James anwyl shareable pdf version 2014 cibse greenbim

Page 1

GreenBIM in Design & Preconstruction James Anwyl WSP, Leeds 03.12.14


GreenBIM in Design & Preconstruction

GreenBIM: Summary 1.  Hadlow College – new build 2.  Large Residential (Grade II Listed) 3.  Small Residential (Point Cloud) 4.  Small Residential (Victorian Terrace) 5.  BIM Intelligent Objects


GreenBIM in Design & Preconstruction

BIM: Hadlow College


GreenBIM in Design & Preconstruction

Project Overview Name:

Hadlow College RRC

Type:

Teaching facility/ Visitor Centre

Build type:

Timber frame, GSHP, MVHR

Location:

Tonbridge, Kent

Occupied:

Since 03/2010

Client:

Hadlow College

Architect:

Eurobuild

Contractor:

Eurobuild


GreenBIM in Design & Preconstruction

Prefabrication

Day 1!

Day 2!

!

!

!

Day 3!


GreenBIM in Design & Preconstruction

Value & Aftercare


GreenBIM in Design & Preconstruction

BIM Cost Benefits

* Based on data from a survey of 834 schools built in the last 10 years


GreenBIM in Design & Preconstruction

EnerPHit Refurbishment

Existing

Proposed


GreenBIM in Design & Preconstruction

EnerPHit Refurbishment

50% space increase

Existing

Proposed


GreenBIM in Design & Preconstruction

EnerPHit Refurbishment

50% space increase


GreenBIM in Design & Preconstruction

EnerPHit Refurbishment

50% space increase


GreenBIM in Design & Preconstruction

EnerPHit Refurbishment

80% energy reduction


GreenBIM in Design & Preconstruction

Proof ?


GreenBIM in Design & Preconstruction

Renovation Filter:


GreenBIM in Design & Preconstruction

Renovation Filter:


GreenBIM in Design & Preconstruction

Renovation Filter:


GreenBIM in Design & Preconstruction

3D Thermal Zones


GreenBIM in Design & Preconstruction

Thermal Bridges


GreenBIM in Design & Preconstruction

Results ?


GreenBIM in Design & Preconstruction

Results ?


GreenBIM in Design & Preconstruction

EnerPHit Walls


GreenBIM in Design & Preconstruction

EnerPHit Floors


GreenBIM in Design & Preconstruction

EnerPHit Thin Screed


GreenBIM in Design & Preconstruction

Point Cloud


GreenBIM in Design & Preconstruction

2.63

EnerPHit Victorian terrace Existing rear addition to property at 112 Jeddo Road

8.245

Existing FFL +5.81

Existing FFL +0.00

5.805

Existing FFL +2.52

5.805

Existing FFL + 2.80

Existing FFL -0.75

Existing Ground Level -0.195

1:100

2.63

Existing Site Section AA

Existing rear addition to property at 112 Jeddo Road

8.245

Proposed FFL +5.71

Existing FFL +0.00

5.805

Proposed FFL +2.64

5.805

Existing FFL + 2.80

Proposed FFL +0.00

Existing Ground Level -0.195

Proposed Site Section AA

All dimensions to be verified on site. All information to be checked by contractor for accuracy and fit. Do not scale drawing. Read drawing in conjunction with all other contract documents. Any identified discrepancies should be pointed out to the design team. At construction status this drawing remains design intent only. Drawings are subject to statutory approvals and site surveys.

1:100

Job No.

Client 0

meters

77 South Road Haywards Heath West Sussex RH16 4LB

Rev.

Change

T: +44 (0)1444 451662 E: plans@eurobuilduk.com UK Company No.: 7604448

1

2

3

4

Faisal Islam & Verity Evans Site Address

10 Kinnear Road London W12 9LE

174

Project

Drawing Title

10 Kinnear Road

Site Sections

Date

27.09.13

Scale on A3

1:100

Status

Planning

3.05.1


GreenBIM in Design & Preconstruction

EnerPHit terrace


GreenBIM in Design & Preconstruction

Structure


GreenBIM in Design & Preconstruction

Construction rehearsal


GreenBIM in Design & Preconstruction

Ventilation


GreenBIM in Design & Preconstruction

Phases

Existing

In construction

As built


GreenBIM in Design & Preconstruction

Fabric & details


GreenBIM in Design & Preconstruction

Clay blocks


GreenBIM in Design & Preconstruction

Brick slips


GreenBIM in Design & Preconstruction

Comfort Living


GreenBIM in Design & Preconstruction

Performance


GreenBIM in Design & Preconstruction

Performance

… in 3 months … in autumn … in a Victorian building


GreenBIM in Design & Preconstruction

BIM Level 3?

PassivHaus Factory, Austria

Delivered 400+ PassivHaus buildings‌


Roof panel

GreenBIM in Design & Preconstruction

BIM Level 3? Engineered product‌ .

Automatically react to structural needs


Roof panel

GreenBIM in Design & Preconstruction

BIM Level 3? Intelligent object? .

Automatically react to structural needs


GreenBIM in Design & Preconstruction

BIM Level 3? LoD protocol support

1:50 detail

3d cut detail Floor panel


GreenBIM in Design & Preconstruction

BIM Level 3? ComponentWallfinishes panel


GreenBIM in Design & Preconstruction

Carbon Footprint


GreenBIM in Design & Preconstruction

BIM Level 3? In Built LCA, cost, weight‌


GreenBIM in Design & Preconstruction

Q. Advantages? A. Resource efficiency: •  Minor changes: less checking; easy output •  Major changes: quick & real (hotfix flats example) •  Drives greater understanding of buildings •  Less risk for same effort •  Demonstrates good value for less effort


GreenBIM in Design & Preconstruction

Thanks for listening‌

www.eurobuilduk.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.