Carlos Romo - Selected Works

Page 1

CONTENTS

SELECTED WORKS

1 ART FOR ARCHITECTURE OR ARCHITECTURE FOR ART

2 ART SCHOOL

3 FIRE STATION 6

4 SCHOOL OF INNOVATION

0

ART FOR ARCHITECTURE OR ARCHITECTURE FOR ART

CARLOS ROMO

FALL 2022 - ARCH 605-AHMED ALI

Art and Architecture are often intertwined. It is said that architecture itself is a form of art, but what is the role of architecture in art or art in architecture? The relationship between art and architecture is sort of like asking the question of what came first the chicken or the egg? If architecture is catagorized as an art then would it not be obvious to say that architecture follows art? That art in term becomes the guidance to good architecture? Donald Judd is an Artist/Architect who tries to bridge the gap between art and architecture. The idea that art can in term result in good

architecture is not always true. Though architecture can be viewed as art, good art does not always yield good architecture. The fact is an art piece with good spacial qualities is not something that can be scaled up to create good architecture. Donald Judd, an artist, who has made hundreds of three dimensional art pieces understood that art and architecture had a connection. The spacial and superficial qualities of art could be explored in architecture just as much as in art. That the art in architecture lies in the creation of space and attention to detail. Through the research of Don-

ald Judd’s ideals and views of art and architecture he believed in permanence. The idea that art and architecture are bound by the connection of the space they create. This exhibit hall in Dallas is designed to house the permanent works of Donald Judd’s Specific Objects. Through the experience of material investigation in creating an untitled work we begin to answer the question of art and architecture. The discovery of a concept that came from recreating one of Donald Judd’s specific objects starts to unfold.

1
4

The process of understanding Donald Judd began from investigating his Untitled works. Untitled 1963 was one of Judd’s first specific objects to incorporate color. Judd believed in the truth of material. That meant embracing any and all imperfections and understanding what a material wants to be not what it can be forced to

become. Most art critics would like to lump Judd into minimalist art, however, Judd himself despised those who would classify him as a minimalist. Through recreation of his work it is easy to understand why. To refine and create work that was so well put together yet so fragile is anything but minimalist. Through my

material investigation of Untitled 1963 it was easy to dissern that this object had no real spacial qualities. Instead it was rich in superficial textures and embraced its material qualities. Upon further disection it almost seemed as though these superficial material qualities were created by a simple extrusion of a profile.

PROFILE INVESTIGATION

5 MATERIAL INVESTIGATION UNTITLED 1963

WHAT IS AN EXTRUSION?

An extrusion in its simples term is a form or shape that is created by taking a two dimensional profile and pulling/pushing it along a line or path in order to create a three dimensional object. The path in which the profile follows can be in any direction not just straight. IIn this example the path of the extrusion becomes the path the occupants take in order to experience the space.

START FINISH PATH EXPERIENCE PROFILE 6
THE PROFILE PARTI

LEGEND

LEGEND

1 CURTAIN WALL SYSTEM; LOW-E TRIPLE PANE GLAZING

1 CURTAIN WALL SYSTEM; LOW-E TRIPLE PANE GLAZING

2 MARBLE TILE; HEATED FLOOR SLAB SYSTEM; CAST IN PLACE CONCRETE FLOOR SLAB

2 MARBLE TILE; HEATED FLOOR SLAB SYSTEM; CAST IN PLACE CONCRETE FLOOR SLAB

3 STANDING SEAM ALUMNINUM MTL PANEL; 2” POLYISO; WEATHER BARRIER; 1/2” GYPSUM SHEATHING; CFMF; BATT INSUL R -21

3 STANDING SEAM ALUMNINUM MTL PANEL; 2” POLYISO; WEATHER BARRIER; 1/2” GYPSUM SHEATHING; CFMF; BATT INSUL R -21

4 STANDING SEAM ALUMINUM MTL PANEL; 1/2” GYP SHEATHING; CFMF

4 STANDING SEAM ALUMINUM MTL PANEL; 1/2” GYP SHEATHING; CFMF

5 TONGUE AND GROOVE WOOD FLOORING SYSTEM; 5” COMPOSITE STL DECKING

5 TONGUE AND GROOVE WOOD FLOORING SYSTEM; 5” COMPOSITE STL DECKING

6 POLISHED CONCRETE FLOOR SLAB

6 POLISHED CONCRETE FLOOR SLAB

7 STANDING SEAM ALUMINUM METAL PANEL; WEATHER BARRIER; 1/2” COVER BOARD; 4” POLYISO, 1/2” COVER BOARD; 5” COMPOSITE STL DECKING

