LILJEHOLMEN BY THE BRIDGE HIGH-RISE & MIX USE
DRABANTENHUSET /ELDERLY HOME HEADQUARTERS SEB BANK HOUSING IN HAMMARBY SJÖSTAD HOUSING IN HAGASTADEN
BADEL BLOCK IN ZAGREB GALLERIAN T30 IN STOCKHOLM CLOSE THE GAP IN NEW YORK
YOUTH CENTER HOTEL & SPA HOUSING, COMMERCIAL & OFFICES
PUBLIC SPACE HOUSING URBAN PLANNING WORKSPACE HIGHRISE COMPETITIONS CARMEN VAL SOLANA architect
portfolio
005 012
006 CURRICULUM VITAE
018
002
INDEX
ON CONSTRUCTION / WORKING EXPERIENCE
DRABANTENHUSET / ELDERLY HOME Upplands Väsby (Sweden)
KV PYRAMIDEN / HEADQUARTERS SEB BANK Arenastaden Solna (Sweden)
KV GODSVAGNEN / HOUSING Hammarby Sjöstad Stockholm (Sweden)
KURHERBERGE / HOTEL & SPA Stift Altenburg (Austria)
HOUSING BLOCK / COMMERCIAL USE & OFFICES Glories, Barcelona (Spain)
077 078
YOUTH CENTER & HOUSING / FINAL MASTER´S THESIS Jaca (Spain)
088
043 044
SCHOOL PROJECTS
096
KV VITSIPPAN, / HIGH-RISE MIX USE Borås (Sweden)
062
LILJEHOLMEN BY THE BRIDGE / URBAN PLANNING Stockholm (Sweden)
070
020 030
DESIGN PHASE / WORKING EXPERIENCE
036
029
KV KROMOSOMEN / HOUSING BLOCK Hagastaden Stockholm (Sweden)
COMPETITIONS
BADEL BLOCK / INTERNATIONAL COMPETITION Zagreb (Croatia)
KV TROLLHÄTTAN T30 / URBAN SCAPE Gallerian Stcokholm (Sweden)
CLOSE THE GAP / INTERNATIONAL COMPETITION New York (USA)
CURRICULUM VITAE
Education
2006 – 2013 Architect Master at ETSAB (Escuela Técnica Superior de Arquitectura de Barcelona) 2010 –2011 Erasmus at TU Wien (Technische Universität Wien) 1997 –2006 Major in Piano at Academy of Music (Sabiñánigo, Spain)
Work experience
2014 - now Alessandro Ripellino Arktitekter, Stockholm 2015 Berg / CF Møller, Stockholm. Loaned from Ripellino to help with a housing projekt under 3 months. 2013 e.l.e Arkitekter, Stockholm 2011 - 2012 Internship at Planet Architects, Vienna 2008 Teacher in Mathematics, Physics and Chemics (High school level) 2007 Designer at MA_SISTEMAS company. Worked on project Bike´s Parking BIGLOO (http://www.bigloo.es/)
Computer knowledge
Revit, Autocad, Rhinoceros, Sketchup, 3D Studio Max, Cypecad, Photoshop, Illustrator, Indesign, Microsoft Office
Languages
Spanish: first language, native Swedish: second language, fluent English: fluent Catalan: fluent German: medium level, B2 certificate. Spent a year living in Austria Danish: medium level, course at Folkuniversitet French: basic level Japanese: basic level, course at NTI skolan
03
Personal information
Carmen Val Solana Hästholmsvägen 15, Stockholm +46 700 35 46 21 carmenvalsolana@gmail.com
04
ON CONSTRUCTION WORKING EXPERIENCE
DRABANTENHUSET / ELDERLY HOME UPPLANDS VÄSBY
KV PYRAMIDEN / HEADQUARTERS SEB BANK ARENASTADEN, SOLNA KV GODSVAGNEN / HOUSING HAMMARBY SJÖSTAD, STOCKHOLM KV KROMOSOMEN / HOUSING BLOCK HAGASTADEN, STOCKHOLM
EN
DRABANTENHUSET ELDERLY HOME
ÄG
Drabantenhuset is included in the project “Fyrklövern” in Upplands Väsby. A jury formed by independent experts evaluates the proposal on different cathegories like urban aspects, cooperation, innovation, rooms and parking. My roll in this projekt was to develop the facade system with prefabricated concrete and to produce the material for the jury presentation. Our proposal got the highest result.
N
ALESSANDRO RIPELLINO. 2017.
