Cedetas Architecture portfolio 2014

Page 1



Cedetaş Architecture is a design and architecture firm based in Turkey, Istanbul that is established by Serkan Atilla Cedetaş. The purpose and vision of Cedetaş Architecture is to reach the best design by including the combination of factors specific to the project such as architectonic, material, budget and culture. It produces permanent prestigous and aesthetics projects from every angles about many different projects and work experince acquıred at the end of the process for building public and private sector by developing the partnership developed with the design offices and construction companies. Our teammates have proven themselves as a qualified team in office and in construction site, have multidisciplinary approach with a domination to the process of operation and are enough to bring the project to life in many different functions.


S

Pro

PROJECT NAME

DESIGN

CONSTRUCTION

DATE

LOCATION

ALCE HQ

2011

Pendik, İstanbul

BEŞİKTAŞ FISH MARKET v.02

2013

Pendik, İstanbul

INSULATOR FACTORY + OFFICES

2011

Pendik, İstanbul

UŞAK TOWN HALL

2013

Uşak

APARTMENT BUILDING

2013

Suadiye, İstanbul

APARTMENT BUILDING

2013

Kadıköy, İstanbul

WTE, EVN GRUPPE

2013

Manama, Bahreyn

EGD MANAGEMENT OFFICE

2012

Pendik, İstanbul

FULYA CULTURAL CENTER / FOOTBRIDGE

2012

Beşiktaş, İstanbul

SOS ! FAST FOOD CHAN

2011

İstanbul

EREN F ACTORY + OFFICES

2013

Pendik, İstanbul

EROL GERHARD DEN İZOĞLU HOME

2013

Ataşehir, İstanbul

ARAS BOLAYIR HOUSE

2009

Göztepe, İstanbul

EYÜP URBAN PROJECT

2010

Eyüp, İstanbul

ANTAKYA 124

2008

Antakya

TATKAR OFFICES

2008

Bakırköy, İstanbul

DENİZLİ TOWN HALL

2011

Denizli

BENETTON T EHERAN

2011

Tahran, İran

FIGARO

2009

Nişantaşı, İstanbul

ORTAKÖY CRAFT BAZAAR

2010

Beşiktaş, İstanbul


Insulator Factory

CLIENT Alce Elektrik A.Ş.

CONCTRUCTION AREA 3.000 m2

ARCHITECT Serkan Atilla Cedetaş

MECHANICAL Aksan Mühendislik

LOCATION Pendik, İstanbul

PROJECT AREA 3.000 m2

DESIGN TEAM Barış Uçar, Ozan Can Er

LIGHTING Kare Dizayn

TYPE Fabrika ve Yönetim Binası

PROJECT DATE 2011-2012

CONSTRUCTION Cedetaş Mimarlık

GRAPHIC DESIGN Alemnuma

STATUS Tamamlandı

ELECTRIC Pover Mühendislik

PHOTOGRAPHY Cemal Emden


Insulator Factory

Insulator Factory + Offices * TRANSPARENT FACTORY DESIGN: The permeability between locations directly impacts the business of life. Alce Insulator Factory Istanbul is a project which is based on a closed area about a total of 3,000 m2 including a production factory and office programs. It is the firs working of a successful company that exports to 40 countries also produces transformers and insulators ,in the name of formating the new spirit of enterprise. The main factory building was a prefabricated structure which is mostly conventionally and industrially formed for production.

As the Company has no own property, the arragements that were made to will only be on industrial productivity rather than permanent solutions about production site and storage areas. The purpose of the design of office and welcome section. Is to increase the efficiency of the staff, to ensure the integrtiy between the management and the production and can be confident enough for the visitors adoption. Firstly the machines tthat will be installed in the factory building were arranged in order to provide the coherence visually and as a whole. Then showroom space was created at the entrance of the management Office. Finally, the production offices facade on the higher elevations were designed transparent. In keeping with this goal the stairs are detailed with a light and slim package.


Insulator Factory

The company’s future growth forecast

hardness.


