760.889.8467 carriebaranowski@gmail.com clbdesigner.com
Carrie Lynn Baranowski
CLB
RÉSUMÉ
00
BARCH from USC School of Architecture ‘07 - ’12 Minor in Painting Work exhibited at USC Fisher Museum of Art show
Education
The One and the Many ‘12
Art Center Maya & 3D Animation class Fall ‘12 Study Abroad University Malaya in Kuala Lumpur & UTP in Ipoh, Malaysia With the USC Summer Asia program, traveled through E & SE Asia studying architecture and designing a prototype school for children in Seam Reap, Cambodia. Received certificate of collaborative design with Malaysian engineering students from UTP Universiti Teknologi Petronas ’11 Alpha Rho Chi professional architecture fraternity, Executive Board ‘10
01
02
Experience
2014 2016
MAKE Architecture Junior Designer & Junior Project Manager
2012 2014
CultureBrain Junior Designer & Creative Consultant
2013 2014
Space Innovations Junior Designer
Collaborative Film Projects
03
Skillset
04
Programs
05
Interests
CAD + 3DM + Rendering + RFIs & Submittals + F,F,E + RFPs + Website Mod. + Award Submission
A collaborative Architecture & Interior Design firm, comprising of 9 highly talented & widely experienced individuals. The two principals offer full commercial & residential architectural services including feasibility studies, F,F&E and custom designed furniture. Work predominately included SD, DD & CD for residential, large T.I., & Restaurant projects. Structural, Mech. & Elec. Coordination, lighting consultant coordination, permitting and Construction Administration for later projects. 3DM + Rendering + CAD + Creative Consulting + Making
A think tank, studio and academy, focusing on studying culture, trends & creativity. Projects included SD, DD & CD for Makercity LA. Creative consulting included graphic design, 3D sculptures, branding and logo design, motion graphics, etc. 3DM + Rendering + CAD Interior Design firm specializing in high end commercial and residential interiors. Work included digitizing plans, furniture layouts, tile plans, CAD-ing, 3D modeling and rendering.
A Chronicle of Tahrir Square Short film. Post-production producer, graphics & website designer, vocalist ‘14
Jewelry
Caliber Jewelry line. Founder, designer ’12-Present
Art Install.
Asia Study Abroad exhibition Interactive installation ‘11
Digital
3D modeling, rendering, motion graphics, lasercutting, 3D printing, graphic design, photography Physical modeling, hand drawing, woodshop tools
Analog Knows Worked With Passion Projects
APX student faculty dinner installations ‘10, ’11
Rhinoceros, AutoCAD, Illustrator, Photoshop, After Effects, InDesign, V-Ray, Sketch-Up, Pepakura Maya, Grasshopper, Revit, Digital Project 3d Modeling & Rendering, Installations & Sculpture, Jewelry Design, Printmaking, Painting, Photography, Boxing, Motion Graphics, Graphic Design
Carrie Baranowski WORK SAMPLES
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
CLB
Beer Belly, a 1,200 sf restaurant & bar in Long Beach is the 2nd installment; its flagship located in Koreatown. Good rapport with the returning client enabled a flexible, unique design with a higher budget; both of which were crucial to this project’s ongoing success.
BEER BELLY LONG BEACH
INTERIOR RENDERING
DE6372
DE6365
DE6344
MAIN DINING & ACCESSIBLE BAR AREA
brushed / galvanized aluminum silver / dark gray / black gradient into black cocktail bar
gray to match aluminum panels
DE6337
RENDERINGS
MAIN BAR AREA clear mason classic light fixture at tall seating
concrete gray counter option
INTERIOR RENDERING
raven gray counter option
epoxy over existing white/ blue hex tile & concrete
tall seating chairs light gray high gloss?
amber mason classic light fixture at entry
bar stools
dark gray stained white oak
low seating chairs
HRS plate 3/8” thick, matte clear powder coat (on) booth seat & back cushion to match steel?
ceiling panels, white?
DE6343
DE6349
dark gray matte sheen
clear mason classic light fixture at tall seating
black cocktail bar counter
cocktail bar stools
V I S. P A C K E T FINISHES & FIXTURES
I N T E R I O R R E N D E R I N G PRIVATE DINING & ENTRY
PRIVATE DINING R E N D E R I N G
BAR DESIGN S K E T C H E S
Carrie Baranowski WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
Completed in Nov. 2016, the space plays on the exposed roof framing & features faceted metal panels, giving it an industrial quality that references a ship’s hull aesthetic within the maritime context of the city of Long Beach.
BEER BELLY LONG BEACH
FINISHED PHOTOS
I N T E R I O R P H O T O MAIN DINING & BAR AREA
photographs on this page taken by Monika Siauw
I N T E R I O R P H O T O MAIN DINING
M I L L W O R K DETAILS
MAIN BAR AREA I N T E R I O R P H O T O
PRIVATE DINING
MAIN BAR & ADA SEATING
MAIN BAR AREA I N T E R I O R P H O T O S
Carrie Baranowski
Millwork & attachment detailing were both large parts of this project. The wall cladding & faceted bar areas needed to be specific depths to allow for bottles and glass storage while keeping with the overal faceted design. Below the bar itself, the facets needed to account for proper knee & toe clearances as well as notch in for ADA compliant clearances. Specific lighting heights were indicated for the cluster of glass pendant lights, giving depth to the dining & entry experience.
WORK SAMPLES
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
CLB
BEER BELLY LONG BEACH
04 A-4.20
04 A-4.00
06 A-4.20
08 A-4.00
6
6
6
5
5
15'-0"
OUTDOOR DINING UNDER SEPARATE PERMIT 06/07 SIM A-7.00
04 A-8.20
PT2
1 (TYP)
1
1
1
1
9
4
101B
PT1
4
06/07 A-7.00 (TYP) 1
101A
PT3
MT2 4
10 A-8.00
10
104D
26
6 (TYP)
15
PT3
04 A-4.10
7
1
5 (TYP) 1
M2
15
06 A-3.00 12 A-4.10
5
M7
MT2
17 8
100B
8
14
8 DOOR TO SWING IN UNLESS OUTDOOR DINING IS APPROVED BY PUBLIC WORKS.
104A
4
04 TYP A-7.00
02/03 A-7.00
19
104 LOUNGE
18 (TYP)
101A
104B 10 A-5.10
18 (TYP)
17
25 (TYP)
CT1
CT2
1
14
12
04 TYP A-7.00
17
17
17
101 MAIN DINING
3h
10 A-5.00
100 MAIN ENTRY
3sp SIM.
3sp SIM.
04 TYP A-7.00
3sp SIM.
11
108A
17
01 A-7.00
3sp SIM.
18 (TYP)
17
20
16'-0"
100A
MT11 MT4 MT5
8 100A
07 SIM A-7.00
16 (TYP)
06 A-4.10
2
104C
4
1 2
104A
1 (TYP)
06 A-4.00
12 9
MT2
3sp SIM. 22
102 BAR
15 A-8.10
22
4
5
1’-0” : 1/16”
6
101C
(TYP) 15
3m
103 BAR
06 A-3.10
2 3
4m
20
3m
4
09 A-8.20
2T-1860
3sp SIM.
5'
11
101D
11
3sm SIM.
111 WOMEN
105 DRY STORAGE
3m 2T-1836
106 WALK-IN COOLER
110 MEN
NOTE: FULLY ACCESSIBLE RESTROOMS COMPLETED UNDER SEPARATE PERMIT BRMD162395 AND BPLM165413, FINALED 02-03-2015.
3sm SIM.
5'
5'
4m
2T-1836
2T-1860
4m
N.I.C.
S E C T. / E L E V. N.
29 (TYP)
1
246 EAST 3RD STREET RAINBOW JUICERY OCCUPANCY: MERCANTILE
M5
MT2
1 1 1 (TYP)
24
5'
4
105A
27
106A
13
29
101B
26
2
108A
101E
28
5
109 BEVERAGE SERVICE AREA
108B 3
2 108A
3mt 11
PT3
PT2
22
28 4
28
108 KITCHEN
MT2 24
SIM. 3sp
3sp SIM.
11
11
PT2
4m
4
101G
5
4t
4t
20
101B
3mp
MT2
6
MT2
24
MT2
9
1p
102 BAR
04 A-5.02
FIRST FLOOR PLAN
WD2 M6
CT2
1 (TYP) 107B
N.I.C.
