Digital-atmospheric garden in Hangzhou

Page 1

[JT05]

9

4

8 72

3

[JAi04]

1

12

2

[JAi01] 12

7

2

7

[JD03]

12

12

4

b

6

6 12

5 3

[JI] 5

5

72

1

12

[JAi02]

48

6

6

6

c [JD01]

[JA01]

[JA02]

[JAi03]

[JD02]

[JA03]

DIGITAL - ATMOSPHERIC GARDEN, HANGZHOU I CARLOS DÍAZ-MONÍS BARONE USP CEU I July 2016

Architecture Thesis Porfolio



work experience 2016 2014 2013

Tutor at the Master in Urban Interior Design [MUID] Madrid, Spain Nieto Sobejano Arquitectos GMBH Berlin, Germany Marsá Architecture Studio Madrid, Spain

education & workshops 2014 - 2016

Final Thesis Project at San Pablo CEU

“Digital - Atmospheric Garden in Hangzhou”

Carlos Díaz - Monís Barone Sept. 1990

carlosdiazmonis@gmail.com + 34 667 7 2 4 2 6 0

about me instagram.com/baroglio pinterest.com/carlosdiazmonis linkedin

2012

Exchange Program at Politecnico di Milano

2008 - 2014

Bachelor & Master in Architecture

2008

Nuestra Sra. Del Recuerdo School of Madri d

2014 2014 2012 2011

Sustainable Urban Regeneration Workshop - R. Plunz, Madrid San Pablo CEU-Zhejiang University Hangzhou Workshop, Hangzhou Drawing the Genius, Milano Architecture versus design - P. Eisenman, Madrid

San Pablo CEU University of Madrid, Spain

awards 2013 2013 2014

First Prize at “Temporary Artistic Spaces” Competition Madrid HM at“Arquideas International Gastronomic Center” Competition Brussels Finalist at “The Archie Cebada Community Center” Competition Madrid

publications 2012 2012 2012 2011 2011

COAM (Madrid College of Architects) + Antonio Bienvenida Gallery

Best TT3 project USP CEU Bullfighting Farming and Cuttle Rising project

TT Plazas de Toros desmontables Madrid Fusión - Cuisine Academy project at Matadero Madrid TT Cocinando Espacios languages & skills Native Spanish Advanced English Advanced Italian Basic German

AutoCAD, CypeCAD, Rhinoceros, Sketchup Adobe (Illustrator, InDesign, Photoshop) Microsoft Office (Excel, Powerpoint, Word)


[JT05]

9

4

8 72

3

[JAi04]

1

12

2

[JAi01]

7

2

7

[JD03]

12

12

4

b

6

6

5 12

5 3

[JI]

5

72

1

12

[JAi02]

12

48

6

6

6

c [JD01]

[JA01]

[JA02]

[JAi03]

[JD02]

D I G I TA L - AT MO S P H E R I C GA R D E N another way to imagine the Post-Industrial riverside of the Grand Canal Beijing - Hangzhou

Hangzhou - China

[JA03]


D I G I TA L - AT MO S P H E R I C GA R D E N post-industrial regeneration planning of abandoned areas along the Grand Canal B-Hz

production activity

decontamination visibility

MANAGEMENT PLAN OF SOIL, WATER, AIR AND DIGITAL TECHNOLOGY

The plan develops the empty and degraded areas near the Grand Canal proposing a programmatic temporal stratification that allows, adapting to the instability of the urban landscape of Hangzhou, the regeneration of the (decadent) ecological axis of the city, condensing plurality of paths and activities through its relationship with digital technology and connecting either population and the increasingly atomised functional (and less human) public space.

the concept


[AN_01]

the global framework

{of metropolitan areas and urban context in China}

main issues

1

2

+

3

+

the project

5

4

JARD�N DIGITAL-ATMOSFÉRICO

a. network of thematic public gardens + b. urban infraestructures & facilities 35

a 30

25

20

top!

S

+

15

10

5

5

10

15

20

25

30

35

40

45

+

b

global framework


[AN_02]

the global framework

{of metropolitan areas and urban context in China}

ijin g-

02

03

04

05

06

07

08

09

10

11

Gra

nC ana

l Be

01

Ha ngz hou

Quiantang delta

a1

d roa

to

ai

gh

an

Sh

a2

b1

b2

de

se

* c1

mb

oc

ad

ura

rĂ­o

Q

uia

ng

c2

c3

urban context

tan

g


[AN_03] the urban context

Hangzhou

HANGZHOU, THE RECREATIONAL GARDEN OF SHANGHAI Used to be known as the most beautiful city in the world, Hangzhou was frequented by Shanghai citizens, due to its geographical proximity, to rest and relate to the nature. Today the balance that existed between nature and historical city is over. The current city is marked by an urban structure characterized by two main axes. These axes, ecological and urban growth, are those who lead the city expansion. The urban axis has suffered a great expansion in a very short period of time. Oppositely, the ecological axis has been blurred and has lost its influence in the city.


[AN_04] the master plan

Hangzhou soft line

THE VALUE OF THE GRAND CANAL AND ITS MASTER PLAN The real value of the Grand Canal has not been recognized in the last years, especially its cultural landscape defined along the last 2,000 years, which has now turned into its carelessness and abuse. The widenings (especially in the north) have also dried up the canal and have become impassable by boat, while some areas have been reduced to industrial cesspools with persistent contamination. Hangzhou city is analyzed along the entire route of the canal due to the influence that it has on the city. Touristically influenced areas due to its historical value appear along the Canal, as well as the legacy of industrial architecture left in the city. This reality has a direct impact on the develop of the proposed master plan along the canal.


[AN_05] the diagnosis

Hangzhou soft line Yuhang

a

Yunhe new town 11.45km² sección

Gonsgchen 12.88km²

[PE01]_Construcciones recuperables

eje de actividad peatonal

área parking ferryboat

con valor: -histórico -cultural -arquitectónico

VO_01

[PE04]_Jardines preexistentes área parking coches

Gonsghu 6.35km²

Downtown

Vacío de oportunidad área: 68.863 m2

Daguan 7.06km²

Westlake

[VO.01]_Zona de actuación

Shenua 11.15km² [PE01]_Construcciones con valor:

área parking privado

-histórico -cultural -arquitectónico

punto de actividad

MAIN ISSUES 1.Instability of the urban landscape

Due to construction and demolition cycles and to a short life of buildings around 10-30 years

1 eje movilidad tráfico rodado 2 eje movilidad TNM conexión universidad Zhejiang equipamientos deportivos 2

área de actividad

[PE04]_Jardines preexistentes

rd

hipya

ahe S

_01 D

n PE

secció

área de desembarco

2. Urban nomadism & loss identity of the place

[PE01]_Construcciones recuperables

The historical legacy of the Grand Canal and the agricultural fabric have given way to architectural, stylistic and energetic low quality residencial towers. Valuable monuments and historical buildings along the Grand Canal have also been demolished, which has caused urban voids and the impoverishment of the city center.

áreas parking privados

con valor: -histórico -cultural -arquitectónico

[VO.02]_Vacío de oportunidad

sección VO_02

Posible ampliación área: 44.544 m2 museo 2

parada ferrybus

plaza Xihu

3. Out of scale growth of city and population

eje de actividad peatonal

[PE01]_Construcciones recuperables con valor: -histórico -cultural -arquitectónico

This is the origin of the overall failure of the city: - resources, infrastructure and buildings - industrial displacement out of the G.C. - transport and urban mobility & increased air pollution - densification residential areas

museo 1

[PE05 ]_Recorridos temáticos plan general. Histórico, cultural, turístico.

punto de actividad

[VO.03]_Vacío de oportunidad

calle histórica conservada

Posible ampliación área: 34.712m2

equipamientos deportivos 1

[PE04]_Jardines preexistentes

4. Fragmentation and segregation of public space

sección VO_03

eje movilidad tráfico rodado

área parking privado

ón

cci

se

área parking privado

[PE04]_Jardines preexistentes

área degradada por la actividad

[PE04]_Jardines preexistentes

[PE01]_Construcciones recuperables con valor: -histórico -cultural -arquitectónico

[VO.04]_Vacío de oportunidad

parada ferrybus

punto de actividad

área histórica-calle Xiaohezhijie

Posible ampliación 150642m2 a'

eje de actividad peatonal

action area of the Grand Canal at Gongshu district

eje movilidad tráfico rodado

4

_0

VO

Public spaces have been replaced by new technologies while increasing efficiency, focused on satisfying mobility needs.This causes a balance -loss between city & nature and excessive zoning, where infrastructures are segregating public space.


[AN_06] the intervention

Vo i d t o v o i d Yuhang Yunhe new town 11.45km²

Gonsgchen 12.88km²

Gonsghu 6.35km²

Downtown

[PEC01]_Conservación Construciones con valor: -histórico -cultural -arquitectónico

E.J.01 P.F.01

[PEA04 ]_Ampliación Jardines preexistentes

D.P.01

Daguan 7.06km²

Westlake

P.F.02

Shenua 11.15km²

THE PROPOSAL

[ZI.01] _Zona de actuación área: 353.710m2 nuevo uso

1. Green areas network. Atmospheric & digital gardens

área de equipamientos culturales Investigación Tratamiento natural Red pedagógica

[PEC01]_Conservación Construciones con valor: -histórico -cultural -arquitectónico

- continuos public space in connection with the Canal and city - naturalization and permeabilization of urban soils - atmospheric and digital bubble- improved weather conditions, communication and digital accessibility - catalogue of architectural preexistences

D.P.02

[PEA04 ]_Ampliación Jardines preexistentes

D.P.03

[PEC01]_Conservación Construcciones con valor -histórico -cultural -arquitectónico

2. Dotacional network

- leisure, rest and gastronomy network - educational, productive and connective network - research, art and natural treatment facility buildings

[ZI.02] _Zona de actuación área: 183.974m2 nuevo uso: Jardín público Red pedagógica

P.F.03 [PEC01]_Conservación Construcciones con valor: -histórico -cultural -arquitectónico

3. Management and exhibition centres

P.A.01

- overall atmospheric & digital gardens coordination - management and maintenance of wireless networks - coordination interactivity - screens and applications

Parking en altura

E.J.02

plaza Xihu

4. Open source programs

E.J.03

[DZI.03] _Zona de actuación área: 220.598m2 nuevo uso huerto productivo y lúdico red docente y de investigación

5. Educational structures network

D.P.04

- educational collaboration between colleges and universities -workshops and classrooms related to gardens (landscape, natural treatment, air pollution, technological)

D.P.05

[PEA04 ]_Ampliación Jardines preexistentes

[PEA04 ]_Ampliación Jardines preexistentes

[PEC01]_Conservación Construcciones con valor: -histórico -cultural -arquitectónico

P.F.04

EJ E O

IC G

LÓ O a lo o

rg

la

área de reciclaje digital y natural Red pedagógica

EC

[ZO.04] _Zona de intervención área: 329.795m2 nuevo uso

- collaborative management models & virtual workshops - exchange ideas platforms &- relational platforms between residents

al

an

lc

de

urban intervention - occupation of urban voids and continuity of public space


[AN_05] the diagnosis [V01]

Integrated voids

[V02]

[V03]

[V04]

[ZI.01]

[ZI.02]

[ZI.03]

[ZI.04]

Cultural facilities, research and natural treatment and educational network area

Public Garden and educational network area

Productive and recreational orchard & educational and research network area

Digital and natural recycling and educational network area

[Z.I.01]_Intervention area [353.710m²]

urban void new use: cultural building + research + natural treatment + educational area applied plan: [VO] = [ZI] public garden area: 113.634m² pedestrian area: 19.425m² infiltration garden: 18.836m² atmospheric garden: 69.346m²


[IM_01] 背景

las fases

P a s o

a

p a s o

[AR_01] the system

A different concept of urban plot

VACÍO OPORTUNIDAD > ZONA ACTUACIÓN

05

04 03 02 01

imagen

THIS IS FOR AD

Vallado publicitario - Ciudad Lienzo

Vallado perimetral -exclusión del espacio en la ciudad

TYPICAL HANGZHOU´S CONSTRUCTION SITE - CONSTRUCTION SYSTEM PROPOSED [capaz de generar actividades mientras se construye]

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU


[AR_02] the proposal [ARQ_02]

Digital - atmospheric garden la propuesta

背景

E l

j a r d í n

d i g i t a l - a t m o s f é r i c o

R

b

a

[ZI.01] Área de equipamientos culturales, de investigación y tratamiento natural+Red pedagógica

Tres planos se superponen (dos para el hombre,uno para la atmósfera: · el suelo, genera recorridos libres con pequeñas plataformas que hacen más 'vivible' la topografía de la parcela · el elevado , de recorridos más controlados · la cubierta , generadora de umbrales

Estrategias arquitectónicas de ocupación Intentando huir de la clásica forma de construir en la ciudad, donde el espacio se cerca con vallas publicitarias (se convierte en solar en construcción) que provocan una segregación constante del espacio público (debido al alto grado de ciclos construcción-destrucción: 2004-2006 1.3 millones m² demolidos y a una vida media de las construcciones de 10-30 años) y una ciudad superpuesta a la existente (la ciudad lienzo con fines económicos), el proyecto se concibe desde la superposición tanto temporal como programática y se va construyendo a diferentes ritmos. Es capaz de habitarse desde el primer momento y formar parte del tejido urbano generando actividades y programas al tiempo que se construye.

Tras la aparición de los jardines se incorporan 3 cuerpos diferenciados según su pograma: Media Art Center[MAC], Centro de Arte Digital e Interactividad [CAD], Centro de Tratamiento Natural [CTN] y un pequeño módulo independiente para la parada de ferry.

N

0

10

50

escala 1.1000

Se parte de lo existente en las fases anteriores (Jardines) entendiéndolo como preexistencia susceptible de ser habitada. Así se incorporan plataformas (a) y cubiertas (b) .

100m

Plano de actuación en VO1 Planta de cubiertas

Los jardines, conexión entre programas

Las cubiertas, protegiendo a sus 'inquilinos'

[JT05 ] Jardín de tierra 10.200m² HAFS 10 50m² (2m²/h -e)

32

CA

33

34

CB

35

[CTN] Ce Tratam ntro ien Natural to 950m²

CD CE CF

CA CB CD

paulo wnia tomentosa plantación 1.

CG

5 x 3m 1000m² 253 uds

CH

CE CF

[JAi04]

CI

CG

CJ

CH

CK

CI

CL

CJ

CM

CK

CN

CL

CO

CM

CP

CN

CQ

CO

CR

CP

CS

[JAi02] Jardín de aire

[JAi01] Jardín de aire

02

03

04

6 infraestructura depuradora aire 3 plantación oxigenante 5.715m² 05 06

[JA02] Jardín de agua

07

08

09

3 infraestructura depuradora aire 1plantación oxigenante 4.410m²

10

11 12

13

14

FMF 830m² HAFS 1.440m² HAFSS 1.350m² 9.021m²

15

16

17

18

[JAi03] Jardín de aire

DA

CT aire 7 infraestructura depuradora 3plantación oxigenante 7.528 m²

DB

19

20

DC

21

23

24

25

26

27

28

DC

CS

DD

CT

DE

DE

32

DF

plaza

DB

CR

22

DD

Fase 1. JT.

DA

CQ

AA

35

Fase 1. JT.

70% área HAFS 1170 permeable m² (2m² /h-e)

AB

DF

33

plaza pública digital 34 1.235m²

[JI] Jar dín infiltraci de ón 8.841m²

AA

área de exposiciones

AB

AC

Fase 1. JT.

AD

AC

Fase 1. JT.

HAFS

área de exposiciones área de eventos AE

paulownia tomentosa

paulownia tomentosa

plantación - bosque productivo 1 x 1 m 230m²

plantación - bosque oxigenante 1.5 x 3m 790m²

AD

[JD03]

Fase 1. JT.

Fase 1. JT.

AF

pabellón abierto

pabellón abierto

AE AF

[CAD] Centro Arte Digital 4.100m²

AG

06

AH

AH

05

AI

AI

AJ

AJ

AG

carga y descarga material

HAFSS

AK

AM a AN

Fase 1. JT.

FMF

FMF

AP

HAFS

AQ AR

AS

AS

AT

AT

AU

AU

AV

AV

AW

AW

AX

AX

AY

[JA02]

BB

BB

BC

02

03

04

05

07

06

09

10

11 12

FMF 1.116m² HAFS 1.742m² HAFSS 638m² 9.750m²

5 pantalla LED 1 proyector 3.608m² 13

14

15

16

[JA03]

[JA03] Jardín de agua BD

[JD02_03] Jardín digital

218m²

FMF 326m² HAFSS 857m² 1.940 m²

08

HAFSS

BC

Ferry Station

[JD01 Jardín digital [JA01] Jardín de agua 3 pantalla LED 1 proyector 1.930m²

FMF

AZ BA

2 pantalla LED

FMF

AY

[JA01]

AZ BA

[JD] Jardín digital 720m²

arquitectura

AO

AR

BD

01

AN paulownia tomentosa plantación - bosque

lúdico 6 x 3m 410m²

AP

ex-área industrial [almacén naves] 3.300 m²

02

AM a'

aula proyecciones

AQ

[PE_comercial] área comercial revitalizada

03

AL

AO

centro comercial

04

AK

AL

17

18

19

20

21

22

23

24

25

26

27

28

[VU] VACÍO URBANO 79.482 m²

Zona de actuación vegetación purificadora 01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

[PE_comercial] ZONA EX-INDUSTRIAL

cota +20.20m cota +17.20m cota +15.40m

Edificios pre-existentes Naves industriales >> centro comercial 5.525m²

6 infraestructura depuradora aire

[JD01 Jardín digital 1.930m²

3 plantación oxigenante 5.715m²

[MAC] Media Art Center

[JAi01] Jardín de aire

[CTN] Centro Tratamiento Natural [CAD] Centro Arte Digital

[PE_res] ZONA RESIDENCIAL

Edificios pre-existentes. altos bloques de viviendas

cota +20.20m cota +17.20m cota +15.40m cota +9.20m

cota +9.20m cota +4.70m

cota +4.70m

V07 vía tráfico rodado perimetral

[JD] Jardín digital 720m²

t n 01

- FMF

V06 vía tráfico rodado perimetral - ancho vía 9.70m conexión ferry station

[JAi02] Jardín de aire 4.410m²

[JA02] Jardín de agua [JA01] Jardín de agua 1.940 m²

9.021m²

[JAi03] Jardín de aire 7.528m²

[JD02_03] Jardín digital 3.608m²

ARCHITECTONIC STRATEGIES FOR OCCUPATION The project proposes to escape to the classical way of building, where lots are fenced with billboards (becoming construction sites) and cause a constant segregation of public space also due to the intensive constructiondemolition cycles: in 2004-06 period,1,3m m² were demolished. The proposal conceives a temporal and programmatic overlap, being built at different rhythms. Therefore the implementation permits the use of the space since the beginning generating activities and programs inside the public space while continues developing further steps. PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

- ancho vía 9.70m logística y aparcamiento lineal


[AR_03] [ARQ_04]

la propuesta 背景 the proposal E l

j a r d í n

d i g i t a l - a t m o s f é r i c o

Digital - atmospheric garden [ARQ_04] 背景 E l

j a r d í n

a

2

12

6

1 7

9

12

3

b

2

1 7

[JAi02]

5

6 6

5 12

[JD01] 12

5 [JA01] 12

c

9

Leyenda

[JAi04]

nuevo perímetro canal área tratamiento primario, secundario, perímetro parcela terciario del agua pavimento preexist impermeable cultivos fitorremediadores viga canal zona ajardinada pavimento impermeable jardín infiltración escorrentía superfcial humedal artificial flujo horizontal pórtico lineal 1m subsuperficial

1 2 7 4

pórtico 3m cultivos lineal fitorremediadores

recorrido acceso principal zona ajardinada

[JD03] 8 [JAi04]

área plantación jardín infiltración oxigenante escorrentía superfcial arbolado protección viento nuevo perímetro canal zona tratamiento ajardinada primario, secundario, área terciario del aguaescorrentía superfcial jardín infiltración cultivos fitorremediadores proyección zona ajardinada pantalla led

1 6 2 7 6 [JD02] [JD03]

5 [JA02]

8

3

[JI]

12

zona ajardinada jardín infiltración escorrentía superfcial

[JT05]

11

12

3 4

N

12

12

[JAi01] 12

cultivos fitorremediadores

3

[JI]

6

6 6

c

5

4

humedal artificial flujo horizontal subsuperficial

d i g i t a l - a t m o s f é r i c 4o

[JAi02]

12

pavimento preexist impermeable viga canal

la propuesta

a 5

perímetro parcela

pavimento impermeable

11 [JAi01]

Leyenda

[JT05]

12 [JAi03]

espacio cubierto escorrentía superfcial jardín infiltración

c

pórtico lineal 1m punto visualización según malla LED pórtico lineal 3m plaza digital recorrido acceso principal zona ajardinada área plantación oxigenante zona comercial

[JA03]

arbolado protección viento

6

zona ajardinada jardín infiltración escorrentía superfcial

0

escala 1.600

10

20

b

30

6

40

50

100m

proyección pantalla led

Alzado de actuación en V01

espacio cubierto

c

punto visualización según malla LED plaza digital

[JD01]

N

0

escala 1.600

10

20

30

40

[JA01]

[JA02]

zona ajardinada

[JA03]

[JD02]

[JAi03]

50

zona comercial

100m

Alzado de actuación en V01

07 06 05

04 03 02 01 07

arquitectura

[VU] VACÍO URBANO

06 05

79.482 m² Zona de actuación vegetación purificadora

04 03 01

02

03

05

04

06

07

08

09

10

11 12

13

15

14

16

17

18

19

20

21

22

23

24

25

26

28

27

[PE_res] ZONA RESIDENCIAL

[PE_comercial] [VU] VACÍO URBANO

ZONA EX-INDUSTRIAL [JD01 Jardín digital

[JAi01] Jardín de aire

Edificios pre-existentes Naves industriales >> centro comercial 5.525m ²

02

03

05

04

06

07

08

09

[CAD] Centro Arte Digital

Ferry Station

[MAC] Media Art Center

01

[CTN] Centro Tratamiento Natural

79.482 m² Zona de actuación vegetación purificadora

1.930m²

6 infraestructura depuradora aire 3 plantación oxigenante 5.715m²

Edificios pre-existentes. altos bloques de viviendas

10

11 12

13

15

14

16

17

18

19

20

21

22

23

24

25

26

28

27

[PE_res] ZONA RESIDENCIAL

[PE_comercial] ZONA EX-INDUSTRIAL

Edificios pre-existentes. altos bloques de viviendas

[JD01 Jardín digital

[JAi01] Jardín de aire

Edificios pre-existentes Naves industriales >> centro comercial 5.525m ²

[CTN] Centro Tratamiento Natural

1.930m²

6 infraestructura depuradora aire 3 plantación oxigenante 5.715m²

[CAD] Centro Arte Digital Ferry Station

[MAC] Media Art Center [JD] Jardín digital 720m²

[JAi02] Jardín de aire

V06 vía tráfico rodado perimetral

t n 0 1 - FMF

4.410m²

- ancho vía 9.70m conexión ferry station

[JAi03] Jardín de aire

[JA02] Jardín de agua

[JD02_03] Jardín digital

7.528m²

9.021m²

V07 vía tráfico rodado perimetral

3.608m²

- ancho vía 9.70m logística y aparcamiento lineal

[JA01] Jardín de agua

1.940 m² 36,2

01

6,2

02

4,7

03

13,2

04

2,5

18,8

05 06

[JD] Jardín digital

27,5

07

08

7,4

15

09

10

1,6

17,6

11 12

14,8

13

22,9

14

9,2

16

10,6

17

8,3

18

9,8

19

9,4

20

15,6

21

7,4

22

7,4

23

12,5

24

15,1

25

[JAi03] Jardín de aire

[JA02] Jardín de agua

4.410m²

- ancho vía 9.70m conexión ferry station

15,4

15

[JAi02] Jardín de aire

V06 vía tráfico rodado perimetral

t n 0 1 - FMF

720m²

12,2

26

26,4

9

27

28

11

30

29

[JD02_03] Jardín digital

7.528m²

9.021m²

7,7

V07 vía tráfico rodado perimetral

3.608m²

- ancho vía 9.70m logística y aparcamiento lineal

[JA01] Jardín de agua

1.940 m² 36,2

01

6,2

02

4,7

03

13,2

04

2,5

05 06

18,8

27,5

07

12,2

7,4

15

1,6

17,6

14,8

22,9

15,4

9,2

10,6

8,3

9,8

9,4

15,6

7,4

7,4

12,5

It is able to being inhabited from the beginning and become part of the urban fabric generating activities and PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 programs while being built. After the appearance of the gardens three different bodies are incorporated by pogram: Media Art Center [MAC], Center for Digital Art and Interactivity [CAD] Natural Treatment Center [CTN] and a small separate module for the ferry stop. It starts from what exists in previous phases (gardens) considering a potential pre-existence of habitability. Thus PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 platforms (a) and covers (b) are incorporated. 08

09

10

11 12

13

14

15

16

17

18

19

UNIVERSIDAD SAN PABLO CEU

UNIVERSIDAD SAN PABLO CEU

20

21

22

23

24

15,1

25

7,7

26

26,4

9

27

28

11

29

30

02 01

arquitectura


[AR_04] the proposal

The gardens

Recovery infrastructure for contaminated soils

Grand Canal depuration and recycling infrastructure

Air decontamination and environmental comfort infrastructure

Accessibility, recycling and digital communication infrastructure

PHASE 1 [JT]

PHASE 2 [JA]

PHASE 3 [JAi] Air garden

PHASE 4 [JD]

esquema - tipo jardín de agua

I

Di g i t a l sección cc'

a b u j u r

pórticos infraestructurales

b

b2

pórticos infraestructurales cubierta - umbral sección dd'

sección bb'

The decontaminating infrastructure continues to grow and the canal water becomes part of the purification process. These gardens are understood as an extension of the wetland landscape, characteristic of the city. Phytoremediation water plants and different type of filters will be settled to stimulate the water cleaning process. This water will be recicled and used in forthcoming phases for programatic needs.

