Architecture Thesis Portfolio

Page 1

chad stewART

[ GROW LEARN CREATE PROVIDE ] studio portfolio


chad stewART CSTEWART36765@GMAIL.COM 705 . 220 . 8007

a design schematic and site analysis for my studio project focused on the celebration of diversification within Vancouver’s downtown east side by trying to enhance the areas vibrancy and abundance of amenities [ market + bistro + culinary school + green house ]


contents

5

the why

8

big ideas

11

site context

25

precedents

33

h b v [ holz - beton - verbund ] structure

39

functional program

43

individual design process

51

current design

66

modeling

75

final - phase two design

95

project structural + mechanical

103

documentation set



5

the why

There has been no shortage of revitalization plans produced for the Downtown East side (DTES) in the last 20 years. Some estimate at least 30 different plans have materialized. Yet quality of life for residents has continued to decline as dilapidated hotels and empty storefronts are replaced with high-priced condos and luxury stores, with no singular vision in place for the neighborhood’s future. The goal of this project is not to push the gentrification of the area but rather to provide amenities and opportunities for the community to strengthen and become more internally sustainable. The ideas that will be presented are seen to positively impact the portions of the communities demographics that are currently suffering.



project focus focus of demographics in need

E VAN S T ALL SEASON

[ URBAN AGRICULTURE

MEN AND WOMEN AGES 20 - 44

TRADES AND APPRENTICESHIP OPPORTUNITIES

[ AGE MAJORITY ]

[ CULINARY ]

7


8

big ideas provide

create

give back to the community by providing needed amenities especially a fresh affordable market that provides the essential food amenities

allow for a meeting place for the public to interact with each other and expose them to what the building has to offer them. create a sense of connection to the public through the building. [student run public bistro]


9

learn providing a location within the community for further education by means of a culinary school. the building is also wanting to be a vehicle for teaching the public about healthy eating and sustainable growing.

grow provide a rooftop greenhouse to promote all season agriculture within the area. Also throughout the surrounding site vegetable gardens shall be created to allow for greater amount of public exposure to sustainable garden food sources

views the views of the north shore mountains and of the city will dictate the fenestration of the windows to allow for the buildings surroundings to influence the building internally. views into the building should be intentional and the view from inside the building to its surroundings should also be intentional



11

vancouver | british columbia

DIRECTLY SOUTH OF MAJOR VANCOUVER PORT

site context macro - micro

VANCOUVER’S DOWNTOWN EAST SIDE

INDUSTRIAL REGION OF NEIGHBORHOOD SOUTH OF HASTINGS STREET

630 raymur ave


12

site context urban design

AREA 6 DESCRIPTION VERY DIVERSE FEEL AND USES WITH INDUSTRIAL + RESIDENTIAL MIXED LIVING RETAIL MARKETS AND ACTIVE COMMUNITY CENTRES. DIVERSE LANDSCAPING IN RELATION TO AREA 4 TO CREATE PUBLIC SPACES AND SENSE OF PLACE. THIS INCLUDES ELEVATED PARKS AND PUBLIC PLAZAS.

MASSING BUILDING WITHIN AREA 6 SHOULD CONFORM TO A MAXIMUM OF 4-6 STOREY AND DEFINE MASSING IN COORDINATION WITH AREA 4. THE AVAILABILITY OF GRAND NORTH SHORE MOUNTAIN VIEWS SHOULD BE CONSIDERED AND ULTIMATELY KEPT. SPREAD NON-MARKET HOUSING THROUGHOUT ENTIRE PROJECT AREA INCREASE AMENITIES [MARKET / GROCERY] FOR LOCAL RESIDENTS. CREATE TRANSIT AND CIRCULATION NODES OF ACTIVITY THROUGHOUT THE SITE CREATE SAFE AND EFFECTIVE BIKE-LANES OFF HASTINGS [RAYMUR AVE] INCREASE PEDESTRIAN ACCESSIBILITY AND MOBILITY THROUGHOUT SITE THIS CREATES A “CAFE CULTURE”


13

site context surrounding context

ADMIRAL SEYMOUR ELEMENTARY SCHOOL

SINGLE FAMILY RESIDENTIAL HOMES

GREEN HOUSE + CAFE MARKET

MEDIUM - LIGHT INDUSTRIAL

ALTERNATIVE YOUTH CENTRE

SINGLE FAMILY RESIDENTIAL HOMES

CO-WORK + CO-LIVE

FUTURE DEVEL.

WORK SHOPS + RETAIL

PUBLIC PLAZA

PROPOSED SITE LOCATION

RETIREMENT + DAY CARE

RAYMUR AVE

SOCIAL HOUSING COMPLEX HEIGHT OF BUILDINGS VARYING BETWEEN 4 - 10 STOREY

SPORTS + REC CENTRE

AQUATICS CENTRE


14

site context immediate context


15

site context surrounding landscape

The pedestrian pathway through residential complex to the west of the site allow for a connection to the other side of keefer street.

behind the site to the east of the rail tracks sits single family residential with tree lined streets. the landscape seems fairly flat and constant.

wide landscaped boulevard on west side of the street with mature trees giving the light industrial area a softened and relaxed environment

to the north are great broad views of the north shore mountains and a direct visual connection to the sugar refinery and the port industry.

large area of land between the two largely treed residential area sits a complete contrast of environment. the central area lacks vegetation and interest.

The homes to the east are not very attractive as they are very old and in some cases in decrepit state especially those closer to the railway.


16

site context

traffic and pedestrian movement


17

site context immediate site traffic

SKY LINE

RAYMUR AVE

KEEFER ST


18

site context

proximity to public spaces


19

1

strathcona park

2

strathcona linear park

3

maclean park


20

site context site metrics

CURRENT ZONING | I 2 MEDIUM INDUSTRIAL AREA

FSR - 2.0 58 METERS

45 METERS

45 METERS

LOT LINE SETBACKS |

FRONT - 3 . 1 M

REAR - 3 . 1 M

SIDE - 0 . 0 M

SITE AREA | 2 6 1 0 . 0 SqM

MAXIMUM ALLOWABLE G F A | 5 2 2 0 . 0 M2 58 METERS

PROPOSED G F A | 4 5 0 0 . 0 M2

HEIGHT ALLOWANCE | NO RESTRICTION


21

site context site topography

PROPOSED SITE LOCATION

5.0m 7.0m

8.0m RAILWAY RAYMUR AVE

6.0m

6.0m

topography changes slightly as the site progresses to the east and raises more drastically beyond the railway to act as a buffer to the residential area beyond. I propose to keep the topography as is within the surrounding site and proposed plaza location to the north. the addition of steps shall be added to lift the facade of the building and give a more prominent entry location off of raymur ave.


22

site context site services

PROPOSED SITE

PROPOSED SITE

PROPOSED SITE

STORM

HYDRANT

STREET LIGHTING

SANITARY

WATER MAIN

CONDUIT LINE


23

site context solar + views

Entrances

Views

SOLAR

entrances shall be: Culinary school entrance is to be directly off of Raymur Ave. and shall be designated as a separate entrance from the market

Major view and connection for the building should be: Towards raymur and across the street to the community residential complex.

Orientation should be embrace the solar gain for the roof top greenhouse

The Market entrance shall be off of the Plaza where pedestrians are led through the plaza space and encouraged to get involved in community befor entering the community market place.

Towards the mountains, hastings, and the port of vancouver

The class rooms should not be in direct sunlight due to glare and heat gain

The proposed skyline development that will connect the residential area to the east.

The market should also embrace solar exposer for the purpose of lighting but not so much as to have significant solar gains.



25

functional Vancouver community college

- culinary school -

The Dirty Apron Cooking School

- Vancouver , BC -

Granville Island Market

precedents

- Vancouver , BC -

LUFA farms

- Montreal , QC -

architectural statoil head office |

- A Lab Architecture -


26

functional precedents Vancouver Culinary School | Culinary

Large scale culinary institute with over 400 students enrolled into the program Very well equipped with every type of kitchen possible | prep, stalks and soups, baking, general kitchens and butchery. 12 teaching kitchen are available within the culinary school Close proximity to refrigeration is essential therefore more kitchen have a 2m x 2m refrigerator within them more kitchen are along an exterior wall with the buildings services and offices within the central core of the buildings floorplan The curriculum devotes 75% to practical knowledge and 25% to theory therefore the majority of the learning within the school is done within the kitchens rather than sitting in a classroom.


27

Important utilities and appliances | VCC has a wall dedicated to 5 commercial fridges to serve the needs of the schools perishable items needs. The food store is approximately 300 sqm therefore for the proposed building size would be closer to 100 sqm Variety and size of appliances is a major importance as it is essential to have the tools to be able to do the job. Large commercial grade ovens and stove tops are required. I have contacted setimio sicoli,director of culinary to help me with the guidelines of what is required and needed within each classroom.


28

G R A N V I L L E

I S L A N D

P U B L I C

M A R K E T

functional precedents Granville Island Public Market

openness and how displayed OPEN Nfreshness E S S OofFtheTproduce H E Pand RO DitUisC E direct interaction with each vendor. you get greeted more sincerely

DIRECT INTERACTION WITH VENDORS

open more traditional market design

grit noises a sense G+Rdirt I T+ loud + D I R T+ smells + Lwith O UtheDbusy Nenvironment O I C E S give AN D BofUexcitement SY and life that resonates through the visitors.

ENVIRONMENT GIVE THE MARKETS VISITERS 90% A ofS the E Nproduce S E Oand F meats E X Care I Tnot E Mconcealed E N T . so the it allows the shopper the opportunity to look touch smell and taste bringing the experience to all the senses.

90% OF PRODUCE AND MEATS AREN`T CONCEALED SO THAT YOU MAY LOOK TOUCH AND SMELL AND TASTE TO ADDRESS ALL THE SENSES AND ADD TO A FULL TRADITIONAL MARKET EXPERIENCE. SURROUNDING A COURT YARD


P RP E C CE EDDEE NN C EE R E C L U F A F A R M S | MONTREAL L U F A

F A R M S

|

29

functional precedents

M O N T R E A L

LUFA Farms | Montreal

ONE OF THE FIRST COMMERCIAL - one of the first commercial GREENHOUSES IN THE WORLD

greenhouses in the

world PRODUCES OVER 25F25 VARIETIES producesO over vegetables NE O T Hvarieties E F I R S TOF Cof OM MERCIAL VEGETABLES.

GREENHOUSES IN THE WORLD

SUPPLIES MONTREAL RESIDENTS WITH with weekly - Supplies montreal residents P R O DTHAT U C E GET S O VDELIVEER 25 VARIETIES OF WEEKLY BASKETS baskets that to over 30 nodes V E G Eget T ANODES Bdelivered L E S . AROUND DERED TO OVER 30 THE METROPOLITIAN AREA. around the metropolitan area.

SUPPLIES MONTREAL RESIDENTS WITH

ENOUGH PRODUCE W E E K L Y TO B ASUPPLY S K E T S TTHE HAT GET DELIVENEEDS OF OVER 1000 PEOPLE. - enoughDproduce needs ofUover E R E D T O to O Vsupply E R 3 0 the NOD ES ARO ND

THE METROPOLITIAN AREA.

1000 people LOCATED IN INDUSTRIAL AREA

ENOUGH PRODUCE TO SUPPLY THE 2900SQM AREA

E Eindustrial D S O F O Varea E R 1 0with 0 0 P 2900sqm EOPLE. - locatedNin of

MONTREAL CLIMATE IS EXTREME AND rooftop area in a montreal climate. STILL ALLOWS L OFOR C A THIGH E D I NYIELD I N D UOF STRIAL AREA PRODUCT.

0 0 S Q M A R Eold A industrial building - sits on2a9 renovated

SITS ON A RENOVATED OLD INDUSTRIAL BUILDING.

6 3 0 R A Y M U R S T

|

MONTREAL CLIMATE IS EXTREME AND TILL ALLOWS FOR HIGH YIELD OF V SPA N C O U V E R RODUCT. SITS ON A RENOVATED OLD INDUSTRIAL BUILDING.

