longitudinal, en el perímetro vial de la LBH como zona de biorretención ante eventos climatológicos adversos, que puedan generar problemas a la red de la ciudad.
[JI]
8.2
ver panel INS01
Utiliza hasta un 100% chatarra férrica como materia prima.
Jardín de infiltración parcial con reductor de flujo
b1
14
08
- sistema urbano drenaje sostenible
1
vía TNM
banda técnica instalaciones
Permeabilización suelos y captación de agua escorrentía superficial
o ad rod co tráfi 1] v ía [V0 dRo a e cto e y h ro o Xia la p rce pa
2
15
13
3%
17m
5. Sistema de Energía c. Jardín de Infiltración [JI]
10,5 vía trafico rodado
a
9 . Ace r ía d e ho r no eléctrico
22 21
3%
19
Las escorias se reutilizan como árido - construcción de carreteras/producción de cemento - mientras que la cascarilla de laminación se recicla al 100% como materia prima en la siderurgia integral o para otros usos.
4.Plan de amplificación, cobertura y gestión digital
Red lúdica - ocio, descanso, jardines, gastronomía Red pedagógica - talleres, aulas, eventos, exposiciones Investigación Red productiva Centros de reciclaje - digital y natural Equipamientos - centros arte (digital) [CAD] - media art center [MAC] - centros interpretación - centros tratamiento natural [CTN] - nuevos espacios de conexión digital
29
6 . D u r a b ilidad
4. Gestión del suelo
5. Redes de equipamientos
30
(c sistemas naturales depuración agua)
8 . V a lo r iz a ció n r e s id u o s d e proceso de producción
b1
Plan de cobertura digital e introducción de infraestructuras de accesibilidad digital Propuesta activación espacio público - tecnología pantallas expositivas Equipamientos públicos - conexión digital, eléctrica Plataformas digitales - estructuras de intercambio ideas, colaboración, organización Red sensible - sensores atmosféricos, sensores físicos Paisaje sensible Convenios con entidades educativas preexistentes - colegios, universidades
d FILTRO DEPURATIVO DE AGUA DE LLUVIA
2%
El acero tiene la mejor relación peso/resistencia de los materiales estructurales.
13
2
continuidad eje peatonal canal
Infraestructura descontaminación del aire Infraestructuras deshumidificación, mejora y confort climático Gestión sostenible de recursos para climatización Propuesta sistemas de climatización compartidos Plan de reforestación de áreas - especies arbóreas beneficios ambientales
cuneta verde dren filtrante tanque de retención y almacenamiento zona de biorretención alcorque inundable superficie permeable humedal de exceso de caudal
V01 Xiaohe Road franja verde
5 . Ra tio re sist encia- peso
b consume, recicla, produce, evoluciona
3. Plan de mejora ambiental
c1 c2 c3 c4 c5 c6 c7
Se propone sustituir el sardinel existente por uno prefabricado con abertura longitudinal para la recolección de agua de escorrentía, con el objetivo de eliminar los torrentes de agua en los eventos climatológicos más incipientes. A esto se añade la sustitución de parte (en una proporción 2:1 imp.-perm.) de la acera - antes realizada en loseta impermeable de hormigón - por un pavimento de piezas prefabricadas de hormigón permeable, conectadas a alcorque inundable y a la banda técnica de instalaciones b1.
Las vigas primarias de forjado (b) también pareadas se realizan con perfiles UPE sin más operaciones de fabricación de su corte y taladrado. Estos perfiles de vigas pareadas se conectan entre si, después de su montaje por medio de diafragmas. La disposición de las vigas b permite la continuidad de las vigas secundarias (c) mediante nudos atornillados, lo que permite una relación luz/canto de 20 - 25 para luces de 7,5 a 12m.
Una de las características de los edificios de acero -excepto soldadura - es que son desmontables - transportables. De esta forma, se puede reutilizar en su concepción original en un nuevo emplazamiento o reutilizar sus componentes con muy pocas modificaciones en nuevos edificios o estructura.
4
7
a consume, crece
Sistemas descontaminación agua del canal Plan de gestión y reutilización sostenible del agua Captación, depuración y reutilización de agua de escorrentía y atmosférica Naturalización bordes del canal Espacio equipado para movilidad pública y privada en el canal Infraestructuras de tratamiento de agua canal
1. sistema viario tráfico rodado 2. sistema espacios públicos [parques, zonas verdes]
- Redefinición del contacto asfalto - acera
La resolución de los nudos se realiza con elementos duplicados pareados continuos en cada fase, esto responde a disposiciones de optimización estructural: los pilares (a) pareados - se orientan con su mínima inercia según el plano del pórtico - aumentan el canto útil al área total con respecto al perfil individual, por lo que los perfiles utilizados son de menor dimensión.