The garden grows, evolves.

If not seen, it does not exist. Visibility.

B

pórticos infraestructurales

u

B

b2

j a

*

[JD**]

[JA**]

B

o s f é At m

FMF

[JA**]

r

r

u B

Hangzhou SOFT LINE grows out of its roots: land gardens generate a plant tissue located in the postbrownfields that have appeared along the Grand Canal. With the decontamination of soil considered as a landscape regeneration, creates a network of productive, ludic, educational and leasable urban gardens that, along with its associated programs, constitute the soil garden.

a FMF

plaza

u

sección aa'

c1

b

d2

canales infraestructurales

b

r

r c

b2

j a

d1

o s f é At m

r

o s f é At m

d3

u

i c a I

bh h

[JT**]

HAFS

i c a I

d1

u

h

j a

i c a I

I

c

esquema - tipo jardín digital

esquema - tipo jardín de aire

I

d2

h

b1

Digital garden

b1

d_ac

r

esquema - tipo jardín de tierra

b1

Water garden

u

b1

b HAFSS

Soil garden

The dangerously polluted air of the city, is filtered through the air gardens: is where purification processes are carried out through different plantations (oxygenating and capturing PM) and electrostatic filters + condensers for improving climate comfort. The result provides a public elevated garden with walkways over the continuous growing vegetation.

The digital garden is addressed to make evident the decontaminating processes that are produced in the previous gardens associated to other programs. It is a tool for visibility, connectivity and accessibility to digital / virtual window. Connects people and interests while responsible for activating the public space with screens, projections and wireless networks.


[AR_05] the proposal

The gardens objetivos huerto lúdico, huerto docente

paisaje urbano productivo - fitorremediación

talleres virtuales participativos

jardín público

8

perímetro parcela pavimento preexist impermeable viga canal

b1

pavimento impermeable

10

humedal artificial flujo horizontal subsuperficial cultivos fitorremediadores

h

b social

zona ajardinada

-contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza

jardín infiltración escorrentía superfcial

h

d1

bh

10

h

d3

[JT**]

1 área eventos 2 área exposiciones 3 enfermería 4 aula proyecciones 5 pabellón abierto 6 plaza 7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento

c

d2

b2

a atmosférico -activación espacio público (desde inicio de plan) -descontaminación suelo urbano degradado -regeneración paisaje canal -permeabilización suelo urbano -consolidadción tejido urbano (línea blanda Hangzhou)

Leyenda

natural) b centro comercial * parcela sin datos conocidos

2

O2

naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes

CO

R

R

humedales de regeneración agua del canal, pluvial, residual y de uso doméstico {en parcelas libres adyacentes a canal}

objetivos

centro de tratamiento natural y mecánico de agua

a atmosférico -descontaminación agua canal -disminución fangos (olores,enfermedades) -mejora calidad agua -reciclaje agua -permeabilización suelo urbano -ampliación biodiversidad canal

Leyenda área descontaminación agua del canal

b1

viga canal nuevo perímetro canal

d_ac

d2

c

área tratamiento primario, secundario, terciario del agua cultivos fitorremediadores

HAFS

b social

zona ajardinada

d1

FMF

b HAFSS

a FMF

c1

-contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza

jardín infiltración escorrentía superfcial

[JA**]

*

13 aula móvil a guardería (convenio clases tratamiento

Leyenda

O2

área descontaminación agua del canal

pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía

NO

plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo

3

2

NO

CO

x

natural) * acceso mercancías canal

objetivos

materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación

a atmosférico -mejora calidad aire -microclima en burbuja atmosférica -mayor confort climático conexión ciudad-canal -reducción afecciones respiratorias

pórtico lineal 1m pórtico lineal 3m b1

recorrido acceso principal

b social

área plantación oxigenante

-ampliación espacio público -tejido público no privativo -red lúdica junto a naturaleza

arbolado protección viento zona ajardinada jardín infiltración escorrentía superfcial

[JA**] b2

12 plataforma formativa a guardería (convenio clases tratamiento natural)

R

Leyenda área descontaminación agua del canal proyección pantalla led b1

espacio cubierto punto visualización según malla LED plaza digital zona ajardinada zona comercial

plaza

[JD**] b2

11 punto de visualización pantalla a guardería (convenio clases tratamiento natural) b espacio comercial activado c acera de visualización

red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online

pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental

paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales

red de reciclaje de desechos digitales

objetivos

a atmosférico -visibilidad procesos atmosféricos -concienciación acerca de los procesos

b social -visibilidad procesos ciudadanos -nuevas zonas encuentro, intercambio ideas -programas código abierto -red virtual y digital

c tecnológico -mejora y aumento superficie conectividad -nueva accesibilidad digital -integración de plataformas digitales


[AR_05] the proposal

The gardens

huerto lúdico, huerto docente

paisaje urbano productivo - fitorremediación

talleres virtuales participativos

jardín público

Leyenda 8

perímetro parcela pavimento preexist impermeable viga canal

b1

pavimento impermeable

10

humedal artificial flujo horizontal subsuperficial cultivos fitorremediadores

h

zona ajardinada jardín infiltración escorrentía superfcial

h

d1

bh

10

h

d3

[JT**]

1 área eventos 2 área exposiciones 3 enfermería 4 aula proyecciones 5 pabellón abierto 6 plaza 7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento

c

d2

b2

natural) b centro comercial * parcela sin datos conocidos

2

O2

naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes

CO

R

R

humedales de regeneración agua del canal, pluvial, residual y de uso doméstico {en parcelas libres adyacentes a canal}

centro de tratamiento natural y mecánico de agua

Leyenda área descontaminación agua del canal

b1

viga canal

objetivos

nuevo perímetro canal

d_ac

d2

c HAFS huerto lúdico, huerto docente

paisaje urbano productivo - fitorremediación

talleres virtuales participativos

d1

perímetro parcela

a FMF

c1

pavimento preexist impermeable

FMF

cultivos fitorremediadores zona ajardinada

a atmosférico

jardín público

-activación espacio público (desde inicio de plan) -descontaminación suelo urbano degradado -regeneración paisaje canal -permeabilización suelo urbano -consolidadción tejido urbano (línea blanda Hangzhou)

jardín infiltración escorrentía superfcial

b HAFSS

Leyenda

área tratamiento primario, secundario, terciario del agua

[JA**]

viga canal pavimento impermeable

*

humedal artificial flujo horizontal subsuperficial cultivos fitorremediadores

13 aula móvil a guardería (convenio clases tratamiento natural) * acceso mercancías canal

jardín infiltración escorrentía superfcial

Leyenda

O2

área descontaminación agua del canal pórtico lineal 1m pórtico lineal 3m recorrido acceso principal

b1

1 área eventos 2 área exposiciones 3 enfermería 4 aula proyecciones 5 pabellón abierto 6 plaza 7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento

zona ajardinada

[JA**] b2

12 plataforma formativa a guardería (convenio clases tratamiento natural)

Leyenda

2

O2

naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes

CO

R

humedales de regeneración agua del canal, pluvial, residual y de uso doméstico b1 {en parcelas libres adyacentes a canal}

R

centro de tratamiento natural y mecánico de agua

área descontaminación agua del canal proyección pantalla led espacio cubierto punto visualización según malla LED plaza digital

Leyenda

zona ajardinada zona comercial plaza

viga canal área tratamiento primario, secundario, terciario del agua cultivos fitorremediadores zona ajardinada jardín infiltración escorrentía superfcial

13 aula móvil

NO

arbolado protección viento

jardín infiltración escorrentía superfcial

R

nuevo perímetro canal

materialidad descontaminante y elementos constructuvos

-contacto comunidades reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y intereses similares energía en fabricación -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza

área plantación oxigenante

natural) b centro comercial * parcela sin datos conocidos

área descontaminación agua del canal

pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía

x

b social

plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo

3

2

NO

CO

zona ajardinada

[JD**]

PHASE 1. [JT] Soil garden

b2

red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online

pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental

objetivos

a atmosférico -descontaminación agua canal -disminución fangos (olores,enfermedades) -mejora calidad agua -reciclaje agua -permeabilización suelo urbano -ampliación biodiversidad canal

11 punto de visualización pantalla a guardería (convenio clases tratamiento natural) b espacio comercial activado c acera de visualización

b social -contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza

paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales

red de reciclaje de d


huerto lúdico, huerto docente

paisaje urbano productivo - fitorremediación

talleres virtuales participativos

jardín público

Leyenda 8

perímetro parcela pavimento preexist impermeable viga canal

b1

pavimento impermeable

10

humedal artificial flujo horizontal subsuperficial cultivos fitorremediadores

h

zona ajardinada jardín infiltración escorrentía superfcial

h

d1

[AR_05]

bh

huerto lúdico, huerto hdocente

paisaje urbano productivo - fitorremediación

d3

Leyenda

[JT**]

talleres virtuales participativos

c

the proposal

d2

b2

perímetro parcela

10

The gardens

pavimento preexist impermeable viga canal

objetivos

a atmosférico

jardín público

1 área eventos 2 área exposiciones 3 enfermería 4 aula proyecciones 5 pabellón abierto 6 plaza 7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento natural) b centro comercial * parcela sin datos conocidos

pavimento impermeable

-contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza

viga canal nuevo perímetro canal

jardín infiltración escorrentía superfcial

área tratamiento primario, secundario, terciario del agua

d_ac

d2

c

cultivos fitorremediadores

HAFS

zona ajardinada

d1

a FMF

c1

FMF

jardín infiltración escorrentía superfcial

b HAFSS

1 área eventos 2 área exposiciones 3 enfermería 4 aula proyecciones 5 pabellón abierto 6 plaza 7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento

centro de tratamiento natural y mecánico de agua

uso doméstico {en parcelas libres adyacentes a canal}

b social

área descontaminación agua del canal

b1

2

Leyenda

zona ajardinada

O2

naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes

CO

R

humedal artificial flujo horizontal subsuperficial cultivos fitorremediadores

-activación espacio público (desde inicio de plan) -descontaminación suelo urbano degradado -regeneración paisaje canal -permeabilización suelo urbano -consolidadción tejido urbano (línea blanda Hangzhou) R humedales de regeneración agua del canal, pluvial, residual y de

[JA**]

*

13 aula móvil a guardería (convenio clases tratamiento

Leyenda área descontaminación agua del canal

pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía

NO

plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo

3

2

O2

NO

CO

natural) b centro comercial * parcela sin datos conocidos

x

natural) * acceso mercancías canal

materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación

pórtico lineal 1m pórtico lineal 3m recorrido acceso principal

b1

2

O2

naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes

CO

R

R

humedales de regeneración agua del canal, pluvial, residual y de uso doméstico {en parcelas libres adyacentes a canal}

centro de tratamiento natural y mecánico de agua

objetivos

área plantación oxigenante arbolado protección viento zona ajardinada

a atmosférico

jardín infiltración escorrentía superfcial

-descontaminación agua canal -disminución fangos (olores,enfermedades) -mejora calidad agua -reciclaje agua -permeabilización suelo urbano -ampliación biodiversidad canal

Leyenda [JA**]

área descontaminación agua del canal

b2

viga canal nuevo perímetro canal

12 plataforma formativa a guardería (convenio clases tratamiento

área tratamiento primario, secundario, terciario del agua

natural)

cultivos fitorremediadores

R

zona ajardinada Leyenda

jardín infiltración escorrentía superfcial

área descontaminación agua del canal proyección pantalla led b1

espacio cubierto punto visualización según malla LED plaza digital

red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online

pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental

b social

-contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza

zona ajardinada zona comercial plaza

[JD**] b2

11 punto de visualización pantalla a guardería (convenio clases tratamiento

13 aula móvil a guardería (convenio clases tratamiento

natural) b espacio comercial activado c acera de visualización

Leyenda área descontaminación agua del canal pórtico lineal 1m pórtico lineal 3m recorrido acceso principal área plantación oxigenante arbolado protección viento zona ajardinada jardín infiltración escorrentía superfcial

12 plataforma formativa

O2

plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo

pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía

NO

2

3 NO

CO

x

natural) * acceso mercancías canal

materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación

PHASE 2. [JA] Wa t e r g a r d e n

objetivos

a atmosférico -mejora calidad aire -microclima en burbuja atmosférica -mayor confort climático conexión ciudad-canal -reducción afecciones respiratorias

b social -ampliación espacio público -tejido público no privativo -red lúdica junto a naturaleza

paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales

red de reciclaje de


7 carga/descarga material 8 huerto docente 9 huerto alquiler 10 ampliación jardines zonas residenciales a guardería (convenio clases tratamiento

* parcela sin datos conocidos

O2

natural) b centro comercial * parcela sin datos conocidos

naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes

2 CO

R

R

humedales de regeneración agua del canal, pluvial, residual y de uso doméstico {en parcelas libres adyacentes a canal}

centro de tratamiento natural y mecánico de agua

Leyenda área descontaminación agua del canal

b1

viga canal nuevo perímetro canal

cultivos fitorremediadores

c1

Leyenda

a atmosférico -descontaminación agua canal -disminución fangos (olores,enfermedades) -mejora calidad agua -reciclaje agua -permeabilización suelo urbano -ampliación biodiversidad canal

the proposal

*

viga canal

objetivos

[AR_05]

[JA**]

área descontaminación agua del canal

centro de tratamiento natural y mecánico de agua

The gardens

nuevo perímetro canal

13 aula móvil a guardería (convenio clases tratamiento natural) * acceso mercancías canal

área tratamiento primario, secundario, terciario del agua

CO

2

cultivos fitorremediadores

O2

Leyenda

zona ajardinada

plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo

b social

pórtico lineal 3m recorrido acceso principal

b1

materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación

-contacto comunidades intereses similares -ampliación espacio público -tejido público no privativo -red dotacional - educativo -red lúdica junto a naturaleza

área descontaminación agua del canal pórtico lineal 1m

jardín infiltración escorrentía superfcial

pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía

x

humedales de regeneración agua del canal, pluvial, residual y de uso doméstico {en parcelas libres adyacentes a canal} a FMF FMF

jardín infiltración escorrentía superfcial

NO

R

b HAFSS

2 CO

O2

naturalización de los límites del canal paisaje flotante depurativo en el borde del canal introducción especies depuradoras flotantes

d1

3

HAFS

zona ajardinada

R

NO

c

área tratamiento primario, secundario, terciario del agua

d_ac

d2

área plantación oxigenante arbolado protección viento zona ajardinada jardín infiltración escorrentía superfcial

[JA**] b2

12 plataforma formativa a guardería (convenio clases tratamiento natural)

13 aula móvil a guardería (convenio clases tratamiento

R

natural) * acceso mercancías canal

red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online

Leyenda

pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental

área descontaminación agua del canal proyección pantalla led

Leyenda

O2

área descontaminación agua del canal

NO

pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental plaza frente a viento protección captación recursos del aire para su aprovechamiento - agua + energía

x

b1

plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo

3

2

NO

CO

materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación

espacio cubierto punto visualización según malla LED plaza digital zona ajardinada

b2

pórtico lineal 3m 11 punto de visualización pantalla a guardería (convenio clases tratamiento

recorrido acceso principal

natural) b espacio comercial activado c acera de visualización

área plantación oxigenante

a atmosférico -mejora calidad aire -microclima en burbuja atmosférica -mayor confort climático conexión ciudad-canal -reducción afecciones respiratorias

zona comercial

[JD**]

pórtico lineal 1m

objetivos

b social -ampliación espacio público -tejido público no privativo -red lúdica junto a naturaleza

arbolado protección viento zona ajardinada jardín infiltración escorrentía superfcial

12 plataforma formativa a guardería (convenio clases tratamiento natural)

R

Leyenda

red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online

pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental

paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales

área descontaminación agua del canal proyección pantalla led espacio cubierto punto visualización según malla LED plaza digital zona ajardinada zona comercial

11 punto de visualización pantalla a guardería (convenio clases tratamiento natural)

red de reciclaje de desechos digitales

objetivos

a atmosférico -visibilidad procesos atmosféricos -concienciación acerca de los procesos

b social

PHASE 3. [Ja] Air garden

-visibilidad procesos ciudadanos -nuevas zonas encuentro, intercambio ideas -programas código abierto -red virtual y digital

c tecnológico -mejora y aumento superficie conectividad -nueva accesibilidad digital -integración de plataformas digitales

paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales

red de reciclaje de d


O2

Leyenda

natural) * acceso mercancías canal

plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo

área descontaminación agua del canal

pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos del aire para su aprovechamiento - agua + energía

3

2

13 aula móvil a guardería (convenio clases tratamiento

NO

CO

NO x

* acceso mercancías canal

materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación

pórtico lineal 1m pórtico lineal 3m recorrido acceso principal

b1

área plantación oxigenante

Leyenda

O2

plantación especies vegetales sumidero de contaminantes jardín público oxigenante+reducción pm10, pm2.5 bosque productivo

área descontaminación agua del canal

pantallas vegetales y mecánicas de confort ambiental paisaje vegetal elevado técnicas higrométricas de confort ambiental protección frente a viento captación recursos [JA**] del aire para su aprovechamiento - agua + b2 energía

3 NO

2

NO x

arbolado protección viento

CO

materialidad descontaminante y elementos constructuvos reutilizables, reciclables, revalorizables o reciclados acabados fotocatalíticos y materiales con baja emisión de co2 y energía en fabricación

[AR_05]

pórtico lineal 3m

a atmosférico -mejora calidad aire -microclima en burbuja atmosférica -mayor confort climático conexión ciudad-canal -reducción afecciones respiratorias

the proposal

The gardens

pórtico lineal 1m

objetivos

zona ajardinada jardín infiltración escorrentía superfcial

12 plataforma formativa a guardería (convenio clases tratamiento natural)

recorrido acceso principal

b social

área plantación oxigenante

R

arbolado protección viento

red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online

Leyenda

zona ajardinada

-ampliación espacio público -tejido público no privativo -red lúdica junto a naturaleza

pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental

área descontaminación agua del canal proyección

jardín infiltración escorrentía superfcial

pantalla led b1

espacio cubierto punto visualización según malla LED plaza digital zona ajardinada zona comercial

plaza

[JD**] b2

11 punto de visualización pantalla a guardería (convenio clases tratamiento natural) b espacio comercial activado c acera de visualización

12 plataforma formativa a guardería (convenio clases tratamiento natural)

R

Leyenda

red de conexión digital {abierta al público} wifi*bluethooth*fibra óptica*multiconexión acceso a información, plataformas, cursos y actividades online

pantallas expositivo-comunicativas activación del espacio público visibilidad procesos atmosféricos, de depuración y programáticos de los jardines concienciación ambiental

paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales

área descontaminación agua del canal

red de reciclaje de desechos digitales

objetivos

a atmosférico -visibilidad procesos atmosféricos -concienciación acerca de los procesos

b social -visibilidad procesos ciudadanos -nuevas zonas encuentro, intercambio ideas -programas código abierto -red virtual y digital

proyección pantalla led espacio cubierto punto visualización según malla LED plaza digital

c tecnológico -mejora y aumento superficie conectividad -nueva accesibilidad digital -integración de plataformas digitales

zona ajardinada zona comercial

11 punto de visualización pantalla a guardería (convenio clases tratamiento natural) b espacio comercial activado c acera de visualización

PHASE 4. [JD] Digital garden

paisajes artificiales emergentes red de sensores ambientales y físicos interactividad especies artificiales

red de reciclaje de


[AR_06] the proposal

The gardens

- huerto urbano (a lúdico b docente c productivo d privado) - talleres taller de análisis de las preexistencias, fotografía y dibujo, mantenimiento y jardinería ecológica - jardín público - eventos/celebraciones ocasionales

2 Agentes intervinientes

depósito acumulación depósito secundario aljibe

4 Funcionamiento AGUA - captación agua riego - riego - reciclaje agua + depuración

e depósito acumulación depósito c secundario

bh

a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) riego c personal de mantenimiento, investigadores d agricultores d2

3 Espacio generado

depósito primario

d3

superficies ajardinadas talleres de uso sostenible del agua, ecología, medioambiente, paisajismo c jardín público

c

*

4 Funcionamiento

VEGETACIÓN - plantación - remoción plantas conservación - secado semillas - recolección de residuos

b2 - banda canal AGUA - captación - pretratamiento - tratamiento natural conservación - cloración - AFS/ACS - reciclaje VEGETACIÓN - plantación y mantenimiento

JARDÍN DE AGUA dededescontaminación y reciclaje de agua [JI]Plan Jardín infiltración

JARDÍN DE TIERRA

Plan de regeneración de suelos contaminados

del canal 1 Método de descontaminación b1 - banda viario

1 Método de descontaminación fitorremediación > especies vegetales a árboles

b arbustos c plantas

2 Agentes intervinientes a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) c turistas d personal de gestión, investigadores e agricultores

3 Espacio y actividad generada - huerto urbano (a lúdico b docente c productivo d privado) - talleres taller de análisis de las preexistencias, fotografía y dibujo, mantenimiento y jardinería ecológica - jardín público - eventos/celebraciones ocasionales

4 Funcionamiento AGUA - captación agua riego - riego - reciclaje agua + depuración VEGETACIÓN - plantación - remoción plantas conservación - secado semillas - recolección de residuos

depósito primario depuración agua

depósito acumulación depósito secundario aljibe

ACS/AFS

pretratamiento - desbaste + desarenado + desengrasado fitodepuración - especies vegetales a FMF macrófitas flotantes T. PRIMARIO b HAFFS humedal flujo horizontal subsuperficial T. SECUNDARIOd1

c HAFS humedal flujo horizontal superficial riego T.TERCIARIO d cascada aireación e cloración

2 Agentes intervinientes

depósito acumulación depósito c secundario

depósito primario

d3

superficies ajardinadas talleres de uso sostenible del agua, ecología, medioambiente, paisajismo c jardín público

4 Funcionamiento

c

b2 - banda canal AGUA - captación - pretratamiento - tratamiento natural conservación - cloración - AFS/ACS - reciclaje

VEGETACIÓN - plantación y mantenimiento

1. 2. 3. 4.

