2014
1
evo路 lu路 tion noun (1) : a process of continuous change from a lower, simpler, or worse to a higher, more complex, or better state. This is the collected works of my own evolution. Starting from a state of being a non-educated member of society being changed by society, to a member of the Architecture community with the abilities and tools to impact society for the better.
2
3
Final Studio
Rhino + Revit
Revit
Rhino
Sketchup
Auto-Cad
Photo
Draw
Sketch
Sketch 4
This fish sketch is the earliest record Showing an interest in art. And so began a lifelong journey culminating in a Master of Architecture Degree in design. This from the support of my wife and family, as well as the direction of many gifted faculty from the University of Utah School of Architecture + Planning.
5
6
Draw
7
8
Photo
9
10
Autocad
ESIGN
11
12
SKETCH-UP
1
2
PLAN 1/2” = 1’-0”
^N
13
Rhino
Rhino + Photoshop
14
15
Revit Revit + Illustrator
16
17
Rhino + Revit
Revit + Illustrator
18
B
Section B.
Section A.
Plan View
1/4”=1’
A
19
Rhino + Revit Rhino + Revit + 3DS Max Photoshop
20
TRIAD
NORTH TEMPLE
YOUTH EXHIBIT
COLLEGE AXIS
Exhibit
COLLEGE AXIS
OPEN EXHIBIT
PLUG IN KITCHENS
PUBLIC ENTRY
PUBLIC ENTRY
1
YOUTH CLSRM
Exhibit
Exhibit
Student Exhibit Exhibit
Exhibit
300 WEST
TRIAD
Exhibit
PLUG IN KITCHENS
PLUG IN KITCHENS
MID-BLOCK WALK
21
NORTH ELEVATION 1/8”=1’
East+West Section 1/8”=1’
SOUTH ELEVATION 1/8”=1’
North+South Section 1/8”=1’
SPRING 2014 ARCHITECTURE & URBAN DESIGN STUDIOS ARCH 6016 + ARCH 6030 / CMP 6445
22
1 SITE SECTI
23
Final Studio
2
1
3
4
LEVEL 2
Level 2. 15’
1
1 OBSERVATION DECK 2 BEGINNERS BOAT LOFT 3 YOUTH POND BOAT BUILD 4 INTERMEDIATE CLASSROOMS 5 INTERMEDIATE WORK SPACE 6 PIN UP / REVIEW 7 ADVANCED STUDIO SPACE 8 PRINT / PLOT 9 ADVANCED BOAT LOFT 10 BOAT LIFT / PROJECT STORAGE
2
3
5
GROUND LEVEL 1 ENTRANCE 2 TRUCK/ MATERIAL DELIVERY 3 ELEVATOR / LOBBY 4 MATERIAL DISPLAY/STORAGE 5 BOAT IS BUILT EXHIBIT 6 INTERMEDIATE MILLROOM 7 INTERMEDIATECLASSROOM 8 ADVANCED CLASSROOM 9 COMPUTER ROOM 10 ADVANCED MILLROOM 11 BACKBONE 12 RIBBING 13 LOFTING 14 FINISH ROOM
MORGAN ST.
CERMAK RD.
S1
Level 3. 30’ Level 2. 15’
6 7
10 8
4
6 8
9
2 4
11
7
3
8
9 5 1
12
6 4 Level 3. 30’
Level 2. 15’
13
14
LEVEL 3 1 2 3 4
10
13
24
14
10
ELEVATOR / LOBBY FACULTY OFFICES CONFERENCE FACULTY BREAK / LOFT
25
26
27
28