4 . R e u t ilización
1
2. Plan regeneración y uso sostenible del agua
b1 banda calzada - abastecimiento agua escorrentía b2 banda canal - recogida y evacuación agua sobrante
4. Calidad del agua > muy baja - durante los eventos de precipitación, la contaminación acumulada en la superficie durante el tiempo seco es lavada y arrastrada hacia la red de colectores.
Se establece una ordenación modular para el planeamiento urbano a partir de un módulo constructivo y estructural soporte y una cubierta umbráculo. La adopción de este sistema hace posible la unificación de materiales y piezas y con ello su fabricación en serie y sistematización. El sistema permite la construcción por fases al mismo tiempo que facilita el acceso a un espacio público en construcción. El espacio se va construyendo con el tiempo, con los habitantes de Hangzhou y desde los elementos naturales.
El grado más alto - puede ser reciclado una y otra vez sin ninguna pérdida de propiedades/calidad ('de la cuna a la cuna').
1] [JD0
espacio público en relación con elementos vegetales
1. El contacto con Xiaohe Road
3 . T a s a d e r e cu p e r a ción para reciclaje 90% - 100%
3
(T) tiempo
-
c JARDÍN DE INFILTRACIÓN
3. Ciclo natural del agua > roto - hidrograma de escorrentía de una lluvia completamente distinto al que se produciría en una zona natural de la misma área. La principal diferencia es el caudal punta que se genera en muy poco tiempo debido al mayor porcentaje de superficie impermeable. La gestión de estos picos para evitar daños en las ciudades motiva la construcción de sistemas de drenaje con el fin de mitigar y controlar los problemas asociados con ellos.
a
captación, almacenaje y reciclaje de agua lluvia mejora de las condiciones de calidad de agua disminución del volumen de escorrentía
b BANDA TÉCNICA DE INSTALACIONES
grandes caudales punta, en comparación con las zonas naturales no urbanizadas en donde apenas se produce escorrentía subsuperficial gracias a procesos naturales tales como: - infiltración - almacenamiento superficial o subterráneo - evapo-transpiración - evaporación
9
-
2 . C o nt e nid o reciclado
de
-Plan de movilidad alternativa peatonal - nuevos recorridos TNM - carriles bici y puntos de recarga eléctrica ferry - mejora de la red de transporte -Reorganización de espacios de aparcamiento -Catálogo de preexistencias -Plan de eliminación de estructuras y construcciones baja calidad -Depuración de suelos industriales contaminados Jardín de tierra -Plan de permeabilización suelos urbanos - sistema drenaje sostenible Jardín Infiltración
8
4.transporte
1 . R e cicla bilidad
5
12 12
-regeneración paisaje del canal
0
Puntos determinantes en la elección del material
6
1] [JAi0
b soft city espacio continuo estancial de relación
7
5.montaje en obra
12
9
- definidos
6
6.uso/vida útil
] [JA01
5
2] [JAi0
5
3'.reciclaje residuos 7.matenimiento
c
4
1
3.transformación/producción 6.reutilización
] [JA02
8
a network city estructura de nudos conectados entre
1. Plan regeneración y gestión del suelo
3
2
Pr oyecto
12
b oportunidad para reforzar experiencias y
2
2.transporte
8.desmontaje
6
3
6
2
1
El nuevo eje ecológico-digital tiene como objetivo generar un espacio público continuo donde su valor reside en su capacidad de generar programas, actividades, recorridos e intereses y no en su capacidad de conectarse con otros espacios.
sí - organizados
1
(Y) Financiación
1.obtención materia prima
9.reciclaje
a INFRAESTRUCTURA DRENAJE AGUA DE LLUVIA
2. Escorrentía superficial > concentración rápida - originando
c
LBH
3] [JD0
8 4
b
3 10.transporte
Se propone una reactivación de la banda del canal incidiendo en factores de regeneración 1urbanos, 2sociales y 3ambientales.