7 STANDING SEAM ALUMINUM METAL PANEL; WEATHER BARRIER; 1/2” COVER BOARD; 4” POLYISO, 1/2” COVER BOARD; 5” COMPOSITE STL DECKING

8 3/4” PLYWOOD BENCH; 6” CFMF

8 3/4” PLYWOOD BENCH; 6” CFMF

9 PAINTED 3/4” STL WINDOW SHROUD

9 PAINTED 3/4” STL WINDOW SHROUD

7 EXTERIOR RENDER INTERIOR RENDER SECTION DETAILS DETAILS D1 D2 DALLAS INDUSTRIAL
HALL 48’ - 0” LEVEL 2 16’ - 0” LEVEL 1 0’ - 0” LEVEL 2 16’ - 0” 4”
ARTS EXHIBIT
1 2
1 1 3 3 7 4 5 6 DETAILS D1 D3 D4 D5 D6 D2
INDUSTRIAL
ROOF 48’ - 0” LEVEL 2 16’ - 0” LEVEL 1 0’ - 0” LEVEL 2 16’ - 0” LEVEL 3 32’ - 0” 4” 33’ - 6” R.O. -5’ -8” R.O. 1/8” 1’-0” 1/8” 1’-0” 1 1 1 9 1 3 3 3 7 6 8 DETAILS D1 D3 D4 D5 D2
ROOF 48’ - 0” LEVEL 2 16’ - 0” LEVEL 1 0’ - 0” LEVEL 2 16’ - 0” 4” -5’ -8” R.O.
DALLAS
ARTS EXHIBIT HALL
DALLAS INDUSTRIAL ARTS EXHIBIT HALL
1 2
1 1 3 3 7 4 5 6
D5 D6 D2 D1 D4 D3 ROOF LEVEL 3 48’ - 0” 32’ - 0” LEVEL 2 16’ - 0” LEVEL 1 0’ - 0” LEVEL -1 -16’ - 0” 8 CROSS SECTION
LONGITUDINAL SECTION 9
ROOF LEVEL 3 48’ - 0” 32’ - 0” LEVEL 2 16’ - 0” LEVEL 1 0’ - 0” LEVEL -1 -16’ - 0” 10

SPRING 2021 - ARCH 406-MARCEL ERMINY

18 x 18 x 36 signifies the size, in meters, and shape of every mass in the city. 18 X 18 X 36 is not a “plot” where to design, it is the form. Given a rectangular prism three projects must be designed that can be oriented in 3 ways; tall, wide, deep. Each of the 3 projects must be a different condition than the last. Meaning you must design one tall, one wide, and one deep. After all 3 are completed one must be chosen to be further developed. The buildings are subjugated to 2 different building conditions. They can be built in a corner or in the middle of a city block. This is

important because that decsion tells you whether you will have 1 or 2 facades to design that will interact with the city. Buildings can build beyond the 18 or 36 meter height constraint, but they must have a 6 meter setback on the leading edge of the building exposed to the sidewalks. This was a rule implimented in order to keep the integrity of the 18 meter or 36 meter height limits along the visible facades. The project I chose to further develop was the art school. The school was meant to have classrooms, administrative offices, studio spaces, cafe, and gallery space for students to

display work. Inspired by the works of Steven Holl the art school uses channeled glass to allow for the most amount of natural light to permeate into the studios and gallery spaces. The obscurity of the frosted affects of the channeled glass serve as a symbolic metaphor for the ambiguity of the meaning of art.where you can design, it is the form.

2
CARLOS
18 X 18 X 36
ART SCHOOL 12
ROMO
CONTEMPORARY

After choosing the building type, typology, and location, the organization of building program is key for the building to function properly. Since the building was to be a wide inbetween a symmetrical idealogy seemed to take over how the core elements and usable space were to be oriented. In this case the core supporting elements were placed as bookends within the form and bridged together by the usable space inbetween.

UNDERSTANDING SITE CONTRAINTS

18X18X36 is not a lot size, but a form. A rectangular prism that can be oriented in a tall direction, deep direction, and wide direction. This exercise was to envision the many possible city block configurations and constraints that could be expected when choosing the location on site.