247 LONG BEACH BOULEVARD BEACHWOOD BLENDERY OCCUPANCY: ASSEMBLY-2 / MODERATE HAZARD FACTORY INDUSTRIAL- F-1
31 WD2 30 21
8
1p
107 WALK-IN COOLER
23
BEYOND 17
101F
24 107A 21
06 A-7.00
WD2
6
5
1p
3sp SIM.
3p
3p 4m
(TYP) 18
6
6
2
3p 3p
5
3m
111A
3m
110A
3sp SIM.
101 MAIN DINING
1’-0” : 1/16”
1’-0” : 1/32”
MT3 (TYP)
07 A-7.00
C R O S S S E C T I O N E.
photo by Asia Morris 06 A-4.10
06 A-4.00
23 1 18 (TYP)
(TYP) 18 13'-9" V.I.F. U.S. JOIST 3
9'-0" U.S. GYP.BD. CLG.
WD2 (TYP)
(TYP) 26
(TYP) 26
5 4
6 (TYP)
WD2
15 PT2
27
VA1
20
06 A-7.00
5'-6" T.O. PARTITION
14
2 24
22
21
(TYP) 10
MT11
21 MT11
16
21 25
WD4
21
21
7
MT11
CT3
D PT2
(TYP) 9
07 A-7.00
M4 (TYP) 12 A-8.10
MT4 (TYP)
WD3
WD4
9 (TYP)
(TYP) 9
REF. FOOD SERVICE DRAWINGS FOR FINISHES AT KITCHEN
MT5 (TYP)
MAIN BAR AREA
L O N G. S E C T I O N E. 1’-0” : 1/16”
12 A-4.10
INTERIOR PHOTO
04 A-4.10 06 A-4.10
6 (TYP)
18 (TYP)
06 A-4.00
23
23 1
18 (TYP) . 1
(TYP) 26
M2
(TYP) 20
20 (TYP)
12
26 (TYP)
26 (TYP)
24 (TYP)
WD2 (TYP)
PT2
6 (TYP) 3
WD2
26 (TYP)
20
PT2
M10 14 14 17 16
22
16
21
21
22
19 PT1
16
CT2 24
11
M6 19
MT11
INTEG SYST MILLW TAP E A-5.0 INTEN
WD2 19
19 PT1
19
(TYP) 9
104 LOUNGE
MT3
9 (TYP)
19
PT2
08 A-8.00
101 MAIN DINING
WD2 (TYP) M6 (TYP) MT3 (TYP)
(TYP) 9
100 MAIN ENTRY
04 A-8.00 101
L O N G. S E C T I O N N. 1’-0” : 1/16”
MT2
1’-0” : 1/16”
102
C R O S S S E C T I O N N.
Carrie Baranowski
Personal involvement in this project included initial concept designing, restaurant seating / space planning, 3D modeling & rendering, CAD drafting CDs, client coordination, MEP consultant coordination, Beer Tap consultant coordination, Lighting consultant coordination, as well as millwork & attachment detailing (SD + DD + CD).
WORK SAMPLES
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
CLB
BEER BELLY LONG BEACH
PT3 12 A-4.10
06 A-4.20
PT3
MT2
5
5
MT2
M7
3
3
12 11 3
CT1
3'-6"
1
4
1
1 2'-10"
1
3'-6"
CT2 1 2
4'-5 1/2"
CT2
1
1
9
9
9
1’-0” : 1/8” MT2
5
E N L A R G E D E L E V. A T M A I N B A R 5
MT2
M7
MT2
12 11
CT2 4
CT1
CT2 MT2 2'-10"
3'-6"
CT2
MT2
MT2
M5 1
1
BT1 9
1’-0” : 1/8”
E N L A R G E D E L E V. A T M A I N B A R F R O N T
COUNTER FACETS FROM 34" A.F.F. TO 42" A.F.F.
2'-9 3/4" 2'-4 3/8"
COUNTER CONTINUES BEYOND. MTL. PLATE WELDED TO POST, T.B.D. PER STRUCTURAL.
MTL. PLATE WELDED TO POST, T.B.D. PER STRUCTURAL. CT2 O/ PLYWOOD PER MILLWORK SHOP DRAWINGS.
1'-11 3/4"
METAL CLADDING, MT2 1/4" MDF PANEL.
1/4" MDF PANEL.
KNEE CLEARANCE
STRUCTURE/BLOCKING FOR METAL FACET CLADDING PER CONTRACTOR / FABRICATOR, T.B.D.
3'-6"
STRUCTURE/BLOCKING FOR METAL FACET CLADDING PER CONTRACTOR / FABRICATOR, T.B.D.
WALL TYPE PER SCHEDULE, REF. A-9.20.
WALL TYPE PER SCHEDULE, REF. A-9.20.
THIN METAL PANEL, T.B.D., BEYOND. FRAMING & FASTENING PER STRUCTURAL. 4"
4"
9" MIN.
FRAMING & FASTENING PER STRUCTURAL. SANITARY COVE BASE, BT2
SANITARY COVE BASE, BT2
6" MAX. CONT. BEAD OF SEALANT
VERTICAL PANEL AT THE END OF COUNTER, BEYOND.
(E) CONCRETE / TILE FLOOR, W/ NEW FINISH. SEE FINISH PLAN ON A-2.15 & FINISH SCHED. ON A-9.00 FOR MORE INFORMATION.
(E) CONCRETE / TILE FLOOR, W/ NEW FINISH. SEE FINISH PLAN ON A-2.15 & FINISH SCHED. ON A-9.00 FOR MORE INFORMATION.
CONT. BEAD OF SEALANT
1’-0” : 3/8”
I N T E R I O R P H O T O MAIN BAR CONSTR. DETAIL
BAR DETAILS
4A A-8.00
4'-0"
2'-6"
2
08 &12 A-5.00
02 A-5.01
8 04 A-5.00
07 A-5.00
6 (TYP)
2'-4 3/8"
2'-6"
1
03 A-5.00
7'-9 1/4" 1'-5"
6 1/2"
2'-1 5/8"
DRIP EDGE, TYP.
DRIP EDGE, TYP.
TOE CLEAR.
4B A-8.00
1'-11 3/4"
METAL CLADDING, MT2
8" MIN.
11" MIN.
CT2 O/ PLYWOOD PER MILLWORK SHOP DRAWINGS. 1/2"
2'-8 1/2"
1/2"
2'-10" 2'-8 1/2" 2'-3" MIN.
1 1/2"
1 1/2"
2'-9 3/4"
CT2
CT2 7
8 A-8.00
102 BAR
04 A-5.01
8
3'-8"
3'-8"
4'-3 3/4"
6'-11 7/8"
2'-9 3/4"
5
5'-0"
CT2 7
CT2 4
P L A N A T H I G H T A B L E S 1’-0” : 1/8”
3'-6"
2'-10"
2'-1 1/2"
E L E V. A T T A B L E S & C A N O P Y
3
1’-0” : 1/8”
1’-0” : 3/32”
ENLARGED BAR PLAN
Carrie Baranowski WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
THINKWELL
INTERIOR RENDERING
RENDERINGS
ENTRY TUNNEL & DISPLAY WALL
INTERIOR RENDERING
INTERIOR RENDERING
Located just north of Downtown LA, this 30,000 sf. tenant improvement consists of creative office, digital production, model making & 3D vis. spaces. Phase 1 of 2 complete, the scope of work is estimated at approx. $1.5 mil. The red undulating tunnel, to be digitally fabricated & machined, will serve as an entry condition, built in reception desk, a display wall for Thinkwell’s projects, a screening element to the open work space and a usable shelving system for the front offices.
“TENNIS” MEETING ROOM
DISPLAY WALL SCHEMATICS
GLASS CORNER MEETING ROOM
INTERIOR RENDERING
COPY CENTER / COFFEE BAR
INTERIOR RENDERING
OVERALL SPACE
INTERIOR RENDERING
Carrie Baranowski
Thinkwell had wonderfully clever names for each of their meeting rooms, which influenced the design and finishes. The conference room deemed “Tennis” had a sporty theme, and was clad in recycled Harlem Globetrotters gym flooring. Another, they called “Glass Corner.” This influenced the glass box design with sliding glass doors and floating lid appearance. The copy center & coffee bar mark the center of the open office with peaked walls & hot lava colored floor.
WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
THINKWELL
FINISHED PHOTOS
TREE HOSUE MEETING ROOM
I N T E R I O R P H O T O “TENNIS” MEETING ROOM
I N T E R I O R P H O T O S COPY CENTER / COFFEE BAR
I N T E R I O R P H O T O S GLASS CORNER
TREE HOUSE MEETING ROOM
PRIVATE OFFICES
INTERIOR PHOTO
“TENNIS” MEETING ROOM
OVERALL OFFICE SPACE
INTERIOR PHOTO
Carrie Baranowski
Phase 2, currently in the construction documentation phase, included a large scale amphitheater leading up to the mezzanine. The amphitheater seating had smaller areas carved out not only as a design element, but also to promote small group interaction. When larger scale lectures, presentations or other events were not happening, the amphitheater serves as smaller, casual places to work or meet.
WORK SAMPLES
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
CLB
THINKWELL
3 A-2.20
AREA OF WORK
240A
240B
10
1
1
3
7
3
3
9 6
9 SEATING NICHE BELOW
6 5
I N T E R I O R R E N D E R I N G AMPHITHEATER & SMALL GATHERING 3
SEATING CONTINUES TO FIRST FLOOR
1 6
3
(E) TO REMAIN / NOT IN SCOPE
7
P H O T O “TENNIS”
JEWEL MEETING
RENDERING
1’-0” : 3/64”
2ND FLOOR PLAN
1 A-2.10 3/4" THK X 2 1/4" WIDE WOOD FLOORING PANELS, T.B.D., INSTALLED OVER 1/2" MAPLE ACX PLYWOOD. FLOORING PATTERN TO BE REMOVED IN DESIGNATED AREAS, EXPOSING PLYWOOD.
AREA OF WORK
LINE OF U.S. OF (E) BEAMS
VERIFY SIZE OF DUCTWORK PER MECHANICAL, COORDINATE PENETRATION THROUGH GLAZING & LOCATION WITH ARCHITECT.
AREA OF EXPOSED PLYWOOD.
140A CO
WOOD FLOORING PANELS.
GLAZING & FRAMING T.B.D.
CO
2s (TYP)
PATTERN TO BE CONFIRMED AND APPROVED BY ARCHITECT IN FIELD, TYP.
CT3 2s (TYP)
ALIGN
5
3
140B
CT1
CT2
4 WD2
2s (TYP)
“T E N N I S” F I N I S H E L E V A T I O N 1’-0” : 3/32”
137B
2s (TYP)
CO
137A
2 1/2" SOLID MAPLE BASE MOLDING, V.I.F.
CO
7
141A
CT1
CT1
CO WD2
2s (TYP)
7
4
136B
3/4" THK X 2 1/4" WIDE WOOD FLOORING PANELS, T.B.D., INSTALLED OVER 1/2" MAPLE ACX PLYWOOD. FLOORING PATTERN TO BE REMOVED IN DESIGNATED AREAS, EXPOSING PLYWOOD.
WD2
WD1
3 CO
4 2 2s (TYP)
LINE OF U.S. OF (E) BEAMS
136B
1
WD1
1
6
GLAZING & FRAMING T.B.D.
WOOD FLOORING PANELS.
WD2
CO
VERIFY SIZE OF DUCTWORK PER MECHANICAL, COORDINATE PENETRATION THROUGH GLAZING & LOCATION WITH ARCHITECT.
AREA OF EXPOSED PLYWOOD.
6 WD2
CO 2
PATTERN TO BE CONFIRMED AND APPROVED BY ARCHITECT IN FIELD, TYP.
10'-6"
145A
SEATING CONTINUES TO MEZZANINE LEVEL
137C
136A 4'-0"
10'-6"
1/2" MAPLE ACX PYWOOD FINISH. 2 1/2" SOLID MAPLE BASE MOLDING, V.I.F.
“T E N N I S” E L E V A T I O N 1’-0” : 3/64”
10'-6"
4'-0"
10'-6"
136A
(E) TO REMAIN / NOT IN SCOPE
1’-0” : 3/64”
1ST FLOOR PLAN
Carrie Baranowski
Perched on top of the amphitheater was the “Press Box” meeting room, whose name influenced the design itself. The “Jewel” meeting room, would serve as 1/2 conference space and 1/2 presentation space, for Thinkwell to give private interactive visual presentations. When not being used as such, the hinged doors could and create a wide opening for the space to serve as a walk-in gallery. The upper level of Jewel for small working areas with built-in seating.
WORK SAMPLES
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
CLB
THINKWELL
T E NNIS P R E S S BOX
CATHEDRAL
A MPHI THEAT E R
CATERING
(BELOW ASSEMBLY)
ASSEMBLY (SEATING CONT. ABOVE)
JEW EL AVCI
JEWEL
DISPLAY WALL
X
M A S S I N G R E N D E R S PROGRAM DIAGRAM
DESIGN
BIZ DEV
CONTENT PRODUCTION Z
TR E E H OUSE GRAPHICS
CLOSET
TENNIS TECH
FRONT OFFICE
GLASS CORNER
COPY / COF F EE
SHOWSET
SPRINKLER
SHOWSET
ENVIRONMENTAL
IT
1’-0” : 3/128”
OVEN
REF
OVEN
2'-2"
7'-11 1/2" 8'-0 1/2"
ADA COMPLIANT UPRIGHT FREEZER
FZR
D
B
15'-9 1/8"
C
10'-0 1/2"
4'-1 1/2"
ADA COMPLIANT REFRIGERATOR
REF
A
DW
BACKSPLASH MATERIAL, TBD.
REF
DW
F
CL
RESIDENTIAL HOOD PER MECHANICAL.
UNDER COUNTER CABINETRY IS PERMITTED PROVIDED: (a) THE CABINETRY CAN BE REMOVED WITHOUT REMOVAL OR REPLACEMENT OF THE KITCHEN WORK SURFACE; (b) THE FINISH FLOOR EXTENDS UNDER THE CABINETRY; AND (c) THE WALLS BEHIND AND SURROUNDING THE CABINETRY ARE FINISHED.
2'-2"
KITCHEN TO COMPLY WITH ADA REQUIREMENTS, PER CBC 11B-804.
1ST FLOOR PLAN
10'-0 1/4"
GLASS C OR NE R
TREE HOUSE
FINISH TBD.
2'-2"
E KITCHEN TO COMPLY WITH ADA REQUIREMENTS, REF. CBC 11B-804.
9'-7"
COORD. PLACEMENT WITH TABLE STRUCTURE, TBD. PER OWNER
2'-10"
2'-6 3/8"
UPPER CABINETS, MATERIAL TBD.
CLEAR FLOOR OR GROUND SPACE UNDER COOKTOP, CBC 11B-804.3.1
LINE OF ISLAND COUNTER IN FRONT, SEE KITCHEN ELEVATION C, E & F.
COUNTER TO BE 34" MAX. TO TOP OF FINISH, PER CBC 11B-804.3. PROVIDE REQ. ADA STORAGE, PER CBC 11B-804.5.
A
5'-8 1/4"
2'-0"
UNDER COUNTER OVEN, TO BE ADA COMPLIANT.
1'-3" MAX.
CLEAR FLOOR OR GROUND SPACE DIRECTLY ADJACENT TO OVEN, CBC 11B-804.3.1
UNDER COUNTER CABINETRY IS PERMITTED PROVIDED: (a) THE CABINETRY CAN BE REMOVED WITHOUT REMOVAL OR REPLACEMENT OF THE KITCHEN WORK SURFACE; (b) THE F.F. EXTENDS UNDER THE CABINETRY; & (c) THE WALLS BEHIND & SURROUNDING THE CABINETRY ARE FINISHED.
124 KITCHEN 15'-9 1/8"
10'-0 1/2"
B
K I T C H E N E L E V A T I O N S 1’-0” : 1/16”
1’-0” : 1/16”
KITCHEN KEY PLAN
A-EXT. 11'-5"
REF
1'-3 1/4" 23' 11"
COPY / COFFEE ELEVATIONS
1’-0” : 3/32”
21'-0"
D-INT.
RICOH 1
3'-6 3/4"
B-INT. C-INT. RICOH 2
CL
3'-6"
2'-10" MDF FINISH PANELS PAINTED WITH DUNN EDWARDS DE6348, DRAW YOUR SWORD. PANELS VARY IN SHEEN FROM HIGH GLOSS, LOW SHEEN & VELVET FINISH. PANELS TO BE 11-7/8" L X 4' W, 1/4" MIN. THK. INSTALL MDF PANELS WITH COUNTERSUNK SCREWS, CONCEALED, T.B.D. PER ARCHITECT. CLAD WALLS WITH 1/2" PLYWOOD PRIOR TO INSTALLING FINISH PANELS.