Insulator Factory

Å•


Insulator Factory


Insulator Factory

Å•


Insulator Factory

Å•I


Insulator Factory


Insulator Factory

Å•


Insulator Factory

Å•


Insulator Factory


Insulator Factory


Insulator Factory


Insulator Factory

Å•


Insulator Factory

Å•


Insulator Factory

Å•


Insulator Factory

Å•II


Insulator Factory

1


Insulator Factory

Å•


Insulator Factory

VAZİYET PLANI ÖLÇEK: 1/500


Insulator Factory

ZEMİN KAT PLANI ÖLÇEK: 1/10

BODRUM KAT PLANI ÖLÇEK: 1/100

KESİT A-A ÖLÇEK: 1/100

1. KAT PLANI ÖLÇEK: 1/100

GÜNEY GÖRÜNÜŞ ÖLÇEK: 1/100

KUZEY GÖRÜNÜŞ ÖLÇEK: 1/100

DOĞU GÖRÜNÜŞ ÖLÇEK: 1/100

BATI GÖRÜNÜŞ ÖLÇEK: 1/100


Insulator Factory

PLAN +1.00 KOTU

PLAN +3.75 KOTU

KESİT A-A

KESİT B-B


ALCE Headquarter *

CLIENT Alce Elektrik A.Ş.

CONCTRUCTION AREA 2.800 m2

ARCHITECT Serkan Atilla Cedetaş

MECHANICAL Aksan Mühendislik

LOCATION Pendik, İstanbul

PROJECT AREA 2.800 m2

DESIGN TEAM Barış Uçar

LIGHTING Kare Dizayn

TYPE Yönetim Binası

PROJECT DATE 2010-2011

CONSTRUCTION Cedetaş Architecture

GRAPHIC DESIGN Alemnuma

STATUS Tamamlandı

ELECTRIC MC Elektrik

PHOTOGRAPHY Cemal Emden


ALCE HQ

The Establishment of The new corporate identity with operational offices of the Management and Headquarters Building “‘It’s primarily aimed to emphesize the new management and operational Office buildings new identity of Alce Headquarters Building during the design.According to the scenario created in architectural applications the process was implemented as the building continued to be in use. And renovation project with the exterior will be finalized on ongoing process. The old unvalid to communicate inside type of structure is redesigned in order to make the study areas more active, fresh and convenient to communicate. According to new spatials, preferred details are formed and created especially keeping the integrity of the architectural design in mind..

The new items found life during the application sush as mulaj are put on the structure from the beginning to the end. Especially in places that make separation Work was allowed transparent , and formed the core of the the transition between solid surfaces in space flow,and the description of the locations provided due to the different volumes."


ALCE HQ

Continuity of Contact* The reconstruction of The Management and operational Headquarters Building and public spaces. That will come to the fore of the new corporate identity. Architectural applications were implemented according to the scenario created inside the active building and the process is still continuing,the project will be finalized with the renovation of the exterior face work.

The structure of the old ,unable to communicate type of space; was redesigned to make it clear constantly in touch and able to work more actively. Due to new needed details , the materials and architectural design integrity were fommed in particular .

*XXI Magazine, Number 110, June 2012


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

Å•


ALCE HQ

+4,73 KOTU | 1. KAT PLANI ÖLÇEK: 1/50

+1,36 KOTU | ZEMİN KAT PLANI ÖLÇEK: 1/50

+4,73 KOTU | 1. KAT PLANI ÖLÇEK: 1/50

+8,07 KOTU | 2. KAT PLANI ÖLÇEK: 1/50

+11,39 KOTU | 3. KAT PLANI ÖLÇEK: 1/50

+14,77 KOTU | TERAS KAT PLANI ÖLÇEK: 1/50


ALCE HQ

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

BETONARME SU YALITIMI TESVİYE BETONU ŞAP YAPIŞTIRICI SERAMİK KABA SIVA-YAPIŞTIRICI DUVAR ASKI APARATI GALVANİZ KARKAS ASMA TAVAN LAVABO LAVABO BATARYASI GÖMME REZERVUAR BUTONU ASMA KLOZET ANKASTRE TUVALET KAĞITLIĞI ANKASTRE ÇÖP KUTUSU KAMPAKT LAMİNAT BÖLÜCÜ DUVAR FOTOSELLİ EL KURUTMA MAKİNASI FLOTAL AYNA+YAPIŞTIRICI+MDF AYDINLATMA ELEMANI YER SÜZGECİ ALUMINYUM KASA-KANAT, SÜT LAMİNE CAMLI KAPI KOLU (HAFELE)

