Architectural Portfolio - Charnbumn Kim

Page 1

CHARNBUMN KIM ARCHITECTURE PORTFOLIO 2019-2022



SOFTWARE MODELING

CHARNBUMN, KIM Junior Architectural Techonologist & Designer

• REVIT • DYNAMO • SKETCHUP • RHINOCEROS • GRASSHOPPER • AUTOCAD

OTHERS

• MS OFFICE • DRIVER'S LICENSE WITH OWN VEHICLE

RENDERING

https://issuu.com/cbkim/docs/charnbumn_kim Recipient of Dean's honor list in 2019, 2020, and 2021. Recipient of Entrance scholarship in 2011, and 2012.

linkedin.com/in/charnbumn-kim-54685a13b https://yamby9191.wixsite.com/charnbumn-kim (647)569-9135

• ENSCAPE • TWINMOTION • V-RAY PRESENTATION

• ADOBE ILLUSTRATOR • ADOBE INDESIGN • ADOBE PHOTOSHOP

yamby9191@gmail.com

EDUCATION Advanced Diploma

ARCHITECTURAL TECHNOLOGY

GEORGE BROWN COLLEGE, TORONTO, ON. CANADA 2019-2022

Certificate

FLIGHT SERVICE

SENECA COLLEGE, MARKHAM, ON. CANADA 2017-2018

LANGUAGE • 3 Years of Experience Designing... Residential Houses, Mixed-Use Buildings, Low-Rise Building, High-rise building, Microhome, Warehouse, Renovation • Proficiency with... Revit, AutoCAD, Sketchup Enscape, Twinmotion, V-Ray Photoshop, Illustrator, Indesign MS Office • Strong ability to... Manage deadlines in a fast-paced work circumstance Cooperate with team Deal with different opinion • Built several physical models • A valid driver’s license with own vehicle • Ability to communicate & resolve issues with the consultant

Bachelor

ECONOMICS IN FINANCE

RENMIN UNIVERSITY, BEIJING, CHINA 2012-2016

• Proactive and detail-oriented

• KOREAN (NATIVE OR BILINGUAL PROFICIENCY) • ENGLISH (PROFESSIONAL WORKING PROFICIENCY) • CHINESE (ELEMENTARY PROFICIENCY)

WORK EXPERINECES Beijing Sung Restaurant SERVER June 2018-November 2019 Vaughan, Canada

Popstar Coin Karaoke COUNTER STAFF June 2016-December 2016 Seoul, Republic of Korea

International Badminton Club CAPTAIN & MEMBER OF EXECUTIVE TEAM September 2013-June 2014 Beijing, China


Contents

Architecture Portfolio 2019-2022 PROJECTS p. 8~59

PROJECT 01

PROJECT 02

PROJECT 03

YIN AND YANG

MICROHOME

THE HAVEN HOUSE

Toronto Waterfront Nature Interpretive Centre p. 8~15

Sustainable Design Project p. 16~21

Wooden Resdential Project p. 22~29

· About Project · Site Plan & Analysis · Bird Eyes' View · Description of Design Concept & Sustainability Features · Design Development · Floor Plans · Structural Description · Perspective Section View · Design Points · Elevations

· About Project · Site Plan & Analysis · Design Development · Site Consideration & Sustainability · Floor Plans · Night View from Rear Side · Elevations

· About Project · Site Plan & Analysis · Design Development · Exploded View & Sustainability · Floor Plans · Elevations · Night View

· Software used: Revit, Twinmotion, Photoshop, Illustrator

· Software used: Revit, Twinmotion, Photoshop, Illustrator

· Software used: AutoCad, Revit, Twinmotion, Photoshop, Illustrator


RENDERINGSS p. 60~67

PROJECT 04

PROJECT 05

PROJECT 06

LASAGNI RESIDENCES

WAREHOUSE

GARDEN IN HOME

10 Storeys Condominium p. 30~39

Steel Frame Warehouse p. 40~49

Renovation p. 50~59

· About Project · Site Plan & Analysis · Environmental Building Section Sustainability Features · Floor Plans · 2D & 3D View of each Unit · Elevations · Day & Night View

· About Project · Site Plan & Analysis · Elevations · Floor Plans · Section Views · Plan Details, Section Details · Wall Sections · 3D Model

· About Project · Floor Plans (Before & After) · Interior Views · Elevations (Before & After)

01 02 03 04 05 06

FINANCE CENTER BENCH TWISTED BUILDING PAVILION DESIGN LAMP MODERN HOUSE

· Software used: Revit, Twinmotion, Photoshop, Illustrator

· Software used: AutoCad, Revit, Twinmotion, Photoshop, Illustrator

· Software used: Revit, Enscape, Sketchup, Photoshop, Illustrator

· Software used: Rhinoceros, Grasshopper, Revit, Dynamo, V-Ray, Twinmotion, Enscape, Photoshop, Illustrator

5


PROJECTS 01 02 03 04 05 06

YIN AND YANG MICROHOME THE HAVEN HOUSE LASGNI RESIDENCES WAREHOUSE GARDEN IN HOME



PROJECT 01 Toronto Waterfront Nature Interpretive Centre

YIN AND YANG Studio & Period: Architectural Technology & Studio 4 Instructor: Pietro Ferrari, Brentwood Jolley About project We focused on open space and optimizing nature’s beauty as much as possible. This is represented in the floor plan, where the corridors are not enclosed, but spacious and wide. The majority of the exterior walls consist of glazed curtain walls. We enhanced this transparent realm between the interior and exterior by incorporating wood facade walls. The cafeteria faces the water, while the multimedia classrooms and hostel face towards the forestry. Following the shape, the parking surrounds the building. This is meant for a cohesive look for the entire interpretative center, from the parking to the structure itself. No matter where you are, nature will constantly thrive in all directions. Will you embark on this journey of endless beauty at yin and yang?

8



SITE PLAN & ANALYSIS topography/physical aspects: Toronto harbor commissioners (THC) followed a 3 phase design in the creation of Tommy Thompson park; the eastern headland, the peninsulas on the north side, and the indictment. there are environmentally significant areas (ESA) that feature wildlife specifies. wildlife includes the presence of migrant bird staging areas, significant nesting areas, and nationally, provincially, and regionally rare plant species.

2 3

1

LEGNEDS 1. building 2. parking 3. courtyard

10


DESIGN CONCEPT yin and yang was designed to preserve nature’s beauty without disturbing any of its natural habitats and species. in all directions, visitors will feel a combination of the breeze from the waterfront and greenery from the abundant trees. on the north side, there is the infamous Toronto skyline. on the south, there sits lake Ontario.

DESIGN DEVELOPMENT

MASS

SEPARATE PARTS

VOID FRONT

MOVE UP & DOWN WALLS

EXTEND ROOF

CREATE SKYLIGHT

MAGNESIUM OXIDE BOARD

LIGHTWEIGHT CONCRETE

TESERO WOODS

WOOD

SUSTAINABLE FEATURES the color concept for the interior of yin and yang is white. white to create a bright and radiant feeling. in addition, bright the bright color can be harmonized with every other color to make a peaceful mood in the exhibition area, café, and hostel.

SMART HALIO TRIPLE-GLAZED

SMART HALIO TRIPLE-GLAZED

11


2

3

8

ROOM NUMBER & NAME

AREA

1. ACCESS AREA 1 (FRONT) 2. ACCESS AREA 2 (REAR) 3. EXHIBITION AREA 1ST FLOOR 4. MULTIMEDIA CLASSROOM 5. FACILITIES ROOM 6. ADMINISTRATION OFFICE 7. CAFETERIA 1ST FLOOR 8. WAREHOUSE

142 142 666 231 93 107 492 179

GROUND FLOOR PLAN

12

M² M² M² M² M² M² M² M²

7 1

4

6 5


9

14

ROOM NUMBER & NAME

AREA

9. EXHIBITION AREA 2ND FLOOR 10. CAFETERIA 2ND FLOOR 11. GREENHOUSE 12. COFFEE SHOP 13. HOSTEL ROOMS 14. OBSERVATORY

666 492 105 86 200 316

M² M² M² M² M² M²

10

13

12 11

SECOND FLOOR PLAN

13


STRUCTURE LEGENDS - CAISSONS: REINFORCED CONCRETE FOUNDATIONS EXTENDING 3660 MM BELOW GRADE - TRENCH WALL: 350MM THICK POURED CONCRETE TRECH WALL BELOW GRADE AT PERIMETER, EXTENDING 1.2192M BELOW FINISHED EXTERIOR GRADE - FOUNDATION WALL: 200MM CONCRETE BLOCK WALL - I STEEL COLUMNS: UNIVERSAL COLUMNS - UC305X305X97 - BEAMS: I-SHAPE BEAM - UB305X165X40