6 3 0 R A Y M U R S T

|

V A N C O U V E R


30

functional precedents

The Dirty Apron Cooking School | Vancouver

Student station setup 1 over and gas range 1 island prep top 0.75m x 1.5m containing all cooking pots pans and utensils 1 range hood 1 sink 1 flat top grill

- 8 m x 8 m rough size- accommodates 20 students per class - 2 people per station

materials| floor - concrete walls - tiled high back splash counters - butcher block

instructors area is large with area in front for class seating for 20. large counter space with extra appliances. angled mirrors above to help class view the instructor


31

architectural precedents statoil head office | A-LAB architecture



33

hbv structure holz - beton - verbund


34

OVERVIEW The basic idea of the HBV-System consists of a continuous bonding between the entire lengths of the cross section of the wood with the overlying concrete cross section. This hybrid approach to building materials allows it to be used as roof and floor structures. Using the advantages of each of the three materials together allows for a very strong yet relatively light system when compared to strictly concrete and allows for further spanning that strictly wood systems such as CLT.

GENERAL FABRICATION www.hbv-systeme.de/hbv/index.htm

This composite action is achieved with the help of the HBV-Shear Connectors extending into both the wood as well as into the concrete. For this process, one or more slots are made along the length of the wood. Afterward the slots are filled with special adhesive and the HBV connector laid in place. After the hardening of the adhesive, the protruding HBV-Shear Connectors act as distance spacer for the insulation and construction reinforcement, which are then filled with a concrete layer. A insulation layer between the wood and the concrete prevent infiltration of moisture from the fresh concrete into the wooden section. The HBV system is completed primarily in panelized systems therefore keeping the process prefabricated allowing for ideal construction environment where costs can be lowered due to less manual labor required.


35

MOMENTS The embedded HBV-Shear Connector can take very high thrust forces which can be transferred into the wooden section, and particularly into the concrete plate. In this static single-span system, the concrete layer takes the compressive stress and the underlying wooden section is takes the torsional stress, while The HBV-Shear Connectors take the shear stress between the wood and the concrete.

PERFORMANCE • significantly increase the stiffness compared to timber-only floors; • considerably improve the acoustic separation • increase the thermal mass, important to reduce the energy consumption needed to heat and cool the building • rapid erection of the timber portion, particularly if prefabricated off-site, due to its lower weight, with a function of permanent formwork for the concrete topping • reduced load imposed on the foundation; reduced mass and, therefore, reduces seismic action • possibility of using the timber as a decorative ceiling lining • low embodied energy • reduced CO 2 emissions because timber is carbon-neutral.

www.woodworks.org


36

ROOF CONSTRUCTION The HBV-Solid Roof consists of pre-fabricated elements, which are based on the HBV-Rib system. Whereas in the floor area the concrete slab is arranged on the top surface, in HBV-Solid Roof the concrete slab is arranged on the bottom. In connection with the walls, they produced a continuous inner frame. An essential insulation will be inserted on the outer surface of the HBV-Solid Roof. • • • • • •

Sound insulating Fire protection Summer thermal insulation Winter thermal insulation Air tightness Considered to be non-combustable

www.hbv-systeme.de/hbv/index.htm

www.hbv-systeme.de/hbv/index.htm


37

ACOUSTIC FLOOR

BOX FLOOR

BEAM FLOOR

RIB FLOOR

FLOOR CONSTRUCTION The HBV-Floor System in comparison with conventional wooden beam floors provides a greater rigidity through the composite effect with the concrete. Through this technique a higher load bearing capacity will be achieved and the floor deflection will be reduced. Furthermore, the HBV-Floor system offers very gut physical characteristics. Firstly, HBV-Floor system can achieve non-combustible fire rating. Secondly, through the higher density of the concrete, the sound insulation values, in particular, the impact sound insulation is comparable to a conventional concrete floor. Thermally, the HBV-Floor system showed better characteristics compared to a similar reinforced concrete floor. Through the characteristics of the wood, the thermal insulation and the acoustic of the rooms as well as the room temperature will be

PLATE FLOOR

HOLLOW FLOOR

www.hbv-systeme.de/hbv/index.htm



39

functional programing


40

fresh market programatic layout


41

culinary school programatic



43

individual design process

my approach to the design process was developing a series of massing models through the medium of sketchup. This allowed me to test ideas and see how they add up to a mass that i either disregarded entirely or took small aspects of and carried them forward to the next iteration of design. I chose this method of design process because I have never used it before and thought it would be a great opportunity to test it while in an educational environment. It however did take longer than other methods I have tried in the past but I believe was useful in the end of the process.


44

concept 1

[raised bridge way with elevated school]


45

concept 2 [crossing atrium connection to skyline]


46

concept 3


47

concept 4


48

massing concepts

1

2

3


49

4

5 7 6

massing before final concept



51

phase [ one ] design


52

programmatic layout program through section

GREENHOUSE SCHOOL COMMUNAL BISTRO

FRESH MARKET

1

2 SPLIT TOP 3 FLOORS CREATING A CONNECTION TO THE MARKET BELOW

3

4

DRAPE THE GREEN HOUSE DOWN WITHIN THE ATRIUM FOR MORE EXPOSURE

ANGLE ROOF AND ALLOW FOR ATRIUM TO OPEN FOR NATURAL VENTILATION AND OCCUPANT COMFORT


visual connection to plaza

visual connection between floors

initial study sections - phase 1

53


54

contextual site plan - phase 1 connection through green-ways

p r o p o s e d

s k y l i n e

connection to skyline green way connection plaza

raymu

r ave

social housing green-space and pathway connecting to keefer street to the east


55


56

schematic elevations - phase 1 warm industrial vision

north elevation

west elevation


57

south elevation

east elevation


58

floor plans - phase 1

1

PROVIDE | market | 1100 sqm


59

2

CREATE | communal | 1150 sqm


60

3

LEARN | classrooms | 1150 sqm


61

4

GROW | greenhouse / resource | 1100 sqm


62

sections - phase 1

east through west | visual connections


63

north through south | sustainability strategies


64

materiality | touch and feel


65

approach through plaza + skyline connection



67

modeling - phase 1


68


69


70


71


72


73



75

final

phase [ two ] design


76

contextual site plan - phase 2 skyline + raymur + plaza


strathcona park

social housing

port

railway

industrial zone

residential zone

skyline location

site location

raymur ave

port

hastings corridor

residential zone

industrial zone

77

surrounding site context - phase 2


78

concrete panel

composite wood panel

p.v. film greenhouse glazing

materiality - phase 2

alluminum facade shading


steel + timber columns

79

industrial marketplace

industrial environment

industrial accents


80

schematic elevations - phase 2 warm industrial vision

north elevation

west elevation


81

east elevation

south elevation


82

pedestrian approach - phase 2 [ 1 ] plaza incorporation and entry [ 2 ] raymur ave school entry

1


83

2


84

floor plans - phase 2

1

PROVIDE | market | 1100 sqm


85

plaza to bistro circulation diagram

2

CREATE | communal | 1150 sqm


86

atrium [ experience + visual connectivity


87

student public bistro student lounge and green house


88

3

LEARN | classrooms | 1150 sqm


89

4

GROW | greenhouse / resource | 1100 sqm


90

sections - phase 2

north east through through south west | visual context connections [ plaza + work live studios + retirement residence]


91

north through south | sustainability strategies


92

west materiality through| touch east |and context feel [ social housing + raymur ave + skyline + residential zone]


93

west through east | solar understanding


94

shadow studies - phase 2

january

january

april

april

june

june

10am 3pm

10am 3pm

10am 3pm


95

structural + mechanical wood innovation and mechanicall incorporation


96

UBC earth sciences building - structural precedence perkins + will | equilibrium consulting

Vancouver - British Columbia This five-storey 158,000 sq.ft. academic facility includes a conventional reinforced concrete laboratory wing, and an 85,000 sq.ft office / lecture hall wing and connecting atrium space built of innovative glulam post and beam and solid wood panel construction.Wood-concrete composite LSL floor panels span 21 feet between woodconcrete composite post and beam frames.

Wood Concrete Composite Floor Construction In an COMPOSITE -Plate Floor, the Shear Connector is glued into solid timber plate made of glued laminated timber. The moisture barrier for the protection of the wood is likewise completed in the manufacturing plant as well as the glazing of the wooden surfaces. At the building site, the prefabricated, large-sized construction elements are installed with the help of building crane. After the installation of the reinforcement steel mesh,

UBC’s Earth Sciences Building Vancouver - British Columbia

COMPOSITE FLOOR TO BEAM CONNECTION: 1. CAST IN PLACE CONCRETE [75mm] 2. RADIANT FLOOR HEATING + COOLING 3. STEEL REINFORCEMENT 4. RIGID INSULATION


97

structural system proposal

COMPOSITE FLOOR TO BEAM CONNECTION: 1. CAST IN PLACE CONCRETE [75mm] 2. RADIANT FLOOR HEATING + COOLING 3. STEEL REINFORCEMENT 4. RIGID INSULATION

MOMENT CONNECTION FROM FLOOR SYSTEM TO ANGLED COLUMN: 1. PERFERATED STEEL SHEER EINFORCEMENTS EPOXY SET WITHIN CLT PANELS 2. CAST IN PLACE CONCRETE [75mm] 3. STEEL REINFORCEMENT 4. RIGID INSULATION


e e e .

98

proposed detail development COMPOSITE FLOOR TO BEAM CONNECTION: 1. CAST IN PLACE CONCRETE [75mm] 2. RADIANT FLOOR HEATING + COOLING 3. STEEL REINFORCEMENT 4. RIGID INSULATION 5. PERFERATED STEEL SHEER EINFORCEMENTS EPOXY SET WITHIN CLT PANELS 6. CLT TWO-WAY STRUCTURAL PREFABRICATED PANEL [190mm] 7. PERFERATED SLEEL SHEER CONNECTOR EPOXY SET WITHIN BEAM + CLT FLOOR PANEL 8. PSL STRUCTURAL BEAM

5

d n e . d .

4

3

2

6

7

8

C I N G

1

MOMENT CONNECTION FROM FLOOR SYSTEM TO ANGLED COLUMN: 1. PERFERATED STEEL SHEER EINFORCEMENTS EPOXY SET WITHIN CLT PANELS 2. CAST IN PLACE CONCRETE [75mm] 3. STEEL REINFORCEMENT 4. RIGID INSULATION 5. STRUCTURAL PSL ANGLED COLUMN 6. STEEL MOMENT BLADE CONNECTION MECHANICALLY FASTENED + INSET WITHIN PSL COLUMN + CLT FLOORING PANELS. 7. CLT TWO-WAY STRUCTURAL PREFABRICATED PANEL [190mm]

