GENERAL NOTES
Lakeland College BioTech Research Facility
DRAWING INDEX
1. COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, LAWS, SAFETY ORDERS, AND DERICTIVES OF THE STATE, COUNTY, AND CITY
GENERAL G 0.00 G 0.01
COVER SHEET CODE ANALYSIS
2. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR PROCURING ALL PERMITS, PAYMENT FEES, CERTIFICATES OF INSPECTION AND APPROVAL, UNLESS NOTED OTHERWISE BY CONTRACT.
CIVIL C 1.00
SITE PLAN
3. THE SUBMISSION OF A BID BY CONTRACTOR SHALL INDICATE THEY HAVE BECOME FAMILIAR WITH THE CONSTRUCTION DOCUMENTS.
STRUCTURAL S 1.01 S 1.02/3 S 1.04/5
FOUNDATION PLAN 2ND AND 3RD FRAMING PLAN 4TH AND ROOF FRAMING PLAN
ARCHITECTURAL A 1.01/2 A 1.03/4 A 1.05 A 1.06 A 2.00 A 3.00 A 3.01 A 4.00 A 5.00
1ST AND 2ND FLOOR PLAN 3RD AND 4TH FLOOR PLAN ROOF PLAN PENTHOUSE PLAN BUILDING SECTIONS COST ANALYSIS ELEVATIONS WALL SECTIONS STAIR SECTION/PLAN
4. PRIOR TO BIDDING EACH CONTRACTOR SHALL VISIT THE SITE, AND VERIFY ALL CONDITIONS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT PRIOR TO THE BID OPENING. 5. IN THE CASE OF DISCREPANCIES OR INCONSISTENCIES IN THE PROJECT MANUAL AND DRAWINGS THE ARCHITECT SHALL BE NOTIFIED. 6. THE BUILDING STRUCTURE AND ALL WORK SHALL BE PROTECTED FROM THE WEATHER, CONSTRUCTION HAZARDS, FIRE, UNNECESSARY INTRUSIONS, DUST, DIRT, OR DEBRIS.
Lakeland College
Consultant Address Address Phone Fax e-mail
7. CONTRACTORS SHALL PROVIDE, INSTALL AND MAINTAIN FOR THE DURATION OF CONSTRUCTION, ALL REQUIRED SCAFFOLDING, TARPAULINS, WARNING SIGNS, FENCES, AND OTHER TEMPORARY CONSTRUCTION ITEMS FOR THE SAFE COMPLETION OF THE WORK. CONTRACTORS SHALL COMPLY WITH ALL LOCAL COUNTY, STATE, OSHA AND EPA APPLICABLE REGULATIONS.
ABBREVIATIONS
8. THE CONTRACTOR SHALL DETERMINE CONSTRUCTION METHODS AND SEQUENCES, AND ENSURE SAFETY OF THE STRUCTURE AND ITS COMPONENTS- DURING CONSTRUCTION. 9. EACH CONTRACTOR TO REVIEW THE PROJECT MANUAL AND DRAWINGS FOR THEIR SCOPE OF WORK AND COORDINATE SEQUENCE OF THEIR WORK WITH OTHER CONTRACTORS.
AB ABV BOF BLK BM CEM CJ CL COL CONC CTR DIAM DN DR DS DWG E EL EJ ELEV
LAKE HIGH WATER ELEV. 253.00 N3 0 'W 0^
254
OUTDOOR AMPITHEATHER
Consultant Address Address Phone Fax e-mail
ANCHOR BOLT ABOVE BOTTOM OF FOOTING BLOCK BEAM CEMENT CONTROL JOINT CENTERLINE COLUMN CONCRETE CENTER DIAMETER DOWN DOOR DOWNSPOUT DRAWING EAST ELEVATION EXPANSION JOINT ELEVATOR
N. 90^0"W 50.00'
FA FD FDN FE FIN FLASH FTG GB GWB HGT LAB LAV MAX MECH MET N OC RD REINF S SECT SF W
FIRE ALARM FLOOR DRAIN FOUNDATION FIRE EXTINGUISHER FINISH FLASHING FOOTING GRAB BAR GYPSUM HEIGHT LABORATORY LAVATORY MAXIMUM MECHANICAL METAL NORTH ON CENTER ROOF DRAIN REINFORCED SOUTH SECTION SQUARE FOOT WEST
Consultant Address Address Phone Fax e-mail
No.
Description
Date
HYDRANT
TRANSFORMER
255
256
USE GROUP: BUSINESS GROUP B 260
EARTH
CONCRETE
BioTech Research Facility
WOOD 261 24' - 0" 5' SIDEWALK
NORTH S. 90^0'E 250.00'
HYDRANT
STEEL
< MAIN STREET 60' R.O.W. 5
20 10
Project number
BATT INSULATION 40
COVER SHEET Date Drawn by Checked by
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
G 0.00 Scale
As indicated
12/14/2015 1:50:04 AM
30' - 0"
SITE CONDITIONS: WILL REQUIRE CAISSON FOUNDATION DUE TO SOIL CONDITIONS NEAR WATER
HC HC
PICK UP AND DROP OFF
259
TYPE OF CONSTRUCTION: TYPE IIIB
HC VAN
SIAMESE CONNECTION 258
< LAKE ROAD 60' R.O.W.