Drabantenhuset represents the latest design in elderly housing and represents how a backside transforms into a front - this is an urban block that contains everything. Drabanten is the city center’s new front and appears as the background for the new district park “Blå parken”. The volume integrates itself carefully in the surroundings and sticks out at the same tlme with its raggedy character. The program consist of different forms of elderly housing according to the client concept. The groundfloor is a basement composed by the entrances for the residents inbetween little local stores and cafés. From the basement grows three different volumes which are strategically placed: - The care department sticks out over the street. - The highrise on the east works as a landmark for the whole center. - The volume at the back creates a green background to the park on top of the basement. This park is for the residents and visitors with direct access to Silver Life’s reception, gym, hair dresser, physiotherapist and a restaurant with ist open-air café. The concept is an infinity garden that visually goes on “blå parken” below.
UPPLANDS VÄSBY
PROJECT SITE
07
08
A STAIR LINKS THE PARK ON TOP OF THE BASEMENT WITH THE STREET LEVEL AS AN EXTENSION OF THE OPEN-AIR CAFÉ.
BISTRO
CAFÉ
09 VERTICAL SEKTION BASEMENT FACADE METAL & CONCRETE
CONCRETE MOCK-UPS
10
HORIZONTAL FACADE SECTION.
FACADE ELEVATION. BUILDING BEHIND THE PARK.
VERTICAL FACADE SECTION
11 HORIZONTAL FACADE SECTION.
FACADE ELEVATION. HIGH RISE BUILDING.
VERTICAL FACADE SECTIONS
KV PYRAMIDEN HEADQUARTERS SEB-BANK
12
SEB’s new headquarters in Arenastaden is one of Sweden’s biggest office building, with 97000 sqm and 4500 workplaces. It is a city in the city. The project is divided into three blocks which are connected above and below the ground with eachother and to the urban fabric. It is also possible to walk between the roof terraces, parks with a different landscape on each block. The flow of people around and inside the buildings organizes the different rooms in the office landscapes responding to the urban situation. The blocks are shaped as three cristal volumes emphasizing horizontality as a strategy to reduce the visual impression of the buildings scale. The design of the bearing steel structure is unique for each volume giving each building it’s identity. Each facade has a screenprinted white pattern based on this design. The glas reflects the surroundings meanwhile the screenprinted motif creates a dynamic shadow effect on the facade behind.
. ..
ALESSANDRO RIPELLINO 2014 The biggest challenge about working on this project was being a part of a 25 architects team (both my collegues and consultants) and working with such a big and complex building. I was involved in it during Project planning process (systemhandling) and building permit drawings (bygglov).
PROJECT SITE
The building is certified by BREEAM Excellent with low energy comsumption, solar cells and a huge bicycle parking.
ARENASTADEN, SOLNA
13 PHOTO DURING CONSTRUCTION
14
THE PLOT
TERRACE PARK
TRANSPARENT GROUNDFLOOR
HORIZONTALITY AS A STRATEGY. TO REDUCE THE BIG SCALE.
ADJUSTING TO THE FLOW OF THE PEOPLE AND URBAN SITUATION
40m
80m
65m
+8,0
PASSAGES THROUGH THE PLOT CREATE 3 URBAN BLOCKS
ARENASTRÅKET
PYRAMIDTORGET
+12,5
+3,5
3 RATIONAL OFFICE BUILDINGS: 16-30.000 sqm EACH FLEXIBILIY: POSSIBILITY TO CONECT OR DIVIDE
+8,0
STJÄRNTORGET
ATRIUM
+13,5 +8,0
PYRAMID PASSAGE
+3,5 PYRAMIDVÄGEN
+3,5
SCALE AND STREET SPACE HORIZONTALITY RELATES TO THE SURROUNDINGS SCALE. LIVELY GROUNDFLOOR WITH TRANSPARENT AND ACTIVE FACADE
GOOD CONDITIONS FOR DAYLIGHT HIGHEST POINT AS A LANDMARK
FLOW DIAGRAM. CONNECTIONS. ON GROUND LEVEL.
15
THE PROJECT IS DIVIDED INTO THREE BLOCKS WHICH ARE CONNECTED ABOVE AND BELOW THE GROUND WITH EACHOTHER AND TO THE URBAN FABRIC. IT IS ALSO POSSIBLE TO WALK BETWEEN THE ROOF TERRACES, PARKS WITH A DIFFERENT LANDSCAPE ON EACH BLOCK.
MODEL AT EARLY STAGE
16
NOLLI PLAN
THE FLOW OF THE PEOPLE AROUND AND INSIDE THE BUILDINGS ORGANIZES THE DIFFERENT ROOMS IN THE OFFICE LANDSCAPE RESPONDING TO THE URBAN SITUATION.
17 TRANSPARENT GLASS 17% REFLECTION
SCREENPRINTED GLASS
SUN SHADING
SCREENPRINTED GLASS IN FRONT OF SUN SHADING
FACADE DIAGRAM
FACADE BUILDING 1
FACADE BUILDING 2
FACADE BUILDING 3
THE GLASS REFLECTS THE SURROUNDINGS MEANWHILE THE SCREENPRINTED MOTIF CREATES A DYNAMIC SHADOW EFFECT ON THE FACADE BEHIND.