1

2

3

7

4

6

105

5


99

structural sequencing diagram

1

2

3

4

5

6

7

8


100

mechanical layout schematics

radiant floor heating + cooling

ventilation

exhaust


101



103

modeling - phase 2


104


105


106


107



1790

1600

1600

1600

1760

2970

1170

1040

1040

1040

1040

1040

1030

1040

1040

1030

1040

1150

1890

1920

1920

1920

1920

2110

109 1800

1300

700

B3

A

A 7740

P3

15160

B

STORAGE 307.1

3110

2090

B

13160

2150

700 1450

W1

15160

13000

GEN. TEACHING KITCHEN 306

B3

W2

7740

W1

7740

7740

W1

3040

D307.2 W1

3250

2050

W1 P3

8500 11470

7840

1900

1900

ELEVATOR E-2

2030

P1 12620

3240

STUDENT GREEN-HOUSE 302

8300 8360

1300 P2

1650

1750

W1

5110

W1

W1

W2

W3

1000

M3

F

830

2840

2880

900

M. WASH 303

3150

1900

M3

810 1630

W3

W2

1630

1630

1630

9940

1780

W3

1-A

1400

2960

990

1330

1330

2960

1330

1280

1200

1330

1330

1330

1020

12450

10530

1-B

WA

SCAL

39990 400

3270

1900

P2

3590

1640

4350

1900

1880

2890

D302 2840

P2 1580

8360

1930

1930

W2

DN

W. WASH 304

1390

1440

9060

1430

F

3500

6990 1630

700

3000

1990 1860 1860 1860 1860

1030

D303 P2 P1

DST1.2

1600

700

3200

3200

3200 1840 3640

P3

D304

1850

STAIR ST-1

B3

B3

E

2040

1030

STUDENT WORK SPACE 301

P1 4910

1600 1600

FRIDGE 305.1

P2

CORRIDOR C-3

3930

1990 2710

1730

ELEVATOR E-1

STALKS + SOUPS 308

9730

B3 P3

3100

P1

P1

1600 1600

12960

2900

N4 2900

2500

540 560

540 560

W2 W5

FRIDGE 308.2

P1

E-2

CORRIDOR C-3

D305.2

1940 4300 8900

ATRIUM SPACE A-1

GEN. TEACHING KITCHEN 305

P2

P3

1-A

W2

3290

W-3

D308.3 880

D308.1

W3

P1 D305.1

P3

E

W2

DST2.4

3000

1460

W1

1650

STAIR ST-2

P1

12780

1140

PANTRY 308.1

D308.2

E-1

FRIDGE 307.3

2130

D

P3

D307.4

6720

P2

N4

P3

wood innovation and mechanicall incorporation

4560

3230

2 A401

_________

800

5880

2600

8500

documentation phase

PANTRY 307.2

D307.3

5960

BRIDGEWAY BR-3

7150

22910

BAKING KITCHEN 307

41470

22910

6320

D

6000

3370

P3

800

1000

3000

W1

C

D306

D307.1 1080

3410

1520 W-3

8290

P1

8080

C

UILDING MODEL - chad drafting.rvt

5000

5000

W2 P3

800

2

6000

3-A

5960

3-B

800

3-C

4

11790

2150

11790

2150


TRUE NORTH

PROJECT NORTH

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

EXTERIOR WALL CONSTRUCTION - W1 50mm - COMPOSITE WOOD RESIN PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

EXTERIOR WALL CONSTRUCTION - W2 150mm THERMALLY INSULATED ALUMINUM EXTERIOR CURTAIN WALL SYSTEM

EXTERIOR WALL CONSTRUCTION - W3 50mm - LIGHTWEIGHT CONCRETE PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

INTERIOR PARTITION CONSTRUCTION - P1 13mm - GYPSUM BOARD WITH PAINT FINISH 19mm - METAL FURRING 200mm REIN. CAST IN PLACE CONCRETE 19mm - METAL FURRING 13mm - GYPSUM BOARD WITH PAINT FINISH

37344 . 30787

CHAD STEWART Name

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 152mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

Signature

chadstewART.DESIGNS

BCIN 37344 . 30787 BCIN

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department

2014-04-28 3:03:18 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 92mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

JOB TITLE

STRATHCONA CULINARY MARKET 610 RAYMUR AVE VANCOUVER, BC

SHEET TITLE

PROJECT INFORMATION WALL CONSTRUCION TAGS SCALE: 1 : 8

SCALE

SHEET NO. 1:8

DRAWN CHAD STEWART

CHECKED CS

A100


TRUE NORTH

PROJECT NORTH

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

Room Area by Department Room Number 1 2 3 11 14 15 24 Not Placed: 7 002 002.1 ST-5 003 E-1

OFFICE Room Room Room Room Room Room MECHANICAL ROOM ELEVATOR ROOM Room ELEVATOR ROOM ELEVATOR

SCHOOL STORAGE AREA 004 WATER CICTERN ROOM ***MASTER LEVEL01: 7 ST-2 STAIR 102 SCHOOL LOBBY E-1 ELEVATOR E-2 ELEVATOR 104 FRIDGE 105 FRIDGE 106 WASH 107 WASH 114 PANTRY 103 LOADING 109 VENDOR 4 110 VENDOR 5 111 VENDOR 2 112 VENDOR 1 108 VENDOR 3 113 PRODUCE VENDORS 1,2,3 115 CUSTOMER LOUNGE 116 B.F.W 117 SHARED BIKE EXCHANGE GARAGE LEVEL 1: 19 8 WASH. 9 WASH. 10 WASH. 206 LECTURE KITCHEN 203 FOOD STORE 205 REFIDERATED ROOM 204 FREEZER ROOM 219 BOARD ROOM 218 WASH 207 BISTRO 201 STUDENT GREENHOUSE A-1 ATRIUM SPACE 202 STUDENT LOUNGE ST-1 STAIR E-1 ELEVATOR

2014-04-28 1:59:37 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

001

Room Type

Level

Room Area by Department Area

Not Placed Not Placed Not Placed Not Placed Not Placed Not Placed Not Placed

Not Placed Not Placed Not Placed Not Placed Not Placed Not Placed Not Placed 0 m² ***MASTER 191 m² LEVEL01 ***MASTER 9 m² LEVEL01 ***MASTER 9 m² LEVEL01 ***MASTER 12 m² LEVEL01 ***MASTER 8 m² LEVEL01 ***MASTER 97 m² LEVEL01 ***MASTER 219 m² LEVEL01

LEVEL 1 LEVEL 1

545 m² 19 m² 78 m²

LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1

8 m² 9 m² 5 m² 5 m² 8 m² 12 m² 4 m² 29 m² 32 m² 53 m² 22 m² 40 m² 31 m² 599 m²

LEVEL 1

43 m²

LEVEL 1 LEVEL 1

6 m² 111 m²

LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2

1114 m² 4 m² 4 m² 8 m² 92 m²

LEVEL 2 LEVEL 2

42 m² 11 m²

LEVEL 2

11 m²

LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2

59 m² 5 m² 152 m² 71 m²

LEVEL 2 LEVEL 2

103 m² 58 m²

LEVEL 2 LEVEL 2

Room Number E-2 BR-2 217 216 215 214 213 212 C-2 ST-2 211 20 LEVEL 2: 27 307.1 307.2 307.3 308.2 308.1 E-1 ST-1 308 304 303 E-2 ST-2 306 305.1 302 305 307 301 BR-3 C-3 LEVEL 3: 20 401 401.1 401.2 402 402.1 405 403 404 C-4 406 E-2 ST-2 LEVEL 4: 12 Grand total: 92

Door Quantities

Room Type

Level

ELEVATOR BRIDGE WAY WASH EX. OFFICE EX. OFFICE OFFICE OFFICE OFFICE CORRIDOR STAIR STUDENT TEACHER RESOURCE OPEN BELOW

LEVEL 2 LEVEL 2

9 m² 40 m²

LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2

5 m² 19 m² 27 m² 18 m² 13 m² 17 m² 194 m² 19 m² 73 m²

LEVEL 2 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3

22 m² 1107 m² 5 m² 6 m² 6 m² 6 m² 6 m² 8 m² 22 m² 87 m²

LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3

29 m² 33 m² 9 m² 19 m² 162 m²

LEVEL 3 LEVEL 3

5 m² 83 m²

LEVEL 3

104 m²

LEVEL 3

123 m²

LEVEL 3

74 m²

LEVEL 3 LEVEL 3 LEVEL 4

43 m² 179 m² 1008 m² 108 m²

LEVEL 4

17 m²

STORAGE PANTRY FRIDGE FRIDGE PANTRY ELEVATOR STAIR STALKS + SOUPS W. WASH M. WASH ELEVATOR STAIR GEN. TEACHING KITCHEN FRIDGE STUDENT GREEN-HOUSE GEN. TEACHING KITCHEN BAKING KITCHEN STUDENT WORK SPACE BRIDGEWAY CORRIDOR STUDENT RESOURCE MEETING ROOM MEETING ROOM GREENHOUSE PRODUCTION ROOM TOOL STORAGE DISH WASHING WASH WASH CORRIDOR COMMERCIAL GREENHOUSE ELEVATOR STAIR

Area

Assembly Description

Count Door Description 1 1 5 3

Exterior Glazed Doors - Aluminum

2 8

1 9 8 13 3 14 7 1

Type

M_Single-Flush

Width

0915 x 2134mm M_Single-Flush 0762 x 2134mm M_Single-Flush 0762 x 2032mm M_Overhead-Sect 2435 x ional 1981mm SCWD 2'-10" x 7"-0" New Door Curtain Wall Double Door Insulated Aluminum Aluminum Door 6'-0" X 8'-0" with Lite - Double SCWD (w louvre) 3'-0" X 7'-0" SCWD with Full 6'-0" X 7'-0" Lite - Double SCWD with Full 3'-0" X 7'-0" Lite Galvanized Door 3'-0" X 7'-0" (0HR) Galvanized Door 3'-0" X 7'-0" Galvanized Door - 6'-0" X 7'-0" Double 3'-0" X 7'-0" Insulated Aluminum Door with Lite

Thickne Construction ss Type Height

EXTERIOR WALL CONSTRUCTION - W1 50mm - COMPOSITE WOOD RESIN PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

Door Type

915

2134

51

10

762

2134

51

16

762

2032

51

18

3048

2500

51

865

2134

44 44

D3 ---

25 27

23

1829

2438

44

D10

29

914 1829

2134 2134

44 44

D3 D8

30 31

914

2134

44

D8

33

914

2134

44

D1

34

914 1829

2134 2134

44 44

D1 D1

35 36

914

2134

44

D12

37

EXTERIOR WALL CONSTRUCTION - W2 150mm THERMALLY INSULATED ALUMINUM EXTERIOR CURTAIN WALL SYSTEM

EXTERIOR WALL CONSTRUCTION - W3 50mm - LIGHTWEIGHT CONCRETE PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

INTERIOR PARTITION CONSTRUCTION - P1 13mm - GYPSUM BOARD WITH PAINT FINISH 19mm - METAL FURRING 200mm REIN. CAST IN PLACE CONCRETE 19mm - METAL FURRING 13mm - GYPSUM BOARD WITH PAINT FINISH

Grand total

Window Quantities Count 3 3

Window Description

Window - 0 Mullion Window - 0 Mullion (Type 2) 6 Window - 1 Mullion 2 Window - 2 Mullion 2 Window - 3 Mullion 1 Window - 4 Mullion Grand total

Type

Width

Height

Window Type

3'-0" 3'-0"

1270 914

1270 1829

EW1 W-3

6' - 4" 10' - 4" 12'-2" 14' - 4"

1930 3150 3708 4369

1829 1829 1829 1829

W-2 W-1 W5 W-4

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 152mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

37344 . 30787

CHAD STEWART

LEVEL 4

18 m²

LEVEL 4

99 m²

LEVEL 4

9 m²

LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4

28 m² 8 m² 8 m² 78 m² 514 m²

LEVEL 4 LEVEL 4

9 m² 19 m² 914 m² 4688 m²

Name

Signature

chadstewART.DESIGNS

BCIN 37344 . 30787

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 92mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

BCIN

WALL CONSTRUCION TAGS SCALE:

1 : 10

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department JOB TITLE

STRATHCONA CULINARY MARKET 610 RAYMUR AVE VANCOUVER, BC

22 m² 8 m² SHEET TITLE

SCHEDULES AND LEGENDS SCALE

SHEET NO. 1 : 10

DRAWN CHAD STEWART

CHECKED CS

A101



TRUE NORTH

PROJECT NORTH

424

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

UP UP

FIRST FLOOR PLAN

1 A200

SECOND FLOOR PLAN

2

SCALE: 1 : 150

DN

A200

SCALE: 1 : 150

37344 . 30787

CHAD STEWART Name

Signature

chadstewART.DESIGNS

BCIN 37344 . 30787 BCIN

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department JOB TITLE

STRATHCONA CULINARY MARKET

2014-04-28 1:47:23 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

610 RAYMUR AVE VANCOUVER, BC

SHEET TITLE

KEY PLANS

DN

SCALE

SHEET NO.

1 : 150

3 A200

THIRD FLOOR PLAN SCALE: 1 : 150

4 A200

FOURTH FLOOR PLAN SCALE: 1 : 150

DRAWN CHAD STEWART

CHECKED CS

A200


TRUE NORTH

1 A402

_________

1-B

2

10530

3-A

3-B

800

6000

5955

EXTERIOR WALL CONSTRUCTION - W1 ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE 50mm - COMPOSITE WOOD RESIN PANEL RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S. 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING CONSTRUCTION NOTES 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION B1 ELECTRICAL POWER OUTLETS TO BE 13mm - GYPSUM BOARD PAINT FINISH INSTALLED FLUSH WITH FLOOR C/W

SHARED BIKE EXCHANGE GARAGE 117

4

3-C

800

STAINLESS STEEL HINGED CASING

37840 11290

12690

B2

ELECTRICAL OUTLETS TO BE INSTALLED AT 4' ABOVE FINISHED FLOOR WITH 1 OUTLET TO BE 120V AND ONE OUTLET AT 240V

M3

EXHAUST REQUIREMENTS TO BE HANDLED BY AN ERV TIED TO SUITABLE A/C UNIT FOR FRESH AIR. (WASHROOM/ SHOWER/ LOCKER RM AREA).