62' - 10 17/32" N 0^0'E 220.00'
S 90^0' E250.00 N 0^0' E220.00'
MATERIALS
257
108' - 8 5/32"
BUILDING INFORMATION:
1
2
3
4
5
93' - 0" 16' - 3 5/8"
16' - 0"
21' - 8 3/8"
28' - 0"
7 A 4.00
17' - 10 1/2"
27' - 0"
MINIMUM STAIR WIDTH: FIRST FLOOR = 11.25FT SECOND FLOOR = 1.275FT THIRD AND FOURTH FLOOR = 1.5FT (SECTION 1005.1) WIDTHS ON SECOND, THIRD AND FOURTH FLOOR DO NOT MEET THE MINIMUM WIDTH OF 44", SO INCREASE TO 44" (SECTION 1009)
2 16' - 5"
A 2.00
16' - 6 1/2"
9' - 1 1/2"
17' - 0 1/2"
C DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
23
18
19
20
COPIER
MINIMUM CORRIDOR WIDTH: DN
FIRST FLOOR = 7.5FT SECOND FLOOR = 0.85FT THIRD AND FOURTH FLOOR = 1FT (SECTION 1005.1) WIDTHS ON SECOND, THIRD, AND FOURTH FLOORS DO NOT MEET THE MINIMUM WIDTH OF 44", SO INCREASE TO 44" (SECTIO 1018.2)
UP
HVAC
B
15' - 5"
24
DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
32
33
34
66
6 A 4.00
1
A 2.00
A 2.00
Lakeland College
MIX USE: EACH PORTION OF A BUILDING SHALL BE INDIVIDUALLY CLASSIFIED WITH SECTION 302.1 (SECTION 508.1)
TESTING ROOM
1
15' - 5"
68' - 10 1/4"
41' - 1 7/16"
22
AREA OF REFUGE: YES, BUILDING EQUIPPED WITH THROUGHOUT WITH AN APPROVED AUTOMATIC SPRINKLER SYSTEM (SECTION 1029.1, EXCEPTION 1)
Consultant Address Address Phone Fax e-mail
STANDPIPES: YES, HOSE CONNECTIONS IN EVERY REQUIRED STAIRWAY FOR EACH FLOOR, EACH SIDE OF THE WALL ADJACENT TO THE EXIT OPENING OF A HORIZONTAL EXIT, EVERY EXIT PASSAGEWAY (SECTION 905.3.1 AND 905.4)
TESTING ROOM 25
TESTING ROOM
DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
68
36
35
67
Consultant Address Address Phone Fax e-mail
ADDITIONAL STORIES ALLOWED: YES, 1 ADDITIONAL FLOOR IF WHOLE BUILDING IS EQUIPPED WITH A SPRINKLER SYSTEM (SECTION 504.2)
STORAGE
22' - 5 1/2"
Consultant Address Address Phone Fax e-mail
117'
LIBRARY 26
DN
ELEC.
J.C.
OFFICE FOR LIBRARY
28
29
30
1
2
3
16' - 3 5/8"
2
THIRD FLOOR PLAN SCALE: 1/8" = 1'-0"
C
16' - 1 3/16"
27' - 0"
50' - 10"
9' - 1 1/2"
41' - 1 7/16"
3 6 A 4.00 5' - 7 27/32" 1
1
A 2.00
68' - 10 1/4"
TYPE OF CONSTRUCTION: TYPE IIIB WITH SPRINKLER SYSTEM FOR FOR ADDITIONAL FLOOR (SECTION 504.2)
A 2.00
EXPERIMENTAL LECTURE/PRESENTATION HALL
NUMBER OF EXITS PER FLOOR: 2 EXITS (TABLE 1021.1)
1
B
BioTech Research Facility
13' - 5 1/2"
COAT ROOM 7
STORAGE
ELECTRIC
6
5
LOBBY 12
9' - 8 1/2"
FLOOR, ROOF, CORRIDOR WALL, INTERIOR BEARING WALL = 0HR (TABLE 601) COLUMNS = 0HR (TABLE 601, SECTION 202) EXTERIOR BEARING WALLS = 2HR (TABLE 601) STAIRS AND ELEVATORS "SHAFT ENCLOSURES" = 2HR (SECTION 708.4)
MINIMUM EXIT SEPARATION:W ITH SPRINKLERS (SECTION 1015.2.1, EXCEPTION 2) FIRST AND SECOND FLOOR = (1/3) X 101 = 34FT. THIRD AND FOURTH FLOOR = (1/3) X 112 = 38FT.