K

K

J

J

J

M

M

H

2

Mx

F

F F

G

1

G

1

H

2 1x

Mx

1x

G

1

M

H

2

DN

DN

1x

Mx

L

L

K L

N

N

N

DN

E

E

E

O

O O

Dx

Dx Dx

DN

D

D D

P

P

P

C Q

R

B A

1ST FLOOR FRAMING PLAN

14

SOUTH (FRONT) ELEVATION

C

C Q

Q

DN

R

B

R

A

2ND FLOOR FRAMING PLAN

B A

ROOF FRAMING PLAN

NORTH (REAR) ELEVATION


DESIGN POINT 2: LOW-SLOPE ROOF

DESIGN POINT 4: SKYLIGHT

- MAXIMIZE NATURAL LIGHT -> MINIMIZE ARTIFICIAL HEATING & COOLING COST

- UTILIZE WHITE PAINT AND COATING TO REFLECT AND EMIT HEAT - COOL ROOFING

- PROVIDE SKY VIEW

DESIGN POINT 1: FACADE WALL

- THE SURFACE COMPOSITION OF PARKLEX PRODUCTS PROTECTS AGAINST ADVERSE WEATHER CONDITIONS, ELIMINATING THE NEED FOR ANY MAINTENANCE OR TREATMENT. - VENTILATION: PERMEABILITY, WATER PROTECTION, THERMAL INSULATION, SOLAR AND ACOUSTIC PROTECTION.

DESIGN POINT 3: HUGE WINDOWS

- MAXIMIZE NATURAL LIGHT -> MINIMIZE ARTIFICIAL HEATING & COOLING COST

- PROVIDE OUTSIDE VIEW OF TOMMY THOMPSON PARK

DESIGN POINT 2: LOW-SLOPE ROOF

DESIGN POINT 1: FACADE WALL

EAST ELEVATION

DESIGN POINT 3: HUGE WINDOWS

DESIGN POINT 4: SKYLIGHT

WEST ELEVATION

15


PROJECT 02 Sustainable Design Project

MICROHOME Studio & Period: Architectural Technology & Studio 3 Instructor: Pietro Ferrari, Brentwood Jolley About project This project was needed to be sustainable and utilized the small gross floor area near Simcoe Lake. This microphone embodies aesthetic and sustainable materials with remarkable natural light and finishes of cedar siding, modern stucco, reclaimed wood. Furthermore, Halio Smart Glass, Tesla solar tiles, and water tank using Lake Simcoe water make this microhome to be more eco-friendly. 31 sq.m gross floor area is utilized - living room, kitchen, full bathroom, and sleeping area.

16



L

SI AKE

MC

OE

DESIGN DEVELOPMENT

LAK

ED

RE

MASS

EXTEND WALL

CREATE OPENINGS

CREATE SOLAR PANELS & BALCONY

SITE ANALYSIS

SUMMER SUN PATH

WINTER SUN PATH

TOPOGRAPHY THE SITE HAS HILL FROM THE SOUTH. THE NORTH PART OF THIS SITE APPROCHES LAKE SIMCOE.

SITE INFORMATION 521 LAKE DRIVE ON L0E 1S0 LOT AREA: 1438 M2 LOT PERMITER: 172.16 M BUILDING FOOTPRINT: 25 M2 BUILDING GROSS FLOOR AREA: 31 M2

18

TREES & LAKE THIS SITE HAS MANY SPECISES OF TREES AND FULL NATURUAL SOURCES LIKE GRASS.

SUN & WIND IN NORMAL, 1166 KWH SUNLIGHT CAN BE PROVIDED IN THIS SITE.

THIS SITE IS ALSO VERY CLOSE TO LAKE SIMCOE SO IT IS EASY TO GET WATER

IN BOTH SUMMER AND WINTER, WIND USUALLY COM FROM NEAR WEST SIDE TO EAST SIDE.


SITE CONSIDERATION & SUSTAINABILITY

TESLA SOLAR PANEL REQUIREMENT OF SOLAR PANELS IN THE PROPOSED SITE

LED LIGHT

AVERAGE SUNLIGHT IN ONTARIO: - 1166 KWH / YEAR CAN BE PROVIDED BY SUNLIGHT AVERAGE ELECTRICITY CAPACITY: - 395 KWH/MONTH, 4741 KWH/YEAR

SU

- REDUCES GREENHOUSE EMISSIONS FROM POWER PLANTS

NL

- SIZE OF PROPOSED SOLAR PANEL: 20.58 M2 - NUMBER OF SOLAR PANELS: 12 SOLAR PANELS - HOW MUCH CAN BE PRODUCED: 3100~4340 KWH/YEAR. - COST: STANDARD SOLAR PANELS COST AROUND 65 TO 75 CENTS PER WATT. AVERAGE INSTALLATION SOLAR PANEL COST: 2560~2830 DOLLAR

IG HT (S UM M ER )

MULTIPLE HEATING ZONES

-HIGH EFFICIENT HEAT PUMP HEATING SYSTEM -ENERGY RECOVERY VENTILATORS CAPTURES

SMART GLASS WINDOW

· MINIMIZES INDOOR TEMPERATURE CONTROL ENERGY. · MAXIMIZES ACCESS TO NATURAL LIGHT.

VENT

V EN TI LATI

V E N T IL A T IO N

ON I L AT I IG SUNL

H T (W

INTE

R)

FACADE WALL

· PROVIDES SHADING PATTERNS. · VERTICAL & LATERAL RESISTANCE TO WIND AND OTHER ACTIONS.

ON

MEZZANINE

VE

IL NT

IO AT

N

WATER TANK

AVERAGE RAINFALL: ABOUT 951 MM (37.4 INCH) TOTAL ANNUALLY WATER TANK FOR HOUSE FOR RECYCLING GREY WATER AND RAINWATER + LAKE WATER ->CAN BE USED FOR MOPPING, FLUSHING, LAUNDRY, CAR WASHING, AND GARDENING

VE NT ILATIO N

LIVING AREA BALCONY

WATER TANK

PARKING

PIPE CONNECT TO LAKE SIMCOE

19


1 4

3

2

GROUND FLOOR

ROOM DESCRIPTIONS GROUND FLOOR 1. LIVING AREA & KITCHEN 2. WASHROOM 3. BALCONY 4. PARKING MEZZANINE FLOOR 5. BEDROOM TOTAL GFA:

20

20 M2 5 M2 5

7 M2

32 M2

MEZZANINE FLOOR

NORTH (FRONT) ELEVATION

INTERIOR 3D

EAST ELEVATION


NIGHT VIEW RENDER FROM REAR SIDE

SOUTH (REAR) ELEVATION

WEST ELEVATION

21


PROJECT 03 Wooden Resdential Project

THE HAVEN HOUSE Studio & Period: Architectural Technology & Studio 2 Instructor: Gianni Regina, Jennifer Zand About project This project needs us to design a sustainable house for the client’s family members. The proposed house should be built based on zoning by law and Ontario building code. The client has his (her) own family and likes to invite his (her) friends often so enough size of the dining room and setting were required. The house embodies a warm and comforting presence with remarkable natural lighting and premium stucco, wood, and stone finishes. The exterior is inspired by traditional designs, while the interior is hardly conventional. Minimal and spacious rooms coupled with sustainable features will be the perfect home to call your haven.

22



SITE PLAN & ANALYSIS

PROPOSED BUILDING

24

GENERAL DESCRIPTION TOTAL LOT AREA BUILDING COVERAGE AREA TOTAL GFA

REQUIRED N/A 40% 60%

PROPOSED 467 SQ.M 127 SQ.M (27%) 254 SQ.M (54%)

SETBACKS (M) FRONT REAR RIGHT LEFT GARAGE

REQUIRED 6.5 7.5 1.2 1.3 0.3

PROPOSED 8.5 13.0 1.3 1.3 0.3

HEIGHT (M) BUILDING HEIGHT HEIGHT OF FINISHED 1ST FLOOR

REQUIRED 10.0 1.2

PROPOSED 10.0 1.2

LANDSCAPE FRONT YARD AREA REAR YARD AREA

REQUIRED 50% 50%

PROPOSED 83 SQ.M (73%) 61 SQ.M (54%)

PARKING (M) DRIVEWAY 1 LENGTH DRIVEWAY 1 WIDTH DRIVEWAY 2 LENGTH DRIVEWAY 2 WIDTH

REQUIRED N/A N/A N/A N/A

PROPOSED 7.7 2.9 4.9 3.5


DESIGN DEVELOPMENT

EXPLODED VIEW

MASS MODEL

SEPARATE TO 2 PARTS

CREATE FLOORS

CREATE ROOF & ATTACH WALLS

EXTEND ROOF & WALLS

MAKE OPENINGS & OTHERS

25


FLOOR PLANS

8

7 2

1

2

6

3

5

5

BASEMENT FLOOR

26

7

4

3

4

1

1ST FLOOR

6

8


BASEMENT FLOOR NO NAME SIZE(M) 1. GYM 2. BATHROOOM 3. LAUNDRY ROOM 4. WIND BAR 5. THEATER 6. GUEST ROOM 7. MECH. ROOM 8. COLD CELLAR