DETAY 04 TUVALETLER ÖLÇEK: 1/20


ALCE HQ

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

HALI YAPIŞTIRICI ŞAP DÖŞEME SIVA+BOYA ALÇI LEVHA KUTU PROFİL DUVAR KENAR FUGASI DENİZLİK PENCERE KASA+KANAT ISI CAM GALVANİZ ASMA TAVAN KARKAS ASMA TAVAN ALÇI LEVHA ASMA TAVAN SIVA+BOYA LAMİNE BÖLÜCÜ CAM DUVAR 40X40mm KUTU PROFİL KARKAS FLEXSTONE TAŞ KAPLAMA LAMİNE CAM PROFİL MDF KOLON KAPLAMA GİZLİ IŞIK FLORASAN DENİZLİK GAZBETON XPS DIŞ CEPHE SIVASI DIŞ CEPHE BOYASI

DETAY 01 TOPLANTI / MÜDÜR ODASI ÖLÇEK: 1/20


ALCE HQ

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

HALI YAPIŞTIRICI ŞAP DÖŞEME SIVA+BOYA ALÇI LEVHA KUTU PROFİL DUVAR KENAR FUGASI MEVCUT DENİZLİK PENCERE KASA+KANAT ISI CAM ASMA TAVAN KARKAS ASMA TAVAN ALÇI LEVHA ASMA TAVAN SIVA+BOYA DENİZLİK GAZBETON XPS DIŞ CEPHE SIVASI DIŞ CEPHE BOYASI 50*100 PENCERE YALITIM PROFİLİ

DETAY 06 AÇIK OFİS ÖLÇEK: 1/20


ALCE HQ

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

SIVA+BOYA ALÇI LEVHA 28X40 mm DEMİR KONSTRUKSİYON CAM TUĞLA DUVAR LAMİNE CAM BÖLÜCÜ DUVAR 24X40mm DEMİR KONSTRUKSİYON U KÖŞE ÇITASI (KAPAMA) DOĞAL TAŞ ALPAMA DOĞAL TAŞ MERDİVEN BASAMAKLARI PASLANMAZ METAL KÜPEŞTE / Ø 5 cm PASLANMAZ METAL DUVAR BAĞLANTI / Ø 2,5 cm PASLANMAZ METAL BAĞLANTI ELEMANI PASLANMAZ METAL BAĞLANTI ELEMANI DUVAR ANKRAJ YUVASI MERDİVEN MEVCUT DUVAR MERDİVEN MEVCUT BASAMAK SÜPÜRGELİK HAVUZ ÇITASI YAPIŞTIRICI DÜZELTME BETONU ASMOLEN DÖŞEME ASMA TAVAN KARKAS ASMA TAVAN ALÇI LEVHA ASMA TAVAN SIVA+BOYA LAMİNE CAM PROFİLİ MERDİVEN KORKULUK CAMI PASLANMAZ METAL BAĞLANTI ELEMANI PASLANMAZ METAL BAĞLANTI ELEMANI DUVAR ANKRAJ YUVASI FOTOSELLİ KAYAR KAPI