8' - 10"
JANITOR'S CLOSET
ALLOWABLE AREA: 6,000SF PER FLOOR (GIVEN)
RATINGS:
8' - 2 1/2"
UP
OCCUPANT LOAD PER FLOOR: FIRST FLOOR = 450 (GIVEN) SECOND FLOOR = 51 THIRD FLOOR = 60 FOURTH FLOOR = 60
FIRST FLOOR = 2 RESTROOMS EACH WITH 4 TOILETS SECOND FLOOR = 0 RESTROOMS THIRD AND FOURTH FLOOR = 2 RESTROOMS EACH WITH 2 TOILETS (TABLE 2902.1)
Date
A 2.00
MAIN USE BROUP B (SECTION 304.1) FIRST FLOOR GROUP A (SECTION 303.1)
TOILETS PER FLOOR:
Description
2
45' - 10"
USE GROUP:
28' - 0"
7 A 4.00
A 2.00
5 No.
21' - 8 3/8"
UP
A
4 93' - 0"
27' - 8 13/16"
27' - 8 13/16"
78
105' CODE ANALYSIS Project number
UP
Date Drawn by Checked by
A 2 A 2.00
FIRST FLOOR PLAN SCALE: 1/8" = 1'-0"
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
G 0.01 Scale
1/8" = 1'-0"
12/14/2015 1:50:22 AM
15' - 8 1/2"
TESTING ROOM
LAKE HIGH WATER ELEV. 253.00
N3 0 'W 0^
N. 90^0"W 50.00'
Lakeland College 254 OUTDOOR AMPITHEATHER
HYDRANT
TRANSFORMER
255
Consultant Address Address Phone Fax e-mail
256 Consultant Address Address Phone Fax e-mail
257 62' - 10 17/32"
258 PICK UP AND DROP OFF
108' - 8 5/32"
259
HC
HC
No.
Description
Date
< LAKE ROAD 60' R.O.W.
HC VAN
SIAMESE CONNECTION
N 0^0'E 220.00'
Consultant Address Address Phone Fax e-mail
260
261
24' - 0" 30' - 0"
5' SIDEWALK NORTH
S. 90^0'E 250.00'
HYDRANT
< MAIN STREET 60' R.O.W.
BioTech Research Facility
5
Project number Date
20
Drawn by Checked by
10
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
40
C 1.00 Scale
1" = 20'-0"
12/14/2015 1:48:44 AM
SITE PLAN SITE PLAN SCALE: 1" = 20'-0"
Lakeland College 2
3
4
5
76' - 8 3/8" 21' - 8 3/8"
28' - 0"
27' - 0" Consultant Address Address Phone Fax e-mail
2 A 2.00
C
7 A 4.00
Consultant Address Address Phone Fax e-mail
41' - 1 7/16"
Consultant Address Address Phone Fax e-mail
00 00 00 TERRA COTTA
No. 07 20 00 BATT INSULATION
Description
Date
6 A 4.00
05 20 00 METAL CLIP 68' - 10 1/4"
09 70 00 FINISH VENEER 07 20 00 RIGID INSULATION
2 A 2.00
03 30 00 4" REINFORCED CONCRETE SLAB
2 A 2.00
B
31 00 00 COMPACT EARTH
07 90 00 EXPANSION JOINT
1 S 1.01
27' - 8 13/16"
06 00 00 WOOD BLOCK 31 00 00 FINISH GRADE
A
04 20 00 CMU BLOCK
03 30 00 REINF. CONC. GRADE BEAM 2 A 2.00
FOUNDATION PLAN SCALE: 1/8" = 1'-0"
BioTech Research Facility
5
FOUNDATION PLAN
20
Project number
10
Date Drawn by Checked by
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
S 1.01 Scale
As indicated
12/14/2015 1:50:53 AM
DETAIL 1 - FOUNDATION SCALE: 1" = 1'-0"
1
2
3
4
5
93' - 0 3/8" 16' - 4"
21' - 8 3/8"
28' - 0"
7 A 4.00 W14 (B)
W18 (B)
W16 (B)
10' - 0"
C
W10 (B)
27' - 0"
2 A 2.00
Lakeland College
W34 (G)
41' - 1 7/16"
DN
68' - 9 1/16"
6 A 4.00
2 A 2.00
B
2 A 2.00
Consultant Address Address Phone Fax e-mail
Consultant Address Address Phone Fax e-mail
W22 (G)
1
DN
2
3
4
5
93' - 0 3/8" 16' - 4"
21' - 8 3/8"
No. 28' - 0"
Description
Date
27' - 0"
A
UP 7 A 4.00 2 A 2.00
THIRD FLOOR SCALE: 1/8" = 1'-0"
2 A 2.00
W14 (B)
W18 (B)
W16 (B)
C
W10 (B)
W34 (G)
6 A 4.00
68' - 9 1/16"
OVERHANG
41' - 1 7/16"
DN
2 A 2.00
B
2 A 2.00
W22 (G)
27' - 7 5/8"
10' - 0"
BioTech Research Facility
FRAMING PLANS DN
Project number Date
20
Drawn by
UP
A
5
Checked by
10
SECOND FLOOR SCALE: 1/8" = 1'-0"
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
S 1.02/3
2 A 2.00 Scale
As indicated
12/14/2015 1:51:06 AM
27' - 7 5/8"
Consultant Address Address Phone Fax e-mail
1
2
3
4
5
93' - 0 3/8" 16' - 4"
21' - 8 3/8"
28' - 0"
7 A 4.00 W14 (B)
W18 (B)
W16 (B)
10' - 0"
C
W10 (B)
27' - 0"
2 A 2.00
Lakeland College
W34 (G)
41' - 1 7/16"
DN
68' - 9 1/16"
6 A 4.00
2 A 2.00
B
2 A 2.00
Consultant Address Address Phone Fax e-mail
Consultant Address Address Phone Fax e-mail
W22 (G)
27' - 7 5/8"
Consultant Address Address Phone Fax e-mail
1
DN
2
3
4
5
No.