*

b

-

d

bosque productivo jardín oxigenante jardín vertical pre-t jardín público talleres contaminación atmosférica espacio de exposición

-

d

d - d bosque productivo jardín oxigenante jardín vertical pre-t jardín público talleres contaminación atmosférica espacio de exposición

-

+ +

d

4 Funcionamiento AIRE - filtrado - condensación - atemperamiento - deshumidif. canal AGUA - captación - descontaminación - almacenaje - uso

multiconexión

2 Agentes intervinientes

b1 - banda viario

+

+

+

-

-

-

-

+ +

+

-

3 Espacio generado jardín sensorial jardín de eventos plaza pública interactiva paisaje sonoro y lumínico - visibilidad de procesos atmosféricos r y de depuración

s i

C

c s

4 Funcionamiento CONEXIÓN - pto. acceso (PA) - servidor industrial (SI) - router b2 - banda canal ADSL(R) - radio enlace wifi (RE) - firewall

CURRENT SITUATION Rapid urban development > surpassed rainwater drain = MICRO INFRASTRUCTURE Surface water runoff > rapid concentration Natural water cycle > broken Water quality > Very low

-

+ +

+

i

C

p01

todos los públicos

aire [contaminado]

-

s

aire [contaminado]

b pantalla led, proyección, iluminación s led, sensor, cámara,

b

-

-

4 Funcionamiento

micrófono ambiental

3 Espacio generado

jardín sensorial jardín de eventos plaza pública interactiva paisaje sonoro y lumínico - visibilidad de procesos atmosféricos r y de depuración

1 Método de conexión y comunicación i r a wifi libre (público, privado), bluetooth, fibra óptica,

v

-

3 Espacio generado

CONEXIÓN - pto. acceso (PA) - servidor industrial (SI) - router b2 - banda canal ADSL(R) - radio enlace wifi (RE) - firewall

-

intervinientes a FMF

+

-

c s

+ + DIGITAL JARDÍN

especies vegetales - paulownia tomentosa (O2), acer pseudoplatanus (PM) deshumidificación - condesación filtrado - PM, CO, SO2

b HAFFS

v

Plan de conexión, comunicación , interactividad y accesibilidad digital RGB -

+

todos los públicos

AIRE - filtrado - condensación - atemperamiento - deshumidif. canal AGUA - captación - descontaminación - almacenaje - uso

JARDÍN DE AIRE

a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) c turistas d personal de gestión, investigadores e agricultores

2 Agentes intervinientes

4 Funcionamiento

remoción de contaminantes en el aire Plan de confort ambiental

HAFS 2 Agentes

micrófono ambiental

b HAFFS

d_ac

e

multiconexión

a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) c turistas d personal de gestión, investigadores e agricultores

1 Método de descontaminación / confort

bh

a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) riego c personal de mantenimiento, investigadores d agricultores d2

3 Espacio generado

b1 - banda viariode Plan

+

b pantalla led, proyección, iluminación s led, sensor, cámara,

2HAFSAgentes intervinientes a FMF

d

+ +

b1 - banda viario

1 Método de conexión y comunicación i r a wifi libre (público, privado), bluetooth, fibra óptica,

especies vegetales - paulownia tomentosa (O2), acer pseudoplatanus (PM) deshumidificación - condesación filtrado - PM, CO, SO2

3 Espacio generado

-

-

1 Método de descontaminación / confort

c HAFS humedal flujo horizontal superficialriego T.TERCIARIO d cascada aireación e cloración

depuración agua

-

d_ac

RGB

3 Espacio y actividad generada

depósito primario

+ + DIGITAL JARDÍN

Plan de conexión, comunicación , interactividad y accesibilidad digital RGB

uso no sanit

b arbustos c plantas

a habitantes parcelas colindantes - vecinos b estudiantes (universidad, colegio) y niños (guardería) c turistas d personal de gestión, investigadores e agricultores

ACS/AFS

pretratamiento - desbaste + desarenado + desengrasado fitodepuración - especies vegetales a FMF macrófitas flotantes T. PRIMARIO b HAFFS humedal flujo horizontal subsuperficial T. d1 SECUNDARIO

fitorremediación > especies vegetales a árboles

JARDÍN DE AIRE

remoción de contaminantes en el aire Plan de confort ambiental

RGB

del canal 1 Método de descontaminación b1 - banda viario

1 Método de descontaminación

2 Agentes intervinientes

b1 - banda viario Plan de

uso no sanit

JARDÍN DE AGUA dededescontaminación y reciclaje de agua [JI]Plan Jardín infiltración

JARDÍN DE TIERRA

Plan de regeneración de suelos contaminados

p01

STRATEGY a. Rainwater drain infrastructure b. Technical installation band c. Infiltration garden d. Purifying rainwater filter

p02

b

p02

b


[AR_07] the proposal

The gardens

El jardín El jardín insertado insertado

Phytoremediation Phytoremediation VI VI Phytoremediation Phytoremediation III III

b1 b1

Festuca Festuca arundinacea arundinacea Panicum Panicum virgatum virgatum

0

e 1:200 e 1:200

Phytoremediation Phytoremediation II II

Trifolium Trifolium repens repens Cynodon Cynodon dactylon dactylon

10

2 1

2

5

5

20m 20m

programa programa asociado asociado

Phytoremediation Phytoremediation I I

Helianthus Helianthus annusannus Trifolium Trifolium repens repens

10 10

50m²50m² 2x aula-taller 2x aula-taller 30m²30m² enfermería enfermería aula aula proyecciones proyecciones 50m²50m²

MorusMorus rubrarubra Populus Populus deltoides deltoides PinusPinus nigranigra Robinia Robinia pseudoacacia pseudoacacia

120m120m ² ² área área de exposición de exposición ² ² área área de eventos de eventos 205m205m bañosbaños 18m²18m²

h h a a

a´ a´

h h d1 d1bh bh h h

d3 d3

c

c

[JT**] [JT**] d2 d2

b2 b2

c

c

tn-ft5tn-ft5

tn-ft4tn-ft4

d3

0 PRET 0 PRET

b1 b1

a FMF a FMF FMFFMF

d1

bh bh

tn-ft3tn-ft3

tn-ft2tn-ft2

tn-ft1tn-ft1

h1

Phytoremediation Phytoremediation I I Iris Iris pseudacorus pseudacorus Iris Iris pallida pallida Polemonium Polemonium caeruleum caeruleum

desarenado desarenado desengrasado desengrasado

Cyrtomium Cyrtomium falcatum falcatum

h1

1b HFSS 1b HFSS

Phytoremediation Phytoremediation II II

Valores Valores reducidos reducidos

>

Ligustrum Ligustrum delavayanum delavayanum Ligustrum Ligustrum japonicum japonicum HostaHosta sieboldiana sieboldiana CannaCanna indica indica

Iris Iris pseudacorus pseudacorus TyphaTypha angustifolia angustifolia TyphaTypha latifolia latifolia Butomus Butomus umbellatus umbellatus Arundo Arundo donaxdonax Chaerophyllum Chaerophyllum hirsutum hirsutum Phragmites Phragmites australis australis

NH4NH4 amonio amonio NO3NO3 nitratonitrato > P fósforo P fósforo C.O.C.O. carbono carbono orgánico orgánico SS sólidos SS sólidos suspendidos suspendidos

a´ a´

b HAFSS b HAFSS

c1 c1

d1

desbaste desbaste

d_ac d_ac

d1 d1

h2

Pretratamiento Pretratamiento

c HAFS c HAFS a a

h2

1a FMF 1a FMF

Ø20 Ø20 - Ø60mm - Ø60mm Ø0.2mm Ø0.2mm grasasgrasas Ø6 - Ø12mm Ø6 - Ø12mm material material flotante flotante

d2 d2

d3

[JA**] [JA**] d-d-d d-d-d

**

desbaste-desarenado-desengrasado desbaste-desarenado-desengrasado

c1

b1 b1

c1

pre-t pre-t

a FMFa FMF

Plantación Plantación

Jardín Jardín vertical vertical

Bosque Bosque productivo productivo O ₂ IO ₂ I

AcerAcer pseudoplatanus pseudoplatanus

Bignonia Bignonia radicans radicans Bouganbvilla Bouganbvilla glabra glabra Jasminum Jasminum

'Mao'Mao pao tong' pao tong' Paulownia Paulownia tomentosa tomentosa

tipo caducifolio tipo caducifolio crecimiento crecimiento rápido rápido alturaaltura < 30m < 30m densidad densidad 610 610 – 680 – 680 Kg/m3 Kg/m3 franjafranja térmica térmica 20º C 20º - 40º C -C 40º C captación captación PM2.5 PM2.5 y PM10: y PM10: 0,021g/m2/año 0,021g/m2/año

a a

a´ a´

[JA**] [JA**] b2 b2

b1 b1

a a

a´ a´

plaza plaza

[JD**] [JD**] b2 b2

a FMFa FMF

tipo caducifolio tipo caducifolio crecimiento rápido crecimiento rápido alturaaltura < 20m < 20m floración abril abril - mayo (fructifica en agosto - septiembre) floración - mayo (fructifica en agosto - septiembre) densidad 290 290 - 250- 250 kg/m3 densidad kg/m3 franjafranja térmica 20º C - 40º térmica 20º C -C 40º C absorción CO2:CO2: 21,721,7 kgCO2/árbol/año (23.950 kgCO2/ha/año) absorción kgCO2/árbol/año (23.950 kgCO2/ha/año) producción O2: O2: 5,9 kgO2/árbol/año (6.486 kgO2/ha/año) producción 5,9 kgO2/árbol/año (6.486 kgO2/ha/año)

d1

d1

b HAFSS b HAFSS

d_ac d_ac

Bosque Bosque productivo productivo O ₂ II O ₂ II


[AR_08] the method

System implementation

[IM_02]

背景 L a

consecuencias del sistema

h i s t o r i a

d e l

m u r o

11 10

09 08 07 06 05

04 03 02 01

imagen

p01

p02

p03 p04

p05

p06

p07

p08

p02a

p02b

p02c

p02d

p02e

Estado inicial del vacío de oportunidad 01 [V01] viga pp viga pp con vigaalta contaminaciónppdel viga pp vigaal desuso de la zona y su actividad precedente. Actualmente la parcela Se trata de un áreapp post-industrial de pequeñas edificaciones, terreno debido 25kN/m se encuentra a medio camino³ entre descampado y zona de acumulación de escombros, con pequeñas áreas de plantaciones espontáneas. p02a

p02b

p02c

p02d

p02e

Se propone la limpieza mediante los Jardines de Tierra del terreno, al tiempo que se retiran las preexistencias en estado de decadencia. La parcela comienza a usarse en este estado inicial, donde la actividad que se realiza es el cultivo de plantas descontaminantes por parte de los barrio oseturistas interesados. Lasresidentes vigas delcanal apoyan sobre

p01

p02

p03 p04

p05

p06

p07

p08

encepados ejecutados in situ. En una primera fase no necesitarían estar armadas, sin embargo se dimensionan par la fase última, en la que entran en carga pasarelas, cubiertas y espacios cerrados. - Esta fase puede ser estable en si misma y perdurable en el tiempo. -acciones a considerar: peso propio de la viga sobre el terreno

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

CURRENT SITUATION The plot is a post-industrial area of small buildings with high soil contamination due to the disuse of the area and its previous contaminating activities. Currently, the area is located halfway between vacant land and debris accumulation area, with small areas of spontaneous plantations. The proposed cleaning of the terrain is in charge of the Soil Gardens phase, while pre-existing buildings in state of decay are removed. The plot begins to be used in this initial state by carrying out the activity of growing decontaminating plants by neighborhood residents or tourists interested.


[AR_09] the method

System implementation

[IM_02]

背景 L a

consecuencias del sistema

h i s t o r i a

d e l

m u r o

11 10

09 08 07 06 05

04 03 02 01

imagen

p01

p02

p03 p04

Mav

p02

p07

p08

p02a

p02b

p02c

p02d

p02e

p02a

p02b

p02c

p02d

p02e

pp viga

av

p01

p06

av

av

pp viga 25kN/m³

p05

Mav

av

p03 p04

p05

p06

p07

p08

Las pórticos lineales debido a su esbeltez y ligereza son susceptibles de sufrir las acciones del viento provocando el agotamiento de la biela a tracción. A este efecto contribuye con su peso propio la viga canal, compensando el momento generado por la carga de viento.

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

GREEN AIR PATH The prefabricated canal beams rest on made-in-situ grillage foundation. At an early phase they don’t need to be reinforced, but in any case had to be sized according to the last phase, where walkways, roofs and closed spaces are incorporated.This phase can be stable itself and maintained over time overlapped with further phases. Actions to be considered: the weight of the beam on the ground. The thinness and lightness of the linear gantries are susceptible of tensile rod depletion due to the wind actions. This effect is balanced by the weight of the concrete canal beams, offsetting the bending moment generated by wind load.


[AR_10] the method

System implementation

[IM_02]

背景 L a

consecuencias del sistema

h i s t o r i a

d e l

m u r o

11 10

09 08 07 06 05

04 03 02 01

imagen

p01

p02

p03 p04

p05

p06

p07

p08

pp n1 scu C1

pbarand

p02a

p02

p03 p04

p05

p06

p02c

p02d

p02e

p02b

p02c

p02d

p02e

pp n1 sc u C1

p02a

p01

p02b

p07

p08

Los módulos estructurales lineales se dimensionan para una sobrecarga de uso C3 junto con una carga asimetrica aplicada de 3KN/m². Acciones sobre forjados exteriores Tierra SC=10KN/m² Nieve N1= 0.05KN/m² PP=0.18 El peso propio de la barandilla ayuda a centrar las cargas y compensa la carga de viento producida en el pórtico.

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

THE AIR PATH PLATFORMS Linear structural modules are dimensioned for use overload C3 along with an asymmetric loading applied 3kN/m². Actions on external platforms SC = 10 KN /m² Snow N1 = 0.05KN / mPP = 0.18 The weight of the handrail helps to focus the loads and compensates wind load produced on the gantry.


[AR_11] the method [IM_03]

System implementation el módulo

背景

E l

j a r d í n

d e

a i r e

[JA03] Jardín público IP1 huerto lúdico+docente (a,b,c,d) IP2 talleres virtuales participativos (b,e)

ID1 paisaje urbano productivo - fitorremediación terreno (h, tn02)

[JAi01]

- fitodepuración agua (tn03)

El contacto con el agua - canal [JD01]

[JA01]

[JA02]

[JAi03]

Naturalización de los límites del canal: [JD02]

[JA03]

tn02 paisaje de macrófitas depurativo en el borde del canal tn03 especies depuradoras flotantes Miradores puntuales (f,g)

tn02

g

h

h

22 21

tn03

20 19

c

18

d

b

17

f

16

e

15 14 13 12 11 10

09

a

08 07 06 05

04 03 02 01

imagen

[JT05]

Hangzhou: el jardín de recreo de Shanghai La escala: Jardín vs Parque Jardín del fr. jardin, dim. del fr. ant. jart 'huerto', y este del franco *gard 'cercado'; cf. a. al. ant. gart 'corro', ingl. yard 'patio'. 1. m. Terreno donde se cultivan plantas con fines ornamentales. 2. (jardín botánico) m. Terreno destinado para cultivar las plantas que tienen por objeto el estudio de la botánica.

Parque

del fr. parc. 1. m. Espacio cercado, con vegetación, destinado a recreo o caza, generalmente inmediato a un palacio o a una población.

La experiencia en el jardín en China

El contacto con el terreno- Pavimentos exteriores

conjunto equilibrado por una red de muros

leyenda ver panel24

Regido por el principio de no acción, la menor acción posible sobre la naturaleza (hombre=elemento negativo y destructivo que debe adaptarse para poder participar en la armonía universal). 'Yuanye' se rige por 3 principios: 1. adaptación al entorno 2. imitación de otros paisajes 3. la creación de un mundo en miniatura (el mundo en un grano).

'La reproducción desescalada de una realidad vuelve a ésta mágica o mística.' La arquitectura Tiene un papel destacado a la hora de concebir el jardín: los pabellones, comunicados entre sí por un conjunto de galerías permiten escoger visuales y puntos de vista que se quiere dar al visitante. La contemplación - el espectador Enmarcada o fraccionada del jardín en espacios independientes se realiza a través de galerías y los muros

pe_06 pe_01

árido comp. y cerámica

cultivo extensivo

pe_10

pe_03

pe_03

p01

p07 p04 p06

p08

p09

p10

p11

p12

p13

p10

p05

pe_06

pe_05

p14

p09

p10

p05

p15

p16

p17 p09

pe_08

pe_07

prefabricado de hormigón drenante

grava estabilizada tráfico rodado

losa de piedra reciclada

reciclada

pe_02

p01 p02 p03 p04 p05

pe_04

pe_03

pe_02

pe_01

cultivo intensivo

p18

p19

p10 p05

p05

p20 p19 p10

pe_01 pe_10

p10

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

pe_09

ipavement [wifi]

gravilla

apisonada

p22

pavimento luminiscente

p21

p10

p05


[ST_01] the construction system

From gardens to colonization

d

etapa con grandes emisiones CO2 11.otro uso

10.transporte

b

1.obtención materia prima

9.reciclaje

1

2.transporte

2

3

4

5

6

7

8

9

(Y) Financiación

c 3

8.desmontaje

3.transformación/producción 6.reutilización

2

3'.reciclaje residuos 7.matenimiento

4.transporte

1

5.montaje en obra 6.uso/vida útil

-0.30

0

-0.30

a

construction system

The modular arrangement is based on a (M) fundamental module as the measure from which the rest of measures, both structural elements and finishes, will be adapted. The submodules (sb) are obtained by dividing the fundamental module between an integer while the multimodules (mm) are integral multiples of the fundamental module. M = 100mm mm multiples of M {3M = 300mm 6M = 600mm} Sb = M / nª integer {Dimensions <3M}

(T) tiempo


[ST_02]

the construction system [EST_01] 背景

el sistema

From gardens to colonization El sistema constructivo

Las unidades básicas constructivas

FASE 1

� La modulación La ordenación modular se realiza a partir de un (M) módulo fundamental como medida fundamental a partir de la cual se adecuarán el resto de medidas, tanto de elementos estructurales como de acabados. Los submódulos (sb) se obtienen al dividir el módulo fundamental entre un número entero mientras que los multimódulos (mm) son múltiplos enteros del módulo fundamental.

M = 100mm mm múltiplos enteros de M

3

2

1

n 600

1

300

3 4

6

6m

6

6

6m

6

{núcleo 1M}

1m

c

Sobre las vigas se apoyan pilares dobles tubulares, mediante un mecanismo (apoyado sobre una chapa metálica de gran espesor) de unión atornillada con pernos roscados pasantes (orificios previstos en viga) que, finalmente, se sella con un mortero sin retracción (ver panel CO_06)

Las vigas canal prefabricadas se apoyan sobre unos encepados previamente ejecutados. Llevan un machihembrado en forma de pirámide tronco-cónica con 4 apoyos por pilote (a hueso). Para asegurar la continuidad de las vigas canal tambien se machiembran en el plano longitudinal. (ver panel CO_04)

La modulación en planta {escala urbana} de los núcleos infraestructurales lineales se realiza en base a dos módulos básicos

2

200 150 120

La combinatoria del sistema b

a

[núcleo infraestructural lineal]

d

Una vez alzados los 4 pilares dobles se arriostran mediante perfiles en T, siguiendo la modulación establecida, pasantes y atornillados a pletina metálica en la parte interior de los pilares. (ver panel CO_06)

e

f

Unos cables de acero ubicados en cada pórtico lineal aseguran la estabilidad de la estructura ante acciones de viento.

Las vigas principales son perfiles tubulares rectangulares pasantes biapoyados entre los dos tubulares de los pilares dobles.

g Para la construcción de los siguientes módulos se sigue el mismo sistema, manteniendo siempre los pilares como elementos de referencia (no se duplican). Las vigas quedan a eje con los pilares por lo que la instalación de las siguientes no resultará un problema.

En los jardines de aire las pieles verticales se realizan con cables tensados. Esta subestructura permite también la adaptabilidad de otros subsistemas para la adición de pieles superpuestas. (ver panel CO_05)

El sistema constructivo permite la adopción de fases/subfases temporales proyectuales como fases de estado últimas o estables en el tiempo. Se empieza construyendo desde los jardines atmosféricos: en los jardines de tierra todos los elementos utilizados están insertados en el terreno; únicamente se construye con las vigas se empiezan a elevar las estructuras de los pórticos canal. En los jardines de agua y aire lineales. se incorpora la cubierta umbráculo. En el jardín digital

5

100

1 2

6

75

8

60

10

50

12

40

15

30

20

25

24

3

4

5 6

3

4

5 6

3m

{núcleo 3M}

{ 3M=300mm 6M=600mm}

sb = M/nª entero

n2·M

{dimensiones <3M}

n1·M

n1·M

n1·M

La modulación en alzado {escala humana} de los núcleos infraestructurales lineales se realiza en base a una serie de módulos básicos

n1·M

a módulos estructurales verticales Cable acero semi-rígido 6 x19 Acabado - inoxidable RI Perfil L 100 x 70 x 8 L=1.200mm doble en T unión genérica Acero laminado S275 Acabado RI Perfil L 100 x 70 x 8 � chapa soldada 80 x 50 x 8mm L=1.200mm doble en T unión genérica Acero laminado S275 Acabado RI Perfil TUB 200 x100 x 8mm L=6.000mm Acero laminado S275 Acabado RI -

Perfil TUB 200 x50 x 10 mm L=11.500mm doble con unión genérica Rigidizadores pletina soldada/150cm Acero conformado S275 Acabado RI -

{modulación 1M}

{modulación 3M}

a1 h

a2

450

600

h= 100

300

450

m1

Cable acero rígido 1 x19 Acabado - inoxidable

6 1m

a2

FASE 2

a

[umbráculo-cubierta de atado]

La modulación en planta de los elementos estructurales de cubierta se realiza en base a un módulo básico de 150cm. Ésto es posible gracias a la previa disposición de los pórticos estructurales verticales (lineales) a distancias múltiplo del multimódulo {d=1,5·n} para n=número entero

v

b

Las cubierta se compone de dos ordenes de vigas. Las principales - de unión rígida- vienen divididas en tramos si su longitud es superior a la máxima transportable En el caso de vigas de 15m de luz, se dividen en 3 tramos

c Las vigas secundarias , articuladas, se atornillan a casquillos en U pre-instalados en fábrica, de forma que únicamente girando y encajándolas se realiza el montaje.

Los extremos de las vigas, que vienen premontados, a excepción del montante interior al pórtico lineal, se atornillan a ocho pletinas soldadas a los pilares. Un mecanismo de machihembrado permite insertar el tramo central.

, a 31 de la luz.

d

1

2

3

4

1

2

3

4

Arriostramiento realizado con cable semirrigido atornillado a pletinas metálicas situadas enrasada en la parte superior de las .

c02

c03

c01

150

p

600 150

600 300

300

100

b

cerchas de cubierta Cable acero semi-rígido 6 x19 Acabado - inoxidable RI -

6m

a pórticos exentos y en voladizo

Los pórticos lineales pueden funcionar como pantallas, lienzos o jardines verticales que co-existen con otros pórticos que llevan instalados forjado elevados. Los voladizos testados para los dos casos de los pórticos lineales (1m y 3m) son de un máximo de tres metros a cada lado, con una sobrecarga de uso uniforme de 5KN/m² - correspondiente a la categoría C3 (DB-SE-AE).

600

6

300

b

1 2

h

m2 h= 100 300

a1

La modulación en alzado de los elementos estructurales de cubierta se realiza en relación a la luz existente entre módulos estructurales verticales (siempre d=1,5·n) h= 0,75 m

h=1,5 m

h=1,8m

d < 7,5m

7,5 m<d <12,0 m

12< d <15,0 m

cubierta bi-apoyada

Los jardines digitales se desarrollan bajo una cubierta de acero biapoyada en dos estructuras soporte paralelas. La geometría de la cubierta permite un vuelo testado de 4.5m desde el último punto de apoyo, siempre que esta sea de categoría G (CTE SE-AE)

1

2

3

4

1

2

3

4

p

Perfil TUB 100 x40 x 6mm L=200mm Acero conformado S275

c

Perfil TUB 70 x70 x 7mm L=2.250mm Acero laminado S275

m

Perfil 2xTUB 80 x 50 x 8 L=6.000mm +casquillo U (acero laminado S275) Acero laminado S275

Perfil 2xTUB 150 x 50 x 8 L=6.000mm +casquillo TUB 150x50x7 L=200mm (acero laminado S275) Acero conformado S275

FASE 3

vs�c

[instalación de forjados]

a

b

{forjados en voladizo}

Existen tres tipos de forjados dentro de sistema - voladizo - apoyado - descolgado+apoyado

c

El pavimento sobre las viguetas es de madera y tramex para las zonas exteriores de pasarelas, apoyándose en perfiles metálicos dobles en L sobre las viguetas.