DETAY 03 MERDİVEN 01 ÖLÇEK: 1/20


ALCE HQ

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

SIVA+BOYA ALÇI LEVHA 28X40 mm DEMİR KONSTRUKSİYON CAM TUĞLA DUVAR LAMİNE CAM BÖLÜCÜ DUVAR 24X40 mm DEMİR KONSTRUKSİYON U KÖŞE ÇITASI (KAPAMA) DOĞAL TAŞ KAPLAMA DOĞAL TAŞ MERDİVEN BASAMAKLARI PASLANMAZ METAL KÜPEŞTE / Ø 5 cm PASLANMAZ METAL DUVAR BAĞLANTI / Ø 2,5 cm PASLANMAZ METAL BAĞLANTI ELEMANI PASLANMAZ METAL BAĞLANTI ELEMANI DUVAR ANKRAJ YUVASI MERDİVEN MEVCUT DUVAR MERDİVEN MEVCUT BASAMAK SÜPÜRGELİK HAVUZ ÇITASI YAPIŞTIRICI DÜZELTME BETONU ASMOLEN DÖŞEME ASMA TAVAN KARKAS ASMA TAVAN ALÇI LEVHA ASMA TAVAN SIVA+BOYA LAMİNE CAM PROFİLİ MERDİVEN KORKULUK CAMI PASLANMAZ METAL BAĞLANTI ELEMANI PASLANMAZ METAL BAĞLANTI ELEMANI DUVAR ANKRAJ YUVASI FOTOSELLİ KAYAR KAPI

DETAY 03 MERDİVEN 01 ÖLÇEK: 1/20


ALCE HQ

KESİT A-A ÖLÇEK: 1/50

KESİT B-B ÖLÇEK: 1/50


EGD

Management Office

CLIENT E.G.D.

CONCTRUCTION AREA 280 m2

ARCHITECT Serkan Atilla Cedetaş

MECHANICAL Aksan Mühendislik

LOCATION Pendik, Istanbul

PROJECT AREA 280 m2

DESIGN TEAM

LIGHTING Total Aydınlatma

TYPE Fabrika ve Yönetim Binası

PROJECT DATE 2011

CONSTRUCTION Cedetaş Mimarlık

PHOTOGRAPHY Cemal Emden

STATUS Tamamlandı

ELECTRIC MC Elektrik


EGD Management Office

An inspiring volume of design without having absolute boundaries of exact physical boundaries and absolute order In the process of transforming the closed tissues to an open office design time, space transitions were provided with a vertical seperation that make up centre island. Surfaces flow into the spaces and the description of the locations are provided with the differences of volumes.


EGD Management Office

Å•


EGD Management Office

Å•


EGD Management Officeŗ

ŕ


EGD Management Office

Å•


EGD Management Office

Å•


EGD Management Office

Å•


EGD Management Officeŗ

ŕ


EGD Management Office

Å•


EGD Management Office

Å•


EGD Management Office

135


EGD Management Officeŗ

ŕ


EGD Management Officeŗ

ŕ


EGD Management Officeŗ

ŕ


EGD Management Office

Å•


EGD Management Office

Å•


Beşiktaş Fish Market v.02 Renovation

CLIENT Beşiktaş Belediyesi

CONCTRUCTION AREA 480 m2

ARCHITECT

MECHANICAL Açıkalın Yapı

LOCATION Beş

PROJECT AREA 480 m2

DESIGN TEAM Ozan Can Er

LIGHTING Pover Mühendislik

PROJECT DATE 2013

CONSTRUCTION Cedetaş Mimarlık

PHOTOGRAPHY Cedetaş + Gad

STATUS Tamamlandı

ELECTRIC Pover Mühendislik

TYPE Alışveriş

iktaş, İstanbul


Beşiktaş Fish Market v.02 Renovation

Besiktas Fish Market, hand once more designed through and became more useful. “With the design process the Köyiçi Street in the fish market, which is the main pedestrian circulation supplying the market, was decided to be the focal point of the Project. The former island shaped plan in 2009 replaced with an arc-shaped fiction. Due to the changes the Street pedestrian traffic expanded and this new settlement got the shape of the new fish market in Köyiçi Street. The new public square that occur in and the new sales counters around the square take their place in the program. They were redesigned and manufactured with the thought of the most comfortable, ergonamic, sturdy,hygienic way of the market goers passing. In the rear sections ,the work benches were placed below the stainless steel surface to keep the fish fresh with the help of hidden cooling systems. In addition to this drainages were added not to disturb anyone with fish water and

top hangerswere designed to brighten the counters and also elements like weighing - bag signs to be hanged on it. Ease of use and quality increased by adding many details, to every fish sales counter such as infrastructure of internet, private water, electricity and telephone. Besiktas Fish Market exposed to harsh weather like wind and rain especially from the Bosphorus side. To mitigate the impact of this bad weather conditions cable-supported tent was designed to the frontage. During the desingn period of the tent, reducing the meteorological effects was taken in to consideration but the perspective of the Fish Market was always the balance point. While selecting the materials, we paid attention not to choose the ordinary membrane, rather than it a rain proof, like a fishing net, ventilation providing product was preferred.