1

2

DESCRIPTION 3.0X4.0 BIG WINDOWS FOR VENTILLATION 3.0X3.5 3-PIECES BATHROOM 3.0X1.5 ENOUGH SPACE FOR STORAGE 3.0X4.9 OPEN SPACE TO THEATER 5.5X4.9 OPEN SPACE TO WINE BAR 4.0X3.0 BUILT-IN CLOSET & DOUBLE BED 2.3X2.0 - -

7 1ST FLOOR

6

3

NO NAME SIZE(M) 1. MAIN ENTRANCE 2. LIVING ROOM 5.9X4.0 3. OFFICE ROOM 3.0X3.2 4. POWDER ROOM 3.0X1.4 5. FAMILY ROOM 3.0X5.0 6. KITCHEN 5.4X4.9 7. DINING ROOM 4.0X4.9 8. BALCONY

DESCRIPTION COZY AND COMFORTABLE AREA STUDY WITH OFFICE DESK & PC 2-PIECES POWDEROOM BIG WINDOWS & SOFA FOR FAMILY SPACIOUS PANTRY & STORAGE TABLE FOR MAXIMUM 12 PEOPLE

2ND FLOOR

4

8

5

NO NAME 1. BEDROOM 1 2. BATHROOM 3. BEDROOM 2 4. ENSUITE 5. MASTER BEDROOM 6. BEDROOM 3 7. LAUNDRY ROOM 8. BALCONY

SIZE(M) 3.0X4.0 3.0X2.6 3.0X4.2 3.0X3.0 5.6X4.9 4.0X3.0 4.0X1.7

DESCRIPTION BUILT-IN CLOSET & DOUBLE BED 4-PIECES SHARED BATHROOM BUILT-IN CLOSET & DOUBLE BED PRIVATE 4-PIECES BATHROOM BUILT-IN CLOSET & QUEEN BED BUILT-IN CLOSET & DOUBLE BED ENOUGH SPACE FOR STORAGE

2ND FLOOR

27


NORTH (FRONT) ELEVATION

SOUTH (REAR) ELEVATION

EAST ELEVATION

28

WEST ELEVATION


29


PROJECT 04 10 Storeys Condominium

LASAGNI RESIDENCES Studio & Period: Architectural Technology & Studio 5 Instructor: Marlene Slopack About project Lake inside and outside. This residence plus a commercial building allows a direct connection with the lake through big openings, balcony areas, and landscaped recreational areas. The concept of the geometry of the building was inspired by organic shapes. The curvature of the balconies is directly related to the waves of the lake. Big openings, big energy efficiency. This building uses opening as an advantage, with the tesla solar panels and smart glass windows to regulate indoor comfort, prevention of heat loss or heat gain, and recycle its resources. All in one design. This building is composed of 8 residential levels, one amenities floor that includes entertainment plus recreational spaces, the main level with retail spaces, 3 underground parking levels including bicycle parking, and outdoor recreational areas.

30



QUEENS QUAY E

LAKE ONTARIO

MERCHANT'S WHARF

SITE PLAN

SITE ANALYSIS WARD: TORONTO CENTRE - ROSEDALE LOCATION: 15 MERCHANT'S WHARF, TORONTO ONTARIO LOT AREA: 5176.3 sq.m MAX COVERAGE: REQUIRED: 2070.52 sq.m (40%) PROPOSED: 1805.66 sq.m (35%) LANDSCAPE AREA: 1747 sq.m (34%) ZONING DESIGNATION: COMMERCIAL & RESIDENTIAL ZONING BYLAW: 438-86 (R1+R2) OCCUPANCY TYPE: GROUP C (RESIDENTIAL) GROUP (MERCANTILE) GROUP F3 (UNDERGROUND PARKING)

GROSS FLOOR AREA: RETAIL FLOOR 1: 1806 sq.m RETAIL FLOOR 2: 1856 sq.m AMENITIES FLOOR 3: 1207 sq.m RESIDENTIAL FLOOR 4: 1219 sq.m RESIDENTIAL FLOOR 5: 1261 sq.m RESIDENTIAL FLOOR 6: 1373 sq.m RESIDENTIAL FLOOR 7: 1522 sq.m RESIDENTIAL FLOOR 8: 1556 sq.m RESIDENTIAL FLOOR 9: 1556 sq.m RESIDENTIAL FLOOR 10: 1522 sq.m TOTAL GFA: 14880 sq.m

SETBACKS: NORTH: 2.69 m SOUTH: 5.44 m EAST: 27.27 m WEST: 29.47 m

LEGENDS:

BUILDING WIDTH: 19.91 m BUILDING LENGTH: 83.16 m BUILDING HEIGHT: 34.00 m

PARKING ENTRANCE

MAIN ENTRANCE RETAIL ENTRACNE LOADING DOCK EMERGENCY EXIT

ENVIRONMENTAL FEATURES CROSS LAMINATED TIMBER PROVIDES ACOUSTIC AND THERMAL INSULATION

ELECTRIC CAR CHARGE STATIONS MINIMIZES POLLUTION

POLISHED CONCRETE REFLECTS INDOOR SUNLIGHT, PROVIDING MORE INDOOR NATURAL ILLUMINATION.

TREES & LANDSCAPE REDUCE EMBODIED ENERGY AND CARBON FOOTPRINT

HARVESTING WATER TANK REUSE OF RAINWATER

32

HARVESTING WATER TANK REUSE OF RAINWATER

KEY BLOCK


environmental building section

SUSTAINABILITY FEATURES TESLA SOLAR PANEL UTILIZE NATURAL ENERGY, MINIMIZE ARTIFICIAL TEMPERATURE CONTROL ENERGY HALIO SMART GLASS WINDOW MINIMIZE INDOOR TEMPERATURE CONTROL ENERGY, MAXIMIZE ACCESS TO NATURAL LIGHT WATER HARVESTING TANK REUSE RAINWATER

tesla solar panel facade roof & wall

FACADE ROOF & WALL VERTICAL & LATERAL RESISTANCE TO WIND AND OTHER ACTIONS LED LIGHT REDUCE GREENHOUSE EMISSIONS FROM POWER PLANTS ELECTRIC CAR CHARGE STATION MINIMIZE POLUTION

led lighting

BICYCLE PARKING LOWER EMISSION

HALIO Smart Glass Windows

electric car charge stations

bicycle parking

harvesting water tank

33


GROUND FLOOR PLAN LEGEND 0-VESTIBULE 1- MAILROOM 2- RESIDENTIAL GARBAGE ROOM 3- COMMERCIAL GARBAGE ROOM 4- LOADING AREA 5- MOVING ROOM 6- BUILDING MANAGEMENT OFFICE 7- UNIVERSAL TOILET 8- ELECTRICAL ROOM 9- CENTRAL ALARM & CONTROL FACILITIES 10- 24H CONCIERGE

19.4 M2 19.8 M2 11.7 M2 73.3 M2 24.3 M2 17.1 M2 6.5 M2 10 M2 4 M2 5.5 M2

6. BLDG 2. RES 3. COMM MANAGEMENT 1. MAIL GARBAGE. GARBAGE ROOM ROOM ROOM ROOM 0. VESTIBULE 4. LOADING DOCK 7. TOILET 5. MOVING ROOM

RETAIL UNIT #1

RETAIL UNIT #2

RETAIL UNIT #6

RETAIL UNIT #7

8. ELECTRICAL ROOM 9. ALARM & CONTROL FACILITIES 10. 24H CONCIERGE

RETAIL UNIT #3

RETAIL UNIT #4

RETAIL UNIT #5

GROUND FLOOR PLAN

LOBBY

SECOND FLOOR PLAN (AMENITIES FLOOR) LEGEND 1- CAFETERIA/ PRODUCTIVITY AREA 2- HALL + RESTING AREA 3- INDOOR CINEMA 4- ENTERTAINING ROOM 5- YOGA + SAUNA 6- GYM

351.75 M2 566.5 M2 178.9 M2 171.3 M2 211.75 M2 187.7 M2

1. CAFETERIA + PRODUCTIVITY AREA 3. INDOOR CINEMA

4. ENTERTAINING ROOM

2. HALL + RESTING AREA

CAFETERIA

34

5. YOGA + SAUNA

SECOND FLOOR PLAN (AMENITIES FLOOR)