18
KV GODSVAGNEN HOUSING
Block Godsvagnen is located on the boarder of central Stockholm, in the heart of Hammarby Sjöstad, by the park Heliosparken. The area was a harbour and industrial area that in the recent years has been transformed into a lively and green profiled neighbourhood creating homes for about 25 000 people. The project consist of three freestanding buildings that open the block towards the park and a building in the center of the plot that defines the backyard.
BERG / CF MØLLER. 2015. I worked on this project for a couple of months when I was outsourced from Ripellino to the office Berg CF Møller in Stockholm. I was part of a five people team and I was responsible of the Revit modell and drawing management for Project planning documents (Systemhanding). I helped the team drawing plans, facades, sections, details, schedules and diagrams.
PROJECT SITE
The concept offers dwellings and yards that are suitable for big families and advocates environmental friendly solutions, recreational green areas and clearly defining private and public space: community terraces on top of the buildings for private use and public functions on the ground floor completing the park and promenade paths.
HAMMARBY SJÖSTAD
19
KV KROMOSOMEN HOUSING BLOCK
20
ALESSANDRO RIPELLINO. .2015-2017. I have worked on this project from early design phase to construction- and building permit drawings. I was responsible for the facade design, had contact with the client, constructors and suppliers, drew by myself construction details and I learned a lot about prefabricated concrete systems and metal construction. It has been an exciting journey working with materiality, doing mock-ups, visiting the concrete factory in order to find the right pigments and aggregates as well as trying to solve constructive details with good quality all the way from sketch to completed building.
PROJECT SITE
HAGASTADEN
21 Kromosomen is one of the first blocks that are being built in the new neighbourhood Hagastaden, an old industrial area which is transforming into a vibrant neighbourhood with 6000 new apartments and 50000 workplaces inbetween Vasastan and Solna. This area is going to become a new annual ring in Stockholm’s cityplan that sticks out because of it’s higher scale and density. The new urban fabric is a sequence of openings (streets and inner yards) that connects public spaces: the new citypark and Norra Stationsgatan. The block has apartments of different sizes and a lively basement with commercial activities. It consist of four towers that are shaped as four rocks to create variation and they are linked by lower buildings. The concept for the facades is a double storage motif to emphasize verticality and reduce the buillding scale. The constructive system is composed by prefabricated concrete elements in warm tones designed with a rugged relief pattern. The inner yard has a pale expression and lighter colours reminding a quarry.
22
FLOORPLAN
23 STREET ELEVATION
THE CONCEPT FOR THE FACADES IS A DOUBLE STORAGE MOTIF TO EMPHASIZE VERTICALITY AND REDUCE THE BUILLDING SCALE.
24 FOUR DIFFERENT CONCRETE PIGMENTS
25 COURTYARD ELEVATION
THE CONSTRUCTIVE SYSTEM IS COMPOSED BY PREFABRICATED CONCRETE ELEMENTS IN WARM TONES DESIGNED WITH A RUGGED RELIEF PATTERN. THE INNER YARD HAS A PALE EXPRESSION AND LIGHTER COLOURS REMINDING OF A QUARRY.
26
A
E 21
B
C
E 22
ELEVATION (1:20) VERTIKALSNITT A-A (1:20) DOUBLE STORAGE MOTIF AS CONCEPT FOR THE FACADE CONCRETE AND METAL
VERTIKALSNITT B-B (1:20) VERTICAL SECTION
VERTIKALSNITT A-A (1:20) VERTIKALSNITT A-A (1:20)
ELEVATION (1:20)
PH = TILLGÄNGLIG FRI HÖJD PÅ BEKLÄDNAD AV PROFILERAD PLÅT
27
PB = TILLGÄNGLIG FRI BREDD PÅ BEKLÄDNAD AV PROFILERAD PLÅT
VERTIKALSNITT B-B (1:20) VERTIKALSNITT B-B (1:20)
A1
HÄNVISNINGAR A
A1
HORISONTALSNITT C-C, D-D, E-E, F-F, SE RITNING A-42.2-02 KULÖRER OCH MATERIAL SE BILAGA 1, MATERIAL- OCH KULÖRBESKRIVNING UTVÄNDIGT
B1
E 22 (1:10) E 22 (1:10)
E 21 (1:10) E 21 (1:10) B1
SKALA 1:20
SKALA 1:5
SKALA 0 0,1 1:200,5
VERTIKALSNITT METER 0 0,1 B-B METER (1:20)
0,5
B
1,0
1,5
2,0
1,0
1,5
2,0
C1
SKALA 1:50,1 0 METER 0 0,1 METER
0,2
0,5
0,2
0,5
V 25 V 25
C1
A
BET BET
ENL. PMA0
ÄNDRINGEN AVSER AVSER ÄNDRINGEN
2017-02-07 DATUM DATUM
CVS
SIGN SIGN
BYGGHANDLING
KV KROMOSOMEN CORRUGATED STAINLESS STEEL WITH A STRIPE PATTERNED FINISH C
N
28
WORKING EXPERIENCE
DESIGN PHASE
LILJEHOLMEN BY THE BRIDGE / URBAN PLANNING STOCKHOLM KV VITSIPPAN / HIGH-RISE, MIX USE BORÃ…S
LILJEHOLMEN BY THE BRIDGE URBAN PLANNING
This project is an urban intervention that connects the districts of Södermalm and Liljeholmen in Stockholm by creating new pedestrian and bike paths, public spaces and 3000 new homes. The connection between the bridge and the urban fabric becomes crucial when the city center grows. PROJECT SITE
ALESSANDRO RIPELLINO. 2014. I was a part of the team that worked on this project on behalf of the city planning office in Stockholm. It was one of my first projects at the office and I worked mostly with the northen part by the bridge, drawing sections, plans and designing the facades. I took care of the integration of the old storage buiding in our proposal.