Beşiktaş Fish Market v.02 Renovation

Besiktas Bazaar Shooting Center: Fish Market* Besiktas Fish Market has been renewed once again using opportunity of the ban months of hunting in the summer once again. This time the architect Serkan Atilla Cedetaş was at the beginning of the project.Cedetaş told the studies of the market that is redesigned to become more useable like this: "Besiktas Fish Market has been projected with the support of Besiktas restaurants, tradesmen and citizens and espacially the contribution of the president İsmail Ünal’s personal support in 2009. This is a project which has an international award. Besiktas In particular is one of the important public scales created in Istanbul. In this second period of renewal, we eliminated the wear that occured in this important project and re-examined the architectural design solutions

to make it renew and assumed the construction of the application to give answer to the demands of the new users. "The Shell was smoothed away the problems of isolation during the structural renovation shell, escaped the problems of isolation " Serkan Atilla Cedetaş says and continues: "All electrical and mechanical systems are renewed.Infrastructure installationschanged. Surface corrosions are removed, the measures taken to extend the life of the material. "


BeĹ&#x;iktaĹ&#x; Fish Market v.02 Renovation

Rain, wind resistant design Fish sales counters, taking the opinion of the trades, market-goers the most comfortable way in which they can exchange ergonomics and durability, redesigned and hygiene in mind, have been made. work benches in the rear section, under all stainless steel surfaces, keep the fish fresh cooling systems established secret. This, as well as fish to water drains away without disturbing anyone, to illuminate the counters and also weighing - bags - signs can be hung with the top strap of such elements, each fisherman a special water, electricity, telephone and internet infrastructure, such as adding to the many details of fish sales counter, ease of use and quality have increased. Besiktas Fish Market, particularly exposed to influences such as wind and rain towards the Bosphorus. Architecture team, the front suspension to alleviate the worst effects stretching awnings made systematic design.

Tent designed, to reduce meteorological effects, but has favored a balance perspective break to level the space creates the perception of the Fish Market. Material selection is made, instead of an ordinary membrane, reminiscent of a fishing net in the form of the network, providing ventilation, but a product that has been preferred to spend the whirlpool and rain. * B + Magazine, fall, 13/22


