1 minute read
Project activities
Key project activities include:
• Supporting schooling and medical needs; enabling the continuation of daily activities, such as sport, dance and tutoring; and contributing to the running costs of the Arrupe Centre, such as food, water, electricty and other essentials.
• Investing in a van for transporting children and hiring out to other social enterprises in the Prefecture, thereby generating income;
• Carrying out infrastructure refurbishments, including rewiring the electricals at the original Arrupe Centre building, to ensure safety of residents and longevity of the facilities;
• Investing in a building to expand social enterprise activities in a sustainable and realistic way. This could include using the building as a shopfront to sell handicrafts and food items produced by people working in the La Paloma Textile Centre or on the farm at Outangia.
Project Cost
The total cost of the project is $906,073.69 over three years. Some examples of project costs include: ii Costs are in AUD unless otherwise stated, and are rounded to the nearest dollar. iii These are examples of costs relating to this project. Donations cannot be allocated to specific items, only to a project.