STOCKHOLM
Today the bridge Liljeholmsbron merges into a big regional road (Södertäljevägen) that passes through Liljeholmen cutting out the neighborhood and not interacting with the local fabric. The new buildings aim to visually shorten the bridge into segments and create better connections between the bridge level and the quay. A new street along the existing storage brick building reduces traffic on the quay, which becomes a leisure path. Dramatic level differences and water space meets architecture at a big scale by the bridge meanwhile the street and park system shapes carefully and highlighting the history of the place. Old architecture will co-exist with new buildings creating an interesting, more dense city.
31
32
TOWERS
BLOCKS
HOUSING COMMERCIAL PARKING
LILJEHOLMS BRIDGE
INSTALLATIONS
PRESERVED BUILDINGS
SECTION CUTTING THE LILJEHOLMS BRIDGE
BASEMENT WITH RAMPS AND STAIRS CONNECTING QUAYSIDE AND BRIDGE
33
34
DRAMATIC LEVEL DIFFERENCES AND WATER SPACE MEETS ARCHITECTURE AT A BIG SCALE BY THE BRIDGE. THE NEW STREET AND PARK ENVIRONMENTS CAREFULLY SHAPED, HIGHLIGHT THE HISTORY OF THE PLACE. OLD ARCHITECTURE COEXIST WITH NEW BUILDINGS CREATING AN INTERESTING, MORE DENSE AND CONNECTED CITYSCAPE.
ELEVATION THE BRICK BASEMENT LINKS TOGETHER THE DIFFERENT BUILDNINGS IN THE BLOCK
35
36
KV VITSIPPAN HIGH-RISE, MIX USE
Block Visippan at Europaplatsen located at the entrance of Borås city is today divided in two parts: car parking and a park with a giant Pinoccio sculpture called “walking to Borås” made by Jim Dines in 2008. The plot is surrounded by the highway to the south and east meanwhile to the west and north it meets the city center. The facade design requires solving the traffic noise problem, that is why all the apartments has glazed terraces that gives unique qualities and can work as a little garden patch. The high-rise is composed by renting apartments, student and elderly homes. This volume rest on a four floor basement that contains a supermarket, offices, parking and a kindergarten that has it’s courtyard on top of the basement.
ALESSANDRO RIPELLINO. .2017. I worked on this project at an early stage during a couple of months together with an assistant in order to create the material for the detailed development plan (detaljplan granskning). I had direct contact with the client, AB bostäder I Borås and worked together with a traffic expert. I had responsibility of how the complex program could coexist in the plot and show some ideas for the facade design.
PROJECT SITE
BORÅS
The facade of the basement relates to the textile manufacturing history of Borås with it’s houndstooth pattern using bricks, a traditional material in many buildings in the city. The buildning includes an interesting mix of functions that reactivates this area in Borås becoming a landmark that welcomes visitors coming to Borås by car, students and people interested in textile and fashion design.
37
38
INSTALLATIONS
APPARTMENTS 4UNITS/FLOOR
THE BUILDNING INCLUDES AN INTERESTING MIX OF FUNCTIONS THAT REACTIVATES THIS AREA IN BORÅS BECOMING A LANDMARK ON THE SOUTH ENTRANCE OF BORÅS.
APPARTMENTS 6UNITS/FLOOR
HOUSING COURTYARD
KINDERGARTENS COURTYARD
KINDERGARTEN PARKING
NEW BRIDGE
OFFICE OFFICE/COMMERCIAL
FABRIKSGATAN SECTION A-A
SUPERMARKET
ARLAGATAN
39 A A
ANNELUNDSPARKEN
40
รถ
kv. vitsippan
april 2017
VERTIKALSNITT LOGGIA
FACADE VERTICAL SECTION
FACADE ELEVATION HIGH-RISE
41
THE FACADE OF THE BASEMENT RELATES TO THE TEXTILE MANUFACTURING HISTORY OF BORÃ…S WITH ITS HOUNDSTOOTH PATTERN USING BRICKS AS A TRADITIONAL MATERIAL MEANWHILE THE HIGH-RISE GLAZED FACADE SOLVES THE TRAFFIC NOISE PROBLEM GIVING EACH APARTMENT A PATCH.