Description
Date
93' - 0 3/8" 16' - 4"
A
UP
7 A 4.00 W10 (B)
28' - 0"
27' - 0"
2 A 2.00
W14 (B)
W18 (B)
W16 (B)
10' - 0"
C
2 A 2.00
ROOF SCALE: 1/8" = 1'-0"
21' - 8 3/8"
W34 (G)
41' - 1 7/16"
DN
68' - 9 1/16"
6 A 4.00
2 A 2.00
B
2 A 2.00
W22 (G)
FRAMING PLANS Project number DN Date Drawn by
20
10
Checked by
UP
A
5
FOURTH FLOOR SCALE: 1/8" = 1'-0"
2 A 2.00
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
S 1.04/5 Scale
As indicated
12/14/2015 1:51:26 AM
27' - 7 5/8"
BioTech Research Facility
1
2
3
4
5
93' - 0" 16' - 3 5/8"
21' - 8 3/8"
28' - 0"
27' - 0"
2
7 A 4.00
A 2.00
C 16' - 1 3/16"
50' - 10"
9' - 1 1/2"
DN
6' - 10 23/32"
10' - 1 25/32"
UP
HVAC 41' - 1 7/16"
13
Lakeland College
45' - 10"
OTB 6 A 4.00
WATER ROOM
68' - 10 1/4"
15 1
1
A 2.00
A 2.00
Consultant Address Address Phone Fax e-mail
B
13' - 5 1/2"
Consultant Address Address Phone Fax e-mail
1
OTB
2
3
4
9' - 8 1/2"
DN
5
93' - 0"
ELEC. 16' - 3 5/8"
17
No.
21' - 8 3/8"
28' - 0"
Description
Date
27' - 0"
UP
A
7 A 4.00
2 A 2.00
2
SECOND FLOOR SCALE: 1/8" = 1'-0"
C
A 2.00
16' - 1 3/16"
50' - 10"
9' - 1 1/2"
8' - 2 1/2"
8' - 10"
UP
41' - 1 7/16"
JANITOR'S CLOSET 45' - 10"
3 6 A 4.00 5' - 7 27/32" 1
1
68' - 10 1/4"
A 2.00
A 2.00
EXPERIMENTAL LECTURE/PRESENTATION HALL 1
B
BioTech Research Facility
ELECTRIC
6
5
15
LOBBY 12
FLOOR PLANS Project number
UP
Date Drawn by
10
20
A
Checked by
FIRST FLOOR SCALE: 1/8" = 1'-0"
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
A 1.01/2
2 A 2.00 Scale
As indicated
12/14/2015 1:40:59 AM
5
7
STORAGE
9' - 8 1/2"
27' - 8 13/16"
COAT ROOM 13' - 5 1/2"
27' - 8 13/16"
Consultant Address Address Phone Fax e-mail
1
2
3
4
5
93' - 0" 16' - 3 5/8"
21' - 8 3/8"
28' - 0"
7 A 4.00
27' - 0"
2 A 2.00
C
19' - 8 15/16"
15' - 8 1/2"
11' - 11"
11' - 3"
11' - 3 5/8"
11' - 4"
5' - 3 7/8"
OFFICE
OFFICE
OFFICE
OFFICE
75
40
69
70
9' - 1 1/2"
17' - 0 1/2"
MAIL DN
DIRECTOR
UP
54
HVAC OFFICE
OFFICE
44
45
46
47
Lakeland College 6 A 4.00
55
1
1
A 2.00
A 2.00
DIRECTOR
OFFICE
OFFICE
53
52
73
74
10' - 8 7/32"
DIRECTOR
56
OFFICE
OFFICE
OFFICE
57
76
Consultant Address Address Phone Fax e-mail
B
Consultant Address Address Phone Fax e-mail
STORAGE 77
Consultant Address Address Phone Fax e-mail
CONFERENCE
1
58
2
3
4
5
93' - 0" DN
ELEC.
