Learning from the past to prepare the future
EVOLUTION
OUR TEAM STEPHANIE CAMAÑO CAROLINA JAEN GAIA PAGNAMENTA FRANCESCA PONTICELLI
CONCEPT WE WANT TO REPRESENT SOME FACTORS FROM THE PAST, COMPARED THEM TO THE PRESENT, EMPHASIZIN ALSO IN THE WONDERS OF THE FUTURE AND HOW WE WOULD LIKE IT TO BE.
SADNESS
INDUSTRIAL
GRAY
CONCRETE CLEAR
ACCESSIBILITY / EASE/ TIME SAVE
PROS TECHNOLOGY
CONTROL / ANXIETY / DEPRESSION / VIOLANCE IMPROVEMENTS
METAL
MURDER / WAR /AWARNESS
GLASS
RED
BRICKS
CONS
PROS
SPEED
CHANGE DIEVOLUTION OVERCOMING
FAST
TIME
RUSH
CONS
PROS PROCESS
EVOLUTION
COMPETITIVENESS CONS STEP ON SOMEONE ELSE
PAST
YELLOW
FAMILY / SOCIAL LIFE / TRADITION
PRESENT
GREEN LIGHT
FUTURE
HOPE
MOVEMENT
SEDENTARY LIFESTYLE
MIND MAPPING
UNCLEAR FOG
SMOKE
CONFUSSION / LOSING TRADITION
TRADITION NOSTALGIC GRAY INTRIGUE
PAST
MOOD BOARD
GREEN
CONCRETE CHANGE
RUSH
FOG
TECHNOLOGY COMPETITION METAL
FUTURE
DESIGN STATMENT The area we are going to develope is located in Venezia (Italy) inside the exposition of Biennale 2018 which the main topic is FREE SPACE. The stand is located inside Arsenale, and the space is 61m2 big. The concept we choose to develope for this space is EVOLUTION. Following the circulation of the exhibition you are going to enter inside the first stage of our concept: PAST. Represented by old memories namely toys (like lego, crayon, furby, etc.) and this toys are going to be in open transparent boxes for let the people interacte with them; close to the wall we are going to put an old and interractive seesaw. The background is a picture in black and white. We are going to use diffuse lights and playing sound of childness (children laughing, mom calling, gelato’s car sound, etc.).Then following the path you will come across in the PRESENT rapresented by mirroring effect with led light on the frame of them. The mirror will have some design (distorted, bigger/smaller, etc.). The light in this wall is going to be directly focused on the viewer because he/she is his/her present. Following the circulation, on the last wall we are going to have the FUTURE rapresent with a board where people can write what is their future, infact in the top of this board we are going to put the sentence: “Write your future”. The light in this wall is going to be diffuse and without any kind of sound. We thought that the future is something not clear, so we are going to put a glass serphy wall in the middle of the stand (split past and future) for create a sense of unclear from where you where and where you are going. On the top of the wall of future we will put a light that will reflect the colored shadow of the people on the blurred wall, so in the other part of the stand you are going to see some shapes of people but not in a clear way. We want this space to be an interactive and nice experience for the people.
CONCEPT BOARD
10.00 M X 6.50 M
( H:6.00 M )
SKETCHES
SKETCHES
SKETCHES
50.0
20.0
10.0
50.0
PLAN
181.0
30.0
62
62
8.
5
8.