42
SCHOOL PROJECTS
YOUTH CENTER & HOUSING FINAL MASTER´S THESIS JACA /SPAIN
KURHERBERGE HOTEL & SPA STIFT ALTENBURG /AUSTRIA
HOUSING, COMMERCIAL & OFFICES GLÒRIES /BARCELONA
YOUTH CENTER & HOUSING FINAL MASTER’S THESIS ETSAB 2012/13
JACA
The programme consist of a Youth Center and dwellings for rent. The project is located on the border of Jaca‘s historical center, to which it takes part of and it has an open view contemplating the landscape. The chosen plot is a part of the Reform Plan of the Historical Center. The challenge is to integrate the public building in the historical urban fabric whereas the dwellings face the avenue that surrounds the city center, enjoying the great views. Two spines organise the project, one for each function: a corridor provides access to the different rooms and an exterior walk way provide entrances to the dwellings. The direction of these spines derives from the historical urban analyse and both of them are linked to the stair- and elevator areas.
JACA AND THE PROJECT SITE
45 PLAN OF THE HEIGHTS IN JACA’S CITY CENTER
46
The model clearly shows 3 elements: / the Cathedral and the Monastery as special objects / the party walls are the elements that give shape to the city / the skin that encloses the city center and reminds of the medieval wall. Two urban fabrics that follows different direccions meet at the project site: the part that grows radially from the monastery and the fabric between the two axis that starts from the cathedral. So the distribution spines of the project follow the direction that belongs to both urban fabrics.
MODEL 1/2000 THE BROWN ELEMENTS AS THE PROJECT SPINES
THE DISTRIBUTION SPINES FOLLOW THE DIRECTION THAT BELONGS TO BOTH URBAN FABRICS.
47 URBAN HISTORICAL EVOLUTION OF JACA
THE SITE TODAY
CATHEDRAL, MONASTERY AND REAL PALACE
URBAN FABRICS
STREETS
ENTRANCES TO THE FORTIFIED CITY
48
The facade is a skin that “moves” freely like the facades of the historical center do, not following the cartesian axis. The empty space draws an interesting sequence that engage the the open landscape with the avenue, going through the project and ending at the existing plaza in the north. The project assimilates interior lighting courtyards which are charcteristised by the place and are shared between the facility and the existing dwellings.
PARTY WALLS & EMPTY SPACES AND COURTYARDS
THE BROWN SPINES ORGANISE THE PROJECT
EMPTY SPACE ENTERS THROUGH THE TERRACE
EMPTY SPACE IN GROUND FLOOR
49
THE EMPTY SPACE DRAWS A SEQUENCE FROM THE LANDSCAPE, GOING THROUGH THE PROJECT AND ENDING AT THE EXISTING PLAZA IN THE NORTH.
GROUND FLOOR
UNDERGROUND
50
POLYFUNCTIONAL ROOM
51
SECTION
THE FACADE IS A RHYTHM OF CONCRETE WALLS AND OPENINGS COVERED WITH DRILLED WEATHERING STEEL
1ST FLOOR
52
AVENUE ELEVATION
W-E SECTION
53
WEST ELEVATION
54
1/200 MODEL
55 SPINE YOUTH CENTER
SPINE DWELLINGS
56
57 1/50 MODEL
WINDOW DETAIL VERTICAL SECTION
WALL DETAIL VERTICAL SECTION
58
WINDOW DETAIL HORIZONTAL SECTION 59
60
Roof
Attic floor The facade is a filter between the project and the exterior empty space. To promote its value it has also working as the structure. The rhytmic loadbearing facade of site-casted concrete allows maximal usage and flexibility of the interior spaces.
3rd floor
2nd floor
The slabs are also made out of reinforced concrete and the roof is a system of laminated wooden beams. The exploded 3D drawing shows the structural system elements and the colours reflect the different forces that affects the builing:
1st floor
Public use live load Residential use live load
Facade lineal load Partition wall between dwellings lineal load
Ground floor
STRUCTURE
Snow load
Underground
61
3RD FLOOR DWELLINGS + ROOF YOUTH CENTER
1ST FLOOR CALCULATION OF DEFORMATIONS N THE FLOORS AND WOODEN BEAM DIMENSIONS WITH CYPECAD
HOTEL & SPA
62
KURHERBERGE
TU WIEN 2010/11 Prof. ANDREAS PALFY
Stift Altenburg baroque Monastery is located in the middle of a large forest. This project is about extending the monastery creating a place for corporal and spiritual regeneration that also contains a library. The project is located next to the monastery courtyard which opens up to the north. The proposal is an interpretation of the cloister: filling this monastery courtyad, moving it till the plott and emptying it again creating a new courtyard. The existing coutyard can be intuited from the new one. Both are connected on the ground floor walking underneath the library located on 1st and 2nd floor. From the new cloister a ramp is going down to the spa which is in a quiet area in contact with the nature.