TC - Tall Corner

TB - Tall Between

DC - Deep Corner

DB - Deep Between

WC - Wide Corner

WB - Wide Between

13
FORM DEVELOPMENT
14
15
16

FIRE STATION 6

CARLOS ROMO + GUADALUPE ALVAREZ

FALL 2020-ARCH 405-MARCEL ERMINY

Located on the outskirts of the growing Texas A&M Rellis campus, the need for a new fire station in the area lingers over the town. As populaion steadily rises in the area with the school plans on having at least 25,000 students by 2025 the need for a new fire station seems inevitable. To reduce the response times the city of Bryan is seeking to build a new fire station in this location. As my partner and I developed the design we planned to build a fire station with a hybrid program that could also tailor to the needs of the community. Being a fire station comes with its own design

challenges and adding a community center only makes the integration more difficult. While working on achieving an equilibrium between the two programs interactions there was also the task of developing a large undeveloped site. However, the site and the building should not be seen as two distinctly different projects, as they should tie together and compliment one another. They should interact with eachother to further strengthen the meaning of the project as a whole. That is why much of the site layout is taylored to the community and the fire fighters needs. My partner and I

heavily focused on the design concept of splitting the programs and stacking them. This lead to the distinct look of a single story community center facing the campus, but a multistory fire station facing the major highway. In this project I focused heavily on the layout/massing, renderings, post production drawings, and detailing. The overall program consisted of fire station program such as apparatus bays, gymnasium, kitchen, bedrooms etc. While the community center focused on more activity rooms, conference rooms, lobby spaces, offices, etc

3
18

NORTH ELEVATION

WEST ELEVATION

EAST ELEVATION

MASSING PROCESS SOUTH
ELEVATION
19
SECTION 1 SECTION 2 20

The gym is a multistory space; however, the complexity of its design arises when you note that half of the height of the gym is considered underground. Therefore, a large retaining wall is needed at the base of the gym in order to support the lateral loads of the dirt. The tension rod truss between the two columns helps to reinforce the lateral bracing for loads that the wall might face above ground, such as wind loads. The column pedestal design was integral to tie back the loads to the load bearing foundation.

21 21 COOL ROOF LAYER RIGID INSULATION VAPOR RETARDER STEEL DECKING 24” TRUSS DUCTWORK RIGID INSULATION 8” H-SECTION 8” H-SECTION ALUMINUM PANELS COLUMN BASE PLATE COLUMN PEDESTAL 18” RETAINING WALL INSULATION STEEL RODS 21
WALL SECTION DETAIL
LEVEL 2 LEVEL 1

GYM RENDER

This is the rendered representation of the the wall section detail to the left.The design of the column pedestals was integral into the design of the gym. Not only did it help to reinforce the structure for lateral loads, such as wind loads, but it also helped to define the gym and bring about character to an otherwise ordinary gym layout.

UNDERGROUND PATIO

ENTRY WALKWAY
22

SCHOOL OF INNOVATION

SPRING 2020 - ARCH 305 - PRIYA JAIN

This project is all about adaptive reuse. There are many older buildings all across Texas A&M and as the population begins to grow the need for new and improved buildings begin to weigh on many smaller outdated buildings across campus. Originally known as the HEEP Laboratory this was initially the school for dairy. Today it is unoperational, but opens its doors to graduates and professors alike who have no office space withinin the buildings that houses their major. The university decided to build an entirely new building dedicated to this major across campus and reused

the same name “HEEP”. The older building soon earned the nickname “old HEEP” or “HEEP of garbage”, since most students wanted it to be demolished. Our goal aims to reuse the current structrual components of the building and comform it to the new programs that is required. This building is no longer the school for dairy, but instead a school of innovation that will provide programs and spaces for startup businesses, such as a maker spaces, print shops, classrooms, auditoriums, offices, etc. The original school was composed of classrooms, labs, and offices

that have never been retrofitted to comply with current and modern coursework. In this project I focused heavily on redesigning the exterior facade and program layout. I produced most of the post production drawings, such as structural diagrams, floorplans, elevations, circulation drawings, and renderings. Being designed prior to ADA a large emphasis was given on providing equality of access to all students.

4
CARLOS ROMO + AUSTIN LAGRANGE 24
25 MASSING PROCESS SOUTH ELEVATION
SECTION 1 EAST ELEVATION SECTION 2

LEVEL 4

-Offices

-Meeting Rooms

-Computer Lab

-Break Room

-Maker Space

-Terrace

LEVEL 3

-Offices

-Seminar Rooms

-Computer Labs

-Clasrooms

-Maker Space

-Terrace

-Library

LEVEL 2

-Offices

-Classrooms

-Computer Labs

-Print Shop

-Conference Rooms

-Terrace

-Library

LEVEL 1

-Offices

-Auditorium

-Event Space

-Coffee Shop

-Loading Dock

-Lobby

26
CIRCULATION

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.