J.C.
OFFICE
60
61
62
16' - 3 5/8"
21' - 8 3/8"
UP
A
16' - 0"
28' - 0"
7 A 4.00
17' - 10 1/2"
27' - 0"
No.
Description
Date
2 16' - 5"
A 2.00
16' - 6 1/2"
9' - 1 1/2"
17' - 0 1/2"
C
FOURTH FLOOR SCALE: 1/8" = 1'-0"
15' - 8 1/2"
2 A 2.00
TESTING ROOM
DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
23
18
19
20
COPIER
DN
UP
HVAC
B
15' - 5"
TESTING ROOM 24
DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
32
33
34
66
6 A 4.00
1
1
A 2.00
A 2.00
15' - 5"
68' - 10 1/4"
41' - 1 7/16"
22
TESTING ROOM 25
TESTING ROOM
DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
68
36
35
67
BioTech Research Facility
STORAGE
27' - 8 13/16"
78
22' - 5 1/2"
17' - 2 13/32"
27' - 8 13/16"
RECEPTION
LIBRARY 26
DN
5
ELEC.
J.C.
OFFICE FOR LIBRARY
28
29
30
15
10
20
Project number Date Drawn by
UP
A
FLOOR PLANS
Checked by 2
THIRD FLOOR SCALE: 1/8" = 1'-0"
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
A 1.03/4
A 2.00
Scale
As indicated
12/14/2015 1:42:07 AM
10' - 8 7/32"
OFFICE
OFFICE
10' - 8 7/32"
68' - 10 1/4"
41' - 1 7/16"
64
OFFICE
Lakeland College 1
2
3
4
5
93' - 0"
2 7 A 4.00
Consultant Address Address Phone Fax e-mail
A 2.00
C
Consultant Address Address Phone Fax e-mail
Consultant Address Address Phone Fax e-mail
05 00 00 SLOPED METAL COPING 06 00 00 WOOD PARAPET CAP 07 60 00 PARAPET FLASHING
6 A 4.00
No.
Description
Date
07 20 00 BATT INSULATION
68' - 10 1/4"
1 07 60 00 HARD BOARD
07 60 00 BASE FLASHING
1
A 2.00
A 2.00 5" DIAM. RD
5" DIAM. RD
07 20 00 RIGID INSULATION 07 10 00 WATERPROOF MEMBRANE
B
05 30 00 ROOF DECKING
SCUPPER
SCUPPER
A 2 A 2.00
ROOF PLAN SCALE: 1/8" = 1'-0"
BioTech Research Facility
ROOF PLAN 5
20
Project number Date
10
Drawn by Checked by
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
A 1.05 Scale
As indicated
12/14/2015 1:42:45 AM
DETAIL 2 - ROOF PARAPET SCALE: 3/4" = 1'-0"
2 A 2.00
4
3
1
11' - 0"
5
14' - 10"
Roof 56' - 6"
6 A 4.00
RESTROOMS
OFFICE
OFFICE
DIRECTOR
DIRECTOR
OFFICE
Lakeland College
DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
TESTING ROOM Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail
WATER ROOM
Level 2 13' - 0" 13' - 0"
LECTURE HALL
Consultant Address Address Phone Fax e-mail
RESTROOMS
Level 1 0' - 0"
1
No.
A 2.00
14' - 10"
Roof 56' - 6"
C
JANITOR'S CLOSET
RECEPTION
OFFICE
OFFICE
OFFICE
JANITOR'S CLOSET
DIGITAL LAB
DIGITAL LAB
DIGITAL LAB
10' - 9"
Level 3 23' - 9"
14' - 4 31/32"
Level 4 38' - 2" 64' - 0"
Level 2 13' - 0"
DOUBLE HEIGHT LOBBY
BioTech Research Facility
5 A 4.00
LECTURE HALL
13' - 0"
2 A 2.00
53' - 0"
BUILDING SECTION BB SCALE: 1/8" = 1'-0"
B
Date
11' - 0"
A
Description
BUILDING SECTIONS
Level 1 0' - 0"
Project number Date Drawn by 1
Checked by
A 2.00
BUILDING SECTION AA SCALE: 1/8" = 1'-0"
5
A 2.00
20
10
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
Scale
As indicated
12/14/2015 1:45:17 AM
14' - 4 31/32"
RESTROOMS
10' - 9"
Level 3 23' - 9"
53' - 0"
64' - 0"
Level 4 38' - 2"
FACADES
TOTAL AREA (SF)
SOUTH ELEVATION
TOTAL AREA (SF)
FLOORS
