Caterina spadoni

Page 1

CATERINA SPADONI portfolio 2016


SUMMARY 01

ARCHITECTURAL DESIGN waste transfers station, manhattan hong kong pasta!, hong kong cinema+baretto, cervia observatory centre, atacama desert stairstotower, FAUP workshop 02

STUDIO WORKS post-frontier, Venice Biennale 2014 salford meadows bridge, manchester seminaar hoogstraten, antwerpen opération les vernets, genève ceva-champel urban space station, genève tyron park, center for rituals, manhattan 03

URBAN DESIGN crevalcore city mall, crevalcore 04

STUDY MODEL 05

PERSONAL SKILLS landscape photography 06

BIOGRAPHY//CV


27.12.1987 Faenza, Ra nationality: Italian phone: (+39) 340 7635361 e-mail: caterina.spadoni1@gmail.com

AD.01

Caterina Spadoni


WASTE TRANSFER STATION manhattan: progettare il margine

tesi di laurea in architettura e progettazione architettonica Prof. Annalisa Trentin Prof. Jonathan Kirshenfeld 2012

The competition launched by the City of New York requires the design of a marine transfer station to replace the existing one in the East River, and the condition to be met, in addition to technological standards of waste storage station, are directed to the integration of this function with the urban context very present and alive in this part of waterfront. Particular attention has been paid to the inclusion of the building in the park system that stretches across the border: the walk along the river should not be hindered or interrupted, but rather enhanced at that point the most critical. Inside a mega reticular structure, like the bridges which marks the landscape around, I embed trhee boxes with three different function: a marine waste transfer, its learnig center and a separate gym. All these areas are linked each other and to outside with a system of ramps and elevated walkways, so the waterfront path continue within the building.


AD.01


solid waste management plan critical analysis

thesis research Manhattan, progettare il margine waste sistem program project’s area studies waterfront exhisting site


thesis book Manhattan, progettare il margine city analysis project’s process conclusions on the building


cross section studies over manhattan’s edge and its relations with urban systems


pushing out the grid

historical edge expansion

existing site

continuing streets and avenue

main volumes

trhee concrete baffles and truss

city plan overview of East river and waste transfe station context


different levels axonometries

first level waste transfer station


detailed section arrival dump trucks

cross section first step: entry to the offices middle step: collection loaded containers last step: unloading containers on barges

East River waterfront station inserstion in the landscape


pier 107 CVII East Harlem New York City photomontages and studies on an abandoned pier in the surrounding area


internal views view of the ramp that runs all floors view from the last floor next the cafè

middle level, footbridge over the cranes view shows the reticular truss as a bridge

external views


POST-FRONTIER Biennale di architettura Venezia 2014

Installation at Mondoitalia plaster model, reasearch and presentation booklet Arch. Giacomo Cantoni Arch.Pietro Pagliaro 2014

Post - Frontier wishes to investigate the condition of the southern borders of Europe, analysing part of the political, regulatory and territorial ambiguities that persist throughout its fields and that are particularly accentuated when they relate to the Mediterranean Sea. These places no longer only directly relate to a definite geographic limit, but have become physically manifest as data processing products, and can thus be delocalised, structuring themselves on ever weaker and diffuse forms of spatial organization.


SW.01


SEMINAAR HOOGSTRATEN school renovation Antwerpen +

OPERATION LES VERNETS masterplan for residential complex Genève competition Baukuh 2014

The restoration of an ancient complex of different aged building,near Antwerp, used in the past to the seminar, involves the adaptation of some indoor and outdoor public spaces for the today’s feature of school. The project is the application of a shared portico that will encircle the entire courtyard used as play area for pupils, and the addition of small catalysts in that space, such a long table, a stage and small temple. Genève is the center of an expanding territory, thanks to the quality of life it offers incomparable, this metropolitan area generates an increasing number of jobs and attracts a population that goes. Les Vernéts, due to the displacement of the barracks of the firemen in another area will leave free a will leave a large free space close to the city center disponible for a new construction program, with priority assigned to housing (about 1,500 units) and accompanied by services and activities.


SW.02


0

1

2

column church capital: glazed ceramic tiles

column porch

lamp on street

entablature: aluminium

lamp: opalescent glass

column: glazed ceramic tiles

column: glazed ceramic tiles

column: glazed ceramic tiles

base: glazed ceramic tiles

base: sand stone

elements for a project


ground floor plan

axonometry


typologies diagram

axonometry

model 1:1000


SW.03


PADIGLIONE LA SPEZIA nautical centre La spezia detail drawings Baukuh 2014


SW.04 1:25 scale details


CEVA-CHAMPEL STATION urban space and forniture design Genève on build Bureau-a 2015

The construction of the station CEVAchampel is part of a much wider program: a tunnel that starts from the nearby France will connects five stations in strategic points for commuters who every day reach the city of Geneva. The design and building of five stations is under the supervision of Jean Nouvel atelier, while the planing of its public spaces related, announced through a competition led by the ville de Genève, shall be borne by winners studios. The project will be built in 2017 and provides for the conversion of the space of connection to the city in an urban forest consists of flower beds with a very dense vegetation and layby. N° DE PLAN