3. ciudad
etapa con grandes emisiones CO2
c
[tejido urbano que configura un espacio público sensible]
relaciones sociales locales -nuevos espacios de encuentro -reactivación de la zona + participación ciudadana -sensibilización, aprendizaje, concienciación acerca procesos atmosféricos -espacio público tecnológico-sensible (físico-virtual)
Ciclo de vida acero
Propuesta
1. Rápido desarrollo urbano > drenaje pluviales sobrepasado
= MICROINFRAESTRUCTURA - durante periodos de intensas lluvias debido a la gran cantidad de zonas urbanas con pavimentos impermeables. Este proceso de densificación e impermeabilización de la ciudad ha dejado de lado el proceso natural que sigue el agua de lluvia a través de suelos vegetados.
11.otro uso
9
objetivo
2. internet público
Se propone el uso del acero nacional chino como material de construcción excedente de su industria, aprovechando la proximidad de las acerías para reducir las emisiones de CO2 en etapas de transporte e interviniendo en el ciclo de vida del acero desde etapas tempranas. Esto junto con el sistema constructivo propuesto - en fases y con una financiación estratificada - hace que una vez recibido el acero y de forma posterior a la vida del proyecto éste se recicle y reutilice siempre dentro de los límites de la LBH.
] [JA03
4] [JAi0
Situación actual
d
Propuesta
10
-imagen de conjunto, sin identidad propia, sienta la base de las futuras colonizaciones - financiación estratificada por fases y subfases -acceso y disfrute del espacio desde el primer momento de la intervención - elementos infraestructurales-estructurales - montaje y desmontaje en seco - construcción paticipativa de elementos vegetales de los jardines - visibilidad, seguimiento virtual y visual y concienciación sobre los procesos - transparencia del proceso constructivo
La LBH pretende solucionar a lo largo de su extensión por el gran canal el problema de inundaciones en la ciudad y la subida del nivel freático hasta niveles por encima de la calle. Se propone como estrategia una infraestructura de drenaje sostenible para la gestión de las aguas de lluvia y que permitan mejorar las condiciones de habitabilidad en el espacio público de la ciudad y mitiguen el efecto de la impermeabilización de los suelos de la ciudad. La gestión de la permeabilidad del suelo, realizada mediante sistemas de drenaje urbano sostenible de gran tamaño, tiene como objetivo la atenuación de los picos de caudal punta - para evitar daños en las desbordadas infraestructuras las ciudades - con el fin de mitigar y controlar estos problemas asociados al tiempo que el agua captada por estos sistemas se reutiliza y depura de forma sostenible.
China se ha convertido en el principal productor global de acero - de los 2.370 millones de toneladas de capacidad global (2015) China acumula 1.140 millones que, debido a su exceso de capacidad - en torno a 400 millones de toneladas anuales (cifra muy superior a la demanda interna) - se ve obligada a exportar material copando los mercados con precios artificialmente baratos.
b2
Se propone un sistema de internvención-colonización para los vacíos elegidos como zona de regeneración de la línea blanda de Hangzhou. El sistema confiere al conjunto una serie de pautas y normas homogéneas de actuación con una serie de ventajas con respecto a la construcción tradicional
regeneración del entorno del gran canal para la consolidación de un eje ecológico-digital
2.2 El método constructivo Situación actual
[V02]
futura conexión recorrido (zona norte)
El paisaje del gran canal está degradado. La evolución y crecimiento de la ciudad ha desplazado las actividades realizadas en su perímetro y ha generado zonas residuales con nula actividad.
1. ciudad
3. Gestión del agua
15
20
25
30
35
04 03 02 01
sostenibilidad
the natural & constructed scale relationship
35
连香树科
Cercidiphyllum japonicum, Katsura ā
ē
日本七叶树 30
榉树
Aesculus turbinata
Zelkova serrata
ī
25
鐵冬青
四照花
Ilex Rotunda
20
ō
Cornus Kousa
ī
ā
hoja perenne
15
10
棕榈属 Trachycarpus
5
ō
5
10
15
20
ǘ
ǔ
25
30
35
the working models
Continuidad La estructura cruza el espacio, y largos trazos rectos, intersecan conteniendo lugares dentro y debajo.
Escala y ligereza
Límites difusos
Como tronco y copa, paramentos alzados que reducen la escala de enorme y diáfano entorno.
Alrededor de un cuerpo cartesiano, aparece un entorno descontrolado, informal, impermanente; un espacio doméstico
PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU
D I G I TA L - AT MO S P H E R I C GA R D E N Hangzhou - China
Carlos DĂaz - MonĂs Barone carlosdiazmonis@gmail.com + 3 4 667 72 42 60