D-EXT.
HP 2
A-EXTERIOR
XEROX 1
10'-2"
HP 1
9'-9"
A-INT.
8'-0 3/4"
HIGH GLOSS.
8'-0 3/4"
19'-2"
12'-2"
11'-0"
2'-0 1/2"
5'-2"
CANON 1
14'-0" LOW SHEEN.
B-EXT.
CL 6'-8"
6'-5"
VELVET FINISH.
30'-3"
C-EXT.
1’-0” : 3/64”
COPY / COFFEE KEY PLAN
Carrie Baranowski WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
1502 Rockwood Blvd. is a new ground-up apartment building situated on a hillside lot boasting magnificent views of the downtown skyline. It is a multi-family apartment with 40 units at approx. 32,400 sf. The units range from studios to one and two bedrooms. Amenities include a large roof deck and pool, as well as two levels of subterranean parking. Currently in construction documentation phase, towards permitting.
1 5 0 2 R O C K W O O D B L V D.
E X T E R I O R R E N D E R I N G STREET ENTRANCE & FOLDED CANOPY
R E N D E R E D E L E V A T I O N S NORTH
EAST
d
1ST & 2ND FLOOR PLANS, N.T.S.
SCHEMATIC PLANS
Rockwoo
E X T E R I O R R E N D E R I N G CORNER CONDITION & ENTRY
ROOFTOP DECK, POOL & DOG PARK
BIRD‘S EYE RENDER
Carrie Baranowski
Personal involvement in this project included initial concept designing, space planning for units within sf allowance, 3D modeling & rendering, city zoning coordination for q / t condition clarification submission, Lighting consultant coordination, & CAD drafting the CDs (SD + DD + CD).
WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
1 5 0 2 R O C K W O O D B L V D. FS
FS
1
X1.1
FS
FS
2
3
12
2% MAX.
FS
A
22
FS 05 A-6.00
FS
3.7
12
05 12 A-3.00
FS
5
D220 DECK
5
210A
22
FS
02 A-5.02
4 22
D210 DECK
D200 DECK
05 A-4.10
5.2 D230 DECK
5
220
12
FS
FS
6
6.1
2% MAX.
15
X6.9
7
05 A-6.40
1
247A
FS
A
12
15
P-3
05 A-6.10
7 207 BATH T1
206 BEDROOM 2
EL ELEVATOR
P-1
207
210B
216 LIVING
226 LIVING
220B
WD1
10 A
204 KITCHEN
H03
235 DINING 15 A-7.20
224 KITCHEN
C
B
10
8
P-6
11
P-2
200 UNIT 200
6
W/D
200B
T1 P-3
201
P-2
223 211 HALL
212B
W/D
WD1
211B P-5
233 231 HALL
6
P-3
FS
11
19
212A
22
4
D
15 13
2% MAX.
2% MAX.
2% MAX.
15
15
15
2% MAX.
2% MAX.
2% MAX.
H04 HALLWAY
15
2% MAX.
15
5 24 222
22
2% MAX.
OPEN TO BELOW
15 2% MAX.
S2.23 STAIR 2 @ FL2-3
12 (TYP) 14 (TYP) 18
15 2% MAX.
STAIR 3 REF SHEET A-5.53
6
292A 292B
05 A-7.40
290B WD1
B 292 BATH
3
7
271
P-5 3
260 UNIT 260
254
P-2
261 DINING
7
T1
P-3 278 HALL
2
255 T1
254 BATH 7
WD1
8
T1
4
11 19
271 BATH
272 BEDROOM 1
WD1
281 DINING
P-1
E
260A 24
P-1
WD1
P-2 P-7
291 KITCHEN
C
2
FS
P-2
270 UNIT 270
280 UNIT 280
3
3
24 270A
5 290 UNIT 290
WD1
250B
255 BEDROOM 1
10 FS 8
F
P-6
11 19
1 5
WD1
P-3 288 BATH
287
8
P-4
282 KITCHEN
T1
288
287A
7
T1
4
286B
P-2
B
276A
FS 4 P-2
265
WD1 283 LIVING
WD1
276 BEDROOM 2
WD1
G
266A
266 BEDROOM 1 7
260B
270B
280B
P-3
WD1
3 265 BATH T1
263 LIVING
275 LIVING
7
T1 11
267B
264 HALL
C
276B
267A P-5
264B
264A
05 A-4.20
5
3 4
P-5
05 A-7.30
C WD1
4
286C
P-1
3 D
267
267 BEDROOM 2
6 A
B 274 DINING
C
285 BATH P-1
FS
262 KITCHEN
P-6
02 A-7.40
278B
6 4
03 A-7.40
D
285 P-2
P-5
05 A-6.20
W/D
3
286A WD1 286 BEDROOM 1
A
WD1
W/D
277 A
284
P-3
P-1
266B 4
11 19
19
266C FS
H
12
1 X1.1 FS
FS
276 5
15
2
3
FS
FS
12
3.7
4
FS
FS
FS
1’-0” : 1/4”
SETBACK
PROPERTY LINE
7
FS
FS
6.1
6
05 A-4.00
2% MAX.
D260A DECK
22 15
05 A-3.20
1’-0” : 1/32”
412'-11 1/2" T.O. ELEVATOR
2% MAX.
D270 DECK
15
12
5
5.2
FS
FS
05 A-4.10
22
12
6
6.1
FS
FS
2
05 A-4.00
X6.9 7 FS
FS
SECOND FLOOR PLAN
FS
FS
FS
FS
FS
5.2
5
4
3.7
3
FS
FS
2
1
05 A-4.10
PROPERTY LINE
22
2% MAX.
D280A DECK 22
SETBACK
1’-0” : 1/8”
D280B DECK 15
4'-0" PROJECTION
2% MAX.
4'-0" PROJECTION
H
K I T C H E N M W K. D E T A I L
FS
268
268 BATH
7 P-4
4
P-2 3
6
5
F
T1 P-3
3
10
P-1
W/D
3
284 HALL
FS
P-4
P-6
278A
277 BATH
P-6
P-2
287B
G
8 10
P-1
287 BEDROOM 2
255
19 11
P-7
P-5
19 11
10
3
6
P-1
P-7
273 KITCHEN
3
P-7
W/D
P-3
19
P-3 7
272A
272B
11
P-3
P-4
05 A-3.30
253 LIVING 252 DINING
24 280A
W/D
250B WD1
21
E 290 24
03 A-7.30
D 10
2% MAX.
5 24
272
280
2% MAX.
5
250 UNIT 250
A
251 KITCHEN P-7
15
15
2% MAX.
05 A-3.40
250A 24
P-6
S3.23 STAIR 3 @ FL2-3
18
15 2% MAX.
8
P-4 S3.12 STAIR 3 @ FL1-2
22
15 24 5
05 A-3.50 5 250A
18
15 2% MAX.
STAIR 2
DN
290A
3
D
13
H04 2% MAX.
15
(TYP) 14 OPEN TO BELOW
REF SHEET A-5.52
S2.12 STAIR 2 @ FL1-2
5 24 FS
15 2% MAX.
UP
12 (TYP)
4
HB
15
DN
(TYP) 12
2% MAX.
FS
24 240A
2% MAX.
15
15 UP
18
5
243B 20
24 5 232
15
2% MAX.
15
243
243A
241 HALL 240 UNIT 240
242
P-2
243 BEDROOM 1
241
W/D
242 T1 BATH
3
22
05 A-3.40
05 A-3.10
2% MAX. 15
6
7 P-1
232A
230A 24
212 5 24 05 A-3.50
WD1 P-3
11 19 232 BEDROOM 1
230 UNIT 230
222A
220A 24
24 210A
FS FS
4
P-5 222 BEDROOM 1
220 UNIT 220
210 UNIT 210
WD1
XG
P-6
10
WD1
2% MAX.
244 LIVING
C
232B
WD1
P-5
212 BEDROOM 1
15
C
3
231A
221A
4
3 P-1
240B
P-7
4
W/D
222B
4
WD1
211A
6
231B
221B
P-3
233 BATH
P-3
4
B
B
P-4 245 KITCHEN
7
223 BATH
221 HALL
W/D
15
T1 201 BATH 7
202B
WD1
02 A-7.30
3
7
213
6
2 WD1
A
P-2
T1
213 BATH
2% MAX.