CCH_02.02-5103 AFFAIRE

HALTE GARE CEVA-CHAMPEL AMENAGEMENTS PUBLICS Plateau de Champel Genève PHASE

PROJET MO VILLE DE GENEVE DEPT. DES CONSTRUCTIONS ET DE L'AMENAGEMENT RUE DE L'HOTEL DE VILLE 4 1204 GENEVE

REPRESENTANT MO

TR AV AI L

HELENE CRAUSTE SERVICE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE RUE DU STAND 25 1204 GENEVE

INGENIEUR CIVIL THOMAS JUNDT FONTENETTE 27 1227 CAROUGE

DO CU ME NT

DE

ARCHITECTE BUREAU A RUE DE GRENUS 12 1201 GENEVE

ALFRED FORSTER AG KERZERSSTRASSE 21 3027 GOLATEN

CONCEPTRICE LUMIERE

SARA CASTAGNE GUSTAVE COURBET 26BIS 92220 BAGNEUX

REMARQUES / NOTES

PLAN PLAN ABRI EST DATE 09.02.2015

ECHELLE GRAPHIQUE

PROJET | plan| îlot bancîlot 1:50 banc PROJET plan

0

.1


RUE

29

B

D BAR LOM

ENEVE

35

Ha C

CENTRE MEDICAL UNIVERSITAIRE

31

+ 407.40

1

5

C 35

Ha

AV + 407.90

Ha

PE

SC

HIE

R

16

37

Ha

18 +

409.8 4

20

411.8

8

R +

7 +

7

411.1

412.1

8

C 2

14

14 R

M

CHE

13

ET

8

RV

8

SE

+

12

MIN

41

L-

410.5

11

accès camion

3

10

THU

9

2

RY

8

1

HE

+

7

15

16

32

MIC

3

6

E

410.3

5

S

RU 12

+

2 + 406.9

4

2

CENTRALE THERMIQUE

412.2

39

3

+

+ 406.9

AVENUE DE CHAMPEL

acc

ès

cam ion

2

Ha

0

23

AV EN UE

407.0

0

UE

Ha

+

3

3

ALF RE D

EN

1 x12

BE RT RA ND

25

C

Ha

4

17

9+

IE

1 x38

+ 410.10

BEAU-SEJOUR

5

+ 409.40

7

+ 409.40

8

C 10 C

TEMPLE

8 C

Ha

2

3B

1

3A

10BIS

x10

+ 411.36

9

2BIS C

4

+ 412.9

9

45BIS

AVENUE

6

0

5

10

EN

R

2

UE

25 m

9

47

+ 412.29

3

S

Ha

3

+ 412.06

REMARQUES / NOTES

DU

MA

4 C

+

409.84

8

5

20

SARA CASTAGNE GUSTAVE COURBET 26BIS 92220 BAGNEUX

+ 413.25

+

410.33

412.28

+

+

414.0

T

A

411.18

+

10

TERRASSE

8

SORTIE CEVA

I

Ha

S

EM IR

M 5

R

NT O C

12 409.81

7

C X

M

22

Ha

Ha

9+

ARRET BUS TPG WC PUBLIC

A

3

UE EN

AV C

55

Ha

7

TAXI

5

9

Ha

8

VELOS X57

2 3

ÎLOT PLANTATIONS 9 1 x24

ARBRE + 410.11

+ 409.40 SORTIE SECOURS CEVA

8

MATS TPG

412.55

1 x11

2

8

410.58

8

51

53

TEL +33 145 46 32 04 FAX +33 176 62 07 79 SARA.CASTAGNE@LUMINOCITE.FR

DOCUMENT DE TRAVAIL

7 +

7 1

11

+

Ha TEL +41 31 755 67 07 FAX +41 31 755 50 78 INFO@FORSTERBAUGRUENAG.CH

CONCEPTRICE LUMIERE TEL +41 22 731 61 75 INFO@A-BUREAU.COM

LEGENDE 1

SW.05

ALFRED FORSTER AG KERZERSSTRASSE 21 3027 GOLATEN

Ha

6

PAYSAGISTE TEL +41 22 309 06 10 FAX +41 22 309 06 29 INFO@JUNDT.CH

+ 413.3

+ 412.80

+ 412.71

Ha

HELENE CRAUSTE SERVICE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE RUE DU STAND 25 TEL +41 22 418 20 83 1204 GENEVE HELENE.CRAUSTE@VILLE-GE.CH