6. GYM


9TH FLOOR (TYPICAL RESIDENTIAL) FLOOR LEGEND UNIT 902 UNIT 903 UNIT 904 UNIT 905 STUDIO STUDIO 1 BDRM STUDIO

UNIT 907 2 BDRM

UNIT 908 3 BDRM

UNIT 906 STUDIO

GARBABE ROOM UNIT 901 3 BDRM UNIT 909 3 BDRM UNIT 915 UNIT 914 UNIT 913 UNIT 912 UNIT 911 UNIT 910 2 BDRM 1 BDRM + DEN 1 BDRM 1 BDRM 2 BDRM STUDIO

UNIT 901 3 BDRM UNIT 902 STUDIO UNIT 903 STUDIO UNIT 904 1 BDRM UNIT 905 STUDIO UNIT 906 STUDIO UNIT 907 2 BDRM UNIT 908 3 BDRM UNIT 909 3 BDRM UNIT 910 STUDIO UNIT 911 2 BDRM UNIT 912 1 BDRM UNIT 913 1 BDRM UNIT 914 1 BDRM + DEN UNIT 915 2 BDRM

128 M2 50 M2 53 M2 62 M2 61 M2 68 M2 98 M2 109 M2 122 M2 56 M2 87 M2 53 M2 53 M2 61 M2 97 M2

9TH FLOOR PLAN (TYPICAL RESIDENTIAL FLOOR)

ROOF PLAN THERE ARE 13 DRAINAGES ON THE ROOF 1% SLOPE TO DRAINAGE

ROOF PLAN

35


BALCONY

HVAC

BALCONY

HVAC

SLEEPING AREA

LIVING AREA

WASHROOM

unit 905 studio (62 m2)

36

KITCHEN ENTRANCE

KITCHEN LIVING AREA GARAGE ENTRANCE

unit 905 1 bdrm (61 m2)

BEDROOM

WASHROOM


ENTRANCE

BALCONY

BEDROOM

WASHROOM

BEDROOOM

KITCHEN & LIVING AREA WASHROOM

BEDROOM

BEDROOM

HVAC

BEDROOM BALCONY

WASHROOM BALCONY

LIVING AREA

ENTRANCE

KITCHEN HVAC

unit 905 2 bdrm (97 m2)

unit 908 3 bdrm (109 m2)

37


SOUTH ELEVATION OPENINGS OPENINGS AREA = 192m2 WALL AREA = 543m2 ACTUAL % OPENINGS = 35% ALLOWABLE % OPENINGS = 40%

ROOF PLAN 3000

34000 Level 10

3000

31000 Level 9

3000

28000 Level 8

3000

25000 Level 7

Level 4 13000 Level 3

34000

Level 5 16000

3000

Level 6 19000

3000

3000

22000

3000

EAST ELEVATION OPENINGS OPENINGS AREA = 776.53 m2 WALL AREA = 2490.02 m2 ACTUAL % OPENINGS = 31.2 % ALLOWABLE % OPENINGS = 40 %

5000

10000

AMENITIES FLOOR PLAN

5000

5000

SOUTH ELEVATION

GROUND FLOOR- LEVEL 1 0

EAST ELEVATION

Day Render

38


WEST ELEVATION OPENINGS OPENINGS AREA = 833.6 m2 WALL AREA = 2490.02 m2 ACTUAL % OPENINGS = 33.5 % (METAL FIRE STUTTER MECHANISM PROVIDED FOR THE WINDOWS ON ALL LEVELS, TO CONVERT THEM INTO PROTECTED OPENINGS) ALLOWABLE % OPENINGS = 31 %

ROOF PLAN 3000

34000 Level 10

3000

31000 Level 9

3000

28000 Level 8

3000

25000 Level 7

Level 4 13000 Level 3

34000

EAST ELEVATION OPENINGS OPENINGS AREA= 192m2 WALL AREA= 543m2 ACTUAL % OPENINGS = 35% ALLOWABLE % OPENINGS = 40%

3000

Level 5 16000

3000

Level 6 19000

3000

3000

22000

5000

10000

AMENITIES FLOOR PLAN

5000

5000

GROUND FLOOR- LEVEL 1

WEST ELEVATION

0

NORTH ELEVATION

Night Render

39


PROJECT 05 Steel Frame Structure Project

WAREHOUSE Studio & Period: Architectural Technology & Studio 4 Instructor: Pietro Ferrari, Brentwood Jolley About project This project needed to be designed and built with steel constructions with curtain walls. According to the Ontario building code, this warehouse was designed based on occupancy types, occupancy load, fire safety features. This project was a huge one. not to be late, we started to separate our parts and deadline first. After then, we made all grid lines, we decided the types, colors, and constructions of the curtain wall. Furthermore, whenever we found something we all should consider, someone who found out that put the pinned message in our group chat to make all read immediately. Whatever we did, we tried to finish way earlier than our deadlines.

40



RTH

SITE AND PROJECT DATA

6.00

SITE PLAN & SITE ANALYSIS

NO

25.00

NORTH STREET

152.52 m

GENERAL PROJECT DESCRIPTION

N 73º 09' 00'' E

2.60

EXISTING PROPERTY LINE

LANDSCAPE AREA LANDSCAPE AREA

LANDSCAPE AREA

6.00

PR

OP

11.10

6.00

LANDSCAPE AREA

BLOCK C CITY OF VAUGHAN GENERAL EMPLOYMENT AREA (EM2) COMMERCIAL / INDUSTRIAL

.C

SITE AREA: 15023.22 sq.m

UR

B

PROPOSED COVERAGE:

LANDSCAPE AREA LANDSCAPE AREA

LANDSCAPE AREA

2.76

LANDSCAPE AREA PROP. CURB

GROUND FLOOR AREA: GROUND FLOOR OFFICES: SECOND FLOOR OFFICES: TOTAL GROUND FLOOR AREA: TOTAL GROSS FLOOR AREA:

.00

12

SNOW STORAGE

PARKING

25.80

3.90

LANDSCAPE AREA

N 16º 55' 22'' W

97.54

1.80

5783 sq.m 307 sq.m 307 sq.m 6090 sq.m 6090 sq.m

REQUIRED 1.5 CARS/100sq.m (61) 2.0 CARS/100sq.m (4) 4% of Total Parking 4 (MIN) 6187.34 sq.m @ 1CAR/100sq.m 62

WAREHOUSE OFFICE BARRIER FREE PARKING TOTAL PARKING

73.15

98.50 m

PROPOSED BUILDING

REQUIRED 10%

PROPOSED 14%

SNOW STORAGE AREA

5% OF PAVED AREA

6732.63x0.05 336.63 sq.m (5%)

SETBACKS REQUIRED 12 m 6m 6m 6m

SOUTH NORTH EAST WEST

LANDSCAPE AREA 9.00

0

9.0

12

.00

00

0

.0

12

2.24

. 12

LANDSCAPE AREA

6.00

SNOW STORAGE

EXISTING PROPERTY LINE

42

14.24

6.00

LANDSCAPE AREA

152.2 m

PROP. CURB

N 73º 09' 00'' E

LOADING DOCK LOCATION DRIVE - IN LOCATION ENTRANCE & EXT DIRECTION OF TRAFIC FLOOR LANDSCAPE ISLANDS: 150 CONC. CURB CONT. AS SHOWN C/W LANDSCAPING SEE LANDSCPAE DWG PAINTED ISLANDS: PAINTED TRAFFIC ISLAND COLOUR AS PER PAINT SPEC.

2.60 SNOW STORAGE

MAN DOOR LOCATION

EXISTING PROPERTY LINE

LANDSCAPE AREA

EXISTING PROPERTY LINE

SITE LEGENDS

DN

97

LANDSCAPE AREA (MIN)

EAST STREET

9.14

98.50 m

16.66

LANDSCAPE AREA

2.60 5.65

LANDSCAPE AREA

6.00

PROPOSED 85 6 6

LANDSCAPE

3.90

N 16º 55' 22'' W

9.00 29.18

6187.34 sq.m (41.19%)

BUILDING STATISTICS: PROPOSED (G.F.A.)