202 BEDROOM 1
5
3
P-1
11 19
T1
7
4
H03 HALLWAY
202A
202
246 DINING P-2
FS
P-1
3
P-1
7
15 203 LIVING
11 19 8
3
19 WD1
2% MAX.
FS
2
248
7 P-7
8 11
3
200A
C
3
P-6
P-4
P-4 P-2
3
P-1
WD1
B
10
D 19
205 DINING
5
C
P-6 8
P-4
22
248 BATH T1
P-3 15 A-7.20
234 KITCHEN
P-7
240B 240A
WD1
3
C
10
2% MAX.
05 A-7.20
D
225 DINING
214 KITCHEN
P-7
P-4
200
22
15 A-7.20
B
3 P-6 15
B
215 DINING
EL2 ELEVATOR LOBBY
206A 4 P-7
FS
WD1
05 A-6.30
" 2'-6 TION EC OJ PR
247A
P-5
4
206B
3
247 BEDROOM 2
247B
WD1 P-5
8
236 LIVING
230B
23
P-2
D240A DECK
247C
4
210B
WD1
05 A-4.20
FS
FS
X6.5
5
230
247B
1
I N T . K I T C H E N E L E V A T I O N S 1’-0” : 1/8”
FS 05 A-4.00
22
9
PS3 2
6 401'-9" T.O. PARAPET
3'-6" MIN. TYP.
401'-11 1/2" HEIGHT RESTRICTION 6
MP3
MP1 11
10
10
397'-0" T.O. STR. ROOF SHEATHING
PS1
9
(TYP) 1 1 (TYP)
PS2
PS2
PS2
PS2
PS1
3 (TYP)
2
MP3
410A
420B 2
MP3
2
MP3
406C
MP2
410B
2
3'-6" MIN. TYP.
(TYP) 1
420
430B
3'-6" MIN. TYP.
430
3'-6" MIN. TYP.
MP3
386'-6" F.F.4(WITHIN LIVING UNITS)
MP2
447C
3'-6" MIN. TYP.
2
440B
3'-6" MIN. TYP.
MP1
MP3
CB1 PS1
MP1
PS1
MP1
PS1
MP1 PS2
PS1
PS2
PS2
PS2
MP2
PS1
MP3
230
(TYP) 1
3 (TYP)
MP3
210A
220B
PS1
2
MP3
PS2
2
MP3
2
MP1
PS2
PS1
140B
147C
MP1
120B
120B
110D
EL2
PS3
3 (TYP)
2
MP3
CO2
MP1
2
MP3
3'-6" MIN. TYP.
CB1 MP3
3'-6" MIN. TYP.
355'-0" F.S.1(WITHIN LIVING UNITS)
130B
130B 3'-6" MIN. TYP.
356'-11 1/2" W. LOWEST POINT W/IN 5'
147 MP1
2
(TYP) 1
CO2
2 MP3
MP3
CO2
CO2
2
5
8
8 CO2
12
CO2
5
8 12 8
DTL. AT PLANTER BOX CURB
1’-0” : 1/2”
12
5
345'-0" F.F. UPPER GARAGE
13 4
344'-3 1/8" E. LOWEST POINT W/IN 5'
13 334'-0" F.F. LOWER GARAGE
1’-0” : 1/32”
PLANTER BOX DIAGRAMS
1’-0” : 1/4”
1’-0” : 3/16”
7
MP3
MP1 PS2
MP2
206C
MP2
210B
CB1
PS1
PS2
MP1
3'-6" MIN. TYP.
EXISTING BUILDING
MP1
2
MP1 PS2
PS2
220
230B
3'-6" MIN. TYP.
PS1
3'-6" MIN. TYP.
365'-6" F.F.2(WITHIN LIVING UNITS)
247C
3'-6" MIN. TYP.
2
240B
2 MP3
PS1
PS2 MP1
2
MP3
306C
MP2
CB1
N. F R O N T E L E V A T I O N
S E C T. D T L. A T P L A N T E R B O X
8
3'-6"
PS1
MP1
2
MP3
310B
3'-6" MIN. TYP.
2
MP3
310A
3'-6" MIN. TYP.
3 (TYP)
320
320B
3'-6" MIN. TYP.
330
330B
3'-6" MIN. TYP.
MP3 376'-0" F.F.3(WITHIN LIVING UNITS)
347
3'-6" MIN. TYP.
MP1
3'-6" MIN. TYP.
347C
3'-6" MIN. TYP.
340B 2
Carrie Baranowski
Marquez Terrace residence remodel located in the Pacific Pallisades, involved a third story addition as well as a pool addition. The client was looking for a distinctive style, which lead to a variety of midcentury modern roof studies, paralleled with a lower architectural projection above the garage and entryway. The enclosed entry stairs served as both a mini-mud room, and a grand entrance to the second story; as well as providing privacy for the 1st floor master suite.
WORK SAMPLES
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
CLB
MARQUEZ TERRACE
GARAGE, MASTER SUITE & BUTTERFLY ROOF
EXTERIOR RENDER
F.O.S.
F.O.C.
F.O.S.
F.O.S.
F.O.S.
F.O.S.
A
A.7
B
C
D
E 1 (TYP)
F.O.S.
F.O.C.
F.O.S.
F.O.S.
F.O.S.
F.O.S.
A
A.7
B
C
D
E
1 (TYP)
ABOVE
11 3m
3vt CT1 9
P-10
DECK BELOW
9
207A
108B
(TYP) 20
201 POWDER RM T1
CT1 BAR
1v
12 A-7.10
1 24
4
10
112 POWDER RM T1 P-2 CT2
P-1
112A
102A
002E
3 30
30
2vf
22 11R @7 1/4" 10T @ 10"
SEE PROPOSED SITE PLAN ON SHEET A-2.00 FOR ADDITIONAL SITE INFORMATION.
14 A-7.20
200A 19
16 15
10 A-7.10
16
09 &13 A-7.40
109A
109 FAMILY ROOM
110 DINING
WD1
WD1
F.O.S.
09 &13 A-7.40
WD3 14
4
16
PLANTER
2
14 A-7.40
1v
22
1v
11 A-7.40
2vf
26
12 A-7.20
F.O.S.
18
05 A-7.20
ABOVE
07 A-7.40
1
F.O.S.
17
27
PLANTER
002D
4 FIREPLACE HEARTH
WD3
109B
F.O.S.
5 12 A-7.40
19R @7 3/8" 18T @ 10" UP
15 29
16
4
22
5
110A
17
21
22
25
21 4
13
UP 15
1v
DN
16
03 A-7.40
DN 002 7R @7 1/4" ENTRY STAIR 6T @ 10" 002C T3
05 A-7.40
WD1 16
1v
WD4
ABOVE
01 A-7.40
111 LIVING
05 A-7.40
OPEN TO BELOW
1v DN
002B 15
4 (TYP) 20
002A WD3
16
16
7
02 A-7.10
24
9
22
08 A7.10 2% MIN. SLOPE
4
19
16
OPEN TO BELOW
4
27 DC DECK
200 LOUNGE WD1
F.O.S.
DN
12
7
200B
DRIVEWAY SEE PROPOSED SITE PLAN ON SHEET A-2.00 FOR ADDITIONAL SITE INFORMATION.
3m
1v 16
16
DECK
1
WINE REF.
13
DC DECK
1 (TYP)
F.O.S.
20
2
24
3m
8
CT1
22
08 SIM A7.10
06 A-7.20
DC 102B
11
P-7
30
102 MASTER BEDROOM WD1
104A
108A
11
3m
3vt
7 108 KITCHEN
WD1
P-6
3
9 16
11
18
3
9
11
5 6
19
P-2
3
WD1 104 MASTER CLOSET
P-10
12
F.O.S.
CT2
P-2 10
3v
1v
DRIVEWAY
SEE PROPOSED SITE PLAN ON SHEET A-2.00 FOR ADDITIONAL SITE INFORMATION.
25
CT1
9
REF.
2vt
P-4
P-1
201A BAR
T1 207 BATHROOM
105A
108A
P-2 CT2
103B 14
107 CLOSET CO
107A
2
23 24 23
7
P-1
4
2v
207A
3vmt
5
WD1
203A
203B
203C 2v
ABOVE
6
P-9
10 SIM A-7.10
8
DC DECK
103A 103 MASTER BATHROOM
103B P-1
10
3
2v
203B
2v
P-2 CT2
202 LAUNDRY RM T1
202A
3
3vmt
203 BEDROOM WD1
F.O.S.