+ 412.30

5

REPRESANTANT MO

+ 414.95

IS

DE L'AMENAGEMENT

411.88

3

5

1/500

AV

C

HAUTE ECOLE DE SANTE

4 ECHELLE GRAPHIQUE

ECHELLE

+

ALTITUDES RELEVE GEOMETRE MAP3082_05

ACTIVITE COMMERCE

ALTITUDES EXECUTION CEVA EX-50D-PN-AJN2-1020B

HABITATION HÔPITAUX UNIVERSITAIRES DE GENEVE MIXTE, LOGEMENT / ACTIVITE RESTAURATION

PERIMETRE SURFACE TOTAL 20.260 M2

13

VOIE VERTE (PIETON/VELO) PLACES DE LIVRAISON

S

STATION ESSENCE

U

UNIVERSITE DE GENEVE/CENTRE MEDICAL UNIVERSITAIRE

7A

57 7B

2 24

PLAN GÉNÉRAL 10

9

59

19

12

21

PLAN GÉNÉRAL

26 61

11 2

14

13

N° DE PLAN

CCH_02.02-5103

PROJET | coupe banc

AFFAIRE

HALTE GARE CEVAAMENAGEMENTS PU

PROJET | coupe banc 1:10

Plateau de Champel Genève PHASE

PROJET MO

VILLE DE GENEVE DEPT. DES CONSTRUCTIONS ET DE L'A RUE DE L'HOTEL DE VILLE 4 1204 GENEVE

REPRESENTANT MO

HELENE CRAUSTE SERVICE DE L'AMENAGEMENT URBAIN RUE DU STAND 25 1204 GENEVE

INGENIEUR CIVIL CABLE D' ALIMENTATION +4.00

AMPOULE ø 120 mm

THOMAS JUNDT FONTENETTE 27 1227 CAROUGE

ARCHITECTE +3.50

143

10

BUREAU A RUE DE GRENUS 12 1201 GENEVE

D

9

DO CU ME NT

4

8

45

R

TUNNEL PIETON Liaison souterraine TUNNE10-4 PA1 (6621.002) L PIETON Réalisé doux par le cantonmodes de Genève

8

GARE CEVA

C

3C

CCH_02.02-0006

VA-CHAMPEL S PUBLICS

412.5

+ 409.40

18

+

Ha

2

DE UE

TUNN TUN EL PIETO Liaiso NEL N 10-4 Réalis n soutePIET PA1 é par rraineON le canto modes (6621.002) doux n de Genè ve

+ 410.11

AV

EN

+ 409.40

Ha

NT

1 x24

8

16

3

+ 412.7

RO LA

1

Ha

1 x5

+ 407.1

+ 410.53

SE

RA

6

A

1

3

2

409.8

1

14

ALFRED FORSTER AG KERZERSSTRASSE 21 3027 GOLATEN

36°

CONCEPTRICE LUMIERE

FUT BOIS MASSIF / 320 CM

SARA CASTAGNE GUSTAVE COURBET 26BIS 92220 BAGNEUX

EMBASE ACIER THERMOLAQUE NOIR

s

REMARQUES / NOTES +0.80

BETON DE BASE

PLAN +0.0

PLAN ABRI EST

4

220

DATE 09.02.2015

PROJET | façade banc

DESSIN ACV

EC


CCH_02.02-5103 HALTE GARE CEVA-CHAMPEL AMENAGEMENTS PUBLICS

AFFAIRE Plateau de Champel

Genève HALTE GARE CEVA-CHAMPEL AMENAGEMENTS PUBLICS PHASE

Plateau de Champel Genève

PROJET

PHASE MO

PROJET VILLE DE GENEVE

16,95 16,95

MO

DO CDUO MCEU NM TEDN ET DE TR T AVRA AI VA L IL

abri bus proposal:

DEPT. DES CONSTRUCTIONS ET DE L'AMENAGEMENT RUE DE L'HOTEL DE VILLE 4 1204 GENEVE

REPRESENTANT MO

VILLE DE GENEVE DEPT. DES CONSTRUCTIONS ET DE L'AMENAGEMENT HELENE CRAUSTE RUE SERVICE DE L'HOTEL VILLE 4 DE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE 1204RUE GENEVE DU STAND 25 1204 GENEVE

REPRESENTANT MO INGENIEUR CIVIL

8,23

HELENE CRAUSTE SERVICE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE THOMAS JUNDT RUE FONTENETTE DU STAND 25 27 12041227 GENEVE CAROUGE