TOTAL AREA (SF)
CURTAINWALL (NORTH)
4,492
VISION GLASS
2,378
FIRST FLOOR
4,986
CURTAINWALL (EAST)
3,604
SPANDREL GLASS
1,454
SECOND FLOOR
1,931
RAINSCREEN (SOUTH)
4,492
VISION TOGGLE GLASS
THIRD FLOOR
5,654
CURTAINWALL (WEST)
3,604
FOURTH FLOOR
5,807
660 4,492
16,192 DUAL PANE GLASS
TOTAL AREA (SF)
18,378 $/SF
UNITIZED WALL
$/SF
STICK WALL
$/SF
50' - 10"
9' - 1 1/2"
8' - 2 1/2"
TOGGLE WALL UP
2,378
8.00
19,024
8.00
19,024
8.00
19,024
SPANDREL
1,454
11.00
15,994
11.00
15,994
11.00
15,994
660
8.00
5,280
8.00
5,280
8.00
5,280
JANITOR'S CLOSET
40,298
3
16,192 TRIPLE PANE GLASS
TOTAL AREA (SF)
$ $/SF
40,298
UNITIZED WALL
$ $/SF
40,298
STICK WALL
$ $/SF
TOGGLE WALL
VISION
2,378
27.00
64,206
27.00
64,206
27.00
64,206
SPANDREL
1,454
30.00
43,620
30.00
43,620
30.00
43,620
660
27.00
17,820
27.00
17,820
27.00
17,820
VISION TOGGLE
16,192
$
125,646
$
125,646
$
Lakeland College
45' - 10"
VISION
VISION TOGGLE
8' - 10"
5' - 7 27/32"
Consultant Address Address Phone Fax e-mail
EXPERIMENTAL LECTURE/PRESENTATION HALL
125,646
1 UNITIZED WALL
$/SF
STICK WALL
$/SF
ALUMINUM MEMBERS
4,492
10.00
44,920
10.00
44,920
8.00
ANCHORS
4,492
1.00
4,492
1.00
4,492
0.00
0.00
SEALANTS/GASKETS
4,492
3.00
13,476
2.00
8,984
2.00
8,984
INSULATION
4,492
1.00
4,492
1.00
4,492
1.00
4,492
HARDWARE
4,492
.30
1,347.60
.30
1,347.60
.30
1,347.60
STEEL REINFORCEMENT
4,492
1.00
4,492
1.00
4,492
8.00
35,936
SHADOW BOXES
4,492
16.00
71,872
16.00
71,872
16.00
71,872
OPERABLE VENTS
4,492
40.00
35,936
179,680
40.00
179,680
40.00
ELECTRIC
6
5
Consultant Address Address Phone Fax e-mail
LOBBY
STICK WALL
179,680 $
$/SF
338,247.60
TOGGLE WALL
4.00
17,968
4.00
17,968
4.00
17,968
SHIPPING
4,492
3.00
13,476
3.00
13,476
3.00
13,476
FABRICATION LABOR
4,492
8.00
35,936
3.00
13,476
3.00
13,476
FIELD LABOR
4,492
15.00
67,380
21.00
94,332
21.00
94,332
FIELD EQUIPMENT
4,492
5.00
22,460
2.00
8,984
2.00
8,984
$ TOTAL AREA (SF)
$/SF
157,220 125,646
UNITIZED WALL
$ $/SF
148,236 125,646
STICK WALL
DOUBLE PANE
4,492
134.30
$
522,097.60
131.30
$
508,621.60
TRIPLE PANE
4,492
191.30
$
607,445.60
188.30
$
593,969.60
TOTAL WALL COST & LABOR
3 DOUBLE PANE UNITIZED 1 RAINSCREEN $ 3 DOUBLE PANE STICK 1 RAINSCREEN $ 3 DOUBLE PANE TOGGLE 1 RAINSCREEN $ 3 TRIPLE PANE UNITIZED 1 RAINSCREEN $ 3 TRIPLE PANE STICK 1 RAINSCREEN $ 3 TRIPLE PANE TOGGLE 1 RAINSCREEN $
1,566,292.80 176,884.00 1,743,176.80 1,525,864.80 171,967.00 1,697,831.80 1,580,344.80 184,876.00 1,765,220.80 1,822,336.80 226,671.00 2,049,007.80 1,781,908.80 221,754.00 2,003,662.80 1,836,388.80 234,663.00 2,071,051.80
GROSS FLOOR AREA (SF)
18,378
$/SF FLOOR
94.85
$ $/SF 135.30 192.30
MEANS $/SF
200.00
S S
S
S
S
S
S
S
V
V
V
S
V
S
S
S
S
S
S
S
S
S
V
V
V
S
V
S
S
S
S
S
S
S
S
S
S
S
Roof 56' - 6"
TOGGLE WALL $
526,781.60
$
612,129.60
% WALL VS. BLDG.
47.43%
92.38
200.00
46.19%
18,378
96.05
200.00
48.03%
200.00
55.75%
V 111.49
S
148,236
18,378
18,378
Date
18' - 4"
$/SF
Description
VT
Level 4 38' - 2" 14' - 4 31/32"
UNITIZED WALL
320,087.60
No.