24°
24°
5
22
°
°
22
°
22
630.0
B A-2
B A-2
680.0
°
22
° 22
° 22
220.0
220.0
21°
389.0
22°
21°
22°
31.0
46°
46°
30.0
38.0
23.0
C A-3
10.0
10.0 50.0
A A-3
50.0
220.5
389.0
220.5
60.0
830.0
60.0
950.0
FLOOR PLAN 1:20
101.0
84.0
42.0 76.0
59.0
79.0
42.0
67.5
84.0
42.0 84.0
56.5
79.0
42.0
67.5
84.0
42.0
101.0
125.0
125.0
65.0
125.0
65.0
101.0
75.0
59.0 75.0
0
60
PLAN FINISHING
RAL 7035
RAL 7038
181
RAL 9018
RAL 7004
RAL 9018
RAL 9022
2205
620
2075
389
RAL 9007
680
RAL 9010
RAL 9016
RAL 9023
RAL 9004 60
RAL 9000
RAL 9017 830 950
RAL 9003
60
A-3
A-3
OPEN ELEVATION
10.0
10.0
50.0
220.5
389.0
60.0
50.0
830.0
60.0
950.0
FLOOR PLAN 1:20
30.0
30.0
30.0
25.0 25.0
30.0
30.0
30.0
30.0
25.0 25.0
220.0
30.0
30.0
30.0
30.0
25.0 28.0
60.0
65.0
65.0 37.5
76.0 184.0
400.0
149.5
166.0
35.0
20.0
105.0
130.0
115.0
112.5 129.5
129.5
28.0
30.0
30.0
30.0
30.0
301.5
25.0 25.0
30.0
30.0
30.0
320.5
647.0
60.0
101.0
101.0
200.0
100.0 129.5
308.0
540.5
62.5
112.5
129.5
320.5
35.0
100.0 100.0 62.5
30.0
20.0
112.5
297.0
112.5
105.0
115.0
200.0 28.0
60.0
THE FUTURE IS OURS
64.5
100.0
64.5
35.0
35.0
20.0 130.0
160.0 60.0
42.0
100.0
291
59.0
65.0
62.5 112.5
20.0
MEMORY HELD IN THE PAST
79.0
42.0 84.0
42.0
67.5
56.5
79.0
84.0
42.0 84.0
84.0
75.0 65.0
112.5
65.0
42.0
112.5
65.0
101.0
125.0
125.0
65.0
250.0
260.0
250.0
65.0
125.0
75.0
59.0
67.5
0
220.5
30.0
25.0 25.0
30.0
30.0
30.0 220.0
540.5
1728.0
30.0
25.0 28.0
60.0 60.0 60.0 60.0
1848.0
1
OPEN ELEVATION 1:20
wallpaper
mirror 101
RAL 9018 box Freestyle script, 76pt
MEMORY HELD IN THE PAST RAL 6038
60
RAL 6018
RAL 6024
RAL 6017
RAL 6010
5405
RAL 6001
RAL 6002
RAL 6016
THE FUTURE IS OURS 299
explanation sheet
400
Arial, 76pt
RAL 9000
RAL 6025
647 1'848
5405
60
42.5
20.5
82.5
82.5
82.5
493.0
82.5
20.5
42.5
950.0
SECTIONS & DETAIL
3 A-A
179.5 10.0
58.5
97.0
5.5
10.0
D2 2
DETAIL 2: PUSH IN-OUT BOX 1:5
6 A-2
10.0
97.0
179.5
4 A-2
60.0
2 A-2
Ceiling lining (gypsum)
Angles of support
400.0
114.0
97.0
DETAIL 1: FALSE FLOOR 1:5
600.0
D1 1
600.0
600.0
124.0
3 A-2
5 A-2
58.5
179.5
43.5
19.5
SECTION A-A 1:20
3
CEILING UNION/ HANGING BOXES
4
20.5
42.5
3 A-2
3 A-A
4 B-B
124.0
SECTION A-A 1:20
A-2 228.0
SECTION B-B 1:20
D1 1
4 A-2 3 A-2
105.0 124.0
950.0
SECTION A-A 1:20
82.5