INGENIEUR CIVIL ARCHITECTE

1,4

THOMAS JUNDT FONTENETTE BUREAU A27 1227RUE CAROUGE DE GRENUS 12 1201 GENEVE

ARCHITECTE

N° D

BUREAU A RUE ALFRED DE GRENUS 12 FORSTER AG 1201KERZERSSTRASSE GENEVE 21 3027 GOLATEN

3,8

pre-definitive drawings

CC

CONCEPTRICE LUMIERE

AFF

ALFRED FORSTER AG KERZERSSTRASSE 21 SARA CASTAGNE 3027GUSTAVE GOLATENCOURBET 26BIS 92220 BAGNEUX

HA AM

CONCEPTRICE LUMIERE REMARQUES / NOTES

3

SARA CASTAGNE GUSTAVE COURBET 26BIS 92220 BAGNEUX

Plate Gen

PHA

1,45

REMARQUES / NOTES PLAN

PR

PLAN ABRI EST

DATE PLAN

DESSIN

MO

09.02.2015 ACVEST PLAN COUVERTURE ABRIS

AVENUE DE CHAMPEL

DATE

VILL DEP RUE 1204

DESSIN

09.02.2015

ACV

REP

HEL SER RUE 1204 N° DE PLAN

INGE

CCH_02.02-5103

THO FON 1227

AFFAIRE

HALTE GARE CEVA-CHAMPEL AMENAGEMENTS PUBLICS

ARC

Plateau de Champel Genève PHASE

0

PROJET

.1

.5

ALFR KER 3027

ECHELLE GRAPHIQUE

3

MO

BUR RUE 1201

ECHELLE GRAPHIQUE

0

PROJET | plan abri EST 1:50

.1

.5

CON

VILLE DE GENEVE DEPT. DES CONSTRUCTIONS ET DE L'AMENAGEMENT RUE DE L'HOTEL DE VILLE 4 1204 GENEVE

16,95

SAR GUS 9222

REPRESENTANT MO

REM

TR AV AI L

HELENE CRAUSTE SERVICE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE RUE DU STAND 25 1204 GENEVE

INGENIEUR CIVIL THOMAS JUNDT FONTENETTE 27 1227 CAROUGE

ARCHITECTE

PLA

PLA

DAT

DE

DO CU ME NT

1,4

BUREAU A RUE DE GRENUS 12 1201 GENEVE

09.0

3,8

ALFRED FORSTER AG KERZERSSTRASSE 21 3027 GOLATEN

N° DE PLAN

CCH_02.02-5103

CONCEPTRICE LUMIERE

SARA CASTAGNE GUSTAVE COURBET 26BIS 92220 BAGNEUX

N° DE PLAN AFFAIRE

CCH_02.02-5103 HALTE GARE CEVA-CHAMPEL AMENAGEMENTS PUBLICS

REMARQUES / NOTES

PROJET | plan abri OUEST

3

PLAN

DATE

Plateau de Champel Genève

PROJET

PHASE MO

DESSIN

09.02.2015

AFFAIRE Plateau de Champel

Genève HALTE GARE CEVA-CHAMPEL AMENAGEMENTS PUBLICS PHASE

PROJET VILLE DE GENEVE

ACV

16,95 16,95

PROJET | plan abri OUEST

MO

ECH

DEPT. DES CONSTRUCTIONS ET DE L'AMENAGEMENT RUE DE L'HOTEL DE VILLE 4 1204 GENEVE

REPRESENTANT MO

VILLE DE GENEVE DEPT. DES CONSTRUCTIONS ET DE L'AMENAGEMENT HELENE CRAUSTE RUE SERVICE DE L'HOTEL VILLE 4 DE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE 1204RUE GENEVE DU STAND 25 1204 GENEVE

DO CDUO MCEU NM TEDN ET DE TR T AVRA AI VA L IL

1,45

PLAN ABRI EST

0

REPRESENTANT MO INGENIEUR CIVIL

8,23

HELENE CRAUSTE SERVICE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE THOMAS JUNDT RUE FONTENETTE DU STAND 25 27 12041227 GENEVE CAROUGE