Todos los forjados se han dimensionado para una sobrecarga de uso teniendo en cuenta que es un espacio público. Se decide resolver todos ellos con el mismo perfil: dos UPE270 separados 20cm - unión con platabanda soldada in situ - pasantes atornillados (6 tornillos) a pletinas soldadas a los pilares y apoyadas sobre las vigas principales del pórtico (perfil tubular de acero 200 x100mm).

El forjado acabado tiene un canto de 52cm, pero al estar compuesto por elementos apoyados y acabados permeables el canto real percibido es mucho menor, permitiendo transparencia en el plano vertical y horizontal.

a,b

c

{apoyo y descuelgue de forjados} Ejemplo del caso más desfavorable de instalación de forjado descolgado. La estructura necesita llevar la carga mediante cables de acero trefilado hasta desde las vigas principales de forjado el punto más alto del pórtico - pasando por la cubierta - .

c

09 08 07

vp�c

1

a

10

bi-descolgado de infraestructura lineal

Desde el pórtico lineal se pueden instalar cubiertas independientes que trabajen de forma uniforme al introducir cables tensados que las recorren longitudinalmente. Se pueden descolgar de éstos forjado a diferentes alturas y con un voladizo exterior al punto de entrada en carga de los cables.

2

3

06

4

05

04

a

03

Sobre los forjados, se instalan viguetas dobles T invertida colocadas a 1cm de distancia y a 75cm a intereje de vigueta.

Perfil TUB 200 x50 x 10 L=11.500mm doble con unión genérica Rigidizadores pletina soldada/150cm Acero conformado S275

02

p

01

estructuras b

c

b

La modulación de las viguetas permite que vaya apoyada en uno de los perfiles UPE mientras que la vigueta del móudulo siguiente se apoyará en el perfil UPE libre.

forjados Perfil L 150 x 100 x 10 doble en T unión soldada pletina 10mm Acero conformado S275

Perfil L=7.000mm doble en I con presillas/150cm Acero laminado S275

vgt

vf

FASE 4

1

a

[cerramiento de espacios]

El sistema ofrece la base para ser colonizada por arquitecturas que conforman espacios cerrados. Una vez terminados los forjados, las subestructuras que conforman la envolvente estanca se apoyan sobre perfiles perimetrales sobre las viguetas.

La subestructura que conforma el espacio cerrado se apoya sobre un perfil en T colocado sobre las viguetas y sobre una vigueta de borde perimetral compuesta por un perfil en L150 y un UPE 150.

b Se colocan los montantes (metálicos/madera) para la ubicación de los diferentes cerramientos.

c Los travesaños de cubierta se descuelgan de la subestructura y se apoyan en los montantes previamente dispuestos.

d La envolvente estanca de los espacios cerrados queda siempre bajo cubierta. Sobre ella, se instalan pieles con diferentes funciones de control climático y atmosférico.

2

3

4

d descolgado de cubierta

Desde las cubiertas se descuelgan forjados si el vuelo de éstos es superior al máximo permitido por el sistema. Los cables se sitúan a eje con las vigas dobles pasantes de cubierta que estarán alineadas con los forjados de doble UPE pasante. El `tirón` por tanto se lo llevan las vigas principales de cubierta compuestas por perfiles dobles tubulares de 150x50mm. (ver detalle panel EST_04)

1

2

3 4

1

2

3 4

5

6

7

8

5

6

7

8

Se conforman los espacios de forma independiente a la estructura en cuanto a funcionamiento estructural. En cuanto a la espacialidad, se cuadra con la modulación propuesta explicada anteriormente.

d cimentación y viga centradora

características subestructura: - autoportante - metálica o de madera - subestructura bajo cubierta descolgada - pieles superpuestas interiores y exteriores a la estructura

Hormigón HA50 Yc=1.5 Acero B500S Yc=1.15 Tipo ambiente IIa viga canal HA prefabricado - 1m de ancho

vc

tipos de pieles: PC

- 3m de ancho

tela-tejido

vidrio

malla metálica

membrana PVC

tubo TiO2

papel-papiro

bambú-cáñamo

Armadura encepado a superior 6Ø16 a inferior 6Ø16 estribos horizontales 9Ø16 estribos verticales Ø16c/13 Pilote D=350mm - HA prefabricado método - hincado separación interejes=3D

*ejemplo de posible espacio cerrado bajo cubierta

e

FASE 5

e pórtico mixto

Combinando opciones pueden aparecer cubiertas apoyadas en tres pórticos, forjados descolgados o biapoyados entre pórticos o forjados en voladizo. Es recomendable siempre que en situaciones en las que el momento producido por el descuelgue de un forjado bajo la cubierta pueda producir el colapso del sistema, compensar con el descuelgue de otro forjado que genere un momento de valor opuesto.

{desmontaje} ver panel IM_02

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU


[AR_12] the proposal

Cover threshold

32

CA

33 35

18,5

CB

CD

[C15] CT N Centr A=1 .221m²

CE

o Trat.

CA

Nat.

CB CF CD

35,8

CG

CE

66

CH CF

CI 16,5

CG CJ 3

CK

3

12,5

1

CH [C14] CT N Centr o Trat. Nat.

A=1.18 8m²

10

3

CI

3

CL CJ CM CK CN CL

18,5

CO 72

CM 72

CP

CN CQ CO CR CP CS

DA

CQ

DA

CT

DB

CR

15

02

03

04

05 06

07

08

09

10

11 12

13

14

15

16

17

18

19

20

DC

21

22

23

24

25

26

DC

DE

15

32 23

DB

DD

CT

DE

23

28

16,5

DD

52

27

CS

10

33

DF

20

34

DF 35

6

AA 6

AA

AB

AB 6

5,3

12,2

3

3

15

3

3,6

3

3

14

15

AC 6

AC

AD 6

AD

AE

AF

6

AF

48

48

6

AE

AG

6

72

AG

AH

6

66

84

AH

AI

AI

6

[C04] Jardín digital+MTC A=672m²

AJ

AJ 168

6

14

AK

6

18

AK

AL

AL

6

[C03] Jardín digital+MTC 60

A=1.656m²

[C09] Jardín digital

6

AM

A=264m²

AN 6

[C02] Jardín digital

18

12

14

AM

AN

15

A=1.932m²

AO

6

AO

26

25

12

6

23

AP

6

AP

AQ

AQ

6

[C10]CAD Centro Arte Digital A=1.080m²

AR

AR

6

18

AS

72

6

66

36

AS

AT 60

6

AT

AU

AU

6

[C01] Jardín digital 60

A=720m²

AV 54

AV 6

20

AW

AW 6

22

AX

15

[C11] Jardín digital+CGU

54

6

[C07] Jardín digital+CINV

12

6

24

6

AZ

[C12] JD Jardín Digital+CAD Centro Arte Digital

26

[C13] Jardín digital+CAD Centro Arte Digital

6

A=648m²

A=1.440m²

AZ

BA

12

24

6

AY

A=1.500m²

[C06] Jardín digital

BA

AX

A=2.520m²

A=1.872m²

AY

BB

15

1 3

6

3 1

BB

[C08] Ferry Station A=1.269m²

BC

BC

6

24

BD

BD

6,2

02

4,7

03

13,2

04

2,5

05 06

18,8

27,5

07

12,2

08

7,4

15

09

10

1,6

11 12

17,6

14,8

13

22,9

14

15,4

15

9,2

16

10,6

17

8,3

18

9,8

19

9,4

20

15,6

21

7,4

22

7,4

23

12,5

24

15,1

25

7,7

26

9

27

28


[AR_12] the proposal

The under cover implantation gardens [ARQ_03] la propuesta

背景 E l

j a r d í n

d i g i t a l - a t m o s f é r i c o

6

CB

CD CA

6

[JT05]

CE

CF +3.00

CD

CG

[JAi04]

paulownia tomentosa plantación 1 . 5 x 3m

120m²

CH

1000m²

CE

253 uds

CF

6

8

i.art test lab

6

3

CB

6

4

11

[CTN] Ce ntro Tratam iento Na 950m² tural

6

9

a

1

5

3 4

b

12

12

12

6 6

6

CG

CJ

2 7

i.art deck

6

5

5

1

+3.60

[JD03]

CJ

CM

6

a

CN

[JA02]

6

[JA03]

[JD02]

[JAi03]

aula proyec

114m²

CO

bajos comerciales

100m

Plano de actuación en VO1

405m²

o docen te

CO

CR

[PE_comercial]

Planta baja

CN

h2 huert

b

6

50

6

[PE_comercial]

10 escala 1.600

CL

ciones

CP

CQ

0

CK

op

CM

6

[JA01]

land.art wo rksh

80m²

6

[JD01]

1.880m²

CI

CL

6

c

N

CH

90m²

CK

6

7

12

[JI]

12

6

12

6

2

[JAi02]

6

[JAi01]

CI

c

acer pseudo plat

CS

bajos comerciales

500m²

DA

50uds

CPAA

anus planta ción

DA

CQ

6

1.826m²

CT

DB

c 02

03

04

05 06

07

08

09

10

11 12

13

14

15

16

17

18

19

20

DC

21

22

23

24

DD

[JAi01] Jardín de aire

[JAi02] Jardín de aire

[JA02] Jardín de agua

[JAi03] Jardín de aire

6 infraestructura depuradora aire 3 plantación oxigenante 5.715m²

3 infraestructura depuradora aire 1plantación oxigenante 4.410m²

FMF 830m² HAFS 1.440m² HAFSS 1.350m² 9.021m²

7 infraestructura depuradora aire 3plantación oxigenante 7.528 m²

[JI] Ja rdín de25 infiltra ción 8.8

DE

32

children books 50m²

6

AF

HAFS 1.440m²

productivo 1 x 1 m 230m²

c/d

6

media office 30m²

cafe

AI

AC

oxigenante 1.5 x 3m 790m²

AD

6

AK 6

6

nave cedida uso almacén + dotaciones jardín de tierra 426m²

AL

AF

[CAD] Centro Arte Digital 4.100m²

info.point

10

09

AI

08 07

AJ

06

f

enfermería 6

paulownia tomentosa plantación - jardín

toilet 15m²

oxigenante 6 x 3m 880m²

storage

6

11

AH

HAFSS 908m²

30m²

AK

aulas-taller de paisajismo y renegeración del terreno

AL

1024m²

AM

05

04 03 02 AN

01

6

AN

12

AG

oxigenante 6 x 3m 1330m²

45m² AM

AE

e

paulownia tomentosa plantación - jardín

380m²

AJ

AA

540m²

HAFSS 355m²

AH

950m²

c/d

paulownia tomentosa plantación - bosque

6

AG

HAFSS 423m²

paulownia tomentosa plantación - bosque

c a 23 camino de aire

95m²

60m²

c a 21 camino de aire

storage

35m²

c a 14 camino de aire

6

free lecture

cuisine

DF 35

plaza pública digital

AB

6

AE

waste

11m²

DE 20,3

34

1.235m²

c a13 camino de aire

rest area

15m²

paulownia tomentosa plantación - jardín productivo 6 x 3m; 1.5x3m 400m²

AD

DD

9,8

d

c a 18 camino de aire

storage

35m²

DC

CS

28

CT

33

DF

c a01 camino de aire

plaza pública digital 1.260m² 1 pantalla LED 1 proyector

6

AC

plantación - bosque productivo 6 x 3m 450m²

27

14,7

toilet 12m² toilet PMR 6m²

paulownia tomentosa

c a05 camino de aire

c a0 3 camino de aire

6 6

AB

26

41m² 70 % áre a HAFS 11 permeabl 70 m² (2m e ²/h-e)

media center 400m² AA

DB

CR

aula 170m²

FMF 424m²

AP

paulownia tomentosa plantación - bosque

6

[JD] Jardín digital

6

co-working office

200m²

lúdico 6 x 3m 410m²

720m² 2 pantalla LED

AQ

29

FMF 417m²

AO

HAFS 1.736m²

AQ

AR

6

AR

30

AP

c a 22 camino de aire

6

AO

arquitectura

toilet 12m² toilet PMR

6

office

160m²

AU

6m²

AS

[PE_m ov] calle res

idencial

HAFSS 617m²

6

AT

c a 29 camino de aire

AT

c a 18 camino de aire

6

c a 17 camino de aire

AS

AU

FMF 670m²

AV

6

AV

6

AX 6

inner terrace

230m²

AX

AY

6

AY

AW

c a 21 camino de aire

AW

AZ 6

AZ

BA 6

BA

BB

BB

ex-área industrial [almacén naves] 3.300 m² 6,2 4,7

02

03

04

13,2

2,5

05 06

18,8

27,5

07

12,2

08

[JD02_03] Jardín digital

FMF 326m² HAFSS 857m² 1.940 m²

3 pantalla LED 1 proyector 1.930m²

09

JA01_capt. agua 7,4

15

10

218m²

1,6

11 12

17,6

14,8

13

22,9

14

15,4

15

9,2

16

10,6

17

8,3

18

9,8

19

9,4

20

JA02_capt. agua

21

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

15,6

7,4

22

7,4

23

12,5

24

15,1

25

BC

FMF 1.116m² HAFS 1.742m² HAFSS 638m² 9.750m²

5 pantalla LED 1 proyector 3.608m²

Ferry Station

n borde canal tn_03naturalizació

[JA03] Jardín de agua

6

BD 36,2

[JA01] Jardín de agua

[JD01 Jardín digital

[PE_comercial] área comercial revitalizada

6

BC

7,7

26

BD

26,4

9

27

JA03_capt. agua

28

72,2

11

29

30


[AR_12] the architectural colonization

M背景e dla colonización i [ARQ_05] a t harquitectónica eque E l

j a r d í n

d i g i t a l - a t m o s f é r i c o

El Jardín digital-atmosférico Hangzhou, ciudad de rápido crecimiento en los último años ha visto su crecimiento tanto en superficie como en altura. Grandes torres residenciales sin valor arquitectónico, estilístico o paisajístico han ido rodeando la principal obra estructural acuática de China. El proyecto, junto con el desarrollo de la línea blanda de Hangzhou propone un modelo-sistema arquitectónico sin carácter definido, de baja densidad inicial y con una altura máxima de 20 m sobre el nivel del agua en su punto más alto. Este sistema será posteriormente colonizado por arquitecturas y programas basados en los planes de desarrollo de la Línea Blanda, siendo su principal uso público y dotacional-educativo.

13 12 11 10

09 08 07 06 05

04 03 02 01

arquitectura

N

0

escala 1.250 Sección longitudinal Sección a-a'

10

20

30

40

50m


[AR_13] the architectural colonization

Mediatheque [ARQ_06]

背景 E l

la colonización arquitectónica

j a r d í n

d i g i t a l - a t m o s f é r i c o

paulownia tomentosa plantación jardín oxigenante 6 x 3m 1330m²

storage

co-working office

30m²

200m²

24 48.40

17.30

24.50

5.80

office

42.40 toilet PMR 6m²

toilet

12m²

160m²

9.00

29.30

6.30

18.20

11.80

18.10

6.30

free lecture 95m²

free lecture

10.10

11

6

5.30

2.80

storage

35m² +0.25

2.90

7.40

24.20 -1.08

-2.23

+0.25

6.60

11.00

11

13.80

1.60

12

95m²

+0.25

+0.25

+0.25

+0.25

+2.23

+0.25

+4.50

+2.16

9.20

+4.50

+0.25

10.20

5.40

+0.25

24

toilet PMR

6 +0.25

6m²

32.20

23.30

-0.72

18m²

60m²

72.80 árbol pre-existente altura:16.5 m

4 +0.25

5.30

12.90

cuisine

locker room

25.80

18.50

14.80

árbol pre-existente altura:8.5 m

árbol pre-existente altura:8 m

1.50

27.90

árbol pre-existente altura:20 m

árbol pre-existente altura:8 m

5.40

9.10

3.00

-1.08

1.40

18.00

16.60

garden

12.80

41.70

3.00

10.80 15.00

+0.25

info.point

+0.25

5.70 2.50

toilet

12m²

25

93.10

22

+0.25

5.90

media office

30m²

2.50

41.70

children books

50m²

5.00

12.50 10

árbol pre-existente altura:10 m

+0.25

14 22

1.90

+0.25

3.80

22.40 54.20

17.50

13 +2.23

12 11 10

árbol pre-existente altura:15 m

árbol pre-existente altura:16.5 m 12.20

-0.72

rest area

15m²

+0.25

4 +0.25

cafe

185m²

7.60

storage

35m²

11m²

7.10

4 +0.25

45.40

09

46.50

-0.72

waiting terrace

08

8.80

9.00

8.90

230m² árbol pre-existente altura:9 m

07

6.10

09

10.90

waste

06

28.50

22

+0.25

+2.23

10.00

15.10

+0.25

+0.25

4.20

04

22

38.10

03

+2.23 4.40

02

12.30

01

info.point

árbol pre-existente altura:9 m

arquitectura

17.50

6.80

44.00

4.00

2.90

+2.23

6.50 6.00

AA

6.00

AB

6.00

AC

6.00

AD

6.00

AE

6.00

AF

6.00

AG

6.00

6.00

AH

AI

N

6.00

6.00

AJ

0

escala 1.200

AK

10

6.00

6.00

AL

AM

20

6.00

AN

6.00

AO

30

6.00

AP

6.00

AQ

40

Planta baja Planta cota +0.25

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

6.00

AR

6.00

AS

50m

6.00

AT

6.00

AU

6.00

AV

7.70

08

2.60

05

22

6.00

AW

6.00

AX

6.00

AY

6.00

AZ

6.00

BA


[ARQ_07]

背景 E l

[AR_14]

la colonización arquitectónica

j a r d í n

d i g i t a l - a t m o s f é r i c o

the architectural colonization

D i gla colonización i [ARQ_07] t a l arquitectónica art centre

背景 E l

j a r d í n

d i g i t a l - a t m o s f é r i c o

b

b'

b

P05

P06

P07

P08

P09

b'

P10

P11

P13

P12

15

P14

14 13 [C13] Cubierta 13 A=648m²

[C11] Cubierta 11 A=2.520m²

12

[C12] Cubierta 12 A=1.500m²

11 10

umbral de sombra

umbral de sombra

09 +15.40

08

+15.40

07

+14.20 +13.70 +12.80

p06

+13.70

06

+12.80

05

umbral seco +11.10

04

[MAC] trabajo artistas A=80m²

03

umbral impermeable

+9.20

+9.20 +8.30

P05

P06

P07

3.00

3.00

3.00

P08

P09

P10

8.70

2.60

P13

P12

11.40

12.60

3.40

7.40

4.00

1.60

01

6.30

pasarela elevada + 4.70

+4.70

[C13] Cubierta 13 A=648m²

[C11] Cubierta 11 A=2.520m²

+8.30

P14

arquitectura

+4.70

pasarela elevada + 4.20

P11

[MAC] exposiciones temporales A=120m²

+4.70

02

+9.20 +8.30

+4.20 [C12] Cubierta 12 A=1.500m²

+4.20

+3.80

+3.80

[CTN] aula-taller A=92m² +2.80

+2.80 2.80

3.10

1.70

5.20

2.70

2.10 de sombra 1.50 umbral

0.80

6.20

3.50

4.10

8.30de sombra umbral

2.20

3.50

3.30

6.90

1.50

1.20

2.60

3.90

+1.00

+15.40

+0.00

+0.00

+15.40

+14.20 +13.70

+13.70

+12.80

+12.80

p06 umbral seco +11.10 [JA01] Jardín de agua + Jardín digital

[JD02] Jardín de agua

[JD03] Jardín digital

[JA04] Jardín de agua

[MAC] trabajo artistas A=80m²

[JA05] Jardín de tierra

umbral impermeable

68.60

+9.20

+9.20

+9.20 +8.30

+8.30

4.60

3.00

3.00

3.00

12.00

3.00

8.70 P05

+4.70

1.00

7.50

3.00

[MAC] exposiciones temporales A=120m²

2.60

15.00

P07

12.60 +4.70

P08

12.00

1.00

+8.30

6.50

arqui

11.40

P06

3.00

P09

P10

3.40

pasarela elevada + 4.70

P11

7.40

4.00

P12

P13

1.60

6.30

P14

+4.70

+4.20

pasarela elevada + 4.20

+4.20

+3.80

+3.80

N

+2.80 2.80

3.10

1.70

5.20

2.70

2.10

1.50

0.80

[CTN] aula-taller A=92m² 0

1

2 3 escala 1.150 6.20

Sección transversal

4

5

10 3.50

20 4.10

8.30

+2.80

30m 2.20

3.50

Sección b-b'

+0.00

3.30

6.90

1.50

1.20

2.60

3.90

+1.00 +0.00

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU


1. concrete canal beams

2. linear structural gantries

3. threshold covering

construction & structural development

4. continuity joints


[CO_0

[CO_01]

p01

+15.40

+13.70

+12.80

p03

p02

p05

p04

GESTIÓN DE LA TIERRA - cultivo

GESTIÓN DEL AGUA - riego

t01 fitorremediación del terreno t02 conservación y secado de semillas t03 almacenaje residuos vegetales [contaminados] t04 cultivos suspendidos [en espera finalización proceso fitorremediación] t05 productividad terreno - huerto t06 gestión del huerto - alquiler [docencia] [investigación] [ocio] t07 jardín público

a01 sistema de captación y depuración(I) agua pluvial a02 sistema de captación y depuración(I) agua escorrentía a03 sistema de captación y depuración(II) agua canal

p06

p07

cerramiento cubierta

cc01 [canalón de chapa plegada]

fase 4

e s t r u c t u

sb-ec02 [carpintería metálica para policarbonato]

fase 3 Instalación de forjados volados metálicos ligeros

sb-ec01 [guías nivelación y apoyo cobertura

fase 2 Atado y arriostramiento del pórtico estructural

L a

subestructura cubierta

fase 1 Elevación de pilares dobles

estructura cubierta

fase 0

ec02 [montante viga secundaria]

ec01 [cordón superior viga secundaria]

the system growth

Excavación y asiento canales de hormigón

el cre

背景

Montaje de cubierta bi-apoyada en pórticos lineales

p08

p05

p06

e12

+9.20

+8.30

+4.70 +4.20 +3.80

+2.80

+0.00

a01 t-n07 filtro macrófito en flotación+cascada oxigenación de agua

p01

a01 t-n06 depósito elevado de agua depurada

p02

p03

p01-02 Infraestructura Jardín de tierra {semillero y cultivo suspendido}

a01 t-n05 humedal natural flujo horizontal subsuperficial

a01 cap02 depósito agua

t08

t06

t-

3

p04

p03-04 Infraestructura Jardín de agua no colonizable t01

a01 t-n03

{depósito y devolución agua al canal; oxigenación agua} e12 e11

p05-06 Infraestructura Jardín de aire oxi

t01

t05 t04 t03

t02

{paulownia tomentosa}

e12 e11

cm03

Infraestructura Jardín de agua {depósito enterrado}

p03a

p04a

p05a

p06a

p07a

p08a

p09a

p10a

p05a

p03b

p04b

p05b

p06b

p07b

p08b

p09b

p10b

p05b

bancal de chapa metálica e =1cm elevado con cultivos fitorremediación

acequia longitudinal de chapa metálica plegada apoyada sobre tablestacado de madera Ø25cm

bancal elevado conformado por pilotes de madera Ø25cm

devolución de agua al canal por medio de canalización de macrófitas en flotación+cascada de aireación

p06a

p06b

cm01

capa 60-75cm de grava gruesa capa 60-70 cm de grava fina membrana impermeabilizante

viga ca na l de hormigón HA50

N

0

1

escala 1.75 Sección transversal

2

3

4

p

p p p p p p p

5m

Sección b-b'

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍ


01_02]