82.5
SECTION A-A 1:20
82.5
20.5
Angles of support
42.5
20.5
4 A-2
97.0
B-B
1:20
950.0
D4 4
DETAIL 4: STATIC BOX/ VERTICAL GARDEN 1:5
CAROLINA JAEN GAIA PAGNAMENTA FRANCESCA PONTICELLI
Angle of support
Aluminium curtain track
97.0
179.5
600.0
105.0 7.5
179.5
10.0
ARCHITECTURAL CEILING UNION/ HANGING BOXES
DETAIL 3: CEILING UNION/ HANGING BOXES 1:5
D5 5
D4 4
DETAIL 4: STATIC BOX/ VERTICAL GARDEN 1:5 DETAIL 5: FABRIC SUPORT SYSTEM 1:5
SECTION A-A & B-B & DETAIL
97.0
DETAIL 4: STATIC BOX/ VERTICAL GARDEN 1:5
ARCHITECTURA
600.0
104.5
97.0
LEVEL +000 ELEV. 0.0cm
Scale:
Angle of Aluminiumsupport curtain track Aluminium sub-structure
FINISHED F.L ELEV. 15cm
1:20/1:5 A0
LEVEL +000 ELEV. 0.0cm
15.0
97.0 600.0
STEPHANIE CAMAÑO CAROLINA JAEN GAIA PAGNAMENTA FRANCESCA PONTICELLI
SECTION A-A & B-B & DETAIL
97.0
10.0
DETAIL 2: PUSH IN-OUT BOX 1:5
Aluminium curtain track
FINISHED F.L ELEV. 15cm
78.0
SECTION B-B 1:20
6.00%
78.0
78.0
62.0
D5 5
Scale:
1:20/1:5 A0
DETAIL 5: FABRIC SUPORT SYSTEM STEPHANIE CAMAÑO CAROLINA JAEN 1:5
GAIA PAGNAMENTA FRANCESCA PONTICELLI
D5 6
680.0
FINISHED F.L ELEV. 15cm
Project:
DETAIL 5: FABRIC SUPORT SYSTEM 1:5
D5 6
DETAIL 4: STATIC BOX/ VERTICAL GARDEN D4 1:5 4 SUPORT DETAIL 6: MIRROR SYSTEM
1:5 104.5
6 A-2
78.0
D5 5
97.0
6 A-2
179.5 78.0
60.0
62.0 4 B-B
D3 3
6 A-2
42.5
97.0
78.0
LEVEL +000 ELEV. 0.0cm
97.0
400.0
15.0
SECTION C-C 1:20 SECTION B-B 4
78.0
UNION/ HANGING BOXES
Project:
228.0
15.0
5 C-C
LEVEL +000 ELEV. 0.0cm
D2 2
Aluminium sub-structure CEILING
DETAIL 3: CEILING UNION/ HANGING BOXES 1:5
DETAIL 5: FABRIC SUPORT SYSTEM 1:5
15.0
680.0
5 A-2 830.0 78.0 950.0
20.5
10.0
78.0
82.5
FINISHED F.L ELEV. 15cm 6.00%
43.5 400.0 58.5
78.0
58.5
228.0
5.5
60.0
104.5
15.0
600.0
600.0
SECTION A-A 1:20
19.5
15.0
6.00%
415.0
58.5
82.5
493.0
UNION/ HANGING BOXES
D3 3
Aluminium sub-structure
D4 4
950.0
LEVEL +000 ELEV. 0.0cm
Aluminium sub-structure STEPHANIE CAMAÑO
D5 5
FINISHED F.L ELEV. 15cm
5 A-2
104.5 97.0
82.5
Angle of support
Angle of support
43.5 58.5 82.5
Ceiling lining (gypsum)
Aluminium curtain track
5.5
400.0 20.5
6 A-2
97.0
43.5 58.5 58.5 5.5
3 A-A
42.5
5 A-2
FINISHED F.L ELEV. 15cm
Ceiling lining (gypsum)
Hanging Box
600.0
19.5
400.0
1 A-2