INGENIEUR CIVIL ARCHITECTE

1,4

THOMAS JUNDT FONTENETTE BUREAU A27 1227RUE CAROUGE DE GRENUS 12 1201 GENEVE

ARCHITECTE

3,8

BUREAU A RUE ALFRED DE GRENUS 12 FORSTER AG 1201KERZERSSTRASSE GENEVE 21 3027 GOLATEN

ECHELLE GRAPHIQUE

CONCEPTRICE LUMIERE

0

.1

ALFRED FORSTER AG KERZERSSTRASSE 21 SARA CASTAGNE 3027GUSTAVE GOLATENCOURBET 26BIS 92220 BAGNEUX

.5

CONCEPTRICE LUMIERE REMARQUES / NOTES SARA CASTAGNE GUSTAVE COURBET 26BIS 92220 BAGNEUX

3

PROJET | plan abri EST 1:50

AFFAIRE

Plateau de Champel Genève PHASE

PROJET

1,45

REMARQUES / NOTES PLAN PLAN ABRI EST

DATE PLAN

AVENUE DE CHAMPEL

DESSIN

09.02.2015 ACVEST PLAN COUVERTURE ABRIS

DATE

MO

VILLE DE GENEVE DEPT. DES CONSTRUCTI RUE DE L'HOTEL DE VILL 1204 GENEVE

REPRESENTANT MO

DESSIN

09.02.2015

HELENE CRAUSTE SERVICE DE L'AMENAGEM RUE DU STAND 25 1204 GENEVE

ACV

INGENIEUR CIVIL

surface de la couverture = 30 mq

THOMAS JUNDT FONTENETTE 27 1227 CAROUGE

N° DE PLAN

ARCHITECTE

CCH_02.02-5103

BUREAU A RUE DE GRENUS 12 1201 GENEVE

AFFAIRE

HALTE GARE CEVA-CHAMPEL AMENAGEMENTS PUBLICS

ECHELLE GRAPHIQUE

ALFRED FORSTER AG KERZERSSTRASSE 21 3027 GOLATEN

Plateau de Champel Genève 0

PHASE

.1

.5

CONCEPTRICE LUMIERE

ECHELLE GRAPHIQUE

3

PROJET 0

PROJET | plan abri EST 1:50

.1

.5

SARA CASTAGNE GUSTAVE COURBET 26BI 92220 BAGNEUX

MO

REMARQUES / NOTES

VILLE DE GENEVE DEPT. DES CONSTRUCTIONS ET DE L'AMENAGEMENT RUE DE L'HOTEL DE VILLE 4 1204 GENEVE

REPRESENTANT MO

8,23

HELENE CRAUSTE SERVICE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE RUE DU STAND 25 1204 GENEVE helene.crauste@ville-ge.ch

PLAN

TR AV AI L

16,95

N° DE PLAN

CCH_02.02-5

HALTE GARE AMENAGEME

DO CU M

PROJET | plan abri EST

INGENIEUR CIVIL THOMAS JUNDT FONTENETTE 27 1227 CAROUGE

ARCHITECTE

PLAN COUVERTURE AB DATE

DESSI

09.02.2015

ACV

DO CU ME NT

DE

BUREAU A RUE DE GRENUS 12 1201 GENEVE

ALFRED FORSTER AG KERZERSSTRASSE 21 3027 GOLATEN

info@forsterbaugruenag.ch

CONCEPTRICE LUMIERE

SARA CASTAGNE GUSTAVE COURBET 26BIS 92220 BAGNEUX

sara.castagne@luminocite.fr

REMARQUES / NOTES

PROJET | plan couverture OUEST

PLAN PLAN COUVERTURE ABRIS EST DATE

DESSIN

09.02.2015

ECHELLE

ACV

PROJET | plan couverture abri OUEST

ECHELLE GRAPHIQUE

0

.1

N° DE PLAN

CCH_02.0 AFFAIRE

PROJET | plan couverture EST

ECHELLE GRAPHIQUE

PROJET | plan couverture 1:50

0

.1

HALTE GA AMENAGE

NIVEAU DE REFERENCE + 0 m

Plateau de Champe Genève

.5

PHASE

PROJET MO N° DE PLAN

VILLE DE GENEVE DEPT. DES CONST RUE DE L'HOTEL D 1204 GENEVE

CCH_02.02-5105

REPRESENTANT M

AFFAIRE

HALTE GARE CEVA-CHAMPEL AMENAGEMENTS PUBLICS

HELENE CRAUSTE SERVICE DE L'AME RUE DU STAND 25 1204 GENEVE

Plateau de Champel Genève

INGENIEUR CIVIL THOMAS JUNDT FONTENETTE 27 1227 CAROUGE

PHASE

PROJET

ARCHITECTE

BUREAU A RUE DE GRENUS 1 1201 GENEVE

MO VILLE DE GENEVE DEPT. DES CONSTRUCTIONS ET DE L'AMENAGEMENT RUE DE L'HOTEL DE VILLE 4 1204 GENEVE

ALFRED FORSTER KERZERSSTRASSE 3027 GOLATEN

REPRESENTANT MO

TR AV AI L

HELENE CRAUSTE SERVICE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE RUE DU STAND 25 1204 GENEVE

THOMAS JUNDT FONTENETTE 27 1227 CAROUGE

ARCHITECTE

CONCEPTRICE LU

SARA CASTAGNE GUSTAVE COURBE 92220 BAGNEUX

REMARQUES / NO

DE

BUREAU A RUE DE GRENUS 12 1201 GENEVE

DO C

INGENIEUR CIVIL

DO CU ME NT

PLAN

FACADE ABRI OU

ALFRED FORSTER AG KERZERSSTRASSE 21 3027 GOLATEN

DATE

CONCEPTRICE LUMIERE

09.02.2015

SARA CASTAGNE GUSTAVE COURBET 26BIS 92220 BAGNEUX

REMARQUES / NOTES

PLAN FACADE ABRI EST DATE 09.02.2015

DESSIN

PROJET | façade abri OUEST

ACV

PROJET |façade abri OUEST

ECHELLE GRAPHI

PROJET | façade abri EST

0

PROJET | façade abri EST ECHELLE GRAPHIQUE

0

.1

.5

.1


N° DE PLAN

CCH_02.02-5109 AFFAIRE

HALTE GARE CEVA-CHAMPEL AMENAGEMENTS PUBLICS Plateau de Champel Genève PHASE

PROJET MO VILLE DE GENEVE DEPT. DES CONSTRUCTIONS ET DE L'AMENAGEMENT RUE DE L'HOTEL DE VILLE 4 1204 GENEVE

REPRESENTANT MO

TR AV AI L

HELENE CRAUSTE SERVICE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE +41 22 418 20 83 RUE DU STAND 25 1204 GENEVE helene.crauste@ville-ge.ch