[CO_02]

ecimiento

transparente]

abertura cubierta

cc03 [chapa de policarbonato ondulado

ac01 [carpintería abatible policarbonato]

pec01 [bi-lama semi abatible de teja cerámi negra reciclada +lámina PC color]

piel exterior-filtro solar cubiert

h a b i t a d a

cc02 [entoldado textil]

r a

the system growth

r ola os ] a ltr r-fi talític rio toca xte ja fo

ier c ub

ta

le a fi pie 2 [lam ra ctu

a02

c12

c13

c12

1%

p07

p08

p09

c11

1%

p10

p04

1%

ta ier ria] cub secunda

ru super est [cordón c10

a02

io r

vi

ie cub

ga

su

0 pec

ra ny ctu lació tr u nive bes uía s [g

c02 bertu sb-e yo co

1 ec0

rta

ra]

c09

a po

p04

p04

c14

e14

c06

c05 c04 p04

1%

+15.40

x 1,5 c01

P.01[CD]

+

espacio de exposiciones temporales

c ió dula mo

c01 1xPC16mm + cámara de aire 500mm 1xPC 50mm

n cu

+

c02 cerramiento vidrio laminado 6+12+6 templado+lama madera orientable automatizada

espacio de trabajo artistas

c05 filtro solar doble piel ventilada exterior vegetal cable acero tensado

c06

c06 cable estructural doble cerramiento PC+textil regulable + malla trepadora

+9.20

c04 2xmallazo + vegetación +panel papel autoportante con bastidor metalico + cámara aire + aislamiento80mm + acabado tablero madera OSB base grava

c03 umbral solar - rejilla tramex 50x50mm+triple policarbonato+tela PVC tensada solar color DIC80 (naranja oscuro)

Umbral seco grado de confort grado depuración

+8.30

c07 hoja batiente 1xPC20mm+1xPC60mm

[JA04]

Umbral de lluvia

c04

+12.80

P.02[CD]

2xPC50mm+1xPC16mm

c03

+13.70

lamas fijas madera termotratada+malla metálica+LED solar

m 1,5 bierta

c05

[JA01]

c07 c08

c07

grado de confort grado depuración

+

P.01[CD]

Umbral impermeable

+

espacio exposición y venta al público + común de trabajo artistas

calle elevada colonizable por la producción de los centros

+4.70 p05

+3.80 p07 +

p08

P.B.[CTN]

aula-taller de paisajismo y renegeración del terreno

+2.80

espacio no climatizado*

+0.00

p01

p02

p03

a01 -n02 filtro arena

p04

a01 t-n01 filtro percolador

a01 cap01 aljibe

7,5

1

xigenante t01

t09

{protección viento + deshumidificación + captación PM} t06

cm03

t06

Infraestructura comuncativa

t03 t04

t05

3,8

3

0,5

8,4

0,5

p09-10 Infraestructura colonizada Jardín de agua

p07-08 Infraestructura Jardín de aire vertical s01

p09

t02

e12

cm03

1,5

3,5

11,8

p12-13 Infraestructura tecnificada Jardín de aire

p11-12 Infraestructura colonizada Jardín de agua t05 t06 a03 e12 e11

t06

t05 t04 t03

t02

e12

e14

t06

e12 cm03

e11 e12

t07

p02

p03

p05

p07b

p04

pavicesped superficie drenante p01a pieza cruciforme hg prefabricado p01b cama de arena fina p01c arena fertil con semillas p01d terreno compactado p01e grava p01f terreno natural compactado

pavimento teja negra reciclada a hueso cama de grava fina 15cm lámina antipunzonante membrana impermeabilizante

filtro percolador natural p03a cultivo-pavimento drenante h>50mm p03b cama de interfase p03c gotero subterráneo p03d filtro de arena h>300mm p03e filtro de grava Ø30mm-Ø60mm h=800mm p03f membrana

forjado placas 1000x500mm tramex rejilla 30x30mm de doble pletina doble encastado e=30mm

p10a

p05

p09b

p08b

p03

ÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

p09a

p04

p02

t01

e11 e12

a01

{pantalla led solar}

p08a

p01

{filtro solar y de partículas PM10 + humidificación y admisión aire}

Infraestructura comunicación

Infraestructura accesibilidad {wifi}

p01

construcción

1

{pantalla proyección}

p07a

p10

a01 pt-n humedal natural lineal flujo vertical

12

t07 t03

p06

p11a

p04

p11b

p04

forjado interior acabado fibrocemento

forjado elevado placas 1000x500mm tramex rejilla 30x30mm de doble pletina doble encastado e=30mm

p05b tablero madera e=2cm p05c aislamiento lana de roca 5cm p05d tablero madera e=3cm

p07

p10b

p05 p05a fibrocemento e=4cm ejecutado in situ sobre cajetín metálico conformado con chapa e=2mm

p013

p13a

p05

p08

p12b

p08

p13

p07

piscina natural, vaso realizado con tablestaca de acero hincada e impermeabilizada con geomembrana impermeabilizante

forjado exterior acabado madera

forjado interior acabado fibrocemento

forjado exterior acabado madera

p07a listones de madera reutilizadas de encofrado madera 300x15x3cm

p05a fibrocemento e=4cm ejecutado in situ sobre cajetín metálico conformado con chapa e=2mm

p08a listón madera Iroko termotratado

zona filtrado con plantas acuáticas y filtros de grava realizado en chapa plegada e=5mm rebosadero e=5mm

de

chapa

metálica

plegada

p07b forjado tipo p05

p14

p13b

p05

p05b tablero madera e=2cm

p14a

300x15x3cm p08b tramex de doble pletina e=50mm

p10

p11

p14b

p14

p10

cubierta plana 1% ventilada

forjado exterior acabado placas de tramex 3000x500mm entramado 30x30mm doble electrosoldado e=50mm

p14a viguetas 150 doble T invertida p14b tablero madera e=3cm

p14c aislamiento lana de roca e=5cm

p05c aislamiento lana de roca 5cm

p14d tablero madera e =2cm

p05d tablero madera e=3cm

p14e rastreles madera 5x5cm


[ST_03] the horizontal cover

Threshold

[EST_02] 背景 E l

+15.40

la cubierta

u m b r a l

h o r i z o n t a l

C01

C02 C03

+10.00 + 4.20 +0.00 p02a

p02b

p02c

p02d

1 3

p02e

N

0

1

escala 1.100

2

3

4

5

Cubierta [C02]

Franja de cubierta testada del edificio MAC

área= 1.932m²

10

20m

Cubierta [C02]

Sección y planta cubierta

área= 1.932m²

Estructuras cubierta

pp viga p02a

p02b

p02c

p02d

p02e

Cubierta [C02] área= 1.932m²

Las vigas canal se apoyan sobre encepados ejecutados in situ. En una primera fase no necesitarían estar armadas, sin embargo se dimensionan par la fase última, en la que entran en carga pasarelas, cubiertas y espacios cerrados. - Esta fase puede ser estable en si misma y perdurable en el tiempo. -acciones a considerar: peso propio (pp vig a) de la viga sobre el terreno

a5

c2_3

c3_2 a3

c3_1

a6 b15 - b33

c1_3

b34 - b42

a1 p02a

p02b

p02c

p02d

c1_1

b1 - b14 a4

a2

c2_1

a Vigas principales de perfiles duplicados pasantes - sobre pilares dobles - 150x50mm de nudos

b Vigas secundarias articuladas de atado entre cerchas principales, realizadas con perfiles

rígidos empotrados, sin triangulación intermedia entre vanos (excepto arriostramientos superiores), bi-apoyadas sobre pórticos lineales. La modulación en planta de los elementos estructurales de cubierta se realiza en base a un

p02a

p02b

p02c

p02d

c2_2

c1_2

p02e

p02e

c Arriostramiento contra las acciones de viento y estabilidad global de la estructura de la cubierta por medio de cables semirrígidos. No es necesario arriostrar los paños intermedios a los soportes debido a que estos llevan su propio arriostramiento, lo que impide la deformación del sistema.

tubulares duplicados pasantes - bajo vigas principales - de 80x50mm.

módulo básico de 150cm. Ésto es posible gracias a la previa disposición de los pórticos estructurales verticales (lineales) a distancias múltiplo del multimódulo {d=1,5·n} para n=número entero

p02b

p02c

p02d

vs27

vs26

p06

p05

vs25

vs24

vs23

vs22

p04

vs21

p03

vs20

vs19

vs18

vs17

vs16

vs15

vs14

vs13

vs12

p02

vs11

p01

vs10

vs09

vs08

vs07

vs06

vs05

vs04

p02

vs03

p01

p02e

45

área= 1.932m²

área= 1.656m²

17

4b 89°

01 ca

t0

Cubierta [C03]

t0 4a

16

Cubierta [C04]

ca 02

3

Cubierta [C02]

°

pp n1 sc u C1

18

45

°

p02a

vs02

vs01

Las pórticos lineales debido a su esbeltez y ligereza son susceptibles de sufrir las acciones del viento provocando el agotamiento de la biela a tracción. A este efecto contribuye con su peso propio la viga canal, compensando el momento generado por la carga de viento.

área= 672m²

89° 4,5

45

° 45

°

45

45

°

°

15 14

9

° 45

ms15_3

ms14_3

m02b_3

ms13_3

m02a_3

ms12_3

09

2xTUB_150x50

TUB_200x80 + TUB_120x70

08 07

2xTUB_150x50

1

1

1

TUB_200x80 + TUB_120x70

TUB_200x80 + TUB_120x70

ms07_3

ms06_3

3

05

m01b_3

m01a_3

TUB_200x80 + TUB_120x70

06

TUB_200x80 + TUB_120x70

ms03_3

4b 3_ vp

ms05_3

ms04_3

m01b_3

ms03_3

1,8

ms01_3 m01a_3

2xTUB_150x50

TUB_200x80 + TUB_120x70

TUB_200x80 + TUB_120x70

ms08_3

3b t0

3 3

1,5

1,5

1,5

04 1,5

1,5

1,5

1,5

1,5

1,5

1,5

1,5

1,5

1,5

03

1,5

02

TUB_200x80 + TUB_120x70

1,5

TUB_200x80 + TUB_120x70

1,5 TUB_200x80 + TUB_120x70

3

TUB_200x80 + TUB_120x70

p02e

structural system 3

2xTUB_150x50

p02d

11 10

3

3

m01b_3

p02c

t0 3a

m01a_3

p02b

12

°

p02a

4a 3_ vp 45

Los módulos estructurales lineales se dimensionan para una sobrecarga de uso C3 junto con una carga asimetrica aplicada de 3KN/m². Acciones sobre forjados exteriores Tierra SC=10KN/m² Nieve N1= 0.05KN/m² PP=0.18 El peso propio de la barandilla ayuda a centrar las cargas y compensa la carga de viento producida en el pórtico.

ms11_3

p02e

TUB_200x80 + TUB_120x70

p02d

ms09_3

p02c

1,5

p02b

ms10_3

13 p02a

01

estructuras


a1 c1_1

b1 - b14 a4

a2

c2_1

a Vigas principales de perfiles duplicados pasantes - sobre pilares dobles - 150x50mm de nudos

b Vigas secundarias articuladas de atado entre cerchas principales, realizadas con perfiles

rígidos empotrados, sin triangulación intermedia entre vanos (excepto arriostramientos superiores), bi-apoyadas sobre pórticos lineales. La modulación en planta de los elementos estructurales de cubierta se realiza en base a un

[ST_04]

módulo básico de 150cm. Ésto es posible gracias a la previa disposición de los pórticos estructurales verticales (lineales) a distancias múltiplo del multimódulo {d=1,5·n} para n=número entero

the horizontal cover

ticos lineales debido a su esbeltez eza son susceptibles de sufrir las es del viento provocando el miento de la biela a tracción. A este contribuye con su peso propio la anal, compensando el momento do por la carga de viento.

p02c

p02d

vs27

vs26

p06

p05

vs25

vs24

vs23

vs22

p04

vs21

p03

vs13

vs12

p02

vs11

p01

vs10

vs09

vs08

vs07

vs06

vs05

vs04

p02

vs03

p01

p02e

45

área= 1.932m²

área= 1.656m²

4b

t0 4a 89°

01 ca

t0

Cubierta [C03]

Cubierta [C04]

ca 02

3

Cubierta [C02]

°

45

°

p02b

vs02

vs01

Threshold

vs20

p02e

vs19

p02d

vs18

p02c

c Arriostramiento contra las acciones de viento y estabilidad global de la estructura de la cubierta por medio de cables semirrígidos. No es necesario arriostrar los paños intermedios a los soportes debido a que estos llevan su propio arriostramiento, lo que impide la deformación del sistema.

tubulares duplicados pasantes - bajo vigas principales - de 80x50mm.

vs17

p02b

c2_2

c1_2

p02e

vs16

p02d

vs15

p02c

vs14

p02b

área= 672m²

89°

9

° 45

45

°

ms15_3

ms14_3

m02b_3

45

ms13_3

m02a_3

ms12_3

2xTUB_150x50 2xTUB_150x50

1

1

TUB_200x80 + TUB_120x70

TUB_200x80 + TUB_120x70

TUB_200x80 + TUB_120x70

1

TUB_200x80 + TUB_120x70

ms03_3

m01a_3

TUB_200x80 + TUB_120x70

m01b_3

4b 3_ vp

ms05_3

ms04_3

m01b_3

ms03_3

1,8

ms01_3 m01a_3

2xTUB_150x50

ms06_3

3

2xTUB_150x50

m01b_3

1,5

1,5

1,5

1,5

1,5

1,5

1,5

1,5

1,5

1,5

1,5

1,5

1,5

TUB_200x80 + TUB_120x70

1,5

TUB_200x80 + TUB_120x70

1,5

TUB_200x80 + TUB_120x70

1,5

TUB_200x80 + TUB_120x70

3

3

TUB_200x80 + TUB_120x70

3

3

p02e

ms11_3

TUB_200x80 + TUB_120x70

ms08_3

3

ms07_3

3

t0

3b

t0 3a

m01a_3

p02d

°

p02c

45

p02b

4a 3_ vp

TUB_200x80 + TUB_120x70

p02e

ms10_3

p02d

ms09_3

p02c

1,5

p02b

ódulos estructurales lineales se onan para una sobrecarga de uso nto con una carga asimetrica a de 3KN/m². es sobre forjados exteriores SC=10KN/m² N1= 0.05KN/m² 8 propio de la barandilla ayuda a las cargas y compensa la carga to producida en el pórtico.

°

45

45

°

°

4,5

estructur

1

1,5

1

1,5

1,5

p02a

1,5

mp04

1,5

mp06

1,5

mp07

1,5

mp08

1,5

mp09

1,5

mp10

1,5

mp11

1,5

mp12

1,5

1,5

mp13

p03a

vs15

vs14

vp02b

vs13

vp02a

vs12

vs11

vs10

vs09

vs08

1,5

mp05

1,5

mp14

p04a

mp15

30°

34°

vs07

vs06

vs05

vs04

vp01b 1,5

mp03

p01a

39°

2xTUB_150x50

1,5

mp02

34°

1,5

mp01

1,5

mp01

30°

1

39°

1

vs03

vs02

vs01 1,2

vp01a

p02e

1,5

p02d

TUB_120x70 + TUB_200x80

p02c

vp01b

1,8

p02b

vp01a

sección vertical estructura cubierta inclinada C02,C03,C04

TUB_70x70 + TUB_200x80

c0 1

ms01_1

ms02_1

m01_1

ms03_1

m02_1

ms06_1

ms05_1

ms04_1

c0

ms07_1

ms12_1

ms11_1

ms13_1

m03_1

m04_1

ms15_1

ms14_1

ms14_2

ms15_2

121°

c0

4 c0

ms01_3

ms01_3

m01_3

ms02_3

ms03_3

m02_3

ms04_3

ms06_3

ms05_3

ms07_3

ms08_3

ms10_3

ms09_3

ms11_3

6

ms12_3

m03_3

ms13_3

m04_3

ms14_3

ms15_3

1,5

vp02a

p01b

mp03

p02b

mp04

2xTUB_80x50

2xTUB_80x50

2xTUB_80x50

2xTUB_80x50

5,2

3

2xTUB_200x50 3

mp06

mp07

2xTUB_80x50

2xTUB_80x50

Cubierta [C03]

mp08 2xTUB_80x50

A = 165m² 15 27,5

7,3

alzado lateral estructura cubierta inclinada C03

mp05 2xTUB_80x50

sección horizontal estructura cubierta inclinada C03

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

mp09 2xTUB_80x50

mp10 2xTUB_80x50

30°

39°

34°

2xTUB_150x50

1,5 TUB_120x70 + TUB_200x80

vp02b

mp02 2xTUB_80x50

30°

mp01 2xTUB_80x50

2xTUB_200x50 1,8

39°

34°

mp01

mp11 2xTUB_80x50

mp12 2xTUB_80x50

p03b 2xTUB_80x50

mp13 2xTUB_80x50

2xTUB_200x50

p04b

mp14

2xTUB_80x50

2xTUB_80x50

2xTUB_200x50 3

3

mp15 2xTUB_80x50

6,3

m04_2

vs15

ms13_2

vs14

m03_2

vp04

ms12_2

vs13

ms11_2

vp03

ms10_2

vs12

ms09_2

vs11

ms08_2

103°

vs10

ms07_2

vs09

ms06_2

vs08

ms05_2

vs07

vs06

ms04_2

vs05

vs04

vp02

vs03

vp01

m02_2

1,5

1,5

121°

103°

ms03_2

2 c0

ulación en planta de los elementos rales de cubierta se realiza en base

módulo básico de 150cm. Ésto es gracias a la previa disposición de icos estructurales verticales (lineales) ancias múltiplo del multimódulo ·n} para n=número entero

m01_2

113°

TUB_70x70 + TUB_200x80

p02e

ms02_2

c0 4

p02d

ms01_2

vs02

vs01

ms01_2

6

vs01b

TUB_70x70 + TUB_200x80

vs01a

p02c

ms10_1

ms09_1

c0 5

113°

p02b

ms08_1

3

1,5

1,5

c03

ms01_1

p06

vs27

2xTUB_200x50

vs26

2xTUB_200x50

p05

vs25

vs24

vs23

vs21

p04

2xTUB_200x50

p03

vs20

vs19

vs18

vs17

vs16

vs15

vs13

vs12

vs14

2xTUB_200x50

p02

vs11

vs10

vs09

vs07

vs06

3,5

2xTUB_200x50

p01

2xTUB_200x50

vs08

2xTUB_200x50

vs05

vs02

vs01

2xTUB_200x50

vs04

erta G1 transitable únicamente para imiento inclinación <20º erta G1 transitable únicamente para imiento inclinación 25º

7,5

vs22

2,8

p02e

p02

p02d

vs03

p02c

p01

p02b


la cubierta

背景

N u d o

a

n u d o

[ST_03] the horizontal cover

15 16

v.p.-p3

5

6

7

8

9

10 11 12 13 14

15 16

17 18 19

0

v.p.-p3

v.p.-p4

v.p.-p3'

v.p.-p4'

v.p.-v.s1

v.p.-v.s2

v.p.-v.s1

v.p.-v.s2

6

7

8

9

10 11 12 13 14

15 16

17 18 19

2 3

2

2 3

3

v.p.-t1' 0,2

0,2

0,2

BB'

0,07

AA'

0,08

0,07

BB'

0,1

0,05

AA'

0,12

0,05

0,21

0,12 0,05

0,08

0,08

B TU

_1

0 x5 50

6 0 ,1

0,15

4 0 ,2

6 0,0

0,05

0,15

0,08

0,15

0,21

0,08

0,05

2xTUB_80x50

0,42 0,15

0,07

0,15

0,05 0,05

0,12

0,05 0,05

0,06

0,05 5 0 ,0

56

56 °

°

5 0 ,1

5 0,1

1 0 ,2 5 0 ,0

0,05 0,05

0,12

0,05 0,05

TUB_120x70

1,62

1,8

1,63

TUB_120x70

1,8

TUB_120x70

1,72

1,65

2xTUB_200x50

0,09

0,1

4° 0,12

2x

5 0,0

0,2

0,21

12

0,05

0,13

0,08 0,01 0,08

0,08

0,15

0,05

5 0,0 1 0,2

2xTUB_200x50

0,07

0,07

0,04

0,04

0,17 0,07

0,11

0,1

0,06

2xTUB_80x50

0,42 0,15

4 0 ,1

0,26

6 0,0

0,1

0,13

6 0,0

7 0,0

0,51

34°

0,05

0,15

0,15 0,1

0,1

0,08 0,03

2xTUB_80x50

0,2

0,09 0,03

5 0 ,1

0,11

0,2

0,05

4 0,2

0,08 0,02

0,31

0,05

0,09

34°

0,08

0,07

5 0,1

0,08

0,15

50 0x 15

34°

0,05

B_

33°

2xTUB_150x50

TU 2x

0,07

0,08 0,02

0,01 0,05

0,1

0,2

0,12

0,2

0,05

0,3

1,8

5

v.p.-t1

0,05

1,65

4

v.p.-v.s1' v.p.-v.s2'

BB'

0,2

3

v.p.-t1

AA' 0,1

2

v.p.-p4

0,2

0,05

1

TUB_120x70

v.p.-p2'

4

0,1

v.p.-p1'

3

0,08 0,03

v.p.-p2

2

0,06

v.p.-p1

1

1

v.p.-p2

0

1

v.p.-p1

17 18 19

0,08

10 11 12 13 14

0,04

9

0,08

8

0,11

7

unión-tipo atornillada en esquina de viga principal-viga secundaria con montante TUB80x50

0,15

6

V.P.-T

0,14

5

c

0,2

4

unión-tipo atornillada de viga principal-viga secundaria con montante TUB80x50

0,12

3

V.P.-V.S.