11690

W1

EXTERIOR WALL CONSTRUCTION - W2 150mm THERMALLY INSULATED ALUMINUM EXTERIOR CURTAIN WALL SYSTEM

A

1480

1650

A

PROJECT NORTH

1600

1600

1600

1520

1180

W2

2920

2970

1050

1160

2190

D110

1580 1580

1810

3000

C

3200

W2

DST2.1

1580

36050

1600 20750

38790

B2

8500

B1 10000

1580

B1

D

W3

VENDOR 4 109

PRODUCE VENDORS 1,2,3 113

B1

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 152mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

W2 W1

1580

VENDOR 3 108

B2

E

1500 D107 1680

2210

1600

440

P1

3690

P2

ELEVATOR E-2

D104

FRIDGE 105

FRIDGE 104

2670

1740

2840

4260

W2

P3

P2

P2 D105

P1 1600

P2

P1

P2

2760

P1 3500

3240

W1

D116

B.F.W 116

1000

BCIN 37344 . 30787

1950

8300

P1 D103.3

2660 M3

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department

F JOB TITLE

W1 P1

D103.2 5850

W1

W3

LOADING 103

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 92mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH 2690

F

D103.1

P1

2740

5530

P1

UP

VENDOR 2 111

P3

1300

VENDOR 1 112

1750

2540

SCHOOL LOBBY 102

D102

1750

3230

2430

2430

2200

WASH 107

D106 P1

940

1400

M3

STRATHCONA CULINARY MARKET

1100

ELEVATOR E-1

M3

P3

WALL CONSTRUCION TAGS 2740

2340

P2

990

410

P1

2300

1730 9730

WASH 106

W2

1600

1600

P1 700

1600

8900

chadstewART.DESIGNS

1360

4150

4300

W-1

E-2

Signature

BCIN

2150

400

Name

P2

W3

E-1

37344 . 30787

CHAD STEWART

E W1

2014-04-28 5:00:10 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

INTERIOR PARTITION CONSTRUCTION - P1 13mm - GYPSUM BOARD WITH PAINT FINISH 19mm - METAL FURRING 200mm REIN. CAST IN PLACE CONCRETE 19mm - METAL FURRING 13mm - GYPSUM BOARD WITH PAINT FINISH

DST2.2

P1

_________

30470

1890

32260

800

W2

1580

8500

2 A401

PANTRY 114

STAIR ST-2

1580

3000

P3

P1

3000

D113.2

P1

D

5000

P3

W1

W2

D113.1

C

7740

4010 2010

W2

2090

CUSTOMER LOUNGE 115

EXTERIOR WALL CONSTRUCTION - W3 50mm - LIGHTWEIGHT CONCRETE PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

1150

B

3820

1580

W2

1580

5000

1100

1720

810

B

1160

W1

VENDOR 5 110

11580

1600

1480

1600

1480

1760

10820

7740

1480

W2

610 RAYMUR AVE VANCOUVER, BC

SCALE: 1 : 8 SHEET TITLE

W3 W2 W3 1630

1630

1630

1630

1630

9940 1400

1-A

FIRST FLOOR

1780 2830

24370

10530

1-B

6000

2

800

3-A

5960

3-B

3-C

800

4 SCALE

1 A201

FIRST FLOOR PLAN SCALE:

1 : 100

SHEET NO.

As indicated

DRAWN CHAD STEWART

CHECKED CS

A201


TRUE NORTH

1 A402

1-B

2

10530

3-A

800

6000

EXTERIOR WALL CONSTRUCTION - W1 50mm - COMPOSITE WOOD RESIN PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

WIREMESH STEEL GUARD RAIL

_________

3-B

3-C

5960

800

4

37840 11330 1790

10540

3880

3880

13830 700

1790

1410

1920

1920

960

960

1920

1920

W1

1040

1040

1040

1040

700 1300

1940

7740

REF. REF. M3

1030

1040

1040

1030

1040

1130

M3

W1

830

OPEN BELOW 20

1680

D212

P2

W1

M3

D207.3 P1

D207.4 D207.5 2240

1750

1750

D207.1 W-2 P3

1820

BRIDGE WAY BR-2

800

P1

3080

1800

STAIR ST-2

W2

DST2.3

D

1740

P1

1600

1910

1910

1860

800

3240

6000

5410

270

5960

W1

W2

W2 B3

1630

1630

700

1630

1630

1630

9940

36190

36190

40930 8500 8300

4170

STRATHCONA CULINARY MARKET

3100

610 RAYMUR AVE VANCOUVER, BC

WALL CONSTRUCION TAGS SCALE: 1 : 8 SHEET TITLE

W3 W3

1780

D204

JOB TITLE W1

400

560

610

1000

2400

1910

FREEZER ROOM 204

830

400 3500

1910

STUDENT GREENHOUSE 201

P1

F

2330

1910

4940

1910

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department

P2

ELEVATOR E-2

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 92mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

FOOD STORE 203

P1

D201

W2

4630

W2

REFIDERATED ROOM 205

1500

W2

F

P2

D203

DST1.1

2040

6990

1600 1600

DN

STUDENT LOUNGE 202

P1

D205

4230

1600

STAIR ST-1

UP

1400

1700

1280

ELEVATOR E-1

9730

8900

4000

D219

P1

E-2

P2

P1

2510

P3

BCIN 37344 . 30787

P2

1280

BOARD ROOM 219

Signature

BCIN

2650

W2 B3

Name

D206.2

CORRIDOR C-2

W2 390

D218

P2

390

1360

WASH 218

37344 . 30787

CHAD STEWART

E

9060

P3

11440

2070 W-2 660

1600

1730

E-1

1450

1450

W3 2150 700

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 152mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

chadstewART.DESIGNS

350

P3

W1

6700

LECTURE KITCHEN 206

CORRIDOR C-2

D211

2690

4150

4150

4300

D217

1770

ATRIUM SPACE A-1

W2

D216

WASH P3 217

W1

CORRIDOR C-2

3090

N4

1470

P2

E

12960

W-4

790

EX. OFFICE 216

W2

1580

1580

P3

2810

4000

5000

STUDENT TEACHER RESOURCE 211

3230

3380

P1

D206.1

8080

1450

790

700

N4

W2

EX. OFFICE 215

3890

1580

B3

INTERIOR PARTITION CONSTRUCTION - P1 13mm - GYPSUM BOARD WITH PAINT FINISH 19mm - METAL FURRING 200mm REIN. CAST IN PLACE CONCRETE 19mm - METAL FURRING 13mm - GYPSUM BOARD WITH PAINT FINISH

C

P2

1580

39680 8500

7880

2 _________ A401

2014-04-28 4:59:26 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

1430

W-1

D

1900

2850

1040

2080

W1

1370

3200

P3

P3

970

W-3

3000

D215

2470

12670 1170

WIRE MESH STEEL GUARD RAIL TO BE INSTALLED TO FLOOR REVEAL WITH BRUSHED STEEL FINISH

D213

700 700

D214

C

OFFICE 212

N4

5000

W-2

5520

B 700

P3

OFFICE 213

1880

1300

P3

8740

8740

5000

OFFICE 214

700

2950

3420

W1

3500

P3

800

4870

4200

EXHAUST REQUIREMENTS TO BE HANDLED BY AN ERV TIED TO SUITABLE A/C UNIT FOR FRESH AIR. (WASHROOM/ SHOWER/ LOCKER RM AREA).

EXTERIOR WALL CONSTRUCTION - W3 50mm - LIGHTWEIGHT CONCRETE PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

D207.6

5200

3380

EW1

5300

B

EW1

EXTERIOR WALL CONSTRUCTION - W2 150mm THERMALLY INSULATED ALUMINUM EXTERIOR CURTAIN WALL SYSTEM

3030

1560

7740

1560

BISTRO 207

W2

1560

W1

M3

1130

B3

A502

EW1

CEDAR WOOD SUN SHADES MECHANICALLY FASTENED TO WALL CONSTRUCTION

1220

1560

W2

9190 7740

1 _________

CONSTRUCTION NOTES B3

A

1560

A

1800

1560

D207.2

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

B3

W2

700

W2

2110

3000

1450

2000

2150 700

PROJECT NORTH

2830

1120

1330

1330

1330

1280

2830

1200

1330

1330

1330

1020

12580

11790

SECOND FLOOR PLAN

37840 1400

1-A 1 A202

10530

1-B

OVERALL LEVEL 2 FLOOR PLAN SCALE:

1 : 100

800

2

6000

3-A

5960

3-B

800

3-C

4

SCALE

SHEET NO.

As indicated

DRAWN CHAD STEWART

CHECKED CS

A202


TRUE NORTH

1-B

2

10530

1 _________ A402

3-A

800

3-B

4

3-C

6000

5960

EXTERIOR WALL CONSTRUCTION - W1 50mm - COMPOSITE WOOD RESIN PANEL ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE 25mm - AIR SPACE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N AIR BARRIER S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S. 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION CONSTRUCTION NOTES 13mm - GYPSUM BOARD PAINT FINISH

800

39990 2150

8360 1790

1600

2970

1600

1600

1760

12680

2970

1170

1040

1040

1040

1040

1040

1030

11690

1040

1040

1030

1040

1150

1890

1920

1920

1140 1920

1920

1010

2110

1800

1300

700

B3

A

A 7740

P3

3040

3250

2050

W1

1860

8500

7840

2030

STUDENT GREEN-HOUSE 302

1860 8360

1300

M3 P2 1650

8300

2880

900

1850

P1 3240

1750

F 3150

1900

W1

1630

1630

1630

9940

1780

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department

5110

JOB TITLE 830

W1

W1

W2

W3

STRATHCONA CULINARY MARKET 610 RAYMUR AVE VANCOUVER, BC

810

1630

W3

W2

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 92mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

3270

1900

12620

W3

WALL CONSTRUCION TAGS SCALE: 1 : 8

2960

990

1330

1330

2960

1330

1280

1200

1330

1330

1330

1020

12450

11790

2150

11790

2150

SHEET TITLE

THIRD FLOOR PLAN

39990 400

1-A

1400

10530

1-B

800

2

6000

3-A

BCIN 37344 . 30787 BCIN

8360

1930

1930

1900

Signature

3590 M3

1640

1900

P2

2890

4350

1900

1880

M. WASH 303

ELEVATOR E-2 3230

2840

1000

1630

700

Name

1390

1440

9060

P2 P1

D302

2840

P2 1580

37344 . 30787

CHAD STEWART

chadstewART.DESIGNS

W. WASH 304

D303

W2

DN

6990

1430

F

3500

1600

700

3000

1990 1860

P3

1030

D304

DST1.2

B3

B3

3200

3200

3200 1840 3640

11470

1030

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 152mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

E

1860

FRIDGE 305.1

P2

STUDENT WORK SPACE 301

P1 4910

1600 1600

STAIR ST-1

540 560

540 560

B3 P3

3100

CORRIDOR C-3

3930

1990 2710

1730

ELEVATOR E-1

P1

9730 1600

12960

2900

2900

P1

STALKS + SOUPS 308

1600

8900

3290

N4

2500

P1

E-2

W2

D305.2

1940 4300

FRIDGE 308.2

D308.1

W2

CORRIDOR C-3

P3

1-A

E-1

ATRIUM SPACE A-1

GEN. TEACHING KITCHEN 305

P2

P3

E

W3

P1

W5

D308.3 880

INTERIOR PARTITION CONSTRUCTION - P1 13mm - GYPSUM BOARD WITH PAINT FINISH 19mm - METAL FURRING 200mm REIN. CAST IN PLACE CONCRETE 19mm - METAL FURRING 13mm - GYPSUM BOARD WITH PAINT FINISH

2040

1460

W1

1650

W2

DST2.4

3000

1140

PANTRY 308.1

P1

D305.1

N4

FRIDGE 307.3

2130

D

W-3

D307.4

6720

STAIR ST-2

P2

P3

P3

D308.2

4560

12780

_________

800

5880

2600

8500

2 A401

PANTRY 307.2

D307.3

5960

BRIDGEWAY BR-3

7150

22910

BAKING KITCHEN 307

41470

22910

6320

D

6000

3370

P3

800

1000

3000

W1

C

D306

D307.1 1080

3410

1520 W-3

8290

WIRE MESH STEEL GUARD RAIL TO BE INSTALLED TO FLOOR REVEAL WITH BRUSHED STEEL FINISH

P1

8080

C

2014-04-28 4:59:10 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

5000

5000

W1

P3 P3

N4

7740 15160

D307.2 W2

EXHAUST REQUIREMENTS TO BE HANDLED BY AN ERV TIED TO SUITABLE A/C UNIT FOR FRESH AIR. (WASHROOM/ SHOWER/ LOCKER RM AREA).