1v
1
16
3
206A
203A
105 GUEST/ MAID RM
2% MIN. SLOPE
16 A-7.10
4
3m
T2
103C
3m
3
24
P-8
103C 103E
P-1
CT2 P-2
CO
10 A-7.10
3m
18
14
16 19
3m
7
105B
18
206B
206 BEDROOM WD1
25 3
P-4
3vt
205A
3vt
10
10
208A
204A
106 BATHROOM T1 3m
102A
103D
P-3 28
04 A7.10
PLANTER
CT2 P-2 SEE PROPOSED SITE PLAN ON SHEET A-2.00 FOR ADDITIONAL SITE INFORMATION.
F.O.S.
2 (TYP) 3vt
23
106A 4
ABOVE
208 CLOSET
103A
106A 105A
16
206A
205 CLOSET 3m
3
DN
8
WD1 204 BATHROOM T1
P-1
3vt
3
1vt
25
3vt
F.O.S.
1 3
4t
1v 2
ABOVE
3t
PLANTER
206C 206B
24
204A
P-4
21
21
1v
1vt
18
25
16 A-7.40
F.O.S.
F.O.S.
F.O.S.
A
A.7
B
2ND FLOOR PLAN
F.O.S.
F.O.S.
F.O.S.
C
D
E
1 (TYP)
F.O.S.
F.O.S.
F.O.S.
A
A.7
B
F.O.S.
F.O.S.
F.O.S.
D
E
C
1’-0” : 1/32”
1’-0” : 1/32”
1ST FLOOR PLAN
8 3'-6"
26'-0 3/4" (365'-10 1/2") T.O. BUTTERFLY ROOF
3 4
18
16
17
1
22'-9 7/8" (362'-7 5/8") T.O. CURB AT ROOF DECK
200A
3
2
15
2
18
8
1
20'-8 3/4" (360'-6 1/2") SECOND FLOOR CEILING
206B
8 3'-6"
6
11'-8 3/4" (351'-6 1/2") (N) SECOND FLOOR F.F.
4
4
9'-9 7/8" (349'-7 5/8") (N) CEILING HT. AT FIRST FLOOR
15
1
102B
8
3'-6"
2 15
4
7
14
0'-0" (339'-9 3/4") FIRST LEVEL F.F. -0'-6" (339'-3 3/4") DECK OVER GARAGE
2 5 9 1
1
11
002A
001B
14 10
E X T E R I O R R E N D E R POOL AREA & DECK
-9'-9 5/8" (330'-0 1/8") LOWEST PT. WITHIN 5' -10'-10 5/8" (328'-11 1/8") ENTRY LEVEL
NOTE:
x
BUILDINGS SHALL HAVE APPROVED ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE AND VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. (R319.1)
x
ALL EXPOSED EXTERIOR CONCRETE WALLS TO HAVE SANDED FINISH.
1’-0” : 1/32”
-11'-5 5/8" (328'-4 1/8") @ (N) GARAGE DOOR
12 PROPERTY LINE
13
SIDE SETBACK
SIDE SETBACK
PROPERTY LINE
10
-11'-11 3/8" (327'-10 3/8") CL OF STREET
FRONT ELEVATION
Carrie Baranowski
In order to add as much square footage as we did, we opted for the 20% RFA bonus with the proportional stories option (see diagram below). The deck connects to the pool in the back yard via a small set of stairs, as shown in the elevation below. Personal involvement in this project included as-builts, schematic program massing & design, 3D modeling & rendering, and CADing & CD’s (SD + DD + CD).
WORK SAMPLES
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
CLB
MARQUEZ TERRACE
E X T E R I O R R E N D E R ENTRY STAIRS, 2ND FLOOR DECK & ROOF DECK
(BASE FLOOR) 1ST FLOOR -- 2453 SF 75% OF BASE FLOOR 1839.75 SF GARAGE / ENTRY FLOOR AREA --464 SF 464 SF < 1,839.75 SF O.K. 2ND FLOOR AREA -- 1,290 SF 1,290 SF < 1,839.75 SF O.K.
2ND FLOOR 1,290 SF E
D
C
B
A
(BASE FLOOR) 1ST FLOOR 2,453 SF MAX ENVELOPE HEIGHT 28'
207 BATHROOM
202 LAUNDRY ROOM
203 BEDROOM
DECK
102 MASTER BEDROOM
104 MASTER CLOSET
107 CLOSET
105 GUEST / MAID RM
REAR SETBACK
FRONT SETBACK
RESIDENTIAL FLOOR AREA 20% BONUS: BASED ON (1) PROPORTIONAL STORIES OPTION ALLOWABLE BUILDING AREA X 1.2 = TOTAL ALLOWABLE BUILDING AREA 3,493.9605 SF X 1.2 = 4,192.758 SF BUILDING PAD DETERMINED AS FLAT BASED ON: HIGHEST POINT WITHIN 5' OF PROPOSED BUILDING PERIMETER: 341.54' LOWEST POINT WITHIN 5' OF PROPOSED BUILDING PERIMETER: 330.01' DISTANCE FROM HIGHEST TO LOWEST POINT: 85.68' (341.54' - 330.01') / 85.68' = 13.4% SLOPE
GARAGE / ENTRY 464 SF
ROOF OPTION STUDIES
RENDERED MASSINGS
P R O P O R T I O N A L S T O R I E S D I A G R A M N.T.S. 8 26'-0 3/4" (365'-10 1/2") T.O. BUTTERFLY ROOF 3
3
MAX ENVELOPE HEIGHT 28'
22'-9 7/8" (362'-7 5/8") T.O. CURB AT ROOF DECK 2
206B
20'-8 3/4" (360'-6 1/2") SECOND FLOOR CEILING
3 206C
2 8
6
2 8 204A
5 11
11'-8 3/4" (351'-6 1/2") (N) SECOND FLOOR F.F. 4
102B 2
2
2
5
002E
8
9'-9 7/8" (349'-7 5/8") (N) CEILING HT. AT FIRST FLOOR
16 23
105A
8 18
(E) GRADE
106A
14 17
18
103A
2
2 15 4
15
20
11
0'-0" (339'-9 3/4") FIRST LEVEL F.F.
7 13
19
5
9 13
21
14 17
NOTE:
x
22 10
14
21
22
N O R T H E L E V A T I O N12 1’-0” : 1/16”
-0'-6" (339'-3 3/4") DECK OVER GARAGE
14
ALL EXPOSED EXTERIOR CONCRETE WALLS TO HAVE SANDED FINISH.
REAR SETBACK
13
PROPERTY LINE
11
K
PROPERTY LINE
PROPERTY LINE
(E) GRADE
001 GARAGE
-9'-9 5/8" (330'-0 1/8") LOWEST PT. WITHIN 5' -10'-10 5/8" (328'-11 1/8") ENTRY LEVEL -11'-5 5/8" (328'-4 1/8") @ (N) GARAGE DOOR
Carrie Baranowski
Mandeville Canyon residence was a hillside renovation project involving reworking the outdated and confined interior rooms into more open, functional spaces. The client wanted to add a restroom downstairs, which involved flipping and redesigning the staircase to fit the new stylistic intent.
WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
MANDEVILLE CANYON
105A
8
105B
22 21
A
WD1 25
105 GUEST BED D
B
C 1'-3" MIN
1m
15 UTILITIES SHED
105A
P-2 5 TRASH PULL OUT
T3
D.W.