INGENIEUR CIVIL

+41 22 309 06 10 info@a-jundt.ch www.jundt.com

THOMAS JUNDT FONTENETTE 27 1227 CAROUGE

ARCHITECTE

DO CU ME NT

DE

BUREAU A RUE DE GRENUS 12 1201 GENEVE

+41 22 731 61 75 info@a-bureau.com www.a-bureau.com

+41 31 755 67 07 info@forsterbaugruenag.ch

ALFRED FORSTER AG KERZERSSTRASSE 21 3027 GOLATEN

CONCEPTRICE LUMIERE

SARA CASTAGNE GUSTAVE COURBET 26BIS 92220 BAGNEUX

TEL +33 145 46 32 04 FAX +33 176 62 07 79 sara.castagne@luminocite.fr

REMARQUES / NOTES

PLAN AXONIMETRIE ABRI EST DATE

ECHELLE

DESSIN

09.02.2015

FORMAT

ACV

42.0X29.7CM

AV

EN

UE

DE

CH

AM

PE

L

ECHELLE GRAPHIQUE

0

.1

NIVEAU DE REFERENCE + 0 m

1m

.5

PROJET | axonometrie abri PROJET | axonomentrie abri ESTEST

N° DE PLAN

CCH_02.02-5109 AFFAIRE

HALTE GARE CEVA-CHAMPEL AMENAGEMENTS PUBLICS Plateau de Champel Genève PHASE

PROJET MO VILLE DE GENEVE DEPT. DES CONSTRUCTIONS ET DE L'AMENAGEMENT RUE DE L'HOTEL DE VILLE 4 1204 GENEVE

REPRESENTANT MO

TR AV AI L

HELENE CRAUSTE SERVICE DE L'AMENAGEMENT URBAIN ET DE LA MOBILITE +41 22 418 20 83 RUE DU STAND 25 1204 GENEVE helene.crauste@ville-ge.ch

INGENIEUR CIVIL THOMAS JUNDT FONTENETTE 27 1227 CAROUGE

+41 22 309 06 10 info@a-jundt.ch www.jundt.com

ARCHITECTE

DO CU ME NT

DE

BUREAU A RUE DE GRENUS 12 1201 GENEVE

ALFRED FORSTER AG KERZERSSTRASSE 21 3027 GOLATEN

+41 22 731 61 75 info@a-bureau.com www.a-bureau.com

+41 31 755 67 07 info@forsterbaugruenag.ch

CONCEPTRICE LUMIERE

SARA CASTAGNE GUSTAVE COURBET 26BIS 92220 BAGNEUX

TEL +33 145 46 32 04 FAX +33 176 62 07 79 sara.castagne@luminocite.fr

REMARQUES / NOTES

PLAN AXONIMETRIE ABRI EST DATE 09.02.2015

DESSIN

FORMAT

ECHELLE

ACV

42.0X29.7CM

EL

P

E

U

N

E AV

E

D

AM

H

C

ECHELLE GRAPHIQUE

0

PROJET | |axonomentrie abri OUEST PROJET axonometrie abri OUEST

.1

NIVEAU DE REFERENCE + 0 m

.5

1m


Honk Kong PASTA! proposal concept for a take-away pasta in Hong Kong (ongoing) Fanta Bureau, collaborazione con Francesca Pagliaro 2016

By a private request of Scriba office in Faenza, me and Arch. Francesca Pagliaro, developed a concept for a future franchaising of Italian pasta restaurants suitably for the Far East market. In a still hypotetical space we design all the forniture and layout to get a confortable mix between italian-oriental language. The desk is continuing in a table and covered by tail, the small table are in wood and modulated in a way that’s remind the rounded-section grid above the kitchen board. A large carved wooden panel on the wall shows the different shapes of pasta in all its best known forms: farfalle, spaghetti, macaroni etc .. A simple and domestic environment has to be the most important impact for a meal eaten in office hours, to guarantee the quality and the “italian taste comfort�, even in a short time.


AD.02


FANTA Bureau_ Francesca Pagliaro Caterina Spadoni Scala 1:50

Staff Area

Storage

M Toilet

1/ Countertop

2/ Table

W Toilet

Entrance

Plan

FANTA Bureau_ Francesca Pagliaro Caterina Spadoni Scala 1:50

Bancone

Struttura bancone

Prospetto

Piastrelle bianche e rosse

Pianta con bancone

Prospetto

Prospetto laterale

Pianta

Sezione

Prospetto laterale

Pianta

Materiali

Piastrelle bianche di rivestimento intervallate con piastrelle rosse

Legno chiaro per struttura (acero)


FANTA Bureau_ Francesca Pagliaro Caterina Spadoni Scala 1:50 Bancone + Tavolo Assonometrie

Legno chiaro Materiali Legno chiaro per struttura (acero o legno autoctono) Piastrelle bianche e rosse