EXTERIOR WALL CONSTRUCTION - W3 50mm - LIGHTWEIGHT CONCRETE PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

B

STORAGE 307.1

3110

2090

B

M3

13160

2150

700 1450

W1

CEDAR WOOD SUN SHADES MECHANICALLY FASTENED TO WALL CONSTRUCTION

15160

13000

GEN. TEACHING KITCHEN 306

B3

B3

EXTERIOR WALL CONSTRUCTION - W2 150mm THERMALLY INSULATED ALUMINUM EXTERIOR CURTAIN WALL SYSTEM

W1

7740

7740

W1

W2

PROJECT NORTH

5960

3-B

800

3-C

4 SCALE

SHEET NO.

As indicated

1 A203

OVERALL LEVEL 3 FLOOR PLAN SCALE:

1 : 100

DRAWN CHAD STEWART

CHECKED CS

A203


TRUE NORTH

PROJECT NORTH

1 A402

_________

1-B

2

3-A

3-B

4

3-C

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

39990 2150

11470

2150

150

1680

1630

1630

1630

12540 1630

1630

1490

1030

1040

1040

1040

1040

1040

13830

1030

1040

1040

1030

1040

1150

CONSTRUCTION NOTES

13830 W1

W1

A

1820

A

B3

CEDAR WOOD SUN SHADES MECHANICALLY FASTENED TO WALL CONSTRUCTION

B4

ROOF ACCES HATCH TO BE INSTALLED WITH PULL DOWN ACCESS LADDER VERTICAL HYRONIC GREEN HOUSE TOWER LOCATION TO BE INSTALLED EXHAUST REQUIREMENTS TO BE HANDLED BY AN ERV TIED TO SUITABLE A/C UNIT FOR FRESH AIR. (WASHROOM/ SHOWER/ LOCKER RM AREA).

1470

1870

7740

8490

1630

1450

700

W1

B5 P1

1710

1650

W2 D401

1850

6700

1650

1990

1000 1700

700

W5

8500

40270

1860

INTERIOR PARTITION CONSTRUCTION - P1 13mm - GYPSUM BOARD WITH PAINT FINISH 19mm - METAL FURRING 200mm REIN. CAST IN PLACE CONCRETE 19mm - METAL FURRING 13mm - GYPSUM BOARD WITH PAINT FINISH

1860

GREENHOUSE PRODUCTION ROOM 402

B3 W2

B5 510

P3

8666

3230

B5

3240

D405

1950

D404

WASH 404 M3

F

P2

DISH WASHING 405

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 92mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

W1

2700

1640

4220

1750

1330

B5

W2

BCIN 37344 . 30787

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department

W3

JOB TITLE 4220

820 550 790

W1

W2

Signature

4170 8450

2180

M3

12490

Name

BCIN

P3

WASH 403

37344 . 30787

CHAD STEWART

chadstewART.DESIGNS

DC4.5

P3 P2

8300

DC4.4

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 152mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

830

11270

3000

DC4.3

P2

E

1750

DC4.2

860

ELEVATOR E-2

3230

1650

DC4.1

P1

B5

1650

P3

D403

F

1500

P3

2160

P1

P1

830

P3

3110 P2

P3

P3

2610

B5 2930

1650 1650

B5

12670

1650

W2

700

2610

2420 2580

1650

W3

COMMERCIAL GREENHOUSE 406

TOOL STORAGE 402.1

CORRIDOR D406 C-4

B5

6730

4100

4300

4300

W2 B5

3170

7650

1750

12640

1860

D402.1

8450

1650

29280

2410

11380

W2

W1

8900

1370

1900

8380

8500 1650

3640

1650

ATRIUM SPACE A-1

11270

E-1

P1

B4

B5

W2

E

P2 D402

1860

13890

1800

D

40270

8500

2 A401

_________

EXTERIOR WALL CONSTRUCTION - W3 50mm - LIGHTWEIGHT CONCRETE PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

3000

3200

3200

3000

1650

3290

1760

W2

1650

3150

1350

C STAIR ST-2

P1

P2

W2

1650

D

EXTERIOR WALL CONSTRUCTION - W2 150mm THERMALLY INSULATED ALUMINUM EXTERIOR CURTAIN WALL SYSTEM

5000

MEETING ROOM 401.2

4530

P3

M3

B

D401.2

4530

5000

1750

5000 3000

870

W-2

MEETING ROOM 401.1

P3

B5

E-2

1890

1760

1470

4590

700

570

3410

1710

C

1630

11690

D401.1

W1

EXTERIOR WALL CONSTRUCTION - W1 50mm - COMPOSITE WOOD RESIN PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

W1

1920

550

B

W2

13555 W2

8420

7720

7740

7740

10530

B3

STUDENT RESOURCE 401

W1

1630

B5

WALL CONSTRUCION TAGS SCALE:

STRATHCONA CULINARY MARKET

1 : 10

610 RAYMUR AVE VANCOUVER, BC

2014-04-28 1:46:09 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

W2

SHEET TITLE 830

1460

1680

2290

1630

1630

1630

1630

1630

1470

990

1330

1330

1330

1280

1200

11310

1330

1330

1330

1020

12450

11790

2150

11790

2150

FOURTH FLOOR PLAN

39990 1400

1-A 1 A204

10530

1-B

OVERALL LEVEL 4 FLOOR PLAN SCALE:

1 : 100

800

2

6000

3-A

5955

3-B

800

3-C

4 SCALE

SHEET NO.

As indicated

DRAWN CHAD STEWART

CHECKED CS

A204


TRUE NORTH

1-B

2 10530

3-A

3-B

800

5960

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

4

3-C

6000

PROJECT NORTH

800

37840 1820

1630

1630

11470 1630

1630

1630

12540 12540

1490

11690 11690

2150

CONSTRUCTION NOTES

W1

A

ROOF TOP AIR HANDLING UNITS TO BE PLACED ALONG SIDE TALL GRASSED AREA OF ROOF TO PROVIDE ADDITIONAL COOLING STRATEGIES

M2

ROOF DRAINS TO BE INSTALLED AT LOW POINTS AND TO BE DRAINED TO THE EXTERIOR THROUGH DOWN SPOUTS

M2

M1

EXTERIOR WALL CONSTRUCTION - W1 50mm - COMPOSITE WOOD RESIN PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

7740

1 A402

_________

7740

7740

6220

4730

A

M1

W1

W1

B

EXTERIOR WALL CONSTRUCTION - W2 150mm THERMALLY INSULATED ALUMINUM EXTERIOR CURTAIN WALL SYSTEM

5000

8000

1630

1650

5000

1300

200

9180

1460

B

W1

3000

W1

8500

9180

1610 1640

8000

1650 1650 8500

1650

1660

1650

1650

1650

M2

E 8000

1640

4300

1650

E

1640

1650

W3

1650

1650

8300

M1

E-1

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 152mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

9180

1-A

E-1

INTERIOR PARTITION CONSTRUCTION - P1 13mm - GYPSUM BOARD WITH PAINT FINISH 19mm - METAL FURRING 200mm REIN. CAST IN PLACE CONCRETE 19mm - METAL FURRING 13mm - GYPSUM BOARD WITH PAINT FINISH

1670

M1

2 A401

_________

EXTERIOR WALL CONSTRUCTION - W3 50mm - LIGHTWEIGHT CONCRETE PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

D

1650

1650

D

C

M2

1630

1650

3000

C

1650

1650

M1

37344 . 30787

CHAD STEWART Name

Signature

chadstewART.DESIGNS

BCIN 37344 . 30787

1640

1650

BCIN W1

1640 1640 1660

F INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 92mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

3780

1650

F

700 1650

8900

1650

M2

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department

E-2

JOB TITLE

1640

550 820

E-2

1640

W1

W2

2014-04-28 1:45:52 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

1680 830

1460

1 A205

1630

1630

1630

1630

1390

1010

1040

1040

1040

11330

1400

1-A

1630

1040

1040

1040

1040

1040

1040

SCALE:

1000

12390

10530

1-B

1040

800

2

6000

3-A

5960

3-B

STRATHCONA CULINARY MARKET

WALL CONSTRUCION TAGS

1040

W3

11830

2150

11830

2150

610 RAYMUR AVE VANCOUVER, BC

1 : 10

SHEET TITLE

800

3-C

4

ROOF PLAN

A206 - ROOF PLAN SCALE:

1 : 100

SCALE

SHEET NO.

As indicated

DRAWN CHAD STEWART

CHECKED CS

A205


TRUE NORTH

PROJECT NORTH

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

1 A402

_________

EXTERIOR WALL CONSTRUCTION - W1 50mm - COMPOSITE WOOD RESIN PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

EXTERIOR WALL CONSTRUCTION - W2 150mm THERMALLY INSULATED ALUMINUM EXTERIOR CURTAIN WALL SYSTEM

28360 1200

27150 W4

W4

D

D

2 A401

EXTERIOR WALL CONSTRUCTION - W3 50mm - LIGHTWEIGHT CONCRETE PANEL 25mm - AIR SPACE AIR BARRIER 25mm - RIGID INSULATION ADHEARED TO SUBSTRATE 25mm - PLYWOOD SHEATHING 150mm - STEEL STUDS @ 405mm O.C 150mm - BATT INSULATION 13mm - GYPSUM BOARD PAINT FINISH

W4

8500

8500

8470

WATER CICTERN ROOM 004

12450

_________

2750

24400 P1

E

19970

2090

ELEVATOR ROOM 003

22520

W4 P1

1870

ELEVATOR E-1

P1

P1

MECHANICAL ROOM 002

P1 D002.1 P1 3200

2710

E-1

3500 2560

P1

2820 D002

12490

ELEVATOR ROOM 002.1

P1

F

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 152mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

W4

Signature

chadstewART.DESIGNS

P1

BCIN 37344 . 30787

Room ST-5

BCIN

P1

P1

3200

4480

W4

37344 . 30787

CHAD STEWART Name

F

D002.2

3260

9730

8900

6190

8300

3350 D003.2

E-1

11510

22180

4300

P1

D003.1

SCHOOL STORAGE AREA 001

INTERIOR PARTITION CONSTRUCTION - P1 13mm - GYPSUM BOARD WITH PAINT FINISH 19mm - METAL FURRING 200mm REIN. CAST IN PLACE CONCRETE 19mm - METAL FURRING 13mm - GYPSUM BOARD WITH PAINT FINISH

E

D004

W4

W4

INTERIOR PARTITION CONSTRUCTION - P2 13mm - GYPSUM BOARD WITH PAINT FINISH 92mm - METAL STUDS @ 405mm O.C 13mm - GYPSUM BOARD WITH PAINT FINISH

2550

E-2

2550

E-2 W4 9720

2790

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department

15840 28360

JOB TITLE

1

2014-04-28 1:45:23 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

A206

BASEMENT LEVEL SCALE:

1 : 100

STRATHCONA CULINARY MARKET

WALL CONSTRUCION TAGS SCALE:

610 RAYMUR AVE VANCOUVER, BC

1 : 10

SHEET TITLE

BASEMENT PLAN

SCALE

SHEET NO.

As indicated

DRAWN CHAD STEWART

CHECKED CS

A206


TRUE NORTH

2 A401

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

_________

E-2

F

E-1

E

D

C

B

PROJECT NORTH

A

TOP OF ATRIUM

T/O ATRIUM

19000

19000

CONSTRUCTION NOTES

3500

N9

N9

N9 N5 T.O ROOF CONST.