Beşiktaş Fish Market v.02 Renovation

ŕ


Beşiktaş Fish Market v.02 Renovation

ŕ


Beşiktaş Fish Market v.02 Renovation

ŕ


Beşiktaş Fish Market v.02 Renovation

ŕ


Beşiktaş Fish Market v.02 Renovation

ŕ


Beşiktaş Fish Market v.02 Renovation

ŕ


Beşiktaş Fish Market v.02 Renovation

ŕ


Beşiktaş Fish Market v.02 Renovation

ŕ


Beşiktaş Fish Market v.02 Renovation

ŕ


Beşiktaş Fish Market v.02 Renovation

ŕ


Beşiktaş Fish Market v.02 Renovation


Beşiktaş Fish Market v.02 Renovation


Beşiktaş Fish Market v.02 Renovation


Beşiktaş Fish Market v.02 Renovation


Uşak Municipality Town Hall

CLIENT Uşak Municibility

CONCTRUCTION AREA

ARCHITECT Serkan Atilla Cedetaş

LOCATION Uşak

PROJECT AREA 8.057 m2

DESIGN TEAM Ozan Can Er, Ezgi Üçüncü

TYPE Belediye Binası

PROJECT DATE 2012

CONSTRUCTION Ferhat Baş

STATUS Tamamlandı

ELECTRIC İbrahim Aktaş

MECHANICAL Selçuk Avcı


Uşak Town Hall

“Möbius Strip: An Architectural problem... A strip obtained by bending one end of the strip to the other end 180 grades and the connection of them. The single faced strip can be described as not having the flexibility.While in a normal strip there are two sides, whereas in a Mobius strip there is only one side. So from a point on the Möbius strip When the whole area is started to move scanning returns to the same spot. " Design is established on three main approaches, (City Wall in the North - Recreation Area in the south - Pedestrian Approach in the West) and two main views related to them. Municipal functions are positioned in the north of the city wall; and the social areas are positioned into the area of the recreation sites.

Between the intersection consisted from this two main sessions, the vertical spatial stream was provided. Courtyard, observation deck and the centrelines at the entrance of the multipurpose hall between the courtyard are fed spatially with the connection between them. The entrance representing the municipal courtyard, not only allows access to services for scholars on the North side , but also provides social interection related to the recreation and undertakes the task of being a passage. The atrium facing the entence of the Municipal, is structured right in the middle of the mass. It provides advantages such as ease of circulation and light. It gives the sense of interior comfort. Interior arrangement was thought with the idea of open office , accessible, easy to define concept. Areas requested for secondary access like the Police were considered in the lower ground level .


Uşak Town Hall

A Service Area was thought on the 1 St Floor as a response for the needs of the staff occured from the intersection of the centerline, at the back of the Office Department. The West side arises as the the beginning of the Recreation Area comes up as the observation deck with the pedestrians needs and the city square. There is a nursery playground and a cafeteria intended with the recreation and the courtyard ,under the observation deck which is used as a plateau. At the line representing the rear end of the building ,there is a multi-purpose hall and the back courtyard which is the exist of the secondary access points.It is planned at the ground floor.

The multi-purpose hall will be done under the hall of ground floor and with a wide open area. The same building system will include the observation deck also. All space fiction was fictionalized to flow into each other and rather than just a visual image ;,st is surrounded with Shell in order to provise the spatial unity. The Shell that covers the structure takes its’ form from the geometric and arthitecturally problematic strip of möbius and the architecture of a problematic strip möbius.


Uşak Town Hall

ŕ


Uşak Town Hallŗ

ŕ


UÅ&#x;ak Town Hall


UÅ&#x;ak Town Hall


UÅ&#x;ak Town Hall

72


UÅ&#x;ak Town Hall

78


UÅ&#x;ak Town Hall


UÅ&#x;ak Town Hall


UÅ&#x;ak Town Hall


UÅ&#x;ak Town Hall


UÅ&#x;ak Town Hall

85


Eren

Factory + Offices

CLIENT Eren Elektrik A.Ş

CONCTRUCTION AREA 1.500 m2

ARCHITECT Serkan Atilla Cedetaş

MECHANICAL Açıkalın Yapı

LOCATION Pendik, İstanbul

.

PROJECT AREA 1.500 m2

DESIGN TEAM Ozan Can Er, Ezgi Üçüncü

LIGHTING Silikon

TYPE Fabrika ve Yönetim Binası

PROJECT DATE 2013

CONSTRUCTION Cedetaş Mimarlık

GRAFPHIC DESIGN Ülker

STATUS Tamamlandı

ELECTRIC Pover Mühendislik

PHOTOGRAPHY Ali Bekman


Eren Factory + Offices

Easy to understand, simple. The design process started with the purpose of exing in a new time and space dream, rather than exising inside its’ old industrial identity. The process was resulted with ease of application and the target of being useful.


Eren Factory + Offices

Å•


Eren Factory + Offices

Å•


Eren Factory + Offices

Å•


Eren Factory + Offices

Å•


Eren Factory + Offices

Å•


Eski BaÄ&#x;dat Cd. 27/1 AltÄąntepe 34840 Istanbul Turkey T +90 216 3676570 F +90 216 3676575 www.cedetas.com

youtube.com/cedetas facebook.com/cedetas vimeo.com/cedetas pinterest.com/cedetas instagram.com/cedetas


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.