1 minute read
Expansion of learning spaces
1 year project duration
The Salesian Sisters established a primary school in Dili in 1998. It was the first Catholic primary school founded in the area.
Known locally as Eskola Primaria Katolika Maria Auxiliadora, the Maria Auxiliadora Catholic Primary School has over 1,000 students, the majority of whom come from vulnerable backgrounds. This project seeks to renovate and add to the school’s current facilities.
The school gymnasium is used as a gathering place for assembly, however, it can no longer accommodate all the students since a recent influx of enrollments. Renovation of this building will also provide a more spacious venue for the students to play and do their free time activities particularly during rainy season. The school library is also in need of an overhaul so the facilities are conducive to student learning and provide storage for resources. The teachers at the school also require space suited to preparing lessons, discussing schoolwork, and rest.
Project location:
Partner profile
Project Code: TLCT-1200084
Funding needed: AUD $270,866
Sr Alma Castagna studied medicine, working in Italy before deciding to become a Salesian Sister of Don Bosco in Timor Leste 30 years ago. As a qualified doctor, Sr Alma was part of the team whom set up the health clinic, creating a space for people to have illnesses treated, feel at home, and be listened to. She is now the Provincial for the Salesian Sisters in TimorLeste and Indonesia. Her hope is to walk with her community, supporting them to build a better future.
Your support can help:
• Construct a multipurpose hall to be used for assembly and student activities
• Renovate the school library to accommodate more students and resources
• Create a gymnasium space for students to safely do physical activities
• Create a relaxing space for teachers and staff to take time to plan lessons and discuss schoolwork
• Add to the holistic learning provided to students by the school.
How your gift can make a difference Cost (AUD)
5% of building and renovations required $13,543.00
10% of building and renovations required $27,087.00
25% of building and renovations required $67,716.00
50% of building and renovations required $135,433.00
75% of building and renovations required $203,149.00