B3

CEDAR WOOD SUN SHADES MECHANICALLY FASTENED TO WALL CONSTRUCTION

N4

WIRE MESH STEEL GUARD RAIL TO BE INSTALLED TO FLOOR REVEAL WITH BRUSHED STEEL FINISH

N5

50mm COMPOSITE WOOD RESIN PANEL MECH. FASTENED TO SUBSTRATE

N6

LIGHT WEIGHT CONCRETE PANELS MECH. FASTENED TO SUBSTRATE. THERMALLY INSULATED SPANDREL PANEL WITH BLACK BACKER

T/O PARAPET

15500

15500

N6 N9

N5 N6

B3

3000

N9

B3 N8

B3

N8

N9

LEVEL 4 12500

N6

N9

N14

N6

N9

N5

N8

THIRD FLOOR 8500

THERMALLY INSULATED ALUMINUM FRAME CURTAIN WALL SYSTEM.

N10

3 COURSE ARCHITECTURAL STONE BANDING GLASS AND STEEL BEAM CANOPY PARALLEL STRAND LUMBER STRUCTURAL COLUMN C/W STAIN FINISH STRUCTURAL CONC. COLUMN FOOTINGS EXTRUDED BRUSHED ALLUMINUM SIGNAGE

N11 N12

4000

N6

N9

N13 N14

LEVEL 3 8500

N5

4000

W1

N4 N9 N8

SECOND FLOOR

LEVEL 2

N9

4500

D103.3

D103.2

N6

DST2.2

4500

4500

N12 FIRST FLOOR

LEVEL 1

0

N13

N10

N5

N6

N9

N6

N5

0

N10

EAST ELEVATION

1

SCALE:

A301

1 : 100

2 A401

_________

A

B

C

D

E

E-1

F

E-2

TOP OF ATRIUM

T/O ATRIUM

19000

19000 N9 1650

3500

1650

1650

1650

1650

1650

1250

1360

3500

N9

T.O ROOF CONST.

1650

1650

1650

1650

1650

1650

1650

1650

Name

N9 3000

N5

15500 1650

37344 . 30787

CHAD STEWART

T/O PARAPET

1650

1250

15500

Signature

chadstewART.DESIGNS

BCIN 37344 . 30787 BCIN

N5 LEVEL 4 N9

2650

4000

3950

330

N6

THIRD FLOOR 8500

LEVEL 3 8500

2450

B3 330 1220

330 1220

SECOND FLOOR

N6

2440

N6

N6

1170

1310

4500

610 RAYMUR AVE VANCOUVER, BC

N8

3000

3110

3000

3000

SHEET TITLE N9

N9

2 A301

N9

N9

N10

N6

N9

STRATHCONA CULINARY MARKET

LEVEL 2

D102

N10

JOB TITLE

4500

1170

3620

N5

N9

550

2014-04-28 4:57:55 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

4500

1170

4500 N6

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department

N8

1140

N5 N11

330

2610

N4

1560

B3

1310

1060

B3

N9

4000

1220

N9

N6

N6

12500

N6

4000

7000

N6

B3

EAST + WEST ELEVATIONS

LEVEL 1 0

WEST ELEVATION

SCALE

SCALE:

DRAWN

1 : 100

SHEET NO. 1 : 100

CHAD STEWART

CHECKED CS

A301


TRUE NORTH

1 A402

_________

4

3-C

3-B

3-A

N9

2

1-B

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

1-A

N9

TOP OF ATRIUM

CONSTRUCTION NOTES

T/O ATRIUM 19000

3500

3500

3100

1090

19000

N9 N5

N9

400

3000

3400

N6

LEVEL 4 330

N5

N9

THERMALLY INSULATED ALUMINUM FRAME CURTAIN WALL SYSTEM. 3 COURSE ARCHITECTURAL STONE BANDING GLASS AND STEEL BEAM CANOPY PARALLEL STRAND LUMBER STRUCTURAL COLUMN C/W STAIN FINISH STRUCTURAL CONC. COLUMN FOOTINGS EXTRUDED BRUSHED ALLUMINUM SIGNAGE

N13 N14

EW1

4000

1270

EW1

N11

1230

2670

LEVEL 2 4500

550

2160

300

3000

D113.1

4500

3620

N5

D113.2

4330

N5

N5

N11

1840

N4

1170

320 330

N8

LEVEL 3 1200

1000

D207.2

SECOND FLOOR

4500

50mm COMPOSITE WOOD RESIN PANEL MECH. FASTENED TO SUBSTRATE LIGHT WEIGHT CONCRETE PANELS MECH. FASTENED TO SUBSTRATE. THERMALLY INSULATED SPANDREL PANEL WITH BLACK BACKER

8500

B3

4500

N10

N5

N9

N8

EW1

N9

WIRE MESH STEEL GUARD RAIL TO BE INSTALLED TO FLOOR REVEAL WITH BRUSHED STEEL FINISH

330

330 1000

THIRD FLOOR 8500

4000

3670

2670

N9 N6

N4

N11 N12 4000

7000

B3

B3

CEDAR WOOD SUN SHADES MECHANICALLY FASTENED TO WALL CONSTRUCTION

N10

12500 N6

B3

N6

15500

N5

330

N6

T/O PARAPET

5010

T.O ROOF CONST. 15500

PROJECT NORTH

FIRSTLEVEL FLOOR 1 N10

1 A302

N9

N9

0

N9

NORTH ELEVATION SCALE:

1 : 100

1 A402

_________

1-A

1-B

2

3-A

3-B

3-C

4

TOP OF ATRIUM

T/O ATRIUM 19000

3500

N9

3500

N9

3100

1090

19000

N5

Name

1390

T.O ROOF CONST.

T/O PARAPET

N6

BCIN 37344 . 30787 BCIN

3000

1940

N6

1280

N9

Signature

chadstewART.DESIGNS

15500

1480

N9

15500

37344 . 30787

CHAD STEWART

1940

N9

4000

B3

12500

1940

3950

2650

430

7000

LEVEL 4 N5

2440

4000

1940

N5

3430

3000

4500

4500

330

1170

1310 3110

4500

B3

610 RAYMUR AVE VANCOUVER, BC

LEVEL 2

8600

1960

SECOND FLOOR 4500 N8

STRATHCONA CULINARY MARKET

N6 1220

4000

N9

N9

JOB TITLE

N9

2450

N8

2014-04-28 4:57:23 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

8500

1560

8500

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department

LEVEL 3

1940

1220

THIRD FLOOR

330

N14

SHEET TITLE

NORTH SOUTH ELEVATIONS

FIRSTLEVEL FLOOR 1 N9

2 A302

SOUTH ELEVATION SCALE:

1 : 100

N6

N12 N13

N10

N12 N13

N5

N12

N10

0

N13

SCALE

SHEET NO. 1 : 100

DRAWN CHAD STEWART

CHECKED CS

A302


TRUE NORTH

PROJECT NORTH

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

1-B

1 3-B A402

_________

2 3-A

3-C 4

TOP OF ATRIUM

T/O ATRIUM

19000

19000

T.O ROOF CONST.

T/O PARAPET

15500

15500

COMMERCIAL GREENHOUSE 406

CORRIDOR C-4

P2

GREENHOUSE PRODUCTION ROOM 402

W2 LEVEL 4 12500

BAKING KITCHEN 307

PANTRY 307.2

FRIDGE 307.3

P3

W1

ATRIUM SPACE A-1

CORRIDOR C-3 P3

P3

CORRIDOR C-3

P2

GEN. TEACHING KITCHEN 305

THIRD FLOOR

LEVEL 3

8500

8500

W2

EX. OFFICE 216

STUDENT TEACHER RESOURCE 211

W2

ATRIUM SPACE A-1

CORRIDOR C-2

CORRIDOR C-2

P2

LECTURE KITCHEN 206

LEVEL 2

W1

LEVEL 2

4500

4500

PRODUCE VENDORS 1,2,3 113

PRODUCE VENDORS 1,2,3 113

W2

VENDOR 3 108

FIRST FLOOR

FIRSTLEVEL FLOOR 1

0

0

WATER CICTERN ROOM 004

W4

37344 . 30787

CHAD STEWART Name

Signature

chadstewART.DESIGNS

BCIN 37344 . 30787

W4

BCIN

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department JOB TITLE

2

2014-04-28 4:56:12 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

A401

STRATHCONA CULINARY MARKET

EAST WEST SECTION SCALE:

610 RAYMUR AVE VANCOUVER, BC

1 : 100

SHEET TITLE

EAST WEST BUILDING SECTION SCALE

SHEET NO. 1 : 100

DRAWN CHAD STEWART

CHECKED CS

A401


TRUE NORTH

PROJECT NORTH

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

2 A401

_________

B

C

D

E

2 _________

F

A403

TOP OF ATRIUM

T/O ATRIUM

3500

19000

3500

19000

T.O ROOF CONST.

T/O PARAPET W2

15500

COMMERCIAL GREENHOUSE 406

3000

15500

LEVEL 4 7000

12500 N12

CORRIDOR C-3 ATRIUM SPACE A-1

8500

4000

BRIDGE WAY BR-2

N12

3 _________

W2

STUDENT GREEN-HOUSE 302

A501

LEVEL 3 8500

N12

CORRIDOR C-2

STUDENT LOUNGE 202

STUDENT GREENHOUSE 201

SECOND FLOOR

4000

THIRD FLOOR

STUDENT WORK SPACE 301

4000

N12

BRIDGEWAY BR-3

LEVEL 2

4500

4500 N12 P2

VENDOR 1 112

FRIDGE 105

FIRST FLOOR

4500

4500

PRODUCE VENDORS 1,2,3 113

N12

W1

Name

Signature

chadstewART.DESIGNS

LEVEL 1

BCIN 37344 . 30787 BCIN

0

W4

WATER CICTERN ROOM 004

P1

MECHANICAL ROOM 002

3500

0

37344 . 30787

CHAD STEWART

W4

***MASTER LEVEL01 -3500

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department JOB TITLE

1

2014-04-28 4:55:44 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

A402

NORTH SOUTH SECTION SCALE:

STRATHCONA CULINARY MARKET

1 : 100

610 RAYMUR AVE VANCOUVER, BC

SHEET TITLE

NORTH SOUTH BUILDING SECTION SCALE

SHEET NO. 1 : 100

DRAWN CHAD STEWART

CHECKED CS

A402


TRUE NORTH

PROJECT NORTH

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

2 _________

CURTAIN WALL MECHANICAL FASTENERS TO BE BOLTED TO PSL TIMBER COLUMNS

A501

ALUM. ROOF RAIN WATER CATCHMENT SYSTEM

STRUCTURAL STEEL HSS BEAM

CURTAIN WALL MECHANICAL FASTENERS TO BE BOLTED TO PSL TIMBER COLUMNS

STRUCTURAL PSL TIMBER ATRIUM ROOF BEAM TREATED FOR MOISTURE PROTECTION

T/O PARAPET 15500

THERMALLY BROKEN ALUMINUM WINDOW ASSEMBLY

COMMERCIAL GREENHOUSE 406

CANT STRIP CONTINUOUS FLASHING W/ EXPANSION CREASE

STRUCTURAL STEEL MOMENT CONNECT ION BLADES MECHANICALLY AND EPOXY SET WITHIN PSL COLUMNS AND COMPOSITE FLOORING SYSTEM

HBV COMPOSITE FLOOR SYSTEM MARMOLEUM FLOORING 150mm REIN. CONC. PERFERATED STEEL BLADE COMPOSITE CONNECTORS 25mm RIGID INSULATION 150 CROSS LAMINATED TIMBER

HBV SLAB CONST. MARMOLEUM FLOORING 150mm CONC. PERFERATED STEEL BLADE REIN. 25mm RIGID INSULATION 150mm CROSS LAMINATED TIMBER

RAIN WATER DOWN SPOUT PIPE LEVEL 4 12500

STRUCTURAL STEEL MOMENT CONNECT ION BLADES MECHANICALLY AND EPOXY SET WITHIN PSL COLUMNS AND COMPOSITE FLOORING SYSTEM

STUDENT GREEN-HOUSE 302

FLASHING TO BE CONTINUOUS FROM COMPOSITE WOOD PANELS TO CONCRETE PANELS LIGHTWEIGHT CONC. PANELS TO BE ANGLED AWAY FROM WALL

CONTINUOUS SPRAYED INSUL. V.B

HBV SLAB CONST. MARMOLEUM FLOORING 150mm CONC. PERFERATED STEEL BLADE REIN. 25mm RIGID INSULATION 150mm CROSS LAMINATED TIMBER

DRIP EDGE

PREFAB ALUM. PANEL BRACING EPOXY SET WITHIN TIMBER FLOOR STRUCTURE CONTINUOUS SPRAYED INSULATION V.B THERMALLY BROKEN ALUM. WINDOW ASSEMBLY SLOPED CONC. WALKWAY AWAY FROM WALL CONST.