0,07

2

b

0,13

1

unión-tipo atornillada de viga principal-pilar estructural lineal 2xTUB200x50

0,16

0

V.P.-P

1

a

12 4°

0,14

C

0,15

0,15

0,07

0,15

C'

0,17

5 0 ,2

0,14

2xTUB_80x50

0,1

0,07

B TU

6 0 ,2

0,12

2xTUB_80x50

0,08 0,15

2x

0 x5 50 _1 4 0 ,1

6 0,1

0,08 0,01 0,08

2xTUB_80x50

0,15

4 0 ,2

6 0,1

0,1

0,15

0,04

0,08 0,02

0,1

0,26

0,07 0,21

5 0 ,1

6 0,1

0,08

C'

0,15

2xTUB_150x50

0,07

0,14

0,11

0,1

0,15

C'

1 24 °

0,11

50 0x 15

0,16

0,07

C

B_

0,1

TU 2x 56 °

C

6 0 ,2

6 0,2

2xTUB_200x50

+

0,08

CC' 0,05

0,08

0,08

B TUB_80x50

TUB_80x50 0,17

TUB_150.50.6

0,04

Perfiles utilizados TUB_150x50

0,08

TUB_150.50.6

0,31

0,12

0,07

0,07 0,07

0,21 0,05

U_135.105.56.3 U_105.56.3

0,06

0,03

TUB_80.50.3 TUB_150x50

TUB_150x50

0,14

0,14

A

TUB_100.40.5

0,06

0,07

0,21 0,05

0,12

0,31

0,07 0,07

U_135.105.56.3

0,07

TUB_80.50.3

0,11

0,05

TUB_150x50

0,08

0,05

0,05 0,06

0,03

U_105.56.3

B' 0,31

TUB_80x50

TUB_80x50 0,05

TUB_150x50

A'

0,21

0,04

TUB_150.50.6

0,05

0,04

A

0,1

0,21

0,08

0,1

0,04

0,05

Perfiles utilizados 0,17

0,05

0,31

2xTUB_100x40

0,07 0,07 0,07

2xTUB_100x40

0,05 0,21

0,04

0,09

0,19

0,05

0,08

0,1

TUB_150x50

0,1

0,05

0,05

0,03 0,07

TUB_200.50.6 0,03

0,05

B

0,19

Perfiles utilizados 0,07 0,03

CC'

0,05 0,08

0,08

TUB_80x50

TUB_80x50

B

0,17

0,09

0,05

0,07

0,21

0,06

0,05

0,21

TUB_200x80

0,05

CC'

0,05

TUB_200x80 +

TUB_200x80

2xTUB_200x50

A'

TUB_200.80.5

A

B'

A' B'

PLET_380.150.6

TUB_80.50.3 TUB_200.80.5 PLET_390.150.6

e 1:15

e 1:15

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

e 1:15


[ST_04] the horizontal cover

d 0

unión-tipo de viga principal-viga secundaria perimetral

V.P.-t 1

2

3

4

5

6

7

8

9

10 11 12 13 14

15 16

e

17 18 19

0

unión-tipo de viga secundaria-montante TUB80X50

V.S.-m 1

2

3

4

5

6

7

8

9

10 11 12 13 14

15 16

f

17 18 19

unión-tipo de viga forjado-tensor descuelgue desde cubierta

V.F.-t 0

1

2

3

4

5

6

7

8

9

10 11 12 13 14

15 16

17 18 19

Cuadro de características según DB-SE-A Tipo de acero Límite elástico Coef. minoración acero Coef. mayoración cargas

v.p.-t1

S 275 JO Su = 2.75 N/mm2 e<16 mm 0º Ga = 1 Ga = 1.5

v.f.-t1

Tipo de cubierta G1. cubiertas accesibles únicamente para mantenimiento. No concomitante con el resto de acciones variables

v.f.-t2 v.p.-t1

v.f.-t1

3

3

3

2

2

2

1

1

1

Sobrecarga de uso 1KN/m² Peso propio Protección contra fuego

v.p.-t1'

v.f.-t1'

AA'

BB'

AA'

BB'

0,2 0,08

BB'

0,07

AA'

0,12 0,05

0,21

0,05

0,08

0,08

0,2

0,14

0,15 0,15

0,12

0,05 0,05

0,07

0,07

0,08 0,01 0,08

0,13

0,04

0,04

0,08

0,15

0,05

0,07

0,14

2xTUB_80x50

0,42

0,06

0,17

7 0,0

0,05 0,11

0,15

0,1

0,1

0,07

0,13

0,08

2xTUB_80x50

0,42 0,15

0,1

0,17 0,06

0,08 0,03

0,08 0,03

0,1

0,08

6 0,0

6 0,0

4 0,2

2xTUB_80x50 0,08

0,08

0,15

0,15

0,19

34°

0,05

0,06

50 0x 15

5 0,1

0,17

0,13

0,05

0,05

0,2

B_

0,07

45°

0,01 0,11

TU 2x

34°

2xTUB_80x50

0,04

0,3

0,12

0,07

0,07

0,05

0,07

0,16

0,2

0,12

0,08

0,06 5 0,0 5 0,1

1 0,2

56 °

0,05 0,05

5 0,0

1,72

0,12

1,72

TU 2x

TUB_120x70

1,8

TUB_120x70

B_

50 0x 15

56 °

6 0,1

0,14

2xTUB_80x50

1 24 °

1,72

TUB_120x70

1,8

TUB_120x70

1,8

1,8

0,07

0,15

0,07

0,08 0,01 0,08

6 0,1

0,15

6 0,1

estructuras t01

6 0,2

TUB_200x80 + TUB_120x80

0,26

C

2xTUB_80x50

C

C'

C' 2xTUB_80x50

t02

0,14

0,08

2xTUB_80x50

TUB_160x80

CC'

0,06

TUB_80x50

Perfiles utilizados 0,14

0,18

t02 0,33

0,08

B

t03 TUB_80x50

TUB_80x50

TUB_80x50 0,06 0,06

TUB_150.50.6

0,07

0,31

0,26

0,12

0,07

0,07

0,21 0,05

U_105.56.3

Perfiles utilizados

A

A

TUB_200.80.5

A'

A' B'

B'

PLET_390.150.6

TUB_70.70.5

0,27

0,14

TUB_80.50.5

0,2

TUB_160.80.5

TUB_80.50.3

0,06

TUB_150x50

0,03

0,07

0,21 0,05

0,07

0,05

0,05

TUB_150x50

0,05

B

0,19

0,17

CC'

0,19

0,05 0,08

0,09

0,08

0,05

0,08

CC'

t04 t06 t05

t01 Terminal laminado gancho acero inoxidable AISI 316 t02 Tensor cerrado acero inoxidable AISI 316 t03 Bloqueo de tensor acero inoxidable AISI 316 t04 Terminal laminado rosca acero inoxidable AISI 316 t05 UPN 200

e 1:15

e 1:15

t06 Cilindro metálico Ø50mm

e 1:15


[ST_05] the joints

e

f

g

h

a

b

c

d

Attempts have always been made in order to find constructive solutions that will ensure the continuity of structural elements avoiding as much as possible the irreversible actions during the construction phase of the building and the lower number of operations on site. Thus, each phase can exist autonomously but be prepared to be able to receive the last phase.


[ST_06] the module

L i n e a l s[EST_02] tructures 背景

L a s

el módulo

e s t r u c t u r a s

l i n e a l e s

ELEMENTOS ESTRUCTURALES VERTICALES

b Unidad básica constructiva - tipo pasarela estructural [6 x 3 m]

AA

IPN 200

191 x 100 x 90

sección dd'-cim2

sección bb'-p1

sección cc'-pe1

.200.100.5

UPN 280 .200.100.5

.200.100.5 .200.100.5

UPN 28 0 .200.100.5

UPN 280 UPN 280 UPN 280 .200.100.5

.200.100.5

.200.100.5

.200.100.5

UPN 280

.200.100.5

.200.100.5

sección dd' pe2

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

08 07

.200.100.5

.200.100.5

+ 6.35

UPN 280

02

IPN 280

IPN 280

.200.100.5

AT

.200.100.5

.200.100.5

.200.100.5

.200.100.5

AY .200.100.5

UPN 280

0 28

.200.100.5

U PN

2 UPN 280 IPN 280

IPN 280

.200.100.5

.200.100.5

.200.100.5

.200.100.5 .200.100.5 .200.100.5

UPN 280

.200.100.5

2 UPN 280

+ 6.35

.200.100.5

AX

.200.100.5

.200.100.5 2 UPN 280

UPN 280

AW

2 UPN 280

.200.100.5

+ 4.09

.200.100.5

UPN 280

BA

UPN 280

BB UPN 280

+ 6.35

.200.100.5

+ 4.09

2 UPN 280

UPN 280

+ 4.09

01

02

Planta estructural Planta primera MAC e 1:300

03

04

AZ

UPN 280 UPN 280

2 UPN 280

05 06

07

08

09 10 11 12

01

estructuras

.200.100.5

280 U PN

03

AV

2 UPN 280

.200.100.5

.200.100.5

UPN 280

.200.100.5

2 UPN 280

2 UPN 280

.200.100.5

IPN 280

UPN 280

2 UPN 280

2 UPN 280

2 UPN 280 + 6.35

2 UPN 280

04

AS

+ 4.09

UPN 280 .200.100.5

AR UPN 280

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5 .200.100.5

2 UPN 280

06 05

2 UPN 280

2 UPN 280

.200.100.5

.200.100.5

UPN 280

.200.100.5 .200.100.5

.200.100.5

2 UPN 280

UPN 280

.200.100.5

.200.100.5 2 UPN 280

2 UPN 280

+ 6.35

09

.200.100.5

.200.100.5

.200.100.5

.200.100.5

UPN 280 UPN 280 IPN 280

10

AQ

2 UPN 280

.200.100.5

2 UPN 280

UPN 280

.200.100.5

UPN 280

.200.100.5

.200.100.5 UPN 280

.200.100.5

.200.100.5 .200.100.5

.200.100.5

UPN 280

280 U PN

UPN 280 UPN 280 UPN 280

IPN 280

IPN 280

.200.100.5

.200.100.5

.200.100.5

.200.100.5

UPN 280

.200.100.5

UPN 280

UPN 280 .200.100.5

.200.100.5 .200.100.5

UPN 280

280

.200.100.5

.200.100.5

U PN

UPN 280 28 0 U PN

IPN 280

IPN 280

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5 .200.100.5 .200.100.5

.200.100.5

UPN 280 UPN 280 UPN 280

.200.100.5

UPN 280

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5 .200.100.5

UPN 280

UPN 280

.200.100.5 .200.100.5

UPN 280

.200.100.5

.200.100.5

.200.100.5

.200.100.5

.200.100.5

28 0

UPN 280

UP N

UPN 280 UPN 280

UPN 280

.200.100.5

.200.100.5

UPN

UPN 280 UPN 280

.200.100.5 .200.100.5 .200.100.5 .200.100.5

.200.100.5 .200.100.5 .200.100.5 .200.100.5

UPN 280

UPN 280

.200.100.5

.200.100.5

d

d

Capacidad portante en situaciones persistentes 250.1 kN Capacidad portante en situaciones accidentales 250.1 kN

.200.100.5

28 0

Ø35.0 cm

UPN 280

2 UPN 280

IPN 280

N20 (Tipo1)

BB

2 UPN 280

2 UPN 280

.200.100.5

Prefabricado de hormigón circular hincado 8xPIL_350_3D (HA50)

BA

.200.100.5

e06 viga principal pórtico tubular acero 200x100x8mm e09 angular en L e10 cable semirígido de ariostramiento e11 angular L pasarela e12 rejilla tramex 30x30x3cm e13 pletina metálica anclaje cable e14 redondo acero corrugado Ø20 e15 UPE 270

2 UPN 280

2 UPN 280

IPN 280

6

LEYENDA

4 Tabla de pilotes

2 UPN 280

11

AP

2 UPN 280

UPN 280

2 UPN 280

2 UPN 280

+ 6.35

.200.100.5

.200.100.5

50

VC.U-1.1 Arm. sup.: 4Ø16 Arm. inf.: 4Ø16 Arm. piel: 8x2Ø16 Estribos: 1xØ8c/20

UPN 280 2 UPN 280

AZ

N19 (Tipo1)

.200.100.5 .200.100.5

UPN 280

.200.100.5

UPN 280

UPN 280 UPN 280

2 UPN 280

2 UPN 280

IPN 280

AY

2 UPN 280

.200.100.5

.200.100.5

2xUPN280

150

VC.S-1.1 Arm. sup.: 4Ø16 Arm. inf.: 4Ø16 Arm. piel: 1x2Ø12 Estribos: 1xØ8c/20

UPN 280

.200.100.5

.200.100.5

.200.100.5 2 UPN 280

AX

2xT

2 UPN 280

2 UPN 280

2xIPE150

2 UPN 280

2 UPN 280

2 UPN 280

2 UPN 280

AW

e12 e11

2 UPN 280

2 UPN 280

e06

.200.100.5

Apoyo de vigueta sobre UPE270

40

6

2 UPN 280 + 6.35

.200.100.5

AV

0,2

2

2 UPN 280

12

AO

0,1

2xIPE150

2xIPE150

+ 4.09

2 UPN 280

.200.100.5

0,2

6

0,7 0,7 0,7 0,7

2x200x50

5,6

0,7

26°

150

2xIPE150

b V.C. U

2xIPE150

a V.C. S-1.1

2xIPE150

El sistema puede usar las vigas centradoras tipo S1.1 en estructuras colonizables.

2xIPE150

Vigas centradoras

2xIPE150

3

2xIPE150

2xIPE150

4 pernos Ø6 placa base 20x20cm

191 x 100 x 90

0,1

2xIPE150

IPN 280

+ 6.35

0,07

+ 6.35

14 13

2 UPN 280

2 UPN 280

UPN 280

UPN 280

.200.100.5

UPN 280

0,27

AT

0,04

2xIPE150

.200.100.5

0,05

0,14

.200.100.5

2xIPE150

2xIPE150

200x100

N21 (Tipo1)

53

53

.200.100.5

UP N

28 0

.200.100.5

IPN 280

IPN .200.100.5 280

UPN 280

0,04

0,7

UPN 280

0,15

2xIPE150

+ 6.35

2 UPN 280

AS

64°

N30 (Tipo1)

.200.100.5

IPN 280

+ 4.09

AN

2 UPN 280

2 UPN 280

.200.100.5

Mecanismo transmisión de cargas

.200.100.5

2 UPN 280

.200.100.5

0,7

0,5

0,4

0,09

2xUPN280

0,03 0,03 0,03

2x200x50

2

.200.100.5

IPN 200

IPN 200 IPN 200

IPN 200 IPN 200

IPN 200

AR

2 UPN 280

16 15

.200.100.5

UPN 280

17

AM

.200.100.5

2 UPN 280

.200.100.5

e10

.200.100.5

e12 e09 e13

.200.100.5

0 28

e15

18

2 UPN 280

2 UPN 280

20 19

2 UPN 280

2 UPN 280

21

AL

UPN

2xT

2 UPN 280

2 UPN 280

Viga principal de forjado (vf) e06

3

2 UPN 280

+ 6.35

AQ

1

3

2 UPN 280

UPN 280

2 UPN 280

UPN 280

Mecanismo arranque de pilares

2 UPN 280

UPN 280

UPN 280 + 6.35

+ 4.73 UPN 280

AP

2 UPN 280

AK

UPN 280 + 4.09

UPN 280

AJ

2 UPN 280

2 UPN 280 2 UPN 280

UPN 280

AI

2 UPN 280

UPN 280

2 UPN 280

2 UPN 280

UPN 280

.200.100.5

.200.100.5

UPN 280

.200.100.5

2xIPE150

0,75

2xIPE150

0,75

2xIPE150

0,75

2xIPE150

0,75

2xIPE150

0,75

2xIPE150

1

2xIPE150

200x100

cota firme asiento cimentación

cota longitud óptima pilote

El mecanismo de arranque de los pilares se realiza mediante unión roscada a la cimentación y unión atornillada entre soporte-pilar.

0,75

AO

2 UPN 280

UPN 280

.200.100.5

Las vigas centradoras pueden ser de dos tipos: viga rectangular HA50 o viga canal prefabricada HA50. 6

-0.95

-11.75

6

2xUPN280

5,6

53

2xT

2 UPN 280

UPN 280

.200.100.5

centradoras(3) y los anclajes de unión de pilares dobles a la cimentación (1,2) . La proximidad al canal y el elevado nivel freático que conlleva, junto con la baja calidad del terreno hacen necesario el pilotaje.

191 x 100 x 90 53

AN EL sistema estructural compuesto, en primer lugar, por los soportes b2 es colonizado por forjados compuestos por vigas principales pasantes (vf) UPE apoyadas sobre las vigas del pórtico y sobre las que se van a atornillar las viguetas doble T invertida de forma que en cada paño de forjado pueden apoyarse en los perfiles UPE interiores - dejando el perfil exterior para apoyar la siguiente.

0,4

Los componentes más representativos del contacto del módulo con el terreno son la cimentación pilotada (4) , las vigas

2x200x50

N40 (Tipo1)

+ 6.35

AH

2 UPN 280

2 UPN 280

2 UPN 280 UPN 280

AG

2 UPN 280

UPN 280

+ 4.09

2 UPN 280 2 UPN 280

2 UPN 280

AM

d'

d'

N30 (Tipo1)

.200.100.5

IPN 200

IPN 200 IPN 200

IPN 200 IPN 200

IPN 200 IPN 200

IPN 200 IPN 200 IPN 200 IPN 200 IPN 200

3,5 0,1

tirante

28 0

+ 5.99

IPN 200

2 UPN 280

2 UPN 280

UP N

2 UPN 280

sección bb'

46 sección cc'-cim1

UPN 280

0,1 0,9 0,1 2,6 0,3

IPN 200

2,9

3 1 3,1

0,1 0,9 0,1 2,6 0,3

IPN 200

0,1

4,3 0,1 2,9

3 1 3,1 1,5

cotas perfil metálico

2 UPN 280

2 UPN 280

AF

2 UPN 280

2 UPN 280

280

b1 pasarela estructural no colonizable b2 pasarelaestructural colonizable b2.1 colonización baja b2.2 colonización media b2.3 colonización alta

2 UPN 280

2 UPN 280

2 UPN 280

AL Leyenda longitud barras

sección bb'

1250

+ 5.45

IPN 200

2 UPN 280

AE

2 UPN 280

2 UPN 280

+ 6.35

2 UPN 280

IPN 200

2 UPN 280

2 UPN 280

UPN 280

2 UPN 280

2 UPN 280

IPN 200

2 UPN 280

AD

2 UPN 280

2 UPN 280

0 28

+ 4.91

2 UPN 280

AC

2 UPN 280

2 UPN 280

2 UPN 280

IPN 280 UPN 280

UPN

AI

2 UPN 280

2 UPN 280

2 UPN 280

IPN 200

2 UPN 280

U PN

tirante

12

2 UPN 280

+ 4.09

IPN 280

+ 6.35

0 28

AH

IPN 200

0 28

cotas perfil metálico

11

AB

2 UPN 280

2 UPN 280

2 UPN 280

2 UPN 280

3

sección aa'

a1 pantalla estructural no colonizable a2 pantalla estructural colonizable a2.1 colonización baja a2.2 colonización media a2.3 colonización alta

10

UPN

AG

0 28

+ 4.37

IPN 200

N UP

Leyenda longitud barras

46

2 UPN 280

2 UPN 280

AK

3,5

46

IPN 200

UPN 280

2 UPN 280

2 UPN 280

2 UPN 280

c'

sección aa'

09

2 UPN 280

+ 6.35

+ 3.83

IPN 200

UPN 280

2 UPN 280

2 UPN 280

AJ

1,5 1

c

08

2 UPN 280

N UP

V1=0.6 N1= 0.2 kN/m²(nieve) SC-u = 3kN/m² (C1 zonas acceso al público) * carga añadida asimétrica 3kN/m²

b'

IPN 200

0 28

El dimensionado de un conjunto de 3 módulos se realiza de forma idéntica al anterior caso. Sin embargo, existen diferencias de comportamiento estructural, debido a la diferencia de separación entre soportes.Los arriostramientos en el plano vertical podrían suponer un impedimento para el tránsito de personas, por lo que se propone la ubicación de estos en los módulos extremos en el caso b1 o en los módulos que contengan núcleos de comunicación vertical en el caso b2 .

IPN 200

2 UPN 280

pasarela estructural colonizable [por pasarela pública en voladizo]

b'

a2 PP=20kN/m² (tierra)

b

07

2 UPN 280

2 UPN 280

AF

b

06

AA

UPN

V1=0.6 (viento) N1= 0.2kN/²(nieve)

05

.200.100.5

AB

c'

El caso estudiado es el del Jardín de aire, tanto para el pórtico colonizable (colonizado por pasarela pública de 3m de voladizo) como para el pórtico no colonizable. Hipótesis de carga que se han tenido en cuenta:

a1 PP= 20kN/m² (tierra)

IPN 200

+ 3.29

AE

b2

04

2 UPN 280

AD

c

pantalla estructural colonizable [por pasarela pública en voladizo]

03

4,3

4,4

0,2

La pasarela estructural es el segundo tipo de soporte, realizda con los mismos perfiles que la pasarela de 6x1m, ésta permite el tránsito de peronas dentro del núcleo estructural, al contrario de lo que propone el módulo estructural más estrecho.

AC

a2

02

pasarela estructural no colonizable

Los elementos estructurales verticales son pórticos lineales de 6x1m y 6x3m que pueden ser de tipos diferenciados: estructuras colonizables - por forjados, cubiertas y cerramientos - y estructuras exentas no colonizables que pertenecen al jardín.

1,2

4,4

01

b1

IPN 200

pantalla estructural no colonizable

IPN 200

a1

IPN 200

Unidad básica constructiva - tipo pantalla estructural

[6 x 1 m]

0,2

a


[CO_03]

背景

the constructive unit

E l Sección aa'

El camino de aire. Unidad básica construciva de los Jarines de aire

The air path

+11.65

6,85

* It has been developed in more detail, the vertical garden module with flowerbeds for plant climbing elements and elevated walkway.

nudo_

h

1

d

0,25

+4.65

0,25

° 90

+3.45

4,6

3

j

nudo_g

1,5

+0.00

-1.50

d nudo_e nudo_f nudo_

-2.40

c

nudo_

0

0.5

1

escala 1.40

1.5

2m

Sección transversal Sección a-a'

3

b

6,4

nudo_

a

a

nudo_

0,7

Leyenda

The garden continues to grow, the first structural pillars appear, such as linear free portals made entirely with S-275JO steel elements.

From a double modulation of linear structures - of 1x6m and 3x6m width - all the pillars of the project are realized.

It has been chosen the system hof double profiles thinking about the advantages offered by this system with respect to others. The reduction of the size of the steel sections is possible thanks to the duplication of elements and to the double supports. cm01 encepado HA50 95x105x270cm sobre pilotes HA circular prefabricados (hinca) cm02 pirámides invertidas tronco-cónicas en encepado; 4 orificios con pernos pasantes -para unión rígida encepado - viga canal

e06 e10 e13

Sección cota +4.65 - pasarela pública dd'

e05

nudo_

cm03 viga canal HA50 prefabricada 150x150x650cm

cm04 armadura piel Ø16/25cm; armadura refuerzo Ø16/25cm, estribos Ø16/25cm, armado longitudinal Ø16/20cm cm05 membrana amortiguante de caucho e =2cm

2,15

cm 06 chapa de acero plegada e=1mm clipada y apoyada sobre membrana de amortiguación cm07 mortero de nivelación sin retracción para sellado de junta e=5cm

1

From the ground, with massive concrete elements designed to lay the solid foundation of future phases. It is the only moment in which concrete is present - both prefabricated and poured in situ.

Planta pasarela pública elevada

e01 placa de apoyo sobre cimentación de chapón de acero e=3cm 20x20x2cm e02 cabeza metálica cruciforme doble 200x200x120cm prevista de 4 orificios Ø16 para roscado de pernos pasantes solidarizados con mortero cemento e03 chapa de acero e=2cm antipunzonamiento en unión pilar - cimentación e04 vaso metálico - mecanismo de apoyo - de pilares tubulares acero 200x50x8mm e05 tornillos roscados pasantes - tuerca y contratuerca e06 perfil metálico T de arriostramiento atornillado a pilar en 4 puntos e07 viga principal pórtico de acero laminado 200x100x8 mm e08 vigueta de acero doble T invertida 150 L=1100mm separadas 1cm e09 perfil de acero atornillado a pletina - subestructura malla cables trepadoras

g

nudo_

e06 e10 e13 e05 e03


[CO_04] the constructive unit

[CO_03_04]

la unidad básica construtiva

背景 E l

c a m i n o

d e

The air path

a i r e

Sección aa'

El camino de aire. Unidad básica construciva de los Jarines de aire

Sección bb''

b

6,4 +11.65 0,2

+11.65

4,2

4,5

{protección viento + deshumidificación + captación PM}

a03_2.jardín de aire oxigenante

4,4

a03_1.jardín de aire con trepadoras {paulownia tomentosa}

6,95

6,85

a03_3. jardín de aire aromático

a01.sistema de captación natural de agua ambiental A = 2x7.5m²=15m² {675L/mes}

° 54

36°

0,2

81 ° ° 76

14°

76 °

26°

26°

h

54 °

36°

° 81

nudo_

**1 cada 3 módulos

14°

64 °

° 64

6,4

d

0,35

0,35

0,35

0,35

0,35

0,35

0,35

0,35

11,65

2,55

3

2,35

0,15 0,1 0,15 0,15 0,15 0,15 0,1 0,15 0,15 0,15 0,15 0,1 0,15 0,15 0,15 0,15 0,1 0,1 0,1 0,1

0,8

1

0,2

97

2,9

0,2

°

10 5°

90

0,25

2,9

d' +4.65

+4.65

0,45

0,65

0,25

0,6

° 0,55

98

0,7

0,7

0,7 1

°

0,8

10 1°

73

+3.45

0,2

°

79 °

1

0,7

+3.45

0,75

0,7

0,7

0,7

0,7

0,7

0,7

0,7

0,75

6 1

4,65

4,6

3

z01.sistema de captación de agua pluvial + tratamiento natural de agua ambiental y pluvial

2,95

j'

A =12m² {mín: 0.8x12m²x51mm/m²mes=489L/mes} {max: 0.8x12m²x202mm/m²mes=1.939L/mes}

3,05

2,95

j

nudo_g

t-n01. filtro percolador natural t-n01a. t-n01b. t-n01c. t-n01d.