CEILING UNION/ HANGING BOXES
DETAIL 3: CEILING UNION/ HANGING BOXES 1:5 Angles of support
42.5
97.0
600.0
3 A-A
3 A-A
493.0
82.5
DETAIL 1: FALSE FLOOR CEILING 1:5 3: CEILING UNION/ HANGING BOXES DETAIL 1:5
10.0
82.5
600.0
58.5
82.5
19.5
600.0
2 A-2
20.5
5.5
42.5
D1 D31 3
LEVEL +000 ELEV. 0.0cm
493.0 950.0
DETAIL 4: STATIC BOX/ VERTICAL GARDEN Hanging Box 1:5
FINISHED F.L ELEV. 15cm
179.5
5 A-2
82.5
DETAIL 2: PUSH IN-OUT BOX 1:5
Ceiling lining (gypsum)
42.5
114.0
82.5
97.0
20.5
DETAIL 2: PUSH IN-OUT BOX 1:5
D3 3
D2 2
DETAIL 1: FALSE FLOOR 1:5
60.0
58.5
42.5
sub-structure
4 A-2
62.0
Hanging Box
D4 4
7.5
43.5
5.5
1 A-2
10.0
19.5
58.5
1 A-2
D2 2
LEVEL +000 Aluminium ELEV. 0.0cm
105.0
SECTION A-A 1:20
20.5
78.0
Hanging Box
7.5
950.0
82.5
78.0
D1 1
Angle of support
DETAIL 1: FALSE FLOOR 1:5
Angles of support
82.5
493.0
78.0
10.0 60.0
82.5
185.0
82.5
600.0
3 A-A
20.5
179.5
5 A-2
114.0 179.5
19.5 43.5 58.5
2 A-2
2 A-2
78.0 680.0
FINISHED F.L ELEV. 15cm
7.5
600.0
1 A-2
42.5
10.0
78.0 124.0
82.5
600.0
82.5
114.0
2 A-2
493.0 950.0
60.0
82.5
60.0
82.5
105.0
20.5
LEVEL +000 ELEV. 0.0cm
Ceiling lining (gypsum)
Angles of support
3 A-2
FINISHED F.L ELEV. 15cm
DETAIL 2: PUSH IN-OUT BOX 1:5
15.0
114.0
DETAIL 3: CEILING UNION/ HANGING BOXES 1:5
10.0
42.5
D2 2
DETAIL 1: FALSE FLOOR 1:5
179.5
15.0
6.00%
D3 3 179.5
7.5
LEVEL +000 ELEV. 0.0cm
D1 1
600.0
FINISHED F.L ELEV. 15cm
1 A-2
104.5
124.0
105.0
Hanging A-2 Box
DETAIL 6: MIRROR SUPORT SYSTEM 1:5
ARCHITECTURAL
Stand Biennale di
SECTION A-A & B-B & DETAIL
FINISHED F.L ELEV. 15cm LEVEL +000 ELEV. 0.0cm
Scale:
1:20/1:5 A0
Venezia 2018
30.10.2018
30.10.2018 Aluminium curtain
Stand Biennale di
Venezia 2018
A
A 2 OF 3
FINISHED F.L ELEV. 15cm
RCP PLAN
LEVEL +000 ELEV. 0.0cm
60.0
830.0
60.0
950.0
5 C-C
SECTION C-C 1:20
950.0 57.5
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
42.5
5.0
117.5
5.0
5.0
CROSS TEES (galvanized steel)
120.0
PERIMETER MOULDING ANGLE
120.0
680.0
120.0
MAIN TEES 11/2 " SPACING OF MAIN TEE 1.20m (galvanized steel)
5.0
72.5
120.0
CEILING PANELS 120 x 60 cm (gypsum board)
6 STEPHANIE CAMAÑO CAROLINA JAEN GAIA PAGNAMENTA FRANCESCA PONTICELLI
ARCHITECTURAL
SECTION A-A & B-B & DETAIL
Scale:
1:20/1:5 A0
RCP PLAN 1:20
RENDERS RENDERS
RENDERS