LANDSCAPE AREA

LIGHT DUTY ASPHALT PAVINT: CAR PARKING AND DRIVEWAY HEAVY DUTY ASPHALT PAVING FIRE ROUTES AND TRUCKING ROUTES

PROPOSED 14.24 m 11.10 m 25.80 m 29.18 m


ELEVATIONS NORTH ELEVATION (FRONT)

TOP OF OFFICE PARAPET 8.93 TOP OF WAREHOUSE PARAPET 7.72 FIN. CEILING 2 7.27 FIN. CEILING 1 3.05

FIN. 2ND FLR 4.27 FIN. GROUND FLR 0.00

EAST ELEVATION TOP OF OFFICE PARAPET 8.93 TOP OF WAREHOUSE PARAPET 7.72 FIN. CEILING 2 7.27 FIN. CEILING 1 3.05

FIN. 2ND FLR 4.27 FIN. GROUND FLR 0.00

WEST ELEVATION (LOADING DOCK LOCATION)

TOP OF OFFICE PARAPET 8.93 TOP OF WAREHOUSE PARAPET 7.72 FIN. CEILING 2 7.27 FIN. CEILING 1 3.05

FIN. 2ND FLR 4.27 FIN. GROUND FLR 0.00

SOUTH ELEVATION (REAR) TOP OF OFFICE PARAPET 8.93 TOP OF WAREHOUSE PARAPET 7.72 FIN. CEILING 2 7.27 FIN. CEILING 1 3.05

FIN. 2ND FLR 4.27 FIN. GROUND FLR 0.00

43


GROUND FLOOR PLANS

1a

1a

0.24

1a

W1 1a

0.92

0.10 2.43

1a

0.18 1.83

1c

W1

0.43

W1 9.14

2.18

11.32

W1 11.32

W1 11.32

2

11.32

A.7.0

W1 11.32

8.27

3.05

A.5.1

11.32

2.67

1a

W1

KITCHENETTE

3.05

1a

DN

W1

W7

8.66

W7 W2

D

W1 W1

8.66

W2

73.15

73.15

8.66

W7 W1

WALL SECTION 3

W2

8.66

E

W8

1 A.7.1

W1

W1

W7

F

W1 1

W7

A.7.0

8.66

W1

WALL SECTION 1

W1 SHIPPING & RECEIVING

G Gx

W2

W2

W7

W1

W1

W7 W2

H 2 A.7.0

W1

W1

J W1 9.14

6.09

0.43

OFFICE FOR ACCOUNT MANAGER

1a

W1

73.15 8.66

57.66

5.72

W1 1

TRAINING ROOM

1a

1a

DN

W1 W1

1 A.5.0

W1

8.66

W2

8.66

14.90

0.22

W7

OFFICE FOR ACCOUNT MANAGER WITH 2 WORKSTATIONS

1a

0.43

W1

0.25

2 A.8.0

0.92 2.12 2.54 2.54 2.54 2.54

1a

KITCHEN & LUNCHROOM

1a

MEN WC

3.05

0.25

C

2.93

5.08

W1

1a

W4

1a

5 WORKSTATIONS FOR ACCOUNTS RECEIVABLE/PAYABLE STAFF

1a

W1

OFFICE FOR PLANT MANAGER

0.20

1a

3 SPARE WORKSTATIONS FOR TEMPORARY STAFFING

ELEVATOR

A.7.1

8.66

W2

EXECUTIVE OFFICE FOR PRESIDENT

14.99

W7

W2

EXECUTIVE OFFICE FOR VICE PRESIDENT, SALES 1a

W1

5.72

W1

1 A.6.1

EXECUTIVE OFFICE FOR VICE PRESIDENT, MARKETING

2.93

By

3.57 1 A.7.0

FIRST AID ROOM

8.66

0.92

W1

W7

1a

2.54 5.08

W2

WOMEN WC/ CHANGE ROOM

2.54 2.54 2.54 2.54 2.54

W1

1a

W4

8.66

8.70 5.68

0.20 0.92

W2

1a

0.16

6.09 0.10

W8

A.5.1

W1

W1

8.66

W2

W1

8.66

W7

W1

5.72

W1

1a

0.92

0.10 13.48

0.20

DN

5.60

0.92 1.00

5.21 0.92

SHIPPING & RECEIVING

5.88

0.20

W1 W1

6.09

2.93

0.25 0.92

1a

W1

1.83 0.18

5.49 2.44

1d

11.32

8.66

W1

KITCHENETTE

0.55

11.50

MEN WC/ CHANGE ROOM

0.16

1d

9x

3.05

1a

Bx

2.67

1a

W7

0.10

2.44

4.99 0.20

W1

8.27

BOARDROOM

1a

MAINTENANCE/ REPAIR

0.92 0.20

1d

11.32

WOMEN WC

B

W1

1 A.7.1

11.32

2

OFFICE 3

3.15 0.92 0.55

0.10 0.10 3.01

14.73

A.5.0

OFFICE 2

1a

1a

1a

Ax

3.05

1a

A

1

OFFICE 7

COMPUTER/ SERVER 1a EQUIPMENT ROOM

1a

0.92 0.50 0.92 0.55

1d

11.32

0.43

0.92 0.30

0.43 3.05

2.110.92 0.50 4.20 2.44

8.66

1a

0.10

2.44

8.66

W4

STORAGE &1a COPIER ROOOM

UP

0.92 3.37

8.66 0.43

J

OFFICE 6

PURCHASING OFFICE

UP

3.66

H

LOBBY RECEPTION & WAITING AREA

1a

1a

5.49

73.15 8.66 8.66 2.93 5.72

Gx

OFFICE 5

MEETING ROOM

W1

9

1

1a OFFICE 4

W1

11.32

W1

1a

1a

W7

G

1a

WOMEN WC

A.8.0

W1

F

OPEN AREA WITH 4 WORKSTATIONS

1a

ELEVATOR

1

1c

11.32

W1 W4

OFFICE 1

A.8.1

A.5.0

5.49

D

E

1a

2.67

8.66

By C

1

8

7x

0.92

1b

OPEN AREA WITH 4 WORKSTATIONS

2

1a

0.43

2.18

1 A.6.0

A.8.1

MEN WC

3.05

Bx

W1

7

0.25 4.85

1

W1

2.93

B

W1

6.09

20.83

1a

W1

1.47 3.66

Ax

11.32 1 A.5.1

0.60

W1

A.7.1

A

3.05 0.25

2

6

0.25

8.27

0.92

W1

5

3.05

11.32

9.14

8.66

11.32

75.97

W1

4

2.67

11.32

3

97.54

3.05

11.32

2

2.93

11.32

1x

8.66

2.18

1

2.93

97.54

0.25

9x

9

0.43

9.14

8 7x

2.54

0.43

7

0.25

1x

6

0.25

5

3.05

4

8.66

3

2.93

2

8.66

1

SECOND FLOOR PLAN

2.18

11.32

W1 11.32

W1 11.32

11.32

W1 11.32

W1 8.27

3.05

11.32

6.09

97.54

97.54

44

Warehouse EXterior View at Night

Warehouse Interior View


OFFICE FLOOR PLAN (GROUND FLOOR)

OFFICE FLOOR PLAN (SECOND FLOOR)