EXTEND VERTICAL MULION+ INSULATION BETWEEN

HBV COMPOSITE FLOOR SYSTEM MARMOLEUM FLOORING 150mm REIN. CONC. PERFERATED STEEL BLADE COMPOSITE CONNECTORS 25mm RIGID INSULATION 150 CROSS LAMINATED TIMBER

HBV SLAB CONST. MARMOLEUM FLOORING 150mm CONC. PERFERATED STEEL BLADE REIN. 25mm RIGID INSULATION 150mm CROSS LAMINATED TIMBER

STRUCTURAL STEEL MOMENT CONNECT ION BLADES MECHANICALLY AND EPOXY SET WITHIN PSL COLUMNS AND COMPOSITE FLOORING SYSTEM STRUCTURAL PSL TIMBER COLUMN C/W MOISTURE PROTECTION TREATMENT RAIN WATER DOWN SPOUT PIPE THERMALLY BROKEN ALUM. FRAME CURTAIN WALL SYSTEM CURTAIN WALL MECHANICAL FASTENERS TO BE BOLTED TO PSL TIMBER COLUMNS

LEVEL 2 4500

SPRAYED INSULATION V.B /A.B W1 WALL CONSTRUCTION

STEEL STUD WALL CONS. W/ BATT. INSUL. C/W GYPSUM INT.

FRIDGE 105

PSL STRUCTURAL COLUMN

RIGID GASKET BTW TIMBER COL. + CONC.

LEVEL 3

STUDENT GREENHOUSE 201

STEEL PLATE MECH. FASTENED TO COLUMN + PSL BEAM

PERF. STEEL CONECTION BLADE EPOXY SET IN TIMBER COLUMN

A501

8500

ALUM. + CEDAR SUNSHADE MECH FASTENED TO PANELING

THERMALLY BROKEN ALUM. WINDOW ASSEMBLY

1 _________

HBV COMPOSITE FLOOR SYSTEM MARMOLEUM FLOORING 150mm REIN. CONC. PERFERATED STEEL BLADE COMPOSITE CONNECTORS 25mm RIGID INSULATION 150 CROSS LAMINATED TIMBER

PREFAB ALUM. PANEL BRACING EPOXY SET WITHIN TIMBER FLOOR STRUCTURE

CONC. PANELING BEYOND

CURTAIN WALL MECHANICAL FASTENERS TO BE BOLTED TO PSL TIMBER COLUMNS

37344 . 30787

CHAD STEWART Name

THERMALLY BROKEN ALUM. FRAME CURTAIN WALL SYSTEM

Signature

chadstewART.DESIGNS

BCIN 37344 . 30787 BCIN

STRUCTURAL STEEL MOMENT CONNECT ION BLADES MECHANICALLY AND EPOXY SET WITHIN PSL COLUMNS AND COMPOSITE FLOORING SYSTEM STRUCTURAL PSL TIMBER COLUMN C/W MOISTURE PROTECTION TREATMENT

STEEL ANCHOR BOLT EXPANSION JOINT

RAIN WATER ROOF RUN-OFF DOWNSPOUT

150mmSTEEL REIN CONC SLAB POLISHED FINISH

FIRSTLEVEL FLOOR 1 0

EXP. JOINT W/ THERMAL BREAK

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department

4 _________

HAMBRO STRUCTURAL STEEL TRUSS SYSTEM

A502

STEEL ANGLE IRON MECH. FASTENED TO TRUSS AND FND WALL

JOB TITLE

MECHANICAL ROOM 002

STRATHCONA CULINARY MARKET 610 RAYMUR AVE VANCOUVER, BC

WATERPROFFING MEMBRANE

2014-04-28 4:55:27 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

50mm RIGID INSULATION INSULATION CANT STRIP

STEEL REIN. CAST IN PLACE CONC. SLAB

125mm WEEPING TILE FND DRAINAGE C/W FILTER SOCK

***MASTER LEVEL01

SHEET TITLE

-3500

50mm RIGID INSULATION

WALL SECTIONS

COMPACT GRANULAR FILL

SCALE

1 A403

SECTION THROUGH WALL PROJECTION SCALE:

1 : 50

2 A403

SECTION THROUGH REAR ATRIUM + GREENHOUSE SCALE:

1 : 50

SHEET NO. 1 : 50

DRAWN CHAD STEWART

CHECKED CS

A403


TRUE NORTH

PROJECT NORTH

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

ROOF RAIN WATER CATCHMENT GUTTER ATRIUM GLAZING MECHANICAL FASTENERS TO BE BOLTED TO PSL TIMBER COLUMNS THERMALLY BROKEN TRIPLE PANE ALUM. ROOF GLAZING SYSTEM STRUCTURAL PSL TIMBER COLUMN C/W MOISTURE PROTECTANT STAIN

RADIANT IN FLOOR HEATING + COOLING THERMALLY BROKEN SPANDREL PANEL

STEEL REINFORCED CAST IN PLACE CONCRETE

STEEL REINFORCMENT REBAR

9째 .2 85

STRUCTURAL PSL BEAM MECHANICALLY FASTENED TO ROOF BEAM + REAR COLUMN

STEEL MOMENT BLADE CONNECTION MECHANICALLY FASTENED + EPOXY SET AS WITH PSL COLUMN + CLT PANELS

PERFERATED STEEL SHEER ENFORCEMENTS EPOXY SET WITHIN CLT PANELS

ATRIUM GLAZING MECHANICAL FASTENERS TO BE BOLTED TO PSL TIMBER COLUMNS

STRUCTURAL PSL TIMBER COLUMN C/W MOISTURE PROTECTANT STAIN

RIGID INSULATION TO ENSURE UPWARD HEAT MOVEMENT OF RADIANT IN FLOOR HEATING AND COOLING

STEEL MOMENT BLADE CONNECTION MECHANICALLY FASTENED + EPOXY SET AS WITH PSL COLUMN + CLT PANELS

THERMALLY BROKEN ALUM. FRAME CURTAIN WALL SYSTEM

0째 10

2 A501

RAIN WATER GUTTER DOWNSPOUT

MOMENT CONNECTION AT TOP OF ATRIUM SCALE:

1

1 : 10

A501

MOMENT CONNECTION AT ANGLED ATRIUM COLUMN

37344 . 30787

CHAD STEWART Name

SCALE: 1 : 25

Signature

chadstewART.DESIGNS

BCIN 37344 . 30787 BCIN

CAST IN PLACE STEEL REINENFORCED CONCRETE SLAB

STEEL REINFORCEMENT REBAR

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department JOB TITLE

STEEL SHEET REINFORCEMENTS EPOXY SET WITHIN PSL TIMBER BEAM @ 200mm O.C

PERFERATED STEEL SHEER REINFORCEMENTS EPOXY SET WITHIN CLT FLOOR PANELS

5 PLY PREFABRICATED CLT PANEL C/W PERFERATED STEEL SHEER CONNECTORS EPOXY SET WITHIN CLT PLYS

STRATHCONA CULINARY MARKET

2014-04-28 4:55:05 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

PSL STRUCTURAL BEAM C/W STEEL SHEER CONNECTORS EPOXY SET WITHIN BEAM SECTIONS @ 200mm O.C

610 RAYMUR AVE VANCOUVER, BC

SHEET TITLE

SECTION DETAILS 3 A501

FLOOR CONSTRUCTION AT BEAM SCALE:

1 : 50

SCALE

SHEET NO.

As indicated

DRAWN CHAD STEWART

CHECKED CS

A501


TRUE NORTH

PROJECT NORTH

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

HIGH DENSITY STRATIFIED TIMBER PANELS

째 80

PLYWOOD SHEATHING

AIR BARRIER PSL STRUCTURAL REAR ANGLED COLUMN 25mm RIGID INSULATION

GYPSUM BOARD PAINT FIN. HIDDEN MECHANICAL FASTENERS FOR PANEL TO WALL CONSTRUCTION

25mm AIR SPACE

6MIL POLY VAPOUR BARRIER

PERFERATED STEEL SHEER CONNECTION EPOXY SET WITHIN PSL TIMBER COLUMN RUBBERIZED MATERIAL SEPARATION GASKET

BATT INSULATION

20

CONC. COLUMN FOOTING / FOUNDATION

METAL STUD WALL CONSTRUCTION [ NON STRUCTURAL] PSL STRUCTURAL COLUMN

FIRSTLEVEL FLOOR 1 0

20

HIGH DENSITY STRATIFIED TIMBER PANELS 25mm AIR SPACE PLYWOOD SHEATHING 25mm RIGID INSULATION

ANCHOR BOLT TO BE SET INTO CONC FND WALL

GYPSUM BOARD PAINT FIN. AIR BARRIER 6mil POLY VAPOUR BARRIER 152 METAL STUD WALL C/W BATT INSULATION

37344 . 30787

CHAD STEWART Name

Signature

chadstewART.DESIGNS

BCIN 37344 . 30787 BCIN

STEEL FRAME FOR GLASS CANOPY BELOW MECHANICALLY FASTENED TO WALL STRUCTURE

1 A502

TYPICAL CORNER COLUMN DETAIL SCALE:

1 : 10

4 A502

ANGLED COLUMN AT GROUND SCALE:

1 : 10

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department JOB TITLE

STRATHCONA CULINARY MARKET

2014-04-28 4:54:48 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

610 RAYMUR AVE VANCOUVER, BC

SHEET TITLE

PLAN DETAILS

SCALE

SHEET NO. 1 : 10

DRAWN CHAD STEWART

CHECKED CS

A502


TRUE NORTH 2184 1524

3/4" PLYWOOD BACKING BETWEEN STUDS, TYP.

419 MIN. 1' - 6 3/4" MAX.

419 MIN.

1105

1' - 6 3/4" MAX.

MIN.

457

457

457

457

914

914

MIN.

MIN.

MIN.

SD

SD

SH2 SH1

457

8 _________ A600BC

TYPE GB24 GB30 GB36 GB48 GB36x54

610

456

LINE INDICATES 1'-0" HIGH 1/2" THICK PLYWOOD AT BASE OF WALL ON STUDS

WASHROOM STALLS AND URINAL ELEVATION SCALE: 1 : 25

457

914

MIN.

MIN.

610

DASHED LINE INDICATES WOOD BACKING

152

152 737

SD

430

1199 MAX.

SHOWER SEAT

991

1117

876

978

3'-11 1/4" MAX.

HD(BF)

800 MAX.

GB36X54

HD

SD

LENGTH

24" 30" 36" 48" 36" x 54"

TYPICAL BACKING NOTES: 1. ALL WOOD BACKING TO BE 3/4" THICK PLYWOOD. INSTALL BETWEEN METAL STUDS BEHIND GYPSUM BOARD FINISH. REFER TO OUTLINE SPECIFICATIONS. STUDS 16" O.C. TYP. UNLESS NOTED OTHERWISE. 2. ALL BACKING TO BE SIZED AND LOCATED AS OUTLINED IN BACKING DETAILS UNLESS OTHERWISE SPECIFIED OR DETAILED. 3. REFER TO WASHROOM AND SHOWER PARTITION ASSEMBLY DRAWING FOR ADDITIONAL DETAILS. 4. REFER TO PARTITION SCHEDULE FOR LOCATION OF 12" HIGH PLYWOOD AT BASE OF WALL AND COORDINATE WITH INSTALLATION OF BACKING. 5. REFER TO FLOOR PLANS FOR LOCATIONS OF TELEVISIONS AND BABY CHANGE STATION. 6. CONTRACTOR TO COORDINATE WITH TRADES FOR INSTALLATION OF WOOD BACKING. 7. EXTENT OF BACKING SHOWN IS APPROXIMATE AND MAY VARY DEPENDING ON SITE CONDITIONS. 8. REFER TO A103 FOR ADDITIONAL WOOD BACKING DETAILS.

1982

SD

914 2743

1524

1067

TYP. BARRIER FREE

TYP. SHOWER STALL

MIN.

TYP. WASHROOM VANITY ELEVATION

7

8

SCALE: 1 : 25

A600BC

533

152 611

SD

1162 MAX.

991 482 MIN.

