Objects, Eccentricities and Geometric Conspiracies

Page 1














The project is situated on a sloped site in San Francisco, a gridded urban context which has a section difference to assure a multilevel circulation system that drives the slippage from plan to section. In this type of site the building can be approached from several perspectives. The program is a school, that includes elementary, middle, and high; a building that could be read in time, in a course of 12 years. In this sense, it is perceived differently according to age, time spent in the building and whether the subject is a student or a visitor.

B

A

A’

N

N

CROSS SECTION B-B’ 1/16" = 1'-0"

Cross Section B-B’

N

N CROSS SECTION A-A’

1/16" = 1'-0" Long Section A-A’

12

B’

































































The foundation of the building was composed by a reinforced concrete perimeter wall on strip footings and isolated footings connected by straps as the basis of the new foundation. The sanitary drenage system consisted of an internal plumbimg which carried the sewage water to a public sewer and an external system which channeled rainwater to the public roadway.

3,08

200x200x15 O Ø50

13

1,00

5 0.6

-3.50 2,69

5

0.3

k

3,81

200x200x15

1,00

-3.50

7

Ø50 H Ø100

1,00

0.6 5

V-R

m

Ø100

Ø100

3,91

l

200x200x15 0,30

o

4 -3.50

14

8

1,00

5 0.6

200x200x15 -3.50

200x200x15 -3.50

V-R

1,37

200x200x15 L Ø50

5

w

Ø150

-3.50

1

Ø150

V-R

0 0,5 5 0,2

-4.38

Ø100

Ø150

0 1,0

1,81

a

0.3

15

200x200x15 9

200x200x15

0,30

b

V-R

4,54

Ø150

Elevator pit

200x200x15

1,82

5

0.6

16

1,00

200x200x15

1,00

u 5

200x200x20

200x200x15 V-R

s

Ø150

Ø150

Ø100 0,30

-3.50

2 0,6

11

-3.50

r

f

2

17

-3.50

V-R

200x200x15

v

V-R

200x200x15

Connection slab/stairs

10

0,30

4,35

Ø50

Ø150

p

-3.50

1,35

Ø150

0,30

Ø150

Ø100

Ø150

0.35 6,15

q

0.65 1,00

V-R

200x200x15

V-R j

-3.50 M Ø50

Ø50

g

6

-3.50

1,00

200x200x15 0.65

3

Ø50 Ø100

e

Ø50

d

h

F Ø100

-3.50

1,00

12

0.65

0.65

FOUNDATION WALL

i

200x200x15

4,37

Masonry base

N Ø50

200x200x15

1,00

2,64

c

1,00

0,30

Ø100

Ø50 -3.50

Ø150

18

4,34

2,97

2 Ø 20 continuous bars in culmination

0.45

Horizontal reinforcement in wall exterior surface 16 Ø 16 / 19 cm

0.60 0.08

0.035

Ground

ELEVATOR PIT

Vertical reinforcement in wall interior surface 2 Ø 12 / 100 cm Horizontal reinforcement in wall interior surface 16 Ø 16 / 19 cm

Vertical reinforcement in wall exterior surface 5 Ø 12 / 25 cm

Steel columns. 2 UPN 120 Sealed joint

-2.70

0.30

0.15

0.25

-2.70

2Ø12 4 Ø12 1Ø8A20

2Ø12

0.30

0.15

0.50

0.70

Slab

0.15

Welded wire fabric reinforcement Ø 12 / 20 cm

1.75 Steel base plate 200 x 200 x 15

0.25

Elevator pit

Stable, uniformly dense soil base

1Ø8A20 1.03

0.48

Welded wire fabric reinforcement 1 Ø 6 60 cm long (each 20 cm) To avoid differential movement in the soil bed. Slab

0.15

Wedge each 50 cm

1Ø8A20

1Ø8A20

1Ø8A20 1Ø8A20

0.25

0.10

Blinding concrete HM-100 Ground

76

Two-way reinforcement uniformly spaced (Ø 12 / 28 cm)

Support wedges > 5 cm

-4.03 15cm.

Blinding concrete

0.20

#Ø8A20

Stiffeners plates

Steel base plate

0.25

#Ø8A20 0.064

0.30

0.25

Concrete joints

0.10

0.40

Crushed stone

0.20

Support wedges > 5 cm


Detail A

Detail A

Nut and check nut to level high and slope

STEEL COLUMN FOOTING.STEEL SECTION COLUMN FOOTING. SECTION

Nut and check nut to level high and slope

Nonshrinking grout Steel column ( 2UPN in square) Steel base plate (20 mm)

Steel base plate (20 mm)

Steel column ( 2UPN in square) Anchor bolt B-500 S

Stiffeners plates

Anchor bolt B-500 S

Stiffeners plates

Detail A Nonshrinking grout

Nonshrinking grout

Nonshrinking grout

Detail A -3.00

Anchor bolts B-500 S (4 Ø 12)

Anchor bolts B-500 S (4 Ø 12)

17

0.20

0.20

0.20

0.20

Support wedges > 5 HM-125 cm Blinding concrete

Blinding concrete HM-125 Two-way reinforcement uniformly spaced Ground

Two-way reinforcement uniformly spaced

0.06

0.40 0.10

0.06

0.40 0.10

4,54

-3.00

Support wedges > 5 cm

Ground

COMBINED FOOTING OF STEEL COLUMN AND STEEL STAIR. SECTION. COMBINED FOOTING OF STEEL COLUMN AND STEEL STAIR. SECTION. 0.35 6,15

7 0,0 6

7 0,0 6

0,1

0,27

0,17

0,17 0,62 Steel base plate (10 mm)

Steel base plate (10 mm)

0,62

Stiffener plates

-4.55

12

0.10

Anchor bolts B-500 S (4Ø 12)

14

0,50

Anchor bolts B-500 S (4Ø 12)

13

-4.55

0.05 (4Ø)

18

Steel beam support (HEB-120)

Nonshrinking grout

0,50

200x200x15

Nonshrinking grout

Stiffener plates Steel beam support (HEB-120)

0.05 (4Ø)

N Ø50

0.10

-3.50

2

2

0,1

0,27

Steel column ( 2UPN-120 in square) Steel column ( 2UPN-120 in square)

0,0

0,0

1,00

Two-way reinforcement 1.00 1.00 uniformly spaced

1.00

1.00

Blinding concrete HM-125 Ground

PN 120

1.00

1.00

1.00

1.00

Blinding concrete HM-125 Support wedges > 5 cm Ground

11

Two-way reinforcement uniformly spaced

Support wedges > 5 cm

09

0.25

08

0.15

2Ø12 Stiffeners plates ( 12 mm)

Steel base plate (20 mm)

Steel base plate (20 mm)

.

15cm.

ng concrete

Blinding concrete

0.20

Support wedges > 5 cm

Welded steam

Welded steam

05

Stiffeners plates 12 mm

04

1Ø8A20 Stiffeners plates 12 mm

h > 150 mm

h > 150 mm

50 mm

50 mm Anchor bolts 4 Ø 12 30 mm B-500 SAnchor bolts 4 Ø 12 30 mm B-500 S

Overflow tank Ø 80 mm

Overflow tank Ø 80 mm

03

-4.03

Welded steam

Welded steam

1Ø8A20

Stiffeners plates ( 12 mm)

Steel column

06

Steel column

07

Ø8A20

02

0.15

-2.70

01

200 x 15

> 5 cm

10

T