+0.00

cultivo-pavimento drenante h >50mm interfase gotero subterráneo agua ambiental filtro de arena h>300mm filtro de grava Ø30mm-Ø60mm h=800mm

+0.00

-0.05 -0.30 2

0,15 0,5 1,65

1,5

0,5

1% 0,15

-1.50

d nudo_e nudo_f

0,3

0,55

0,3

-1.50

1,5

nudo_

1,05

-2.40

-2.40

0,35

0,35

b'

0,65

2,65

c

nudo_

0

0.5

1

escala 1.40

1.5

2m

0

0.5

1

escala 1.40

Sección transversal

1.5

2m

Alzado longitudinal

Sección a-a'

Sección b-b'

j05

j01

j02

j03

esquema funcionamiento estructural de la jadinera y cargas aplicadas

1

N1=0,05 KN/m² PP=0,18 + 0,15* KN/m² Q1=3,0 KN/m²

1,3

D

0,85

1,6 KN/m

1,15

j05

esquema funcionamiento estructural de la barandilla y cargas aplicadas

1,6 KN/m

0,7

D

0,7

L

0,7

D

0,7

1

D

3

2,15

0,55

0,7

0,7

0,2

2,15

Sección gg' 0,85

0,1

elementos independientes de la jardinera

0,1

0,35

nudo_

b

j07

6

6,4

j08

a

a'

j01 j08

a 4,9

nudo_

j07

2,2

0,7

Planta pasarela pública elevada e05

cm04 armadura piel Ø16/25cm; armadura refuerzo Ø16/25cm, estribos Ø16/25cm, armado longitudinal Ø16/20cm

Sección ii'

planta proyectada jardinera

sección longitudinal jardinera

parterres

Attempts have always been made in order to find constructive solutions that will ensure the continuity of structural elements avoiding as much as possible the irreversible actions during the construction phase of the building and the lower number of operations on site. Thus, each phase can exist autonomously but be prepared to be able to receive the last phase. 0,5

1

cm07 mortero de nivelación sin retracción para sellado de junta e=5cm

2,15

0,05

e19

e18 e17 e05

0,1

0,8

0,05

81°

e01 placa de apoyo sobre cimentación de chapón de acero e=3cm 20x20x2cm

0,85

0,1

1

0,5

0,05

0,85

0,1

2,15

cm 06 chapa de acero plegada e=1mm clipada y apoyada sobre membrana de amortiguación

0,05

0,05

cm05 membrana amortiguante de caucho e =2cm

e02 cabeza metálica cruciforme doble 200x200x120cm prevista de 4 orificios Ø16 para roscado de pernos pasantes solidarizados con mortero cemento e03 chapa de acero e=2cm antipunzonamiento en unión pilar - cimentación

Elementos de contención de tierra

barandilla acero corrugado reciclado y doblado

0,2

e06 e10 e13

h

nudo_

cm03 viga canal HA50 prefabricada 150x150x650cm

Sección hh'

seccoón constructiva barandilla y forjado

0,05 0,07

cm02 pirámides invertidas tronco-cónicas en encepado; 4 orificios con pernos pasantes -para unión rígida encepado - viga canal

Sección ff'

planta constructiva barandilla y forjado

Elementos de protección vertical

Sección cota +4.65 - pasarela pública dd'

cm01 encepado HA50 95x105x270cm sobre pilotes HA circular prefabricados (hinca)

Sección ee'

0,1

Leyenda

5,85

g

nudo_

e06 e10 e13 e05 e03

e04 vaso metálico - mecanismo de apoyo - de pilares tubulares acero 200x50x8mm e05 tornillos roscados pasantes - tuerca y contratuerca e06 perfil metálico T de arriostramiento atornillado a pilar en 4 puntos

e16

e07 viga principal pórtico de acero laminado 200x100x8 mm e08 vigueta de acero doble T invertida 150 L=1100mm separadas 1cm e10 angular metálico en L 50x50mm soldado a perfil e09

Ø0,01 Ø0,03

0,07

e09 perfil de acero atornillado a pletina - subestructura malla cables trepadoras

8

e11 tensor

0,2

0,14


背景

[CO_05] [CO_05]

la unidad básica construtiva

the constructive unit E l

Alzado transversal aa'

Sección transversal bb´

c a m i n o

d e

a i r e

Sección constructiva por viga forjado UPE270 - estructura

Sección constructiva por pasarela de mantenimiento - estructura+malla cables

Alzado constructivo - estructura + malla cables + forjado+ jardinera

e06 e08

e06

e09 e10

11.50 e13

e10

e10 e03

e10

e07

e13

e06

7.00

e05

e09 e13 e10 e03

j06 j05 e12 e12

25

e11

24 23

j01 j04

e02

e06 e12 j03 e09

e06

22 21 20 19

4.00 e09

e05

18 17

j08

16

j02

15 14

e10 e14

13 12

e09 e08

e11

e07

11 10

e06 e06

09

3.00 e09

e05

08 07 06 05

e03

04 03

e04

e04

0.10 e02 e01 cm07

e02 e01 cm07 cm03

cm03 cm04

e03

e10

j02

j03

e12

e10

j01

j02

cm01 cm02

*Ver leyenda plano 24

0

escala 1.15

0.5

1

1.5

2

2.5

3m

Detalles constructivos

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

j06

j01

j02

e03

e10

02 01

construcción


[CO_06]

背景 E l

[CO_06] la unidad básica construtiva

c a m i n o

d e

a i r e

the constructive unit details

0,07

0,2 0,3

a

0,1

0,15

0,35 0,15

0,02

e10 0,0 Ø

2

0,0 Ø

2

+0.26 +0.23

Cota de arranque pilares

e04

Cota de asiento placa base

b'

0,08

0,12

b

0,32

0,15

0,16

e10

e02

° 54

0,03

0,02

0,03

e03 +0.41

e13

e10

a'

37°

e13

0,01

0,04

0,12

0,12

e10

0,1

0,2

e06

0,05

0,05

0,08

0,13

e09

e10

e13

0,1

0,1

0,03

0,1

0,04 0,01

e09

0,2

e08 0,07

e08

0,14

0,05

0,2

e06

0,05

0,05

0,04

0,1

0,05

0,19

e06

0,02

e02 Cota de replanteo y nivelación e01

cm07

0,04

+0.14

0,07

+0.10

Cota terreno 0,05

+0.00

0,06

0,1

cm06

0,06

53 °

e10

cm03

e10

0,3

0,22

0,19

e10

0,0 Ø

2

0,0 Ø

26

0,09

2

cm04

25 24 23

0,15

0,02

0,04

0,03

37°

e13

22 21

e06

20

17 16

e13 0,12

0,05

0,12

15

0,2 0,09

0,1

0,1

0,12

14

26°

0,1

13

0,1

0,05

0,01

0,02

e13

18

0,1

° 81

0,12

e06

0,2

0,2

e06

0,2

19

12 79 °

0,21

° 64

11° 0,0 Ø

2

0,0 Ø

11 10

2

09 08 07

Encuentro pilar-pieza soporte de anclaje roscado Sección a-a'

0,03

0,05

e05

0,1

64 °

0,27

0,12 0,05

0,1 0,05

5 0,0

4 0,1

Encuentro pilar-cimentación. Sección b-b'

4 0,0

j01 7 0,0

e13

0,06

0,08

0,03 0,03

0,03

0,01

0,07

0,09

26°

j03

cm07

0,05

0,22

4 0,0

0,44 0,05

0,1

e06 0,1

j03

0,2

0,06

0,08

e15

0,03 0,05

0,2

0,26

j01

01

0,16

0,08

e10

e05

0,1

e13

0,08

0,22

0,15

0,2

0,2

0,1

0,1

0,04

e01 cm07

e09

0,12

0,09

0,1

0,07

0,06

e06

e13 0,01

e06

0,05

0,2

0,2

e02 e12

0,17 10

0,06

0,1

0,06

0,11 0,22

*Ver leyenda plano 24

0

escala 1.05

0.1

Detalles constructivos

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

03 02

0,05

j04

04

construcción

0,08

0,48

0,05

05

e03

0,03

0,15

j05

0,05

06 0,07

0,16

j05

0,08

0,08

0,09

° 90

10

e12

0,15

0,03 0,03 0,03

0,07

0.2

0.3

0.4

0.5m


[CO_07]

背景 E l

los cerramientos

u m b r a l

f1

v e r t i c a l

f2 f3

[CO_07] the constructive skins 1

sección transversal bb' ver panel CO_01

La cubierta

0,03 0,08

0,010,04 0,03

0,01

0,12

0,030,02

0,17

0,27 0,07

0,02 0,04

0,04

0,03

0,09 0,04

0,07 0,03

0,02 0,03

f38

f37

c03

0,04

e 1/10

0,04

0,04

0,05

Det_08

f17

0,12

i01

Det.Papel Sohi

f18

0,02 0,09

0,06

0,3

0,12

0,04

0,08

0,02

0,06

0,07

f14 f13 f12

0,1

0,1

0,05

f15

0,06

0,08

0,11

0,02

0,06

e 1/10 0,03

0,17

0,16

0,16

Det_03

0,06

0,16

f16

0,04 0,020,02

0,05

f11 f10 0,07

0,09

0,05

f09

0,06

26 25

f33

24 23

22

f29 f28

f08

0,12

21 20

f27

19

Det_02 e 1/10

f07

0,03 0,02

0,07

f06 f05 f04

0,02 0,03

0,05

0,12

f03 f02

0,04

0,11

0,06

0,1

16

f23

15

f04 f22

0,11 0,13

14

f21

13

0,08

0,05

f01

17

f24 0,02

0,04

0,02

c_02 c_01

18

f25

0,05

0,05

c_03

0,21

Det_03

27

f35 f34

f31 f30

0,13

0,19

f36

f32

0,16

e 1/15

f39

0,06

f19

0,04

c_08 c_07 c_06 c_05 c_04

0,08

0,04

0,03

Det_06

Det_10

c15 c14

0,06

0,08

La cubierta de los espacios abiertos (a , c0, c1 ) es de chapa de policarbonato situada sobre el translúcido(a) entramado, de lamas de teja y policarbonato (b), lamas fotocatalíticas ( c1) y de lamas de madera. La cubierta de los espacios cerrados es de policarbonato translúcido (b1), de panel sandwich+tablón de madera machihembrada en ambas caras y aislamiento (c2)

c_10 c_09 i_03 i_02

0,05 0,01 0,04

0,09

vs

0,05

Para la cubierta se utiliza una estructura de acero desarrollada en diferentes niveles, con una distancia variable entre soportes de 7 a 15m de ancho, a los que correspondes tres alturas viga de 1,00m, 1,50 y 1,80m sostenidas por una retícula de pilares a distancias de 1m y 3m.

c03

0,09

Det_01b

e 1/10

0,16

Det_01a

0,04

0,11

c_12 c_11

Det.Vidrio Det_04

0,04

Det_01 e 1/15

b1

f40

f20

12

0,16

a2

c01montante de viga secundario tubular rectangular c02 viga secundaria perfiles tubulares 80x50mm pasantes dobles c03 subestructura correas metálicas dobles pasantes h=5cm c04 viga doble principal tubular metálica rectangular 150x50mm c05 chapa plegada metálica e=0.5mm c06 canalón metálico de chapa apoyado sobre correas de cubierta entre paños c07 angular metálico en U subestructura PC cubierta h=50mm c08 placa grecada de policarbonato 150x300cm atornillada a subestructura c09 subestructura metálica descuelgue desagüe cubierta perfil cuadrado 5x5cm c10 subestructura metálica descuelgue desagüe cubierta rectangular 5x2.5cm c11 sumidero sifónico c12 rastrel perimetral de madera c13c tubo PPE

0,12

Det_10

a1

0,06

0,02

gestión del agua

f43 f42 f41

f39

0,06

La cubierta de los espacios abiertos (a , c0, c1 ) es de chapa de policarbonato translúcido(a) situada sobre el entramado, de lamas de teja y policarbonato (b), lamas fotocatalíticas (c1) y de lamas de madera. La cubierta de los espacios cerrados es de policarbonato translúcido (b1), de panel sandwich+tablón de madera machihembrada en ambas caras y aislamiento (c2)

f44

0,14

0,08

Para la cubierta se utiliza una estructura de acero desarrollada en diferentes niveles, con una distancia variable entre soportes de 7 a 15m de ancho, a los que correspondes tres alturas viga de 1,00m, 1,50 y 1,80m sostenidas por una retícula de pilares a distancias de 1m y 3m.

f45

e 1/10

0,06

la cubierta impermeable - recoge el agua en su superficie la cubierta solar - protege de la radiación solar excesiva la cubierta permeable - deja pasar el agua a través de la estructura

0,05

a b c

0,09

Det_05

0,07

Det_04

0,07

c3

Det_07 Det_08

0,12

c2

0,08

c1

0,01 0,04 0,01 0,05

0,1

0,1

c0

Det_05 Det_06

0,11

c

b1

a2

Det_02 Det_03 Det_04

0,05

a1

1%

0,01

0,19 0,06

0,07

b

1%

e 1/10

0,14

1%

Det.Policarbonato Det_06

vf viga forjado UPE270 doble pasante empresillada /150cm presillas soldadas p01 vigueta doble T invertida 150/75cm intereje p02 chapa grecada e=4cm p03 tablero de madera Iroko e=3cm p04 subestructura rastreles metálicos + 5cm aislamiento térmico lana de roca p05 tablero de madera e=2cm p06a bastidor metálico 150x300 cm cajón vertido microcemento p06b capa microcemento e=3cm p07 angular L metálico cierre de forjado p08 rastrel de madera 5x5cm atornillado de suelo acabado p09 rastrel metálico omega h=5cm p10 tornillo para madera con cabeza plana p11 plancha metálica e=2mm p12 perfil angular L perimetral bastidor de microcemento p13 microcemento vertido e=3cm

0,07

c14 perfil tubular metálica carpintería abatible atomatizada 6x4cm c15 carpintería ligera de policarbonato alveolar e=20cm f01cable estructural rígido trefilado para sujeción de forjado f02 angular en L de cierre de forjado h=15cm f03 perfil metálico tubular rectangular 120x50mm f04 rastrel de madera perimetral + capa de aislamiento térmico 3cm f05 pre cerco de madera apoyo de carpintería f06 perfil tubular rectangular 100x50mm f07 carpintería vidrio laminado templado 6+12+6 f08 perfil metálico en T armado h=140mm f09 tapa de carpintería realizada en chapa f10 junta de neopreno para apoyo de perfil f11 carpintería metálica tubular 50x10cm f12 tapa de chapa metálica acabado interior carpintería f13 angular en L cierre y fijación cerramiento metacrilato f14 carpintería metálica tubular rectangular subestructura lamas f15 plancha metacrilato e=3cm f16 lama metálica orientable automatizada f17 angular de cierre superior cerrramiento metacrilato f18 carpintería perfil metálico tubular unión tornillos expansible f19 angular L de cierre perimetral f20 chapa plegada para conformar vaso jardinera f21 perfil U soldado a perfil L permietral f22 angular L perimetral h=11cm f23 cerramiento autoportante bastidor de madera +cerramiento papel Sohi f24 bastidor madera 6x6cm f25 cerramiento doble chapa plegada metálica con aislamiento f26 aislamiento térmico lana de roca e=8cm(cara norte) f27 bastidor madera 6x6cm f28 chapa plegada e=0.5mm f29 bastidor madera 12x5cm f30 chapa plegada exterior e=0.5mm f31 acabado interior panel madera fenólico f32 rastrel madera 13x3cm f33 perfil tubular 13x3cm f34 viga superior cerramiento UPN160 f35 cerramiento lámina PVC tensada f36 canalón perimetral chapa plegada e=0.2mm f37 chapa plegada metálica cierre esquina f39cerramiento doble policarbonato con previsión de abertura para ventilación admisión/extracción f40 Aislante 20mm translúcido f41 Panel policarbonato alveolar protección U.V.500x500x20mm f42 Corona de PVC e=2mm f43 Panel policarbonato celular protección U.V. 500x500x40mm f44 Pieza especial de plástico cilindrica e=2mm f45 Cilindro de ventilación de PCe=16mm f46 Sistema de montaje por medio de perfil atornillado para machihembrado de paneles f47 Pieza de PC para sellado de junta f48 Montante en U metálico e=1mm 40x30mm f49 Cámara de aire e=5cm

0,05

Leyenda

Det_01

a

2 La piel vertical

superposición de pieles- cerramiento f25+f23+f50

11

Det_07

f25 piel masa sólida [tablero OSB] f23 piel masa papel+luminaria f50 piel aire vegetal [2xmallazo+ jardinera]

e 1/10

0,01

10

0,1

0,21

3

envolvente estanca climatizada

09

El forjado ligero

0,17

0,05

0,1

0,05 0,01 0,03

0,08

0,1

0,17

0,1

0,1

0,03

0,01

0,11 0,21

forjado int - ext

0,07 0,27

0,14 0,05 0,1

0,2

0,1

0,39

f_42

[2]

f_44 f_45

Det_02

c

p06_b

m01

[3]

f_46

barandilla reciclada de redondo de acero corrugado Ø20

f_47

Det_07

f_48

Bignonia radicans

ver panel CO_03

p04

p05

h<10 m hoja caduca color flor anaranjada

Det_09

f_49

p06_a

p03

vf

[4 ]

p02

b

p01 franja detalle

f1

franja detalle

f2

franja detalle

f3

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

forjado tipo-pavimento interior

vf

04 03

cota de apoyo de viguetas 2xT

02 01

vf

ef_02 ef_01

[1]

f_41

06 05

0,07

a

07

margen de nivelación

0,14

0,04

cota suelo terminado

p01

ef_03 0,03 0,04

f_40

f_43

p06 p05 p04 p03 p02

ef_04

montaje [ 1 , 2 , 3 , 4 ] ver memoria construcción

f_39

0,03 0,04

0,08

0,12

p07

0,03 0,04

0,01

en la doble abertura sellada de PVC se introduce un cilindro de PMMA que aisla y amortigua el tubo de ventilación con respecto al cerramiento

0,12

0,07

0,17

a,b,c

0,01

0,05

0,02 0,04

cerramiento doble policarbonato con previsión de abertura para ventilación admisión/extracción

0,06

08

0,05

0,05

0,14

f_45

0,15

f39

0,03

f_40

0,17

0,05 0,010,04

f_39 Det_05 Det_06

p13 p12 p11 p10 p09 p08

e 1/10

0,05

Det_09

Det_08

0,05

Det_05

e 1/35

0,01

Det_05-06

cota de apoyo vigas 2xUPE cara superior viga tubular lineal (pórtico)

construcción


[INS_03]

[IN_01] 背景

E l

las instalaciones

c o n f o r t

e n

e l

j a r d í n

the sealed skin

Comfort in the garden 10

09

PLV

PLV

PLV

PLV

PLV

08a

09a

08b

11a

09b

100 mm

mm 35

mm 0 50 mm4 50 mm 1 00

mm 50 mm 100 mm

40 mm

832 l/s 665 l/s 332 l/s 166 l/s

100 mm 50 mm

85m²

audiovisual rooms

22

08a

208W/m²

446 l/s ganancias cerramiento

Qpers 0.7 kW

446 l/s

Ø200

166 l/s Qpers 0.7 kW tint 25ºC

17.60

2687l/s

b

20lux

100lux

+0.25

1.60

+14.70

Ø600 2015 l/s

446 l/s

c 335 l/s

Ø600 1679 l/s

Ø600 2675l/s

Ø600 2230 l/s

446 l/s

d 335 l/s

[MAC] digital research A=128m²

Ø500 1343 l/s

446 l/s

e 335 l/s

Ø500 1007 l/s

Ø650 3121 l/s

446 l/s

f

Ø400 671 l/s

Ø650 3125 l/s

446 l/s

g 335 l/s

Ø300 335 l/s

+9.45

5.70

+4.70

+4.95

h

a.3

admisión aire ext expulsión aire ext

renovación aporte aire

20lux

a.4

650x350

08 07

Ø650

335 l/s tint 25ºC

+0.00

+0.25

-1.90

a.5

a.4

Zona instalaciones 2 en cajón de sótano.

UTA Mediateca Primera Planta.

b.1

10.000m3/h MODELO 6.05 WESPACK by AIRWELL 1350 X 1990 X 540 mm (1P)- 65X65cm, 2690 l/s

b.2

UTA Mediateca Planta Baja. 10.000m3/h MODELO 6.05 WESPACK by AIRWELL 1350 X 1990 X 540 mm (PB)- 65X65cm, 2690 l/s

b.3

UTA Oficinas y Almacenes.

MODELO 6.05 WESPACK by AIRWELL 1350 X 1990 X 540 mm (PB)- 55X55cm, 8020 m3/h

UTA Cafetería Planta Baja. 3.000m3/h - 850l/s Modelo TROX, TBS-EC (PB)- 40X40cm, 2995 m3/h - 832 l/s

06 05

a.4

unidad tratamiento aire

7,5

LED TECHO LAMPARA SUSPENDIDA GLOBO

LUMINARIA 2 x 36

5625 m3/h - 1562 l/s 6075 m3/h - 1687 l/s

REJILLA EXTRACCION

5.000m3/h

(Campana)- 40X40cm, 300-450 m3/h (Extracc.)- 15X15cm, 50 l/s

EXTRACCION BAÑOS EXTRACTOR A CUBIERTA CAMPANA HUMOS EXTRACCION A CUBIERTA CONDUCTO DE IMPULSION CONDUCTO DE EXTRACCIÓN

8020 m3/h

BASE T/T 10/16 A BASE T/T 25 A

Extractores en Aseos y Z.Servicio.