UP
Level 3 23' - 9"
BioTech Research Facility
Level 2 13' - 0"
COST ANALYSIS
10' - 9"
$/SF
$
4,492
WALL TYPE
7
STORAGE
Project number
18,378
109.03
200.00
54.52%
18,378
112.70
200.00
56.35%
V
S
S
13' - 0"
TOTAL AREA (SF)
324,579.60
ENGINEERING/DESIGN
TOTAL COSTS AND LABOR
COAT ROOM
12
$ INSTALLATION
Consultant Address Address Phone Fax e-mail
TOGGLE WALL
Date Drawn by Checked by
Level 1 0' - 0"
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
A 3.00 Scale
1/8" = 1'-0"
12/14/2015 1:46:42 AM
$/SF
13' - 5 1/2"
TOTAL AREA (SF)
9' - 8 1/2"
PARTS AND PIECES
05 00 00 SLOPED METAL COPING
05 00 00 SLOPED METAL COPING
06 00 00 WOOD PARAPET CAP
06 00 00 WOOD PARAPET CAP
07 60 00 PARAPET FLASHING
07 60 00 PARAPET FLASHING
1.00
EXTERIOR AIR FILM
0.17
INTERIOR AIR SPACE FILM
0.68
TERRA COTTA VENEER
0.44
METAL STUDS WITH BATT INSULATION
7.10
ROOF MEMBRANE
0.44
CMU
1.11
DIVISION 03 - CONCRETE 03 30 00 REINFORCED CONCRETE GRADE BEAM DIVISION 04 - MASONRY 04 20 00 CMU BLOCK DIVISION 05 - METAL 05 00 00 SLOPED METAL COPING 05 10 00 WIDE FLANGE GIRDER 05 20 00 METAL CLIPS 05 30 00 ROOF DECKING DIVISION 06 - WOODS & COMPOSITES 06 00 00 WOOD BLOCK DIVISION 07 - THERMAL MOISTURE PROTECTION 07 10 00 WATERPROOF MEMBRANE 07 20 00 BATT INSULATION 07 80 00 FIRE STOP 07 90 00 EXPANSION JOINT DIVISION 08 - OPENINGS 08 80 00 INSULATED GLASS DIVISION 09 - FINISHES 09 50 00 DROP CEILING 09 70 00 WALL FINISH VENEER DIVISION 31 - EARTHWORK 31 00 00 COMPACT EARTH
07 20 00 RIGID INSULATION 4 A 1.05
07 20 00 BATT INSULATION 07 60 00 BASE FLASHING
07 20 00 BATT INSULATION ROOF
07 20 00 RIGID INSULATION
07 60 00 BASE FLASHING
ROOF
07 20 00 RIGID INSULATION
07 10 00 WATERPROOF MEMBRANE
07 10 00 WATERPROOF MEMBRANE
05 30 00 ROOF DECKING
05 30 00 ROOF DECKING
05 20 00 METAL CLIPS
09 70 00 FINISH VENEER
4 A 4.00 09 70 00 WALLBOARD
Lakeland College 10'-0" 4TH FLOOR
AIR SPACE
42" TOP OF PARAPET
NOTE LEGEND
5'-0" INT. SPACE
R-VALUES
FOURTH FLOOR
FOURTH FLOOR
05 10 00 METAL STUD 05 10 00 WIDE FLANGE GIRDER 05 10 00 WIDE FLANGE BEAM 05 10 00 WIDE FLANGE BEAM
05 00 00 WIRE TO HOLD UP CEILING
05 00 00 WIRE TO HOLD UP CEILING
Consultant Address Address Phone Fax e-mail
4'-0" INT. SPACE
05 10 00 WIDE FLANGE GIRDER
Consultant Address Address Phone Fax e-mail
09 50 00 DROP CEILING
05 00 00 X LUM FRAME AIR SPACE
08 80 00 SNAP ON COVER THIRD FLOOR
07 80 00 FIRE STOP 00 00 00 FORM STOP
05 10 00 METAL STUD 05 10 00 WIDE FLANGE GIRDER
05 00 00 CLIP ANGLE
05 10 00 WIDE FLANGE BEAM
08 80 00 SPANDREL PANEL
00 00 00 AIR SPACE
05 00 00 WIRE TO HOLD UP CEILING
4'-0" INT. SPACE
08 80 00 1" INSULATED GLASS
56'-6" TO TOP OF PARAPET
10'-0" 3RD FLOOR
09 50 00 DROP CEILING
Consultant Address Address Phone Fax e-mail
THIRD FLOOR
No.