STIFT ALTENBURG / AUSTRIA
63
-1 LEVEL_SPA EAST ELEVATION FROM THE NATURE
64
A WOODEN PATH, A SEQUENCE OF COURTYARDS AND SPACES FROM THE MONASTERY TOWARDS THE NATURE, THROUGH THE HOTEL AND THE SPA.
NORD ELEVATION CUTTING THE SPA
65
GROUNDFLOOR
66
THE EXISTING COURTYARD CAN BE INTUITED FROM THE NEW COURTYARD. BOTH ARE CONNECTED ON THE GROUND FLOOR WALKING UNDERNEATH THE LIBRARY.
COURTYARD SECTION
1ST FLOOR
67
68
.388
.387
.387
.387
.387
.387
.385
.386 .387
.387
.383
.383
.384
.385
GROUND FLOOR
.385
.382
Ground floor 1/200 East facade 1/200
69
THROUGH THE RAMP THAT GOES DOWN FROM THE NEW COUTYARD TO THE SPA e 1/200 THERE IS A VIEW TO THE NATURE. THE FACADE IS A FILTER THAT CAN MOVE DEPENDING ON THE NEED OF LIGHT, VIEWS AND PRIVACY.
Courtyard section 1/200
Detail facade 1/20 wooden floor
floor 1/1000
insulation poliestire waterproof film concrete
Detail facade 1/20
metal rain protection concrete wall profile jalousie holder galvanic element holding fixed jalousies fixed jalousie metal rail for jalousie movable jalousie glass railing ISOKORB sliding glass door .383
concrete floor metal window frame steel windowsill travertine plates
detail
FACADE DETAILS
.382
steel travertine holder
Second floor 1/200 West facade 1/200
COMMERCIAL USE & OFFICES
70
HOUSINGBLOCK ETSAB 2008/09. Prof. MARTA PERIS.
The proposal consist of housing with commercial and office functions located on the ground floor. The site is situated at a block of one of the developed plans to solve this crucial point of Barcelona. The concept is based on 3 pieces that are placed in different positions with different heights. PROJECT SITE TODAY
This 3 pieces are connected on the ground floor populating urban activities and is interrupted on two points. A crack facing Gran Vía that relates to the next block and a ground floor passage that connects the new Encants Market with the inner plaza that the three pieces surround. Each piece has two “L”-shaped elements that contain two dwelling typologies: a duplex and a simplex. In the cracks between these two “L” elements the staircase, elevator and installations are located and two walkways along the inner courtyard organize the dwellings.
GLORIES
71 Dia
gon
al
Gran Vía
New Mercat dels Encants
Me
a
an
i rid
PROJECT SITE GLORIA´S PROPOPOSAL
72
3 PIECES THAT ARE PLACED STRATEGICALLY WITH DIFFERENT HEIGHTS WHICH ARE CONNECTED ON THE GROUND FLOORS POPULATING URBAN ACTIVITY.
-1 LEVEL: PARKING
73 GROUNDFLOOR: ENTRANCE HALLS FROM THE DWELLINGS & COMMERCIAL/OFFICES USE
1ST FLOOR: COMMERCIAL/OFFICES USE
2ND FLOOR: DWELLINGS/OFFICES USE
FACADE DETAIL
FLOOR PLAN
ELEVANTION FROM MERCAT DELS ENCANTS
74
75
INTERIOR DETAIL TYPOLOGY FOR 1 OR 2 PEOPLE
DUPLEX TYPOLOGY FOR FAMILIES
76
COMPETITIONS
BADEL BLOCK INTERNATIONAL COMPETITION ZAGREB
KV TROLLHÄTTAN / T30 URBAN SCAPE GALLERIAN / STOCKHOLM
CLOSE THE GAP INTERNATIONAL COMPETITION NEW YORK
BADEL BLOCK INTERNATIONAL COMPETITION
Badel block is the only area in this part of Zagreb that has not been developed. In this particular district nor buildings neither blocks are duplicated; instead, the enriched dialectic found in continuos and carefully demarcated spaces, which follow the plot of distinct mobility infrastructures and undefined, opened, discontinued spaces that remain isolated closed in urban bubbles. The city section shows us the alternation of the characteristics of these two logics: the alignment of the facades’ continuity that helps to formalize the streets independently of the interior pieces. In Badel Parks proposal the perimeter is broken perforating the hard crust block to discover an exuberant, disquiet and insolent interior, where: new activities are in interaction, a diversity of architectonic objects coexist. The heritage value lives in its use capacity, in continuing to be useful in the new socio-economic structures. The purpose is not freezing objects to preserve them from time; moreover, it’s about providing them meaning throughout times. Melting different theme parks encourage many itineraries associated to different activities, making a group of diverse thematic systems. Heritage Park, Commercial Park, car park, Business Park, enviromental park, residential park, public service, Leisure Park.