Piastrelle bianche di rivestimento intervallate con piastrelle rosse

Pianta + prospetto

Legno chiaro

01

FANTA Bureau_ Francesca Pagliaro Caterina Spadoni Scala 1:50 Tavoli Materiali Legno chiaro per struttura (acero o legno autoctono) Piante + prospetti + asonometrie

Pannelli in legno “Forme di Pasta” per rivestimento parete (dimensioni 80 x 90 cm)

Legno chiaro

Legno chiaro

FARFALLE

SPAGHETTI

PENNE

BUCATINI

LINGUINE

CAPELLI D’ANGELO

Pannelli in legno componibili (80cmx90cmx2cm sp.) 1cm sp. pannello di supporto 1cm sp. pannello con decoro

03


CINEMA+ BARETTO

public stair and pavilion Cervia, RA project 2014

Is a small place where a square combines a stair and a pavilion. This will not only cinema or cafè but will be a catalysts of functions, or just big objects to spend some ‘time off. The scale is too large and the bar is too small, it does not matter because the square is right. the importance of what happens in the middle is equivalent to the possibility to take refuge in defined places.


AD.03 stair piazza view



bar internal view


WHERE THE CITY ENDS urbanized countryside in Partnico

extension cities and the dialectic between smaller towns and new infrastructure PRIN 2012 Prof. Annalisa Trentin


UD.01

design plan project reconnection between city and rural area with housing and green ribbon

individual housing units

linear park, green system

linear residences

school modular settlement


FORT TYRON PARK CENTER FOR RITUALS Manhattanism

STOREFRONT FOR ARCHITECTURE NYC 2016

the damages of an hearthquake are not only measurable in phisical and economical terms. The side effects are infact huge in life’s eople, effecting their habbits and securities. People life’s cahged suddenly, school, theatre and churches stoped to work. The reconstruction should stard from the analysis of the previous cinrcumstances made also of weackness. this features are those to work on. Is necessary to find the most close opportunity to grow economically and culturally.


UD.09


UNIVERSITY ISLAND Manhattanism

STOREFRONT FOR ARCHITECTURE NYC 2016

the damages of an hearthquake are not only measurable in phisical and economical terms. The side effects are infact huge in life’s eople, effecting their habbits and securities. People life’s cahged suddenly, school, theatre and churches stoped to work. The reconstruction should stard from the analysis of the previous cinrcumstances made also of weackness. this features are those to work on. Is necessary to find the most close opportunity to grow economically and culturally.


SW.03


SALFORD MEADOWS BRIDGE pedestrian bridge connection RIBA competition studio AUS Arch. Roberto Pasini 2013

The Meadows site in Salford covers an area of around 7 hectares and forms the northern anchor of the Irwell River Park project. With 3 new bridges already constructed at MediaCityUK, Spinningfields and Greengate along the 8km stretch of IRP, Salford City Council is now seeking to design a new landmark pedestrian bridge linking The Crescent (A6) with The Meadows. Adjacent to the University of Salford, this new bridge will further unlock the vast development potential of this major corridor linking Salford and Manchester, where game changing projects such as Salford Central and Greengate are already underway.


SW.06


plan concept schemes

cross section scale 1:20


daytime view river landscape

landscape park

night view


OBSERVATORY CENTRE international museum of astronomy Acatama Desert (CL) competition 2014

San Pedro de Atacama is located at an altitude of 2,400 m, and receives around 40,000 visitors a year, many of them attracted by the quality of its sky. IMOA will be a focal point for international tourism interested in astronomical observation, where visitors will be able to enhance their knowledge and share experiences in an area free of light contamination, offering a unique setting to observe the stars.


AD.10



02 // MUESEUM GALLERY VIEW


3 words limits reef comfortable

StairstoTower

chain of conseguences made by wish, fantasy or problem summer workshop at FAUP Porto Academy ‘14 UNULAUNU 2014

A project is an end of a chain of conseguences thats begins with a wish, a fantasy or problem. The course shaping the project is a continuous test of decision making abilities, supported by a complete overview of the operation and an idea. We will test our abilities following a process that will be unvelied progressively during the atelier, ending in a yet unknown shape.

s h a p e it!

the stair


reality 16*16 m

(neighbors) (neighbors) (neighbors)

all toghether

t o w e r

AD.11


WORKS** Nickl&Partner Bureau D-BSSE Laboratory and Research Building, ETH Zurich Basel, Switzerland


CPP Philip Plain Sofia


STUDY & ARCHITECTONICS MODELS lime wood steel laser cutted plexiglas cardboard cartonbois

0.1

0.2


0.3

0.1 Bahrain Pavilion, Expo 2015 Milan, competition. Baukuh (scale 1:100) 0.2 Waste transfer station, NYC. Thesis project, Università di Bologna Facoltà di architettura Aldo Rossi (scale 1:200) 0.3 Opération Les Vernets, Genève. Masterplan for residential complex, competition. Baukuh (scale 1:100)