Description
Date
09 50 00 DROP CEILING 09 70 00 WALLBOARD
08 80 00 VISION GLASS PANEL
08 80 00 SPANDREL PANEL 05 10 00 WIDE FLANGE GIRDER 08 80 00 SNAP ON COVER
SECOND FLOOR
08 80 00 1" INSULATED GLASS
09 00 00 TERRA COTTA SECOND FLOOR
05 10 00 METAL STUD 05 10 00 WIDE FLANGE GIRDER 05 10 00 WIDE FLANGE BEAM
4'-0" INT. SPACE
05 00 00 CLIP ANGLE
7'-0" 2ND FLOOR
07 80 00 FIRE STOP 00 00 00 FORM STOP
05 00 00 WIRE TO HOLD UP CEILING
07 90 00 EXPANSION JOINT
03 30 00 4" REINFORCED CONCRETE SLAB
1 S 1.01
31 00 00 FINISH GRADE 06 00 00 WOOD BLOCK 07 10 00 VAPOR BARRIER 04 20 00 CMU BLOCK 31 00 00 COMPACT EARTH 03 30 00 REINFORCED CONCRETE GRADE BEAM
BioTech Research Facility
07 60 00 BOTTOM FLASHING FIRST FLOOR
07 90 00 EXPANSION JOINT
FIRST FLOOR
31 00 00 FINISH GRADE 06 00 00 WOOD BLOCK 07 10 00 VAPOR BARRIER 04 20 00 CMU BLOCK
WALL SECTIONS
31 00 00 1200 PSI COMPACT EARTH 03 30 00 REINF. CONC. GRADE BEAM
Project number Date Drawn by
CURTAIN WALL SECTION (BEARING) SCALE: 1/2" = 1'-0"
RAINSCREEN WALL SECTION (NON BEARING) SCALE: 1/2" = 1'-0"
3"
Checked by
1'-0" 6"
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
A 4.00
2'-0"
Scale
As indicated
12/14/2015 1:47:25 AM
03 30 00 4" REINFORCED CONCRETE SLAB
1' - 8"
DETAIL 3 - MID FLOOR CURTAINWALL SCALE: 3/4" = 1'-0"
9'-0" 1ST FLOOR
09 50 00 DROP CEILING
1
1
A 5.00
A 5.00
1
2
1
2
6 A 5.00 9' - 0"
9' - 0"
A A
B
14' - 3"
Parapet 56' - 6"
5' - 0"
24' - 0" DN
Consultant Address Address Phone Fax e-mail 10' - 0"
4' - 0"
AREA OF REFUGE
Consultant Address Address Phone Fax e-mail
AREA OF REFUGE
Fourth Floor 38' - 0"
B FOURTH FLOOR SCALE: 1/4" = 1'-0"
6 A 5.00
A 5.00
2
1
2
4' - 0"
9 RISERS @ 7"
0' - 8"
10 RISERS @ 7"
4' - 0"
5' - 2 17/32"
8' - 8"
12' - 5"
6' - 3 9/16"
11 RISERS @ 7" 12 RISERS @ 7"
13' - 0" 6' - 10 7/16"
First Floor -0' - 2"
AREA OF REFUGE
1' - 0"
B TREAD/RISER DETAIL SCALE: 1" = 1'-0"
B FIRST FLOOR SCALE: 1/4" = 1'-0"
1
3
2
BioTech Research Facility
7 A 5.00
STAIR SECOND FLOOR SCALE: 1/4" = 1'-0"
Project number
STAIR SECTION SCALE: 1/4" = 1'-0"
Date Drawn by
5
20
Checked by
Project Number December 11, 2015 CAYLA WALTER PROFESSOR HAWK
A 5.00
10 Scale
As indicated
12/14/2015 1:39:19 AM
4' - 0"
2' - 6"
4' - 0" 3' - 0"
0' - 2"
Date
Second Floor 13' - 0" 24' - 0"
8' - 4"
1' - 0"
3' - 0"
1' - 0"
0' - 9"
0' - 7"
UP
9 TREADS
13' - 4"
9 TREADS
24' - 0"
UP DN
1' - 0"
10' - 2"
11 TREADS 14' - 3"
13' - 4" 3' - 4"
2' - 10 1/2"
10 TREADS
11' - 0"
4' - 0"
4' - 1"
8' - 8" 0' - 8"
Description
Third Floor 24' - 0"
A 4' - 1"
A 4' - 0"
No.
9' - 0"
9' - 0"
5' - 9 15/32"
1
53' - 2"
A 5.00
7' - 0"
1
56' - 8"
1
HANDRAIL EXTENSION DETAIL SCALE: 1" = 1'-0"
Consultant Address Address Phone Fax e-mail
12 RISERS @ 7"
14' - 0"
THIRD FLOOR SCALE: 1/4" = 1'-0"
12 RISERS @ 7"
B
2' - 6"
3' - 0"
2' - 6"
3' - 0"
4' - 0"
7' - 0"
2' - 3 7/8"
14' - 0"
1' - 0"
Lakeland College
Roof Slab 53' - 0"
1' - 0"
10' - 2"
14' - 3"
4' - 0"
24' - 0"
10' - 2" UP
1' - 0"
DN
1' - 9"
0' - 8"
4' - 1"
8' - 8" 4' - 0"
11 TREADS
4' - 0"
14' - 3"
11' - 6" 1' - 0"
0' - 8"
11 TREADS
4' - 0"
4' - 1"
8' - 8"
4' - 0"
A