21.31

21.31 0.25

2.79

16.86

7x

0.92

8 W4

8

9x

9

W1

W4

W4

W4

W4

0.10

7.20

7.20

6.22 W4

W4

W1

4.27

LOBBY RECEPTION & WAITING AREA

EXECUTIVE OFFICE FOR VICE PRESIDENT, MARKETING

3.18

W1

4.80

0.20

0.25

A

OPEN AREA WITH 4 WORKSTATIONS

3.05

OPEN AREA WITH 4 WORKSTATIONS

2.79

A

0.25

0.20

W4

0.20

18.31

7x

9x

9

W1

2.79

0.20

0.53

EXECUTIVE OFFICE FOR VICE PRESIDENT, SALES

EXECUTIVE OFFICE FOR PRESIDENT

1.52

3.41

OFFICE 1

2.36

12.70

OFFICE 7

ELEVATOR

3.13

KITCHENETTE

W7 W8

5.10

OFFICE FOR ACCOUNT MANAGER

W4

KITCHENETTE

2.31

W6

MEN WC

1.51 0.25

0.25

Bx

W1

3.72

1.52

W7 1.60

W8

1.13

1.51

MEN WC

TRAINING ROOM

W1

3.72

2.31

W8

W6

1.57

B

1.41

1.41

4.04

0.20

1.56

BOARDROOM

2.50 1.60

W7

1.57

OFFICE 3

0.10

3.13

W6

2.74

2.50

COMPUTER/ SERVER EQUIPMENT ROOM

1.13

5.10

0.10

W7 W4

1.81 W8

B

3.27

3.72

2.50

PURCHASING OFFICE

0.20

MEETING ROOOM

6.93 W8

2.50

W8

3.13

STORAGE & COPIER ROOM

1.41

1.81 1.56

3.72

1.57

15.21

WOMEN WC

OFFICE 2

3.13

W6

W4

2.06

2.50

2.06

WOMEN WC

5 WORKSTATIONS FOR ACCOUNTS RECEIVABLE / PAYABLE STAFF

3.72

OFFICE 6

15.21

OFFICE 5

W6

0.10

0.20

OFFICE 4

1.57

3 SPARE WORKSTATIONS FOR TEMP. STAFFING

W4

OFFICE FOR ACCOUNT MANAGER WITH 2 WORKSTATIONS 12.70

2.50

W7 9.65

3.49

2.50

ELEVATOR

1.41

2.50

2.50

2.50

1.70 W6

1.70

1.60

W7

4.04

2.36

1.30

W7

0.10

0.10

W7

0.10

Ax W7

0.10

0.92

Ax

Bx

0.25 0.25 W6

W6

W1

5.84

W1

W6

1st Floor Office

W6

W1

W1

0.25

2nd Floor Office

45


BUILDING SECTION 1 9x

9

8

7x

7

6

5

4

3

2 1x

1 TOP OF OFFICE PARAPET 8.93 TOP OF WAREHOUSE PARAPET 7.72 TOP OF STEEL

OFFICE FOR ACCOUNT MANAGER WITH 2 WORKSTATIONS

3 + 5 WORKSTATIONS AREA

ELEVATOR

WAREHOUSE AREA OFFICE 1

OFFICE 7

OFFICE 6

OFFICE 5

OFFICE 4

FIN. CEILING 2

7.32

7.27

FIN. 2ND FLR

FIN. CEILING 1

ELEVATOR

3.05 GRADE

4.27 FIN. GROUND FLR 0.00

4 A.8.1

Botton of Caissons -5.49

1

Building cross section 1 1 : 200

BUILDING SECTION 2 TOP OF OFFICE PARAPET

A

3

B

Bx

By

C

D

E

F

G

Gx

H

8.93 TOP OF WAREHOUSE PARAPET

J

7.72

A.8.0

TOP OF STEEL EXECUTIVE OFFICE FOR VICE PRESIDENT, MARKETING

OPEN AREA WITH WORKSTATIONS

FIN. CEILING 2

BOARDING ROOM

OFFICE 4

MEETING ROOM

7.32

7.27

MAINTENANCE/ REPAIR

MEN WC/ CHANGE ROOM WITH LOCKER

WOMEN WC/ CHANGE ROOM WITH LOCKER

FIRST AID ROOM

OFFICE FOR PLANT MANAGER

KITCHEN & LUNCHROOM

FIN. CEILING 1 3 A.8.1

3.05 GRADE

FIN. GROUND FLR 0.00

Botton of Caissons -5.49

1

46

Building cross section 2 1 : 200


1

Plan Detail #1

Plan Detail #2

2

1 : 25

1 : 25

9 0.20

SECTION DETAIL - ROOF PARAPET

PLAN DETAIL #1 Bx MED. BRONZE ALUM. FLASHING

MED. BRONZE ALUM. FLASHING

WOOD OR FIBER CANT.

WOOD OR FIBER CANT.

8

TOP OF OFFICE PARAPET 8.93

PRECAST CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICH PANEL’

7.72

PRECAST CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICH PANEL’

1

TOP OF WAREHOUSE PARAPET

DRIVE-IN OR OVERHEAD DOORS

1

7.72

Plan Detail #1

1 #21 : 25 PLAN DETAIL

GLASS SPANDREL PANELS; 8” DEEP PREFINISHED ALUMINUM FRAME

3

2 J

Section Detail #1

4

GLASS GLAZING UNITS; 8” DEEP PREFINISHED ALUMINUM FRAME

Plan Detail #2

Plan Detail #3

1 : 25

0.25 PRECAST CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICH PANEL’

Section Detail #2 1 : 10

GLASS UNITS 8” DEE PREFI ALUM

9" CONCRETE SLAB

9" CO

8.93

PRECAST CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICH PANEL’

‘SANDWICH PANEL’

2

0.30

ROOF CONSTRUCTION FLAT ROOF CONSTRUCTION MIN 2% SLOPE TO 0.3 AIR CHANGES 0.25 0.18 PER HOUR AVERAGE DOVER 24 HOURS 4-PLY HOT ASPHALT AND GRAVLE ROOF SYSTEM ON 1/2" FIBREBOARD OVERALY ON 2.3" POLY-ISO INSULATION MECH. FASTENED TO DECK W/ FASTMERS & PLATES TO MEET CURRENT FM 1-60 RATING ON ONE PLY VAPOUR BARRIER SEALED AT ALL END LAPS WITH ADHESIVE

Section Detail #3

Plan Detail 3 1 #4 : 10 1 : 25

0

0.25

0.30

TOP OF OFFICE PARAPET

F

0.00

WOOD OR FIBER CANT.

PRECAST

CAISSON CONCRETE PANEL 1524MM DIAMETER REINFORCED CONCRETECURTAIN FOUNDATIONS WALL; EXTENDING 4267MM BELOW 10” THICK GRADE

FIN. GROUND FLR

CONC FOUN

CONCRETE

MED. BRONZE ALUM. FLASHING FOUNDATION WALL

0.08

0.18

0.23

0.20

0.25

PRECAST

Plan Detail

9

WOOD OR FIBER CANT.

ROOF CONSTRUCTION CONCRETE PANEL FLAT ROOF CONSTRUCTION MIN 2% SLOPE CURTAIN WALL; TO 0.3 AIR CHANGES PER HOUR AVERAGE 10” THICK DOVER 24 HOURS 4-PLY HOT ASPHALT AND ‘SANDWICH PANEL’ GRAVLE ROOF SYSTEM ON 1/2" FIBREBOARD OVERALY ON 2.3" POLY-ISO INSULATION MECH. FASTENED TO DECK W/ FASTMERS & PLATES TO MEET CURRENT FM 1-60 RATING ON ONE PLY VAPOUR BARRIER SEALED AT ALL END LAPS WITH ADHESIVE

2

1 : 25

Bx MED. BRONZE ALUM. FLASHING

CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICH PANEL’

1 : 25

SECTION DETAIL - CAISSON

INSULATED METAL PANEL SPANDREL CURTAIN WALL WITH PREFINISHED METAL PANEL; 9” THICK MIN. 1 : 10

PRECAST CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICHPRECAST PANEL’

G

Plan Detail #3

8

1 : 25

7.32

PRECAST CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICH PANEL’

0.43

1

TOP OF STEEL

0.18

A

0.25 0.18

A

0.18 0.25

PANEL; 9”

0.20

1

By

TOP OF WAREHOUSE PARAPET

ROOF CONSTRUCTION FLAT ROOF CONSTRUCTION MIN 2% SLOPE INSULATED METAL PANEL TO 0.3 AIR CHANGES PER HOUR AVERAGE SPANDREL CURTAIN WALL DOVER 24 HOURS 4-PLY HOT ASPHALT AND WITH PREFINISHED METAL GRAVLE ROOF SYSTEM ON 1/2" FIBREBOARD THICK MIN. OVERALY ON 2.3" POLY-ISO INSULATION MECH. FASTENED TO DECK W/ FASTMERS & PLATES TO MEET CURRENT FM 1-60 RATING ON ONE PLY VAPOUR BARRIER SEALED AT ALL END LAPS WITH ADHESIVE

3.91

ROOF CONSTRUCTION FLAT ROOF CONSTRUCTION MIN 2% SLOPE TO 0.3 AIR CHANGES PER HOUR AVERAGE DOVER 24 HOURS 4-PLY HOT ASPHALT AND GRAVLE ROOF SYSTEM ON 1/2" FIBREBOARD OVERALY ON 2.3" POLY-ISO INSULATION MECH. FASTENED TO DECK W/ FASTMERS & PLATES TO MEET CURRENT FM 1-60 RATING ON ONE PLY VAPOUR BARRIER SEALED AT ALL END LAPS WITH ADHESIVE

0.25

0.18

GLASS GLAZED DRIVE-IN OR PANELS; OVERHEAD DOORS 8” DEEP PREFINISHED ALUMINUM FRAME

9

GRADE

GRADE

TOP OF WAREHOUSE PAR

B TOP OF

4

Section

47

1 : 10

GLASS SPANDREL


WALL SECTION 1

WALL SECTION 3

9

4

J

1x

NOTE: COURSE NAME:

A.8.0

MED. BRONZE ALUM. FLASHING WOOD OR FIBER CANT.

MED. BRONZE ALUM. FLASHING

TOP OF WAREHOUSE PARAPET

ROOF CONSTRUCTION FLAT ROOF CONSTRUCTION MIN 2% SLOPE TO 0.3 AIR CHANGES PER HOUR AVERAGE DOVER 24 HOURS4-PLY HOT ASPHALT AND GRAVLE ROOF SYSTEM ON 1/2" FIBREBOARD OVERALY ON 2.3" POLYISO INSULATION MECH. FASTENED TO DECK W/ FASTMERS & PLATES TO MEET CURRENT FM 1-60 RATING ON ONE PLY VAPOUR BARRIER SEALED AT ALL END LAPS WITH ADHESIVE

WOOD OR FIBER CANT.