9
A
01 A-5.10
C
CT-1 02 A-5.10
P-10
E
D
CT-1
ABOVE
02 A-5.10
1
1m D
T2
2 3
109A
100B
100A
27
100 ENTRY
B 28
C
ST1 STAIR
7
24
14 R @ ___" 13 T @ ___"
UP 107 LIVING RM
18
23
WD1
1
109 GARAGE
CO 100A
P-1
1
102A
PATIO
TC1
A
3m 5
11 12
P-4
03 A-5.00
103A
109B
17
P-2 106A
1m
106 POWDER
1m
102C
102 KITCHEN
REFRIGERATOR FREEZER
P-6
10 DOUBLE OVEN
CT-1
102A
B
1m
102B ABOVE
13
26
106A
17
104 GUEST BATH T2
WD1
CT-2 5
109A
105C
104A
CL
1m P-7
B
C
CT-2
T2 P-1
4
02 A-5.00
1m
(E) A/C UNIT
6
A
01 A-5.00
D
108 GYM
WD1 ST2 STAIR
108C
WD1
TC1 WD1
101 DINING ROOM
108A
24
18
14
108A
108B
29 101A
101A
19
20 107A 107A
28 107B
28
8
16
PROPOSED 1ST FLOOR PLAN
16
16
1’-0” : 1/16”
E X I S T I N G N O R T H E L E V A T I O N 1’-0” : 3/64”
SCALE
E X I S T I N G S O U T H E L E V A T I O N 1’-0” : 3/64”
E X I S T I N G E A S T E L E V A T I O N 1’-0” : 3/64”
EXISTING HOUSE
EXTERIOR PHOTO
STAIR STUDIES
INTERIOR RENDERS
Carrie Baranowski
Specific emphasis was placed on reworking the kitchen and dining room, to completely open up those spaces and create a flow between them. The unusual barn shape of the existing house provided interesting optionsfor reworking the guest room, bedrooms and master suite. Personal involvement of the project included extensive as-builts of the entire property, CADing CDs, and 3D modeling. (SD + DD + CD).
WORK SAMPLES
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
CLB
MANDEVILLE CANYON
201A
202A
8
1'-3" MIN
9 201 BEDROOM
WD1
6
202 OFFICE
4
CL 206A
P-1
10
CT-2
C
T2
7 CT-2 P-2
CL
1'-3" MIN
A 2049
13
205 MASTER BED
WD1
1
1
2
12 8
23
23 2
WD1
1
203 BEDROOM
18
4
205D
DOWN
10
8 203D
6
16
203B 16
2
205B
203A 203C
PROPOSED 2ND FLOOR PLAN
205A 205C
18
1
06 / 07 A-7.00
3
12
1m
204A
4 WD1 207 207A MASTER CLOSET 207B 4
206D
06 / 07 A-7.00
3
23
FIRST FLOOR BELOW
C
DOWN
DN
1 206B
ST2 STAIR
203A
11
T2
1m
10
02 BATH B A-5.20
D
P-3
204A
DN
11
1
6
ST1 STAIR
1'-3" MIN
P-1 P-4
DOWN
1
P-3
T3
206 MASTER BATH
206A
1'-3" MIN
B P-1 CL W/D
B
3m
01 A-5.20
1m
4
202A
3m
P-3
9
1
P-2
DOWN
1m
200 A BATH D
10
WD1
200A
11
200A
C
1
06 / 07 A-7.00
T4
P-8
03 A-5.20
D
1mb
201A
DOWN
DOWN
206C
A
T2
P-14
1
1
1m
15
206B
WD1
16
16
1’-0” : 1/16”
2
3'-7 3/8"
1'-10"
2'-4 7/8"
2'-4"
2'-4" 1'-8"
1'-5 7/8"
3'-6 7/8"
3'-1"
4"
2'-4" 1'-8"
1'-0"
2
5
3'-0"
3'-0"
6
A
1'-0"
CT-1
1'-9 5/8"
1'-9 5/8"
1'-6 1/2"
1'-6 1/2"
1'-9 5/8"
5
7
7
C
1'-9 5/8"
1’-0” : 1/8”
2'-0"
CT-1
CT-1
6
B KITCHEN ELEVATIONS
CT-1
1'-8"
8 2'-0"
3'-0"
CT-1
3'-0"
CT-1
2'-0"
CT-1 8
4'-2"
7
TRASH PULL OUT
01 A-5.10
A
5
5'-6 1/2"
D
CT-1
2'-0"
4'-6"
CT-1 3'-6 1/4"
6'-0"
P-1
A
T2 D
P-14
C
1
T4
B 206 MASTER BATH
P-3
T3 11
206A
K I T C H E N K E Y P L A N 1’-0” : 1/8”
MASTER BATH ELEVATIONS
P-8
03 A-5.20
1mb
D.W.
CT-1
02 A-5.10
REFRIGERATOR FREEZER
E
1’-0” : 1/8”
C
P-10
02 A-5.10
DOUBLE OVEN
B CT-1
1 206B
1’-0” : 1/8”
KEY MASTER BATH PLAN
Carrie Baranowski WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
Sandal Lane residence, a new two-story single family dwelling, included an attached basement & garage, roof deck and pool. Personal involvement in this project included CD’s and specifically master bath and powder room millwork detailing.
08 -
1’-0” : 1/4”
PROVIDE CLEARANCE FOR DRAIN PIPE WHERE REQ.
04 -
06 -
02 -
12 -
SANDAL LANE
KEY PLAN AT MASTER BATH
LINE OF COUNTER ABOVE.
PULL OUT DRAWERS
4"
PULL OUT DRAWERS
1'-2 3/4" V.I.F.
2"
1'-3 5/8"
1'-3 5/8" 3'-4"
2"
OPEN SHELVES
1’-0” : 1/4”
04 -
CABINET WITH SHELVES
S E C T. D T L. M A S T E R V A N I T Y
2'-2 3/4"
1’-0” : 1/4”
2'-4 3/4"
E L E V. A T M A S T E R V A N I T Y
LINE OF SINK ABOVE.
4"
4" TYP.
DRAWERS BEYOND, BOTH SIDES.
4'-0"
3'-3 1/2" 4'-0"
4"
MILLWORK PLAN DIAGRAM
3"
1’-0” : 1/4”
PULL OUT DRAWERS (3).
E L E V. A T M A S T E R V A N I T Y
1’-0” : 1/4”
11"
S E C T I O N D T L. M A S T E R V A N I T Y 1’-0” : 1/4”
SCALE:
1ST FLOOR PLAN
1’-0” : 3/128”
1’-0” : 3/8”
SECTION DETAIL AT POWDER ROOM
Carrie Baranowski WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
MAKERCITY LA
I N T E R I O R P H O T O ACADEMY SPACE
The re-design of LA Mart’s 11th floor into Maker City LA (MCLA) involved transforming showroom spaces into an inspiring environment for the creative community of LA. The Academy creative classroom, the Atelier design studios, the Media Lab shooting and podcasting studios, Fabrication Lab for lasercutters, 3d printers & woodshop, the Maker Kitchen, & the Co-Working space. This project included as-builts, drafting plans, as well as 3D modeling & rendering (SD + DD). T HE A C A D E M Y
ACADEMY SPACE I N T E R I O R R E N D E R I N G
OFFICE
DINING
ACADEMY SPACE I N T E R I O R R E N D E R I N G
ACADEMY FLOOR PLANS
1’-0” : 1/32”
THE ACADEMY IS A PLACE WHERE A CULTURAL SALON, A VIBRANT CABARET & AN INTELLECTUAL LECTURE SERIES COULD ALL HAPPEN WITH EFFORTLESS TRANSITION... CONCEPT & INSPIRATION
INTERIOR PHOTOS
LOUNGE & ACADEMY
1’-0” : 1/16”
SECTION THROUGH ACADEMY
Carrie Baranowski
The programmatic requirements of the 11th floor needed to accommodate the diverse range of creatives at Maker City LA. The Media Lab provides a fully equipped podcasting studio, green screen studio & lounge. The Co-Working space allows for flexible creative work space with several lounges for collaborating. The MCLA Office welcomes visitors & creatives with a Japanese Tea Room style entry. This vinvolved as builts, drafting plans and designing the interior spaces.
WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
MAKERCITY LA
COWORKING & MEDIA LAB
HILL STREET
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
N
WOMEN
M
CREATIVE OFFICES 1145 4,486 r.s.f.
1144 1,668 r.s.f.
CO-WORKING
CultureBrain ACADEMY
1142 1,668 r.s.f.
1143 1,668 r.s.f.
MEDIA LAB
1141 1,668 r.s.f.
1139 2,838 r.s.f.
LA Makerspace
34
1138 2,185 r.s. f.
47 32
Fab. Lab.
L
1130 3,441 r.s.f.
K SHAFT
FREIGHT ELEVATOR LOBBY
MEN
46
CLOSET
45
44
43
42
41
40
39
38 30
J 48
49
50
51
52
53
54
55
56
58
Maker City LA Office + Showroom
28
PING PONG ROOM 1126 719 r.s.f.
60
26
H The Living Room 1151-1169 16,049 r.s.f.
INSTITUTE FOR ART AND OLFACTION 1124 719 r.s.f.
62
24
64
22
G FAN ROOM
PHOTO STUDIO
02
73
72
71
70
69
04
05
06
07
68
67
66
65
WOMEN
08
09
10
11
1122 719 r.s.f.