MIGRANT GARDEN Bureau A Genéve



LANDSCAPE PHOTOGRAPHY


HAMPTONS



CASA DA MUSICA


work experience 1 Academic year Lecturer at Universiteti Polis, Tirana Architect at studio MetroPolis Competition . Park of Faith, Tirana Studio Pironi . Milano . may-november 2015 architect Philip Plain Sofia shop design, Philip Plain Milano Showroom Bureau-A, Genève . february-may 2015 architect CEVA-Champel Station, urban spaces design Nickl&Partner, Zurich . september 2014-january 2015 practicing in architecture studio D-BSSE Laboratory and Research Building, ETH Zurich Basel, Switzerland AC studio, Milan . june-august 2014 collaborator in architecture studio competition . Bussa Overpass, Milan . Wine Culture Centre Mondoitalia, Biennale di Venezia 2014 . april-june 2014 collaboration for installation Post - Frontier Arch. Giacomo Cantoni, Arch. Pietro Pagliaro BAUKUH, Milan . october 2013-april 2014 collaborator in architecture studio competition . Opération Les Vernets, Genève (1°-2°STEP) . Seminaar Hoogstraten, Antwerp (WON) . Bahrein pavillion, Expo Milano 2015 Gans Studio, New York . march-may 2012 internship in architecture studio working drawings, monitoring visits to the building site

education License to practice architect profession . september 2015 Graduate degree in Architecture . september 2007-december 2012 Facoltà di Architettura Aldo Rossi Alma Mater Studiorum, Bologna Laurea specialistica in Architettura e Ingeneria edile final thesis abroad program . march-may 2012 Jonathan Kirschenfeld Architect P.C.New York preparatory studies for thesis on NYC’s waste tranfer infrastructure Erasmus scolarship . september 2010-july 2011 Faculté d’architecture, d’ingénierie architecturale, d’urbanisme St. Luc, Bruxelles (UCL) Tecnologie per i beni culturali . septemper 2006-july 2007 Università di Ferrara other studies

languages Italian mother tongue English fluent French fluent


competition First prize POST QUAKE VISIONS . november 2013 YAC competition “Crevalcore city mall” urban reactivation 3rd placed Re-Thinking the future . october 2013 International Architectural Thesis Awards 2013 Category | Transport Terminal “Manhattan: progettare il margine”

Archiprix Italia award 2013 selected thesis project architecture section “Manhattan: progettare il margine”

workshop & courses Porto Academy ‘14 . july 2014 UnulaUnu Studio photography workshop (4days each) . july 2012 may 2013 Giovanni Chiaramonte photography workshop (4days) . july 2011 Robert Simon

publication Bologna: Dokumente und Lektionen . february 2012 zur Raumentwurfslehre Prof. Uwe Schröder Wasmuth Ernst Verlag Publisher Architettura 43. Abitare . February 2011 “leisure spaces” project publication and exhibition Prof. Elena Mucelli CLUEB - Cooperativa Libraia Universitaria Editrice Bologna

technical skills graphic photoshop, illustrator, indesign, premier drawing & autocad 2,3D, vectorworks, rhino (V-Ray), modeling archicad, sketchup representation sketching, drafting, study models, wood and plaster models, landacape photography

CURRICULUM VITAE . 14

PRIN competition . january-march 2013 composizione architettonica e urbana “where the city ends” academic research



via Tertulliano 70 20137 Milan, Italy tel: +39 0284542716 e-mail: posta@baukuh.it

Milan, 08 April 2014

Caterina Spadoni collaborated as intern architect in our office over six months, where she took part in three competitions: “Operations Les Vernets”, a masterplan for 1200 housing units in Genève, “Seminaar Hoogstraten”, an open call competition for the redevelopment of internal and external spaces of a former seminary, now primary and secondary school in Antwerp and Barhain’s pavilion competiton at Milan Expo 2015. In “Operations Le Vernets” she took part into the two competition’s steps, where she helped to develop the project firstly with 3d study models and then desining plans, sections and physical models. For the Hoogstraten competition her contribution included drawing plants as well as make the model and produce diagrams and other presentation material for the final booklet. In Barhain’s pavilion competiton she worked on the assembling of the representation model for photos, editing pictures and work over the final presentation booklet. In the meantime she also drew some working drawings for a pavilion under construction in La Spezia. During this time, Caterina has shown great interest and strong sense of responsibility at work, trying, with participation and critical thinking, to understand and learn from each daily experience in studio. She has closely followed the development process of each competition: from the site’s first analysis and the knowledge of its problems, to the project design, up to the graphic representation and explanatory methods to provide the selected solutions. Within the competition’s tight schedules she has worked with the team by providing her technical and professional skills. In these recent months I have had the chance to see Caterina in a passion and knowledge of contemporary and past architecture, of whom she speaks with critical remarks, looking for establish a constructive dialogue with other architects in the office. For all these reasons mentioned above and for the good relationship of trust grown during this period, I can finally recommend Caterina for each type of offices in which she wants to increase her work experience.

Pier Paolo Tamburelli



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.