7.72 TOP OF STEEL 7.32 FIN. CEILING 2

7.72 7.72 TOP OF STEEL TOP OF STEEL

7.32 7.32

ROOF CONSTRUCTION FLAT ROOF CONSTRUCTION MIN 2% SLOPE TO 0.3 AIR CHANGES PER HOUR AVERAGE DOVER 24 HOURS 4-PLY HOT ASPHALT AND GRAVLE ROOF SYSTEM ON 1/2" FIBREBOARD OVERALY ON 2.3" POLYISO INSULATION MECH. FASTENED TO DECK W/ FASTMERS & PLATES TO MEET CURRENT FM 1-60 RATING ON ONE PLY VAPOUR BARRIER SEALED AT ALL END LAPS WITH ADHESIVE

OWSJ

UB305 X 165 X 40

UB305 X 165 X 40

PRECAST CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICH PANEL’

PRECAST CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICH PANEL’

TOP OF STEEL 7.32

ROOF CONSTRUCTION FLAT ROOF CONSTRUCTION MIN 2% SLOPE TO 0.3 AIR CHANGES PER HOUR AVERAGE DOVER 24 HOURS 4-PLY HOT ASPHALT AND GRAVLE ROOF SYSTEM ON 1/2" FIBREBOARD OVERALY ON 2.3" POLYISO INSULATION MECH. FASTENED TO DECK W/ FASTMERS & PLATES TO MEET CURRENT FM 1-60 RATING ON ONE PLY VAPOUR BARRIER SEALED AT ALL END LAPS WITH ADHESIVE

FIN. CEILING 2

OWSJ

OWSJ

UB305 X 165 X 40

UB305 X 165 X 40

8”x8” WIDE FLANGE COLUMN (“I” COLUMN)

FIN. 2ND FLR FIN. 2ND FLR

4.27

MED. BRONZE ALUM. FLASHING

7.27

GLASS GLAZING UNITS; 8” DEEP PREFINISHED ALUMINUM FRAME

FIN. 2ND FLR

PARAPET

WOOD OR FIBER CANT.

7.72

7.27 7.27

GLASS SPANDREL PANELS; 8” DEEP PREFINISHED ALUMINUM FRAME

8”x8” WIDE FLANGE COLUMN (“I” COLUMN)

WOOD OR FIBER CANT.

FIN. CEILING 2 CEILING 2 FIN.

7.27

OWSJ

COURSE CODE: CREDIT HOURS:

MED. BRONZE ALUM. FLASHING

TOP OF WAREHOUSE PARAPET TOP OF WAREHOUSE PARAPET

ROOF CONSTRUCTION FLAT ROOF CONSTRUCTION MIN 2% SLOPE TO 0.3 AIR CHANGES PER HOUR AVERAGE DOVER 24 HOURS4-PLY HOT ASPHALT AND GRAVLE ROOF SYSTEM ON 1/2" FIBREBOARD OVERALY ON 2.3" POLYISO INSULATION MECH. FASTENED TO DECK W/ FASTMERS & PLATES TO MEET CURRENT FM 1-60 RATING ON ONE PLY VAPOUR BARRIER SEALED AT ALL END LAPS WITH ADHESIVE

Ax ARCHITECTURAL TECHNOLOGY & STUDIO 4 ARCH 2005 THURSDAY - 11:59AM TOP OF 8AM WAREHOUSE

FIN. 2ND FLR

4.27 4.27

4.27

8”x8” WIDE FLANGE COLUMN (“I” COLUMN) COMPOUND CEILING

FIN. CEILING 1

FIN. CEILING 1 CEILING 1 FIN.

3.05

FIN. CEILING 1

3.05 3.05

GLASS SPANDREL PANELS; 8” DEEP PREFINISHED ALUMINUM FRAME

PRECAST CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICH PANEL’

3.05

PRECAST CONCRETE PANEL CURTAIN WALL; 10” THICK ‘SANDWICH PANEL’

8”x8” WIDE FLANGE COLUMN (“I” COLUMN)

Loading Dock doors: 8’-0” wide by 10’-0” high

GLASS GLAZING UNITS; 8” DEEP PREFINISHED ALUMINUM FRAME 9" CONCRETE SLAB

9" CONCRETE SLAB

FIN. GROUND FLR FIN. GROUND FLR

0.00

GRADE

GRADE

14" TRECH WALL

CONC PIER EXTENSION OF CAISSION

FIN. GROUND FLR

0.00 0.00

10" CONC POURED FOUNDATION

10" CONC POURED FOUNDATION CONC PIER EXTENSION OF CAISSION

9" CONCRETE S

9" CONCRETE SLAB

FIN. GROUND FLR

0.00

CONC P EXTENS CAISSIO

GRADE CONC PIER EXTENSION OF CAISSION

10" CONC POURED FOUNDATION

10" CONC POURED FOUNDATION GRADE

14" TRE

14" TRECH WALL 14" TRECH WALL

SHEET TITLE:

2 WALL SECTIONS REINFORCED CONCRETE CAISSON TO REST ON UNDISTURBED SOIL

REINFORCED CONCRETE CAISSON TO REST ON UNDISTURBED SOIL

PROJECT NAME:

FINAL CONSTRUCTION DRAWINGS

REINFORCED CONCRETE CAISSON TO REST ON UNDISTURBED SOIL

PROJ. NO:

SCALE:

1 Botton of Caissons

48

Botton of Caissons Botton of Caissons

-5.49

Wall section 1

-5.49 -5.49

Wall section 2

DATE:

2021 - 02 - 28 DRAWN: HYOUNGJOON CHOI 101253983

1 : 30 Botton of Caissons -5.49

REINFO CONCRE TO RES UNDIST


49


PROJECT 06 Renovation

GARDEN IN HOME Studio & Period: Architectural Technology & Studio 6 Instructor: Steffanie Adams About project The design concept of our group is “Garden” where they can give us a feeling of “rest and peace” rather than “assisted living unit”. The green color that we can easily see in the garden can provide psychological stability to both the dementia patient and family protector, simple & warm design. In addition, eco-friendly features such as wood floors make social intersection easier, so it can keep their active social life. Lastly, garden concept design can make artificial and rigid residential life much more comfortable, soft, and lively resting place.

50


51


GROUND FLOOR BEFORE & AFTER

READING ROOM

LIFT

BEDROOM 1 (FOR DEMENTIA)

UNIVERSAL WASHROOM HALLWAY

0

1

2

5

BEDROOM 1 (FOR DEMENTIA)

STAIRS & STORAGE

TEA ROOM

LIFT

SECOND FLOOR (PRIVATE AREA)

VERANDAH

READING ROOM

BEDROOM 1 (FOR DEMENTIA) BEDROOM 1 (FOR DEMENTIA)

D FLOOR TE AREA)

LIFT

SECOND FLOOR (PRIVATE UNIVERSAL AREA)

READING ROOM WASHROOM

BEDROOM 1 STAIRS & STORAGE (FOR DEMENTIA) BEDROOM 1 (FOR DEMENTIA)

SECOND FLOOR TEA ROOM (PRIVATE AREA) KITCHEN & DININGBEFORE ROOM

LIVING ROOM

ND FLOOR MON AREA)

LIFT SECOND FLOOR GROUND FLOOR (PRIVATE AREA) (COMMON AREA)

UNIVERSAL TEA ROOM WASHROOM

KITCHEN & STAIRS & STORAGE DINING ROOM

LIVING ROOM

52

GROUND FLOOR (COMMON AREA) BEDROOM 3 (FOR GUEST)

GROUND FLOOR LIFT (COMMON AREA) BASEMENT FLOOR

READING ROOM

LIFT

BEDROOM 1 (FOR DEMENTIA)

UNIVERSAL WASHROOM

GROUND FLOOR BEDROOM 1(COMMON AREA) (FOR DEMENTIA)

LIFT READING ROOM HALLWAY TEA ROOM UNIVERSAL WASHROOM BEDROOM 1 (FOR DEMENTIA) KITCHEN & DINING STAIRSROOM & STORAGE BEDROOM 1 BASEMENT FLOOR (FOR DEMENTIA) (GUEST & MECH) LIVING ROOM

UNIVERSAL WASHROOM

KITCHEN & DINING ROOM

HALLWAY LIVING ROOM HALLWAY

STAIRS & STORAGE

STAIRS & STORAGE

LIFT

LIFT

BEDROOM 3 (FOR GUEST)

LIFT UNIVERSAL WASHROOM HALLWAY UNIVERSAL WASHROOM STAIRS & STORAGE

VERANDAH

UNIVERSAL WASHROOM HALLWAY

MECH. ROOM

HALLWAY

STAIRS & STORAGE

HALLWAY

STAIRS & STORAGE

VERANDAH

LIFT TEA ROOM HALLWAY UNIVERSAL BEDROOM 3 WASHROOM KITCHEN & (FOR GUEST) DINING ROOM STAIRS & STORAGE LIVING ROOM MECH. ROOM

AFTER LIFT VERANDAH LIFT UNIVERSAL WASHROOM HALLWAY UNIVERSAL WASHROOM STAIRS & STORAGE STAIRS & STORAGE

VERANDAH

HALLWAY HALLWAY


KITCHEN: ALL THE FURNITURE IN THE KITCHEN LIKE THE TABLE, CABINET AND SINK ARE SLIGHTLY LOWER THAN NORMAL COUNTERTOP HEIGHT SO THAT IT WOULD BE A LITTLE EASIER FOR THE CLIENT TO REACH THINGS WHEN HE IS USING A WHEELCHAIR WHILE COOKING. IT STILL WORKS FOR HIS WIFE'S COOKING AS WELL. OF COURSE, THERE IS ENOUGH SPACE TO PASS BY IN A WHEELCHAIR.