ETSAB 2011/12 COMPETITION WORKSHOP GROUP OF STUDENTS TEACHERS YOUNG ARCHITECTS
ZAGREB
The program displays in two clearly different ways, following the guidelines in which urban materials are organized. On a dispersed way in a three floor spongy baseboard associated with two levels of parking and chained by an overlaping set of stairways and elevators that develop different architectural objects. On the other hand the buildings are architectural objects, articulated through an innovative technological garden as a new urban space, distanced from the cultural spaces linked to heritage.
79
80
SEQUENCES OF SPACES, ITINERARIES, BROKEN VIEWS, CONTRASTED FRAGMENTS, BUILT- AND URBAN VISUAL EXPERIENCE.
M. Solà Morales espacios públicos –espacios colectivos. La Vanguardia 1992
81
“If the public spaces are the social image of the city and the private plots are the privilege of the individual citizen where contemporary urbanity may perhaps appears as it’s highest level is in what we define as “collective spaces”, hybrid spaces that are simultaneously public and private, where the force of urbanity as a spatial mechanism to mediate social differences becomes tangible, material, and sometimes conflict-ridden”.
82
BADEL PARKS
83
84
FLOOR PLAN AND SECTION
85
UNDEFINED, OPEN, DISCONTINUED SPACES THAT REMAIN ISOLATED CLOSED IN URBAN BUBBLES. NEURONAL WEB OF COLLECTIVE SPACES BY DUPLICATING THE URBAN GROUND FLOOR. MELTING DIFFERENT THEMATIC PARKS AS HERITAGE, COMMERCIAL, ENVIROMENTAL, HOUSING AND LEISURE PARKS.
86
THE CITY BRINGS TOGETHER DIFFERENT PEOPLE, INTENSIFIES THE COMPLEXITY OF SOCIAL LIFE, PRESENTS PEOPLE AS STRANGERS. ALL THESE ASPECTS OF THE URBAN EXPERIENCE, DIFFERENCE, COMPLEXITY, STRANGENESS ALLOW RESISTANCE AND DOMINATION.
87 “The city brings together different people, intensifies the complexity of social life, presents people as strangers. All these aspects of the urban experience, difference, complexity, strangeness- allow resistance and domination. This steep and difficult urban geography makes a particular moral promise. It can be a home for those who have been accepted as exiles from the Garden of Eden. “
Richard Sennet, Flesh and Stone
88
KV.TROLLHÄTTAN GALLERIAN / COMPETITION
ALESSANDRO RIPELLINO. 2014. This was my first project at Ripellino Arkitekter. We competed against three other offices: Snøhetta, Lundgaard & Tranberg and Wingårdhs. It was really interesting to think about how working space combines with entertainment and relaxation, day and night. I was an important part of the team, developing the competition concept, through the design process to presentation drawings, plan, sections and facades.
A BUILDING THAT TELLS US ABOUT STOCKHOLM CREATES RINGS ON WATER
A FORCE FIELD IN STOCKHOLMS CITY
PROJECT SITE This project is located at Brunkebergs torg in the heart of Stockholm on top of the existing shopping mall Gallerian. It contains 40000 square meters office space and apartments.
The fifth floor is a meeting place for the whole block: from here the space branches out creating connections to the different buildings.
Cambium motto is a metaphor for growth, nutrition exchange and annual rings which manifests in the buildings outer skin: a room for communication that flows through all the storages in the building.
Around the atrium people meet for conference, lectures, coffee… and you can even find enclosed “holkar” (the Swedish word for “birdhouses”) spaces where you can focus or relax in the middle of the crowd.
The shape of the building responds to peoples flow, connection of paths and activation of Regeringsgatan. A new passage way connects Segels torg and the metro station with Gallerian and Regeringsgatan.
The connected space within the facade, Cambium, shows the buildings life and flows out to the city and activates the street environment.
STOCKHOLM
A CONTEMPORARY ANNUAL RING THAT ENRICHES THE CITY
COMMUNICATES WITH: WORLD SWEDEN STOCKHOLM CITY TROLLHÄTTAN-GALLERIAN T30
89
90
HOLKAR: “BIRDHOUSES” ROOM-FLOW DIAGRAM
VIEW FROM THE TOP FOORS
NUTRITION
CAMBIUM
WATER
INNER BARK OUTER BARK
FLOW
FLOW GROWTH
THE FACADE WORKS AS A CAMBIUM
FACADE CONCEPT
T30
CAMBIUM OFFICES
MEETING PLAN
MALMSKILLNADSGATAN
GALLERIAN TUNNELBANA - CENTRALEN
CROSS SECTION
REGERINGSGATAN
91
CAMBIUM MOTTO IS A METAPHOR FOR GROWTH, NUTRITION EXCHANGE AND ANNUAL RINGS WHICH MANIFESTS IN THE BUILDINGS OUTER SKIN: A ROOM FOR COMMUNICATION THAT FLOWS THROUGH ALL THE STORAGES IN THE BUILDING.