F
Maker Kitchen 1102 983 r.s.f.
20
12
JAN.
E
ATELIER
iLLUMINODE
1104/1106 16,158 r.s.f.
03
18
1120 2,623 r.s.f.
D 16A
I N T E R I O R P H O T O PODCAST STUDIO
16B
C
MEN
B BROADWAY
11TH FLOOR
INTERIOR PHOTOS
SCHEMATIC FLOOR PLAN
CO-WORKING SPACE
INTERIOR PHOTO
JAPANESE TEA ROOM
CO-WORKING
SCHEMATIC ELECTRICAL FLOOR PLAN
WASHINGTON BLVD.
I 1149 2,858 r.s.f. ELEVATOR LOBBY
Carrie Baranowski WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
MAKERCITY LA
INTERIOR RENDER
The Atelier design studios provide working space for fashion & design creatives in a wide open co-working environment encouraging collaboration across creative fields. Several studios with specialized equipment allow for temporary or monthly membership use: the sewing studio, jewelry studio, spray-booth, as well as the large workshop style desks and elegant catwalk. This included 3d modeling & rendering, designing the custom stage, catwalk and desks. THE ATELIER
ATELIER & CATWALK
SEWING STUDIO
INTERIOR RENDER
8’ long 4’ wide 1” thick 3/4” thick
2’9”
INTERIOR RENDER
SPECIFICATIONS DIAGRAM
JEWELRY STUDIO
FASHION STUDIO
STUDIO DESK RENDER
SPRAY BOOTH
JEWELRY STUDIO CATWALK INTERIOR PHOTO
ATELIER & CATWALK
SEWING STUDIO
INTERIOR PHOTO
ATELIER & CATWALK
PROGRAMMATIC DIAGRAM
BIRD‘S EYE RENDER
Carrie Baranowski WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
The Mullin Residence in Malibu, CA involved designing the recently purchased roughly 1500 sf interior. The most rewarding part of the project was transferring the original printed construction documents to digital format for the subsequent electrical, furniture and tile plans and elevations.
MULLIN RESIDENCE
All thresholds will be slab Parasol A with White Limestone honed & Nero Panthera Classic Base around room + shower 2cm Stacked Mosaic in Thassos Select Polished 03-22743-72180
White limestone 2cm mosaic (in 2X4) Frame around top shelf for soap and below for shampoos Honed keystone and thassos narrow markquina dot.basketweave Mosaic Style #KSMOB3
U P P E R L E V E L F L O O R P L A N 1’-0” : 3/32”
1’-0” : 3/16”
MASTER & GUEST BATHROOM TILE PLAN
Classic chair rail 1 3/8" X 6" bevel 6" X 12" bevel Classic chair rail 1 3/8" X 6" bevel Staggered mosaic 1 7/8" X 3 4/8" 16" X 16" bevel Classic base honed 4" X 12", 3/4" depth All in White Limestone (honed)
1’-0” : 3/16”
MASTER SHOWER TILE ELEVATION
"A" Rail 1 1/4" X 12", KSRLO1 6" X 12" KSF612 "A" Rail 1 1/4" X 12", KSRLO1 Staggered mosaic 1/2" X 1 1/4", # 03-69587-4
U P P E R L E V E L F L O O R P L A N 1’-0” : 3/32”
12" X 24", KSF224
S PA C E I N N O VAT I O N S INTEROR
DESIGN
GROUP
Standard base 5" X 12", KSBSO1 All in Thassos (honed)
1’-0” : 3/16”
GUEST SHOWER TILE ELEVATION
Carrie Baranowski
Under the directino of the two principals at Space Innovations, the residence’s interior design was cleanly updated per the client’s intentions. Re-working the lighting and re-tiling were the main endeavors suggested by the firm to give the residence a refined aesthetic, in addition to the new furnishings.
WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
MULLIN RESIDENCE
attached to moulding clock outlet 6" in, 6" up TV
Living Room Fireplace
TV
+72"
11/16” X 4 1/2” : B24-44 Base Mouliding 13/16” X 4 5/8” : CR17-45 Crown Moulding 5/8” X 2 1/2” : CH10-24 Chair Rail 5/8” X 2 1/2” : CH10-24 Chair Rail
R
+72"
11/16” X 3 1/2” : B19-34 Base Moulding Small Bricks Approx. 1” X 4” 300DVB Series Direct Vent Gas Fireplace 3
$$ $
D
chandelier
11/16” X 3 1/2” : B19-34 Base Moulding
A
S
S
$ 3D $D
11/16” X 4 1/2” : B24-44 Base Mouliding 13/16” X 4 5/8” : CR17-45 Crown Moulding 5/8” X 2 1/2” : CH10-24 Chair Rail
+30
1
1 chandelier
3
3
$$
GFI
G
GFI
B
GFI
+42
FIREPLACE ELEVATIONS
$3D
1
$D
$ GFI
+42
1 +42
11/16” X 3 1/2” : B19-34 Base Moulding
220V
1 1
Small Bricks Approx. 1” X 4” 300DVB Series Direct Vent Gas Fireplace
$$
GFI
S
GFI
GFI
1
+30
GFI
11/16” X 3 1/2” : B19-34 Base Moulding
1
G
1
S
1
$$ 3
under cabinet lighting *note: heated floors in bathrooms only
All in Carrera, honed
cabinet for ironing board folds into wall electrical inside cabinet
elec above desk elec below desk All elec necessary for AV
U P P E R L E V E L E L E C T R I C A L P L A N 1’-0” : 1/8”
12" X 12" Carrera honed
Par Basketweave Thassos / Ming polished basketweave Mosaic Style #KSMOB3 3cm X 5cm
basketweave in carrera and nero polished basketweave Mosaic Style #KSMOB6 5.5 cm X 8cm
A rail top Carrera 1 3/4" X 12" KSRL01 3" X 6" Carrera KSFO36
Standard Base, Carrera 4" X 12" KSBS01
Architectonic, in Icewater Bayleaf Rail in Icewater 3.375" X 7"
3" X 6" in Icewater
Frame around top shelf for soap and below for shampoos Honed keystone and thassos narrow markquina dot.basketweave Mosaic Style #KSMOB3
A L T E R N A T E T I L E P L A N 1’-0” : 3/16”
Standard Base Icewater 5" X 12", KSBSO1
ALTERNATE TILE ELEVATION
Carrie Baranowski WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
SKYSCRAPER STUDIO
D I A G R A M STRUCTURAL STRUC CTURAL SKIN SYSTEM
The studio under Scott Johnson and David Gerber proposed designing a tall building at least 50 floors tall. The site is directly behind the CBS building on Sunset Blvd in Hollywood, CA. Instead of trying to inject open space into an increasingly urban area, I looked at how compartmentalized Hollywood is. A massive hybrid tower with extensive public program compartments fits with Hollywood’s potential for future density. The program for this tower is split between office and residential & hotel, which occupy the larger tower for deeper radial units. STUDENT WORK
TOWER IN HOLLYW HOLLYWOOD CONTEXT
RENDERING
14
DN
UP
night club wine bar restaurant park rec center restaurant
DN
supermarket
CONCERT HALL
conference hall swimming pool gym movie theater
lounge convenience store
DN
UP
spa gym
retail retail
residential hybrid program DN
hotel
Scale 1’ 0” : 1/64”
S E L E C T F L O O R P L A N S 1’-0” : 1/64”
Program Diagram
PROGRAM DISTRIBUTION
connecting program
DIAGRAM
office
Carrie Baranowski WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
SKYSCRAPER STUDIO
Public spaces are inserted between each main program including a concert hall as a central focal point where the towers collide. The structure is a double layered structural skin with two diagrids morphing separately. This allows for a conversation between the two structures creating a dynamic yet column free ï¬&#x201A;exible space.
STUDENT WORK : RENDERINGS
Carrie Baranowski WORK SAMPLES
CLB
760.889.8467 carriebaranowski@gmail.com clbdesigner.com
SKYSCRAPER STUDIO
The skin system morphs to accommodate the differing solar orientations. Known as the Topological Tower, this project served as an analysis of how certain spacial properties are preserved under deformation. In this sense, a performative skin system is developed with a uniform geometry. The acrylic model is a diagram of the two diagrids in conversation. The blue, holding the elevator core and circulation program. 3D printing was also a big part of examining the structure of the building overall, before designing the skin system. STUDENT WORK : PHYSICAL MODELS