915

INSULATE EXPOSED PIPES

997 MAX

GB24

GB24 610

459

457

SD

TO U/S MIRROR GLAZING

RETURN PLYWOOD 2'-0" AT COUNTER SIDESPLASH

TTD 610 TYP.

1200 MAX.

916 MINIMUM TYP. STANDARD

SD

PLYWOOD

MAX.

1219

MAX.

304

445

LINE INDICATES EXTENT OF 3/4" PLYWOOD BACKING BETWEEN THE STUDS

T/O PLYWOOD 914

381

305

381 CH

1523 MINIMUM

A600BC

534

304

2'-0" X 3'-0" MIRROR FRAME

458

8. ALL GRAB BARS: - 1-1/2" DIAMETER AND 1-1/2" CLEAR FROM WALL - STAINLESS STEEL, W/ KNURLED GRIP & CONCEALED FLANGE

SCALE: 1 : 25

A600BC

915

SCALE: 1 : 25

7. PROVIDE SEALANT AT ALL ACCESSORY CONNECTIONS AT FLOOR AND WALL PENETRATIONS AND AROUND FIXTURES.

TYP. SHOWER STALL PLAN

4

2'-3 1/2" MIN.

813 MIN.

TYP. BARRIER FREE

6

SCALE: 1 : 25

2'-10' MAX.

432 MIN.

UNIVERSAL WASHROOM ELEVATION

1'-6 3/4" MAX.

TTD

838 MIN.

3'-0" MAX.

MIRROR GLAZING

997 TO U/S

INSULATE EXPOSED PIPES

864 MAX.

GB36

813 MIN.

SEAT COVER PROVIDED FOR BARRIER FREE WC ONLY GB24

2. INFORMATION ON THIS SHEET IS AS PER THE BRITISH COLUMBIA BUILDING CODE 2006.

* REFER TO FLOOR PLANS FOR SPECIFIED PLUMBING FIXTURES

3/4" PLYWOOD BACKING (BEHIND GYP. BD. AND BETWEEN STUDS)

MIN.

1. THIS IS A GRAPHIC REPRESENTATION FOR BUILDING CODE COMPLIANCE AND REVIEW.

4. REFER TO PLUMBING DRAWINGS FOR ACTUAL PLUMBING FIXTURE TYPES.

TYP. WASHROOM VANITY PLAN

3

CLEAR APPROACH

SD

H SS

NOTES:

6. BACKING AS INDICATED ON FLOOR PLANS AND DETAILS.

A600BC

458

1219 MIN.

SD

3. REFER TO FLOOR PLANS FOR ACTUAL DIMENSIONS AND LAYOUT IN ORDER TO COMPLETE THE WORK REQUIRED.

*REFER TO FLOOR PLANS FOR SPECIFIED PLUMBING FIXTURES

*REFER TO FLOOR PLANS FOR SPECIFIED PLUMBING FIXTURES

TYP. STANDARD

1065

SH1

SD

SHOWER SEAT

L1

+/- 3962

18 3/4" MAX.

ALL DRAWINGS ARE THE PROPERTY OF THE CONSULTANT AND MUST BE RETURNED ON REQUEST. CONTRACTOR TO CHECK ALL DIMENSIONS O N S IT E A N D V E R I F Y. D O N O T S C A L E D R A W I N G S.

SD

5. REFER TO PROJECT COVER SHEET AND PLUMBING PLANS (ARCHITECTURAL SET) FOR ABBREVIATIONS.

1'-8' MAX.

914

SD

HD (BF)

GRAVITY HINGES REQUIRED

DASHED LINE INDICATES WOOD BACKING

457

1200 MAX.

813 MIN.

2'-10" MAX.

1'-4 1/2" MIN.

1'-6 3/4" MAX.

HD

12 _________ A600BC

18" MIN.

DASHED LINE INDICATES WOOD BACKING

TTD

838 MIN.

3' - 0" MAX.

TYP. SHOWER STALL

7 A600BC

SCALE: 1 : 25

A600BC

SEAT COVER PROVIDED FOR BARRIER FREE WC ONLY GB24

5

BF SHOWER STALL

_________

TYP. WASHROOM STALLS AND URINAL PLAN

610

A600BC

1068

MIN.

813 MIN.

13 _________ A600BC

GB36

1524 MIN. CLEAR

914

SCALE: 1 : 24

1' - 6 3/4" MAX.

3/4" PLYWOOD BACKING BETWEEN STUDS, TYP.

610

CLEAR APPROACH

914 MINIMUM

TYP. BARRIER FREE

2

L1

NOTE: BARRIER FREE DOOR TO BE EQUIPPED WITH A SIDE LATCH ON THE DOOR INTERIOR AND A DOOR PULL ON THE DOOR EXTERIOR NEAR THE LATCH SIDE OF THE DOOR

DOOR PULL BF STALL ONLY 1524 MINIMUM

UNIVERSAL WASHROOM PLAN

L1

SD

PROJECT NORTH

1219

TTD

---

BCS (OPTIONAL)

*REFER TO FLOOR PLANS FOR SPECIFIED PLUMBING FIXTURES

U1

_________

TTD

WC1

800 MIN.

419 MIN.

305

GB36X54

WC2

MIN.

1524

5 A600BC

1699 MIN.

HD

GB24

U1

_________

CLEAR OPENING 279

A600BC

2743

457

GB24

10 A600BC

L4

_________

1

914

GB24

GB36

507

GB36

9 _________ A600BC TTD (NIC)

914

MIN.

457

3/4" PLYWOOD BACKING BETWEEN STUDS, TYP.

SD

GB24

WC4

3/4" PLYWOOD BACKING BETWEEN STUDS, TYP.

A600BC

SHOWER STALL ELEVATION SCALE: 1 : 25

13 _________ A600BC MIRROR

434

9 A600BC

WC SECTION (FLOOR)

WC SECTION (WALL)

10

SCALE: 1 : 25

A600BC

SCALE: 1 : 25

11 A600BC

RESERVED SCALE: 1 : 25

12 A600BC

Signature

chadstewART.DESIGNS

305

INSULATE EXPOSED PIPES

37344 . 30787

CHAD STEWART

EQ

Name

660

BCIN 37344 . 30787 BCIN

997

864 MAX.

737 MIN.

MIN. CLEAR AREA

686 MIN.

271 MIN.

997 TO U/S

MIRROR GLAZING

864 MAX.

737 MIN.

INSULATE EXPOSED PIPES

+/- 813 EQ

203 MIN.

229

229

MIN. CLEAR AREA

686 MIN.

203 MIN. 279 MIN.

997 TO U/S

MIRROR GLAZING

3'-0" MAX.

838 MIN

813 MIN.

1'-6" MAX.

406 MIN.

254

2'-10" MAX.

GB24

38 MIN.

3'-0" MAX.

1'-4 1/2" MIN.

1'-6 3/4" MAX.

38 MIN.

GB36

TTD

14 _________ A600BC

457

DASHED LINE INDICATED 3/4" PLYWOOD BACKING FOR WALL HUNG SINK SUPPORT

864 - MAX.

914 MIN.

GB24

838 MIN.

457

2' x 3' MIRROR

SEAT COVER PROVIDED FOR BARRIER FREE WC ONLY

OF GB

457

813 MIN.

914 MIN.

GB36

TTD

DASHED LINE INDICATES WOOD BACKING

SEAT COVER PROVIDED FOR BARRIER FREE WC ONLY

OF GB

457

WALL HUNG TOILET SHOWN FOR REFERENCE ONLY, REFER TO FLOOR PLANS FOR ACTUAL FIXTURE USED FOR APPROPRIATE MOUNTING HEIGHTS

2'-10" MAX.

DASHED LINE INDICATES WOOD BACKING

MIRROR

FLOOR MOUNT TOILET SHOWN FOR REFERENCE ONLY, REFER TO FLOOR PLANS FOR ACTUAL FIXTURE USED FOR APPROPRIATE MOUNTING HEIGHTS

434

VANITY SECTION SCALE: 1 : 25

SINK SECTION (WALL)

13 A600BC

SCALE: 1 : 25

14 A600BC

L4 SINK ELEVATION SCALE: 1 : 25 BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY architectural science department JOB TITLE

REFER TO PLANS FOR LOCATION OF CHANGE STATION ON WALL WITHIN ROOM

DASHED LINE INDICATES WOOD BACKING

STRATHCONA CULINARY MARKET

2' - 0"

610 RAYMUR AVE VANCOUVER, BC

2' - 10"

SSH

TO SPOUT

914 MAX.

G

153

FIN. FLOOR

1194 MAX.

762

1194 MAX. B.F

SHEET TITLE 4' - 7" MAX. TYP. SHOWERS

1' - 8"

1' - 11"

3' - 2"

1168 MAX. - BF WR & SHOWERS

2014-04-28 2:28:02 AM E:\4TH YEAR\STUDIO FINAL\REVIT\BUILDING MODEL - chad drafting.rvt

51 MAX. CH

SCALE

V. OCT. 30/12 - KY

15 A600BC

HOOK SECTIONS SCALE: 1 : 25

16 A600BC

BABY CHANGE STATION SCALE: 1 : 25

BARRIER-FREE (BCBC 2006) MOUNTING HEIGHTS AND WOOD BACKING LOCATIONS SHEET NO.

As indicated

17 A600BC

SSH SECTION SCALE: 1 : 25

18 A600BC

GARBAGE SECTION SCALE: 1 : 25

19 A600BC

BF DF SECTION SCALE: 1 : 25

DRAWN CHAD STEWART

CHECKED CS

A600BC


CHAD STEWART

46 Nicholson Cres. Minesing Ontario, L0L 1Y3 | (Cell) 705-220-8007 | cstewart36765@gmail.com

Professional Summary A Project Coordinator who is hands-on and result oriented with experience working closely with architects and developers to ensure successful completion of projects on time and under budget. I am Safety-conscious and detailoriented with a large background in architectural design and construction scheduling, offering a comprehensive knowledge of the principles, techniques and instruments used in construction process, building sciences and architectural innovation.

Skills l l l l l

Subcontractor management Strong interpersonal skills Material application knowledge Excellent customer relations Proficient in AutoCAD + BIM [Revit]

l l l l l

Project scheduling Design experience Budgeting Building codes knowledge Integrated design

Work History Project Coordinator Michael Green Architecture

Feb 2014 - Apr 2014 Vancouver, BC

l l

Reviewed plans and specs during the schematic design and pre-construction. Conducted weekly production and operations contractor meetings, which facilitated stronger communication and the ability to resolve critical issues.

l l

Performed regular job site observations to provide direction for all general contractor personnel. Avoided construction delays by efficiently following through with all site inspections in a timely manner.

Architectural Design Coordinator / Technologist Jasper Design [ Residential Design / Build ] l l l l

Feb 2012 - Aug 2012 Collingwood, ON

Met with municipal building department and other governing agency officials to coordinate approvals. Coordinated with clients, consultants and contractors during construction bidding. Consulted with clients to determine functional and spatial requirements of the new structure. Completed design and documentation drawings for construction and permit approvals

Capital Infrastructure Inspector / Technologist City of Barrie | Capital Asset Management Dept. Barrie, ON l l l

Inspected project sites to monitor progress and adherence to design specifications, safety protocols and city's sanitation standards. Analyzed survey reports, maps, blueprints and other topographical and geologic data to effectively plan projects. Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.

Carpentry / Framing Apprentice Chris Primrose Construction l l l l

Jan 2010 - Apr 2011

Jan 2008 - Nov 2008 Barrie, ON

Read and interpreted blueprints and construction documents to determine project directives. Properly poured, set and cured concrete. Specialized in ICF foundations, and framing Read and effectively used truss-roof prints to cut and set roofs accordingly.

Education Bachelor of Technology: Architecture and Engineering British Columbia Institute of Technology

2014 Burnaby, BC

Advanced Diploma of Architectural and Construction Engineering Fanshawe College

2012 London, ON

Accomplishments l l

Graduated with Honors in both degrees Led a 18-person design team through all phases of building projects for TED Talks, Vancouver.


A BIG THANK YOU TO MY MENTORS PETER LEVAR

WESLEY WOLLIN

RON KATO

MICHEL LABRIE


...keep drawing... cstewart36765@gmail.com 705 220 8007


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.