92
GROUNDFLOOR 3RD FLOOR
93 OFFICE FLOOR MAIN ATRIUM
RECREATION FLOOR RESTAURANT
LIGHT ATRIUM
LIGHT ATRIUM CAMBIUM
MEETING FLOOR COMMERCIAL USE, OFFICE, CULTURE, RECREATION
LIGHT ATRIUM COMMERCE FLOORPLAN 4 COMMERCE FLOORPLAN 3 COMMERCE FLOORPLAN 2
LONGITUDINAL SECTION VISUAL CONTACT AND FLOW BETWEEN DIFFERENT FUNCTIONS AND FLOORS
FLAGSHIP STORE
94
THE FIFTH FLOOR IS A MEETING PLACE FOR THE WHOLE BLOCK: FROM HERE THE SPACE BRANCHES OUT CREATING CONNECTIONS TO THE DIFFERENT BUILDINGS.
5TH FLOOR
95 MAIN ATRIUM FROM 5TH FLOOR
96
CLOSE THE GAP INTERNATIONAL COMPETITION
INTERNSHIP 2011 PLANET ARCHITECTS VIENNA 1ST PRICE
‘Close the Gap’ competition was held by Transportation Alternatives, and d3 to generate ideas for the New York City Greenway. The greenway is a cycle path that loops along the banks of the Hudson and East River but is interrupted by a huge gap along the East river waterfront, between 38th and 58th street. The East River waterfront has long been in need of infrastructure changes, the FDR (Franklin D. Roosevelt) highway that runs along the waterfront prevents access to bike paths and the waterfront. The proposal explores issues of mobility (how NewYorkers move in their city) through alternative transport modes and address the issue of renewable, green energy as a sustainable resource within a (still) growing 21st century Metropolis. Within the considerations was not only how the urban infrastructure could support alternative transportation access points but more importantly, how is the East River part of a New Yorker’s life? How would it change the movement and quality of the city if you could swim or surf in the East River on a hot summer day? As in any Metropolis there exists a high demand for public spaces and recreational areas. The proposal offers a wide range of interventions that not only offer mobility but play with New York City’s landscape and pre-existing infrastructure. One aspect of the project links Manhattans East River front to Roosevelt Island via a water reservoir that doubles as a hydropower station, allowing more access to Roosevelt as well as providing development and recreational possiblities.
NEW YORK
97
98
99
100
SPACE, ENERGY, CONNECTION The approach to the waterfront is defined under the categories Connection, Space and Energy : - to develop an infrastructure that merges seamlessly into already pre-existing networks of public and alternative transportation but offers increased access points and mobility. - to provide Manhattan and its inhabitants a new green, public space and recreational environment that allows for an increase range of activities. - to include within the interventions a possibility for the production of renewable energy, such as installing solar panels on highway´s noise barriers.
101
INCREASING ACCESS TO OPEN SPACE IN MANHATTAN WITH AN EYE TO INTEGRATING NEW AND OLD INFRASTRUCTURE, PROVIDING DEVELOPEMENT AND RECREATIONAL POSSIBILITIES.
103
The proposed waterfront design has broad esplanades for both cyclists and pedestrians, as well as designated areas for sports and recreational activites. The FDR highway is tucked under a sound barrier that is fitted with solar panels and integrated into the waterfront. The East River can now boast of a reservoir that straddles Manhattan and Roosevelt Island creating a pedestrian/cyclists link between the two islands, while the East River is allowed to freely flow underneath the reservoir, powering an energy station run on hydropower. The waterfront park and reservoir not only offer a much needed “greening” of New York City, but offers a breathing space that enhances the city’s quality of life and redefines it, increasing access to open space in Manhattan with an eye to integrating new and old infrastructure.
104
105
BADEL BLOCK IN ZAGREB GALLERIAN T30 IN STOCKHOLM CLOSE THE GAP IN NEW YORK
YOUTH CENTER HOTEL & SPA HOUSING, COMMERCIAL & OFFICES
LILJEHOLMEN BY THE BRIDGE HIGH-RISE & MIX USE
DRAGBANTENHUSET /ELDERLY HOME HEADQUARTERS SEB BANK HOUSING IN HAMMARBY SJÖSTAD HOUSING IN HAGASTADEN
STOCKHOLM SOLNA / BORÅS UPPLANDS-VÄSBY STIFT ALTENBURG JACA / BARCELONA ZAGREB / NEW YORK