VENTUM serie E 1350 X 1990 X 540 mm

BASE SUELO x 4 T/T 10/16/25 INTERRUPTOR SENCILLO INTERRUPTOR TEMPORIZADO INTERRUPTOR CONMUTADO

N

0

escala 1.200

5

Planos instalaciones Planta baja y primera Sección longitudinal y transversal

10

20

12 mm

30m

A.F.S. POLIPROPIENO A.C.S. POLIPROPILENO MONTANTE A.F.S. MONTANTE A.C.S. LLAVE DE CORTE GRIFO MEZCLADOR TEMPORIZADO

BALIZAMIENTO LED EN SUELO RED DE EXTRACCION

VIC-VEC y Extractor

Fontanería - Saneamiento 12 mm

LAMPARA SUSPENDIDA PAPIRO 18 W

5.000m3/h (1B)- 45X45cm, (PB)- 45X45cm,

unidad tratamiento aire

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

I.C.P. SECUNDARIO

PUNTO DE LUZ EN TECHO

- anch

Sección longitudinal MAC e 1.200

Electricidad - Iluminación

UTA Salas Exposiciones

UTA Oficinas y Almacenes. MODELO 6.05 WESPACK by AIRWELL 1350 X 1990 X 540 mm 55X55cm,

20lux

Expulsión al exterior

a.1 unidad tratamiento aire

09

15

Zona instalaciones 1 en cajón de sótano.

a.1

+9.20

[MAC] audiovisual rooms A=90m² 16.40

446 l/s

4.70

+1.70 +0.25

a

166 l/s

11 10

Ø400

+17.00

a.2 9.50

Ø500 1783l/s

12 446 l/s

Qfrio 2351 l/s

335 l/s

13

04

[MAC] terrace A=135m²

Ø500 1337 l/s

tint 25ºC

Qfrio 332l/s

Ø650

5.00

0

Ø650 2351 l/s

Ø650

4,2

+4.95 Ø650 admisión aire ext expulsión aire ext

650x350 Ø650

5.00

446 l/s

4.70

POZO GENERAL EDIFICIO

+4.00 4.80

446 l/s

+4.95

CONEXIÓN FECALES

Ø400 891 l/s

cubierta invernadero (abierta)

446 l/s Qilum 100W

15 14

Ø300

5.00

Ø600

3.80

VENTILACION

Ø300 445l/s

16

Esquema funcionamiento térmico verano Sección transversal bb'

a

b

4.80

FANGOS Y GRASAS

CONEXIÓN PLUVIALES DE CUBIERTAS

Retorno

Ø500

100lux

21

17 protección solar tª max media ext verano 28.9ºC tª media ext invierno 7ºC

altura máxima nave [PE_com]

Ø650

SANEAMIENTO DESCOLGADO EN GALERÍA

Impulsión

d

9.20

ACOMETIDA SANEAMIENTO PUBLICO

9.10

SANEAMIENTO PUBLICO

SUMIDERO SIFONICO

9.50

REGISTRO EN SANEAMIENTO DESCOLGADO

Toma de Aire exterior

Ø500

12a 12b

11b

20

Planta primera MAC e 1.200

2.20

2.20

1.90

1.30 9.50

LINEA DE PROPIEDAD 9.70

FEC

e

Ø400

11a

09b

12,5

c

[MAC] physical research A=160m²

POZO DE REGISTRO

PLV

f

09a

08b

19

+16.00

Ø300

23

03

63.20

umbral jardín de aire

24

446 l/s

b.3 unidad tratamiento aire

precipitaciones 1260mm/año agua total recogida en [C03] 2.086 m²

[C03]Cubierta 03 A=1.656m²

27 25

Ø350 445 l/s

335 l/s

28 26

Esquema funcionamiento térmico invierno Sección transversal aa'

446 l/s

Ø400 891 l/s

446 l/s

a.1

Planta baja MAC e 1.200

Planta cimentación - galerías técnicas

unidad tratamiento aire

7,5

15

Ø450 1.337 l/s

13

12,5

a.4

Ø550 1.783 l/s

11

446 l/s

i 2687 l/s Ø650

10

29

0

árbol prealtura:1

09

lecture

a

f

08

search

PLV

j 335 l/s

36m²

PLV

446 l/s

18

446 l/s

105m²

PLV

166 l/s Ø200

PLV

b Ø650 2351 l/s

a

e

335 l/s tint 21ºC

Qfrio 891 l/s

free lecture

k

Ø650

335 l/s

166 l/s

l

95m²

e

166 l/s

media office

j

PLV

30m²

cafe

185m²

PLV

Ø300

d

b

Qcalef 2351 l/s

2.230 l/s

PLV

446 l/s Ø400

tint 21ºC

radiación solar

446 l/s

335 l/s

2015 l/s Ø600

PLV

332 l/s

PLV

b.1

PLV

c

166 l/s

PLV

b.2

m

d

80m²

Exposiciones Baja

i

FEC

c

virtual search Ø600

Oficina Baja / Exposiciones Primera

PLV

166 l/s Qpers 0.7 kW tint 21ºC

n

335 l/s 1679 l/s Ø600

PLV

a.4

Ø650 2.675 l/s

d

h

Ø300

PLV

Ø700 3.125 l/s

d

499 l/s

PLV

Ø750 3.125 l/s

o

166 l/s

c

mm

c

95m²

PLV

446 l/s

Ø500 1343 l/s

PLV

335 l/s

e

garden

PLV

f

e

166 l/s

Ø350

PLV

b

PLV

cubierta invernadero (cerrada)

b.3 unidad tratamiento aire q

p

g

665 l/s

PLV

free lecture

b

FEC

r

g

40 mm

a.3 Oficina Común Baja / Exposiciones Primera

446 l/s

335 l/s

Ø200

Ø500 1007 l/s

150x150 50 l/s

t

446 l/s

children books

a

PLV

c

f

VEC

50m²

PLV

832 l/s Ø400

PLV

storage

a

Qilum 100W

Qcalef 332l/s

s

g

f

50 mm

150x150 VIC 50 l/s

0

335 l/s

Ø400 671 l/s

c

b.3

PLV

b

VEC

cuisine

PLV

mm

Ø300

Ø400 60m²

PLV

40

150x150 50 l/s VIC

a

PLV

h

h

335 l/s

d

0

a

PLV

Ø300

35m²

u

35m²

PLV

tª max media ext verano 28.9ºC tª media ext invierno 7ºC

mm

toilet PMR

waste

rest area

a.2 PLV

introducción luz

Ø 120 mm

Qpers 0.7 kW

i

40 mm

e

50

mm

pérdidas cerramiento

50 l/s 150x150

e

11m²

PLV

40 mm

mm

50

446 l/s

b

d

Ø 120 mm

a.1

100 mm

PLV

12a 12b

11b

Qcalef 891 l/s

mm

Biblioteca infantil y multimedia Planta Baja

15m²

PLV

PLV

50

mm

Ø 120 mm

40

PLV

PLV

11a

09b

6m²

mm

PLV

50

35

toilet

12m²

0

Búsqueda fisica y virtual Aulas audiovsuales Planta Primera

PLV

mm

35

locker room

10

35 mm

PLV

35 mm

PLV

09a

08b

208W/m²

a.1

FEC

b.3

Sala Cafetería

08a

radiación solar

PLV

PLV

12a 12b

11b

a.5 18m²

Vestuarios Cocina Extracción

11a

FEC

FEC

PLV

PLV

12a 12b

11b

mm

PLV

12

35

PLV

11

100 mm

08

GRIFO / SUMINISTRO 50 mm

SANEAMIENTO PVC BAJANTE PVC BOTE SIFONICO

02 01

instalaciones


[SOS_01]

estrategia sostenible

背景

[SO_01]

E l

c o n f o r t

e n

e l

j a r d í n

sustainable strategy 1. Sostenibilidad urbana, medioambiental y digital

2. El sistema propuesto

PLAN DE ESTRATEGIA URBANA DE ACTIVACIÓN -SOFT LINE

2.1 El material

Los puntos de la línea blanda de Hangzhou

[V01]

11

12

1. Plan regeneración y gestión del suelo 2. Plan de regeneración y uso sostenible del agua 3. Plan de mejora ambiental 4. Plan de amplificación, cobertura y gestión digital 5. Redes de equipamientos

[V03]

[V04]

7

5] [JT0

9 11

2] [JD0

7

6

5

[JI]

3] [JAi0

12

5

a

- eficientes

12

1

9

a problema que agrava el vacío en el espacio

6

[JI01]

3

Todo el acero que se produce en el mundo tiene un contenido de material reciclado que, dependiendo del proceso de producción, varía entre 15% - 95% (acerías eléctricas a arco). Estos valores son de los más altos comparados con otros materiales de construcción.

4

6 b5

2

eje plazas actividas

28 27 26 25 24 23

1

pavimento imp.loseta hormigón

20

2

3 vía TNM

10,5m vía trafico rodado

2m

10,5m

vía trafico rodado

3 vía TNM

18

Actual

2

17

[JI]

1

V01 Xiaohe Road

16

Propuesta

c

b

2

3

sardinel prefabricado (capt. agua) pavimento drenante sin infiltración

franja verde

7 . Ma nt e nim ie nto mínimo

2%

5 vía TNM

10,5 vía trafico rodado

12 ver panel IM03

3. Sistemas naturales de depuración de agua

+

a. Agua escorrentía b. Agua canal c. Agua ambiental b1

1. arbolado y plantación 2.cultivo h > 450 mm 3.depósito de roca de drenaje. 4. subsuelo escarificado 5. tubería de drenaje perforada Ø150 mm 6. Geotextil 7. Sobre flujo (tubo vertical o canal de drenaje) 8. Restrictor de flujo 9. Excedente secundario 10. Tubería de salida al sistema de saneamiento 11. Presa

a . Agua escorrentía

10

09

h

d1

6. Sistema de reciclaje - Recuperación de materiales

El clima de Hangzhou se caracteriza por su alto grado de humedad presente tanto en el suelo como el en aire. La LBH (Línea Blanda de Hangzhou), situada en las proximidades del gran canal, es atravesada en muchos casos por canales secundarios, por lo que cuenta con una circulación del agua freática muy elevada en toda su extensión.

Este hecho implica que los métodos de intercambio de energía con el terreno tendrán una alta eficacia. Se propone implementar, en los pilotes que incorpora el sistema constructivo, dicha técnica, lo que permitiría así gestionar la energía demandada mediante el intercambio de calor y el mantenimiento del entorno del subsuelo del proyecto.

h

bh

d3

[JT**]

En Hangzhou en los ultimos años (2004-2006) se han derribado más de 1.3 millones de m² y durante los siguientes - de acuerdo con el Hangzhou City Construction Plan - están proyectados para ser demolidos 5 millones más durante los próximos 5 años.

Los materiales reutilizados se usarán principalmente para la conformación de pavimentos, elementos de protección vertical y cerramientos y pieles de las envolventes, siguiendo los mismos conceptos de construcción de la arquitectura china, donde elementos portantes estructurales de calidad mientras que los cerramientos pueden ser móviles o transformables.

.\Á RB OLES \Aes cul us turbinata2.png

pe_03_04

Otra especie relevante introducida en el proyecto, debido a su gran captación de PM10 y PM2.5 - 0,021g/m2/año - es el Acer Pseudoplatanus, cuya altura de copa suele llegar hasta los 35m.

c

d2

pe_03

pe_04

reciclada

losa de piedra reciclada

árido comp. y cerámica 1,6 KN/m

35

日本七叶树

30

榉树

1,6 KN/m PP=0,18 + 0,15* KN/m² Q 1=3,0 KN/m²

nivel freático (3-7m)

7

2

5

11

8

10

d1

p10

p11

p12

p13

p10

p05

20

11 UTA Acondicionamiento térmico

Cornus Kousa

Cercidiphyllum japonicum, Katsura Ilex Rotunda

10

Pavimentos de cerámica y losa de piedra reciclada. 5

榉树

5

Trachycarpus

10

棕榈属 (Zōnglǘ shǔ)

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU

鐵冬青 (Tiě d ōngqīng)

Aesculus turbinata

15

El proyecto recupera aproximadamente unos 360 ml/módulo de barra de acero corrugado - para elementos de protección vertical - de demoliciones en otros puntos de la ciudad, lo que supone una reducción importante de residuos generados por fabricación y transporte de materiales desde las acerías más próximas.

连香树科 (Lián xiā ng shù kē)

p09

BCG BCG 9

4

17m

四照花 (Sì zhào hu ā)

(Huā qiū shǔ)

Zelkova serrata Sorbus Commixta 榉树

p08

Suelo radiante (no desarrollado en proyecto)

3

(Rìběn q ī yè shù)

花楸属

25

N1=0,05 KN/m²

3

1

05

La vegetación introducida en todos los jardines y áreas verdes de la LBH pertenecen a especies propias del clima de Hangzhou y especies autóctonas de la zona. Para la realización de los jardines de aire se proponen especies de las regiones geográficas de reforestación y agroforestería (R1, R2, R3 y R4) tales como la paulownia tomentosa, especificada como especie de reforestación en la zona R3 (Zhejiang) que además posee el grado más alto de absorción de CO2 entre las especies arbóreas conocidas y la expulsión de grandes cantidades de oxígeno - absorción CO2: 21,7 kgCO2/árbol/año (23,95 tCO2/ha/año) -producción O2: 5,9 kgO2/árbol/año (6,486 tO2/ha/año) Esto unido al rápido crecimiento de la especie permite la generación de áreas boscosas productivas y oxigenantes, que son parte de los Jardines de aire.

Se propone mediante la introducción de Centros de reciclaje ubicados en la LBH, la valoración, reutilización, revalorización de los elementos susceptibles de poder formar parte del sistema ubicados en las parcelas demolidas o por demoler.

b2

2

06

7. La vegetación introducida

h

6

11

07

Este jardín se inserta de forma longitudinal, en el perímetro vial de la LBH como zona de biorretención ante eventos climatológicos adversos, que puedan generar problemas a la red de la ciudad.

[JI]

8.2

ver panel INS01

Utiliza hasta un 100% chatarra férrica como materia prima.

Jardín de infiltración parcial con reductor de flujo

b1

14

08

- sistema urbano drenaje sostenible

1

vía TNM

banda técnica instalaciones

Permeabilización suelos y captación de agua escorrentía superficial

o ad rod co tráfi 1] v ía [V0 dRo a e cto e y h ro o Xia la p rce pa

2

15

13

3%

17m

5. Sistema de Energía c. Jardín de Infiltración [JI]

10,5 vía trafico rodado

a

9 . Ace r ía d e ho r no eléctrico

22 21

3%

19

Las escorias se reutilizan como árido - construcción de carreteras/producción de cemento - mientras que la cascarilla de laminación se recicla al 100% como materia prima en la siderurgia integral o para otros usos.

4.Plan de amplificación, cobertura y gestión digital

Red lúdica - ocio, descanso, jardines, gastronomía Red pedagógica - talleres, aulas, eventos, exposiciones Investigación Red productiva Centros de reciclaje - digital y natural Equipamientos - centros arte (digital) [CAD] - media art center [MAC] - centros interpretación - centros tratamiento natural [CTN] - nuevos espacios de conexión digital

29

6 . D u r a b ilidad

4. Gestión del suelo

5. Redes de equipamientos

30

(c sistemas naturales depuración agua)

8 . V a lo r iz a ció n r e s id u o s d e proceso de producción

b1

Plan de cobertura digital e introducción de infraestructuras de accesibilidad digital Propuesta activación espacio público - tecnología pantallas expositivas Equipamientos públicos - conexión digital, eléctrica Plataformas digitales - estructuras de intercambio ideas, colaboración, organización Red sensible - sensores atmosféricos, sensores físicos Paisaje sensible Convenios con entidades educativas preexistentes - colegios, universidades

d FILTRO DEPURATIVO DE AGUA DE LLUVIA

2%

El acero tiene la mejor relación peso/resistencia de los materiales estructurales.

13

2

continuidad eje peatonal canal

Infraestructura descontaminación del aire Infraestructuras deshumidificación, mejora y confort climático Gestión sostenible de recursos para climatización Propuesta sistemas de climatización compartidos Plan de reforestación de áreas - especies arbóreas beneficios ambientales

cuneta verde dren filtrante tanque de retención y almacenamiento zona de biorretención alcorque inundable superficie permeable humedal de exceso de caudal

V01 Xiaohe Road franja verde

5 . Ra tio re sist encia- peso

b consume, recicla, produce, evoluciona

3. Plan de mejora ambiental

c1 c2 c3 c4 c5 c6 c7

Se propone sustituir el sardinel existente por uno prefabricado con abertura longitudinal para la recolección de agua de escorrentía, con el objetivo de eliminar los torrentes de agua en los eventos climatológicos más incipientes. A esto se añade la sustitución de parte (en una proporción 2:1 imp.-perm.) de la acera - antes realizada en loseta impermeable de hormigón - por un pavimento de piezas prefabricadas de hormigón permeable, conectadas a alcorque inundable y a la banda técnica de instalaciones b1.

Las vigas primarias de forjado (b) también pareadas se realizan con perfiles UPE sin más operaciones de fabricación de su corte y taladrado. Estos perfiles de vigas pareadas se conectan entre si, después de su montaje por medio de diafragmas. La disposición de las vigas b permite la continuidad de las vigas secundarias (c) mediante nudos atornillados, lo que permite una relación luz/canto de 20 - 25 para luces de 7,5 a 12m.

Una de las características de los edificios de acero -excepto soldadura - es que son desmontables - transportables. De esta forma, se puede reutilizar en su concepción original en un nuevo emplazamiento o reutilizar sus componentes con muy pocas modificaciones en nuevos edificios o estructura.

4

7

a consume, crece

Sistemas descontaminación agua del canal Plan de gestión y reutilización sostenible del agua Captación, depuración y reutilización de agua de escorrentía y atmosférica Naturalización bordes del canal Espacio equipado para movilidad pública y privada en el canal Infraestructuras de tratamiento de agua canal

1. sistema viario tráfico rodado 2. sistema espacios públicos [parques, zonas verdes]

- Redefinición del contacto asfalto - acera

La resolución de los nudos se realiza con elementos duplicados pareados continuos en cada fase, esto responde a disposiciones de optimización estructural: los pilares (a) pareados - se orientan con su mínima inercia según el plano del pórtico - aumentan el canto útil al área total con respecto al perfil individual, por lo que los perfiles utilizados son de menor dimensión.

4 . R e u t ilización

1

2. Plan regeneración y uso sostenible del agua

b1 banda calzada - abastecimiento agua escorrentía b2 banda canal - recogida y evacuación agua sobrante

4. Calidad del agua > muy baja - durante los eventos de precipitación, la contaminación acumulada en la superficie durante el tiempo seco es lavada y arrastrada hacia la red de colectores.

Se establece una ordenación modular para el planeamiento urbano a partir de un módulo constructivo y estructural soporte y una cubierta umbráculo. La adopción de este sistema hace posible la unificación de materiales y piezas y con ello su fabricación en serie y sistematización. El sistema permite la construcción por fases al mismo tiempo que facilita el acceso a un espacio público en construcción. El espacio se va construyendo con el tiempo, con los habitantes de Hangzhou y desde los elementos naturales.

El grado más alto - puede ser reciclado una y otra vez sin ninguna pérdida de propiedades/calidad ('de la cuna a la cuna').

1] [JD0

espacio público en relación con elementos vegetales

1. El contacto con Xiaohe Road

3 . T a s a d e r e cu p e r a ción para reciclaje 90% - 100%

3

(T) tiempo

-

c JARDÍN DE INFILTRACIÓN

3. Ciclo natural del agua > roto - hidrograma de escorrentía de una lluvia completamente distinto al que se produciría en una zona natural de la misma área. La principal diferencia es el caudal punta que se genera en muy poco tiempo debido al mayor porcentaje de superficie impermeable. La gestión de estos picos para evitar daños en las ciudades motiva la construcción de sistemas de drenaje con el fin de mitigar y controlar los problemas asociados con ellos.

a

captación, almacenaje y reciclaje de agua lluvia mejora de las condiciones de calidad de agua disminución del volumen de escorrentía

b BANDA TÉCNICA DE INSTALACIONES

grandes caudales punta, en comparación con las zonas naturales no urbanizadas en donde apenas se produce escorrentía subsuperficial gracias a procesos naturales tales como: - infiltración - almacenamiento superficial o subterráneo - evapo-transpiración - evaporación

9

-

2 . C o nt e nid o reciclado

de

-Plan de movilidad alternativa peatonal - nuevos recorridos TNM - carriles bici y puntos de recarga eléctrica ferry - mejora de la red de transporte -Reorganización de espacios de aparcamiento -Catálogo de preexistencias -Plan de eliminación de estructuras y construcciones baja calidad -Depuración de suelos industriales contaminados Jardín de tierra -Plan de permeabilización suelos urbanos - sistema drenaje sostenible Jardín Infiltración

8

4.transporte

1 . R e cicla bilidad

5

12 12

-regeneración paisaje del canal

0

Puntos determinantes en la elección del material

6

1] [JAi0

b soft city espacio continuo estancial de relación

7

5.montaje en obra

12

9

- definidos

6

6.uso/vida útil

] [JA01

5

2] [JAi0

5

3'.reciclaje residuos 7.matenimiento

c

4

1

3.transformación/producción 6.reutilización

] [JA02

8

a network city estructura de nudos conectados entre

1. Plan regeneración y gestión del suelo

3

2

Pr oyecto

12

b oportunidad para reforzar experiencias y

2

2.transporte

8.desmontaje

6

3

6

2

1

El nuevo eje ecológico-digital tiene como objetivo generar un espacio público continuo donde su valor reside en su capacidad de generar programas, actividades, recorridos e intereses y no en su capacidad de conectarse con otros espacios.

sí - organizados

1

(Y) Financiación

1.obtención materia prima

9.reciclaje

a INFRAESTRUCTURA DRENAJE AGUA DE LLUVIA

2. Escorrentía superficial > concentración rápida - originando

c

LBH

3] [JD0

8 4

b

3 10.transporte

Se propone una reactivación de la banda del canal incidiendo en factores de regeneración 1urbanos, 2sociales y 3ambientales.

3. ciudad

etapa con grandes emisiones CO2

c

[tejido urbano que configura un espacio público sensible]

relaciones sociales locales -nuevos espacios de encuentro -reactivación de la zona + participación ciudadana -sensibilización, aprendizaje, concienciación acerca procesos atmosféricos -espacio público tecnológico-sensible (físico-virtual)

Ciclo de vida acero

Propuesta

1. Rápido desarrollo urbano > drenaje pluviales sobrepasado

= MICROINFRAESTRUCTURA - durante periodos de intensas lluvias debido a la gran cantidad de zonas urbanas con pavimentos impermeables. Este proceso de densificación e impermeabilización de la ciudad ha dejado de lado el proceso natural que sigue el agua de lluvia a través de suelos vegetados.

11.otro uso

9

objetivo

2. internet público

Se propone el uso del acero nacional chino como material de construcción excedente de su industria, aprovechando la proximidad de las acerías para reducir las emisiones de CO2 en etapas de transporte e interviniendo en el ciclo de vida del acero desde etapas tempranas. Esto junto con el sistema constructivo propuesto - en fases y con una financiación estratificada - hace que una vez recibido el acero y de forma posterior a la vida del proyecto éste se recicle y reutilice siempre dentro de los límites de la LBH.

] [JA03

4] [JAi0

Situación actual

d

Propuesta

10

-imagen de conjunto, sin identidad propia, sienta la base de las futuras colonizaciones - financiación estratificada por fases y subfases -acceso y disfrute del espacio desde el primer momento de la intervención - elementos infraestructurales-estructurales - montaje y desmontaje en seco - construcción paticipativa de elementos vegetales de los jardines - visibilidad, seguimiento virtual y visual y concienciación sobre los procesos - transparencia del proceso constructivo

La LBH pretende solucionar a lo largo de su extensión por el gran canal el problema de inundaciones en la ciudad y la subida del nivel freático hasta niveles por encima de la calle. Se propone como estrategia una infraestructura de drenaje sostenible para la gestión de las aguas de lluvia y que permitan mejorar las condiciones de habitabilidad en el espacio público de la ciudad y mitiguen el efecto de la impermeabilización de los suelos de la ciudad. La gestión de la permeabilidad del suelo, realizada mediante sistemas de drenaje urbano sostenible de gran tamaño, tiene como objetivo la atenuación de los picos de caudal punta - para evitar daños en las desbordadas infraestructuras las ciudades - con el fin de mitigar y controlar estos problemas asociados al tiempo que el agua captada por estos sistemas se reutiliza y depura de forma sostenible.

China se ha convertido en el principal productor global de acero - de los 2.370 millones de toneladas de capacidad global (2015) China acumula 1.140 millones que, debido a su exceso de capacidad - en torno a 400 millones de toneladas anuales (cifra muy superior a la demanda interna) - se ve obligada a exportar material copando los mercados con precios artificialmente baratos.

b2

Se propone un sistema de internvención-colonización para los vacíos elegidos como zona de regeneración de la línea blanda de Hangzhou. El sistema confiere al conjunto una serie de pautas y normas homogéneas de actuación con una serie de ventajas con respecto a la construcción tradicional

regeneración del entorno del gran canal para la consolidación de un eje ecológico-digital

2.2 El método constructivo Situación actual

[V02]

futura conexión recorrido (zona norte)

El paisaje del gran canal está degradado. La evolución y crecimiento de la ciudad ha desplazado las actividades realizadas en su perímetro y ha generado zonas residuales con nula actividad.

1. ciudad

3. Gestión del agua

15

20

25

30

35

04 03 02 01

sostenibilidad


the natural & constructed scale relationship

35

连香树科

Cercidiphyllum japonicum, Katsura ā

ē

日本七叶树 30

榉树

Aesculus turbinata

Zelkova serrata

ī

25

鐵冬青

四照花

Ilex Rotunda

20

ō

Cornus Kousa

ī

ā

hoja perenne

15

10

棕榈属 Trachycarpus

5

ō

5

10

15

20

ǘ

ǔ

25

30

35


the working models

Continuidad La estructura cruza el espacio, y largos trazos rectos, intersecan conteniendo lugares dentro y debajo.

Escala y ligereza

Límites difusos

Como tronco y copa, paramentos alzados que reducen la escala de enorme y diáfano entorno.

Alrededor de un cuerpo cartesiano, aparece un entorno descontrolado, informal, impermanente; un espacio doméstico

PFC JARDÍN DIGITAL-ATMOSFÉRICO HANGZHOU CARLOS DÍAZ-MONÍS BARONE JULIO2016 UNIVERSIDAD SAN PABLO CEU


D I G I TA L - AT MO S P H E R I C GA R D E N Hangzhou - China


Carlos DĂ­az - MonĂ­s Barone carlosdiazmonis@gmail.com + 3 4 667 72 42 60


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.