[CONSTRUCTION DOCUMENTS] batroun , lebanon preschool [ ground floor plan ] Notes
-
All dimensions should be verified on site
-
Do not scale drawing
-
The contractor must provide all shop drawings related to the project for Architect approval
-
All existing conditions must be verified by the contractor prior to
-
All samples must be submitted to the Architect for approval
-
All dimensions are in centimeters except where noted
Legend
Plot Boundary
Sheet Number
ROOM REFERENCE
Door Number
DOOR REFERENCE
Finish Level
Sheet Number Sheet Number
Set Back 3m Direction
CROSS REFERENCE
Sheet Number
DETAILS
Gypsum Board
ELEVATION MARK
TRAFFIC DIRECTION
SECTION CUT Section Number
WATER
Gypsum Board
Western Cedar Wood
Sheet Number
REINFORCED CONCRETE
Finish Floor Level
EXCAVATION
LEVELS CMU
Structure Level
Set Back 3m
Plot Boundary
DATE
NO
Western Cedar Wood
REVISION/ISSUE
Key Plan
Western Cedar Wood
Western Cedar Wood
Architect
Gypsum Board
ALAA CHAAR
Client
MINISTRY OF EDUCATION
Western Cedar Wood
Structural Engineer
W.E.C
MEP
A.S
Project Number
01
CAD DWG File
1701-CD-A101.DWG
Drawn By
AC
Checked By
DA CONSTRUCTION DOCUMENTS
Status
Drawing Specification
A
Phase
01
Floor
Sector
Drawing
Index
01 0
0
B
B
Drawing Type
Date
18 / 07 / 2017
alaa.chaar@lau.edu
Index Date
18 / 07 / 2017
TEL
+961 76 80 40 33
Site
LEBANON, BATROUN
Format
594 x 841 mm
Scale
1 : 100
GROUND FLOOR PLAN
A 101
[ s e c t i o n s aa / bb ] Notes
-
All dimensions should be verified on site
-
Do not scale drawing
-
The contractor must provide all shop drawings related to the project for Architect approval
-
All existing conditions must be verified by the contractor prior to
-
All samples must be submitted to the Architect for approval
-
All dimensions are in centimeters except where noted
Plot Boundary
Set Back 3m
Plot Boundary
Set Back 3m
Legend Door Number
LEVELS
DOOR REFERENCE Sheet Number
Window Number
Plastered Wall
T.O.R 5.8m
T.O.R 5.5m
WINDOW REFERENCE
AL
T.O.R 4.5m
T.O.R 4.5m AL
Western Cedar Wood
Roof
Sheet Number
T.O.R 4.5m T.O.R 3.6m
F
REINFORCED CONCRETE
AL
F
Western Cedar Wood
Gypsum Ceiling
Gypsum Ceiling
Gypsum Ceiling
AL
SOIL
F
AL
AL
F F
Ground Floor
CMU
Piling
WOOD
Basement
DATE
NO
REVISION/ISSUE
Key Plan
Architect
ALAA CHAAR
Client
MINISTRY OF EDUCATION
F
A.S T.O.R 4.5m
Western Cedar Wood
Western Cedar Wood
Western Cedar Wood
F
Western Cedar Wood
Ground Floor
W.E.C
MEP
T.O.R 5.5m
T.O.R 4.2m Roof
Plot Boundary
Set Back 3m
Set Back 3m
Plot Boundary
Plastered Wall
T.O.R 5.8m
Structural Engineer
Gypsum Ceiling
AL
Gypsum Ceiling
Project Number
01
CAD DWG File
1701-CD-A301.DWG
Drawn By
AC
Checked By
DA
AL
F
F AL
CONSTRUCTION DOCUMENTS
Status
Basement Drawing Specification
A
Phase
01
Floor
Sector
Drawing
Index
03 0
0
A
B
Drawing Type
Date
18 / 07 / 2017
alaa.chaar@lau.edu
Index Date
18 / 07 / 2017
TEL
+961 76 80 40 33
Site
LEBANON, BATROUN
Format
594 x 841 mm
Scale
1 : 100
S E C T I O N AA & BB
A 301