LIFT

LIVINGROOM: LIVING HAS SOFT FINISHES WITH ROUNDED CORNERS TO KEEP FROM HARM, AND WE JUST LEFT THE EXISTING BEAUTIFUL FIREPLACE AS IT WAS.

53


SECOND FLOOR BEFORE & AFTER

0

1

2

5

READING ROOM

LIFT

BEDROOM 1 (FOR DEMENTIA)

UNIVERSAL WASHROOM HALLWAY

BEDROOM 1 (FOR DEMENTIA)

STAIRS & STORAGE

TEA ROOM

LIFT

SECOND FLOOR (PRIVATE AREA)

VERANDAH READING ROOM READING ROOM BEDROOM 1 (FOR DEMENTIA) BEDROOM 1 (FOR DEMENTIA)

GROUND FLOOR BEDROOM 1(COMMON AREA) READING ROOM

BEDROOM 1 (FOR DEMENTIA) BEFORE BEDROOM 1 (FOR DEMENTIA)

LIFT

SECOND FLOOR (PRIVATE AREA) SECOND FLOOR

UNIVERSAL WASHROOM UNIVERSAL WASHROOM

TEA ROOM HALLWAY STAIRS & STORAGE

TEA ROOM KITCHEN & DINING ROOM KITCHEN & DINING ROOM

GROUND FLOOR LIFT (COMMON GROUNDAREA) FLOOR

(COMMON AREA)

LIVING ROOM VERANDAH

UNIVERSAL WASHROOM

KITCHEN & DINING ROOM

HALLWAY LIVING ROOM

HALLWAY

STAIRS & STORAGE

HALLWAY

STAIRS & STORAGE STAIRS & STORAGE

WASHROOM

BASEMENT FLOOR (GUEST & MECH) LIVING ROOM TEA ROOM

LIFT

(PRIVATE UNIVERSAL AREA)

D FLOOR TE AREA)

54

(FOR DEMENTIA) BEDROOM 1 (FOR DEMENTIA)

LIFT

LIFT

STAIRS & STORAGE STAIRS & STORAGE

AFTER VERANDAH

LIFT UNIVERSAL WASHROOM UNIVERSAL WASHROOM

LIFT

BEDROOM 3 (FOR GUEST)

UNIVERSAL WASHROOM

VERANDAH MECH. ROOM HALLWAY HALLWAY

HALLWAY STAIRS & STORAGE


BEDROOM FOR DEMENTIA PATIENT BEDROOMS: THE BEDROOMS FOR THE DEMENTIA PATIENT AND THE CAREGIVER ARE ATTACHED TOGETHER. OPENING BETWEEN THOSE ROOMS PROVIDES BETTER ACCESS, SO THE CAREGIVER WILL BE ABLE TO REDUCE THE TIME TO GO TO TAKE CARE OF THE PATIENT AND LOOK AFTER HIM ALL THE TIME.

UNIVERSAL WASHROOOM

READING ROOM: READING ROOM WITH MORE WINDOWS WILL GIVE YOU A BETTER VIEW OF THE BACKYARD AND MORE SUNLIGHT.

55


BEDROOM 1 (FOR DEMENTIA)

STAIRS & STORAGE

TEA ROOM

LIFT

SECOND FLOOR (PRIVATE AREA)

BASEMENT FLOOR

VERANDAH

BEFORE & AFTER

0

READING ROOM

BEDROOM 1 (FOR DEMENTIA) BEDROOM 1 (FOR DEMENTIA)

LIFT

SECOND FLOOR (PRIVATE AREA) SECOND FLOOR (PRIVATE UNIVERSAL AREA)

READING ROOM READING ROOM

LIFT LIFT

BEDROOM 1 (FOR DEMENTIA) BEDROOM 1 1 DEMENTIA) 2 (FOR

UNIVERSAL WASHROOM UNIVERSAL 5 WASHROOM

GROUND FLOOR AREA) BEDROOM(COMMON 1

(FOR DEMENTIA) BEDROOM 1 (FOR DEMENTIA)

D FLOOR TE AREA)

TEA ROOM

KITCHEN & DINING ROOM

LIVING ROOM

ND FLOOR MON AREA)

BEDROOM 3 (FOR GUEST)

BEFORE

GROUND FLOOR LIFT (COMMON AREA) GROUND FLOOR (COMMON AREA)

LIFT LIFT

KITCHEN & DINING&ROOM KITCHEN DINING ROOM BASEMENT FLOOR

UNIVERSAL WASHROOM UNIVERSAL WASHROOM

LIVING ROOM LIVING ROOM

STAIRS & STORAGE STAIRS & STORAGE

MECH. ROOM

56

HALLWAY HALLWAY

STAIRS & STORAGE

LIFT

VERANDAH VERANDAH MECH. ROOM

UNIVERSAL WASHROOM HALLWAY STAIRS & STORAGE

HALLWAY HALLWAY

VERANDAH

UNIVERSAL WASHROOM

STAIRS & STORAGE

LIFT FLOOR BASEMENT (GUEST & MECH) BASEMENT FLOOR (GUEST & MECH)

HALLWAY BEDROOM 3 (FOR GUEST) BEDROOM 3 (FOR GUEST)

MECH. ROOM MECH. ROOM

UNIVERSAL WASHROOM

STAIRS & STORAGE

LIFT LIFT UNIVERSAL WASHROOM UNIVERSAL WASHROOM STAIRS & STORAGE STAIRS & STORAGE

HALLWAY HALLWAY

AFTER HALLWAY

ENT FLOOR T & MECH)

LIVING ROOM

BEDROOM 3 (FOR GUEST)

TEAHALLWAY ROOM TEA ROOM

(GUEST & MECH)

HALLWAY

STAIRS & STORAGE STAIRS & STORAGE

WASHROOM

STAIRS & STORAGE

UNIVERSAL WASHROOM

KITCHEN & DINING ROOM


BUILT-IN CLOSET

GUEST ROOM: GUESTROOM WITH A BUILT-IN CLOSET PROVIDES ENOUGH SPACE TO PUT CLOTH.

SLIDING DOOR

WIDER HALLWAY & USING SLIDING DOOR: MOVE THE WALL TO MAKE A WIDER HALLWAY, AND REPLACE ALL INDOOR DOORS WITH SLIDING DOORS TO SAVE MORE SPACE AND EASIER TO OPEN FOR THE OLD PEOPLE.

57


SOUTH ELEVATION CHANGES: 1. LOCATION OF MAIN ENTRANCE

0

1

2

5

BEFORE

AFTER

EAST ELEVATION CHANGES: 1. NEW WINDOWS ON THE SECOND FLOOR

0

BEFORE

58

1

2

5

AFTER


NORTH ELEVATION CHANGES: 1. BIGGER & MORE WINDOWS

0

1

2

5

BEFORE

AFTER

WESH ELEVATION CHANGES: 1. LOCATION OF WINDOWS 2. DEMOLISH EXIT DOOR & WINDOWS

0

BEFORE

1

2

5

AFTER

59


RENDERINGS 01 02 03 04 05 06

FINANCE CENTER BENCH TWISTED BUILDING PAVILION DESIGN LAMP MODERN HOUSE



FINANCE CENTER SOFTWARE USED: REVIT, DYNAMO, TWINMOTION, PHOTOSHOP

62


BENCH SOFTWARE USED: REVIT, DYNAMO, TWINMOTION, PHOTOSHOP

63


TWISTED BUILDING SOFTWARE USED: REVIT, DYNAMO, ENSCAPE, PHOTOSHOP

64


PAVILION DESIGN SOFTWARE USED: RHINOCEROS, GRASSHOPPER, TWINMOTION, PHOTOSHOP

65


LAMP SOFTWARE USED: REVIT, DYNAMO TWINMOTION, PHOTOSHOP

66


MODERN HOUSE SOFTWARE USED: SKETCHUP, V-RAY, PHOTOSHOP

67


THANK YOU ARCHITECTURE PORTFOLIO 2019-2022

68


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.